UNION COUNTY PUBLIC WORKS INVITATION FOR BID NO HAZEN AND SAWYER PROJECT NO

Size: px
Start display at page:

Download "UNION COUNTY PUBLIC WORKS INVITATION FOR BID NO HAZEN AND SAWYER PROJECT NO"

Transcription

1

2 A. SCOPE UNION COUNTY PUBLIC WORKS INVITATION FOR BID NO HAZEN AND SAWYER PROJECT NO TWELVE MILE CREEK WASTEWATER TREATMENT PLANT 7.5 MGD EXPANSION ADDENDUM NO. 2 This Addendum No. 2 consists of twelve (12) pages and two (2) attachments referenced to the Contract Drawings. This addendum covers responses to requests for interpretations or clarifications submitted by plan holders and additions and changes to the Contract Documents as described below. B. SPECIFICATIONS SECTION Page Paragraph 1.04.A.1: Delete text in its entirety and replace with the following text: North Carolina State Building Code SECTION Page Paragraph 2.02.G: Add the following text: Galvanized guide angles shall be field painted or may be factory coated to match the curtain. SECTION Add Section Toilet and Bath Accessories attached to this addendum. SECTION Page Paragraph 1.03.A.8: Delete the text 2.08.K and replace with: 2.08.M Page Paragraph 1.05.A: Delete the text ITT (aka WEDECO) Duron model and system and replace with: Xylem Water Solutions USA, Inc. s Wedeco Duron model and system Page 2 of 12 Addendum No. 2

3 Page Paragraph 1.07.G: For Number of UVT Detection Systems ; delete two occurrences of 1 per channel and replace with: 1 Page Paragraph 2.01.A.3: Delete text in its entirety and replace with: (NOT USED) Page Paragraph 2.04.I.3: Delete the 1 st sentence in its entirety and replace with: A redundant wiper mechanism, whether electric, hydraulic, or pneumatic, shall be provided. Page Paragraph 2.04.I.6: Delete text its entirety and replace with: The wipers shall be replaceable without having to dismantle the wiper drive system or disassemble the module structure. Page Paragraph 2.05.H: Add the following text at the end of the text: or factory calibrated Page Paragraph 2.08.D: Delete text in its entirety and replace with: (NOT USED) [For clarification: Transformers shall be provided under Division 16 scope as shown on the Drawings. 4-wire WYE configuration is being provided to equipment as shown on the Drawings.] Page Paragraph 2.08.G: Delete the word tray and replace with: trench Page Paragraph 2.08.I: Delete text in its entirety and replace with: (NOT USED) Page Paragraph 2.08.M.1: Delete the 3 rd sentence in its entirety. Page Paragraph 2.08.M.1: In the 5 th sentence, delete the text 20,000 A and replace with: 35,000 A Page Paragraph 2.08.M.1: In the 5 th sentence, delete the text output of the transformer and replace with: primary side of the transformers Page 3 of 12 Addendum No. 2

4 Page Page Paragraph 2.08.M.7: Delete text in its entirety. Paragraph 2.09.C.1: Delete the text 15-inch. [For clarification: Operator interface may be provided in accordance with Section ] Page Paragraph 2.09.C.3: Delete the words red and amber. SECTION Page Paragraph 2.06: Delete text in subparagraphs A G in its entirety and replace with: A. Access platform(s) shall be provided as shown on the Drawings. Equipment manufacturer shall submit proposed modifications to platforms, railing, stairs, etc. to coordinate equipment maintenance access and to coordinate any equipment items that may conflict with platform structure. Equipment submittal shall be approved by Engineer including any recommended proposed platform modifications prior to submittal of platform design for Engineer approval. SECTION Page Paragraph 2.06: Delete text in subparagraphs A G in its entirety and replace with: A. Access platform(s) shall be provided as shown on the Drawings. Equipment manufacturer shall submit proposed modifications to platforms, railing, stairs, etc. to coordinate equipment maintenance access and to coordinate any equipment items that may conflict with platform structure. Equipment submittal shall be approved by Engineer including any recommended proposed platform modifications prior to submittal of platform design for Engineer approval. SECTION Page Paragraph 1.01.A.3 and 1.01.A.4: Delete text in its entirety and replace with: (NOT USED) Page Paragraph 1.06.C: Add the following text: Where the erector does not have AISC certification, the erector shall have a minimum of 10 years of experience erecting pre-engineered metal buildings and submit a list of projects representative of their experience over the ten year period. Page Paragraph 2.05: Delete paragraphs A E in their entirety and replace with: (NOT USED) Page 4 of 12 Addendum No. 2

