B. Sequencing: Schedule installation to keep sheathing exposure to UV within the manufacturer s recommended limits.

Size: px
Start display at page:

Download "B. Sequencing: Schedule installation to keep sheathing exposure to UV within the manufacturer s recommended limits."

Transcription

1 SECTION GYPSUM SHEATHING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior GMF gypsum sheathing. 2. Joint treatment materials. 3. Panel and penetration joint and fastener treatment. 4. Supplementary components and accessories necessary for a complete installation whether or not such items are indicated on the Drawings or included in the Specifications. 1.2 SECTION REQUIREMENTS A. Coordination: 1. Where items are installed or applied as part of fire-resistance-rated or STC-rated assemblies, items must be identical those products tested and listed as part of the selected UL or GA fire resistance and sound control system design designation. 2. Coordinate sheathing delivery with installation to minimize storage periods at the site. 3. Coordinate sheathing installation with installation of materials installed over sheathing so sheathing is not exposed to precipitation or left exposed at end of the workday when rain is forecast. B. Sequencing: Schedule installation to keep sheathing exposure to UV within the manufacturer s recommended limits. C. Submittals: Product Data and Samples. PART 2 - PRODUCTS 2.1 GMF GYPSUM SHEATHING A. Application: Installed outside of building wall framing members; serves as the substrate for exterior wall finishes. B. Description: Gypsum-based commercial exterior sheathing conforming to ASTM C C. Products: 1. Basis of Design Product: Design is based on the following. a. DensGlass Sheathing manufactured by GP Building Products. GYPSUM SHEATHING

2 2. Acceptable Products: Other acceptable comparable products are limited to one of the following. a. GlasRoc Sheathing manufactured by CertainTeed Corp. b. Gold Bond e 2 XP Extended Exposure Sheathing manufactured by National Gypsum Co. c. SECUROCK Glass-Mat Sheathing Panels manufactured by USG Corp. D. Items must conform to the following: 1. Minimum Size: Provide at least 4-foot by 8-foot sheets. 2. Thickness: 5/8-inch. 3. Edges: Tapered long edges and square ends. 4. Facers: Heat-cured, acrylic-coated, fiberglass mat on the face side, back side, and around long edges. Water repellent face and backing papers are not permitted. E. Joint Treatment Materials: 1. Joint Tape: a. Glass Mesh Tape: Provide 4-inch wide, alkali-resistant, polymer-coated, glassfiber mesh tape supplied, required, recommended, approved, or accepted by the manufacturer. b. Seam Seal Tape: 40-mil thick self-adhering, rubberized asphalt/polyethylene flexible flashing tape. 1) Acrylic-coated polypropylene tape is not permitted. 2) Glass mesh tape applied without sealant is not permitted. c. Products: 1) Basis-of-Design Product: Design is based on the following. a) Perm-A-Barrier Wall Flashing manufactured by W.R. Grace & Co. 2) Acceptable Manufacturers: Other acceptable sources of comparable products are limited to the following, contingent on demonstrated conformance to the specified requirements, including the item description above. a) CETCO, Inc. b) The Henry Co. d. Seam Seal Tape Primer: Perm-A-Barrier WB Primer water-based primer manufactured by W.R. Grace & Co. 2. Tape Bonding Materials: a. Joint Sealant: Provide low modulus single-component sealant specified in Section , unless otherwise supplied, required, recommended, approved, or accepted by the manufacturer. 2.2 ACCESSORIES A. Screw Fasteners: Provide inch shank diameter (#8-32 UNC) by at least 1-1/4 inch long stainless steel, bi-metal, duplex anti-corrosive steel, 3-coat anti-corrosive steel, or ceramic-coated anti-corrosive steel Philips bugle head, self- piercing or self-drilling (as applicable) screw fasteners specified in Section GYPSUM SHEATHING

