CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
|
|
- Kory Burke
- 6 years ago
- Views:
Transcription
1 CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC Cumberland Parkway Suite 350 Atlanta, Georgia (voice) (fax) ARCHITECT S ADDENDUM NO. 06 TO: ALL HOLDERS OF PROPOSAL DOCUMENTS PROJECT: WALTON HIGH SCHOOL REPLACEMENT SCHOOL COMPLETION STAGE 2, PHASE 2 - PERFORMING ARTS AND ATHLECTIC SPACES 1590 BILL MURDOCK ROAD MARIETTA, GEORGIA OWNER: COBB COUNTY SCHOOL DISTRICT 440 GLOVER STREET MARIETTA, GEORGIA, ARCHITECT: CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC CUMBERLAND PARKWAY SUITE 350 ATLANTA, GEORGIA DATE: JANUARY 31, 2018 The items listed on the attached pages take precedence over referenced portions of Contract Documents for the project and, in executing a contract, shall become a part thereof. Where any item called for in the Contract Documents is supplemented hereby, the original requirements shall remain in effect. All supplemental conditions shall be considered as added thereto. Where any original item is amended, voided, or superseded hereby, the provisions of such items not so specifically amended, voided, or superseded shall remain in effect. THIS ADDENDUM IS ISSUED TO PROVIDE THE STRUCTURAL SHEETS LISTED IN ADDENDUM #5 AS (CLARIFICATION/COORDINATION). ONE ADDITIONAL CHANGE IS LISTED UNDER PART 1. PART 1 - CHANGES TO THE DRAWINGS 1-1 Sheet A-4.31 CANOPY DETIALS: Sheet reissued in its entirety. A. Revise 2/A-4.31 to change the canopy depth as indicated. PART 2 - CHANGES TO THE SPECIFICATIONS PART 3 SUBSTITUTION REQUEST RESPONSES PART 4 QUESTIONS FROM CONTRACTORS
2 CGLS ARCHITECTS, INC. Page 2 PART 5 CHANGES TO ADDENDA 5-1 Sheet A-4.31 CANOPY DETIALS: Sheet reissued in its entirety. B. Revise 4/A-4.31 to change the canopy depth from 4-0 to Sheet A-6.22 WALL SECTIONS: Sheet reissued in its entirety. A. 3/A-6.22 provide soffit vent full perimeter of ceiling at loading dock. 5-3 Sheet S-2.11 LEVEL 200 FOUNDATION PLAN - PART 1: Sheet reissued in its entirety. A. Changed footing size at A.P/5 & A.J/5 to F Sheet S-2.12 LEVEL 200 FOUNDATION PLAN - PART 2: Sheet reissued in its entirety. A. Changed pier type at grid intersection A.O/38 to pier type P3. B. Changed footing size at G/45 to F9. C. Changed footing sizes at A.J/5, A.O/43.1, L/45, & N/45 to F10. D. Changed footing sizes at I/11.2, I/39.7, A.N/45 & A.G/43.1 to F7. E. Changed footing size at S/45 to F11. F. Added Grids 16.3 & 34.8 to clarify location of columns K/16.3 & K/34.8 (see S-2.22). 5-5 Sheet S-2.13 LEVEL 200 FOUNDATION PLAN - PART 3: Sheet reissued in its entirety. A. Changed pier type at grid intersection A.O/38 to pier type P3. B. Changed footing size at B.J/13.9 & B.J/39 to F10. C. Changed footing size at B.J/22 to F8 D. Changed columns at B.J/30 & B.J/33 from HSS12x8x5/8 to HSS8x8x3/ Sheet S-2.14 LEVEL 200 FOUNDATION PLAN - PART 4: Sheet reissued in its entirety. A. Changed footing sizes at B.J/46 & B.B/83 to F6. B. Changed footing sizes at A.N/45 to F Sheet S-2.15 LEVEL 200 FOUNDATION PLAN - PART 5: Sheet reissued in its entirety. A. Changed footing size at G/45 to F9. B. Changed footing sizes at A.O/43.1, L/45, & N/45 to F10. C. Changed footing sizes at A.N/45 & A.G/43.1 to F7. D. Changed footing size at S/45 to F Sheet S-2.21 LEVEL 300 FLOOR FRAMING PLAN - PART 1: Sheet reissued in its entirety. A. Added section cut 7/S-6.14 (sim) for edge of stair landing along grid A.J. 5-9 Sheet S-2.25 LEVEL 325 FLOOR FRAMING PLAN - PART 5: A. Added section cut 7/S-6.14 (sim) for edge of stair floor landing along grid A.N Sheet S-4.14 ROOF FRAMING PLAN - PART 4: Sheet reissued in its entirety. A. Updated tube beam along Grid B.K between Grids to HSS16x8x3/8 (LSV) & updated section at this tube beam from 1/S-7.28 to 6/S-7.28 to coordinate with Architectural.
