2 Background A number of pipeline girth weld failures have occurred in the US recently Some in newly-constructed pipeline during pre-service hydrostatic proof testing Advisory Bulletin was issued by Pipeline and Hazardous Materials Safety Administration (PHMSA) that highlights these and other issues ADB Girth Weld Quality Issues Due to Improper Transitioning, Misalignment, and Welding Practices of Large Diameter Line Pipe Contributing factors include: High-low misalignment Unequal-wall-thickness transitions High longitudinal stress/strain associated with lifting and lowering-in practices Inadequate tie-in and repair welding procedures Improper inspection and delay times Insufficient adherence to qualified welding procedures 2

3 Industry-Sponsored Activities Guidelines for Interpretation and Application of API 1104 Funded by Pipeline Research Council International (PRCI) Hydrogen Diffusion Demonstration video Funded by Det Norske Veritas (U.S.A.), Inc. (DNV) and Spectra Energy Pre-Advisory Bulletin Guidelines to Address Construction Quality Issues Funded by PRCI and PHMSA In-kind contribution from PRCI to PHMSA Welding of Field Segmented Induction Bends and Elbows for Pipeline Construction Joint industry project (JIP) at DNV In response to Advisory Bulletin 3

4 PRCi Project API1-2, Catalog L52306 Guidelines for Interpretation and Application of API 1104 The application of requirements in many industry codes and standards requires interpretation by the user (and by the regulator who is called upon to enforce their use) Often differences occur in the application of API 1104 due to unclear specification language Some industry codes and standards contain guidance in the form of commentary sections or companion documents AWS D1.1 Structural Welding Code Steel CSA Z662 Oil and Gas Pipeline Systems This is not the case for API 1104 Requests for interpretation are common because of unclear requirements or an absence of information pertaining to rationale 4

5 Objective/Status Objective was to develop a companion document for API 1104 to allow users to better understand: The intent regarding interpretation of some requirements The rationale behind the requirements The applicability of API 1104 to both conventional and modern high-strength pipelines Status Project was completed in April 2010 Report is available from PRCI Report describes development of guidance document Guidance document is contained in appendix to report PRCI.org > Published Reports > search Catalog No.: L52306 Free for PRCI members, $400 for non-members 5

6 PRCi Project MATH 5-1 Guidelines to Address Construction Quality Issues Objective is to develop guidelines pertaining to issues identified by PHMSA related to pipeline construction quality and how these issues should be addressed in the field Joint project between DNV and CRES Initial tasks being funded by PRCI Remainder of tasks being funded by PHMSA PRCI work being provided as in-kind contribution to PHMSA Approximately 60% complete Targeted completion date is December 31,

7 PRCi Project MATH 5-1 Construction Quality Project Activities Task 1 Review of Recent Incidents and Relevant Literature Task 2 Examination of Key Contributing Factors Task 2a High-Low Misalignment* Task 2b Unequal-Wall-Thickness Transitions* Task 2c Lifting and Lowering-In Practices Task 2d Tie-in and Repair Welding* Task 2e Inspection and Delay Times* Task 2f Adherence to Qualified Welding Procedures Task 3 Integration of Results Task 4 Development of Guidelines Document Task 5 Reporting and Program Management CRES primary responsibility DNV primary responsibility * Also covered in Segmented Induction Bends and Elbows JIP 7

8 Review of Recent Incidents and Relevant Literature Common factors for recent girth weld failures during hydrostatic testing were identified Many attributed to hydrogen-induced cracking Production welds in pipelines constructed using conventional stove-pipe techniques (cellulosic-coated electrodes) Welds at wall thickness transitions in particular Repair and tie-in welds (cellulosic-coated electrodes) in pipelines otherwise constructed using mechanized gas-metal arc welding No failures of mechanized gas-metal arc welds Transition welds at segmented induction bends and elbows Many involve pipelines targeted for operation at 80% SMYS Large diameter line pipe made from high-strength steel and/or heavy wall thickness material Increased stiffness tends to concentrate bending stresses during movement at girth welds 8

9 Development of Guidelines Results are being used to develop guidelines that address the construction quality issues that have been identified Two versions are being developed Technical version for engineers, etc. Non-technical version for welders, helpers, etc. The primary focus is the development of easy to read, cohesive documents that will be useful to both owner companies and contractors Proper alignment helps reduce stress 9

