1 ISO/TC 67/SC 4 N 297 Annex A JOINT INDUSTRY PROJECT SUBSEA UMBILICALS: PROPOSED DRAFT FOR REVISION OF ISO REPORT NO REVISION NO. 0 DET NORSKE VERITAS
2 Date of first issue: Project No.: Approved by: Organisational unit: Kim Mørk Riser, Moorings and Fundations Head of Section Client: Joint Industry Project Client ref.: DET NORSKE VERITAS Veritasveien 1 N-1322 Høvik Norway Tel: Fax: Summary: Encouraged by the industry, DNV has taken the initiative to invite to a Joint Industry Project (JIP) that shall address issues that are not sufficiently covered by the current ISO standard for subsea umbilicals, ISO This report presents the issues raised so far, and how these issues may be implemented in ISO The suggested changes are presented in chapter 2. An overview of the ISO standard, illustrating the identified changes, is presented in Appendix A. This revision of the report, rev. 0, is a very preliminary draft. It is intended to work as a basis for further discussions in the project regarding which changes that should be prioritized in the further work. The project participants are still welcome to bring up additional issues to be addressed in the project. Report No.: Subject Group: Indexing terms Report title: Key words Service Area Subsea Umbilicals: Proposed Draft for Revision of ISO Work carried out by: Yngve J. Arnesen, Olav Aamlid, Andreas Echtermeyer, Kjell Hagen, Rolf B. Johansen, Nils Sødahl, Work verified by: Andreas Echtermeyer and Nils Sødahl Date of this revision: Rev. No.: Number of pages: Umbilicals International Standard Technology Qualification Market Sector Upstream, Oil and Gas No distribution without permission from the client or responsible organisational unit (however, free distribution for internal use within DNV after 3 years) No distribution without permission from the client or responsible organisational unit. Strictly confidential Unrestricted distribution 2002 Det Norske Veritas AS All rights reserved. This publication or parts thereof may not be reproduced or transmitted in any form or by any means, including photocopying or recording, without the prior written consent of Det Norske Veritas AS.
3 Table of Content Page 1 INTRODUCTION PROPOSED CHANGES Task 1-2: General aspects Establish safety philosophy Establish philosophy entire sub-sea system reliability Establish philosophy for qualification and testing List typical engineering tasks in a project Task 1-3: Design Global analysis On-bottom stability analyses: Vortex Induced Vibrations (VIV): Interaction and clashing: Minimum Bending Radius (MBR) Maximum Handling Tension (MHT) Cross section analysis Joints, termination and splice Terminations and ancillary equipment design Task 1-4: Metal pipes Wall thickness Maximum acceptable accumulated strain Plastic deformation Corrosion testing NDE Welding and mechanical testing Link to design Task 1-5: Installation and operation Installation procedures Repair Electrical aspects Task 1.6 Aspects related to production Task 1-3 Joints - Mechanical performance of termination 9 3 REFERENCES Appendix A Overview of ISO Page i
4 1 INTRODUCTION Encouraged by the industry, DNV has taken the initiative to invite to a Joint Industry Project (JIP) that shall address issues that are not sufficiently covered by the current ISO standard for subsea umbilicals, ISO A work-shop was arranged by DNV at Høvik, Norway, in November Present at this workshop were representatives from the Scandinavian industry; oil companies, umbilical manufacturers and steel suppliers. Several issues that need to be addressed were identified. Based on the outcome of this work-shop DNV prepared a JIP proposal to the work-shop participants, ref /11/. During the work-shop arranged at Høvik in November 2003, some of the issues that need to be addressed were identified. This report presents the issued raised so far, and how these issues may be implemented in ISO The suggested changes are presented in chapter 2. An overview of the ISO standard, illustrating the identified changes, is presented in Appendix A. This revision of the report, rev. 0, is a very preliminary draft. It is intended to work as a basis for further discussions in the project regarding which changes that should be prioritized in the further work. The project participants are still welcome to bring up additional issues to be addressed in the project. 2 PROPOSED CHANGES The following tasks have been defined based in the November 2003 work-shop and the first participant meeting in April The task numbers are identical to those used in the project proposal. Appendix A illustrates how these changes may be implemented in ISO Task 1-2: General aspects These aspects will be included in chapter 4 of ISO This may require that this chapter is re-structured and re-named. Further, other relevant paragraphs of the ISO document have to be reviewed and the safety principles have to be implemented Establish safety philosophy The principles and requirements stated in the current DNV Offshore Standard for dynamic risers (DNV OS-F201) /1/ shall be adopted and modified to fit subsea umbilicals Establish philosophy entire sub-sea system reliability Minimum requirements to the scope of reliability analyses shall be defined, and the general principles of such analyses shall be stated. The focus shall be on the total system, including electrical systems. Page 1
5 2.1.3 Establish philosophy for qualification and testing The principles and requirements of the DNV Recommended Practice for qualification of new technology (DNV RP-A203) /2/ shall be adopted and made specific for subsea umbilicals. Specific testing procedures shall also be addressed List typical engineering tasks in a project Examples of typical distribution of work and preferred roles for the different companies can be included in an appendix to the ISO document. 2.2 Task 1-3: Design Global analysis It is proposed to maintain the overall structure of section 6 of the current ISO document. However, the section should be significantly expanded / revised to include minimum requirements to global load effect analyses. Redundant requirements given in section 6 and 9 should be coordinated (e.g. Dynamic service life, Seabed stability). An informative annex should be established to give additional guidance on global load effect analyses. A consistent cross-reference to local load sharing analysis should be given throughout the document to provide umbilical specific design analysis guidance. The following generic issues will be addressed: Brief introduction to relevant global analyses procedures Discussion of umbilical specific nonlinearities and link to recommended analyses procedures Guidance on modelling of special components (bend stiffener, bellmouth, buoyancy modules, seabed interaction etc.) Guidance on modelling of cross-sectional nonlinearities Guidance on relevant structural damping models for umbilicals. Link to test data/ cross sectional structural analyses. Amplitude dependency will be addressed. Principles for verification of simplified analyses procedures. Guidance on modelling of marine growth Guidance on selection of hydrodynamic coefficients (e.g. distributed buoyancy modules). Principles to obtain an overall conservative selection of hydrodynamic coefficient (i.e. areas with damping or loading) will be discussed These issues will be specially adapted for umbilicals with basis in guidance given in DNV OS- F201 Dynamic Risers /1/ and API RP 2RD /3/. The following issues related to extreme load effect analyses will be addressed: Page 2
6 Global cross-sectional capacity check format (combined tension-curvature capacity curves) Link to local cross-sectional testing/analyses procedures as well as load case category (e.g. accidental or intact condition). Discuss effect of friction in local load sharing analyses. Statistical extreme response assessment principles (e.g. estimation principles, assessment of statistical uncertainty and link to required duration of simulations) Required output from global extreme load effect analyses (e.g. combined tension-angle response for design of bend-stiffeners) Special issues related to installation analyses will be addressed The following issues related to global fatigue analyses will be addressed: Analysis procedures (blocking of wave scatter diagram, regular/irregular analyses, floater offset etc) Procedures for calculation of fatigue stress in relevant structural components of the umbilical (metal tubes, tensile armour, electrical cables) based on results from global analyses (curvature and effective tension). Link to cross-sectional analyses to determine load sharing between elements will be given. Main focus will be on industry accepted procedures together with principles for validation/calibration against more advanced analyses and/or testing. Discuss effect of friction on stress cycles and methods for incorporating friction effects in fatigue analyses. Friction effects depends on cross-sectional design as well global system design (Generally considered to be an important deepwater effect due to high effective tension giving high contact pressures between the cross-sectional components) Fatigue damage calculation (Hot-spots, SCF s cycle counting) Reference to accepted SN-curves for relevant cross-sectional components. Give principles for testing/qualification of new SN curves (reference to existing document) Reference to relevant documents e.g. DNV RP C203 Fatigue Strength Analysis of Steel Structures /4/ and DNV RP F204 Riser Fatigue /5/. System condition to be considered in fatigue analyses (e.g. rate of marine growth, corrosion, wear) Special issues (e.g. fretting, wear, testing/qualification etc) On-bottom stability analyses: The following issues related to on-bottom analyses will be addressed: Criteria for static on-bottom stability of umbilicals. This is of relevance for field-layout evaluations/routing as well as installation (lay) of static umbilicals. Straight as well as curved on-bottom configurations will be considered. Guidance on principles selection of friction coefficients will be given. Reference to DNV RP F109 On Bottom Stability of Offshore Pipeline Systems /6/ will be given for general on-bottom stability assessments. Special guidance for application of DNV RP F109 /6/ for umbilicals will be given. Page 3
7 2.2.3 Vortex Induced Vibrations (VIV): The following issues related VIV will be addressed: Guidance on special considerations regarding VIV analyses of umbilicals (e.g. structural stiffness and damping for typical VIV response) Free-span VIV analysis guidance. Reference to DNV RP F105 Free Spanning Pipelines /7/ with special guidance to umbilical applications Interaction and clashing: The following issues related Interaction/clashing will be addressed: Outline general methodology for interference analysis considering hydrodynamic interaction. Reference to DNV RP F203 Riser Interference for general description. Focus on no clashing design scenario. Special modelling considerations (e.g. marine growth, fluid content in adjacent risers ) Minimum Bending Radius (MBR) ISO says the following about MBR (Section 9.5): The minimum radii to which the umbilical can be bent for storage or service without affecting its performance shall be as stated in the manufacturer s written specification. The minimum bend radii of the electrical cables, hoses, tubes and optical fibres shall also be as stated in the manufacturer s written specification. The above does include a definition of MBR. More specific details on how to determine the radii will be included, e.g. specific limits related to the material properties (no straining beyond a stated limit etc) Maximum Handling Tension (MHT) ISO says the following about MHT (Section 9.2): The maximum working load for the umbilical shall not be less than the values stated in the manufacturer s written specification. The above does not include an adequate definition of MHT, but an adequate definition may be written based e.g. on the definition of MBR Cross section analysis This should include guidance on transforming global loads (bending moment, torque, axial loads (and shear forces if ever relevant)) to the individual umbilical elements. ISO does not include this. If one is to include (nonlinear) interaction between elements (e.g. contact forces and friction), these calculations are complex and cannot be presented as analytical equations. A general description of the phenomenon and their effects will be given. Approximate (and conservative) analytical equations (industry practice) will be stated. Page 4
8 Design envelopes (axial tension vs. curvature) capacity/limit states for all relevant components; metal tubes, hoses (plastic tubes), electrical cables (and insulation), optical cables, fillers, armouring, inner sheets and outer sheets, will be discussed. Further, the use of testing and/or advanced numerical analysis to qualify simplified analysis procedures will be discussed Joints, termination and splice Termination interface (electrical cables): The ISO-standard simply states that the electrical cables will be terminated in some form of waterblocking arrangement. The same section also displays a NOTE: This part of ISO does not provide detailed specifications of electrical terminations for use subsea. Adding guidelines are therefore recommended. The ISO-standard does not differ between a splice box/joint and a termination interface. The former typically is used to join together component lengths or sub-components to achieve the required production length, whereas the latter typically refers to mechanisms which form the transition between the umbilical and the subsea termination or subsea umbilical distribution unit. To the extent that this may influence the choice of a mechanical solution, this shall be spelled out/explained in this Section. Typical termination components employed are electrical connectors and/or penetrations which come in a wide variety of solutions/designs. Examples (figures) shall be included / displayed as typically shown in API RP 17B /8/. In general, an umbilical is a custom-built product that can be designed and manufactured in a variety of methods. It will therefore not be the intent of the examples to discourage novel and new developments in connectors / penetrations. On the contrary, it is recognised that a variety of designs are possible. The figures will only provide some guidance to the user while still leaving open the possibility of using alternative approaches. Experience/solutions will be sought among the JIP-participants. Termination interface (optical fibre cables): The ISO-standard simply states that the design of optical fibre cables shall recognise that the cables will be terminated in some form of waterblocking arrangement. The same section also displays a NOTE: This part of ISO is not applicable to the design of optical fibre terminations for subsea use. Adding guidelines are therefore recommended. As for electrical cables (see above) the ISO-standard does not differ between a splice box/joint and a termination interface. To the extent that this may influence the choice of a mechanical solution, this should be explained in this Section. In certain applications a mechanical splice may be requested, whereas in other cases a fusion-splice solution may be preferred. A non-permanent device for connecting two fibres or fibres to some equipment (converter) may call for a fibre optic connector of some sort. Examples, e.g. connectors, ought to be included/displayed as typically employed in API RP 17B /8/. Typical connector- and splice-loss mechanisms (i.e. examples) should be visualized/demonstrated. Again, it will not be the intent of the shown examples to discourage novel and new developments in fibre optic connectors. On the contrary, it is recognised that a variety of designs are possible. The figures will only provide some guidance to the user while still leaving open the possibility of using alternative approaches. Experience/solutions will be sought among the JIP-participants. Page 5
9 Termination interface (hoses):this topic (for thermoplastic hoses) is covered relatively extensively in the ISO-standard. More detailed/structured coverage is recommended and visualized with examples/figures similarly as in API RP 17B /8/. Experience/solutions will be sought among the JIP-participants. Termination interface (metallic tubes): Unlike thermoplastic hoses termination interfaces is hardly covered in the ISO-standard. Adding guidelines/guidance will be done. The ISO-standard does not differ between a splice box/joint and a termination interface. The necessity for joining umbilicals (with metallic tubes) to achieve a required production length is probably of limited importance, but in repair situations this issue may nevertheless become relevant. In any instance, a transition between the umbilical and the subsea termination or subsea umbilical distribution unit will require a mechanical coupling/end fitting. Termination components (connector assembly/coupling) employed come in a wide variety of solutions/ designs. Examples (figures) should be included/displayed as typically shown in API RP 17B /8/. It will not be the intent of the examples to discourage novel and new developments in tube connectors/end fittings. On the contrary, it is recognised that a variety of designs are possible. The figures will only provide some guidance to the user while still leaving open the possibility of using alternative approaches. Experience/solutions will be sought among the JIP-participants Terminations and ancillary equipment design General: The ISO-standard states: The design of umbilical terminations and ancillary equipment is invariably specific to a particular umbilical system and, as such, detailed specification data are outside the scope of this part of ISO Some general information is then provided for guidance only. The economical consequences, however, of end terminations that fail in one way or another and which will lead to malfunction/failure of a subsea umbilical, is never discussed. It is therefore recommended that a new section is included, i.e. Section 8.2 Mechanical/electrical/optical performance of terminations. Inclusion (in the added Section) of the following bullet points are recommended: Methods to describe failure mechanisms of an end termination and their consequences (on mechanical and electrical performance. Terminations involve both mechanics, corrosion and the complex physics of electric conductivity between to metal surfaces. Here are several techniques to consider, e.g. normal shrimp cable shoes or Fusion lug forming the cable shoe of the conductor itself. Also involve moulding/sealing for isolation etc). Requirements to ensure that critical failure mechanisms will not take place Special challenges in long term performance (different failure mechanisms may be activated over time) Descriptions of methods to address multiple failure mechanisms with different long term performance Experience/feed-back will be sought among the JIP-participants. Terminations: A new section, Section Hose/tube terminations, to be added/included. Sections and only cover Armour terminations and Cable terminations respectively. Experience/solutions will be sought among the JIP-participants. Page 6
10 Armour terminations: Additional text/guidance to be added. Experience/solutions will be sought among the JIP-participants. Cable terminations: Additional text/guidance to be added. Experience/solutions will be sought among the JIP-participants. 2.3 Task 1-4: Metal pipes The following changes are proposed to be included in section 7.10 of the ISO document. (The entire section 7 should be re-structured, i.e. the section should be divided to avoid the high number of sub-sections and the requirements to each component should be stated in the same order within each section) Wall thickness This section should include criteria for pressure containment, collapse, propagating buckling and combined loading. It is suggested that the ISO document adopts DNV-OS-F101 (Section 5, Design Criteria) /9/, that includes all this. One needs however to ensure that the material requirements are sufficiently stringent, e.g. thickness tolerances, testing and supplementary requirements. ISO includes a pressure containment check (which for most practical applications give similar wall thickness as DNV-OS-F101) /9/ and general statements on the other limit states. One needs to document relatively thoroughly the differences between DNV-OS-F101 /9/ and ISO System pressure needs to be considered (1.5 p d, 1.25 DWP (Section )). See also DNV-OS-F101 Appendix A: Supplementary Requirements to ISO /9/. This work shall be coordinated with the ongoing ISO/API work to update API 2RD /3/ Maximum acceptable accumulated strain Maximum accumulated strain is included in DNV-OS-F101 (Section 5) /9/, including description of required testing for qualification. One needs however to document the differences between DNV-OS-F101 /9/ and ISO , and to modify the requirements for umbilical tubing Plastic deformation Criteria for maximum plastic deformations are included in DNV-OS-F101 Section 5 /9/, both with respect to maximum bending (one cycle) and accumulated plastic strain. One needs however to document the differences between DNV-OS-F101 /9/ and ISO , and to modify the requirements for umbilical tubing. Page 7
11 2.3.4 Corrosion testing The reference to ASTM G48 testing shall be kept. The alternative test methods, planned to be included in a new ISO standard, based on resent research results from the EU sponsored project Crevcorr should be referenced, if possible NDE More specific requirements to Non Destructive Examination shall be included. The extent of testing should be specified more in detail. Special considerations related to the relatively small dimensions of umbilical tubes shall be stated Welding and mechanical testing Special considerations related to the relatively small dimensions of umbilical tubes shall be stated. Several of the standardized testing procedures cannot be applied to small tubes. In such cases alternative testing methods should be proposed. Special considerations regarding the formation of intermetallic phases in ferritic-austenitic (duplex) steels should be stated, it is proposed to define testing program adjusted to verify the critical properties for tubes to be applied in subsea umbilicals Link to design DNV-OS-F101, Section 12 J describes some links between material, design and supplementary requirements /9/. Similar links in ISO should be made more evident. 2.4 Task 1-5: Installation and operation Installation procedures Umbilical-specific recommendations for installation techniques and equipment shall be discussed Repair This section (section 15.23) is designated repairs to an umbilical caused during installation, but without stating the type of repair since each repair shall be installation-specific. The installer shall carry out a survey along the entire subsea route of the umbilical including subsea terminations. The umbilical terminations shall be inspected for leakage and damage. Current experience shows that damages inflicted to an umbilical in most cases indeed take place during the installation phase. Repair work carried out offshore on an already installed umbilical does not provide the same work conditions as when performed onshore. Repair work offshore will necessitate some sort of support vessel with high day-work rates. These are negative factors Page 8
12 that may influence the initiated repair actions. The ISO-standard allows a splice box to be installed in the static section/part of an umbilical and guidance to these work tasks is recommended added to this section. Repair work performed directly on subsea termination interfaces (if possible) should also be clarified/included in the standard. Experience/solutions will be sought among the JIP-participants Electrical aspects The following topics have currently been identified. These will mainly require changes in chapter 7 of the current ISO , but chapters 2, 11, 13, 14 and 15 may also be affected. IEC is a normative reference, but its intended use does not include subsea neither movable cables. Evaluate implications or find possible alternative standards. Post-fabrication (FAT) testing. Time domain reflectometry (TDR). Requirement to instrumentation (uncertainty) needs to be better specified. Requirements to detectable length and resolution of imperfections. When has a cable failed? Evaluate or find a standard for maximum acceptable short distance reduction of cross section of cable. Or, how many strands of a multi stranded cable can be broken before defined as damaged? Evaluate entire ISO regarding requirements and how they can be proved to be fulfilled. I.e. how producer specifications shall be given, how FAT and Post-installation tests shall be performed and how the acceptance criteria shall be defined. 2.5 Task 1.6 Aspects related to production The following changes are proposed: Write philosophy and high level requirements for this subject. Link production section into the general safety and functionality philosophy. We want to achieve and ensure the same quality as assumed in the design. Consistency of the production process must be ensured. Critical production parameters must be identified and how to do this. Standard should help to identify the critical parameters. How to control it in detail is up to the manufacturer. Only general aspects will be included in the text. 2.6 Task 1-3 Joints - Mechanical performance of termination The following changes are proposed to the ISO document. Method to describe failure mechanisms in a joint and their consequence (on mechanical and electrical performance). Requirement to ensure that all critical failure mechanisms will not happen. Page 9
13 Special challenge is long term performance, because differnt failure mechanisms may be activated over time. Describe method to address multiole failure mechanisms with diferent long term performance. (Extension / conversion of what has been written about this in DNV-OS-C501) /10/. Page 10
14 3 REFERENCES /1/ Det Norske Veritas Offshore Standard, DNV-OS-F201, Dynamic Risers, /2/ Det Norske Veritas Recommended Practice, DNV-RP-A203, Qualification Procedures for New Technology, /3/ American Petroleum Institute, API RP 2RD, Design of Risers for Floating Production Systems (FPSs) and Tension-Leg Platforms (TLPs), /4/ Det Norske Veritas Recommended Practice, RP-C203, Fatigue Strength Analysis of Offshore Steel Structures, /5/ Det Norske Veritas Recommended Practice, RP-F204, Riser Fatigue, planned publication in October /6/ Det Norske Veritas Recommended Practice, RP-F109, On Bottom Stability of Offshore Pipeline Systems, planned publication in July /7/ Det Norske Veritas Recommended Practice, DNV-RP-F105, Free Spanning Pipelines, /8/ American Petroleum Institute, API RP 17B, Recommended Practice for Flexible Pipe, /9/ Det Norske Veritas Offshore Standard, DNV-OS-F101, Submarine Pipeline Systems, /10/ Det Norske Veritas Offshore Standard, DNV-OS-C501, Composite Components, /11/ Agreement for Joint Industry Research and Development Project, Subsea Umbilicals: Development of a Proposed Draft for Revision of ISO , issued in o0o - Page 11
15 APPENDIX A OVERVIEW OF ISO xii
16 Item Title Proposed change 1 Scope Update. 2 Normative references Update (see also section 2.4 in this report). 3 Terms, definitions and abbreviated terms Update. 3.1 Terms and definitions Update. 3.2 Abbreviated terms Update. 4 Functional requirements 4.1 General requirements Umbilical End terminations and ancillary equipment 4.2 Project-specific requirements 5 Quality assurance 6 Design requirements 6.1 General 6.2 Design methodology 6.3 Analysis General Definition of load classes Load combinations and conditions Installation analysis Dynamic service analysis Structural analysis Report No , rev. 0 Re-name and re-structure chapter 4 to include safety philosophy and other general aspects as described in section 2.1 of this report. The overall structure of chapter 6 should be maintained. The chapter should be significantly expanded and revised. Redundant requirements found in chapter 6 and 9 should be coordinated. See section 0 of this report. 7 Component design, manufacture and test Cross section analysis should be included. See section 0 of this report. Requirements to electrical components should be revised, see section 2.4 of this report. Further, the entire section 7 should be re-structured, i.e. the section should be divided to avoid the high number of sub-sections and the requirements to each component should be stated in the same order within each section. See section 2.3 of this report. 7.1 General 7.2 Electric cable General Operating voltage Power cables Signal cables Construction General Configuration and type of conductor Power cables Signal cables Conductor coding Lay-up Page A-1
17 Fillers Screening Sheath Identification Termination interface See section 0 of this report. 7.3 Performance requirements Electric cable Conductor resistance Insulation resistance Screening layer resistivity (non-metallic layers) Performance characteristics Signal Power 7.4 Structural analysis Electric cable 7.5 Manufacture Electric cable Conductor stranding Insulation extrusion Lay-up Sheath extrusion 7.6 Verification tests Visual and dimensional checks Conductor resistance test Resistivity of screening layers Insulation resistance High voltage DC test High voltage AC test Complete voltage breakdown Partial discharge test Rate of application of test voltages Inductance characteristics Capacitance characteristics Attenuation characteristics Characteristic impedance 7.7 Component acceptance tests Electric cable Visual and dimensional inspection Spark test DC conductor resistance test Insulation resistance test High voltage DC test Inductance characteristics Capacitance characteristics Attenuation characteristics Characteristic impedance Cross-talk Time-domain reflectometry Delivery to umbilical manufacturer 7.8 Optical fibre cable General Fibre type and coding Report No , rev. 0 Page A-2
18 7.8.3 Cable construction Construction Termination interface See section 0 of this report Performance requirements Optical attenuation Fibre strain Cable jointing Cable Fibre jointing Verification tests Transmission and optical characteristics Mechanical characteristics Environmental resistance External pressure test Fibre splicing Component acceptance tests Visual and dimensional inspection Optical time-domain reflectometry (ODTR) Delivery to umbilical manufacturer 7.9 Hoses General Hose sizing Hose construction General Hose liner Hose reinforcement Hose sheath Identification Termination interface See section 0 of this report Performance requirements Design pressure ratios Collapse pressure Change in length Structural analysis Hose manufacture Liner extrusion Reinforcement application Sheath extrusion Verification tests General Test fluid Visual and dimensional checks Change-in-length test Leakage test Burst test Impulse test Cold bend test Collapse test Report No , rev. 0 Page A-3
19 Volumetric expansion test End fitting anti-rotation test Fluid compatibility tests General Immersion tests Pressure cycling tests Permeability tests General Liquids Gases Component acceptance tests Visual and dimensional inspection Test fluid Liner burst test Change in length Burst test Proof pressure/decay test Delivery to umbilical manufacturer 7.10 Metallic tubes See section 2.3 of this report General Tube sizing Nominal bore and DWP Tube wall thickness See section 2.3 of this report Wall thickness calculations Calculation of stresses Strength criteria General Stresses due to load combinations for static umbilicals Allowable strain See section 2.3 of this report General Strain ageing Strain hardening Buckling Fatigue life determination Construction General Material Form of tubing Corrosion/erosion protection Tube marking Termination interface See section 0 of this report Performance requirements Design pressure ratios Minimum bend radius Corrosion Structural analysis Tube manufacture Report No , rev. 0 Page A-4
20 Manufacturing process General Changes to essential variables Metal-making Plate and strip manufacture Tube manufacture Degreasing Corrosion protection Internal cleaning Tube welding General Annealing Tube preparation Automated or manual production welding Weld preparation Weld process qualification Weld repairs Tube repairs Verification tests General Visual and dimensional checks Tensile tests Flattening tests Hardness tests Flaring tests Chemical analysis Corrosion test See section 2.3 of this report Weld qualification See section 2.3 of this report Non-destructive examination (NDE) See section 2.3 of this report Burst tests Acceptance tests Visual and dimensional tests Non-destructive examination (NDE) See section 2.3 of this report Test fluid Burst test Single-heat-number manufacture Multiple-heat-number manufacture Pressure test 8 Terminations and ancillary equipment design 8.1 General See section 0 of this report. 8.2 Terminations Armour terminations See section 0 of this report Cable terminations See section 0 of this report Pull-in head Topside hang-off Subsea termination interface Subsea umbilical termination Subsea umbilical distribution unit Report No , rev. 0 Page A-5
21 8.3 Ancillary equipment Joint box Weak link Buoyancy attachments 9 Umbilical design Chapter 9 in general: see section 0 of this report. 9.1 Temperature range 9.2 Maximum working load See section 0 of this report. 9.3 Minimum breaking load 9.4 Minimum bend radius See section 0 of this report. 9.5 Dynamic service life 9.6 Seabed stability 9.7 Service environment 9.8 Cross-sectional arrangement 9.9 Lay-up 9.10 Sub-bundles 9.11 Inner sheath 9.12 Armouring 9.13 Outer sheath 9.14 Length marking 10 Umbilical manufacture and test 10.1 Umbilical manufacture Lay-up Inner sheath Armouring Outer sheath 10.2 Verification tests General Tensile test Bend stiffness test Crush test Fatigue tests 11 Umbilical factory acceptance tests (FATs) See section 2.4 of this report General 11.2 Visual and dimensional inspection 11.3 Electric cable 11.4 Optical fibre cables 11.5 Hoses 11.6 Tubes 12 Storage 12.1 General 12.2 Protection of umbilical services Electrical services Optical fibre cables Hydraulic services 12.3 Spare length 12.4 Repair kits 12.5 Handling for integration tests Report No , rev. 0 Page A-6
22 13 Pre-installation activity See section 2.4 of this report Umbilical information 13.2 Route information 13.3 Terminations and ancillary equipment information 13.4 Host facility information 13.5 Subsea structure information 13.6 Host facility visit 14 Load-out See section 2.4 of this report General 14.2 Technical audit of load-out facilities 14.3 Load-out procedure 14.4 Pre-load-out meetings 14.5 Pre-load-out tests General Electric cables DC conductor resistance test Insulation resistance test Optical fibre cables Hoses/tubes Hydraulic control hoses/tubes Hose proof pressure/decay test Tube proof pressure/decay test 14.6 Load-out operation 14.7 Stopping and starting the load-out 14.8 Handling of the umbilical General Twist Bending Lifting the umbilical Transfer across spans Terminations Weak link 14.9 Load-out monitoring General Electric cables Optical fibre cables Hoses/tubes Visual examination Umbilical length Load-out on a reel or carousel Post-load-out tests 15 Installation operations See section 2.4 of this report General 15.2 Requirements for installation vessel and equipment 15.3 Pre-installation survey General Requirements of survey Reporting Report No , rev. 0 Page A-7
23 15.4 I- or J-tube pull-in operations General Preparatory work Weather window for pull-in Initiation of pull-in operations Visual survey Recovery of the messenger wire Umbilical pull-in Securing the umbilical on the host facility I- or J-tube sealing and chemical protection Second end pull-in Movement of vessel away from the host facility 15.5 Lay-down of subsea termination (first end) 15.6 Lay route 15.7 Handling requirements for the main lay 15.8 Vessel positioning to achieve required touch-down 15.9 Control and monitoring of length laid Integrity monitoring during lay General Electric cables Optical fibre cables Hoses/tubes Visual inspection Burial operations General Monitoring during the burial operation Interaction with umbilical Approach to subsea termination position (second end) Lay-down of subsea termination Pull-in of subsea termination Pipeline crossings Arming of weak link Post-lay survey Post-burial survey Post-pull-in test Post-hook-up test Retrieval of installation aids Contingencies Repairs See section 2.4 of this report Post-installation survey Annex A Annex B Annex D Annex E Report No , rev. 0 - o0o - Page A-8
ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals
INTERNATIONAL STANDARD ISO 13628-5 Second edition 2009-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals Industries du pétrole et du
More informationSpecification for Subsea Umbilicals
Specification for Subsea Umbilicals Upstream Segment ANSI/API SPECIFICATION 17E FOURTH EDITION, OCTOBER 2010 EFFECTIVE DATE: APRIL 1, 2011 ISO 13628-5:2009 (Identical), Petroleum and natural gas industries
More informationSummary of Changes and Current Document Status
DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,
More informationINDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS
E&P Pag. 1 / 14 Pre-salt Standard Steel Tube Umbilical Types Umbilical Electrical Cable Element DPT-SUB/ES/DCT INDEX OF REVISIONS REV DESCRIPTION AND/OR AFFECTED SHEETS 0 Original ORIGINAL REV. A REV.
More informationProcurement Risk Management of Flexible Pipes and Umbilicals. Presented by Hanh Ha Kuala Lumpur Convention Centre 9 th June 2010
Procurement Risk Management of Flexible Pipes and Umbilicals Presented by Hanh Ha Kuala Lumpur Convention Centre 9 th June 2010 Content Who are BPP-TECH? SURF Procurement What is it about. How and where
More informationUmbilicals and Subsea Power Cables Excellence in Connecting Subsea EWEA
Umbilicals and Subsea Power Cables Excellence in Connecting Subsea EWEA Control and Power Umbilicals The control umbilical consists of hydraulic lines used for transfer of chemicals and fluids. In addition,
More informationRiser Installation in Deep & Ultra Deep Water
Riser Installation in Deep & Ultra Deep Water Frank Lim 38 th Annual Offshore Pipeline Technology Conference Amsterdam, February 2015 Outline Introduction Overview of current deepwater riser systems and
More informationUmbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director
Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations Presented by: James Young, JDR Engineering Director 1 MCE DEEPWATER DEVELOPMENT 2015 1. Introduction 2. JDR Cables and Umbilicals
More informationLearn more at
Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry
More informationInnovative Subsea Engineering
Innovative Subsea Engineering www.subsea.co.uk Innovative Subsea Engineering Formed in 1985 by a team of experienced engineers and diving professionals, Subsea Innovation is a company dedicated to delivering
More informationDNV GL s 16 th Technology Week
OIL & GAS DNV GL s 16 th Technology Week Advanced Simulation for Offshore Application 1 SAFER, SMARTER, GREENER AGENDA Time Topic Instructor 09:00 Welcome Aravind Nair 09:15 1 Erosion and Corrosion for
More informationDeepwater design challenges
Phillip Cooper, INTECSEA, UK, shows us how advanced numerical simulations are unravelling deepwater design challenges. Deepwater design challenges As oil and gas developments move into extreme water depths
More informationCost Reduction in Frontier Deepwater Riser Systems
NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Cost Reduction in Frontier Deepwater Riser Systems Ray Burke Global Product Leader GE Oil & Gas Applications Subsea Production, Injection, Export Combines
More informationISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing of fusionwelded
INTERNATIONAL STANDARD ISO 17636 First edition 2003-09-15 Non-destructive testing of welds Radiographic testing of fusionwelded joints Contrôle non destructif des assemblages soudés Contrôle par radiographie
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 13628-8 First edition 2002-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 8: Remotely Operated Vehicle (ROV) interfaces on
More informationISO/TR TECHNICAL REPORT
TECHNICAL REPORT ISO/TR 13624-2 First edition 2009-12-01 Petroleum and natural gas industries Drilling and production equipment Part 2: Deepwater drilling riser methodologies, operations, and integrity
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 28781 First edition 2010-08-15 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment Industries du pétrole et
More informationISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing Part 1: X- and gamma-ray techniques with film
INTERNATIONAL STANDARD ISO 17636-1 First edition 2013-01-15 Non-destructive testing of welds Radiographic testing Part 1: X- and gamma-ray techniques with film Contrôle non destructif des assemblages soudés
More informationPipeline Repair Systems
Pipeline Repair Systems Pipeline Repair Systems Subsea Innovation is a world leader in the supply of split sleeve pipeline repair equipment with over 20 systems supplied to major operators around the
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 17636-1 First edition 2013-01-15 Non-destructive testing of welds Radiographic testing Part 1: X- and gamma-ray techniques with film Contrôle non destructif des assemblages soudés
More informationTore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13
Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of
More informationOFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants
OFFSHORE SPECIALIST ENGINEERING SERVICES ZEE Engineering Consultants With experienced engineers, with advanced knowledge in FEA modeling and backed by state of the art software, ZEE Engineering Consultants
More informationEmergency Pipeline Repair Systems; A Global Overview of Best Practice
Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James
More informationINGAA Foundation Workshop - Industry Initiatives Regarding Welding of Field Segmented Induction Bends and Elbows for Pipeline Construction
INGAA Foundation Workshop - Industry Initiatives Regarding Welding of Field Segmented Induction Bends and Elbows for Pipeline Construction October 20, 2011 Steve Rapp, P.E. Spectra Energy Transmission
More informationISO INTERNATIONAL STANDARD. Non-destructive testing Ultrasonic thickness measurement
INTERNATIONAL STANDARD ISO 16809 First edition 2012-11-15 Non-destructive testing Ultrasonic thickness measurement Essais non destructifs Mesurage de l'épaisseur par ultrasons Reference number ISO 2012
More informationConnecting Systems for Cable Repair (Cable Splices)
p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-E015 Connecting
More informationMaintaining a High Quality & Qualification Standard for Submarine Cables
Maintaining a High Quality & Qualification Standard for Submarine Cables Heiner Ottersberg, Bianca Schulte, Heiko Dirks, Dr. Clemens Unger (Norddeutsche Seekabelwerke GmbH, NSW) Email: < heiner.ottersberg@nsw.com
More informationFlexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery
Flexible Pipe Solutions a competitive approach for Shallow water development Sylvain Cabalery Agenda 1. Subsea at Technip in Brief and Asia Pacific presence 2. Flexible Pipes Solutions a. Main differences
More informationOpportunities and Challenges in Deepwater West Africa Projects
Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and
More informationNon-destructive testing Equipment for eddy current examination Array probe characteristics and verification
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 20339 First edition 2017-03 Non-destructive testing Equipment for eddy current examination Array probe characteristics and verification Essais
More informationISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems
INTERNATIONAL STANDARD ISO 10418 Second edition 2003-10-01 Petroleum and natural gas industries Offshore production installations Basic surface process safety systems Industries du pétrole et du gaz naturel
More informationClosing the Collaboration Gap
Closing the Collaboration Gap Technology for Improved Offshore Piping and Structural Analysis Projects Bilal Shah MSc Structural Engineering (Hons) Software Development Manager, Piping Mark Upston B Mechanical
More informationIntegrity Management of Offshore Assets
OIL & GAS Integrity Management of Offshore Assets Opening session Leif Collberg 05 May 2017 1 DNV GL 2015 05 May 2017 SAFER, SMARTER, GREENER How regulations can solve the challenge of being performance
More informationINTERNATIONAL TELECOMMUNICATION UNION TRANSMISSION MEDIA CHARACTERISTICS CHARACTERISTICS OF A DISPERSION-SHIFTED SINGLE-MODE OPTICAL FIBRE CABLE
INTERNATIONAL TELECOMMUNICATION UNION ITU-T G.653 TELECOMMUNICATION (03/93) STANDARDIZATION SECTOR OF ITU TRANSMISSION MEDIA CHARACTERISTICS CHARACTERISTICS OF A DISPERSION-SHIFTED SINGLE-MODE OPTICAL
More informationISO INTERNATIONAL STANDARD. Fluid power systems O-rings Part 1: Inside diameters, cross-sections, tolerances and designation codes
INTERNATIONAL STANDARD ISO 3601-1 Fifth edition 2012-03-01 Fluid power systems O-rings Part 1: Inside diameters, cross-sections, tolerances and designation codes Transmissions hydrauliques et pneumatiques
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 13628-11 First edition 2007-09-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 11: Flexible pipe systems for subsea and marine
More informationStudy on Subsea Petroleum Pipeline Design in Deepwater
Study on Subsea Petroleum Pipeline Design in Deepwater Abd Khair Junaidi, a and Jaswar Koto, a,b,* a) Department of Aeronautics, Automotive and Ocean Engineering, Mechanical Engineering, Universiti Teknologi
More information2 ND COPEDI FORUM / 2012
2 ND COPEDI FORUM / 2012 The COPEDI (Comitê Brasileiro para Pesquisa, Desenvolvimento e Inovação) members are delighted to invite you for our Forum which will occur on the 1st October at IBP Av. Almirante
More informationRecommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015
Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Special Notes API publications necessarily address problems
More informationPipeline Design & Installation Systems
Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -
More informationTHE INFLUENCE OF GOUGE DEFECTS ON FAILURE PRESSURE OF STEEL PIPES
International Conference on Mechanical Engineering Research (ICMER2013), 1-3 July 2013 Bukit Gambang Resort City, Kuantan, Pahang, Malaysia Organized by Faculty of Mechanical Engineering, Universiti Malaysia
More informationThe influence of gouge defects on failure pressure of steel pipes
IOP Conference Series: Materials Science and Engineering OPEN ACCESS The influence of gouge defects on failure pressure of steel pipes To cite this article: N A Alang et al 2013 IOP Conf. Ser.: Mater.
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 21457 First edition 2010-09-01 Petroleum, petrochemical and natural gas industries Materials selection and corrosion control for oil and gas production systems Industries du
More informationISO INTERNATIONAL STANDARD. Fluid power systems O-rings Part 1: Inside diameters, cross-sections, tolerances and designation codes
INTERNATIONAL STANDARD ISO 3601-1 Fourth edition 2008-07-01 Fluid power systems O-rings Part 1: Inside diameters, cross-sections, tolerances and designation codes Transmissions hydrauliques et pneumatiques
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 19901-4 Second edition 2016-07-15 Petroleum and natural gas industries Specific requirements for offshore structures Part 4: Geotechnical and foundation design considerations
More informationThe use of Mechanical Connectors throughout Life of Field
The use of Mechanical Connectors throughout Life of Field Andrew Woodward Subsea Sales Engineer andrew.woodward@hydratight.com 1 What I will cover Safety Moment Introduction to Hydratight What are Mechanical
More informationConsideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015
Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Special Notes API publications necessarily address problems
More informationSubsea Tooling Services UK Ltd Engineered Subsea Solutions
Subsea Tooling Services UK Ltd Engineered Subsea Solutions Who we are: Subsea Tooling Services - What We Do Dredgers Subsea Baskets Project Tooling HPU s Clump Weights Supplying our clients with advanced
More informationDagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA
Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater
More informationIADC Conference, RIO 2005 Fatigue Monitoring of Deepwater Drilling Risers. Mateusz Podskarbi, Ricky Thethi, Hugh Howells; 2HOffshore Inc
IADC Conference, RIO 2005 Fatigue Monitoring of Deepwater Drilling Risers Mateusz Podskarbi, Ricky Thethi, Hugh Howells; 2HOffshore Inc How Far the Eye Reaches? Slide No. 2 Drilling Riser Fatigue Fatigue
More informationEmergency Pipeline Repair Solutions and Future Contingency Planning
Emergency Pipeline Repair Solutions and Future Contingency Planning SubseaEurope 2010 Espace Grande Arche, Paris 28/10/10 Paul Hughes, Product Manager - Connectors Hydratight Products & Services Part of
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 10424-2 First edition 2007-11-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Threading and gauging of rotary shouldered thread connections Industries
More informationThe intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.
1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local
More informationCOPPE/UFRJ Course on Flexible Pipes and Umbilical Cables Introduction to Unbonded Flexible Pipe Manufacturing 04 of December 2007
Manufacture -1 COPPE/UFRJ Course on Flexible Pipes and Umbilical Cables Introduction to Unbonded Flexible Pipe Manufacturing 04 of December 2007 Judimar Clevelario Technology Manager Wellstream do Brasil
More informationSECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationDNVGL-CP-0293 Edition July 2018
CLASS PROGRAMME Type approval DNVGL-CP-0293 Edition July 2018 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited
More informationOffshore Wind Risks - Issues and Mitigations
DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years
More informationInterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa
InterMoor Innovation in Action InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor is an Acteon Company linking subsea services 3 InterMoor Services MOORINGS Rig Moves Permanent
More informationApplication of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges
PRESENTATION ON Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges NCRAC 2012, Hyderabad 15.06.2012 S.K. Dewri, Chief Engineer, ONGC, Institute of Engineering
More informationISO 7438 INTERNATIONAL STANDARD. Metallic materials Bend test. Matériaux métalliques Essai de pliage. Second edition
INTERNATIONAL STANDARD ISO 7438 Second edition 2005-06-15 Metallic materials Bend test Matériaux métalliques Essai de pliage Reference number ISO 7438:2005(E) ISO 2005 PDF disclaimer This PDF file may
More informationFOUNDATION ISSUES: OFFSHORE WIND FARMS Indian Context
FOUNDATION ISSUES: OFFSHORE WIND FARMS Indian Context R.K. Ghanekar, Head - Geotechnical Section, INSTITUTE OF ENGINEERING AND OCEAN TECHNOLOGY (IEOT), ONGC, PANVEL, NAVI MUMBAI OFFSHORE WIND ENERGY IN
More informationRapid Deployment System. subsea pipelines
Rapid Deployment System for monitoring i slugging in subsea pipelines Agenda Issue Design criteria Design process Operating principles Qualification strategy System description Future applications 2 Pulse
More informationOBSERVATORY SERVICING AND MAINTENANCE
OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I
More informationLife Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016
Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016 2016 Oceaneering International, Inc. All rights reserved. About Oceaneering
More informationTECHNOLOGY QUALIFICATION MANAGEMENT
OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property
More informationDesign and manufacture of subsea and topside composite cables and connectors
Overview Design and manufacture of subsea and topside composite cables and connectors Hydro Group. sales@hydrogroup.plc.uk www.hydrogroup-asia.com tel: +65 63343566 fax: +65 63343566 1 : 5 Hydro Group
More informationPart 1: General principles
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 9934-1 Second edition 2015-09-01 Non-destructive testing Magnetic particle testing Part 1: General principles Essais non destructifs Magnétoscopie
More informationSubsea Integrity and Efficiency Conference
SUBSEA INTEGRITY & EFFICIENCY CONFERENCE 2015 Subsea Integrity and Efficiency Conference - 2015 Flexible Riser Integrity Assessment with Advanced MEC-FIT Technique Andreas Boenisch a.boenisch@innospection.com
More informationTechnological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa
Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa 1 SAFER, SMARTER, GREENER Content Going Deeper Scale/Size of Deepwater Mega
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 10407-2 First edition 2008-10-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Inspection and classification of used drill stem elements Industries du
More informationImpact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension
GE Oil & Gas Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension Hussain Hashemizadeh Vidar Strand 6 th December 2012 LEADING PROGRESS TOGETHER Introduction The
More informationSiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008
SiRCoS Submarine pipeline repair system Carlo Maria Spinelli - Bratislava, 18-19 September 2008 Outline 1 Introduction to subsea pipelines 2 Deep water projects 3 Pipeline damage & scenarios 4 SiRCoS Repair
More informationReliability of Deepwater Technologies
Reliability of Deepwater Technologies Technical Risk Management during R&D Alex Imperial, MD - Deepwater Technology Centre SMI Workshop - 3 April 2012 Reliability and Technical Risk Management Why New
More informationWorking for the future POSGRIP Technology
Working for the future POSGRIP Technology A Request for Joint Industry Support to enable roll-out of a new method of wellhead design October 2008 Page 1 1.1 - The Principals of POS-GRIP A New Method for
More informationSend your directly to
Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.
More informationISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers
INTERNATIONAL STANDARD ISO 16812 Second edition 2007-02-15 Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers Industries du pétrole, de la pétrochimie et du gaz naturel
More informationEvolution of Deepwater Subsea / Offshore Market
Evolution of Deepwater Subsea / Offshore Market Amar UMAP Vice President, Technip COOEC Alliance DMFT 2014 Zhu Hai, China 18 October 2014 Table of contents 1. Evolution of Offshore/ Subsea Oil & Gas Industry
More informationOffshore Pipelines. Capability & Experience
Offshore Pipelines Capability & Experience Capability Overview INTECSEA is a leading engineering and project delivery company in the offshore oil and gas sector. It operates across the full project cycle
More informationCable Type 100. CAI Certification Specification
Cable Type 100 CAI Certification Specification Ref: CAI-007-C / 100 / 12-2016 Confederation of Aerial Industries Ltd Communications House 41a Market Street WATFORD Herts WD18 0PN Tel: 01923 803030 Fax:
More informationDESIGNING AND DEPLOYING SPECIAL MULTI FUNCTION FIBER OPTIC CABLES
DESIGNING AND DEPLOYING SPECIAL MULTI FUNCTION FIBER OPTIC CABLES Heiner Ottersberg 1 NSW The Company Over 100 Years Experience in Cable Technology 1899 NSW (Norddeutsche Seekabelwerke) is founded by the
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More information11-SDMS-03 REV. 02 SPECIFICATIONS FOR
11-SDMS-03 REV. 02 SPECIFICATIONS FOR XLPE INSULATED POWER CABLES FOR RATED VOLTAGES FROM 15 KV UP TO 36 KV (U m ) This specification is property of SEC and subject to change or modification without notice
More informationWell Control Contingency Plan Guidance Note (version 2) 02 December 2015
Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...
More informationDNV-OS-F101 Checker. User Manual
DNV-OS-F101 Checker User Manual For Version: 1.0.9 Copyright 2010-2016 OPIMsoft Technology Co., Ltd. All Rights Reserved. INDEX 1 FUNCTION... 1 2 INSTALLATION... 2 3 HOW TO USE... 3 4 INTERFACE DETAIL...
More informationEmerging Subsea Networks
FIBRE-TO-PLATFORM CONNECTIVITY, WORKING IN THE 500m ZONE Andrew Lloyd (Global Marine Systems Limited) Email: andrew.lloyd@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford
More informationSubsea Integrity Practices in GoM A Case Study
Subsea Integrity Practices in GoM A Case Study Session 9: HSE SPE Workshop 21 st October 2011 Objectives Integrity Management Philosophy Performance Assessment Methods Integrity Issues and Mitigation Strategy
More informationCable Type 125. CAI Certification Specification
Cable Type 125 CAI Certification Specification Ref: CAI-008-C / 125 / 12-2016 Confederation of Aerial Industries Ltd Communications House 41a Market Street WATFORD Herts WD18 0PN Tel: 01923 803030 Fax:
More informationSingle / Dual Barrier HP Drilling Risers
Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction
More informationUnderlying Causes of Mooring Lines Failures Across the Industry
Underlying Causes of Mooring Lines Failures Across the Industry Guy Drori 24 th March 2015 Underlying Causes of Mooring Line Failures 24 th March 2015 This information is for public use 1 Content Introduction
More informationRISK MANAGEMENT IN THE OPERATIONS OF A SUBSEA PIPELINE
RISK MANAGEMENT IN THE OPERATIONS OF A SUBSEA PIPELINE Graham McIntosh Principal Subsea and Pipelines Engineer (2007 2009), iicorr Ltd, Aberdeen, UK This paper presents the Integrity Management (IM) of
More informationISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Specific requirements for offshore structures Part 6: Marine operations
INTERNATIONAL STANDARD ISO 19901-6 First edition 2009-12-15 Petroleum and natural gas industries Specific requirements for offshore structures Part 6: Marine operations Industries du pétrole et du gaz
More informationAPI COPM CPMA Chapter 20.X
API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February
More informationDIFFICULT TO PIG AND TO INSPECT OFFSHORE PIPES
DIFFICULT TO PIG AND TO INSPECT OFFSHORE PIPES K. Reber, Innospection Germany GmbH, Stutensee, Germany S. Hartmann, Innospection Ltd., UK A. Boenisch, Innospection Ltd., UK Introduction When it comes to
More informationShell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015
Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,
More informationOffshore Construction Management Services. Capability & Experience
Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by
More informationThe Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing
The Evolution & Future of API Coiled Tubing Standards Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing API Overview Presentation Outline Resource Group on Coiled Tubing
More informationFAILURES TO MONITOR AND PREDICT. Detect early warning signs Automate monitoring of critical systems Give critical data to key decision makers
FAILURES TO MONITOR AND PREDICT Detect early warning signs Automate monitoring of critical systems Give critical data to key decision makers ABOUT ASTRO TECHNOLOGY ADVANCED INSTRUMENTATION FOR: Subsea
More informationPulse Structural Monitoring
Pulse Structural Monitoring Pulse Structural Monitoring Marin SCRASSURE Budgetary Proposal Pulse Overview SCRAssure Monitroing System Monitoring Objective System Overview System Architecture Cost and Schedule
More informationDevelopments in Deepwater Handling Systems. Gregor McPherson, Caley Ocean Systems
Developments in Deepwater Handling Systems Gregor McPherson, Caley Ocean Systems Caley Ocean Systems Glasgow based, over 45 years experience of building bespoke handling systems for the Offshore industry
More informationThe surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.
SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called