3 CGLS ARCHITECTS, INC. Page Sheet S-4.15 ROOF FRAMING PLAN - PART 5: Sheet reissued in its entirety. A. Added HSS6x4x1/2 (LSH) stub cantilevers at lobby roof from columns at Grid A along 58.8 & 53 to end of joist top chord extension per 4/S Sheet S-6.13 FLOOR FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 1/S-6.13 Modified roof deck edge bent plate thickness to ½. Clarified joists shall be designed for 7.6k point load from brick veneer B. 2/S-6.13 Modified roof deck edge bent plate thickness to ½. Clarified joists shall be designed for 7.2k point load from brick veneer Sheet S-6.14 FLOOR FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 7/S-6.14 Deleted L3x3x5/16 slab edge edge of stair landing slab. Added L4x4x3/8 x continuous with ¾ diameter expansion bolts (embed 6 24 oc in 2 vertical slots connecting bottom of stair channel to CMU wall. B. 9/S-6.14 Removed CMU wall & T/CMU wall connection below floor beam from section. T/CMU wall stops (1) course above ceiling per Architectural Sheet S-6.16 FLOOR FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 5/S-6.16 Updated slab edge location to 1-2 from grid A.E. & corresponding slab edge bent plate horizontal leg length to 13 ½ to coordinate with Architectural update. Modified beam web stiffener thickness to 5/16 each side. B. 7/S-6.16 Changed L8x8x1/2 continuous with ¼ stiffener 48 on center to 3/8 X 9 ½ continuous steel plate with 5/16 stiff 32 C. 8/S-6.16 Updated slab edge bent plate thickness to 3/8. Added ¼ beam web stiffener 48 oc. D. 9/S Changed L8x8x1/2 continuous with ¼ stiffener 48 on center to 3/8 X 9 ½ continuous steel plate with 5/16 stiff 32 on center Sheet S-6.17 FLOOR FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 3/S-6.17 & 4/S Deleted 3/8 X7 X6 (LLH) x continuous veneer relief bent plate & weldable bars at slab edge Sheet S-7.13 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 2/S-7.13 Removed weld size for tube beam to embed plate connection to be coordinated by steel fabricator with tube beam radius Sheet S-7.15 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 3/S-7.15 Noted reactions for joist design Sheet S-7.16 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 3/S-7.16 Clarified spacing of expansion anchors in deck edge bent plate to be at 24 oc. Modified roof deck edge bent plate thickness to ½. Corrected veneer load on joist to 7.6k. B. 4/S-7.16 Noted reactions for joist design Sheet S-7.17 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 4/S-7.17 Noted reactions for joist design.
4 CGLS ARCHITECTS, INC. Page Sheet S-7.18 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 1/S-7.18 Noted reactions for joist design Sheet S-7.19 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 1/S-7.19 Noted for GC to provide steel shims as needed on top of steel truss for deck bearing to accommodate differential deflection between truss and adjacent joist. Added note for cross bridging not to be installed in end bay of Gym roof between steel joist & steel truss Sheet S-7.20 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 1/S Updated T/CMU wall bent plate connection size from bent plate 3/8 x 17 x 8 (LLV) to bent plate 3/8 X 17 X 5 (LLV). 2. Updated F/CFSF stud relative to centerline of steel beam. 3. Added CFSF clip connection from high deck edge bent plate to parapet CFSF. 4. Added plf load for steel joist to be designed for. 5. Added bent plate 3/8 x 10 x 10 x on center with ¾ diameter expansion 32 on center at bottom of steel joist connection to CMU wall. 6. Added 12 depressed web block with (2) - #5 continuous at new bottom of steel joist connection to CMU wall Sheet S-7.21 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 3/S Modified roof deck edge bent plate to 11 x6 x½ (LLH) Sheet S-7.22 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 1/S Modified roof deck edge bent plate to 11 x6 x½ (LLH). B. 2/S Updated T/CMU wall bent plate connection size from bent plate 3/8 x 17 x 8 (LLV) to bent plate 3/8 X 17 X 5 (LLV). 2. Updated F/CFSF stud relative to centerline of steel beam. 3. Added CFSF clip connection from high deck edge bent plate to parapet CFSF. 4. Added plf load for steel joist to be designed for. 5. Added bent plate 3/8 x 10 x 10 x on center with ¾ diameter expansion 32 on center at bottom of steel joist connection to CMU wall. 6. Added 12 depressed web block with (2) - #5 continuous at new bottom of steel joist connection to CMU wall Sheet S-7.27 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 1/S Updated Tube beam width from 12 wide to 8 wide. 2. Clarified dimension from centerline of tube to grid B.J. 3. Added 4 CMU grouted solid at interior face of tube beam Sheet S-7.28 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 4/S Modified roof deck edge bent plate thickness to ½.
