1 Clear Wall Planning Guide CLEAR WALL PLANNING GUIDE December

2 Contents Five steps to specs... 3 Design and Installation Planning Space Planning, Site Survey and Measurement Planning Checklist Components Framing Elements Transition Connectors...15 Glass Inserts...16 Copolymer Strips Doors Door Sections Door Hardware Power/Data Installation

3 5 Steps Five steps to specs: 1. Pre-qualify the project 2. Select Framing Elements 3. Select Door and Door Hardware 4. Select Glass Insert sizes and color 5. Select Electrical and Data components 3

4 Design and Installation Planning Proper planning and preparation is key to successful and profitable Clear Wall projects. Take the time to fully understand the customer s needs and requirements. Use the Budget Estimator tool to pre-qualify the project and select the product that suits the client's price parameters. Have their Request for Bid documentation on hand when performing site surveys and during design and installation. It is critical to document all decisions made from start to finish. Installation and Trendway Field Support Trendway offers Field Technical Support for a nominal fee. Certified Trendway Technicians can take field measurements, train and assist during the actual installation at the customer location. Using this resource assures accurate product design and planning, as well as fast, expert installation. Contact the Trendway Architectural Product team for more details. 4

5 Before You Begin Use the AP Budget Estimator tool to generate pricing for customer approval. Clear Wall measurements are based on center-to-center locations. If you are working with an existing space, you must make an onsite inspection to determine the ceiling height and amount of floor runout within the area where product will be installed. See pages 6 to 9. THIS IS THE MOST IMPORTANT STEP OF ANY SUCCESSFUL CLEAR WALL INSTALLATION. While you (or a certified installer or Trendway Technician) are at the site measuring the ceiling height and floor runout, it is also a good idea to inspect for building mechanicals and utilities that may affect the installation and need to be addressed prior to placing the order. See pages Utilize the AP Budget Estimator's Building Site Condition Checklist to ensure you have all necessary information. If you are working with new construction, note that the areas of concern noted above may not be able to be addressed at the time of pre-order quotation, but will affect the final outcome of the installation. Be prepared to address them prior to placing the order. For pre-order quotation purposes, all new construction requests for quotes must be accompanied by a cad model of the space with the partition location and type of Architectural Wall Product clearly noted. This should come from a licensed interior designer or architect to ensure all applicable codes have been addressed. Ceiling height a critical measurement Measurements must be taken on the final site floor treatment (after carpet or other flooring is installed) for accuracy. IMPORTANT: Measure ceiling height at every door location. Measure ceiling heights every 10', along the line the wall will run. If there is variance greater than 1/2" over a 10' measurement, take additional measurements at 5' intervals. Specify ceiling heights in 1/8" increments. Note heights accurately on the floor plan. 5

6 Space Planning First, define the location of the partition run. Clear Wall is 3-1/4" thick, so using construction lines that are offset by 1-5/8" is a good place to start (center of Glass Insert). (Step 1, page 7.) Once the location of Clear Wall has been determined, the framing layout and elevations can be developed using CAP, GIZA or other office product planning software that is supported with Trendway symbol libraries. Locate all vertical elements (vertical posts and door sections) The horizontal beams can be added last, using the 2020 Auto Hardware function (Step 2, page 7). Plan the Glass Inserts, based on the sizes established by the vertical elements (Step 3, page 7). TrendWall and Clear Wall can be integrated with the use of In-Line Posts. Volo and Clear Wall can be integrated with the use of a variety of Posts: In-Line, 90 and 3-way conditions. Remember that the systems have different thicknesses, so that when bringing two together, there will be a setback on one or both sides where they join. Remember to plan for insertion of Copolymer Strips if specified by the customer. Floor plans Accurate floor plans with key dimensions and conditions within the building architecture are essential. They should include: Overall space dimensions Wall locations and distance from columns Wall runs that terminate flush with building wall surfaces Door locations for ceiling height measurements is crucial for accuracy Existing corridor widths and runs that bypass building columns Site survey and verified field measurements A thorough pre-installation survey is required. Ensures fast, accurate, effective space planning and design. Allows effective scheduling, timely completion, no lost time on the job. Problem-free installations, happy customers and return business improve profit. PLEASE NOTE: Clear Wall can not be used in a freestanding application. It must be attached to a ceiling or soffit (no special blocking required). 6

7 Planning Steps STEP 1: LOCATE OFFICE CENTERLINES STEP 2: PLACE VERTICAL POSTS 11'-7" 12'-3" Door 8" Insert Minimum STEP 3: PLAN GLASS INSERTS STEP 4: ADD COVERS 7

8 Site Ceiling Determine the installation site's ceiling type and grid (if applicable), which will determine the attachment requirements. If you are not certain, or encounter a type of ceiling different from those described here, send a photo to your Trendway Technical Support team for assistance. Information you will need: Identify ceiling type: Grid and Tile, Gypsum, or other material (e.g. wood). This will determine the type of ceiling anchors you require. For Grid Ceiling, identify the Tile type: - Flat (Tile does not protrude proud of the Grid) - Tegular/Reveal. Tegular/Reveal grids require the use of Grid Blocks for installation. Determine if the Tegular tile has a 1/4" or 3/8" tile recess dimension (dimension it sits proud of the grid). Use Stucco-colored Grid Blocks for a finished appearance. Specify either 3/8"-high x 7/8" wide or 1/4"-high x 7/8"- wide. Special sizes available upon request. Specify one Block for every 2' of Clear Wall run, or 6 for every Crown section on order. Identify Grid type (if applicable): 1" Standard or 9/16" Thinline. Flat Lay-In Tile Grid Tegular/Reveal Tile Flat Tile Tegular/Reveal Tile Grid Grid Block Installed 8