5 Page Paragraph 2.06.B: Delete the text 30 and replace with: 19 Page Paragraph 2.06.D: Delete paragraph in its entirety and replace with: (NOT USED) Page Paragraph 2.07: Delete paragraphs A E in their entirety and replace with: (NOT USED) SECTION Page MOV-89211/89212/89213/89214 entries in table: Revise Operator Type to: Open/Close (3) [For clarification: Modifying note reference.] SECTION Page Paragraph 2.06.D: Delete the 2 nd sentence in its entirety and replace with: All configuration and programming software necessary to implement this functionality shall be provided on the HMI Server operator workstations specified in Section Control and Information System Scope and General Requirements. SECTION GRIT REMOVAL FACILITY: Add the following I/O: Grit Sampler Program Complete DI PLC-3 YN Grit Sampler Pump Error DI PLC-3 YAA Grit Sampler Distributor Jammed DI PLC-3 YAB Grit Sampler Bottle Full DI PLC-3 YAC EFW PUMP STATION: Add the following I/O: Cascade Aerator Sampler Program Complete DI PLC-7A YN Cascade Aerator Sampler Pump Error DI PLC-7A YAA Cascade Aerator Sampler Distributor Jammed DI PLC-7A YAB Cascade Aerator Sampler Bottle Full DI PLC-7A YAC Page 5 of 12 Addendum No. 2

6 C. DRAWINGS Drawing EC16 Add the following text: 2. Area on this drawing may be used to stockpile excavation soil from the site deemed by the Engineer to be suitable for use as backfill around structures or other site fill purposes. Any excavation rock or soil deemed by the Engineer to be unsuitable for use on the site shall be removed from the site. Drawing M6 Delete two occurrences of the text Bid Alternate. Delete the text In-Plant Pump Station and Existing Metal Salt Feed and replace with the text: Filtrate Pump Station Drawing M13 Refer to call-out for Manhole No. 21A : Delete the text See Note 3 and replace with the text: See Note 4 Drawing M14 Detail 4: Add callout and leader to access hatch on top of precast vault: 3-0 x 3-0 Hinged AL Access Hatch Drawing M15 Note 3: Add the following text at the end of the note: [Applies to all new SS manholes and piping.] Drawing M226 Detail 1: Change detail title to: Foul Air Pipe Support on Pier Drawing M400 Add the following text: 3. Provide a split sleeve coupling (Victaulic Type 233, or equal) for each buried BFV. Carbon steel couplings shall be coated equivalent to piping in Section Page 6 of 12 Addendum No. 2

7 Drawing M711 Details 2 and 3: Add the following text as a note: 3. Existing and proposed platform metal is hot dip galvanized steel. Upper platform grating is 6-0 x 3-0. Drawing M722 Add the following text: 4. See Drawing M712 / Note 2. Drawing S1 Note C-17: Add the following sub-note text and table: D) Adhesive Anchor and Dowel Schedule: ADHESIVE ANCHOR AND DOWEL SCHEDULE DOWEL SIZE / ANCHOR DIAMETER (in) EMBEDMENT DEPTH (in) PROOF TEST LOAD (kips) # # # # # # /2 2 1/ / / / ¾ ¾ ¾ Drawing S205 Section A: Refer to inside of grit tank: For Lower Limit of MIC Coating ; delete text: El and replace with: El Drawing S207 Section N: Add the following text at the end of the single NOTE associated with this detail: Alternate HSS sizes may be submitted for approval Page 7 of 12 Addendum No. 2