5 CGLS ARCHITECTS, INC. Page 5 B. Added section 6/S-7.28, which revises 1/S-7.28 at Grid B.K between Grids (sheet S- 4.14) for tube beam update from 12 wide to 8 wide with 4 CMU grouted interior face of tube beam Sheet S-7.29 ROOF FRAMING SECTIONS & DETAILS: Sheet reissued in its entirety. A. 3/S-7.29 Noted reactions for joist design. Updated HSS on top of joist to HSS4x4x5/16. END OF ADDENDUM NO. SIX
Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.
ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationIntroducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA
The SIMPLE FRAMING SYSTEMSM INSTALLATION GUIDE USA for Floors This Installation Guide is intended to provide general information for the designer and end-user. For further information, please refer to
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationCOLD-FORMED METAL FRAMING INSPECTION REPORT SUMMARY
COLD-FORMED METAL FRAMING INSPECTION REPORT SUMMARY Inspector: Section 05400 Name: Date: Company: Address: City: State: Zip code: Phone: Fax: E-mail: Project: Project Name: Location: Contractor: Phone:
More informationGarage Design Guide. October 2018
Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationTypical Deck Details
Botetourt County guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachment to existing house s footing beam -to-beam connection post-to-beam connection
More informationTypical Deck Details
Based on the 2009 Michigan Statewide Building Code guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachement to existing house s footing beam
More informationNORMAL WEIGHT CONCRETE TOTAL-LEWIS-DECK GYPSUM BOARD 2 OR 3-PLY COMPOSITE TOTALJOIST TOP CHORD CONNECTION
GENERAL DETAILS 100 TYPICAL FLOOR CONSTRUCTION NORMAL WEIGHT CONCRETE WELDED WIRE MESH FIBERGLASS BATT INSULATION (OPTIONAL) 18 GAUGE TIE WIRE 7/8" RESILIENT CHANNEL NOTE: CEILING MAY ALSO BE SUSPENDED
More informationTo the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603
ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More information3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?
Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:
More informationGlasRoc Sheathing Type X
Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More informationREINFORCEMENT DESIGN FOR METAL BUILDING SYSTEMS
REINFORCEMENT DESIGN FOR METAL BUILDING SYSTEMS By Donald L. Johnson, P.E. RETROFIT PROJECTS CAN BE NECESSARY FOR ANY NUMBER OF REASONS, though change in use is one of the most common. Change of use can
More informationSTANDARD MSGDET4AC: NOTES TO DESIGNER
GIRDER DETAILS (SHEET 1 OF 2) NOTES TO DESIGNER: Standard is to be used for trapezoidal or curved, 4-span continuous, steel plate girders. The standard includes girder details; tables for plate sizes,
More informationFIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND
HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationAcceptable Standards of Domestic Construction
Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be
More informationREQUEST FOR INFORMATION
REQUEST FOR INFORMATION Project: Junction City HS General Contractor: Corp Inc. RFI #: MVCC 0 RFI Title: Cold Framing Submittal EOR Response RFI Section: 05 40 00 Date: 0/4/07 Response Required: ASAP Information
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationSuggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees
Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees General 1. When detailing substructures, it is preferable not to use series bars unless necessary. The first
More informationUse the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7
www.garyklinka.com page 1 of 16 Truss Joist I-Joist Quiz Instructions: www.garyklinka.com 1. Print these pages. 2. Print referencing manual from my site at http://garyklinka.com/manuals/tj-4000.pdf or
More informationVERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA
INSTALLATION GUIDE VERSA-LAM BCI LIMIT STATES DESIGN CANADA The information in this document pertains use in the CANADA ONLY, Limit States Design. Refer the appropriate Specifier Guide US for use in the
More informationIRC 2015 Code Compliant Wood Framed Residential Details. Incorrect Installations of Connectors with code references and remedies, discussion.