3 B. Other Accessories: Provide other accessories and similar secondary items supplied, required, recommended, or accepted by the manufacturer. 2.3 PANEL AND PENETRATION JOINT TREATMENT A. Short-Term Wind Protection Joint Treatment (Uncontrolled Enclosure): 1. Panel Joint and Penetration Treatment: Promptly after sheathing is installed, apply acrylic-coated polypropylene sheathing tape to panel joints and a. Center tape over sheathing panel joints and on perimeter openings surrounding b. Tape seams in continuous lengths as long as possible, with firm and continuous adhesion. c. Provide an overlap at intersections at least equal to the tape width. 2. Fastener Treatment: None. B. Short-Term Wind and Rain Protection Joint Treatment (Uncontrolled Enclosure): 1. Panel Joint and Penetration Treatment: a. Apply at least a 3/8-inch continuous bead of sealant over the sheathing panel joint. Provide a backer rod for joint openings wider than 1/8-inch. b. With a trowel, compress the sealant into the joints creating a continuous, flat, and level surface. 2. Fastener Treatment: None. C. Long-Term Wind and Water Protection Joint Treatment (Partially-Controlled Enclosure): 1. Panel Joint and Penetration Treatment: Promptly after sheathing is installed, apply glass mesh joint tape to panel joints and penetrating items promptly after sheathing is installed. a. Center tape over sheathing panel joints and on perimeter openings surrounding b. Provide an overlap at intersections at least equal to the tape width. c. Apply at least a 3/8-inch continuous bead of sealant over the glass mesh joint tape, centered over sheathing panel joints and on perimeter openings surrounding d. With a trowel, compress and embed the sealant into the entire surface of the tape creating a continuous, flat, and level surface. 2. Alternate Panel Joint and Penetration Treatment: As an alternate to sealant and glass mesh tape, specified seam seal tape may be provided when applied to properly prepared and primed sheathing surfaces in conformance with the seam seal tape manufacturer s published installation instructions. 3. Fastener Treatment: Apply sealant to each exposed fastener; trowel level and smooth. GYPSUM SHEATHING

4 PART 3 - EXECUTION 3.1 INSTALLATION REQUIREMENTS A. General: 1. Install gypsum sheathing in compliance with ASTM C 1280, GA publication GA-253, Application of Gypsum Sheathing, and the following. a. Comply with the manufacturer s installation instructions when installing protecting, and repairing sheathing and accessories. b. Use materials and methods required, recommended, approved, or accepted by the manufacturer, along with manufacturer-recommended accessories and techniques. c. In the event of conflict between the manufacturer s instructions and the referenced standards, then the manufacturer s instructions govern. 2. Do not install materials with defects that impair the quality of sheathing, or pieces that are too small to use with at least a number of joints or optimum joint arrangement. Use appropriate-length materials to minimize end joints. B. Special Techniques: 1. Furnish units in longest available lengths to minimize end joints. 2. Pre-cut panels and make accurate cutouts for penetrations. 3. Position gypsum sheathing next to framing with coated (gray) side away from studs. a. Fit ends closely. b. Cut panel to required size and make cutouts. c. Leave 1/8-inch gap between penetrating items and panel edges. 4. Orient panels with long edge perpendicular to framing and short edges vertically oriented and centered over studs. a. Fit sheathing snugly around openings. b. Install panels with at least a 3/8-inch gap where non-load-bearing construction abuts structural elements. c. Install panels with at least a 1/4-inch gap where they abut masonry or similar materials that may retain moisture. d. Do not bridge building expansion or seismic joints. Cut and space edges of panels to match framing spacing. 5. Securely fasten sheathing panels to framing. a. Stagger vertical joints at least 16 inches on center, but not less than one framing space between adjacent rows. b. Locate fasteners at least 3/8-inch from perimeter edges, and space fasteners a maximum of 8 inches on center, both along the panel perimeter and over the panel face. c. Drive fasteners to bear tightly against sheathing faces. Do not break or rupture facing, fracture underlying core or countersink fasteners. GYPSUM SHEATHING

5 3.2 PANEL JOINT AND PENETRATION TREATMENT A. Long-Term Joint Treatment: 1. Promptly after sheathing is installed, apply glass mesh joint tape centered over sheathing panel joints and around Provide minimum overlap at intersections greater than or equal to tape width. 2. Apply at least a 3/8-inch continuous bead of sealant over the glass mesh joint tape, centered over sheathing panel joints and on perimeter openings surrounding 3. With a trowel, compress and embed the sealant into the entire surface of the tape creating a flat and level surface. 4. As an alternate to sealant and glass mesh tape, specified seam seal tape may be provided when applied to properly prepared and primed sheathing surfaces in compliance with the seam seal tape manufacturer s published installation instructions. B. Fastener Treatment: Apply sealant to each exposed fastener; trowel level and smooth. END OF SECTION GYPSUM SHEATHING

