Submission Draft South District Plan

Size: px
Start display at page:

Download "Submission Draft South District Plan"

Transcription

1 Submission Draft South District Plan Project March 2017 Revision A Prepared by Dickson Rothschild 9 Argyle Place Millers Point NSW Dickson Rothschild Page 1 of 36

2 Rev Description DATE AUTHOR A For Lodgement KM Dickson Rothschild D.R. Design (NSW) Pty Limited ABN Argyle Place Millers Point NSW 2000 Australia Phone Dickson Rothschild Page 2 of 36

3 Table of Contents 1 EXECUTIVE SUMMARY The Report THE CITY CENTRE Context URBAN FORM ANALYSIS Urban Structure Analysis Blocks and Streets Northern Precinct Railway Parade South Surrounding Residential Areas Existing Land Use Infrastructure and Services Residential Areas Accessibility and Walkability Building Height Airport Overshadowing TESTING THE DRAFT LEP STANDARDS Method Draft LEP Standards Mixed Use Core Floor-to-Ceiling Heights Effective Building Height Height and Built Form Outcomes Regent Street Railway Parade South Mixed Use - Site Testing Summary THE DISTRICT PLAN AND KOGARAH AS A STRATEGIC CENTRE Comparison with other Strategic Centres and District Centres The Relationship Between Height and FSR and the Draft Kogarah LEP Appropriate Building Height and FSR for Kogarah Priorities of the District Plan CONCLUSION APPENDIX 1 EFFECTIVE HEIGHT AND COST ANALYSIS APPENDIX 2 RAILWAY PARADE SITE FEASIBILITY STUDIES Dickson Rothschild Page 3 of 36

4 1 Executive Summary Kogarah is a uniquely positioned city centre. It is at the southern edge of the Global Economic Corridor, proximate to Kingsford Smith Airport and yet not located directly under a designated flight path. It is serviced by a railway line, has relatively flat topography, easy access to Princes Highway and an established base of health, banking and educational institutions. Parts of the city centre are also susceptible to change with aged building stock. The District Plan has acknowledged the potential of Kogarah designating it as a Strategic Centre and at the same strategic level as Chatswood, Liverpool, Blacktown and Macquarie Park. In our opinion, the District Plan identifies the strategic importance of Kogarah correctly, particularly in its role as a Health and Education Super Precinct. However, the new controls for Kogarah Town Centre do not capture the potential of the area to function as a strategic centre within the metropolitan area. The Department should focus immediately on facilitating a process where planning controls for the centre are provided that are commensurate with Kogarah s strategic importance. In our opinion, Kogarah s urban structure is suitable for heights and densities consistent with a Transit Oriented Development model with FSRs and Heights consistent with other important town centres in the Metropolitan Area. Kogarah has been identified as perhaps the most important centre is the entire Southern District and planning controls for the centre must reflect this. The current Draft Kogarah LEP firstly sets out Height and FSRs which are incongruous with one another, not providing sufficient height to achieve high quality design outcomes. Secondly, the current Draft Kogarah LEP affords Height and FSR controls which are insufficient to capture Kogarah s strategic importance. This Draft LEP, while a step in the right direction, should not be the last word on Kogarah City Centre. The department should focus on testing increased Height and FSR outcomes for Kogarah to achieve high quality urban design outcomes and create a critical mass important for the realisation of the Super Precinct. Maximum FSR controls of 4.5:1 and Heights of 39 m are unlikely to achieve desired outcomes and meet district priorities. The core of the City Centre should be afforded FSRs of 7:1-8:1 with flexible height controls to achieve high quality design outcomes. FSRs in the order of 5:1 are considered appropriate for the edges of the centre with heights of at least storeys. 1.1 The Report This submission has been prepared by Dickson Rothschild (D.R. Design (NSW) Pty Limited) on behalf of the owners of 44 Montgomery Street and Railway Parade, Kogarah. Dickson Rothschild Page 4 of 36

5 2 The City Centre 2.1 Context Kogarah is strategically located within Metropolitan Sydney. It is located at the southern edge of the Global Economic Corridor. It is located in close proximity to Botany Bay and only 3.5 km from Kingsford-Smith Airport. It is designated under the draft District Plan as the only Health and Education Super Precinct and a Strategic Centre in the South District. In several instances the draft Plan underscores the particular strategic importance of Kogarah, signalling it out. Together with Kogarah s particular strength in employment and productivity, the draft District Plan also recognises the areas around Kogarah and Hurstville are important housing areas. The Plan states that increased frequency of services to Kogarah is a key factor in achieving the 30-minute city. Figure 1: Location Map Based on the multiple functions of Kogarah and its unique importance in terms of high value jobs, the District Plan should facilitate Height and FSR controls which achieve higher densities and greater building heights to further bolster land use diversity and sustain a critical mass for the area while providing flexibility for high quality design outcomes. Kogarah s potential is clear given its locational attributes, the existing pattern of land uses in the area and the centre s relationship to existing and planned infrastructure. The densities currently provided for in the Draft Kogarah LEP, while a notable increase from the existing condition, are not proportionate to Kogarah s strategic importance. Dickson Rothschild Page 5 of 36

6 3 Urban Form Analysis 3.1 Urban Structure Analysis Kogarah City Centre and immediate surrounds have a relatively flat topography with an ordered grid structure between Belgrave Street and Gladstone Street with each block bisected by a laneway. Where the grid meets the rail corridor, irregular blocks are created, providing opportunities for dynamic built forms arising from the urban structure itself. The figure below provides a generalised view of existing building form within the City Centre. STATION Figure 2: Kogarah Town Centre Dickson Rothschild Page 6 of 36

7 3.1.1 Blocks and Streets The Kogarah City Centre Core Within the existing grid structure of the City Centre between Post Office Lane and Kensington Street, blocks have depths of approximately 45 m. Along Regent Street and Railway Parade block depths reduce to approximately 37 m. Montgomery Street, Regent Street, Belgrave Street, Premier Street and Kensington Street have a distance boundary-to-boundary of 20 m. Refer to the Figures below. These block sizes and street widths are analogous to other important centres within the metropolitan area including the Sydney CBD, Bondi Junction and Liverpool. Please note that this analysis has been undertaken for these existing areas since they have achieved high density built mixed use built form.. The street widths within Kogarah are almost identical to George Street which has a width of 20 m near Wynyard Station in the Sydney CBD. Other streets in the Sydney CBD such as King Street, Castlereagh Street and Pitt Street, have a width of 19 m. Refer to the Figures below. Dickson Rothschild Page 7 of 36

8 The spatial characteristics of Kogarah are also similar to areas of Bondi Junction and Liverpool. Refer to the Figures below. Generally, street widths within the Kogarah City Centre and block depths are sufficient to sustain increased building density and scale and afford for adequate footpath widths, open space, tree planting and the like. This would be a departure from the generally low, squat and bulky character of built form in the centre currently Northern Precinct Blocks north of the Kogarah s city centre core have a similar block size to the core but have a somewhat more irregular subdivision pattern. These sites, being in close proximity to the railway station, historically used for residential purposes and having few heritage items, are relatively susceptible to change. This similarity indicates that Kogarah has a structure which can tolerate increased height and density. Regardless of whether FSRs are increased, permissible building height should be increased to allow for appropriate buildings separations, solar access and overall amenity. Dickson Rothschild Page 8 of 36

9 3.1.3 Railway Parade South South of Gray Street, the laneway structure dissipates but block sizes, depths and widths are suitable for higher density development given similar structure to the mixed-use core. The existing lower density residential areas to the south of the precinct do give rise to a constraint in terms of visual impacts and solar access but sites fronting the railway line benefit from having only one potentially sensitive interface. Sites fronting Railway Parade are generally susceptible to change due to the aged building stock and prominent frontage with a north westerly aspect Surrounding Residential Areas With the exception of the heritage conservation area around Ocean Street, the existing residential areas within 800 m of the railway station are suitable for increased height and density as well. The major constraint on this is where there are existing strata titled apartment buildings. However, many of these buildings are aging and provided adequate incentives and uplift could undergo redevelopment and renewal. Based on the proximity of the precinct to the railway station, the draft R2 and R3 zoning of the existing residential precincts within 800 m of the railway station should be reconsidered. Dickson Rothschild Page 9 of 36