9 Physical building conditions Site conditions may affect wall placement or require special planning to accommodate. Inspect the site and note any situations that may impact or interfere with the layout, or require special wall connection treatment due to site wall conditions. The AP Budget Estimator's Building Site Condition Checklist is a valuable aid in identifying these. Conditions may include: ADA requirements Building walls and columns Building electrical and data access Convector Units (baseboard heating units) Perimeter Wall Start conditions Air-handling diffusers Floor Type HVAC Supply and Return Grills Light fixtures Soffits Sprinkler heads Unusual Baseboard Configurations Wall or floor outlets Window conditions Ceiling type Flooring type Window sill and drapery pockets Ask the customer to look for obstructions before the product is ordered. It will be their responsibility to remove obstructions or relocate the wall. Once the site observation and measurements are complete: Identify any design modifications that should be anticipated due to site conditions. Review modifications with the designer before any design or layout begins Review modifications with the installers before installation work begins. Once the design is finalized, it s essential to do a thorough onsite verification of the installation drawings to actual site dimensioning prior to installation. Compliance with relevant regulations Before any work is performed, be certain you are in compliance with local and/or Government project or contract regulations. These may include, but are not limited to: Building Codes (see the AP Codes and Construction Requirements document on Trendealer) Building Permits Technical specs, test data or product sample submissions for approval Certificates of Occupancy Labor requirements (security clearance, trade union jurisdictions for tasks, etc.) Dealer- or customer-supplied verification of seismic bracing if required by local code 9

10 Installation planning checklist Where will material be received, and who will receive? Check all products received against the packing list and Bingo sheet. Where will material be stored? Are there any access or security rules governing time that installation may take place? Where are walls to be installed? Is the environment (i.e. heat, light, humidity, etc.) satisfactory? Are there any power complications? Are there any material handling obstacles (e.g. elevator/stairwell/corridor dimensions)? What preparation is required for cleanliness of metal trim and component cutting? Are there any special tools or equipment required? Refer to the Recommended list of installation tools on page 24. Are there complications or timing conflicts with other trades? Are flooring-loading limitations satisfactory? Ceiling type (drywall, drop Flat, drop Tegular/Reveal etc.)? Obtain accurate minimum/maximum ceiling heights in 1/8" increments. Is there anything on this job that requires extraordinary preparation? Post-Installation Obtain post-installation verification of product delivery, ownership, and security. Complete any punch list items and turnover procedures (Certificate of Occupancy, etc.). If promotional photography is desired, obtain permission (signed release) and schedule. 10

11 Components Clear Wall delivers a sophisticated aesthetic in a simple wall with just a few components. Framing Elements Glass Inserts Doors CROWN CHANNEL CROWN COVER UPPER BEAM COMPONENTS ADJUSTABLE WALL START DOOR SINGLE DOOR JAMB GLASS 90 DEGREE POST ELECTRICAL ADDER POST ELECTRICAL COVER IN-LINE POST FLOOR COVER FLOOR BEAM 3-WAY POST LOWER BEAM COMPONENTS 11

12 Framing Elements Beams Upper and lower beam assemblies include all structural and decorative trim pieces, as well as all required connectors. All beam covers are made from the highest-grade extruded aluminum and are 3 1/4" thick. All beam covers are field-cut to ensure the best possible fit and finish. Beams can be specified in Satin Etch (brushed aluminum look) or in any of Trendway s standard powder coat finishes. Upper beams are 4-1/2" tall and mount to a ceiling. The Upper Beam assembly consists of Crown Channel, Crown Cover, Inline Splice Plate, Spring Clip, Gaskets and Glass Cam. Lower beams rest on the finished floor and vary between 4" and 5" tall, depending on the extension required to accommodate any floor run out. The Lower Beam assembly includes Floor Channel, Floor Beam, Inline Splice Plate, Load Saddle, Floor Cover, Micro Plumb Bolt and Gaskets. All Beam components can also be ordered separately as Accessories. CROWN CHANNEL IN-LINE SPLICE PLATE CROWN COVER GLASS CAM UPPER BEAM GASKETS GASKETS MICRO PLUMB BOLT FLOOR COVER LOAD SADDLE IN-LINE SPLICE PLATE FLOOR BEAM FLOOR CHANNEL LOWER BEAM 12

13 Vertical Posts Clear Wall Vertical Posts are divided into three categories: Wall Start, Transition, and Electrical. Transition Posts are used to transition from Clear Wall into Volo, TrendWall frames or into existing building elements. They can be used aesthetically or functionally. All Electrical Posts are 3-1/4" thick and designed with vertical wire management capability and come with an integral electrical cover. Door jambs are always included as part of the door section, but, as with Wall Starts and Transition Posts, do not have the ability to house power or data. Electrical Posts Electrical Posts allow power access via Ceiling Feeds. They include the End of Run Post, In-Line Post, 3-Way Post, 90 Post and Electrical Adder Post. Adder Posts are used to locate power next to Door Jambs. Electrical posts can be used either functionally as powered posts or aesthetically to add vertical mullions to the Clear Wall elevation. When used functionally as a power post, remember to specify the height(s) of the power access cover punch-outs. All Electrical Posts are made from the highest-grade extruded aluminum and are 3-1/4" thick. They can be specified in Satin Etch, or in one of Trendway's many powder coat finishes. NOTE: All vertical posts are field cut to ensure the best possible fit and finish. Punch-out Description: C1 45" Switch Height C2A 18" Standard Height C3 32" Work Height C4 6" Data Height C5A 18" Standard and 32" Work Height C6A 18" Standard and 6" Data Height C7 6" Data and 32" Work Height C8 Special Punch Out location AV 72" AV Height AVC5A 72" AV, 18" Standard and 32" Work Height AVC6A 72" AV, 6" Data and 18" Standard Height 3-WAY POST 90 DEGREE POST END-OF-RUN POST IN-LINE POST ELECTRICAL ADDER POST 13