IRC 2015 Code Compliant Wood Framed Residential Details Incorrect Installations of Connectors with code references and remedies, discussion. You can help to avoid this, by being diligent with inspections.
More informationProject Booklet. Structural Drafting with AutoCAD
Project Booklet Structural Drafting with AutoCAD Introduction 1 General Setup 2 Border and Title Block 3 Drafting the Foundation Plan (Plate 1) 8 Drafting the South Elevation (Plate 2) 11 Drafting Section
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationPANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D " NAILS/ SPACING " o.c. SILL BOLT SPACING 1 2 " 36" O.C. 1 2 " Ø
PANEL NOTATION (3) D2 X2 SHEATHING THICKNESS (IN.) 32 " NAILS/ SPACING 32 " 8d @3" o.c. SILL BOLT SPACING 2 " Ø @ 36" O.C. 2 " Ø @ 2" O.C. 2 " Ø @ O.C. 2 " Ø @ 6" O.C. 2 " Ø @ '-0" O.C. 980 PLF D2X2 32
More informationDefinitions and Design Considerations... W-CR-2
General Information SECTION DIRECTORY Definitions and Design Considerations... W-CR-2 Combination Assembly Recommendations and Limitations Typical Sealant... W-CR-4 Single-Unit Opening... W-CR-4 Two-Way
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationCentral Office Grayson County Schools Leitchfield, Kentucky BG #13-089
Central Office Grayson County Schools Leitchfield, Kentucky BG #13-089 ADDENDUM NO. 3 June 7, 2013 The original specifications and drawings dated May 9, 2013, for the above referenced project are amended
More informationSite Preparation Information for:
Site Preparation Information for: Product Series - Big Doors Product Type - MultiGlide Door Read these instructions and the Product Safety Information before starting procedure. For: MultiGlide Door Instructions/Videos
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationADDENDUM NO. 4 November 15, Page 1
ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,
More informationStandard Signs Manual
Standard Signs Manual NEW, CHANGED, OR DELETED 1/2017 STANDARD SIGN DETAILS Title Page Number Fractions... 101 Straight Arrows... 102 Double Head Arrows... 102A Double Head Arrows - 90... 102B Advance
More informationTotal precast solution for large stadium projects meet tight schedule
Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy
More informationHIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11
HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum
More informationSutton Screened in Awning / Porch
Sutton Screened in Awning / Porch Sections: Project Overview Roof Work Cedar Framing Canopy Frame Screen Frames Misc. Sheet 1 - - - Index Sheet 2 - - - Project Summary Sheet 3 - - - Roof Work overview
More informationIRC 2012 Code Compliant Wood Framed Residential details. Miss Installed Connectors with code references and remedies, discussion.
IRC 2012 Code Compliant Wood Framed Residential details Miss Installed Connectors with code references and remedies, discussion. You can help avoid this, by being diligent with inspections. Notes to Attendees
More information1.1 RELATED DOCUMENTS
SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections
More informationAASHTO/NSBA Steel Bridge Collaboration G Design Drawing Presentation Guidelines. AASHTO/NSBA Steel Bridge Collaboration
AASHTO/NSBA Steel Bridge Collaboration G 1.2-2003 Design Drawing Presentation Guidelines AASHTO/NSBA Steel Bridge Collaboration Preface This document is a standard developed by the AASHTO/NSBA Steel Bridge
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationCarpentry/Carpenter CIP Task Grid
1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify
More informationT-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY
August 10, 2010 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY ST - T-BRACE 2 R MiTek Industries, Chesterfield, MO Page 1 of 1 Note: T-Bracing / I-Bracing to be used when continuous lateral bracing is impractical.
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More information1. Show the following information with additional information necessary to indicate shop compliance with the requirements of this section.
SECTION 12360 LIBRARY SHELVING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 06100 - Carpentry. 2. 09200 - Metal Studs, Lath, Suspension Ceiling, Plaster and Stucco. 3. 09660 - Resilient Tile Flooring.