10 Joint Industry Project Welding of Field Segmented Induction Bends and Elbows for Pipeline Construction 10

11 Joint Industry Project: Welding of Field Segmented Induction Bends and Elbows for Pipeline Construction Cold field bends are not practical for all pipeline construction applications Segmenting long radius elbows and induction bends is often a necessary part of normal construction practice Current guidance that existed regarding the use of segmented fittings for pipeline construction was less than adequate Joint Industry Project (JIP) was organized by Spectra Energy and conducted by DNV to develop guidelines Guidance regarding the specification and purchase of segmentable fittings Guidance for field construction practices Guidance for segmented fittings in existing pipelines 11

12 JIP Project Participants Spectra Energy - Chair Alliance Pipeline CenterPoint Energy El Paso Corporation Kinder Morgan NiSource/Columbia Gas Panhandle Energy TransCanada PipeLines Williams PHMSA/INGAA to be kept abreast of progress 12

13 Project Activities Phase 1 Guidance for specification and purchase Task 1 Review current industry codes and company specifications Task 2 Review current manufacturing practices Task 3 Establish dimensional control capabilities Task 4 Develop proposed specification requirements for purchasing Phase 2 Guidance for field construction practices Task 5 Develop optimal methods for mapping, cutting, beveling, and transitioning Task 6 Develop limits for high-low misalignment and alternative joint designs Task 7 Develop methods for measuring high-low and addressing misalignment Task 8 Develop backwelding guidance Task 9 Address radiographic issues for welds with internal misalignment Task 11 Development of guidance for revision of construction specifications Phase 3 Guidance for existing pipelines Task 10 Assess use of caliper tool data 13

14 Technology Transfer The PRCi and JIP projects provide detailed guidance on how to responsibly apply best practice field construction methods with an emphasis on methods to field segment and install fittings and induction bends. It is now the shared responsibility of pipeline operators and contractors to implement these construction methods. 14

15 Thank You for Your Attention Questions??? 15

Pipeline Research Council International, Inc.

Pipeline Research Council International, Inc. Pipeline Research Council International, Inc. Technology Development for Pipeline Integrity Current Features & Coming Attractions API 2012 Pipeline Conference & Cybernetics Symposium Phoenix, AZ April

More information

ASME B31.3 INTERPRETATIONS NO. 13

ASME B31.3 INTERPRETATIONS NO. 13 /. '.... _,' ASME B31.3 INTERPRETATIONS NO. 13 1 Replies to Technical Inquiries April 1, 1994, Through March 31, 1995 General Information It has been agreed to publish interpretations issued by the B31

More information

Pipeline Research Council International, Inc.

Pipeline Research Council International, Inc. Pipeline Research Council International, Inc. The Future of the Pipeline Industry Cliff Johnson President NAPCA Summer Workshop August 16, 2012 2 Outline PRCI Overview State of the Pipeline Industry Changing

More information

ACF Maintenance Bulletin. TC-200 Revision B. ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement

ACF Maintenance Bulletin. TC-200 Revision B. ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement ACF Maintenance Bulletin TC-200 Revision B ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement May 16, 2016 SHEET: 1 of 13 FOREWORD: This ACF Maintenance Bulletin TC-200 details the inspection

More information

JVI Vector Connector

JVI Vector Connector The JVI Vector Connector User Guidelines 1 of 11 INTRODUCTION JVI designed the Vector Connector for use as shear and alignment connections between precast concrete elements such as double-tee flanges,

More information

Energy Pipelines CRC Building for the Future. Valerie Linton

Energy Pipelines CRC Building for the Future. Valerie Linton Energy Pipelines CRC Building for the Future Valerie Linton Energy Pipelines CRC Enabling safer, more efficient and reliable pipelines to meet Australia s growing energy needs Background Energy Pipelines

More information

Standards and Competencies

Standards and Competencies Skill Performance The skill performance assessment includes the completion of a metal project and a demonstration of the ability to weld carbon steel, aluminum or stainless-steel project in various using

More information

Initiating Cracks in PCC Pavements. Malcolm K. Lim, PE

Initiating Cracks in PCC Pavements. Malcolm K. Lim, PE Initiating Cracks in PCC Pavements by Malcolm K. Lim, PE Technology Transfer Concrete Consortium (TTCC) and National Concrete Consortium (NCC) Fall 2009, St Louis, MO Better Performance Through Innovative