14 Building Termination Connectors Clear Wall can be terminated into existing building elements by using a Wall Start, which allows 1" of adjustment (FIG A). (FIG A) WALL START POST (Planned at 3") 2-1/2" 3" 4" Fully Compressed Nominal Dimension Fully Extended Transition Connectors TrendWall to Clear Wall Remember that TrendWall is 2-3/4" and Clear Wall is 3-1/4" thick, so that when bringing the two systems together, there will be a 1/4" step on both sides of the Connector (see illustration below). To transition into TrendWall, specify a GWPTWALL10. When transitioning into a building wall, use the GWWS10, which includes both a Transition Post and mating wall channel. TRENDWALL TRANSITION POST Clear Wall to TrendWall Transition Post TRENDWALL TRANSITION POST GWPTWALL10 WALL START GWWS10 Post Plan View 1/2" 2-3/4" 3-1/4" 14

15 Transition Connectors Volo to Clear Wall Volo to Clear Wall Frame Connectors provide an easy connection and clean lines when transitioning between Volo and Clear Wall Glass Insert runs. Remember that Volo is 2-1/4" and Clear Wall is 3-1/4" thick, so that when bringing the two systems together, the centerlines will not align perfectly and there will be a step on both sides of the connectors (see Fig 1 below). CLEAR WALL TO VOLO TRANSITION POSTS 3-Way Connector - CVC FIG. 1 Post 7/8" Clear Centerline Volo 3/8" Clear Clear Volo Clear Volo Centerline Plan View 3-Way Connector - VCC Inline Connector Volo Clear Clear Volo Clear Plan View Plan View 3-Way Connector - VVC 90 Degree Connector Volo Clear Volo Clear Volo Plan View Plan View 15

16 Glass Inserts Clear Wall Glass Inserts are 1/2" tempered glass that can be specified to any width from 8" to 48" in 1/8" increments. They come standard in three distinct glazing color options: Clear, Low Iron and Frost. Clear is standard tempered glass that has a slight hint of color. Low Iron tempered glass is as colorless as glass can get. Frost gives visual privacy, while allowing some light transfer between spaces. Glass Inserts are available with straight, single-angle and double-angle vertical edge treatments to allow for the design of unique faceted wall sections. Angles that can be specified as standard are: 22.5, 45, or 135. Other angles are available as specials for an upcharge. Note: angled glass is not recommended over 9'. GLASS INSERT Important note: Due to its intrinsic nature, glass naturally displays a degree of deflection (bowing) from its own weight. Clear Wall glass is no exception, but any deflection that may occur is well within accepted tolerances (see the chart below). Optional Copolymer Strips may be used to minimize the appearance of deflection (see page 17). Glass Deflection Tolerances Industry Standards 1/4" Glass 3/8" Glass 1/2" Glass 8' Doors 15/32" 9/32" 13/64" 9' Doors 17/32" 11/32" 9/32" 10' Doors 21/32" 15/32" 3/8" GLASS EDGE ANGLE OPTIONS Straight Single Angled Single Butt ' Double Angle ' 45 2'-1.5" 2'-1.5" 45 Double Angle ' 45 2'-1.5" 2'-1.5" 45 /135 Double Angle NOTE COM Glass: Customers may choose to source COM glass panels locally. To specify Clear Wall with COM glass, customers must order all components that are not Glass Insert part numbers in the usual manner (e.g., Doors, Upper Beam etc.) and order one Clear Wall Glass Hardware Kit (CWGLASSKIT) for each Glass Insert required. 16

17 Clear Copolymer Strip The Clear Copolymer Strip is an option that can be specified for insertion along the Glass Insert edge where two Inserts abut. They bridge the slight gap for a smooth look. Customers may desire this finishing detail to achieve the most finished appearance. The also minimize the slight irregularities that arise from the natural 'bow' that appears in large sheets of glass. See the note about deflection on the previous page. Use of the Strips also allows creation of a more refined butt corner joint for a cost-effective alternative to a mitered-edge Glass Insert joint. The Strip is sold in 10 sections and field cut to the required length. Clear Copolymer Strips are available for all for 4 Clear Wall angle conditions: In-line (180 ), 90, 3-Way and 135. They come with a pre-applied clear adhesive tape for installation. Note: the Strip is recommended for walls over 8' high. COPOLYMER STRIPS In-Line (180 ) 90 3-Way

18 Doors Clear Wall offers several architectural door options that differentiate it from other systems. Note: Door heights are based on ceiling height see the technical Cut Sheet for the specified Door for details. Double Acting (Pivot) Doors Full 1/2" tempered glass Double Acting (Pivot) Doors are specified at full height and have three pull options, 18 Post Pull (non locking), 36"Post Pull (non locking) and 72" Ladder Pull (optional lock). Double Acting (Pivot) doors are available in full height. Full height doors are nominally 4 1/2" shorter than the ceiling; running from 1/2" above the finished floor to a 1/2" below, the upper beam. These doors come standard with 180, hold open and self-closing hinges. The 72" Ladder Pull throws a lock rod into a floor-mounted dustproof strike, which is located on the key side of the pull. Door glazing is available in the same glazing colors as Clear Wall Glass Inserts (Clear, Low Iron and Frost) and Door Jambs are available in the same finishes as all other framing elements. Sliding Doors The 1-3/4" Sliding Doors are offered at full height only, in Frameless Glass, Flush Wood, Wood Full Lite and Aluminum Framed options. Wood Doors are offered in Veneer finish only, and Aluminum Framed Doors can be specified in any of Trendway s standard powder coat finishes or Satin Etch (Anodized). Door glazing is available in the same colors as Clear Wall Glass Inserts (Clear, Low Iron and Frost. Door Jambs are available in the same finishes as all other framing elements. Sliding Doors offer three pull options: 18 Post Pull, 36"Post Pull and 72" Ladder Pull Wood doors, locking or non locking. For Frameless Glass Doors, the lock is separate from 18" and 36" pulls and is incorporated as a Patch Lock. Sliding Doors can be specified as Right or Left handed. See the image below to determine which to specify. Right-Hand Slide Side 2 Outside Side 1 Left-Hand Slide Side 2 Outside Side 1 DOUBLE ACTING (PIVOT) DOOR FLUSH WOOD SLIDING DOOR FULL LITE WOOD SLIDING DOOR ALUMINUM FRAMED SLIDING DOOR FRAMELESS GLASS SLIDING DOOR 18

19 Sliding Door Sections Sliding Doors are ordered as Sections, which come complete with Door and Frame plus optional Soft Close mechanism and Hardware when specified. All Clear Wall Doors are Full Height. Find detailed door dimensions on the following page. Frameless Glass Sliding Door Section Frameless Glass Sliding Doors are ½" thick and available at up to 9' in height. Doors are specified as either Right or Left opening as viewed from the exterior of the space. Frameless Glass Doors are available with the same glazing options offered for Glass Inserts, all tempered glass: Clear, Frost or Low Iron. Soft Close Mechanism is required for Frameless Glass Sliding Doors and must be ordered separately. Choose from Soft Close or dual Soft Open/Close options. SOFT CLOSE MECHANISM FRAMELESS GLASS SLIDING DOOR SECTION Choose from Soft Close or dual Soft Open/Close options. Offered for Frameless Glass Doors only. NOTE: Do not operate with excessive force. The Mechanism exerts slight resistance as it begins the soft open or close operation: do not force. You can release at this point and the action completes gently and automatically. Aluminum Framed Sliding Door Section Aluminum Framed Sliding Doors are offered in three stile/ rail combinations (below) : 2" Vertical Stiles and 2" Horizontal Rails 2-2-4: 2" Vertical Stiles and 2" top Horizontal Rail paired with a 4" bottom Horizontal Rail 4-4-4: 4" Vertical Stiles and 4" Horizontal Rails Aluminum Framed Doors are available with the same glazing options offered for Glass Inserts, all are tempered glass: Clear, Frost or Low Iron. ALUMINUM FRAMED SLIDING DOOR SECTION ( Shown) 19

20 Wood Sliding Door Section Wood Doors are included with the associated Door Frame. Sliding Doors are single-opening, 1-3/4" Flush or Full Lite frame. Full Lite come standard with 1/4" glazing. Full Lite Wood Doors are available with the same glazing options offered for Glass Inserts, all tempered glass: Clear, Frost or Low Iron. WOOD SLIDING DOOR SECTION FLUSH WOOD SLIDING DOOR SECTION FULL LITE Door Dimensions Double-Acting (Pivot) Frameless Glass Sliding Trendway Catalog Number Ceiling Height Clear Opening (Installed) GWDSA08 (R/L) 7'2" to 8' 34" GWDSA09 ( R/L) 8'-1/4" to 9' 34" GWDSA10 (R/L) 9'-1/4" to 10' 34" Trendway Catalog Number Ceiling Height Clear Opening (Installed) GWDSLAL08 (R/L) 7'4" to 8' 33-3/8" GWDSLAL09 ( R/L) 8'-1/2" to 9' 33-3/8" Aluminum Framed Sliding Trendway Catalog Number Ceiling Height Clear Opening (Installed) GWDSLAL08 (R/L) 7'2" to 8' 34" GWDSLAL09 ( R/L) 8' 1/8" to 9' 34" GWDSLAL10 (R/L) 9' 1/8" to 10 34" Wood Sliding Trendway Catalog Number Ceiling Height Clear Opening (Installed) GWDSLW08 (R/L) 7'2" to 8' 34" GWDSLW09 ( R/L) 8' 1/8" to 9' 34" GWDSLW10 (R/L) 9' 1/8" to 10 34" 20

21 Door Hardware Several architectural-style door hardware options are available. All Door Pull styles are available as Locking and Non-Locking. All door pulls are a Satin Chrome 626 finish. BD Blank Door: Allows COM pulls or lock sets. Doors must be drilled/machined on-site as required. Not available for Glass. BDL Blank Door with Lock: Allows for COM pulls. Doors must be drilled/machined on-site to accommodate COM pull, but door will be bored for our standard mortise lock which is included. Not available for Glass. 18N 18" Post Pull non locking 18L 18" Post Pull locking 36N 36" Post Pull non locking 36L 36" Post Pull locking 72N 72" Ladder Pull non locking 72L 72" Ladder Pull locking Door Hardware Application Matrix 18N 18L 36N 36L 72N 72L Double Acting (Pivot) Door Sliding Doors: Wood and Aluminum * * Frameless Glass Sliding Door ** ** * Mortise Lock Option ** Patch Lock Option Locks Into floor IMPORTANT NOTE: Master Key Statement Each end user needs their own unique Master Key system. It is most effective for a local locksmith to work with the client on their specific setup, so if changes or additions are required there is a nearby professional who understands their system and can address their future needs. For that reason, supplying master keyed products directly from Trendway is not in the best interest of the end user. Trendway can provide blank cylinders, without keying, to assist in this process. If frequent changes are anticipated, an interchangeable core system should be used so the cylinder can be removed without disassembling the lock. 21

22 DOOR PULL OPTIONS HINGE Double Acting (Pivot) Door only PATCH LOCK 18" Post Pull 12" centerline to centerline of mounting hardware 36" Post Pull 22.5" centerline to centerline of mounting hardware Option for Frameless Glass Sliding Door 18" and 36" Post Pulls only 72" Ladder Pull NOTE: Not available on and Aluminum Framed Doors. 72"Pull locks into floor (see image left) The Ladder Pull features a Schlage "C" keyway and throws a lock rod into a 1"-deep dustproof strike (supplied). This option requires floor machining at the job site by a certified installer. 22

23 Power and Data Clear Wall can integrate either modular power or building hardwire into the system. All vertical frame elements except Door Jambs, Wall Starts and Transition Posts are Electrical Posts, available as End of Run, In-Line, 90, 3-Way and Adder. Modular power begins by placing power blocks in vertical power posts. Power is brought into the system from ceiling junction boxes via Ceiling Feed harnesses. Note: power is supplied via ceiling access at each desired vertical post location, it is not routed via the Lower or Upper Beam. Ceiling Feeds supply power to Power Block Modules. These are available in either 10' or 12' lengths Power Blocks accept Power Duplexes and bring modular power to the user. Clear Wall Power Blocks at 6" Data height, 18" Standard height, 32" Standard height, 45" Switch height and 72" AV height above the finished floor. Power and data can be added at Clear Wall door jambs with the use of an Electrical Adder Post. All power modules are powered from the ceiling. Power Duplexes provide access to electrical in the Electrical Posts. Each one is clearly marked for Circuit I, II, III, or IV access. Circuit IV is marked in orange to designate it as a dedicated circuit. Power Duplexes are sold individually or in boxes of 6. The Hardwire Box Kit is a modified Appleton M1-250 masonry box that fits into Clear Wall Electrical Posts. This box should be specified for every field wired electrical opening. The Electrical Box includes 1/2" and 3/4" knockouts. UL Listed. NOTE: This part is a single gang electrical box only. All other electrical components must be supplied by the electrical contractor. 1-15/16" Total Unit Depth CEILING FEED POWER DUPLEX POWER BLOCKS HARDWIRE BOX KIT 23

24 Installation Installation and Trendway Field Support Trendway offers Field Technical Support for a nominal fee. Certified Trendway Technicians can take field measurements, train and assist during the actual installation at the customer location. Using this resource assures accurate product design and planning, as well as fast, expert installation. Contact the Trendway Architectural Product team for more details. Note: This is an overview summary of a typical installation. Every project is different. Detailed installation instruction documents with drawings can be found in the Install Sheets & Video section of Trendealer. See sheets INS484 (Clear Wall) INS655 (Frameless Glass Sliding Door) and INS660 (Wood Framed Sliding Door). Note: Inspect the contents of all containers for shipping/handling damage. Make sure you have all required parts before proceeding. Recommended Installation Tools #1 square Roberts bit 1", 3/4 and 3/8 open end wrench or Crescent wrench 1/4" and 5/16 nut driver (magnetic preferred) 1 Hole Saw 12" inch Compound Miter saw with a 90 to 120 tooth carbide non-ferrous metal cutting blade. (12" required to cut through 3 way posts and 90 degree crown covers for Clear Wall) 15mm open end wrench (thin bicycle wrench preferred) 2 Ladders 2 Quick Clamps 2 & 6 Putty Knifes 5/32, 1/4 and 3/16" Masonry Drill Bits Channel Lock Pliers Combination square Counter sink bit Drill Bit Set Electric Screwdriver (cordless preferred) File Glass cleaner and Paper towels Glass Suction Cups (Recommended) Hammer drill Level (2 & 4' preferred) Masking or Duct Tape Mini 1/8" Flat Head Screw driver Nylon Mallet Phillips Head Screw Bits #2 and #3 Plumb Bob (Laser preferred) Portable Band Saw with extension cord (18 or 24 tooth blade) Saber Saw or Jig Saw with 4 1/2" blade Safety Glasses Saw Horses with drop cloth Shop Vac Standard and Metric Set of Allen wrenches Steel Hammer Steel Tape Measure Tin Snips (set) Utility Knife 24

25 Installation Sequence 1. Working from your Clear Wall floorplan, use tape or chalk to create a layout on the ceiling for the Upper Beam. 2. Locate and install all Wall Starts. 3. Find and mark all full height vertical connector locations. 4. Install Crown Channel components of Upper Beam between the full height connectors. 5. Mark floor layout for the Lower Beam, using a laser Plumb Bob. Mark with tape. 6. Locate and install all vertical connectors and Door Jambs which are NOT full height (they terminate below the Crown Channel). 7. Install all Floor Channel and Floor Beam components between the vertical connectors. 8. Level all Floor Beams to the same distance from the ceiling: make sure this is less than the height of the Glass Inserts. 9. Locate all Glass Inserts. Install, making sure each is plumb before installing the next. 10. Install Double Acting (Pivot) Doors. 11. Install modular power components. 12. Install Crown and Floor covers 13. Install Sliding Doors. Marking the Layout All Clear Wall dimensions are based on centerline dimensioning. Use tape to create the layout on the ceiling to indicate where the Crown Channel will be located. Locate the centerline of the run on the wall. (NOTE: Start your installation at a corner and work back to the building wall.) Use tape and a plumb bob or laser to locate the centerline of the floor layout inline with the centerline of the ceiling layout. Use tape to mark the locations for all vertical posts. Door locations are height-critical! They must be accurate. Find and mark the high spot in the entire system, to be used when leveling the system due to floor runout. Installing Wall Starts Measure and mark 1-3/4" from the centerline at the wall start to locate the perimeter edge of the Wall Channel. Measure from the finished floor to the ceiling and cut the Wall Start Transition Post. PLEASE NOTE THAT ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64". Check the fit and mount the Wall Channel to the building using either 1.5" drywall screws or a combination of wall anchors and corresponding screws, making sure it is plumb. NOTE: It is the responsibility of the installer to make sure that the mounting method is appropriate for the condition of the building wall. Before installing the Wall Start Post into the Wall Channel (friction fit), place a 1/2" shim (any length) between them at the floor level. Set it to the dimension on the supplied drawing (usually 3"). Make sure it is plumb, then mark the face location on the ceiling this will indicate the Crown Channel start location. Reference the Trendway supplied drawings to locate, measure, and mark the locations of all other full height vertical posts. DO NOT INSTALL OR CUT THESE POSTS YET. The Trendway supplied drawings will note these dimensions. However, always mark their locations and re-check the Crown and Floor Channel dimensions prior to cutting these posts. Full height vertical posts can include Wall Starts, Transition Posts, Two-Way Corner Posts, Two-Way In-line Posts, Three-Way Posts, and Electrical Adder Posts. The Trendway supplied drawings will indicate which posts are full height posts. 25

26 Installing Upper Beam Measure 1-3/8" from the centerline to locate the perimeter edge of the Crown Channel. The Crown Channel cut dimensions can be pulled from the Trendway supplied drawings, however, it is highly recommended to verify the dimensions from the field marked layout. If a Sliding Door is specified, the Glass Cam side of the installed Upper Beam must be on the opposite side of the panel from the installed Sliding Door (Fig B). Cut the corresponding Crown Channel, starting with the piece closest to the installation start point. For mitered corners, miter cut the Crown Channel to the specified angle on the Trendway supplied drawings. Measure the distance from the face of the Wall Start to the first ceiling grid intersection. Mark this distance on the Crown Channel and drill a 1/4" clearance hole. Measure, mark, and drill a clearance hole for all other ceiling grid intersections, typically every 2' or 4'. Using #8 self-drilling sheet metal screws attach the Crown Channel to the ceiling grid. NOTE: If the ceiling tile used is a tegular tile, or a recessed tile, be sure to use the appropriate Ceiling Grid Block at each hole in the crown. This will prevent the Crown Channel from pushing the ceiling tile up and out of space. For mitered corners, use a tie bar and self-drilling sheet metal screws to secure the joint together. Note: Crown sections must be attached only to structurally sound ceilings and connected to the ceiling grid at least every 2' or 4' as the ceiling grid allows. Once the first piece of Crown Channel is installed, it is highly recommended to install the mid-run full height post before moving on to the next Crown Channel. A ceiling grid spanner must be used in the case where the end of run is located between the ceiling grid bars, and not on a ceiling grid. Installing Mid-Run Full Height Posts Measure from the finished floor to the ceiling and cut the mid-run full height post. PLEASE NOTE THAT ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64". For Electrical Adder Posts, align the two connection legs of the already cut-to-size Electrical Adder Post to the two connection grooves of the adjacent already cut-to-size post, and slide the two posts together until they become one post. NOTE: Be sure to take caution when sliding the two posts together to minimize any possible damage to either post. Position the post in place. Install two L-Brackets to the top of the post, inside the glass channel, with the provided #10x3/4 self-drilling screws. Plumb the post. Continue installing the rest of the Crown Channel and mid-run full height posts until complete. NOTE: If an Insert has a Post or Door Jamb on both sides of it, install the final Post or Door Jamb after the Floor Channel, Floor Beam, and Insert have been installed. For inside clear corners, miter cut the Crown Channel to the angle specified on the Trendway supplied drawings. Installing Half of the Crown Cover CEILING INSTALLED SLIDING DOOR Measure the distance between the full height posts and cut the Crown Covers for the half of the Crown Channel with the leg on it. PLEASE NOTE THAT ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64". For clear corners, miter cut the Crown Cover to the angle specified on the Trendway supplied drawings. This angle must match the installed angle of the Crown Channel. Install a Straight or Corner Alignment Bracket, if required. Install the Crown Cover and be sure that it completely snaps into place with the Crown Channel. FIG B 1-3/8" FROM CENTERLINE TO PERIMETER EDGE GLASS CAM ON OPPOSITE SIDE OF PANEL FROM SLIDING DOOR 26

27 Installing Door Jambs and Mid-Run Sub-Crown Posts Locate the mid-run sub-crown post locations. The mid-run sub-crown post dimensions can be pulled from the Trendway supplied drawings, however, it is highly recommended to verify the dimensions from the field marked layout. Measure from the finished floor to the bottom of the installed Crown at each location, then subtract 4-3/16" to determine the length to cut the post. NOTE: Due to floor run out, do not assume that every post will be cut to the same height. Cut the corresponding Door Jamb or mid-run sub-crown post. PLEASE NOTE THAT ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64". NOTE: The Door Jambs for Double Acting (Pivot) Doors come with pre-drilled holes for specific Double Acting Door locations. Be sure to cut the corresponding Door Jamb. For Electrical Adder Posts, align the two connection legs of the already cut-to-size Electrical Adder Post to the two connection grooves of the adjacent already cut-to-size post, and slide the two posts together until they become one post. NOTE: Be sure to take caution when sliding the two posts together to minimize any damage to either post. For each Door Jamb, install a Door Jamb Weldment to the top of the Door Jamb by aligning 12" steel bar and serrated tabs to the features in the Door Jamb profile. Bottom out the weldment to the Door Jamb using a hammer or mallet. The measurement from the top of the jamb to the top of the weldment is 4-3/16". For each Door Jamb, install a Door Jamb Foot Plate to the 2-1/2" studs near the bottom. Rotate the Foot Plate into the square cut out and attach in place using 3/4" nuts. Position the Door Jamb in place. Pre-drill 1/4 holes and anchor the Door Jamb to the Crown Channel using the provided 1/4"- 20 thread-cutting screws provided. NOTE: If a Door Jamb creates a complete frame around a single Insert, install the Door Jamb that completes the frame after the Floor Channel, Floor Beam, and Insert have been installed. Plumb the Door Jamb. If a Door Jamb is cut short, run out the 2-1/2" studs to the floor to attach the Door Jamb in place. NOTE: All Door Jambs must be firmly attached to the floor to ensure adequate strength for the Door Jamb. For all other mid-run sub-crown post, install a Vertical-to-Crown Bracket Assembly to the top of the post, inside the glass channel, with the provided #10x3/4 self-drilling screws. NOTE: The Vertical-to-Crown Bracket may need to be rotated so that the Bracket is flush to the Crown Channel Leg. Position the mid-run sub-crown post in place and anchor the Vertical-to-Crown Bracket Assembly to the Crown Channel using the provided #10x3/4 self-drilling screws. NOTE: If a vertical post creates a complete frame around a single Insert, install the vertical post that completes the frame after the Floor Channel, Floor Beam, and Insert have been installed. Plumb the post. Installing Floor Channel Measure 1-1/2" from the centerline to locate the edge of the Floor Channel. The Floor Channel cut dimensions can be pulled from the Trendway supplied drawings, however, it is highly recommended to verify the dimensions from the field marked layout. NOTE: Floor Channel is 3" wide (not the full width of the systems 3-1/4" width). There will be 1/8" on both sides of the Floor Channel to account for the Floor Covers. Cut the corresponding Floor Channel, starting with the piece closest to the installation start point. PLEASE NOTE THAT ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64. For clear corners, miter cut the Floor Channel to the angle specified on the Trendway supplied drawings. This angle must match the installed angle of the Crown Channel. For Floor Channel pieces that are adjacent to a Door Jamb, drill four 5/16" clearance holes, through the Floor Channel, inline with the holes of the Door Jamb Foot Plate. Use the 1/4" Tapcon screws provided to attach the Channel to the floor. 27

28 Carpet Condition Peel off backing of Carpet Gripper and apply to each Floor Channel. NOTE: Carpet Grippers should be applied near each end and spaced evenly along the Floor Channel. For Floor Channels adjacent to Door Jambs, anchor all Door Jambs to the floor through the Door Jamb Foot Plate and clearance holes in the Floor Channel. Recommended anchors are 1/4"x2-1/4" Tapcon screws which require a 3/16" pre-drill hole. NOTE: It is the responsibility of the installer to make sure that the anchoring method is appropriate for the condition of the building floor. Non-Carpet Condition Drill a 5/16" clearance holes near each end of the Floor Channel. Install the Floor Channels to the floor through the clearance holes. NOTE: It is the responsibility of the installer to make sure that the anchoring method is appropriate for the condition of the building wall. For Floor Channels adjacent to Door Jambs, anchor all Door Jambs to the floor through the Door Jamb Foot Plate and clearance holes in the Floor Channel. Recommended anchors are 1/4"x2-1/4" Tapcon screws which require a 3/16" pre-drill hole. NOTE: It is the responsibility of the installer to make sure that the anchoring method is appropriate for the condition of the building floor. Installing Floor Beams Cut Floor Beams to match the Floor Channels, staying clear of the Leveling Bolts. NOTE: Floor Beams do not need to be miter cut. Level all Floor Beams to the ceiling, starting at the high point in the system. This will ensure proper glass engagement and maximum leveling capability. Ensure that every Leveling Bolt is in contact with the Floor Channel. Install Floor Beam Saddles and Plumbing Nuts onto the Floor Beams. NOTE: Be sure that the Plumbing Nuts are completely bottomed out and position the groove parallel to, or inline with, the Floor Beam. NOTE: For Glass Inserts that are 24" wide or less, use (2) sets. For those that are larger than 24", use (3) sets. Installing Glass Inserts NOTE: Glass Suction Cups are very useful when positioning the Glass Inserts into place, especially if they engage with a vertical post. Reference the Trendway supplied drawings to determine each Insert s location. The acknowledgement/ drawing will reflect the specified ceiling height. Please note that actual Glass sizes are 6-1/4" shorter than the specified ceiling height. NOTE: It is recommended to install the Glass Inserts adjacent to vertical posts first and make sure there is enough open space for the remaining Insert(s), then install the remaining Insert(s). For Glass Inserts adjacent to vertical posts, press the Insert into the post. It is recommended to use Windex to lubricate the glass panels before insertion, for easier adjustment. Install the Insert into position by placing it on top of the corresponding Plumbing Nuts. NOTE: Be very cautious with Glass Inserts. The edges are very sensitive and easily damaged. If the Clear Copolymer Strip option is being used, measure and cut to match Glass Insert heights. These are installed by removing the tape from the self-adhesive surfaces of the Strip and pressing into place along the edge of an installed Insert. Stand and plumb the next adjacent Glass Insert and slide it against the strip adhesive on the previously installed Insert to seal the gap between them. NOTE: For Glass Inserts that are 24" wide or less, there should be a Plumbing Nut near each edge of the Insert. For those that are larger than 24", there should be a Plumbing Nut near each edge of the Insert and one in the middle of the Insert. 28

29 Installing Glass Inserts - continued NOTE: Glass has a natural deflection (bow) to it (see table, below). This may result in a noticeable gap in mitered-corner applications, especially over 8' high. (Butt joints or Corner Posts are recommended for those applications.) Be sure to note the deflection of all adjacent Glass Inserts to help optimize glass alignment. As each Insert is positioned, plumb the Insert by rotating the corresponding Plumbing Nuts. Once plumbed, ensure that all Plumbing Nuts are tight to the bottom of the Insert. Lock the Insert in place by rotating (2) Glass Cams in the Crown Channel. If Glass Inserts do not align due to the bow in the glass, use 3-5 pieces of the supplied double sided tape to help with alignment. If these are used, apply them in consistent locations for the best appearance. If the system had any vertical posts that completed a frame around a single Insert, install the remaining vertical posts, as de-scribed in the Installing Door Jambs & Mid-Run Sub-Crown Posts section. Glass Deflection Tolerances Industry Standards 1/4" Glass 3/8" Glass 1/2" Glass 8' Doors 15/32" 9/32" 13/64" 9' Doors 17/32" 11/32" 9/32" 10' Doors 21/32" 15/32" 3/8" Installing Remaining Crown Covers Measure the distance between the full height posts and cut the Crown Covers for the other half of the Crown Channel. PLEASE NOTE THAT ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64". For clear corners, miter cut the Crown Cover to the angle specified on the Trend-way supplied drawings. This angle must match the installed angle of the Crown Channel. Install a Straight or Corner Alignment Bracket, if required. Install the Crown Cover and be sure that it completely snaps into place with the Crown Channel. Installing Floor Covers The Floor Cover cut dimensions can be pulled from the Trendway supplied drawings, however, it is highly recommended to verify the dimensions from the field marked layout. Measure the distance between the posts and cut the Floor Covers. PLEASE NOTE THAT ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64". For clear corners, miter cut the Floor Cover to the angle specified on the Trendway supplied drawings. This angle must match the installed angle of the Floor Channel. Install the Floor Covers into place by pressing them down onto the Floor Beam Saddles. To remove a Floor Cover, place a crowbar on the bottom leg of the Floor Cover. CAREFULLY press the Floor Cover up, working along its length. 29

30 Installing Glass Double Acting (Pivot) Doors Mount the Door Hinges to the Door Jambs with the provided 1/4"-20 Flat Head Screws. Remove the clamping half of the Door Hinge with a 5mm Allen Wrench and locate both the thinnest and thickest shims. Remove the backing of the double-sided tape on both halves of the Door Hinge, and adhere the thinnest shims to the tape. The Door Hinges lock in the 90 position. Press them into this position before installing the Glass Double Acting (Pivot) Door. Install the Glass Double Acting (Pivot) Door onto the Door Hinges and mount the previously removed Door Hinge half. NOTE: Do not completely tighten the mounting screws. Tighten them to the point that the Glass Double Acting (Pivot) Door does not shift. Cut the (4) legs off of the thickest shims. Lift the Glass Double Acting (Pivot) Door and wedge the shim legs between the Door Hinge and hinge cutout in the Glass Double Acting Door, both above and below each hinge. Carefully close the Door, making sure that it will not interfere with either Door Jamb. NOTE: As you close the Glass Double Acting (Pivot) Door, the Door Hinges will make a very loud banging sound, which sounds like the glass is breaking. The glass is fine. This noise indicates that the zero position of the Door Hinges has not been set. NOTE: Reference the instruction sheet that is supplied with the Door Hinges for more details. Adjust the Glass Double Acting Door so that there is an even gap along the handle side of the door and then completely tighten the mounting screws. Position the Glass Double Acting Door about 1/2" from the zero position, or center. Turn the set screw of the bottom Door Hinge, on one side of the Glass Double Acting Door, clockwise with a 1/8" flat screwdriver until the Glass Double Acting Door begins to move. Turn the set screw of the top Door Hinge, on the same side of the Glass Double Acting Door, clockwise until the Glass Double Acting Door reaches the zero position. Walk through the door. Position the Glass Double Acting Door to the zero position and turn the set screw of the bottom Door Hinge clockwise. Turn the set screw of the top Door Hinge clockwise. Walk through the door and retighten the setscrews on the first side. Check the final zero position by opening the door completely and letting it shut on its own. Install the Plastic Cover Caps on all Door Hinges. 30

31 Installing Wood and Aluminum Framed Sliding Doors NOTE: find detailed drawings in the Installation Instructions document INS485 on Trendealer. INSTALLING THE MORTISE LOCK 1. Using a small flat screwdriver, loosen the Mortise Cylinder Set Screws enough to al-low the Mortise Cylinders to be installed. 2. Insert the Mortise Lock into the routed pocket on the side of the Sliding Door. 3. Using the wood screws provided, mount the Mortise Lock to the Door, but do not fasten completely. 4. Place the 1/2 thick trim ring on the key Mortise Cylinder and screw it into the correct side of the Door until it is snug. 5. Carefully unscrew the Key Mortise Cylinder until the key is centered at the bottom. 6. Tighten the Mortise Cylinder Set Screw and check the function of the Lock. 7. Place the 1/8 thick Trim Ring on the Thumb Turn Mortise Cylinder and screw it into the other side of the Door until it is snug. 8. Carefully unscrew the Thumb Turn Mortise Cylinder until the Thumb Turn is centered at the bottom. 9. Tighten the Mortise Cylinder Set Screw and check the function of the Lock. 10. Tighten the Wood Screws that attach the Mortise Lock to the Door. 11. