ADDENDUM #1. April 29, 2009

Similar documents
ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

RENOVATION OF THE FARMERS MARKET Reference Number:

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

1.01 NOTICE TO BIDDERS

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

State College of Florida, Manatee-Sarasota

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

SECTION PROJECT COORDINATION VIA BIM

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

Specifications: Other: sign in sheet

Company. Signed: Date:

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

Single-Family Dwelling Submittal Requirements

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

Addendum #1 - Bid Package #

Residential Construction Checklist Single and Two Family Construction

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

ADDENDUM #2 September 12, 2018

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

ADDENDUM NO. 4 November 15, Page 1

Architectural Floor Plan Symbols

Hall of Waters List of Historic Drawings

ADDENDUM NO. 1 November 10, 2016

Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers

HOENER ASSOCIATES INC. ARCHITECTS

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Bid No. B14-02 Building 100 HVAC Improvements

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

TELEPHONE: (215) Addendum No. 1

OCPS Submittal Register for Product Data and Shop Drawing Reviews

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

TO: All Recipients Date: March 20, 2015

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

Residential Room Addition / Remodel Submittal Requirement Checklist

RECORD GROUP NUMBER 156

Architect. Architect.

Notre Dame High Addition/Renovation Addendum 3 Page 1

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

Addendum No. 4 page 1

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

ADDENDUM NO. 1. Behlen Laboratory High Power Laser Science Collaboratory.2 RE-BID

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

HUSSEY GAY BELL SAVANNAH, GEORGIA

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

SECTION PROJECT MANAGEMENT AND COORDINATION

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

TO WHOM IT MAY CONCERN:

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.

744 Kent Minh, Project Engineer

State College Area School District

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

ADDENDUM NO. 3. Ellis County Elections Building

Addition and Renovations to Upper Bucks County Technical School

City of St. Charles School District New Addition and Renovation at George M. Null Elementary School 435 Yale Boulevard St. Charles, Missouri 63301

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

Florida Fish and Wildlife Conservation Commission

Section Meetings Section Material and Equipment. None Required

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

Answer: Only to ChurchWoods, LLC.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

37/5/6 Facilities and Services Assembly Hall Assembly Hall Construction and Management Records, Box 1:

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

(Full legal name of business submitting the offer)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Transcription:

April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA 17110 To: All Planholders This Addendum is hereby made part of the Plans and Specifications dated April 6, 2009 for the above referenced project. The provisions of this Addendum are intended to supplement the provisions of the Plans and Specifications and/or supersede them where contradictory thereto. This Addendum contains changes to the requirements of the Plans and Specifications. Such changes shall be incorporated into the Plans and Specifications and shall apply to work with the same meaning and force as if they had been included in the original Plans and Specifications. Where this Addendum modifies a portion of a paragraph or phrase of the Project Manual, the remaining unmodified portion of the paragraph or phrase shall remain in force. The conditions and terms of the Plans and Specifications shall govern work described in this Addendum. Whenever the conditions of work, or the quality or quantity of materials or workmanship are not fully described in this Addendum, the conditions of work etc. included in the Plans and Specifications for similar items of work shall apply to the work described in this Addendum. If no similar items of work are included in the Plans and Specifications, the quality of material and workmanship shall be subject to the written acceptance of the Architect. 1.1 BID DATE RESCHEDULED Section 00100 Invitation to Bid CHANGE FOURTH PARAGRAPH TO READ: HACC, Central Pennsylvania s Community College will receive sealed bids for the work at the HACC Harrisburg Campus, One HACC Drive, Harrisburg, PA - Purchasing Office, Room 130- Whitaker Hall until 2:00 pm local prevailing time on May 14, 2009. Bids received after this time will not be accepted. ONLY BONAFIDE BIDS WILL BE ACCEPTED. Bids will be opened and read aloud immediately following the bid receipt time. Page 1