10 3.2 Existing Land Use Infrastructure and Services Montgomery Street, stretching from the railway station towards the Hospital, Princes Highway and TAFE, creates a strong central axis for the city centre and connecting the main transport hub with health and education infrastructure. Also within a 5-minute walk are key civic institutions including Council, Police and Fire. A high concentration of schools is also found within the City Centre. The street is also within close proximity of the existing Hospital and creates a link between the Railway Station and the heart of the Health and Education Super Precinct. Refer to the Figures below. Dickson Rothschild Page 10 of 36

11 MONTGOMERY STREET Source: Draft South District Plan, Page 46, Kogarah, with Montgomery Street identified Given the Draft District Plan identifies Kogarah as a unique and particularly important centre, the existing land use mix, densities and building quality does not reflect its strategic importance. While the centre is seeing a moderate level of redevelopment, there is not a critical mass in the centre to bolster and support diverse retail uses and other ancillary uses that would support and contribute to the envisaged super precinct Residential Areas The area of the City Centre between 400 m and 800 m of the railway station is largely a mix of institutional uses and residential uses. Residential densities are relatively low and heritage is intermittent with the exception of the conservation area centred on Ocean Street. Block sizes remain similar to the City Centre core but the subdivision pattern is more varied with a looser grid and wedge shaped blocks as the grid intersects with Princes Highway and the rail line. Given that many of the sites are either strata titled or are individually owned smaller lots, increased densities are needed to catalyse renewal. Dickson Rothschild Page 11 of 36

12 3.3 Accessibility and Walkability Kogarah, with its relatively flat topography and regularised street pattern, organised system of laneways, and arrangement of major attractor land uses makes it highly suitable to pedestrian movement. Within the urban structure, there are numerous opportunities to further enhance permeability though east-west midblock links as sites redevelop. Taking the 400 m and 800 m radii from the Railway Station, the existing town centre along with its first residential ring creates the opportunity for a compact city centre within approximately 400 m of the railway station and moderately lower densities as one approaches a distance of 800 m. Refer to the Figure below. Dickson Rothschild Page 12 of 36

13 The 400 m walking distance extends itself north and south along Railway Parade, providing an opportunity for a highly visible extension of the City Centre core along a corridor to capitalise on proximity to transport. With its existing railway station, walkable urban structure and existing institutions along with its wider strategic location within the metropolitan area at the southern tip of the Global Economic Corridor close to major employment lands around Botany Bay, Kogarah City Centre is well suited to high density mixed use development. The District Plan clearly recognises this suitability; however, the existing draft LEP standards applying to the centre are insufficient and do not support such a strategic vision for the city centre. 3.4 Building Height Existing buildings in the area are generally of a low height, although a number of consented DA s for the area achieve heights in the order of 8 storeys. Heights and densities are particularly low considering the accessibility of the area. Refer to the Figure below. Dickson Rothschild Page 13 of 36

14 A transition to built form with greater bulk and scale has begun with consents and construction projects within the centre Airport Kogarah, while close to the airport, is not within a direct flight path. This is in contrast to other established centres in the area such as Rockdale, Hurstville and Mascot. This makes Kogarah relatively unconstrained in terms of land use, heights, densities in spite of its proximity to the airport Overshadowing With the hospital area creating a buffer between the zone of the city centre within 400 m of the railway station and the lower density residential areas beyond, reducing the potential for adverse shadow impacts arising from higher buildings within the Kogarah City Centre generally. This provides an opportunity for the strategic core of Kogarah to achieve greater heights without an exponential increase in environmental and amenity impacts. In any scenario, additional increased heights would allow for space between taller buildings creating slimmer, faster moving shadows. Dickson Rothschild Page 14 of 36

15 4 Testing the Draft LEP Standards 4.1 Method The existing built form in the area has been modelled using Revit as the baseline for built form in the area and to analysis potential amalgamation patterns. Existing built form is generally low scale and somewhat bulky. There is a susceptibility to change. 4.2 Draft LEP Standards To test the Draft LEP controls, first the Core of the Mixed-Use zone has been modelled taking the 400 m catchment generally. Podium tower forms have been utilised to achieve consistency with the intent of SEPP 65, and the Apartment Design Guide. Building Envelopes tested have the following attributes: 2-4 storey streetwall to streets (forming street wall, no increase in footpath width) 2 m setback to laneways at ground level 2-3 storey streetwall to laneways Hybrid tower forms including perimeter block forms and towers Separations between towers above podiums of 24 m. Building Envelopes between m (inclusive of articulation zone) Refer to the Figure below. Dickson Rothschild Page 15 of 36

16 To calculate the resulting FSR, floor plate areas generated from these envelopes were discounted by 25% in accordance with the Apartment Design Guide to accommodate for an articulation zone. Refer to the Figure below. 4.3 Mixed Use Core Floor-to-Ceiling Heights The Draft LEP proposes a maximum height of 39 m. With floor-to-ceiling heights recommended in the Apartment Design Guide of 4 m for ground floor in mixed use areas and 3.3 for Level 1 as well as provisions for lift overruns, plant rooms and roof gardens, 39 m equates to a height of approximately 11 storeys. The figure below shows desired floor to ceiling heights in mixed-use buildings. Dickson Rothschild Page 16 of 36

17 Figure 3: Draft Apartment Design Guide, pg 106 Within a height of 39 m, it was found through site testing that sites between Post Office Lane and Kensington Street and where significant heritage constraints did not occur, FSRs achieved were close to 4.4:1-5:1, depending on lot size. The scenario is also based on the 25% articulation zone factor, which is at the lower end of the ADG recommendation. This built form scenario is demonstrated in the diagram below. This indicates that at heights of 39 m, an FSR of 4.5:1 is likely to result in buildings with lower degrees of building articulation, larger floor plates, longer buildings and only the minimum building separations set Dickson Rothschild Page 17 of 36

18 out in the ADG. In our opinion, the 39 m height limit is inappropriate for the existing draft controls as it does not afford the opportunity for design flexibility, appropriate building articulation or generous building separation. Increased height would also improve opportunities for redeveloping by relieving pressure for significant and large lot amalgamations and opening up opportunities for open spaces, wider footpaths, larger setbacks, etc. 4.4 Effective Building Height Due to BCA requirements for stair pressurisation and fire protection measures above an effective height of 25 m, once a building exceeds 8 storeys, the cost of construction per floor increases significantly until the height of the building becomes such that economies of scale can once again be achieved. Therefore generally, a built form of 39 m is not optimal in project feasibility. Advice from RC Group, WT Partnership and Watpac have been obtained in regard the impact of building height on construction cost of adding $25,000 per unit once the effective height of 25 m is breached. Refer to Appendix 1. In our opinion, based on the existing subdivision pattern, street network, block size, accessibility of the area, site topography and Kogarah being outside of a direct flight path, increased height should be considered within 800 m of the railway station, particularly given the mixed use and residential land uses contemplated. While the new draft LEP is a change from the existing planning regime, it is actually very conservative in light of Kogarah s strategic importance. Heights of less than 13 storeys are not appropriate and a 39 m height limit is insufficient to achieve good built form outcomes under the current Draft LEP regime for the core of the City Centre. 4.5 Height and Built Form Outcomes A representative site on Montgomery Street was tested (site area of approximately 1850 m²). Refer to the figure below. Built form testing resulted in the following Height an FSRs using minimum building separations: 11 Storeys 4.55:1 13 Storeys 5.1:1 18 storeys 6.4:1 Refer to the Figures below which compare a 13 storey option with an 18 storey option. Dickson Rothschild Page 18 of 36

19 13 Storey Option 18 Storeys at Montgomery Street This scenario uses only the minimum separation standards in the ADG to generate building envelopes and uses the 25% factor in articulation where the ADG recommends 25%-30%. This has been done to demonstrate that the current draft LEP standards provide very little flexibility in built form outcomes. Dickson Rothschild Page 19 of 36