More informationSTRUCTURAL WOOD DETAILING IN CAD FORMAT
STRUCTURAL WOOD DETAILING IN CAD FORMAT STRUCTURAL WOOD DETAILING IN CAD FORMAT K.A. ZAVAT lnm51springer Science+Business ~---Media, LLC Copyright 1993 by Springer Science+Business Media New York Originally
More informationBUILDING PLANS. BUILDING DEPARTMENT
BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More information3 DATE ISSUE R# Forefront Dermatology. CONFLUENCE DESIGN GROUP #2 Daniel Drive O'Fallon, MO ph: St. Peters, Missouri 63376
THESE DRAWINGS ARE FOR THE TENANT FINISH PORTION OF THE SCOPE. LANDLORD IS RESPONSIBLE FOR THE SHELL WORK. THOSE DOCUMENTS ARE PROVIDED FOR REFERENCE ONLY New 5700 Mexico Road Suite 14 St. Peters, MO 63376
More informationBeam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE
U.S. Technical Guide U.S. TECHNICAL GUIDE LP SolidStart LVL & Header Technical Guide 2900F b -2.0E Please verify availability with the LP SolidStart Engineered Wood Products distributor in your area prior
More informationS001 LOWER LEVEL ISO SECOND FLOOR ISO S001 FULL ISO FIRST FLOOR ISO. O="Katahdin Engineering, LLC",
1 LOWER LEVEL ISO 3 SECOND FLOOR ISO Elizabeth Woolf No. Digitally signed by Elizabeth Woolf DN: C=US, E=ewoolf@katadineng.com, O="", CN=Elizabeth Woolf 01.1.30 1:30:53-05'00' Revision / issue Date 0 10/1/1
More informationListed below are the competencies required and examples from the aforementioned job:
1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.
More informationTypical Deck Details Based on the City of Nixa Residential Deck Ordinance
Typical Deck Details Based on the City of Nixa Residential Deck Ordinance The use of this package in lieu of submitted drawings applies to Single Span, Single Level, Residential Decks ONLY. Decks must
More informationOHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO
OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 20, 2012 To: Users of the Standard Bridge Drawings From: Tim Keller, Administrator, Office of Structural
More informationFastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationAUXILIARY FRAMING AND ACCESSORIES
CUSTOM CABINETS & RACKS STRUT AND ACCESSO- RIES JUNCTION KITS ANGLE AND BRACE KITS SPLICE KITS BRACE KITS INSTALLATION KITS WALL ANGLE KITS RUBBER END CAPS SUPPORT INSTALLATION AND SUPPORT KITS STANCHION
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More information10930 W. Sam Houston Parkway N., Suite 900
ADDENDUM NO. 1 10930 W Sam Houston Pkwy. North Suite 900 Houston, Texas 77064 281.664.1900 281.664.1912 (f) www.salasobrien.com March 21, 2018 Project: Prepared by: Taylor Career Center Welding Labs Beaumont
More informationC.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit
Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800
More informationStantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)
Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationCONSTRUCTION / HOUSING
CONSTRUCTION / HOUSING - PRINCE EDWARD ISLAND APPLIED MATHEMATICS 80A Table of Contents Construction/ Housing Reading a Tape Measure (Imperial)... - Using a Carpenter s Square... -5 Checking for Squareness
More informationStrong, lightweight composite structural I -Beam.
Strong, lightweight composite structural I -Beam. This Installation Guide has been prepared as a source of information to provide general guidance to consultants and in no way replaces the services of
More informationSections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES
2 Sections & Details WOOD SILL and FLOOR CONSTRUCTION NOTES 1 Commonly Used Lumber Common LENGTHS include: 8, 10, 12, 14, 16 NOMINAL SIZES 2 x 4 2 x 6 2 x 8 2 x 10 2 x 12 ACTUAL SIZES 1 ½ x 3 ½ 1 ½ x 5
More informationDeck Evaluation Checklist
Date: Reported By: Project Name/Client: Year Deck was Built: I. Stairs A. Not Applicable B. Are there any visible signs of cracks, decay or over-notching? No Yes 1. If yes, where? C. Stairway width: (Hint:
More informationMTJ Outdoor Baggage Claim
MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationConstruction Tolerances - The following tolerances apply to cast-in-place structures:
00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationStorefront Installation Guide INSTALLATION INSTRUCTIONS
STOREFRONT General Notes 1. Check contract documents and shop drawings, and understand and clarify any Field Verify Notes, approvals of drawings, and products required to be familiar with the project.
More informationDrywall, Wood and Truss Uplift
Drywall, Wood and Truss Uplift Drywall (gypsum board) has to: provide rigidity provide aesthetics provide fire protection not leak air Concerns Wood moves. Drywall does not move. Interesting problem. The
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationPLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.
TYPICAL HEADER, SEE DETAIL 3/ 4 1 6 2 CEILING FRAMING PLAN SCALE: 3/16" = 1'-0" 2 2 4 600S162-43 FLAT BRACE, 4 CEILING JOIST, SEE SCHEDULE, BOXED BEAM: (2) 600S162-54 + (2)14GA TRACKS 2 CEILING JOIST SCHEDULE
More informationProducts for fixing to Steelwork and Decking
Products 8.0 Beam Clamp - Single Support 8.1 Universal Joint for any variable Angle Adjustment 8.2 Beam Clamp TCS for Header Rails 8.3 Beam Clip for Cross Support/ Dimensioning of Bolts 8.4 Beam Clip for
More informationPART II ENGINEERED BASIS OF RIDGE AND EAVE VENT DETAILS
PART II ENGINEERED BASIS OF RIDGE AND EAVE VENT DETAILS A - INTRODUCTION This report addresses engineered design for unblocked wood structural panel (plywood or OSB) roof diaphragms with either continuous
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationGlulam Connection Details
T E C H N I C A L N O T E Glulam Connection Details Note: This version is superseded by a more current edition. Check the current edition for updated design and application recommendations. ENGINEERED
More informationVertical Offset Base and Safety Rail System Installation Instructions
Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat
More information602.4, TABLE 602.4, , , , , , , , , TABLE
602.4, TABLE 602.4, 602.4.1, 602.4.2, 602.4.3, 602.4.4, 602.4.5, 602.4.9, 2304.11, 2304.11.1, TABLE 2304.11.1.1, 2304.11.2, 2304.11.3, 602.4.8, 602.4.8.2, 602.4.8.1, 602.4.6, 602.4.6.2, 602.4.6.1, 2304.11.4,
More informationTYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:
City of Aliso Viejo Building Division 12 Journey, Suite 100 Aliso Viejo, CA 92656 (949)425-2540 Fax (949)425-3899 www.cityofalisoviejo.com TYPICAL PATIO COVERS 111 I. GENERAL Patio covers are one-story,
More informationLP SolidStart LSL. LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.
LP SolidStart LSL LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.35E LSL Please verify availability with the LP SolidStart Engineered Wood Products
More informationNailed Structural-Use Panel and Lumber Beams
D A T A F I L E Nailed Structural-Use Panel and Lumber Beams When roof load or span requirements are too great to allow use of commonly available dimension lumber or timbers, a box beam constructed of
More informationESR-1254 * DELETED BY CITY OF LOS ANGELES. Reissued April 1, 2006 This report is subject to re-examination in one year.
ESR-1254 Reissued April 1, 2006 This report is subject to re-examination in one year. www.icc-es.org Business/Regional Office 5360 Workman Mill Road, Whittier, California 90601 (562) 699-0543 Regional
More informationAttachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder. Installation Instructions Revised 9/2/2016
Attachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder Installation Instructions Revised 9/2/2016 SBCA has been the voice of the structural building components industry
More informationThe following information supplements and/or supersedes the bid documents issued on July 10, 2017.
Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents
More information14000 Series. Fabrication and Installation Instructions
14000 Series Fabrication and Installation Instructions Revision May 2013 Table of Contents GENERAL CONSTRUCTION NOTES...3 EXTRUDED ALUMINUM PARTS...5 ACCESSORIES...8 OVERVIEW...10 FRAME FABRICATION...15
More informationWood Connections. Concepts of Well Designed Connections
Wood Connections Sam Hensen, P.E. Branch Engineering Manager Concepts of Well Designed Connections Must provide sufficient capacity to transfer loads to supporting members Utilize fastener spacing which
More informationASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER
ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER Our unique assembly process quickly transforms individual pieces into a finished structure that will give you a lifetime of service. Great care has been taken
More information