1.2 CHANGES TO PROJECT MANUAL A. Section 00010 Table of Contents ADD Section 01270 Unit Prices to the list of Specifications DELETE the following listed Drawings: HD1.1A ALTERNATE FIRST FLOOR PLAN HVAC DEMO HD1.3A ALTERNATE MEZZANINE PLAN HVAC DEMO ADD the following listed drawings: H1.1A ALTERNATE FIRST FLOOR PLAN HVAC H1.2A ALTERNATE SECOND FLOOR PLAN HVAC B. Section 01125 Summary of Contract ADD the following specifications sections to Contract No. 2 General Trades: 07410 Metal Wall Panels 10810 Toilet Accessories C. Section 07410 Metal Wall Panels ADD section in its entirety D. Section 08710 Door Hardware DELETE pages 9-29 ADD new pages 9-32, replace Hardware Sets 1-42 E. Section 09260 Gypsum Board Assemblies ADD the following: 2.03 Board Materials H. High-Impact Gypsum Board, Level 3 - Heavy Duty: Astm C 1629, of thickness indicated. 1. Type: Regular, unless otherwise indicated. 2. Type: Type X, where required for fire-resistance-rated assemblies and where indicated; 5/8" thickness. 3. Product: Subject to compliance with requirements, provide Gold Bond Hi-impact XP Gypsum Board manufactured by National Gypsum Co. 4. Use: Interior partition in Lab areas and corridors on First Floor. Page 2

F. Section 10100 Visual Display Boards CHANGE the following paragraph 2.02.A., Item 5. to read as follows: 5. Size: (2) 6 x4 marker boards installed adjacent to one another G. Section 10810 Toilet Accessories ADD section in its entirety. H. Section 16425 Switchboards ADD section in its entirety I. Architectural Detail Reference Manual 1. Notes - N-2 notes have been revised. See attached. 2. Door Schedule - Door 100/1 - amend Hardware Set from ETR to 1. Door 101/1 - amend Hardware Set from ETR to 1. 3. Hollow Metal Detail - HMD-29 - detail has been revised. See attached. 4. Miscellaneous Detail - MDT-17 - detail has been revised. See attached. 5. Miscellaneous Detail - MDT-34 - detail has been added. See attached. 1.3 DRAWINGS: ADD the following drawings. ARCHITECTURAL SKA-1 - First and Second Floor Finish Plans have been revised on drawing A7.1 and A7.2. Additional finish notes have been added. See SKA-1 for revised locations. SKA-2 - Second Floor Demolition Plan has been revised on drawing X2.2. Additional demolition notes have been added. See SKA-2 for revised locations. SKA-3 - First Floor Demolition Plan has been revised on drawing X2.1. Additional demolition notes have been added. See SKA-3 for revised locations. SKA-4 - Exterior Elevations have been revised on drawing A3.1. Insulated metal panels have been added and additional notes have been added. See SKA-4 for revised locations. SKA-5 - Exterior Elevations have been revised on drawing A3.1. Insulated metal panels have been added and additional notes have been added. See SKA-5 for revised locations. Page 3

SKA-6 - Wall Sections have been revised on drawing A5.2. Opening for ductwork (N.I.C.) added. See SKA-6 for revised locations. SKA-7 - Partial First Floor Demolition and First Floor Plan have been revised on drawings X2.1 and A2.1. Openings for ductwork (N.I.C.) have been added. Additional demolition notes have been added. See SKA-7 for revised locations. SKA-8 - Exterior Elevations have been revised on drawing A3.1. Additional notes have been added. See SKA-8 for revised locations. SKA-9 - Exterior Elevations - Demolition have been revised on drawing X3.1. Additional notes have been added. See SKA-9 for revised locations. SKA-10 - Exterior Elevations - Demolition have been revised on drawing X3.1. Additional notes have been added. See SKA-10 for revised locations. SKA-11 - First Floor Dimension Plan has been revised on drawing A2.1-D. Additional dimensions have been added. See SKA-11 for revised locations. SKA-12 - First Floor Demolition Plan has been revised on drawing X2.1. Additional dimensions have been added. See SKA-12 for revised locations. SKA-13 - Index has been revised on drawing Index. See SKA-13 for revised locations. SKA-14 - First Floor Demolition Plan and First Floor Plan have been revised on drawings X2.1 and A2.1. Additional demolition and construction notes have been added. See SKA-14 for revised locations. SKA-15 - Second Floor Demolition Plan and Second Floor Plan have been revised on drawings X2.2 and A2.2. Additional demolition and construction notes have been added. See SKA-14 for revised locations. Drawing A0.1 - Code Review. Drawing has been added. See attached drawing. STRUCTURAL 1. Drawings S1.1 & S1.1A - An HSS5x3x3/16 column and base plate were added to the southwest corner of the elevator between column lines 7.5 and 8 near A.2 to support the 4" I wall construction of the elevator. Notes were added to the plan for the columns in this area. See SKS-1. 2. Drawings S1.2 & S1.2A - HSS5x3x3/16" beams are added to support the 4" I wall construction of the elevator. See SKS-2. 3. Drawing S1.2 & S1.2A - The attic stair location was revised between column lines 6.5 and 7. Beams and post are not required due to the new location. The other W8 and post locations were rearranged as required. See SKS-3. Page 4