20 Additional height is essential to achieving good urban form in the City Centre. Providing heights of at least 18 storeys at 4.5:1 is considered a more reasonable outcome because it can provide for slimmer towers with more building separation. In a compact urban setting the spaces between buildings are essential to providing open spaces, wider footpaths, a more successful and robust public domain and smaller floor plates with better natural daylighting and solar access. The existing Height and FSR standard for the core of Kogarah at 39 m and 4.5:1 are incongruous Regent Street On sites immediately adjacent to the Railway station heights of only 9-12 m are contemplated (with FSRs of 2.5:1 and 2.8:1) in the Draft LEP. Many of the sites within 400 m of the Railway Station are afforded FSRs of 2.5:1 and 2.8:1. These controls appear to respond to existing built form rather than the sites locational attributes, particularly their proximity to transport infrastructure and Kogarah s strategic location within the metropolitan area. The heights proposed do not allow the centre to achieve a sustainable compact city form around an existing rail transport node. With an average block depth of 37 m and street widths of 20 m and lane widths of 6 m, the sites along Regent Street are of a size and orientation which make them suitable for increased height and density, commensurate to their proximity to the railway station. Refer to the Figure below. These greater heights and densities can be achieved while retaining a low scale street wall of 2-3 storeys with setback tower forms above via DCP provisions. Furthermore, while there are several heritage listed items in the street façades with heritage value can be retained in redevelopments and increased FSRs actually make such strategies viable. Dickson Rothschild Page 20 of 36

21 Testing the site on the corner of Regent Street between Montgomery Street and Gladstone Street the following FSRs are achieved: 11 storeys :1 13 storeys 4.8:1 18 storeys 5.9:1 The built form utilised on the Regent Street sites incorporated an increased front setback from the street wall and a reduce streetwall height to address Council s desire to recognise the existing scale of the street. A Heritage Floor Space Transfer scheme should be considered to allow owners of heritage sites to be incentivised rather than penalised in relation to other land owners. Dickson Rothschild Page 21 of 36

22 4.5.2 Railway Parade South The Railway Parade South precinct is between 380 and 800 m from the Railway Station. It also has a strong visual connection to the Railway Station. Due to Railway Parade acting as an urban edge and having built form only on one side of the street, there are opportunities for extending the mixed-use core along Railway Parade within a 5-10-minute walk of the railway station. This has been acknowledge in the Draft LEP and the District Plan. Dickson Rothschild Page 22 of 36

23 A Yield Study of two options for the site at Railway Parade has been undertaken at 11 and 13 storeys (Refer to Appendix 2 for feasibility study). This site is just within the 400 m distance from the Railway Station and has a block depth which allows for a laneway form at the rear. A Perimeter Block building form has been nominated with no side setbacks, an upper level front setback of up to 9 m, and increasing rear setbacks to create increased separation to the residential zone behind. In addition, a 2 m setback at Ground Level has been provided to allow for footpath widening. The Perimeter Block typology also allows redevelopment to occur in a consistent manner without having to wait for site amalgamations to occur. Refer to the Figure below. Dickson Rothschild Page 23 of 36

24 Railway Parade indicative built form, Perimeter Block 11 storeys At a height of 11 storeys, allowing for increased floor to ceiling heights at lower levels and a maximum height of 39 m an FSR of 4.58 is achieved. This is with a relatively large retail floor area at ground level. A similar scenario with height increased to 13 storeys yields an FSR of 5.3:1. As is apparent in the Figure below increased building height to 13 storeys achieves a more dynamic, and better proportioned built form, with little additional visual impact. Railway Parade indicative built form (Perimeter Block) 13 storeys Dickson Rothschild Page 24 of 36

25 The testing demonstrates that there is clearly more flexibility provided by pairing a 39 m height limit with an FSR of 4:1. It does not however, unlock opportunities for both increased setbacks to transition to the residential area adjacent and provide for tower forms with side setbacks which would further improve solar access to neighbouring sites. Allowing for increased building heights in relation to FSR would provide opportunities for increased setbacks at upper levels and allow for a podium/tower block form with side setbacks and increased building separation, allowing light to pass between towers towards the residential areas adjacent. Thus, while a perimeter block building allows for a built form to occur on the site in accordance with the LEP standards, it indicates that a tower form would not be achievable with ADG nominated side setbacks. 4.6 Mixed Use - Site Testing Summary Based on site feasibility consideration, height limits of 11storeys are incongruous with the FSRs proposed and do not take into account feasibility issues around effective heights and cost of construction. While 4.5:1 and even higher FSRs can be accommodated within certain building typologies within an 11 storey height limit, these outcomes are highly restricted and constrain opportunities for high quality built form outcomes, particularly in a mixed use context. Heights of at least 18 storeys would allow for better outcomes where FSRs are 4:1 4.5:1. However, this does not address the matter of the appropriate density for the centre given its position as a Strategic Centre. A maximum FSR of 4.5:1 is inconsistent with Kogarah s locational attributes, its existing land use patterns and its proximity to existing and planned infrastructure. The draft District Plan rightly identifies Kogarah s strategic importance. The Draft Kogarah LEP fails to do so. Dickson Rothschild Page 25 of 36

26 5 The District Plan and Kogarah as a Strategic Centre With the District Plan identifying Kogarah as a Strategic Centre and also a Super Precinct, this positions Kogarah near the top of the Hierarchy of Centres. Based on Kogarah s strategic location and particular attributes this is appropriate. The local land use planning regime does not meet the expectations that are set up by this strategic designation. 5.1 Comparison with other Strategic Centres and District Centres A review of the existing permissible Heights and FSRs for other designated Strategic Centres in the Metropolitan Area reveals that Kogarah is afforded substantially lower Heights and FSRs in core areas under the current Draft LEP. The FSR and Height controls for Kogarah are in many instances even less than designated District Centres which are lower in the strategic hierarchy to Kogarah. The table below provides a comparison of the maximum Height of Buildings and FSR controls for a variety of Strategic Centres and District Centres in the metropolitan area. This is followed by a comparison of HOB and FSR maps for the selected Strategic Centres and District Centres. It is apparent from this simple comparison that the existing and Draft LEP controls for Kogarah set out FSRs and Heights which are not commensurate with Kogarah s strategic importance. TOWN CENTRE MAX FSR CONTROL MAX HEIGHT CONTROL DRAFT CONTROLS INFORMATION Strategic Centres Kogarah 4.5:1 39 m These are Draft LEP Controls Liverpool 10:1 100 m Planning proposal currently under consideration (LEP 2008, Amendment 52) to increase proportion of city centre which is B4 and to increase FSRs for many of the sites currently permitted FSRs of between 3:1-5:1 to 7:1-10:1 under an opportunity site bonus. Blacktown 8.5:1 72 m Chatswood 8:1 90 m Rhodes 9.3:1 127 m Macquarie Park 6:1 120 m District Centres Burwood 6:1 70 m Bondi Junction 7:1 60 m Dickson Rothschild Page 26 of 36

27 Dickson Rothschild Page 27 of 36

28 Dickson Rothschild Page 28 of 36

29 Dickson Rothschild Page 29 of 36

30 Dickson Rothschild Page 30 of 36

31 Dickson Rothschild Page 31 of 36

32 5.1.1 The Relationship Between Height and FSR and the Draft Kogarah LEP From the comparison of the Strategic Centres and District Centres that the maximum height limits set out in the draft Kogarah LEP are insufficient to meet proposed FSRs and achieve good quality built form. The LEP should provide greater height limits to allow more flexibility and better amenity for built form in the centre as demonstrated. For example, in Macquarie Park, where an FSR control of 4.5:1 is permitted, a height limit of m is provided. Similarly, where an FSR of 4.5:1 is permitted in Blacktown, a height limit of 44 m is provided. In Burwood, an FSR of 4.5:1 is coupled with a height limit of 60 m. The height and FSR combinations appear more reasonable in light of the testing done in the previous sections of this report. 5.2 Appropriate Building Height and FSR for Kogarah Based on the review of other City Centres, increased Height of Buildings and FSR standards should be afforded to Kogarah City Centre based on its high level of strategic importance as a Strategic Centre commensurate with other Strategic Centres which are afforded Heights and FSRs much greater than currently contemplated for Kogarah under the Draft LEP. The previous urban form analysis indicates that Kogarah has an urban structure very similar to other major centres in the metropolitan area that sustain significantly greater Heights and FSR than what is currently contemplated for Kogarah. FSRs in the order of 8:1 should be considered in core area of Kogarah with base FSRs at the lower end of the spectrum in the order of 5:1. In light of a comparison with other centres, it is clear that Kogarah s draft LEP building envelop controls are too restrictive. It is noted that these precedents are largely existing planning controls which were drafted prior to the District Plan. A number of draft controls which have arisen more recently seek to use bonus incentive schemes which allow for remarkable increases in Height and FSRs. This includes Liverpool which allows increases in FSRs from 3:1 to 10:1 with no height limit. It is also being contemplated in other areas such as Parramatta where base and bonus incentive schemes in the draft LEP for the City centre increase FSRs and Heights considerably. Indeed, Heights and FSRs proposed in Kogarah lag well behind other centres. The Department should direct Council to consider more innovative ways to incentivise high quality outcomes within a sufficiently high density mixed use setting. 5.3 Priorities of the District Plan Providing Kogarah with appropriate Zoning, Height of Buildings and FSR standards and incentives will be critical to the centre s role in meeting the priorities of the draft District Plan. The current Draft Kogarah LEP controls are insufficient and should be considered for further increases going forward. It is clear by considering a number of the Priorities in the Draft District Plan, that increased height and density is needed in Kogarah. IM1: Align land use planning and infrastructure planning The Draft Kogarah LEP sets out a reasonable land use planning pattern to capitalise on infrastructure with a core area provided with a B4 Mixed Use Zoning within a 5-minute walk of the railway station and pockets of R4 zoning to the north and R3 zoning to the south. However, the range of FSRs from 2:1 4.5:1 and Heights of 9 m 39 m does not capitalise on the locational attributes of Kogarah including the existing railway station, hospitals and schools. It is also insufficient given the Centre s close proximity to the Airport, Port Botany and the M4. The District Plan has acknowledged the unique importance of Kogarah within the Metropolitan Area but the Local Council s Draft Planning Controls do not support this vision. Land use Dickson Rothschild Page 32 of 36

33 planning for Kogarah should remain mixed use and high density but at a density and height commensurate with its strategic importance. P1: Coordinate planning and infrastructure delivery to grow the Kogarah health and education super precinct Kogarah is signalled out in the Productivity Priorities and Actions. An important factor in delivering infrastructure in the area is to provide sufficient incentives for redevelopment and renewal to support that delivery. It appears that many other centres allow greater FSR and Height Limits and are considering incentive schemes to deliver planning priorities. The current Draft LEP controls are a modest uplift and inconsistent with Kogarah s particular strategic importance. A super precinct with a particular focus on education and health will need a supporting diversity of land uses, jobs and housing to sustain a critical mass to support continued growth in these targeted health and education areas. L3: Councils to increase housing capacity across the District Kogarah has gone part of the way in increasing densities around rail infrastructure. However, the densities proposed currently are not commensurate with Kogarah s particular strategic importance in the District. L11: Provide design-led planning to support high quality urban design The draft controls for the Kogarah City Centre provide very little impetus for design excellence. The height limits greatly restrict potential built form outcomes and public domain improvements. There appears to be little in the draft LEP to create opportunities for innovative out of the box design outcomes. As demonstrated in the previous section of this report, the height and FSR combinations in the city centre under the Draft LEP restrict opportunities for built form articulation, building separation, open spaces, expanded public domain areas and the like. There should be clear incentives for achieving high quality urban design, which are currently absent in the Draft LEP standards. S9: Support the development of environmental performance targets and benchmarks Increasing density around railway stations to create a more compact and transit oriented development pattern, where more people can live, work and meet their daily needs within walking distance of their homes or major public transport links is a reasonably successful way to improve the sustainability of urban areas through the structure of urban form itself. This idea seems to underpin the Plan for Growing Sydney. Kogarah, with its clear importance as an identified super precinct and its current character as relatively low density with aging stock and susceptibility to change, could become a best practice example of a more sustainable transit oriented hub with a clear identity, a diverse employment base and a diverse community. Redevelopment incentives need to be implemented which allow this to occur. The current Draft LEP does not provide the Heights and FSRs to bolster this vision. Dickson Rothschild Page 33 of 36

34 6 Conclusion This submission has demonstrated four key points: The existing urban structure in Kogarah is generally suitable for significantly greater heights and densities than afforded to it by the Draft Kogarah LEP. Regardless of whether the Draft FSR controls in the Draft LEP are suitable for the area, the Draft Height limits will not facilitate high quality design outcomes in the centre. The heights are simply too low and force large floor plate building typologies with reduced building separation, less articulation, less open space and less amenity. The existing Draft LEP controls for Kogarah City Centre are insufficient based on the strategic importance of Kogarah as afforded by the Draft District Plan. Both the strategic importance of Kogarah and its urban structure should sustain significant increases in Height and FSR standards. The Kogarah City Centre is suitable greater Heights and FSRs, commensurate with its strategic location within the Metropolitan Area. The existing urban structure and built form make the City Centre well suited to the Transit Oriented Development model. To create vital and diverse centre, built form controls should be based on an FSR which provides sufficient density to create a critical mass for a diversity of uses and a Height which allows built form with upper level separations, high degrees of built form articulation, resulting open spaces, an expanded public domain, and a reduced reliance on the need for substantial amalgamation before redevelopment can occur. Built form controls should be formed as a catalyst for renewal to achieve good outcomes and a compact, equitable, and sustainable future built form. In this regard, our recommendations are as follows: The existing Draft LEP controls provide Height and FSR controls which are incongruous and should be corrected immediately. Future planning for the centre should afford base FSR limits in the order of 5:1 with Heights of at least storeys similar to other centres. The core of Kogarah City Centre should be afforded FSRs in the order of 7:1-8:1 with flexible height limits based on design outcomes. We urge the Department to focus on Kogarah s future planning and the Height and FSR controls in the city centre to ensure that Kogarah is afforded planning controls which are commensurate with its particular strategic importance. Dickson Rothschild Page 34 of 36

35 APPENDIX 1 Effective Height and Cost Analysis Dickson Rothschild Page 35 of 36

36

37

38 Appendix 2 Railway Parade Site Feasibility Studies Dickson Rothschild Page 36 of 36

39 DRAWING LIST SHEET DRAWING NAME REV 00 A-001 COVER SHEET A A-005 PROJECT SUMMARY SHEET A PLANS A-201 GROUND FLOOR PLAN A A-202 LEVEL 1 FLOOR PLAN A A-205 LEVEL 2 FLOOR PLAN A A-208 LEVEL 8 FLOOR PLAN A A-209 LEVEL 9-12 FLOOR PLAN A VISUALISATIONS A-901 3D MASSING A DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH FEASIBILITY Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING COVER SHEET PROJECT NO. DRAWING NO A-001 A3 DATE 15/05/2015 REVISION A DRAWN SA AUTHORISED ND

40 Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING PROJECT SUMMARY SHEET PROJECT NO A3 DRAWING NO. A-005 DATE 15/05/2015 REVISION A DRAWN SA AUTHORISED ND

41 2000 RETAIL B RETAIL A RES 218 m² 241 m² F/S LOBBY 33 m² 32 m² RETAIL C 191 m² LOADING BAY / RAMP TO BASEMENT PARKING 166 m² Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING GROUND FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-201 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1: m A SA ND

42 BOUNDARY 18.71m 2000 BOUNDARY 9.36m 5000 TERRACE 16 m² 5000 TERRACE 34 m² TERRACE 50 m² TERRACE 36 m² 2 BED 85 m² 2 BED 83 m² BOUNDARY 39.52m 2 BED 91 m² 2 BED 91 m² BOUNDARY 45.18m 1 BED 57 m² 1 BED 57 m² TERRACE 23 m² 8 m² 7 m² TERRACE 23 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 1 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-202 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

43 BOUNDARY 18.71m BOUNDARY 9.36m m² 17 m² 28 m² 25 m² 2 BED 75 m² 2 BED 77 m² BOUNDARY 39.52m 2 BED 84 m² 2 BED 89 m² BOUNDARY 45.18m 1 BED 57 m² 1 BED 57 m² 6 m² 6 m² 8 m² 7 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 2 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-205 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

44 BOUNDARY 18.71m 5000 BOUNDARY 9.36m TERRACE 14 m² TERRACE 27 m² TERRACE 21 m² TERRACE 14 m² BOUNDARY 39.52m 2 BED 81 m² 1 BED 2 BED 54 m² 78 m² 3 BED 90 m² 2 BED 83 m² BOUNDARY 45.18m 6 m² 6 m² TERRACE 39 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 8 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-208 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

