1 Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat leading edge protection. The vertical offset base can be installed on the fascia board of a sloped roof providing safety rail protection during the entire roof-sheathing and shingle-installation processes. The offset base and safety rail can also be used for floor openings, perimeter guarding, stairwell, and balcony areas.
2 Attaching Offset Base for Perimeter Guarding Step 1 Align the bend on the back of the vertical offset base to the surface of the floor, shown in Figure 1. Fixed Rail Adjustable Rail Align to floor Figure 2 Figure 1 Safety Snap Step 2 Header Joist (1.5 Thick) and Floor Joist (Truss) Use four (¼ x 3 1 /8 ) screw fasteners in the middle and bottom holes of the vertical base when installing the base to a header joist and corresponding floor joist. Install one row of the screw fasteners thru the header joist and penetrate the end of the floor joist, as shown in Figure 1. Step 3 Install the safety snap pin in the center hole of the vertical offset base; this is used to keep the vertical railing post from sliding through the base, as shown in Figure 1. Step 4 Install a railing post in the vertical offset base pocket, as shown in Figure 2. Choose a fixed railing post (the height of the railing bracket is fixed) or an adjustable railing post depending on the application. Step 5 When using adjustable railing brackets, set the top rail at a height of 42 ± 3 from the floor surface to the top of the horizontal top rail. Set the toe board at the bottom of the post and set the mid rail height half way between the bottom of the top rail and the top of the toe board, as shown in Figure ± 3 Top Rail Mid Rail Toe Board 8 Max 8 Max Figure 3 Step 6 Repeat steps 1-5 until all bases are installed at a maximum of 8 feet on centers to completely protect the exposed edge, as shown in Figure 3. Section 5 Page 2
3 Step 7 Install the 2 x 4 toe board against the vertical offset base and in direct contact with the floor surface. Fasten the toe board to the vertical offset base with screws (or 8d nails) in a minimum of two of the holes provided in the vertical offset base. When two toe boards abut (Figure 4), you must install a fastener in all four holes provided, as shown in Figure 5. Figure 6 Step 9 Install the mid rail (2 x 4 board) flat or on end, as shown in Figure 7. Abutting Toe Boards Figure 4 Figure 5 Step 8 Install the horizontal top rail (2 x 4 board) flat or on end, as shown in Figure 6. Figure 7 Step 10 Make sure that all horizontal rails overlap a minimum of 6 and should be secured to each of the railing brackets with either an 8d nail or screw fastener using the holes provided in the bracket, as shown in Figure 8. Min 6 Min 6 Figure 8 Section 5 Page 3
4 End-to-end Configuration Step 11 Single Wall Stud/ Single Floor Truss Use 3 screw fasteners when installing the base to a single wall stud. Use top, middle and bottom holes provided on either side of the vertical offset base, as shown in Figure 9. Single Stud Overlap Configuration Figure 11 Figure 9 Double Wall Stud/ Double Floor Truss Use 4 screw fasteners in the top and bottom holes on both sides of the base when installing the vertical base to a double wall stud, as shown in Figure 10. Double Stud Attaching Offset Base for Roof Work Guarding Step 1 After installation of the roof fascia board, position the vertical offset base along the leading edge of the roof. Align the holes of the vertical offset base with the desired roof rafter so that fasteners can be fully driven thru the fascia board and into the tail of the rafter. Step 2 Install a minimum of three screw fasteners on one side of the vertical offset base, screwing thru the fascia board and into the tail of the rafter. Figure 10 Step 12 Construct the corners of the railing system in either an end-to-end configuration or an overlap configuration. Fasten with either an 8d nail or screw fastener using the holes provided in the bracket. An additional fastener through both boards is required in the overlap configuration, as shown in Figure 11. Step 3 Install the safety snap pin in the center hole of the vertical offset base; this is used to keep the vertical railing post from sliding through the base. Step 4 Spacing between vertical offset bases shall not exceed 8 feet. Step 5 Install the adjustable vertical rail system along the leading edge, as indicated below. Section 5 Page 4