4. Drawing S2.2 - Detail 28 - Typical Fence Post Anchorage Detail was added for the fence locations interior and exterior. ELECTRICAL 1. Drawing 2.1 - First Floor Plan - Power & Systems a. Sketch SKE-1 issued. Revised circuiting to the air cooled condensers and to the air compressor in Mechanical Room. b. Sketch SKE-2 issued. Added metering cabinet next to new transformer. 2. Drawing 2.2 Second Floor Plan - Power & Systems a. Sketch SKE-3 issued. Circuited ceiling mounted receptacle. b. Sketch SKE-4 issued. Revised switchboard in Electrical Room 251. 3. Drawing 3.1 Symbols, Schedules & Details a. Sketch SKE-5 thru SKE-9 issued. Revised the Power Riser Diagram. b. Sketch SKE-11 issued. Revised Duct Bank Detail. 4. Drawing 3.3 Panel Schedules a. Sketch SKE-10 issued. Revised Switchboard SWBD and SWBD-E schedules. 1.4 GENERAL CLARIFICATIONS Questions received as of the date of this addendum are listed below with respective responses: a. Q: At the pre bid meeting we were told that all Demo is by others. But on the HVAC and plumbing Drawings it has demo what are we to proceed? A: The Scope of Work described under Contract No. 1 Selective Demolition contains language that addresses the demolition reference notes. Unless noted otherwise, all demolition shall be performed by the Selective Demolition Contractor. Exceptions are listed. b. Q: For the WBE and MBE do we just have to solicit or do we have to meet certain percentages? No percentages were found in bid documents just the form to show that we tried to solicited. A: No percentages or minimums are required. Page 5

c. Q: What Steel certs do we have to meet Pa steel or US steel or both A: United States. See Specifications Section 00800, para. 15.6.1 d. Q: Are we responsible for temp. water and heat or is that back to the G.C. A: See Specifications Section 01125, page 8, Contract No. 2 General Trades, Item #7 references temporary heat. No provision has been made yet for temporary water. e. Q: Is commissioning required for HVAC? A: No f. Q: Is this job Tax exempt? A: No g. Q: I know we have to do some saw cut for the plumbing who is responsible for the patching of concrete? A: Sawcutting of the slab and removal of concrete will be performed by the Selective Demolition Contractor (see Item #5 under Contract No. 1 Selective Demolition). Plumbing Contractor will be responsible for excavation and backfill in this trench. General Trades Contractor will be responsible for concrete in-fill (see Item #11, Contract No. 2 General Trades). h. Q: Where are we to put the alternates for the plumbing and HVAC on are bid form there is no place for them? A: A Bid Form has been provided for each Contract. Plumbing, and HVAC & Controls are separate Contracts. i. Q: Are coordination drawings required? A: Coordination Drawings are addressed under Specification Section 01310, para. 1.4.A. Coordination Drawings will be produced and coordinated by the HVAC & Controls Contractor. j. Q: Who is responsible for concrete pads for equipment? A: General Trades Contractor Page 6

k. Q: The air piping is that by the plumber or is it by others. Or are we responsible for the piping on the drawings only? A: Compressed air piping shown on the Drawings (only) is included in Contract No. 4 Plumbing. l. Q: The Specifications indicate for the G/C to provide visual display boards and tack boards. None of which seem to be indicated on the drawings or in the specifications. How many of each should be provided and what size are they? A: Specifications Section 10100 is included in the Project Manual. Updated information (sizes, locations) is being provided in this Addendum. m. Q: The Specifications indicate for the G/C to provide surface mounted and recessed projection screens. None of which seem to be indicated on the drawings or in the specifications. How many of each should be provided and what size are they? A: Specifications Section 11131 is included in the Project Manual. 1.5 PRE-BID MEETING MINUTES Meeting minutes from the Pre-Bid Meeting held on April 24, 2009 are attached and are a part of this Addendum. In the event of a conflict between the information contained in the Pre-Bid Meeting Notes and the Drawings, Specifications and responses to questions contained in this Addendum, the latter shall take precedence. END OF ADDENDUM Page 7