45 BOUNDARY 18.71m BOUNDARY 9.36m m² 11 m² 13 m² 7 m² BOUNDARY 39.52m 2 BED 78 m² 2 BED 71 m² 3 BED 90 m² 1 BED 51 m² 2 BED 82 m² BOUNDARY 45.18m 6 m² 15 m² 6 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 9-12 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-209 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

46 Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING 3D MASSING PROJECT NO. DRAWING NO A-901 A3 DATE 15/05/2015 REVISION A DRAWN SA AUTHORISED ND

47 DRAWING LIST SHEET DRAWING NAME REV 00 A-001 COVER SHEET A A-005 PROJECT SUMMARY SHEET A PLANS A-201 GROUND FLOOR PLAN A A-202 LEVEL 1 FLOOR PLAN A A-205 LEVEL 2 FLOOR PLAN A A-208 LEVEL 8 FLOOR PLAN A A-209 LEVEL 9&10 FLOOR PLAN A DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH FEASIBILITY Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING COVER SHEET PROJECT NO. DRAWING NO A-001 A3 DATE 15/05/2015 REVISION A DRAWN SA AUTHORISED ND

48 Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING PROJECT SUMMARY SHEET PROJECT NO A3 DRAWING NO. A-005 DATE 15/05/2015 REVISION A DRAWN SA AUTHORISED ND

49 2000 RETAIL B RETAIL A RES 218 m² 241 m² F/S LOBBY 33 m² 32 m² RETAIL C 191 m² LOADING BAY / RAMP TO BASEMENT PARKING 166 m² Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING GROUND FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-201 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1: m A SA ND

50 BOUNDARY 18.71m 2000 BOUNDARY 9.36m 5000 TERRACE 16 m² 5000 TERRACE 34 m² TERRACE 50 m² TERRACE 36 m² 2 BED 85 m² 2 BED 83 m² BOUNDARY 39.52m 2 BED 91 m² 2 BED 91 m² BOUNDARY 45.18m 1 BED 57 m² 1 BED 57 m² TERRACE 23 m² 8 m² 7 m² TERRACE 23 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 1 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-202 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

51 BOUNDARY 18.71m BOUNDARY 9.36m m² 17 m² 28 m² 25 m² 2 BED 75 m² 2 BED 77 m² BOUNDARY 39.52m 2 BED 84 m² 2 BED 89 m² BOUNDARY 45.18m 1 BED 57 m² 1 BED 57 m² 6 m² 6 m² 8 m² 7 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 2 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-205 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

52 BOUNDARY 18.71m 5000 BOUNDARY 9.36m TERRACE 14 m² TERRACE 27 m² TERRACE 21 m² TERRACE 14 m² BOUNDARY 39.52m 2 BED 81 m² 1 BED 2 BED 54 m² 78 m² 3 BED 90 m² 2 BED 83 m² BOUNDARY 45.18m 6 m² 6 m² TERRACE 39 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 8 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-208 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

53 BOUNDARY 18.71m BOUNDARY 9.36m m² 11 m² 13 m² 7 m² BOUNDARY 39.52m 2 BED 78 m² 2 BED 71 m² 3 BED 90 m² 1 BED 51 m² 2 BED 82 m² BOUNDARY 45.18m 6 m² 15 m² 6 m² BOUNDARY 27.43m Dickson Rothschild D.R. Design (NSW) Pty. Ltd. 9 Argyle Place, Millers Point, Sydney, NSW 2000 ABN: Phone: ndickson@dicksonrothschild.com.au Nominated Architect: Robert Nigel Dickson Registration No: 5364 This drawing and design is subject to D.R. Design (NSW) Pty Ltd copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Resolve all discrepancies with the Architect before proceeding. Figured dimensions to be taken in preference to scaled drawings. All work is to conform to relevant Australian Standards and other Codes as applicable, together with other Authorities' requirements and regulations. REV DESCRIPTION DATE ISSUED CHECKED A ISSUE FOR SUBMISSION 27/05/2015 SA KM N PROJECT DRAFT CONTROL FEASIBILITY STUDY Railway Parade, KOGARAH CLIENT ROD CHRISTOU FEASIBILITY DRAWING LEVEL 9&10 FLOOR PLAN PROJECT NO A3 1 : 200 DRAWING NO. A-209 DATE 15/05/2015 REVISION DRAWN AUTHORISED 0 SCALE 1:200 10m A SA ND

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991 BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL IN THE MATTER of the Resource Management Act 1991 AND the Proposed District Plan STATEMENT OF EVIDENCE OF TIMOTHY CARR

More information

Queenstown Park Limited. Appellant. Queenstown Lakes District Council. Respondent NOTICE OF APPEAL ON BEHALF OF QUEENSTOWN PARK LIMITED

Queenstown Park Limited. Appellant. Queenstown Lakes District Council. Respondent NOTICE OF APPEAL ON BEHALF OF QUEENSTOWN PARK LIMITED BEFORE THE ENVIRONMENT COURT AT CHRISTCHURCH IN THE MATTER of the Resource Management Act 1991 ( RMA ) AND IN THE MATTER of the Queenstown Lakes Proposed District Plan BETWEEN Queenstown Park Limited Appellant

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary

Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary South Worcestershire Development Plan Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary 1.0 Environment Agency (EA) 1.1 EA comments: The EA want the footnote,

More information

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary Richmond Official Community Plan CITY CENTRE AREA ST. ALBANS SUB-AREA PLAN Bylaw 7100 Schedule 2.10A ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN KEY MAP PLAN AREA MAP

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

SITE STATISTICS SQ.FT [ SQ.M.]

SITE STATISTICS SQ.FT [ SQ.M.] SITE PLAN :00 No. 66 ADJACENT STOREY DWELLING LOT AREA GFA SITE STATISTICS 870.77 SQ.FT [777.67 SQ.M.] N 8 00'" E OVERHEAD WIRE '-7 " [760] EXISTING PRIVATE TREE TO BE REMOVED '-" [680] 9'-7" [90] 9'-7

More information

New Appendix Aa: Five-Year Housing Land Supply

New Appendix Aa: Five-Year Housing Land Supply Appendices: Main Modification SC-MM238 Add a new Appendix Aa after Appendix A. New Appendix Aa: Five-Year Housing Land Supply Five-year housing land supply will be calculated using the Liverpool methodology,

More information

Appendix 10 Business City Centre Zone building in relation to boundary

Appendix 10 Business City Centre Zone building in relation to boundary Appendix 10 Business City Centre Zone building in relation to boundary The following explanation is divided into two parts: Part 1. A preliminary explanation of the nature of the indicator system and why

More information

Submission to the Productivity Commission inquiry into Intellectual Property Arrangements

Submission to the Productivity Commission inquiry into Intellectual Property Arrangements Submission to the Productivity Commission inquiry into Intellectual Property Arrangements DECEMBER 2015 Business Council of Australia December 2015 1 Contents About this submission 2 Key recommendations

More information

Resource Management Act 1991 ( Act ) KAWARAU JET SERVICES HOLDINGS LIMITED. Appellant QUEENSTOWN LAKES DISTRICT COUNCIL.

Resource Management Act 1991 ( Act ) KAWARAU JET SERVICES HOLDINGS LIMITED. Appellant QUEENSTOWN LAKES DISTRICT COUNCIL. IN THE ENVIRONMENT COURT AT CHRISTCHURCH ENV-2018-CHC-0000 UNDER THE IN THE MATTER OF Resource Management Act 1991 ( Act ) An appeal under Schedule 1, Clause 14(1), of the Act BETWEEN KAWARAU JET SERVICES

More information

Non-Technical Summary of Environmental Statement

Non-Technical Summary of Environmental Statement Non-Technical Summary of Environmental Statement Speedway World Cup Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) prepared for the proposed Speedway

More information

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units.

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units. 3. HOUSING ELEMENT The purpose of this element is to provide plans and policies that will assist the City in meeting identified or projected deficits in the supply of housing, correcting substandard or

More information

Coles Bay Ferry Proposal - point 1 Provide a shorter and safer route for visitors to Coles Bay and Freycinet National Park

Coles Bay Ferry Proposal - point 1 Provide a shorter and safer route for visitors to Coles Bay and Freycinet National Park Friday 20 th May 2016 Nicholas Johnston Coles Bay Ferry Pty Ltd 14 Invercargill Road Mount Nelson TAS 7007 Dear Mr Johnston, I am writing on behalf of the Swanwick Community Association (SCA) regarding

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha

LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha OPPORTUNITY TO ACQUIRE AN IMMEDIATE RESIDENTIAL DEVELOPMENT SITE BY INFORMAL TENDER. DEADLINE 12 NOON TUESDAY 16 th FEBRUARY 2016. LONG BUCKBY CONSENTED

More information

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: May 4, 2015

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: May 4, 2015 BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: May 4, 2015 CASE NUMBER 5967/4155/1652 APPLICANT NAME LOCATION VARIANCE REQUEST John D. McCampbell 1564 Duval Street (North side of Duval Street, 255 ± East

More information

Mordialloc Bypass Project. Report of Naomi Cavanagh

Mordialloc Bypass Project. Report of Naomi Cavanagh Mordialloc Bypass Project Report of Naomi Cavanagh 1 Introduction My firm WSP Australia Pty Limited prepared the impact assessment report titled Social Impact Assessment (Report) which is included as Appendix

More information

Report. Brighton & Hove City Charrette

Report. Brighton & Hove City Charrette Report Brighton & Hove City Charrette April 2017 1 Brighton & Hove City Charrette Report Background On 20th March 2017, 80 people debated 10 critical issues for the future of Brighton and Hove. After hearing

More information

Introduction. Page 1. Welcome to the signage guidelines for St John Ambulance premises, updated as of September 2012.

Introduction. Page 1. Welcome to the signage guidelines for St John Ambulance premises, updated as of September 2012. Signage guidelines Introduction Welcome to the signage guidelines for St John Ambulance premises, updated as of September 2012. These guidelines provide a signage standard for all St John Ambulance buildings,

More information

Road signs Specifications

Road signs Specifications AS 1743:2018 AS 1743:2018 Road signs Specifications This Australian Standard was prepared by Committee MS-012, Road Signs and Traffic Signals. It was approved on behalf of the Council of Standards Australia

More information

The Church of Jesus Christ of Latter-day Saints Trust Board (LDS) Aitutaki Enua Society Incorporated (Aitutaki Enua)

The Church of Jesus Christ of Latter-day Saints Trust Board (LDS) Aitutaki Enua Society Incorporated (Aitutaki Enua) BEFORE THE INDEPENDENT HEARINGS PANEL IN THE MATTER OF: The Proposed Auckland Unitary Plan SUBMITTERS: The Church of Jesus Christ of Latter-day Saints Trust Board (LDS) The Federation of Islamic Associations

More information

Vertical emphasis examples from the Station Park Green Design Guidelines are shown on the following page.

Vertical emphasis examples from the Station Park Green Design Guidelines are shown on the following page. ARCHITECTURE PLANNING URBAN DESIGN Ms. Lorraine Weiss Department of Community Development City of San Mateo 330 West 20th Avenue San Mateo, CA 94403-1388 RE: Station Park Green Dear Lorraine: I attended

More information

MARKET ANCILLARY SERVICE SPECIFICATION

MARKET ANCILLARY SERVICE SPECIFICATION MARKET ANCILLARY SERVICE SPECIFICATION PREPARED BY: AEMO Systems Performance and Commercial DOCUMENT REF: ESOPP_12 VERSION: 5.0 EFFECTIVE DATE: 30 July 2017 STATUS: FINAL Approved for distribution and

More information

A powerful voice for your business

A powerful voice for your business HAMPSHIRE CHAMBER OF COMMERCE OBJECTION TO PORTSMOUTH CITY COUNCIL PLANNING APPLICATION 13/00993/OUT RE-SUMBISSION OF 12/00998/OUT. Trafalgar Wharf, Hamilton Road, Portchester, Portsmouth PO6 4PX Outline

More information

This table identifies provisions subject to and consequentially affected by appeals:

This table identifies provisions subject to and consequentially affected by appeals: Chapter 3 Strategic Direction This table identifies provisions subject to and consequentially affected by appeals: Provision Subject To Appeal (identified in red text in the relevant chapter/s) Strategic

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

THE WHARVES DEPTFORD EXCHANGE & EXPLORE - FOCUS SESSION MINI-REPORT. November December 2014 MOVING FORWARD

THE WHARVES DEPTFORD EXCHANGE & EXPLORE - FOCUS SESSION MINI-REPORT. November December 2014 MOVING FORWARD THE WHARVES DEPTFORD MOVING FORWARD THE WHARVES DEPTFORD EXCHANGE & EXPLORE - FOCUS SESSION MINI-REPORT November December 2014 2 The Wharves Deptford Exchange & Explore - Focus Sessions The Wharves Deptford

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: Introduction Aim 1 Sustainable Development To guide e development of e Borough and its environs in such a way at a careful balance is maintained between economic, social and environmental aspirations

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project

More information

For personal use only

For personal use only 1 September 2017 ASX: MOD MOD Doubles Exploration Budget to A$10M MOD doubles exploration spend to fast track drilling of regional targets A$10M exploration budget approved for 12 months from October 2017

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

shedkm architects complete first Ruskin Square office in Croydon

shedkm architects complete first Ruskin Square office in Croydon Press release December 2016 shedkm architects complete first Ruskin Square office in Croydon One Ruskin Square by shedkm architects Jack Hobhouse London and Liverpool based practice shedkm architects has

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 4: Expressway and Connectivity Study Recommendation: It is recommended that the Forum: a) Write to the Secretary of State for Transport setting

More information

Why execution is everything in modern Australian infrastructure projects

Why execution is everything in modern Australian infrastructure projects Market Insights Why execution is everything in modern Australian infrastructure projects By Michael Thorpe Commonwealth Bank, Managing Director, Global Head of Infrastructure and Utilities In partnership

More information

2013 BUILT ENVIRONMENT MEETS PARLIAMENT QUEENSLAND

2013 BUILT ENVIRONMENT MEETS PARLIAMENT QUEENSLAND Level 1, 70 Merivale Street South Brisbane QLD 4101 PO Box 3275 South Brisbane QLD 4101 T +617 3828 4100 F +617 3828 4133 qld@raia.com.au architecture.com.au 2013 BUILT ENVIRONMENT MEETS PARLIAMENT QUEENSLAND

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

A10 Electronic Interference: Application 2 - LBHF

A10 Electronic Interference: Application 2 - LBHF A10 Electronic Interference: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A10.1 This Chapter of the Addendum to the June 2011 Environmental Statement

More information

Chapter 3 Business and Industrial Development

Chapter 3 Business and Industrial Development Chapter 3 Business and Industrial Development Existing Business/Industrial Development Bayview Ridge is a unique area with respect to economic development opportunities. The growth of industry around the

More information

Manually verifiable area calculations; and BC Land Surveyor certified area calculations (typically practical only for large development proposals).

Manually verifiable area calculations; and BC Land Surveyor certified area calculations (typically practical only for large development proposals). City of Vancouver Planning - By-law Administration Bulletins Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 604.873.7060 planning@city.vancouver.bc.ca AREA CALCULATION AND

More information

Cambridge Rapid Mass Transit Options Appraisal

Cambridge Rapid Mass Transit Options Appraisal Cambridge Rapid Mass Transit Options Appraisal Study Overview Greater Cambridge Partnership and Cambridgeshire and Peterborough Combined Authority November 2017 Tom Higbee, Michael May, Mark Hobden Overview

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

APPENDIX 15.6 DORMOUSE SURVEY

APPENDIX 15.6 DORMOUSE SURVEY APPENDIX 15.6 DORMOUSE SURVEY Picket Piece - Dormouse Nut Search Report Wates Development Limited December 2009 12260671 Dormouse report QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks

More information

3 Economic Development

3 Economic Development 3 Economic Development Introduction: The Economic Development Element of the Comprehensive Plan is intended to guide the climate for enterprise and commercial exchange in Buckley and reinforce the overall

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

Mapping rural services in the parishes of Leicestershire

Mapping rural services in the parishes of Leicestershire Mapping rural services in the parishes of Leicestershire Final Report September 2007 Produced by the Policy, Research and Information Team, Chief Executive s Department, Leicestershire County Council Contact

More information

LOW FREQUENCY SOUND IN ROOMS

LOW FREQUENCY SOUND IN ROOMS Room boundaries reflect sound waves. LOW FREQUENCY SOUND IN ROOMS For low frequencies (typically where the room dimensions are comparable with half wavelengths of the reproduced frequency) waves reflected

More information

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay

More information

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is

More information

Single Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A. Definition: Mass, Bulk & Scale

Single Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A. Definition: Mass, Bulk & Scale The purpose of this issue paper is to: Single Family Design Guidelines Update/ Neighborhood Preservation Ordinance Update ISSUE PAPER A Definition: Mass, Bulk & Scale clarify current definitions of mass,

More information

Building Canada s Advanced Wireless Networks: Protocol Development

Building Canada s Advanced Wireless Networks: Protocol Development Building Canada s Advanced Wireless Networks: Protocol Development Meeting with Markham Development Services Committee May 20, 2014 1 Origins of this meeting Development Services Committee resolved to

More information

CHAPTER 3. Public Schools Facility Element

CHAPTER 3. Public Schools Facility Element CHAPTER 3 Public Schools Facility Element Page 1 of 12 CHAPTER 3 PUBLIC SCHOOL FACILITIES ELEMENT GOAL 3.1: Collaborate and coordinate with the School Board of Volusia County to provide and maintain a

More information

Assessment of rail noise based on generic shape of the pass-by time history

Assessment of rail noise based on generic shape of the pass-by time history Proceedings of Acoustics 23 Victor Harbor 7-2 November 23, Victor Harbor, Australia Assessment of rail noise based on generic shape of the pass-by time history Valeri V. enchine, Jonathan Song Science

More information

NOW LEASING NOW LEASING DOWNTOWN VANCOUVER GRANVILLE ISLAND

NOW LEASING NOW LEASING DOWNTOWN VANCOUVER GRANVILLE ISLAND TO 25,300 SQUARE FEET OF NEW BUILD PREMISES IN THE WESTSIDE OF VANCOUVER 1296 W BROADWAY Burrard Street Burrard Bridge Granville Street Bridge DOWNTOWN VANCOUVER GRANVILLE ISLAND W 4th Avenue W 6th Avenue

More information

NCRIS Capability 5.7: Population Health and Clinical Data Linkage

NCRIS Capability 5.7: Population Health and Clinical Data Linkage NCRIS Capability 5.7: Population Health and Clinical Data Linkage National Collaborative Research Infrastructure Strategy Issues Paper July 2007 Issues Paper Version 1: Population Health and Clinical Data

More information

SMART PLACES WHAT. WHY. HOW.

SMART PLACES WHAT. WHY. HOW. SMART PLACES WHAT. WHY. HOW. @adambeckurban @smartcitiesanz We envision a world where digital technology, data, and intelligent design have been harnessed to create smart, sustainable cities with highquality

More information

KMAC Meeting Minutes February 27, 2007

KMAC Meeting Minutes February 27, 2007 DRAFT, not yet adopted by KMAC KMAC Meeting Minutes February 27, 2007 1. Roll call. Chairman Barraza called the meeting to order and introduced the KMAC members. In attendance were Gordon Becker, Pam Brown,

More information

Newton Suites Residential Tower

Newton Suites Residential Tower Newton Suites Residential Tower 60 Newton Road Singapore Architects WOHA Architects Pte Ltd / R Hassell, W M Summ Singapore Clients UOL Development Singapore Commission 2003 Design 2003-2004 Construction

More information

Market-led proposals What is the future?

Market-led proposals What is the future? Market-led proposals What is the future? March 2016 kpmg.com.au Contents Introduction 3 Queensland s MLP framework 4 The process 6 Granting of the elusive exclusive mandate 8 Critical success factors for

More information

TRANSITIONSCAPE: GENERATING COMMUNITY-BASED SUSTAINABLE TRANSPORT INITIATIVES

TRANSITIONSCAPE: GENERATING COMMUNITY-BASED SUSTAINABLE TRANSPORT INITIATIVES TRANSITIONSCAPE: GENERATING COMMUNITY-BASED SUSTAINABLE TRANSPORT INITIATIVES Michael Dale, Susan Krumdieck, Shannon Page, Kerry Mulligan Department of Mechanical Engineering, University of Canterbury

More information

Problems with the INM: Part 2 Atmospheric Attenuation

Problems with the INM: Part 2 Atmospheric Attenuation Proceedings of ACOUSTICS 2006 20-22 November 2006, Christchurch, New Zealand Problems with the INM: Part 2 Atmospheric Attenuation Steven Cooper, John Maung The Acoustic Group, Sydney, Australia ABSTRACT

More information

Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) Coogee Bay Road COOGEE NSW 2034

Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) Coogee Bay Road COOGEE NSW 2034 The Occupier 22 nd February 2018 Dear Sir/Madam Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) 146-148 Coogee Bay Road COOGEE NSW 2034 Urbis is writing

More information

Status: Rev: Comments Date: Author: Reviewer:

Status: Rev: Comments Date: Author: Reviewer: PAKENHAM EAST PRECINCT STRUCTURE PLAN CITY GATE NOISE ASSESSMENT Rp 002 R03 20171135 28 May 2018 Marshall Day Acoustics Pty Ltd ABN: 53 470 077 191 6 Gipps Street Collingwood VIC 3066 Australia T: +613

More information

SUSTAINABLE GROWTH AGREEMENT STIRLING COUNCIL AND SCOTTISH ENVIRONMENT PROTECTION AGENCY

SUSTAINABLE GROWTH AGREEMENT STIRLING COUNCIL AND SCOTTISH ENVIRONMENT PROTECTION AGENCY SUSTAINABLE GROWTH AGREEMENT STIRLING COUNCIL AND SCOTTISH ENVIRONMENT PROTECTION AGENCY 27 AUGUST 2018 Sustainable Growth Agreement Stirling Council and Scottish Environment Protection Agency 3 OUR JOINT

More information

Article 4.0 Measurements and Exceptions

Article 4.0 Measurements and Exceptions This Article identifies and explains some of the more common forms of measurement used throughout this Ordinance. It also specifies exceptions to certain requirements of this Ordinance. Sec. 4.1 Measurements

More information

LAND USE ASSESSMENT REPORT (LUAR) Signal Hill Gate Expansion 22 St. Joseph s Lane March 23, IMAGE: Rendering of Proposed Development

LAND USE ASSESSMENT REPORT (LUAR) Signal Hill Gate Expansion 22 St. Joseph s Lane March 23, IMAGE: Rendering of Proposed Development LAND USE ASSESSMENT REPORT (LUAR) Signal Hill Gate Expansion 22 St. Joseph s Lane March 23, 2018 IMAGE: Rendering of Proposed Development Signal Hill Gate Expansion 22 St. Joseph s Lane CONTENTS A. BUILDING

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL)

REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL) CITY OF CARDIFF COUNCIL CYNGOR DINAS CAERDYDD CABINET MEETING: 14 JULY 2016 CARDIFF STATUE AND MONUMENT PROTOCOL REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY

More information

EXPANDING THE PUBLIC TRANSPORT NETWORK THROUGH A FEEDER BUS SYSTEM CHALLENGES AND NEED

EXPANDING THE PUBLIC TRANSPORT NETWORK THROUGH A FEEDER BUS SYSTEM CHALLENGES AND NEED EXPANDING THE PUBLIC TRANSPORT NETWORK THROUGH A FEEDER BUS SYSTEM CHALLENGES AND NEED 4 Dec 2013 Pawan Mulukutla, MS Project Manager - EMBARQ India (pmulukutla@embarqindia.org ) Priyanka Vasudevan, MURP

More information

Last Name: First Name: M.I:

Last Name: First Name: M.I: ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)

More information

Further Comparison of Traffic Noise Predictions Using the CadnaA and SoundPLAN Noise Prediction Models

Further Comparison of Traffic Noise Predictions Using the CadnaA and SoundPLAN Noise Prediction Models Proceedings of 20 th International Congress on Acoustics, ICA 2010 23-27 August 2010, Sydney, Australia Further Comparison of Traffic Noise Predictions Using the CadnaA and SoundPLAN Noise Prediction Models

More information

Making Canberra. A human-centered city. -charter-

Making Canberra. A human-centered city. -charter- Making Canberra A human-centered city -charter- Date: 13th October 2018. Place: Gorman Arts Centre, 55 Ainslie Avenue, Braddon. Suggested citation for this charter: Making Canberra A Human-Centred City

More information

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection East Anglia TWO and East Anglia ONE North Summary and Approach to Site Selection 1 Introduction ScottishPower Renewables (SPR) has recently concluded work in order to inform our onshore site selection

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

strategic policies in the adopted development plan for South Cambridgeshire. Some

strategic policies in the adopted development plan for South Cambridgeshire. Some Strategic in adopted development plan for South Cambridgeshire According to the National Planning Policy Framework () a local planning authority should set out clearly the for their area (para 184). There

More information

The Response from Motorola Ltd. to the Consultation on The Licence-Exemption Framework Review

The Response from Motorola Ltd. to the Consultation on The Licence-Exemption Framework Review The Response from Motorola Ltd. to the Consultation on The Licence-Exemption Framework Review June 21 st 2007. Key Points 1. The introduction of the concept of a version of Commons in which the possible

More information

The Response of Motorola Ltd. to the. Consultation on Spectrum Commons Classes for Licence Exemption

The Response of Motorola Ltd. to the. Consultation on Spectrum Commons Classes for Licence Exemption The Response of Motorola Ltd to the Consultation on Spectrum Commons Classes for Licence Exemption Motorola is grateful for the opportunity to contribute to the consultation on Spectrum Commons Classes

More information

April 7, Notice of Project Change Hyde Park Avenue, Jamaica Plain Phase C Rental Portion of Parcel U. Dear Director Golden:

April 7, Notice of Project Change Hyde Park Avenue, Jamaica Plain Phase C Rental Portion of Parcel U. Dear Director Golden: April 7, 16 Mr. Brian Golden, Director Boston Redevelopment Authority One City Hall Square, Ninth Floor 021 Attn: Phil D. Cohen, Project Manager Re: Notice of Project Change nue, Jamaica Plain Phase C

More information

Submission to the Ministry of Economic Development. on MHz Band Replanning Options

Submission to the Ministry of Economic Development. on MHz Band Replanning Options Submission to the Ministry of Economic Development on 806-960 MHz Band Replanning Options 30 July 2009 Background Metrix, a business unit of Mighty River Power Ltd (MRP), is presently installing Advanced

More information

Newtown SGA Master Plan

Newtown SGA Master Plan Newtown SGA Master Plan CITY OF VIRGINIA BEACH 25 MARCH 2010 Consultant Team Urban Design Associates Lead Firm, Urban Design Landmark Design Group Landscape and Civil Engineering URS Corporation Transportation

More information

M E M O R A N D U M CITY OF BEVERLY HILLS

M E M O R A N D U M CITY OF BEVERLY HILLS M E M O R A N D U M CITY OF BEVERLY HILLS TO: FROM: City Council and Planning Commission Liaison Committee Ryan Gohlich, AICP, Assistant Director of Community Development / City Planner DATE: January 6,

More information

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE Head Office Postal Address T 02 9908 1270 Suite 9 PO Box 270 F 02 9908 1271 38-46 Albany St Neutral Bay 2089 E info@acousticdynamics.com.au St Leonards 2065 ABN: 36 105 797 715 W www.acousticdynamics.com.au

More information

Mapping the capacity and performance of the arterial road network in Adelaide

Mapping the capacity and performance of the arterial road network in Adelaide Australasian Transport Research Forum 2015 Proceedings 30 September - 2 October 2015, Sydney, Australia Publication website: http://www.atrf.info/papers/index.aspx Mapping the capacity and performance

More information

AMTA Submission addressing the draft Terms of Reference of the Convergence Review 2011

AMTA Submission addressing the draft Terms of Reference of the Convergence Review 2011 Convergence Review Secretariat Department of Broadband, Communications and the Digital Economy GPO Box 2154 CANBERRA ACT 2601 By email: convergence@dbcde.gov.au AMTA Submission addressing the draft Terms

More information

Notice of Advice. RevA: 18-September-2017 RevB: 26-September Engineering Assessment of Aurizon network's Capital Claim

Notice of Advice. RevA: 18-September-2017 RevB: 26-September Engineering Assessment of Aurizon network's Capital Claim Notice of Advice AECOM Australia Pty Ltd Level 8 540 Wickham Street PO Box 1307 Fortitude Valley QLD 4006 Australia www.aecom.com +61 7 3553 3740 tel +61 7 3553 2050 fax ABN 20 093 846 925 Attention Graham

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

For personal use only

For personal use only 7 August 2017 ASX: MOD Drilling Resumes at T3 Copper Project Drilling at T3 Copper Project resumes today following DEA approval Approval granted for 17 months, until December 2018 Initial program will

More information

FLY THROUGH ANIMATION

FLY THROUGH ANIMATION RETAIL FLY THROUGH ANIMATION H E N D R I K P OT G I E T E R R O A D 6 WELTEVREDENPARK N 1 W E S T E R N B Y PA S S FAIRLAND GAUTENG JOHANNESBURG WORLD MAP SOUTH AFRICA JOHANNEBURG SITE LOCATION CONSTANTIA

More information

Professor Don Bursill FTSE Chief Scientist for South Australia GPO Box 320 Adelaide January 2013

Professor Don Bursill FTSE Chief Scientist for South Australia GPO Box 320 Adelaide January 2013 Australian Academy of Technological Sciences and Engineering (ATSE) GPO Box 4055, Melbourne Victoria 3001, Australia www.atse.org.au ACN 008 520 394 ABN 58 008 520 394 Professor Don Bursill FTSE Chief

More information

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST One 11 x 17 signed and sealed original set and 11 copies must be submitted to the Planning and Zoning Department inclusive of all

More information

Score grid for SBO projects with a societal finality version January 2018

Score grid for SBO projects with a societal finality version January 2018 Score grid for SBO projects with a societal finality version January 2018 Scientific dimension (S) Scientific dimension S S1.1 Scientific added value relative to the international state of the art and

More information

Proposed Urban Art Park/Safe Graffiti Space at Donevan Recreation Complex

Proposed Urban Art Park/Safe Graffiti Space at Donevan Recreation Complex Public Report To: From: Report Number: Community Services Committee Ron Diskey, Commissioner, Community Services Department CS-17-43 Date of Report: May 5, 2017 Date of Meeting: May 11, 2017 Subject: Proposed

More information

Collaboration Agreement

Collaboration Agreement Collaboration Agreement Central London, West London, Hammersmith & Fulham, Hounslow, Ealing Clinical Commissioning Groups January 2014 Version 5 1 Context In December 2011 the eight North West London (NWL)

More information

Example 1: The visitors are guided to the building entrance by means of increasing illumination densities.

Example 1: The visitors are guided to the building entrance by means of increasing illumination densities. On the basis of three examples, luminance values are compared with each other in specific applications. The examples are the square in front of a historical function building, a train station concourse

More information

2005 HSC Notes from the Marking Centre Food Technology

2005 HSC Notes from the Marking Centre Food Technology 2005 HSC Notes from the Marking Centre Food Technology 2006 Copyright Board of Studies NSW for and on behalf of the Crown in right of the State of New South Wales. This document contains Material prepared

More information

Technology and Innovation in the NHS Scottish Health Innovations Ltd

Technology and Innovation in the NHS Scottish Health Innovations Ltd Technology and Innovation in the NHS Scottish Health Innovations Ltd Introduction Scottish Health Innovations Ltd (SHIL) has, since 2002, worked in partnership with NHS Scotland to identify, protect, develop

More information

Plan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017

Plan Peoria AZ 2040 General Plan Update. Public Workshop #2: Presentation June 5, 2017 Plan Peoria AZ 2040 General Plan Update Public Workshop #2: Presentation June 5, 2017 Introductions City of Peoria Planning Staff Chris Jacques, AICP Planning Director Lorie Dever Senior Planner (Project

More information

MANuFACturers industry QuALity statement.

MANuFACturers industry QuALity statement. MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off

More information