5 Additional Offset If an additional offset is required, attach the adapter tube to the base with the provided bolts and wing nuts. This will set the railing system out from the vertical surface an additional 1 /2, as shown in Figures 13 & 14. An important aspect of the vertical offset base is that the finished railing, as shown in Figures 13-15, is that the temporary guarding can be left in place throughout the installation of the finished product. Finished Stair Application 1.5 Adapter Tube Vertical Offset Base Bolt and Wing Nut Figure 14 Finished Balcony Application Bolt and Wing Nut Figure 13 Figure 15 Section 5 Page 5
6 8. Install the horizontal top rail (2 x 4 board) on end or flat. 1. Vertical Offset Base Installation Instructions - Perimeter Guarding Align the bend on the back of the vertical offset base to the surface of the floor. 2. Use 4 (¼ x 3 1 /8 ) screw fasteners in the middle and bottom holes of the vertical base when installing the base to a header joist and corresponding floor joist. Install one row of the screw fasteners thru the header joist and penetrate the end of the floor joist. 3. Install the safety snap pin in the center hole of the vertical offset base; this is used to keep the vertical railing post from sliding through the base. 4. Install a railing post in each of the vertical offset base pockets. Choose a fixed railing post (the height of the railing bracket is fixed) or an adjustable railing post depending on the application. 5. When using adjustable railing brackets, set the top rail at a height of 42 ± 3 from the floor surface to the top of the horizontal top rail. Set the toe board at the bottom of the post and set the mid rail height half way between the bottom of the top rail and the top of the toe board. 6. Repeat steps 1-5 until all bases are installed at a maximum of 8 feet on centers to completely protect the exposed edge. 7. Install the 2 x 4 toe board against the vertical offset base and in direct contact with the floor surface. Fasten the toe board to the vertical base with screws (or 8d nails) in a minimum of two of the holes provided in the vertical offset base. When two toe boards abut, you must install a fastener in all four holes provided. 9. Install the mid rail (2 x 4 board) on end or flat. 10. All horizontal rails should overlap a minimum of 6 and should be secured to each of the railing brackets with either an 8d nail or screw fastener using the holes provided in the bracket. 11. Use 3 screw fasteners when installing the base to a single wall stud. Use the top, middle and bottom holes provided on either side of the vertical offset base. Use 4 screw fasteners in the top and bottom holes on both sides of the base when installing the vertical base to a double wall stud. 12. Construct the corners of the railing system in either an end-to-end configuration or an overlap configuration. Fasten with either an 8d nail or screw fastener using the holes provided in the bracket. An additional fastener through both boards is required in the overlap configuration. Attaching Offset Base for Roof Work Guarding 1. After installation of the roof fascia board, position the vertical offset base along the leading edge of the roof. Align the holes of the vertical offset base with the desired roof rafter so that fasteners can be fully driven thru the fascia board and into the tail of the rafter. 2. Install a minimum of three screw fasteners on one side of the vertical offset base, screwing thru the fascia board and into the tail of the rafter. 3. Install the safety snap pin in the center hole of the vertical offset base; this is used to keep the vertical railing post from sliding through the base. 4. Spacing between vertical offset bases shall not exceed 8 feet. 5. Install the adjustable vertical rail system along the leading edge. Section 5 Page 6
Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419)
125 TAYLOR PARKWAY ARCHBOLD, OH 43502 PHONE: (419) 445-8915 FAX: (419) 445-0367 www.biljax.com Multi-Stage ST-8100 SERIES ASSEMBLY INSTRUCTIONS ALL DRAWINGS ARE FOR ILLUSTRATION ONLY. PRINTED IN U.S.A.
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationChapter 7 - Porch Framing
Chapter 7 - Porch Framing Contents Chapter 7 - Porch Framing... 7-1 Timing & Prerequisites... 7-2 Concrete Porches Caps (Contractor)... 7-3 Organize the Porch Framing Lumber... 7-3 Types of Porch Roofs...