8 Drawing S313 Section K: For 1/2 Ø ADH 12 OC STAGGERED ; add the text: WITH 4 EMBED Drawing S363 Section K: For 1/2 Ø ADH 12 OC STAGGERED ; add the text: WITH 4 EMBED Drawing S402 Add the following text: 3. C5 channels indicated for roof framing shall be C5X9 channels. Drawing S404 Detail 1: Delete HSS4x2x5/16 and replace with the text: HSS4x2x1/4 Detail 4: Delete 5/8 Ø THREADED ROD and replace with the text: 1/2 Ø ADHESIVE 2 1/2 EMBED Detail 4: Delete L3X2X1/4 BETWEEN BEAMS and replace with the text: L3X2X1/4 W/ 1/2 Ø ADHESIVE 12 OC BETWEEN BEAMS Drawing S601 Delete Notes and numbering in its entirety. Drawing S603 Add the following text as Notes : NOTES: 1. METAL BUILDING SHALL BE DESIGNED AND PROVIDED BY METAL BUILDING MANUFACTURER, SEE SPECIFICATION SECTION DESIGN FOR GROUND SNOW LOAD, WIND LOAD, AND SEISMIC LOAD IN ACCORDANCE WITH GENERAL STRUCTURAL NOTES ON DRAWING S1. FOR WIND, THE BUILDING SHALL BE CONSIDERED TO BE OPEN. IN ADDITION, DESIGN SHALL INCLUDE 30 PSF LIVE LOAD AND 10 PSF COLLATERAL LOAD Page 8 of 12 Addendum No. 2

9 3. LATERAL SUPPORT FOR BUILDING SHALL UTILIZE EITHER PORTAL FRAMES, PORTAL BRACE FRAMES, OR CROSS BRACING. CROSS BRACING MAYA BE PROVIDED ALONG COLUMN LINES A AND B BETWEEN COLUMN LINES 2 AND 4 ONLY. 4. THE METAL BUILDING FOUNDATION SHALL BE AS SHOWN ON THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL COORDINATE ANCHOR ROD REQUIREMENTS, INCLUDING ADDITIONAL REINFORCEMENT, WITH THE METAL BUILDING MANUFACTURER. THE ENGINEER SHALL VERIFY THE FOUNDATION CAPACITY FOR THE REACTIONS PROVIDED BY THE METAL BUILDING MANUFACTURER. FOUNDATION DIMENSIONS SHOWN ARE FOR BIDDING PURPOSES AND MAY VARY DEPENDING ON MANUFACTURER SELECTED. FINAL DIMENSIONS SHALL BE VERIFIED AFTER METAL BUILDING MANUFACTURER S FINAL DESIGN HAS BEEN APPROVED. 5. DUE TO SERVICEABILITY CONSIDERATIONS, BUILDING MOVEMENT SHALL BE CONSIDERED IN THE DESIGN OF NON- STRUCTURAL COMPONENTS AND SUBJECT TO THE LIMITATIONS IN THE TABLE BELOW. ELEMENT DEFORMATION LIMIT LOADING METAL PANELS / PERPENDICULAR H/ YEAR WIND BARE FRAME TO WALL METAL PANELS / HORIZONTAL L/ YEAR WIND GIRTS / COLUMNS DEFLECTION BARE FRAME RACKING H/ YEAR WIND SPANDRELS VERTICAL DEFLECTION 3/8 MAXIMUM DL PRIOR TO CLADDING SPANDRELS VERTICAL L/480 < 5/8 TOTAL DL DEFLECTION MAXIMUM SPANDRELS VERTICAL L/360 < ½ 0.5 X LL DEFLECTION MAXIMUM SPANDRELS VERTICAL DEFLECTION L/600 < 3/8 MAXIMUM DL INCLUDING CLADDING WEIGHT ROOF MEMBERS VERTICAL DEFLECTION L/240 MAXIMUM 0.5 X LL OR SNOW LOAD ROOF PANELS VERTICAL DEFLECTION L/240 LL 6. THE CONTRACTOR SHALL PROVIDE COMPLETE FABRICATION AND ERECTION DRAWINGS FOR CONSTRUCTION OF THE PREENGINEERED BUILDING WHICH SPECIFY THE REQUIRED MATERIALS, GRAVITY AND LATERAL LOADS, SIZES, AND LOCATIONS OF ALL STRUCTURAL ELEMENTS INCLUDING, BUT NOT LIMITED TO, BEAMS, COLUMNS, PORTAL FRAMES, JOISTS, PURLINS, GIRTS, BRACES, ARCHES, AND WALL AND ROOF PANELS. PROVIDE COMPLETE DETAILS WHICH CLEARLY INDICATE REQUIRED CONNECTIONS BETWEEN ALL STRUCTURAL FRAMING COMPONENTS INCLUDING ANCHORAGE TO FOUNDATION TO ADEQUATELY RESIST ALL APPLICABLE Page 9 of 12 Addendum No. 2