1. Section : Rough Carpentry 2. Section : Exterior Insulation and Finishing Systems 3. Section : Metal Roof Panels

1. Section : Rough Carpentry 2. Section : Exterior Insulation and Finishing Systems 3. Section : Metal Roof Panels SECTION 06 16 00 SHEATHING PART 1 GENERAL 1.1 SUMMARY A. Section includes: 1. Roof and Wall Sheathing. B. Related Sections: Documents relating to the work of this section include, but are not limited to,

More information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.

More information

SECTION ROUGH CARPENTRY

SECTION ROUGH CARPENTRY SECTION 06 10 00- ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Contracting Requirements and Division 1 Specification Sections, apply

More information

3M Air and Vapour Barrier 3015 Technical guide

3M Air and Vapour Barrier 3015 Technical guide 3M Air and Vapour Barrier 3015 Technical guide Product overview Typical physical properties For installation ease and flexibility, 3M Air and Vapour Barrier 3015 High performance 3M acrylic adhesive grabs

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

Asphalt Shingle Installation at Roof Edges, Intersections and Valleys

Asphalt Shingle Installation at Roof Edges, Intersections and Valleys & Asphalt Shingle Installation at Roof Edges, Intersections and Valleys Abstract This updated document is intended to provide additional guidance and options for asphalt shingle installations at roof edges,

More information

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Includes: Cove, Craftsmen Staggered, Diamond, Fish Scale, Octagon, Round and Old Mill Shingle Lap Important: Read and understand

More information

eco-shake INSTALLATION INSTRUCTION

eco-shake INSTALLATION INSTRUCTION 1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,

More information

Technical Note No. 026

Technical Note No. 026 Technical Note No. 026 Strand Substrate Installed Vertically for Board & or Board-on-Board Applications This Technical Note is an addendum to the Strand Substrate Application Instructions and Trim and

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show

More information

SHEET METAL FLASHING AND TRIM Christ on the Mountain

SHEET METAL FLASHING AND TRIM Christ on the Mountain SECTION 076200 - SHEET METAL FLASHING AND TRIM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Compatibly with the bumping of flashings and trim as identified in the Membrane Roofing Section 075000.

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

Ash Brook Golf Course Scotch Plains, New Jersey

Ash Brook Golf Course Scotch Plains, New Jersey SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ForceField Air & Water Barrier System. installation instructions

ForceField Air & Water Barrier System. installation instructions ForceField Air & Water Barrier System installation instructions Protection and Performance inside and out The ForceField air and water barrier system consists of engineered wood sheathing panels laminated

More information

PRIMED STRAND REVERSIBLE SHAKE

PRIMED STRAND REVERSIBLE SHAKE PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems

More information

Installation Instructions for Panel Siding and Soffit

Installation Instructions for Panel Siding and Soffit Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808

More information

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.

More information

Tools required by installer: Materials required by installer:

Tools required by installer: Materials required by installer: Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely

More information

Shapes Siding. Perfection Shingles. Chalk Line

Shapes Siding. Perfection Shingles. Chalk Line Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY SECTION 07312 PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Dominica PVC thatch shingles. 2. Self- adhering sheet underlayment. B. Related

More information

PROJECT INSTRUCTIONS Roofing

PROJECT INSTRUCTIONS Roofing PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not

More information

Engineered Hardwood Flooring Installation Instructions

Engineered Hardwood Flooring Installation Instructions Engineered Hardwood Flooring Installation Instructions 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully inspect all materials before installation. Materials installed

More information

Technical Note No. 028

Technical Note No. 028 Technical Note No. 028 38 Series Strand Substrate for Board & Batten Applications This Technical Note provides guidance for the application of 38 Series Strand Substrate for Board & Batten Applications.