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationPrecut Value Shed Manual Gambrel Barn
Tools Needed: -Cordless Drill (12V or higher) -#2 Square Drive Bit -Hammer -6 Step Ladder -Tape Measure -Square utility knife w/ blade & hook blade -Speed Square Little Cottage Co. PO Box 455 Berlin, OH
More information10 Octagon Cedar Gazebo Assembly Instructions
10 Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/22/09 10 Cedar Gazebo Assembly Instructions
More informationTREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions
TREX ENHANCE RAILING (Also Applies to Trex Select Railing) NOTE: All Enhance Railing lengths are manufactured at CLEAR SPAN dimensions (spanning between space of posts): 7" for 6' clear span. Note that
More informationFastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More informationV nyl Gazebo truct c it Assembly Instr ons
V nyl Gazebo Vi Assembly Instr ct tr t u ru ons ct c i ti Pre-assembly Instructions A C B #1 - Site properly prepared. 4" - 6" clean stone 9 linear blocks 2" x 8" x 16" C C A A B B #1a - 12" sauna tubes,
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationInstallation Instructions for the AlphaDeck Staging System
Installation Instructions for the AlphaDeck Staging System Step 1 - Preparation A. Before setting up your system, determine the location where the stage will be installed and locate all the parts you will
More informationCAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:
Octagon Wood Gazebo Kit Contents Hardware included for assembling your gazebo: 5/16" Lag Bolts Use to fasten post to floor 2 1/2" screws Use to fasten joist together fasten posts to outside joist fasten
More informationGambrel Barn with Overhang Manual
Tools Needed: -Cordless Drill (12V or higher) -#2 Square Drive Bit -Hammer -6 Step Ladder -Tape Measure -Square utility knife w/ blade & hook blade -Speed Square Little Cottage Co. PO Box 455 Berlin, OH
More informationEZ Shed. Tool eeded ST MER SER I E
00 EZ Shed PLEASE READ ALL INSTRUCTIONS AND HELPFUL HINTS CAREFULLY BEFORE CONSTRUCTION Tool eeded ST MER SER I E 203 591-9032 - 30-5 30 INSTRUCTIONS 1. Separate and stack all parts included in kit. STUD
More informationAssembly Instructions
Selling Station Assembly Instructions View from above without top A B C D Rounded finished corners on A & D Square unfinished 3-sides on B & C Selling Station Components (2) 2' x 6' Side s Have a channel
More informationOctagon Vinyl Gazebo Assembly Instructions
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationBest Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016
Best Barns USA Assembly Book revised March 23, 2016 the Brookhaven 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationATLANTIS RAIL Contact Information
ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing
More informationinstallation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty
installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationAssembly Instructions
10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationVinyl Gazebo Instructions
P a g e 1 Vinyl Gazebo Instructions 10 Vinyl Gazebo Shown Thank you for the purchase of your New Gazebo. Depending on the size of your Gazebo, installation can usually be completed in 1 to 2 days. These
More informationTHANK YOU FOR PURCHASING FROM HERITAGE PATIOS
Installation Guide THANK YOU FOR PURCHASING FROM HERITAGE PATIOS Your purchase is engineered by nearly a half century of commercial and residential product design proudly manufactured in the USA from responsibly
More information6x6 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More informationTurada Hardwood Shingles and Shakes Installation instructions
1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced
More informationINSTALLATION INSTRUCTIONS
www.marwincompany.com Kit Number Door Height Rough Opening Height KD200BB68 80 84 ½ KD200BB70 84 88 ½ KD200BB80 96 100 ½ INSTALLATION INSTRUCTIONS 200BB SERIES KD POCKET DOOR FRAME FOR 2 X 4 STUD WALLS
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationBoxed Shed. QUAKER or A-FRAME SIZES: 6 x 8 6 x 10 T1-11Siding
Boxed Shed QUAKER or A-FRAME SIZES: 6 x 8 6 x 10 T1-11Siding Required Equipment; * Power Drill with square head bit * Hammer, Square, Gloves & an Allen wrench * Step Ladder Screws Supplied; * 2 for roof
More informationGambrel Barn Construction Manual 8x8 through 16x24 Units
Gambrel Barn Construction Manual 8x8 through 16x24 Units Tools Needed: Cordless drill (12V or higher) #2 square drive bit Hammer 6 step ladder Tape measure Square utility knife w/ blade & hook blade Little
More informationSECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.
PROPOSED 1ST FLOOR PROPOSED 2ND FLOOR Anthony Hatziioannou Architect, P.C. EXISTING 1ST FLOOR ZONING CALCULATION JURISDICTION: TOWN OF OYSTER BAY SECTION: 15 BLOCK: 71 LOT: ZONE: RESIDENCE R1-7 PERMITTED
More informationCountry Cabin. Assembly Manual. HomePlace Structures
Country Cabin Assembly Manual Country Cabin Assembly Manual revised 3/20/10 Dear Customer, Thank you for your purchase of our Country Cabin. The craftsmanship and detail in this building is unmatched.
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationOctagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationGrand Garden Chalet 6X3 Assembly Manual
Revision #8 November 1, 2009 Grand Garden Chalet 6X3 Assembly Manual Thank you for purchasing a Grand Garden Chalet. Please take the time to identify all the parts prior to assembly. Please use Safety
More information8x8 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationBUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame
BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood
More informationT-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY
August 10, 2010 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY ST - T-BRACE 2 R MiTek Industries, Chesterfield, MO Page 1 of 1 Note: T-Bracing / I-Bracing to be used when continuous lateral bracing is impractical.
More informationDave's Glossary of Construction Terms. by Dave Osborne (www.daveosborne.com)
Dave's Glossary of Construction Terms by Dave Osborne (www.daveosborne.com) 5/4" A thickness of decking material between 1 x 6 and 2 x 6. Although it is called 5/4 x 6, it is actually 1" thick and 5 1/2"
More informationREDWOOD. Garden Tool Shed. Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects
B U I L D I T W I T H REDWOOD Garden Tool Shed R E D W O O D Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects Garden Tool Shed BUILD THE TOOL SHED
More informationBaby Grande with Crank, Housing, and Side Rails Installation Instructions
Baby Grande with Crank, Housing, and Side Rails Installation Instructions Tools Needed Hardware Provided (per shade) Hardware Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil
More informationSAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Belmont with pocket doors. Building Size 12'x16' or 12'x20' Revised January 10, 2012
Best Barns USA Assembly Book Revised January 10, 2012 SAMPLE INSTRUCTIONS the Belmont with pocket doors Building Size 12'x16' or 12'x20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive
More informationWith Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans
12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed
More informationExtra Wide Designer Lockers Series Installation Instructions
Extra Wide Designer Lockers 20000 Series Thank you for selecting the 20000 Series Extra Wide Designer Lockers. We are confident that the quality and construction of the lockers will prove to be a good
More informationWINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS
WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH 44660 www.wayne-dalton.com See garage door owner s manual for
More informationDesk/Wall-Mount Rack
Desk/Wall-Mount Rack Patent(s) Pending Installation Instructions Post P/N: 119-1752 119-1781 119-1782 119-4014 Frame P/N: 119-1591 119-1754 119-1755 Kit Contents (2) Frames (4) Posts Assembly Hardware
More informationChapter 22. Shed Construction
Chapter 22. Shed Construction 22.1 BUILDING SHED FLOOR 22.2 BUILDING SHED WALLS 22.3 BUILDING SHED ROOF 22.4 ASSEMBLING SHED Tools needed by volunteers: Hammer Nail apron Tape measure Square Utility knife
More informationBest Barns. 10' x 12' the Elm R. Assembly Book. revised September 29, 2016
Best Barns Assembly Book revised September 29, 2016 the Elm R 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under the
More information1. Tile Roof Installation:!
1. Tile Roof Installation:! * Solar Roof Fan have a different base plate and ventilation opening size. This will require different measurements and allowances to those shown as pictures. Materials Needed:
More informationChapter 23. Garage Construction
Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES
More informationEkoroof LiteTile Dimensions
Ekoroof LiteTile Dimensions 7 3 3.5 Height 40 Width 20 Length Weight per Panel: 3 kg / 6.61 lbs 2 2 Area per panel 800 in / 5.55 ft 2 Panels per Square: 20 (including overlap, for a 100 ft covered area)
More informationCOMPOSITE RAILING INSTALLATION
COMPOSITE RAILING INSTALLATION Tools All you ll need is a hammer and screw gun, circular saw (carbidetipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line.
More informationBest Barns. 10' x 16' the Elm R. Assembly Book. revised September 29, 2016
Best Barns Assembly Book revised September 29, 2016 the Elm R 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under the
More information10x10 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationTREX SELECT RAILING Installation Instructions
RAILING NOTE : All Trex Select Railing lengths are manufactured at ON CENTER dimensions (spanning from center of each post): 67-5/8" (76.8 cm) for 6' (.83 m) on center, and 9-5/8" (35.3 cm) for 8' (.44
More informationSTOP! Call Us First! DO NOT RETURN TO STORE.
16632 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@backyardproductsllc.com Our
More informationASSEMBLY INSTRUCTIONS
ASSEMBLY INSTRUCTIONS PRINTED IN USA Assembly Instructions Include: P/N: LL-04-5 Step : Site Preparation Step 0: Guard Rail Installation Step : Leg Assembly Step : Stairs Step 3-8: Setting the Stage Step
More informationTYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:
City of Aliso Viejo Building Division 12 Journey, Suite 100 Aliso Viejo, CA 92656 (949)425-2540 Fax (949)425-3899 www.cityofalisoviejo.com TYPICAL PATIO COVERS 111 I. GENERAL Patio covers are one-story,
More information12' Octagon Wood Gazebo
12' Octagon Wood ANY REPRODUCTION, ALTERNATION, OR USE OF STARTING ANY DISCEPANCY SHALL BE REPORTED IN WRITTING BEFORE STARTING DESIGN REQUIREMENTS 1. Governing Code: Including, not limited to: IBC 2015
More informationFeaturing TJ Rim Board and TimberStrand LSL
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load
More informationTREX SELECT RAILING. Installation Instructions PARTS
RAILING NOTE : All Trex Select Railing lengths are manufactured at ON CENTER dimensions (spanning from center of each post): 67-5/8" (76.8 cm) for 6' (.83 m) on center, and 9-5/8" (35.3 cm) for 8' (.44
More informationTriple Bypass System
Triple Bypass System ASSEMBLY INSTRUCTIONS TRIPLE BYPASS SYSTEM Recommended Tools Drill with 1/4 Drill Bit and Phillips Screw Bit 7/16 Combination Wrench Socket Wrench with 7/16 and 9/16 Socket Level Tape
More informationAPA Performance Rated Rim Boards
D a t a F i l e APA Performance Rated Rim Boards A Rim Board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030
ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com
More information6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015
6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015 Thank you for purchasing a 6x6 Maximizer Storage Shed. Please take the time to identify all the parts prior to assembly. Please Note-
More informationItem #BUILD SHED. build your shed today HOW TO BUILD A SHED. Copyright windows.
WWW.SHED-WINDOWS.COM build your shed today Item #BUILD SHED HOW TO BUILD A SHED www.shed-windows.com 1 These shed plans will show you how to build a 10 x14 storage shed using T1 11 for sheathing and asphalt
More informationALL SEASON PATIO COVER
ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the
More informationWindload Post 9100/9600/9900 Installation Instructions
Windload Post 9100/9600/9900 Installation Instructions Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH 44660 www.wayne-dalton.com Wayne-Dalton Corp. P.O. Box 67 Mt. Hope,
More informationChapter 33: Lofts (Or Second Floors)
Chapter 33: Lofts (Or Second Floors) Most Common Mistakes: 1. Designing loft yourself and installing later. 2. Inadequate height either below or above. 3. Not enough headroom for stairs. 4. Failure to
More information12x8 Cabana Garden Shed Assembly Manual
12x8 Cabana Garden Shed Assembly Manual Revision #15 Feb 13th, 2015 Thank you for purchasing our 12x8 Cabana Garden Shed. Please take the time to identify all the parts prior to assembly. Safety Points
More informationSTOP! Call Us First! DO NOT RETURN TO STORE.
16575 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@backyardproductsllc.com Our
More informationINS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System
Ceiling Mount Track System 10.26.2016 Specifications Ceiling Post: Unassembled 2-7/8 Assembled 1-11/16 7/8 7-9/16 5-7/8 3/8 2 Tubes 1/2 2-3/8 5 Parts and Tools Tools Needed Tape Measure Pencil Drill with
More informationPRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)
More informationDescription. Lesson Outcomes. Assumptions. Build a Floor. Carpenter
Carpenter Description Floors are an integral part of residential construction and must be built to specifications that meet building code requirements. In this Activity Plan, students will be cutting and
More informationIsland Wood Range Hood
Island Wood Range Hood Patent Pending Important Notes Always read the instructions completely and carefully before beginning assembly. Remove and check contents for damage and/or missing parts. Keep the
More information8x4 SpaceSaver Garden Shed - Double Door - Bevel Model Assembly Manual Revision #18 January 3rd, 2018
8x4 SpaceSaver Garden Shed - Double Door - Bevel Model Assembly Manual Revision #18 January 3rd, 2018 Thank you for purchasing an 8x4 SpaceSaver Garden Shed. Please take the time to identify all the parts
More informationA Step-by-Step How To Guide
HOW TO REMODEL YOUR STAIR A Step-by-Step How To Guide Add new life to your staircase and achieve professional results. 1 Renovating your staircase is more than a remodel, it s a transformation of your
More informationTYPE "B" GAS VENT. Do not connect gas vent to a solid or liquid fuelled appliance or any appliance requiring a chimney.
TYPE "B" GAS VENT SD (sizes 3", 4", 5", 6", 7") INSTALLATION INSTRUCTIONS Type "B" Gas Vents are strictly for interior or enclosed exterior use or exterior use above a roof line. Read vent and appliance
More information12x12 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More information8x4 SpaceSaver Garden Shed Bevel Model Assembly Manual Revision #18 March 9th, 2017
8x4 SpaceSaver Garden Shed Bevel Model Assembly Manual Revision #18 March 9th, 2017 Thank you for purchasing an 8x4 SpaceSaver Garden Shed. Please take the time to identify all the parts prior to assembly.
More informationMONKEY BARS OVERHEAD RACK INSTALLATION
MONKEY BARS OVERHEAD RACK INSTALLATION Thank you for purchasing the New Monkey Bars Overhead storage rack. The most innovative overhead rack on the market WARNING THE PROPER INSTALLATION OF THIS STORAGE
More informationSunTrackerTwo Preparation
TOLL FREE:(888)29-2705 FAX:(941)77-9460 info@eco-smart.com SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T.G.I Or Truss CIRALIGHT INSTALLATION MANUAL Page 1 Cutting Holes and Preparing Curbs
More informationBest Barns. 10' x 12' the Cypress R. Assembly Book. revised September 29, 2016
Best Barns Assembly Book revised September 29, 2016 the Cypress R 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under
More information8x12 SpaceMaker Garden Shed Assembly Manual
8x12 SpaceMaker Garden Shed Assembly Manual Version #6 Revised June / 2007 Thank you for purchasing a 8x12 SpaceMaker Garden Shed. Please take the time to identify all the parts prior to assembly. Safety
More informationChapter 17 - Porch Trim
Chapter 17 - Porch Trim Contents Chapter 17 - Porch Trim... 17-1 Timing & Prerequisites... 17-2 Trim on Porch Beams (Volunteer)... 17-4 Smart Trim on the Bottom of the Beam... 17-4 Smart Trim on the Inside
More information10. Vents, Baffle Guard and Blocking
10. Vents, Baffle Guard and Blocking 10.1 INSTALLING BATH FAN AND END CAP 10.2 INSTALLING RANGE PLENUM AND END CAP 10.3 INSTALLING PROPER VENTS 10.4 INSTALLING WIND WASHING BAFFLE GUARD 10.5 INSTALLING
More informationMounting Instructions Item No.: xxx
Mounting Instructions Item No.: 271.92.xxx Wall-Beds 1 General Notes For vertical folding beds Successful and safe installation of Bed-Lift and construction of casework requires a professional skill level
More information8' x 22' Cash Hut INSTALLATION INSTRUCTIONS
PARTS IST J I G A A J I C F D E B B K H A A K H G A Posts w/ Feet (4pcs) J eft End Panels (Front & Back) [4'3"x7'8"] (2pcs) B 22' Peak Trusses (2pcs) K Right End Panels (Front & Back) C 8' Centre Truss
More informationExterior Wall Fastener Schedule
City of Republic Community Development Department Exterior Wall Fastener Schedule REVISION DATE: JANUARY 2017 Design and construction (2012 IRC Section R602.3): Exterior walls of wood frame construction
More information8x8 Sunshed Garden Shed Assembly Manual Revision #9 June 11th, 2012
8x8 Sunshed Garden Shed Assembly Manual Revision #9 June 11th, 2012 Thank you for purchasing an 8x8 SunShed Garden Shed from Outdoor Living Today. Please take the time to identify all the parts prior to
More information12ft Octagon (Precut) Creekside Gazebo Assembly Manual
12ft Octagon (Precut) Creekside Gazebo Assembly Manual Aug 1st, 2008 Revision #9 In Florida, additional hardware may be required that is not included in kit due to hurricane winds. Please check with local
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More informationFortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.
Installation Instructions for Fortress Al HOME Traditional Adjustable Panels with Simplified and Al HOME Posts It is the responsibility of the installer to meet all code and safety requirements, and to
More informationAssembly Book. the Brandon. Building Size 12'x12' or 12'x16' Revised September 13, 2017
Assembly Book Revised September 13, 2017 the Brandon Building Size 12'x12' or 12'x16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.
More informationGrand Garden Chalet 6X3 Assembly Manual
Revision #11 June 15, 2010 Grand Garden Chalet 6X3 Assembly Manual Thank you for purchasing a Grand Garden Chalet. Please take the time to identify all the parts prior to assembly. Please use Safety Eyewear
More informationROOFING APPLICATION STANDARD (RAS) No. 130
ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used
More informationHowtoPlans..org. 10'x16' Storage Shed Plan
HowtoPlans.org 10'x16' Storage Shed Plan Disclaimer The information provided here will show you how to build a chicken coop. However, we at howtoplans.org do not claim that the recommended techniques are
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More information