10 Drawing S613 DESIGN LOADS INCLUDING GRAVITY, WIND, AND SEISMIC. DRAWINGS SHALL ALSO SPECIFY THE REQUIRED SIZE, QUANTITY, AND LOCATIONS OF BUILDING ANCHOR BOLTS. Add the following text as Notes : NOTES: 1. See notes on Drawing S603. Drawing S750 Add the following text: 2. Column reinforcing shall be 12 #8 bars with #4 Refer to Standard Detail Drawing S755 Detail 3: Delete the text: PL 1/4"x12 x12 and replace with the text: PL 1/4"x12 10 MAX Drawing S758 Beam Schedule: Delete the table in its entirety and replace with the table in Attachment 1 to this addendum. Drawing S951 Delete numbering in its entirety and add the following text: 1. See S204 / Detail 3 for connection of roof joists to CMU walls. Drawing A1 Door Schedule: Doors 200-A, 200-B, 200-C, 200-D, and 202-A: Delete text in column Remarks. [For clarification: All doors in project shall be insulated per specifications.] Door Schedule: Doors 200-C, 200-D, 400-B, 750-C, 751-A, and 751-D: Delete text in columns Frame / Matl and Door / Matl and replace with: GALV [For clarification: Rollup doors shall be galvanized steel per Section ] Page 10 of 12 Addendum No. 2

11 Note 2: Add the following text: Wall thickness shall be 1-2 from face of exterior wall to interior face. Dimensions indicated in this note are nominal. Drawing A207 Section F1: Delete the text: 1/2 Stainless Steel Plate. Drawing A754 Add the following text: 2. Epoxy counter top shall be provided for laboratory casework, Elevation F and solid surface countertop shall be provided for desk area, Elevations D and E. 3. Plumbing fixtures and sink shall be provided in accordance with Section Section D: Delete the text: Steel. [For clarification: Overhead cabinets shall be wood per Section ] Drawing P752 Fixture Branch Schedule: Fixture Number P3: Delete text in columns Manufacturer, Model Number, and Accessories and replace with the text: See Section Drawing E650 Composite sampler riser diagram: Add a second conduit tag under I that reads: C Drawing E924 Conduit C : Delete the text 6#14, #14 GND and replace with the text: 14#14, #14 GND Drawing E924 Conduit C : Replace the unused row with the following: C /4" CPB-CA (AT CASCADE AERATOR) COMPOSITE SAMPLER (AT CASCADE AERATOR) 8#14, #14 GND Page 11 of 12 Addendum No. 2

12 Drawing E955 Grit Facility composite sampler riser diagram: Add a second conduit tag under I that reads: C Drawing E958 Conduit C : Delete the text 4#12, 56#14, #12 GND and replace with the text: 4#12, 64#14, #12 GND Drawing E958 Conduit C : Replace the unused row with the following: C /4" CPB-GRF1 GRIT FACILITY COMPOSITE SAMPLER 8#14, #14 GND Drawing D5 Delete Standard Detail R. [Clarification: No ribbon curb in project.] D. CLARIFICATIONS 1. Pre-Negotiated Equipment Item pricing by Siemens: a. Pricing does not include sales tax. b. Terms and conditions in proposal shall apply unless negotiated otherwise between Bidder and Supplier. 2. Curb is only required along asphalt pavement where specifically shown on Civil drawings. 3. Building roof monitors shall have same slope as main roof. 4. Building translucent panels shall be provided to coordinate to dimensions shown in building elevations. - END OF ADDENDUM No Page 12 of 12 Addendum No. 2

13 SECTION TOILET AND BATH ACCESSORIES PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Furnish and install toilet and bath accessories as shown on the Drawings and specified herein SUBMITTALS A. In accordance with the procedures and requirements set forth in Section Submittals, submit the following: 1. Manufacturer's data QUALITY ASSURANCE A. Coordinate with other work to avoid interference and to assure proper operation and servicing of accessory units. PART 2 -- PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. The following manufacturers are approved for use. 1. American Specialties Inc. 2. Bobrick Washroom Equipment, Inc. 3. Bradley Corp. 4. McKinney Parker 2.02 MATERIALS A. Provide the following (Model numbers are Bobrick Washroom Equipment, Inc. numbers and are used for convenience only). 1. Surface Mounted Toilet Tissue Dispenser for Two Rolls At each water closet - Model B-686, Type 304 -stainless, polished finish, concealed stainless steel wall plate. 2. Surface Mounted Paper Towel Dispenser and Disposal: Satin finish stainless steel, 12 gallon removable receptacle. Dispenses 600 C-fold, 800 multifold, or 1100 single fold towels. Model B-3949 with skirt BR /10800:6/21/ TMWWTP 7.5 MGD EXPANSION

14 3. Wall Mirrors: One (1) at each lavatory - stainless steel angle frame mirror, Model B Corners shall heliarc welded, ground and polished smooth. No. 1 quality, ¼ (6mm) select float glass mirror electrolytically copper-plated; guaranteed against silver spoilage for 15 years. Provide 1/8 inch (3mm) thick, water-resistant, shockabsorbing padding and 20 gauge galvanized steel back. Concealed mounting. Size as shown on Drawings. 4. Mop Holder: 18 gauge, 304 stainless steel shelf, hooks and anti-slip mop holders with spring loaded rubber cam, 34 inch, Model B-239 x Grab Bars: 1-1/2 inch diameter, 18 gauge, stain finish, Type 304 stainless steel, concealed mounting with set screws. Joints and supports shall be contour cut and heliarc welded. Length shall be as indicated on the Drawings, and shall comply with the requirements of the Americans with Disabilities Act. 6. Surface Mounted Soap Dispenser: 304 stainless steel back and body with satin finish. Capacity of 40 fluid ounces. Corrosion-resistant valve and dispenser. Unbreakable refill window. Vandal resistant. Large, locked, hinged, stainless steel filler top. Model B PART 3 -- EXECUTION 3.01 INSPECTION A. Examine substrates, previously installed inserts and anchorages necessary for mounting of toilet accessories and other conditions under which installation is to occur, and notify the Contractor of conditions detrimental to proper completion of work. Do not proceed until unsatisfactory conditions have been corrected in a manner acceptable INSTALLATION A. Install in accordance with manufacturer's instructions, using fasteners which are appropriate to substrate and recommended by the manufacturer of the unit. Install plumb and level, firmly anchored in locations indicated. B. Install mirrors with back frame concealed fasteners. C. Mounting heights shall comply with the American with Disabilities Act ADJUST AND CLEAN A. Adjust for proper operation of that mechanisms function smoothly. B. Clean and polish exposed surfaces after removing protective coating. - END OF SECTION /10800:6/21/ TMWWTP 7.5 MGD EXPANSION

15

A. It is preferred that all submittals to be submitted electronically in PDF format.

A. It is preferred that all submittals to be submitted electronically in PDF format. June 20 2013, Rev 00 10 2800 Toilet, Bath, and Laundry Accessories PART 1. GENERAL 1.01 This Section includes: A. Toilet room accessories: 1.02 Submittals 1. Grab bars 2. Metal framed mirrors 3. Sanitary

More information

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition. SECTION 10800 TOILET ROOM ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic Tile. 4. 10170 - Solid Plastic Toilet Partition.

More information

***************************************************************************************************************

*************************************************************************************************************** 10800 TOILET ROOM ACCESSORIES SPECIFIER: CSI MasterFormat 2004 number 10 28 13 PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 04220 - Concrete Unit Masonry. 2. 06100 - Carpentry. 3. 09310 - Ceramic

More information

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS SECTION 10520: FIRE EXTINGUISHERS AND CABINETS PART 1 GENERAL 1.01 GENERAL REQUIREMENTS: A. This section specifies fire extinguishers, cabinets for fire extinguishers, fire and other accessories. Their

More information

SECTION BATHROOM ACCESSORIES

SECTION BATHROOM ACCESSORIES SECTION 10-20-00 BATHROOM ACCESSORIES PART 1 GENERAL 1.01 SCOPE OF WORK A. Include all supplied materials, to complete the work of the above referenced section. 1. SCS to supply bathroom accessories, Finish

More information

WASHROOM ACCESSORIES 2013 CATALOG

WASHROOM ACCESSORIES 2013 CATALOG WASHROOM ACCESSORIES 2013 CATALOG Washroom Accessories engineered for the high traffic restroom. 12-14 GAUGE STAINLESS STEEL 1 Paper Towel Dispenser C-Fold or Multi-Fold Towels Refill indicator slot Heavy

More information

SECTION PRECAST CONCRETE STRUCTURES

SECTION PRECAST CONCRETE STRUCTURES SECTION 02605 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall provide all professional services, labor, materials, equipment and incidentals as shown, specified and required

More information

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM). PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available. SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

Project: # Solano Community College District

Project: # Solano Community College District ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District

More information

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section 02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

Product Guide Specification

Product Guide Specification Shield Casework February 2014 3421 Merriam Lane Overland Park, Kansas 66203 Phone 913-744-2183 Fax 913-384-3477 Website www.shieldcasework.com E-mail info@shieldcasework.com Product Guide Specification

More information

SECTION TOILET, BATH, AND LAUNDRY ACCESSORIES

SECTION TOILET, BATH, AND LAUNDRY ACCESSORIES SECTION 10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section for custom fabricated

More information

1.1 RELATED DOCUMENTS

1.1 RELATED DOCUMENTS SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections

More information

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS SECTION 15062 NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS For best results, display hidden notes to specifier. PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe supports. B. Conduit supports. C. Duct supports,

More information

SECTION ARCHITECTURAL WOOD CASEWORK

SECTION ARCHITECTURAL WOOD CASEWORK SECTION 06410 - ARCHITECTURAL WOOD CASEWORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Wood cabinets for opaque finish. B. Flush wood paneling for transparent finish. C. Factory finishing. 1.02 RELATED REQUIREMENTS

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

ALUMINUM PIPE GUIDERAIL 01/01/

ALUMINUM PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

SECTION Display Case Door Series 1301-CM

SECTION Display Case Door Series 1301-CM 1 SECTION 12 3559 Display Case Door Series 1301-CM PART 1 - GENERAL 1.01 SUMMARY A. This section includes: 1. Display Case Glass Doors. 2. Sidelites. B. Related work in other sections: 1. 08 8000- Glazing

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

APPENDIX FENCE GENERAL NOTES

APPENDIX FENCE GENERAL NOTES APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.

More information

SECTION THERAPEUTIC POOL ACCESSORIES

SECTION THERAPEUTIC POOL ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 13 17 23.11 THERAPEUTIC POOL ACCESSORIES SPEC WRITER NOTES: Delete between // // if not applicable to project. Also, delete any other item or paragraph not applicable

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

SECTION CHAIN LINK FENCING

SECTION CHAIN LINK FENCING SECTION 32 31 13 CHAIN LINK FENCING PART 1 - GENERAL 1.01 SECTION INCLUDES A. The Work specified in this Section consists of furnishing and installing permanent chain link fences and gates in accordance

More information

System 3000 specifications

System 3000 specifications System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be

More information

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

The following information supplements and/or supersedes the bid documents issued on July 10, 2017. Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents

More information

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

STEEL PIPE GUIDERAIL 01/01/

STEEL PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports

More information

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.

More information

SECTION CHAIN LINK FENCING AND GATES

SECTION CHAIN LINK FENCING AND GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide chain link fencing and gates as Shown on the Contract Drawings

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-11 42 00 (January 2008) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS-11 40 00.00 20 (April 2006) UFGS 11 46 01.00 10 (April 2006) UNIFIED

More information

DIVISION 6 WOOD, PLASTICS AND COMPOSITES

DIVISION 6 WOOD, PLASTICS AND COMPOSITES DIVISION 6 WOOD, PLASTICS AND COMPOSITES PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 06 1000 ROUGH CARPENTRY A. Rough opening framing for doors, windows, and roof openings. B. Roofing nailers. C. Preservative

More information

SECTION MANUFACTURED CASEWORK

SECTION MANUFACTURED CASEWORK 1 GENERAL 1.1 SECTION INCLUDES SECTION 12300 MANUFACTURED CASEWORK A. Work required to complete the manufactured casework indicated by the Contract Documents, and the items necessary for its proper installation.

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION FOLDING GLASS PANEL PARTITIONS

SECTION FOLDING GLASS PANEL PARTITIONS SECTION 10 22 26.35 FOLDING GLASS PANEL PARTITIONS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED FOLDING GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY, MOUNTING BRACKETS, MOUNTING

More information

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

Symphony II Adaptable Table System

Symphony II Adaptable Table System Symphony II Adaptable Table System 1.00 General 1.01 Conditions 1.02 Scope of work 1. This section covers all materials, equipment, tools and labor for the supply and installation of the laboratory Symphony

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Addendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project:

Addendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project: McKee and Associates Architecture and Interior Design Addendum No. ONE Date: 10.8.18 Project: A New Office for Gaston Elementary School for The Etowah County Board of Education Gadsden, Alabama A1.1 GENERAL

More information

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions 14000 I/O Series Flush Glaze Fabrication and Installation Instructions Last saved on 12/18/2009 Table of Contents GENERAL CONSTRUCTION NOTES...3 EXTRUDED ALUMINUM PARTS...4 ACCESSORIES...5 OVERVIEW...6

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

SECTION FUEL OIL SYSTEM (PLUMBING)

SECTION FUEL OIL SYSTEM (PLUMBING) SECTION 15484 FUEL OIL SYSTEM (PLUMBING) PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-In-Place Concrete. 3. 15410 -

More information

Hardware Bathroom Washroom Handrail Signs. Bathroom Fittings

Hardware Bathroom Washroom Handrail Signs. Bathroom Fittings Bathroom Fittings Hardware Bathroom Washroom Handrail Signs 2 Marine Quality Stainless Steel The high humidity levels in the bathroom setting necessitates the use of a non-corrosive rustresistant. On

More information

1. Show the following information with additional information necessary to indicate shop compliance with the requirements of this section.

1. Show the following information with additional information necessary to indicate shop compliance with the requirements of this section. SECTION 12360 LIBRARY SHELVING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 06100 - Carpentry. 2. 09200 - Metal Studs, Lath, Suspension Ceiling, Plaster and Stucco. 3. 09660 - Resilient Tile Flooring.

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements. SECTION 12356 - CASEWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION INTERIOR SIGNAGE

SECTION INTERIOR SIGNAGE SECTION 10 14 02 INTERIOR SIGNAGE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by

More information

Football Goals 7,32x2,44 m

Football Goals 7,32x2,44 m Football Goals 7,32x2,44 m 120x100 mm Professional aluminum football goals 7,32x2,44 m Made of special oval aluminum profile 120x100 mm with double reinforcing ribs. The main frame of the goal powder coated

More information

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"

More information

Slate Shingle Specifications

Slate Shingle Specifications Slate Shingle Specifications California Slate is a proud member of the Slate Roofing Contractors Association of North America, Inc. (SRCA) which publishes Section 07310 Slate Shingles setting forth architectural

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 51 13 (May 2011) ------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 51 13 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are

More information

C. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames

C. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames SECTION 083463 DETENTION DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and

More information

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School Submittal Review TO: Pavilion Construction DATE: 07.20.2015 JOB NO.: 1484P 4700 SW Macadam Ave Suite 200 ATTENTION: Riley Tobin Portland, OR 97239 RE: BSD Sunset High School Concession Stand/Interior Renovations

More information

GUIDELINE SPECIFICATIONS

GUIDELINE SPECIFICATIONS GUIDELINE SPECIFICATIONS GORDON MILLENNIUM DECORATIVE METAL COLUMN COVERS DIVISION 05 7500 or DIVISION 09 2000 Note To Specifier: Column Covers are a finished, decorative product and should be installed

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

SECTION LAMINATE CLAD CASEWORK - COMMERCIAL

SECTION LAMINATE CLAD CASEWORK - COMMERCIAL SECTION 123400 LAMINATE CLAD CASEWORK - COMMERCIAL PART 1 GENERAL 1.01 SECTION INCLUDES A. Fixed modular laminate clad casework and components. B. Flexible rail mounted laminate clad casework and components.

More information

Coordinate installation of rough carpentry members specified in other sections.

Coordinate installation of rough carpentry members specified in other sections. 1 1.03 Preservative treated wood materials. Concealed wood blocking, nailers, and C. Miscellaneous wood nailers, furring, and grounds. PART2 2.01 See Section 01 30 00 =Administrative Requirements, for

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

Bathroom Fittings. Hardware Bathroom Washroom Handrail Wardrobe Signs KNUD HOLSCHER H DESIGN

Bathroom Fittings.   Hardware Bathroom Washroom Handrail Wardrobe Signs KNUD HOLSCHER H DESIGN KNUD HOLSCHER H DESIGN www.dline.com Bathroom Fittings Hardware Bathroom Washroom Handrail Wardrobe Signs d line no: 1038-1215 Carl F as, Denmark E-mail: dline@dline.com Internet: www.dline.com Photography:

More information

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe. PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under

More information

Modular Gazebo Kit Series GardenHouse 12

Modular Gazebo Kit Series GardenHouse 12 Octagonal CUPOLA screened with louvers and light fixture Modular Gazebo Kit Series GardenHouse 12 with DOUBLE-TIERED Roof Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

SECTION 12345.1 - MODULAR STEEL LABORATORY CASEWORK 1 PART 1 PRODUCTS 1.01 MANUFACTURER A. Casework and equipment manufacturer: ALIR Systems, Inc., 245 Harrison St, Jamestown, New York, 14701. 1.02 CASEWORK

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO MEDICAL EQUIPMENT SUPPORTS SECTION 05600 1. GENERAL

More information

Design and Construction Standards SECTION ATHLETIC LOCKERS

Design and Construction Standards SECTION ATHLETIC LOCKERS SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,

More information

Accessory Dwelling Unit Prototype 4 Plan Sets. Prototype 4: Detached 1- Story ADU using alternate materials and techniques

Accessory Dwelling Unit Prototype 4 Plan Sets. Prototype 4: Detached 1- Story ADU using alternate materials and techniques Accessory Dwelling Unit Prototype 4 Plan Sets Prototype 4: Detached 1- Story ADU using alternate materials and techniques Prototype Design Firm Prototype 4: Detached Singly Story ADU Alternative Materials

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM CASEWORK

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM CASEWORK DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM CASEWORK PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication and installation

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130 PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

SECTION CABLE TRAYS

SECTION CABLE TRAYS SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION WOOD SHINGLES

SECTION WOOD SHINGLES SECTION 07 31 29.13 WOOD SHINGLES SPEC WRITER NOTES: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. This guide specification does not include requirements

More information

SECTION ARCHITECTURAL WOODWORK

SECTION ARCHITECTURAL WOODWORK SECTION 06400 ARCHITECTURAL WOODWORK PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Custom Cabinet Units a. Plastic Laminate b. Sound Barrier for Casework 2. Cabinet Hardware B. Related Sections:

More information

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 062000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information