More information

DuPont Flashing Systems Installation Guidelines. Integral Flanged Door Before water-resistive. Version 2

DuPont Flashing Systems Installation Guidelines. Integral Flanged Door Before water-resistive. Version 2 DuPont Flashing Systems Installation Guidelines Helping you get the job done right Integral Flanged Door Before water-resistive barrier (wrb) is installed Version 2 Table of Contents Applicable Products...2

More information

How To Install Windows: Nail-Fin Application

How To Install Windows: Nail-Fin Application How To Install Windows: Nail-Fin Application Required Tools & Materials: Materials: 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into framing For mulled and/or DP50 or above units:

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. SECTION 07460 LAP SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. B. Factory-finished fiber cement lap siding, panels, single,

More information

Flashing Materials. Rough Opening Preparation

Flashing Materials. Rough Opening Preparation Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

REPORT HOLDER: ISAIAH INDUSTRIES, INC. EVALUATION SUBJECT:

REPORT HOLDER: ISAIAH INDUSTRIES, INC. EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1360 Reissued 08/2018 This report is subject to renewal 08/2019. DIVISION: 07 00

More information

CFDTT-01. Control Joint Study (General)

CFDTT-01. Control Joint Study (General) Trim Method Classic Method Notes: Control joints are required and should be located by the designer at the following locations on the construction documents: 144 sf (13.4 sm) is the maximum overall area

More information

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3 Step 1. Install Sill Flashing Product: 9" or 12" RainBuster #440 SubZero Flashing Tape 1.A Flashing Length = (Rough Opening Width) + 12" 1.B Install sill flashing flush with the sill of the rough opening.

More information

Installation Instructions for TruWood Reversible Trim

Installation Instructions for TruWood Reversible Trim Installation Instructions for TruWood Reversible Trim Important: Read and understand all pages of the installation instructions before starting the trim application. For TruWood care and maintenance information,

More information

Self-Adhering Reflective Sheet Membrane

Self-Adhering Reflective Sheet Membrane application instructions preparation All surfaces must be dry and clean. Dirt, dust and any other foreign matter must be removed. TW Flash-n-wrap 40 must be applied when air, substrate, and membrane temperatures

More information

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

More information

UL Construction No. 254

UL Construction No. 254 UL Construction No. Wind-Uplift - Class 90 (See Item No. ) / Fire Not Investigated Metal Roof Deck Panels* Snap-Clad No. MSG or No. MSG min. thickness coated steel panels. Panels in. wide max., 0 in. wide

More information

DIVISION 6 WOOD AND PLASTICS

DIVISION 6 WOOD AND PLASTICS DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.

More information

DuPont Flashing Systems Commercial Installation Guidelines

DuPont Flashing Systems Commercial Installation Guidelines DuPont DuPont Flashing Systems Commercial Installation Guidelines FOR STOREFRONT WINDOW ON A KNEE WALL AFTER WRB IS INSTALLED Table of Contents Applicable Products... 2 Recommended Materials... 2 Optional

More information

Product Information & Installation Instructions

Product Information & Installation Instructions Product Information & Installation Instructions TUFF-STRAND TM OSB Sheathing OSB Structural Panels from MARTCO Installation Instructions: Site-Built and Modular Construction Important Notice to Buyers

More information

GlasRoc Sheathing Type X

GlasRoc Sheathing Type X Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity

More information

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant) SECTION 066030 EXTERIOR PVC PERGOLAS (IBC Compliant) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and other Contract Documents, listed in the agreement between the Owner and Contractor, apply to

More information

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay

More information

Coatings ASTM B117 SST Salt Spray Test Kesternick Phosphate Zinc E-Coat Dip Spin Coatings

Coatings ASTM B117 SST Salt Spray Test Kesternick Phosphate Zinc E-Coat Dip Spin Coatings Head and Thread types Coatings ASTM B117 Two major types of coating tests: SST Salt Spray Test screws are placed in a container and a salt solution is sprayed on the screws for a number of hours, checking

More information

SECTION ASPHALT SHINGLES

SECTION ASPHALT SHINGLES SECTION 07311 ASPHALT SHINGLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Asphalt shingle roofing. 2. Flexible sheet membranes for eave protection, underlayment, and valley protection. 3. Associated

More information

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,

More information

Tamko. tw window & door flash Flashing Membrane PRODUCT DATA *

Tamko. tw window & door flash Flashing Membrane PRODUCT DATA * tw window & door flash PRODUCT DATA DESCRIPTION Tamko TW WINDOW & DOOR FLASH is a flexible self-adhering rubberized asphalt flashing membrane with a white polymer surface film and a removable treated release

More information

1.04 QUALITY ASSURANCE

1.04 QUALITY ASSURANCE SECTION 07312 ARCHITECTURAL ASPHALT SHINGLES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

TAMKO. TW MOISTURE WRAP Above Grade Moisture / Air Barrier Membrane PRODUCT DATA

TAMKO. TW MOISTURE WRAP Above Grade Moisture / Air Barrier Membrane PRODUCT DATA PRODUCT DATA DESCRIPTION TAMKO is a flexible 40 mil self-adhering rubberized asphalt sheet membrane with a clear polymer film on the surface film and a removable treated release film on the adhesive side.

More information

ZIP System Roof Sheathing INSTALLATION MANUAL A REVOLUTION IN ROOFING

ZIP System Roof Sheathing INSTALLATION MANUAL A REVOLUTION IN ROOFING A REVOLUTION IN ROOFING FROM THE CREATORS OF ZIP System Roof Sheathing INSTALLATION MANUAL Sales Office: 10925 David Taylor Dr., Suite 300 Phone: 800-933-9220 zipsystem.com Charlotte, NC 28262 Fax: 704-547-9228

More information

Tape Measure Metal Clippers Screw Bit Set With Extensions

Tape Measure Metal Clippers Screw Bit Set With Extensions IMPORTANT: Read through instructions thoroughly before beginning to replace any damaged material. Minor damage can be fixed with a fiberglass repair kit and color matched paint. Tools Required Tape Measure

More information

Installation Manual for Thermo Panel

Installation Manual for Thermo Panel Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on

More information

B. Related Sections: The following Sections contain requirements that relate to this Section:

B. Related Sections: The following Sections contain requirements that relate to this Section: SECTION 07311 - ASPHALT SHINGLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

ROOFING City of Grand Rapids Building Safety Division

ROOFING City of Grand Rapids Building Safety Division ROOFING City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Grand

More information

Integrity Polygon and Round Top Installation and Finishing Instructions

Integrity Polygon and Round Top Installation and Finishing Instructions Integrity Polygon and Round Top Installation and Finishing Instructions 08/20/2004 70852 BEFORE YOU BEGIN IMPORTANT: Read these instructions thoroughly before beginning to install your Integrity Polygon

More information

KuraStone TM Installation Guide

KuraStone TM Installation Guide Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18

More information

FASTENERS BUILDING DEPARTMENT

FASTENERS BUILDING DEPARTMENT FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and

More information

AIA Specification. Section Slate Shingles PART 1 GENERAL

AIA Specification. Section Slate Shingles PART 1 GENERAL AIA Specification Section 07315 Slate Shingles PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Adorn Mortarless Stone Veneer Installation Natural Concrete Products Adorn Mortarless Stone Veneer Installation Adorn Mortarless Stone Veneer can be used on new or existing construction. Adorn is nailed or screwed onto the wall; therefore no brick ledge is required. Adorn

More information

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation. Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed

More information

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding** TYPAR WEATHER PROTECTION SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS Table of Contents...01 Special Installation Considerations...01 Code Requirements...02 Approvals and Reports...02 Recommended Materials...02

More information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture A B A - Open / Closed (Page 5) B - Vented (Page 6) ON SITE STORAGE Store off the ground well supported, on a flat well-drained

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED 0 Most Widely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3532 Reissued 01/2017 This report is subject to renewal 01/2019. DIVISION: 07 00 00 THERMAL

More information

Vinyl Windows Manufactured by VPI Quality Windows

Vinyl Windows Manufactured by VPI Quality Windows Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.

More information

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3 Products: 12" RainBuster #415 Self-Adhered Flashing Membrane-40mil 12" RainBuster #415 Self-Adhered Flashing Membrane-25mil 12" RainBuster #420 Nail On Flashing Membrane-25mil RainBuster #430-4.0 Recess

More information

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn

More information

Window Frame Installation Instructions For Nail-on and Block Frames

Window Frame Installation Instructions For Nail-on and Block Frames General The key to any window or door installation is preparation. This extends from storage of the product to the final installation and to all points in between. Careful planning and attention to detail

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 06 1053 - MISCELLANEOUS ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Division 01 Specification

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1717 Reissued 12/2017 This report is subject to renewal 12/2018. DIVISION: 07 00

More information

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations

More information

C. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames

C. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames SECTION 083463 DETENTION DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013.

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013. ICC-ES Evaluation Report ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

3.4 Wall Flashing Wall Flashing General

3.4 Wall Flashing Wall Flashing General 3.4 Wall Flashing 3.4.1 Wall Flashing General The wall flashing details are in line with the two methods of base tie-in, previously described. Either the field membrane has to be spliced onto the QuickSeam

More information

Horizontal Shaft Wall

Horizontal Shaft Wall SYSTEMS 317 INSTALLATION 319 GENERAL REQUIREMENTS 319 FRAMING 319 PLASTERBOARD LAYOUT 320 PLASTERBOARD FIXING 320 CONSTRUCTION DETAILS 321 Horizontal Shaft Wall Horizontal Shaft Wall is constructed in

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material

More information

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,

More information

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Installation Guidelines Installation Instructions for Integral Flanged Windows in Recessed Openings BEFORE Water-Resistive Barrier (WRB) is installed DuPont Flashing Systems Installation Guidelines INSTALLATION INSTRUCTIONS FOR

More information

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year.

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year. ICC-ES Evaluation Report ESR-2648 Reissued June 1, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

Installation Guide: NC 25 System

Installation Guide: NC 25 System Installation Guide: NC 25 System Table of Contents INSTALLATION GUIDE: NC 25 SYSTEM 1 PROPER STORAGE AND HANDLING 3 SUITABLE SUBSTRATES 3 FLASHING 3 MOISTURE BARRIER 4 METAL CHANNELS/COMPONENTS 4 STAINLESS

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the

More information

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3 45 45 6 6 Step 1. Modify Weather Resistive Barrier 1.A Cut the weather resistive barrier flush to the recessed opening (per diagram). Remove the cut away weather resistive barrier, exposing recessed opening

More information

Section 914. JOINT AND WATERPROOFING MATERIALS

Section 914. JOINT AND WATERPROOFING MATERIALS 914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.

More information

Dear Contractor, I am glad that you are interested in our window rebate program.

Dear Contractor, I am glad that you are interested in our window rebate program. Dear Contractor, I am glad that you are interested in our window rebate program. I have included three documents with this letter. One is our form to indicate your intention to participate in the program.

More information

A. Rough carpentry includes but is not limited to the following:

A. Rough carpentry includes but is not limited to the following: SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,

More information

All Window Installation Instruction

All Window Installation Instruction 1 All Window Installation Instruction Hurd Window Installation Instructions for Nail Fin & Wood Brick Mould Units Nail Fin Windows See Pages 2-11 Wood Brick Mould Windows See Pages 2-6, 8 & 12BM - 14BM

More information

SECTION WOOD SHINGLES

SECTION WOOD SHINGLES SECTION 07 31 29.13 WOOD SHINGLES SPEC WRITER NOTES: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. This guide specification does not include requirements

More information

UNA-CLAD Metal Roof Systems

UNA-CLAD Metal Roof Systems UNA-CLAD Metal Roof Systems Underwriters Laboratories (UL) UL Roof Deck Constructions and P Assemblies Factory Mutual Approvals (FM) Table of Contents 1.01 EXTERNAL FIRE RATINGS... 7 Assemblies are updated.

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing.

SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing. SECTION 07 31 26 SLATE SHINGLES SPEC WRITER NOTES: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Slate shingles

More information

STEEL FRAMING WEATHERBOARD SYSTEM

STEEL FRAMING WEATHERBOARD SYSTEM T A R A NAK IPINE STEEL FRAMING WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz T A R ANAKIPINE

More information

ENDUREED VIVA SERIES Specifications

ENDUREED VIVA SERIES Specifications ENDUREED VIVA SERIES Specifications SECTION 07312 HDPE THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Viva Series synthetic thatch shingles.

More information

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Vinyl Windows and Doors Manufactured by VPI Quality Windows Vinyl Windows and Doors Manufactured by VPI Quality Windows Part Number: 511_Installation ENDURANCE CASEMENT\AWNING\PW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction These

More information

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS CORE WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS Proper Window & Door Flashing Although all possible measures have been taken to insure the accuracy of the material presented,

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years.

ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years. ICC-ES Evaluation Report ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION: