Attn: Emil Pierson, Community Development Director

Size: px
Start display at page:

Download "Attn: Emil Pierson, Community Development Director"

Transcription

1 November 27, 2018 City of Centralia 118 Maple Street Centralia, A Attn: Emil Pierson, Community Development Director Re: Floodplain Cut/Fill Report Dear Emil, HBH Consulting Engineers, Inc (HBH) completed a volumetric analysis of the Alexander on the River project. A finished ground grading plan was generated based around a site plan completed by D Bol Design, LLC. The volumetric analysis was created using the AutoCAD Civil3D program by comparing the finished ground surface to the existing ground survey completed by Latitudes N, Inc. Through discussions with EST Consultants Ray alton, PhD, PE, it was determined that three potential 100-year base flood elevations (BFE) exist. The current BFE is based on the National eodetic Vertical Datum of 1929 (NVD 29). The second BFE was based on a preliminary study completed in 2010 and is NVD 29. This preliminary BFE is no longer considered current. Finally, Ray alton informed HBH of a preliminary BFE of NVD 29. EST Consultants believes this revised BFE is based on best science and is working with the City to finalize this figure as the revised BFE. Due to the wide-ranging BFE, HBH developed the volumetric analysis based on both the highest and the lowest BFE. The volumetric analysis compared only the portion of the existing ground surface currently inside the existing floodplain. Excluded from the cut/fill analysis was any fill at or above the BFE even when placed inside the existing floodplain. The proposed retention pond on site will be hydraulically connected to the floodplain. Cut will be removed from this area in order to create the retention pond; this cut will be considered compensatory storage. During a storm, it is acknowledged that a portion of the compensatory storage will be occupied by stormwater runoff. Using the HM2012 software package from the ashington Department of Ecology, the maximum, or peak depth, of the stormwater retention pond is anticipated to be approximately 2.75 ft based on historical storm data from the past fifty years. A 3 ft depth of retained water was assumed and the associated volume was removed from the compensatory storage calculations. The cut/fill analysis results are included in Table 1 below. l:\\2-correspondence\outbox\ cut-fill statement\statement of floodplain cut-fill balance.docx

2

3 APPROXIMATE LOCATION OF FLOODAY BOUNDARY TOE OF SLOPE TOP OF SLOPE EX. FENCE N 89 34'00" 65.79' N 00 26'00" ' NO DISTURBANCE ALLOED IN FLOODAY. DENSE BLACKBERRIES MAP. ELEVATION: 173.3' DENSE BLACKBERRIES. N 89 34'00" E SS SS SS SS EDE OF ATER AVERAE: ±156.1' EX BUILDIN. MAP. N90 00'00" 79.70' EX. DRIVEAY EX. FIRE HYDRANT EX. SIDEALK TO HOUSE (TYP) MAP. EX. SS MANHOLE RIM: ' IE OUT (E): 166.0' IE IN (): ' EX. SS MANHOLE RIM: ' IE OUT (E): ' IE IN (): N 89 34'00" ,698 SQ FT ZONIN: R-3 N 90 00'00"E 14.00' S 00 00'00" 26.00' N 00 00'00" E ' S 00 00'00" ' S 90 00'00"E S 00 25'58" ' S 00 25'58" E 60.00' TOP OF BANK ,643 SQ FT SS 1 1 of 5 EXISTIN CONDITIONS EXISTIN L:\\4-Design\D\Floodplain Analysis.dwg

4 BLD-5 TOTAL 4716 HEATED SQ.FT SQ.FT. FOOT PRINT 4 CARPORTS / 4 CARPORTS BLD-4 TOTAL 2000 HEATED SQ.FT SQ.FT. FOOT PRINT 2 ARAES / 2 CARPORTS BLD-3 TOTAL 5846 HEATED SQ.FT SQ.FT. FOOT PRINT 8 ARAES / 2 CARPORTS PROPOSED KEYSTONE RETAININ ALL. LANDSCAPE AREA O S PROPOSED KEYSTONE RETAININ ALL. BLD-2 TOTAL 2044 HEATED SQ.FT SQ.FT. FOOT PRINT 2 ARAES / 2 CAR PORTS BLD-1 TOTAL 6,681 HEATED SQ.FT SQ,FT, FOOT PRINT 6 ARAES / 6 CARPORTS PROPOSED LIVIN SPACE CANTILEVERED OVER RETAININ ALL PROPOSED RETAININ ALL AT BACK OF ARAE. 24' (TYP) R23' R23' PROPOSED RETAININ ALL PROPOSED STPED RETAININ ALLS BLD-6 TOTAL 8748 HEATED SQ.FT SQ.FT. FOOT PRINT 8 ARAES BLD-7 TOTAL 8748 HEATED SQ.FT SQ.FT. FOOT PRINT 8 ARAES 18' (TYP) 14 PROPOSED RESIDENT PARKIN STALLS. PROPOSED FLOODPLAIN INTERCONNECTION CULVERT. 24' (TYP) 10' (TYP) R23' R23' R18' R24' 24' (TYP) R24' MAP. ELEVATION: 173.3' R12' 30' (TYP) ALEXANDER STREET MAP. PROPOSED RETAININ ALL AT BACK OF ARAE 31' BLD-8 TOTAL 6,681 HEATED SQ.FT SQ,FT, FOOT PRINT 6 ARAES / 6 CARPORTS R15' R7' 24' PROPOSED UEST PARKIN AREA ' x 16' MAP. 2 2 of 5 SITE PLAN Designed By: MCD Drawn By: ARB Checked By: ARC SITE L:\\4-Design\D\Floodplain Analysis.dwg

5 TO = ' BO = ' RADE SLOPE FROM TOP OF ALL BACK TO EX. ROUND, TO = ' BO = ' ELEV = 158.0' BUILDIN ELEV = 159.0' TO = ' BO = ' 168' ' (TYP) ' TBC (TYP) ARAE S = ' = ' 158' BUILDIN ARAE TO = ' BO = ' TO = 168.3' BO = 164.3' ARAE 168' 5' (TYP) BUILDIN ARAE = ' ELEV = 158.0' ELEV = 159.0' TO = ' BO = ' TO = ' BO = ' TO = ' BO = ' ' (TYP) ' TBC (TYP) TO = ' BO = ' RADIN L:\\4-Design\D\Floodplain Analysis.dwg TO = ' BO = ' TO = ' BO = ' BUILDIN BUILDIN 168' TO = ' BO = ' S = ' = ' ARAE ' (TYP) ' TBC (TYP) ARAE TO = ' BO = ' -3:1 = ' S = ' ELEV = 160.0' ELEV = 158.5' BUILDIN BUILDIN ARAE ARAE 168' BUILDIN OFFSET 5' (TYP) = ' MAP. ELEVATION: 173.3' TOP OF SLOPE TO MATCH EXISTIN ROUND ELEVATION TO = 168.3' BO = 164.3' TO = 175.7' BO = 175.7' TO = ' BO = ' TO = ' BO = ' TO = ' BO = ' MAP. BOTTOM OF ALL TO MATCH EX RADE. TO = 176.0' BO = 176.0' TO = ' BO = ' S TO = ' BO = ' TO = ' BO = ' TO = ' BO = ' TO = ' BO = ' 1. THE FINISHED RADE SURFACE SHON DICTS THE FINAL RADE ONCE ALL LANDSCAPIN HAS BEEN COMPLETED. SITE RADIN SHALL TAKE INTO ACCOUNT, AND ADJUST AS NECESSARY, FOR ANY LANDSCAPIN, BARK, OR RAVEL ADJUSTMENTS. TO = ' BO = ' TO = ' BO = ' OH 3 RADIN/RETAININ 11/27/2018 ALL PLAN 3 of 5

6 MAP. ELEVATION: 173.3' MAP. S SITE BOUNDARY BASE FLOOD ELEVATION EARTHORKS SUMMARY SITE AREA CUT FILL NET (FT) (SF) (CY) (CY) (CY) FULL SITE N/A 151, , , ITHIN CURRENT FLOODPLAIN ITHIN 2010 FLOODPLAIN , , , , , , , CUT ITHIN NE FLOODPLAIN FILL ITHIN NE FLOODPLAIN 1. A SMALL PORTION OF THE PARKIN LOT TO THE SOUTH RESIDES INSIDE THE NE FLOODPLAIN OF 174.1'. THE AREA COMPRISES ENTIRELY OF A 37.7 CY CUT. IT IS NOT SHON IN THE FIURE ON THIS SHEET; HOEVER, IT IS INCLUDED IN THE TABLE ABOVE. 2. A BASE FLOOD ELEVATION OF FT AS USED IN THE FIURE ON THIS SHEET AS THE MOST CONSERVATIVE FIURE. 4 4 of 5 CUT AND FILL CUT/FILL L:\\4-Design\D\Floodplain Analysis.dwg

7 100-YEAR FLOODPLAIN EXTENTS 5 5 of 5 FLOODPLAIN BOUNDARIES FLOOD L:\\4-Design\D\Floodplain Analysis.dwg

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

Re: Survey of constructed cross section per Restoration Framework on Wind River, Fremont County, WY

Re: Survey of constructed cross section per Restoration Framework on Wind River, Fremont County, WY 1-11-17 LeClair Irrigation District 1418 Cowboy Lane Riverton, WY 82501 (307) 856-4018 Re: Survey of constructed cross section per Restoration Framework on Wind River, Fremont County, WY Dear Mr. Hoelzen,

More information

6'' W 8'' W 8'' W 4'' SAN 4'' SAN 2'' W 6'' W 6'' W INSTALL C.U. PAD (SEE MECHANICAL). M FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM TOP OF TOP OF SW

More information

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT 400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

NWP of 9 Enclosure

NWP of 9 Enclosure A l b a n y Linn County Tax Lots S03W8BD0050 S03W8BA003 S03W8BA00700 Albany, OR 973 G e o R e s o u r c e s, L L C 000 0 000 000 Feet Scale: :,000 FIGURE : LOCATION MAP Scale: " =,000' Source: Albany GIS

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

Clarifications in italics added July 2018

Clarifications in italics added July 2018 SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,

More information

10010 RECORD DRAWING INFORMATION

10010 RECORD DRAWING INFORMATION SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering

More information

Appendix DRAWING STANDARDS

Appendix DRAWING STANDARDS Philadelphia Water Department DRAWIN STANDARDS Water & Sewer Design Manual Appendix II a Drawing Size and Borders (Water) b Drawing Size and Borders (Sewer) c Title Block (Water Drawing) d Title Block

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

ELEVATION CERTIFICATE

ELEVATION CERTIFICATE U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emei-gency Management Agency National Flood insurance Program Al. Building Owner's Name Dayton Development, LLC ELEVATION CERTIFICATE Important: Read the instructions

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS SECTION 2.1 INTRODUCTION... 1 (a) Objective...1 (b) Applicability...1 2.2 SUBMITTAL

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

CITY OF MERCER ISLAND

CITY OF MERCER ISLAND CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org NONLAND USE APPLICATION- PLAN SET GUIDE The applicant for a land use approval

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

The Basics. HECRAS Basis Input. Geometry Data - the basics. Geometry Data. Flow Data. Perform Hydraulic Computations. Viewing the Output

The Basics. HECRAS Basis Input. Geometry Data - the basics. Geometry Data. Flow Data. Perform Hydraulic Computations. Viewing the Output The Basics HECRAS Basis Input Geometry Data. Flow Data. Perform Hydraulic Computations by G. Parodi WRS ITC The Netherlands Viewing the Output ITC Faculty of Geo-Information Science and Earth Observation

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT Case #: SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT 171 North Ross Street, Suite 200 Auburn, AL 36830 (334) 501-3000 ~ Fax: (334) 501-7294 Applicant Name: Mailing Address: Email Address:

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) 415 W 6 th ST ~ Vancouver, WA 98660 PO Box 1995 ~ Vancouver, WA 98668 Phone (360) 487-7800 www.cityofvancouver.us Type Of Work Type I

More information

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone: CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

Record Drawing Standards for Projects Version 2.1

Record Drawing Standards for Projects Version 2.1 for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission

More information

Town of Apex, North Carolina

Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION Town of Apex, North Carolina POND DRAINAGE PLAN APPLICATION: Applications are due by 12:00 pm on the first business day of each month. Please see the Minor Site Plan Schedule

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL This summary is not all inclusive of the requirements set forth by the York County Planning & Development Services, York County

More information

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must

More information

24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE

24' - 0 99' - 0 B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE 5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY

More information

URBAN DRAINAGE AND FLOOD CONTROL DISTRICT

URBAN DRAINAGE AND FLOOD CONTROL DISTRICT URBAN DRAINAGE AND FLOOD CONTROL DISTRICT Digital Flood Hazard Area Delineation (DFHAD) Guidelines July 2009 Prepared by 720 South Colorado Boulevard Suite 410 S Denver, Colorado 80246 phone (303) 757-3655

More information

AE Project No

AE Project No P:\202426\00_Prakash_Civ_Eng\Working_Dwgs\00_Civil\Edam\20242600.dwg DATE: 203024, Matthew Walters This Drawing Is For The Use Of The Client And Project Indicated No Representations Of Any Kind Are Made

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Appendix E-4. City of Fort Collins. Requirements for Utility Plans Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS

More information

FEMA Conditional Letter of Map Revision (CLOMR) Process. Shawn Arden, PE, CFM OTEC 2017

FEMA Conditional Letter of Map Revision (CLOMR) Process. Shawn Arden, PE, CFM OTEC 2017 FEMA Conditional Letter of Map Revision (CLOMR) Process Shawn Arden, PE, CFM OTEC 2017 What is a CLOMR? CLOMR = Conditional Letter of Map Revision Letterissued by FEMA stating that a proposed project,

More information

Cleveland State University

Cleveland State University CVE 212 - Surveying Lab #4 LOCATION SURVEY EQUIPMENT Right angle mirror (pentaprism) Surveyor s tape Plumb bobs Range poles INTRODUCTION Many times the surveyor is called upon to catalog details of a project

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

City of Keizer Floodplain/Greenway Development Application

City of Keizer Floodplain/Greenway Development Application City of Keizer Floodplain/Greenway Development Application If there are any questions about this application, who should be contacted (Agent)? Name: Address: Daytime Phone Number(s): Fax: Email: 1. Applicant

More information

APPENDIX E - FLOODPLAIN INFORMATION

APPENDIX E - FLOODPLAIN INFORMATION CITY OF WOODLAND PARK STORMWATER MASTER PLAN - Floodplain Information APPENDIX E - FLOODPLAIN INFORMATION E1 - Floodplain Information TABLE OF CONTENTS I. INTRODUCTION... 2 Loy Gulch, Paint Pony, East

More information

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A This checklist is used for subdivision, mobile home parks, and

More information

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

SURVEY GUIDANCE AND FORMS

SURVEY GUIDANCE AND FORMS Appendix H Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN SURVEY GUIDANCE AND FORMS Version 2.0 April 2014 1 Table of Contents Section 1 Survey and Mapping... 1 1.1 Introduction...

More information

Bestall Collaborative Limited Planning Environment Construction Management Development

Bestall Collaborative Limited Planning Environment Construction Management Development November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley

More information

MILL HILL ARTS VILLAGE

MILL HILL ARTS VILLAGE OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,

More information

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location: Rec d Rec d: GWINNETT COUNTY Department of Planning & Development One Justice Square 446 West Crogan Street, Suite 150 Lawrenceville, Georgia 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects

More information

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax) King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA 23085 (804) 785-5975 (804) 785-5999 (fax) Shoreline Erosion Project Water Quality Impact Assessment (WQIA) & Wetland Board Permit Submittal

More information

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3

More information

1 MUNICIPAL INFRASTRUCTURE

1 MUNICIPAL INFRASTRUCTURE Engineering Design Criteria & Standard Drawings Page 5 1 MUNICIPAL INFRASTRUCTURE 1.1 Drawing & Submission Requirements 1.1.1 General This section discusses the requirements for the submission of engineering

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider.

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider. Nate Hatleback Project Manager City of Thornton 303 538 7694 Nate.Hatleback@cityofthornton.net Re: Topgolf Review The City of Thornton has provided comments regarding several submittals on June 14 th,

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section

More information

SECTION SITE SURVEYS

SECTION SITE SURVEYS SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design

More information

Loy Gulch, Paint Pony, East Fork Paint Pony LOMR

Loy Gulch, Paint Pony, East Fork Paint Pony LOMR Loy Gulch, Paint Pony, East Fork Paint Pony LOMR Woodland Park, CO Prepared by: Michael Baker International 165 S. Union Blvd, Suite 200 Lakewood, CO 80226 TABLE OF CONTENTS I. INTRODUCTION... 2 1.1 Purpose...

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Onslow Water & Sewer Authority

Onslow Water & Sewer Authority Onslow Water & Sewer Authority REQUIREMENTS FOR SITE PLAN SUBMITTALS THAT DO NOT INCLUDE EXTENSIONS OF WATER/SEWER MAINS BY OWNERS/DEVELOPERS/CONTRACTORS February 28, 2017 (Revised) Required Items for

More information

PLOT PLAN/ CONDITIONAL USE PERMIT

PLOT PLAN/ CONDITIONAL USE PERMIT March Joint Powers Authority Planning Department 23555 Meyer Drive Riverside, CA 92518 P: (951) 656-7000 F: (951) 697-6703 SUBMITTAL REQUIREMENTS PLOT PLAN/ CONDITIONAL USE PERMIT SUBMITTAL REQUIREMENTS

More information

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

7000 Fifteen Mile Road Sterling Heights, Michigan

7000 Fifteen Mile Road Sterling Heights, Michigan 7000 Fifteen Mile Road Sterling Heights, Michigan Industrial Building With Excess Land and Rail Access As exclusive agents, we are pleased to offer the following property for lease: 128,648 Sq. Ft. Completely

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

Floodplain Modeling 101. Presentation Goals

Floodplain Modeling 101. Presentation Goals Floodplain Modeling 101 Presenter: Joseph L. Miller, P.E., CFM 2016 INAFSM Conference Presentation Goals Introduction to Indiana s and FEMA s floodplain modeling technical requirements for riverine modeling

More information

Flood Hazard Area Delineation Guidelines MOSER & ASSOCIATES ENGINEERING ICON ENGINEERING URBAN DRAINAGE AND FLOOD CONTROL DISTRICT

Flood Hazard Area Delineation Guidelines MOSER & ASSOCIATES ENGINEERING ICON ENGINEERING URBAN DRAINAGE AND FLOOD CONTROL DISTRICT Flood Hazard Area Delineation Guidelines MOSER & ASSOCIATES ENGINEERING ICON ENGINEERING URBAN DRAINAGE AND FLOOD CONTROL DISTRICT Flood Hazard Area Delineation (FHAD) Guidelines Contents Section Page

More information

LINES 01 & 10 2 BEDROOMS / 2 BATHROOMS

LINES 01 & 10 2 BEDROOMS / 2 BATHROOMS 5'-0" X 32'-6" 17'-8" X 22'-8" MASTER 12'-0" X 16'-4" W.I.C. 10'-0" X 12'-0" 11'-6" X 11'-3" FOYER A AC LINES 01 & 10 2 S / 2 ROOMS TOTAL SQ.FT. 1,432 / TOTAL M 2 133 Area 1,245 sq ft Terrace Area 187

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

ELEVATION CERTIFICATE Important: Follow the instructions on pages 1-9.

ELEVATION CERTIFICATE Important: Follow the instructions on pages 1-9. U.S. DEPARTMENT OF HOMELAND SECURTY Federal Emergency Management Agency National Flood nsurance Program ELEVATON CERTFCATE mportant: Follow the instructions on pages 1-9. Expiration Date: November 30,

More information