More information

The Essentials of Pipeline Integrity Management

The Essentials of Pipeline Integrity Management TRAINING METHODOLOGY This interactive training workshop includes the following training methodologies : Lectures Video Discussion of case histories and hands on calculations WHO SHOULD ATTEND The course

More information

GAS GATHERING LINES. Presented to OHIO GAS ASSOCIATION 2012 Technical Seminar Seminar. March 29, 2012 Marriott Columbus Northwest Hotel

GAS GATHERING LINES. Presented to OHIO GAS ASSOCIATION 2012 Technical Seminar Seminar. March 29, 2012 Marriott Columbus Northwest Hotel GAS GATHERING LINES Presented to OHIO GAS ASSOCIATION 2012 Technical Seminar Seminar March 29, 2012 Marriott Columbus Northwest Hotel 5605 Blazer Parkway Dublin, Ohio 43017 by Paul E. Oleksa Oleksa and

More information

Determining Remaining Strength of Corroded Pipelines. Houston Section April 10, 2012

Determining Remaining Strength of Corroded Pipelines. Houston Section April 10, 2012 Determining Remaining Strength of Corroded Pipelines Houston Section April 10, 2012 Who is DCP Midstream? Formerly Duke Energy Field Services the Company was renamed on January 1, 2007 to align with DCP

More information

Trade of Sheet Metalwork. Module 3: Thermal Processes Unit 13: MMA Butt Weld Flat Position Phase 2

Trade of Sheet Metalwork. Module 3: Thermal Processes Unit 13: MMA Butt Weld Flat Position Phase 2 Trade of Sheet Metalwork Module 3: Thermal Processes Unit 13: MMA Butt Weld Flat Position Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 3 Thermal

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

NCCER Progress Blvd, Alachua, Florida Phone: (888)

NCCER Progress Blvd, Alachua, Florida Phone: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPEFITTING Competencies / Objectives Level One MODULE 08101-06 - ORIENTATION TO THE TRADE 1. Describe the

More information

RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI.

RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI. RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By Ir. Muhd Ashri Mustapha & Dr. Yong BaI. June 2011 Hannover All rights reserved. No part of this document may be reproduced,

More information

Module 4 Design for Assembly IIT BOMBAY

Module 4 Design for Assembly IIT BOMBAY Module 4 Design for Assembly Lecture 8 Case Studies - IV Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles

More information

COASTAL BEND COLLEGE WELDING SYLLABUS (Revised 8/10) Introduction to Blueprint Reading for Welders

COASTAL BEND COLLEGE WELDING SYLLABUS (Revised 8/10) Introduction to Blueprint Reading for Welders COASTAL BEND COLLEGE WELDING SYLLABUS (Revised 8/10) WLDG 1313: Introduction to Blueprint Reading for Welders Semester Hours: 3 Textbooks: Blueprint Reading For Welders, by A.E. Bennett & Louis J. Siy,

More information

DEPARTMENT OF TRANSPORTATION BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION DEPARTMENT OF TRANSPORTATION BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION ) Pipeline Safety: Information Collection Activities ) Docket No. PHMSA 2013 0061 ) COMMENTS OF THE AMERICAN

More information

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC.

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC. Arctic Council Open Access Repository Arctic Council http://www.arctic-council.org/ 1.8 Sweden Chairmanship I (May 2011 - May 2013) 4. SAO Meeting, March 2013, Stockholm, Sweden SUMMARY REPORT AND RECOMMENDATIONS

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S BOILERMAKER PRESSURE VESSEL V2 BLMK34_02 October 2014 Focus Statement A journey level boilermaker is skilled in all aspects

More information

Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation To cite this

More information

OBSERVATORY SERVICING AND MAINTENANCE

OBSERVATORY SERVICING AND MAINTENANCE OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I

More information

BRAZE INSTRUCTION VIDEO

BRAZE INSTRUCTION VIDEO BRAZE INSTRUCTION VIDEO 1 Purpose: The purpose of this video is to provide instructions, guidelines and examples as to the proper techniques involved in the brazing of diamond cutters into matrix or steel

More information

Ritch Rappel Enbridge

Ritch Rappel Enbridge Ritch Rappel Enbridge Pipeline Safety Trust October 21, 2016 Quality is Free When it is Done Right. n Inspection does more quantity survey than quality documentation." n Each inspector is required to complete

More information

SPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING

SPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING SPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING CU11 14/11/2012 Page 1 of 108 Contents SECTION 1: SPECIFICATION FOR PIPEWORK WELDING INSPECTION AND TESTING GENERAL CLASSIFICATION

More information

Inspection Kit Alignment, Measurement & Weld Measuring Gauges Model: IK-BACT13. Welders, CWI Inspectors, Instructors

Inspection Kit Alignment, Measurement & Weld Measuring Gauges Model: IK-BACT13. Welders, CWI Inspectors, Instructors Inspection Kit Inspection Kit Alignment, Measurement & Weld Measuring Gauges Model: IK-BACT13 Brief Aluminium Case Type Size: 430mm x 290mm x 35mm Welders, CWI Inspectors, Instructors Now You Can Design

More information

Optional Training Courses - January 26, 2015

Optional Training Courses - January 26, 2015 Optional Training Courses - January 26, 2015 Risk-Based Inspection (8 Hours) Trainer: Lynne Kaley The details of API s recommended practices (API 580 and API 581) will be presented by recognized industry

More information

Producing platework components and assemblies. Outcome one

Producing platework components and assemblies. Outcome one 006 UNIT 023 Producing platework components and assemblies Learning outcomes 1 2 Know how to produce platework components and assemblies Performance evidence must be the main form of evidence gathered.

More information

SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method

SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method OBJECTIVE: Upon completion of this lesson the learner will be able to strike and maintain an arc using SMAW on steel plate

More information

Steel Nipples. Nipples & Fittings. Black and Galvanized Steel Nipples. Black and Galvanized. Steel Nipples. 142

Steel Nipples. Nipples & Fittings. Black and Galvanized Steel Nipples. Black and Galvanized. Steel Nipples. 142 PRODUCT SPECIFICATIONS Welded steel pipe nipples both galvanized an dblack in diameters ranging from 1/8 up to 4 in lengths from close to 12 and cut-pipe up to 120. TECHNICAL SPECIFICATIONS Standards:

More information

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations SUBSEA ASIA 2012 Kuala Lumpur Convention Centre, Malaysia Conference 03 October 2012 By John

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 4680:2006 AS/NZS 4680:2006 Australian/New Zealand Standard Hot-dip galvanized (zinc) coatings on fabricated ferrous articles AS/NZS 4680:2006 This Joint Australian/New Zealand Standard was prepared

More information

7th International Pipeline Conference September 29-October 3, 2008, Calgary, Alberta, Canada

7th International Pipeline Conference September 29-October 3, 2008, Calgary, Alberta, Canada 7th International Pipeline Conference September 29-October 3, 2008, Calgary, Alberta, Canada IPC2008-64148 TECHNOLOGY TRANSFER: MOVING KNOWLEDGE FROM RESEARCH INTO INDUSTRY STANDARDS Cliff Johnson NACE

More information

The influence of gouge defects on failure pressure of steel pipes

The influence of gouge defects on failure pressure of steel pipes IOP Conference Series: Materials Science and Engineering OPEN ACCESS The influence of gouge defects on failure pressure of steel pipes To cite this article: N A Alang et al 2013 IOP Conf. Ser.: Mater.

More information

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,

More information

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2 Trade of Metal Fabrication Module 5: Pipe Fabrication Unit 3: Flanges Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 5 Pipe Fabrication... 7 Unit

More information

Interpretations No. 1 to ANSI/ASME 831.8

Interpretations No. 1 to ANSI/ASME 831.8 Interpretations No. 1 to ANSI/ASME 831.8 (This supplement Is not part of ANSIIASME 831.8 or the Addenda It is included for Information only.) It has been agreed to publish lnterpretations issued by the

More information

Basic Measurements for Pipe Inspections

Basic Measurements for Pipe Inspections Basic Measurements for Pipe Inspections Period 7 Basic Corrosion Course 2017 February 21-23, 2017 Mark Anderson-MTS 1 DOT 192.459 External corrosion control: Examination of buried pipeline when exposed.

More information

SiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008

SiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008 SiRCoS Submarine pipeline repair system Carlo Maria Spinelli - Bratislava, 18-19 September 2008 Outline 1 Introduction to subsea pipelines 2 Deep water projects 3 Pipeline damage & scenarios 4 SiRCoS Repair

More information

Title of Innovation: In-Line Inspection for Water Pipelines

Title of Innovation: In-Line Inspection for Water Pipelines Title of Innovation: In-Line Inspection for Water Pipelines Nominee(s) Margaret Hannaford, P.E., Division Manager, Hetch-Hetchy Water and Power Division of the San Francisco Public Utilities Commission

More information

SEMPEO2-23 (SQA Unit Code - FP2Y 04) Producing platework components and assemblies

SEMPEO2-23 (SQA Unit Code - FP2Y 04) Producing platework components and assemblies Overview This standard covers a broad range of basic heavy platework (above 3 mm) competences that will prepare you for entry into the engineering or manufacturing sectors, creating a progression between

More information

Pipeline & Specialty Services (P&SS)

Pipeline & Specialty Services (P&SS) Pipeline & Specialty Services (P&SS) A Pipeline Inspection Case Study: Design Improvements on a New Generation UT In-line Inspection Crack Tool Mark Slaughter Global Product Line Manager Pipeline & Specialty

More information

Paper 5 DEVELOPING GUIDELINES FOR EVALUATING DAMAGE TO SUBSEA PIPELINES

Paper 5 DEVELOPING GUIDELINES FOR EVALUATING DAMAGE TO SUBSEA PIPELINES Paper 5 DEVELOPING GUIDELINES FOR EVALUATING DAMAGE TO SUBSEA PIPELINES C. Alexander*, R. Ayers Stress Engineering Services, Inc., Houston, Texas USA B. Exley Williams Gas Pipeline, Houston, Texas USA

More information

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does

More information

New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines

New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines A. Barbian 1, M. Beller 1, F. Niese 2, N. Thielager 1, H. Willems 1 1 NDT Systems & Services

More information

Producing platework components and assemblies

Producing platework components and assemblies Unit 823 Producing platework components and assemblies UAN: R/600/5880 Level: Level 2 Credit value: 14 GLH: 64 Relationship to NOS: Endorsement by a sector or regulatory body: Aim: This unit has been derived

More information

Subsea Asset Integrity. Matthew Kennedy

Subsea Asset Integrity. Matthew Kennedy Subsea Asset Integrity Matthew Kennedy matthew.kennedy@1csi.uk 1 Typical Asset Integrity Cycle Mitigation, Intervention and Repair. Risk Assessment and IM Planning Support Engineering support during anomaly

More information

High Reliability Organizing Conference. Deepwater Horizon Incident Investigation

High Reliability Organizing Conference. Deepwater Horizon Incident Investigation 1 High Reliability Organizing Conference Deepwater Horizon Incident Investigation April 20, 2011 2 Disclaimer The PowerPoint presentation given by Mark Griffon, Board Member, United States Chemical Safety

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL MAINTENANCE MECHANIC V4 MEMT32_04 Released June 2013 Focus Statement A journey-level Industrial Maintenance Mechanic

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014 National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL BOILERMAKER - MAINTENANCE V4 October 2014 Focus Statement A journey level industrial boilermaker in maintenance

More information

AIR PLASMA CUTTING C71

AIR PLASMA CUTTING C71 AIR PLASMA CUTTING C71 Quick specs Industrial Application: Home workshops Metal workshops For These materials: Mild Steel Brass Input Power: 400V, 3-Phase Amperage Range: 20-70A Rated Output at 40 C (104

More information

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings. 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

JIS G3465 Seamless Steel Tubes for Drilling

JIS G3465 Seamless Steel Tubes for Drilling JIS G3465 Seamless Steel Tubes for Drilling 1. Scope This Japanese Industrial Standard specifies the seamless steel tubes, hereinafter referred to as the "tubes", used for casing tube, core tube and drill

More information

NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION

NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION Prepared by Liftech Consultants Inc. Quality Assurance Review for Liftech Consultants Inc. Author: Kenton Lee Structural Engineer Editor: Erik Soderberg

More information

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. Release Notes: Release 2 Issued May 2016 Document # OM ST 001, Shock Tool Operating Manual Reviewed By: RG 1 P age OPERATING MANUAL SHOCK TOOL

More information

DNV-OS-F101 Checker. User Manual

DNV-OS-F101 Checker. User Manual DNV-OS-F101 Checker User Manual For Version: 1.0.9 Copyright 2010-2016 OPIMsoft Technology Co., Ltd. All Rights Reserved. INDEX 1 FUNCTION... 1 2 INSTALLATION... 2 3 HOW TO USE... 3 4 INTERFACE DETAIL...

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

Visual Testing of Pipe Threads

Visual Testing of Pipe Threads From NDT Technician, Vol. 10, No. 1, pp: 1 5. Copyright 2011 The American Society for Nondestructive Testing, Inc. The American Society for Nondestructive Testing www.asnt.org FOCUS AAs an oil well is

More information

Safety of Gas Transmission and Gathering Pipelines

Safety of Gas Transmission and Gathering Pipelines Safety of Gas Transmission and Gathering Pipelines RIN: 2137-AE72 Docket: PHMSA - 2011 0023 Gas Pipeline Advisory Committee Meeting December 14-15, 2017 1 Recap of 1/11 & 1/12/2017 Meetings Topic 6-month

More information

Delineation and Regulatory Oversight of Processing Oil and Gas Midstream Facilities

Delineation and Regulatory Oversight of Processing Oil and Gas Midstream Facilities Delineation and Regulatory Oversight of Processing Oil and Gas Midstream Facilities Presented by Subcommittee on Midstream Facility Safety PHMSA Gas & Liquids Technical Advisory Committees August 2015

More information

NVIC March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO Tensile Fasteners

NVIC March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO Tensile Fasteners UNITED STATES COAST GUARD COMMANDANT (MMT-4) U.S. COAST GUARD WASHINGTON, DC 20591 NVIC 3-68 21 March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO. 3-68 Subj: Tensile Fasteners 1. Purpose. The purpose

More information

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification

More information

Basic terms of a welded joint are shown in Fig and the five basic types of joints are shown in Fig

Basic terms of a welded joint are shown in Fig and the five basic types of joints are shown in Fig Welding is an effective method of making permanent joints between two or more metal parts. Cast iron, steel and its alloys, brass and copper are the metals that may be welded easily. Production of leak

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

Welding Qualification/Certification

Welding Qualification/Certification Welding Qualification/Certification 9/14/2011 1 Index Page Number Pre-testing Procedure 3 Bend Test Procedure Coupons 4 Drawing for cutting Coupons and Back strap removal 5-9 Preparation and Testing Procedure

More information

ASME INTERPRETATIONS NO. 19

ASME INTERPRETATIONS NO. 19 ASME 831.3 INTERPRETATIONS NO. 19 Replies to Technical Inquiries April 1, 2001 through October 31, 2003 General Information It has been agreed to publish interpretations issued by the B31 Committee concerning

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL PIPEFITTER V4 September 2013 Focus Statement An advanced pipefitter: Masters mathematical functions and knows

More information

December 30, Christopher A. Hart National Transportation Safety Board 490 L Enfant Plaza, SW Washington, DC Dear Chairman Hart,

December 30, Christopher A. Hart National Transportation Safety Board 490 L Enfant Plaza, SW Washington, DC Dear Chairman Hart, December 30, 2016 Christopher A. Hart National Transportation Safety Board 490 L Enfant Plaza, SW Washington, DC 20594 Dear Chairman Hart, In response to the safety study on Integrity Management of Gas

More information

SPIRAL PIPE PLANTS. Tailor-made solutions with measurable benefits

SPIRAL PIPE PLANTS. Tailor-made solutions with measurable benefits SPIRAL PIPE PLANTS Tailor-made solutions with measurable benefits SMS GROUP Leaders in plant construction and machine engineering The SMS group unites global players in the construction of plants and machines

More information

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. GOMR OCS Subsea Pipelines Regulatory Perspectives Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. Gobert Overview Governing Regulations & Guidance Documents GOMR Pipeline

More information

WELDING FABRICATION. First, download and review the General Regulations at: updates.skillsusa.org.

WELDING FABRICATION. First, download and review the General Regulations at: updates.skillsusa.org. WELDING FABRICATION PURPOSE To evaluate each contestant s preparation for employment and to recognize outstanding students for excellence and professionalism in the field of fabrication. First, download

More information

EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection

EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection WaveTrue Science + Technologies 504 El Paraiso Rd NE Albuquerque, NM 87113 CEO Ron Floit President John DeWees (888) 711-2532/ (212) 625-6622

More information

SPOOLBASE & MULTIJOINT SERVICES

SPOOLBASE & MULTIJOINT SERVICES SPOOLBASE & MULTIJOINT SERVICES PIPELINE FABRICATION COMPANY PROFILE Pipeline Technique is a world leading provider of solutions to the oil and gas industry for the most demanding challenges in Welding,

More information

Probability-based fatigue inspection planning

Probability-based fatigue inspection planning Probability-based fatigue inspection planning THE MARINE TECHNOLOGY DIRECTORATE LIMITED

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

WELDING FABRICATION NYS

WELDING FABRICATION NYS WELDING FABRICATION NYS PURPOSE To evaluate each contestant s preparation for employment and to recognize outstanding students for excellence and professionalism in the field of fabrication. ELIGIBILITY

More information

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual

More information

ONSHORE SERVICES PIPELINE CONSTRUCTION

ONSHORE SERVICES PIPELINE CONSTRUCTION ONSHORE SERVICES PIPELINE CONSTRUCTION COMPANY PROFILE Pipeline Technique is a world leading provider of solutions to the oil and gas industry for the most demanding challenges in Welding, Non Destructive

More information

Welcome to the Pipeline Integrity Seminar

Welcome to the Pipeline Integrity Seminar Welcome to the Pipeline Integrity Seminar Pipelines and their infrastructure play a vital role in Alberta s gas & oil heavy economy. The design, maintenance, and integrity are of paramount importance.

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping

More information

Volume 11 Number 05- May CANUSkCPS A ~I4AwrnP rn~apa~jv. IflfeIIiCOATTM

Volume 11 Number 05- May CANUSkCPS A ~I4AwrnP rn~apa~jv. IflfeIIiCOATTM V V~ Volume 11 Number 05- May 2011 01 CANUSkCPS A ~4AwrnP rn~apa~jv flfeicoattm /7 f / 0 /1 1~~ L_.~ [ J:J~ K ( / ( L ~ 7/ 1... CONQUERNG CHALLENGES Jim Tolly, Farwest Corrosion Control Company, USA, explains

More information

Safety Instructions Manual Original Instructions - RRM2

Safety Instructions Manual Original Instructions - RRM2 Radius Roller RRM2 Safety Instructions Manual Original Instructions - RRM2 Safety Manual 1 General Operator and Supervisor Information Signal Word Definition Signal Word Panel 2 Shop Press Signal Word

More information

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018 Offshore Support Vessels Located in the US Gulf of Mexico in March 18 IMCA March 1, 18 Prepared by IMCA The International Marine Contractors Association (IMCA) is the international trade association representing

More information

AIR PLASMA CUTTING C101

AIR PLASMA CUTTING C101 AIR PLASMA CUTTING C101 Quick specs Industrial Application: Home workshops Metal workshops For These materials: Mild Steel Brass Input Power: 400V, 3-Phase Amperage Range: 20-100A Rated Output at 40 C

More information

PENSTOCK CONDITION ASSESSMENT

PENSTOCK CONDITION ASSESSMENT Northwest Hydro Association May 17, 2012 Technical Seminar PENSTOCK CONDITION ASSESSMENT Thomas L. Kahl, P.E. Kleinschmidt TOPICS Concerns Types of Penstock Failure Modes Steel and Wood Stave Failure Mode

More information

Ring Pair Corrosion Monitor : RPCM

Ring Pair Corrosion Monitor : RPCM Ring Pair Corrosion Monitor : RPCM RPCM is an in-line, piggable, monitor for pipelines, flow lines and process pipework giving true corrosion rate measurement in all service conditions due to full inner

More information

AN OVERVIEW OF THE PIPELINE DEFECT ASSESSMENT MANUAL (PDAM)

AN OVERVIEW OF THE PIPELINE DEFECT ASSESSMENT MANUAL (PDAM) 4th International Pipeline Technology Conference 9-13 May 2004, Oostende, Belgium AN OVERVIEW OF THE PIPELINE DEFECT ASSESSMENT MANUAL (PDAM) ANDREW COSHAM Penspen Integrity @ (a member of the Penspen

More information

TECHNICAL REPORT JOINT INDUSTRY PROJECT SUBSEA UMBILICALS: PROPOSED DRAFT FOR REVISION OF ISO REPORT NO REVISION NO.

TECHNICAL REPORT JOINT INDUSTRY PROJECT SUBSEA UMBILICALS: PROPOSED DRAFT FOR REVISION OF ISO REPORT NO REVISION NO. ISO/TC 67/SC 4 N 297 Annex A JOINT INDUSTRY PROJECT SUBSEA UMBILICALS: PROPOSED DRAFT FOR REVISION OF ISO 13628-5 REPORT NO. 2004-0634 REVISION NO. 0 DET NORSKE VERITAS Date of first issue: Project No.:

More information

ERECTION & CONSTRUCTION

ERECTION & CONSTRUCTION ERECTION & CONSTRUCTION High Strength Structural Bolting Author: Clark Hyland Affiliation: Steel Construction New Zealand Inc. Date: 24 th August 2007 Ref.: Key Words High Strength Bolts; Property Class

More information

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014! PT Hallin Marine June 18 th, 2014! Introduction Issues and Risks Inspection, Maintenance & Repair Case Study Conclusions and Recommendations 2 Introduction Subsea Pipeline IMR q Obtain data to assess the

More information

Delmec Engineering Limited

Delmec Engineering Limited Delmec Engineering Limited DEL6 Tower Maintenance Specification Delmec Product Manual 2 Delmec Engineering Ltd. Approvals Name Signature Date Ivan Daly Kealan Delaney Delmec Engineering Ltd. Distribution

More information

Pipeline Repair Systems

Pipeline Repair Systems Pipeline Repair Systems Pipeline Repair Systems Subsea Innovation is a world leader in the supply of split sleeve pipeline repair equipment with over 20 systems supplied to major operators around the

More information

Study on Subsea Petroleum Pipeline Design in Deepwater

Study on Subsea Petroleum Pipeline Design in Deepwater Study on Subsea Petroleum Pipeline Design in Deepwater Abd Khair Junaidi, a and Jaswar Koto, a,b,* a) Department of Aeronautics, Automotive and Ocean Engineering, Mechanical Engineering, Universiti Teknologi

More information

Weldment Visual Inspection Requirements

Weldment Visual Inspection Requirements Table of Contents 1.0 Purpose / Scope / Timing... 2 1.1 Purpose / Scope... 2 1.2 Compliance Date... 2 2.0 Procedure / Quality Recd Requirements... 2 2.1 General Requirements... 2 2.2 Acceptance Criteria...

More information

Vinidexair THE BLUE AIR PRESSURE PIPING SYSTEM

Vinidexair THE BLUE AIR PRESSURE PIPING SYSTEM Vinidexair THE BLUE AIR PRESSURE PIPING SYSTEM Vinidexair - the blue air pressure piping system Compressed air should be handled with respect. Now there is a poly pipe designed specifically to handle compressed

More information

New generation of welding and inspection systems

New generation of welding and inspection systems New generation of welding and inspection systems Throughout the pipeline industry, and particularly in offshore and spool base production, welding requirements are shifting toward higher quality, greater

More information

ASME B31.3 INTERPRETATIONS NO. 11

ASME B31.3 INTERPRETATIONS NO. 11 ,..,.- r, ASME B31.3 INTERPRETATIONS NO. 11 Replies to Technical Inquiries April 1,1992, Through March 31,1993 'I General Information,It has been agreed to publish interpretations issued by the B31 Committee

More information

Figure 11 Flange Adapter and Back-Up Ring

Figure 11 Flange Adapter and Back-Up Ring Flange Adapters Standard back-up rings are Standard back-up rings are convoluted ductile iron with AWWA C207 150 lb drilling. One edge of the back-up ring bore must be radiused or chamfered. This edge

More information

OTTO ARC TABLE OF CONTENTS INTRODUCTION PIPE SYSTEMS CONTACT US! ARC-PS (Pipe System) ARC-3R (Pressing Roller Pipe Welding System)

OTTO ARC TABLE OF CONTENTS INTRODUCTION PIPE SYSTEMS CONTACT US! ARC-PS (Pipe System) ARC-3R (Pressing Roller Pipe Welding System) OTTO ARC INTRODUCTION Otto Arc Systems, Inc., formerly Otto Tool, has been in business for over 27 yrs. We have provided Beveling and Facing Equipment since the day we opened our doors and have been expanding

More information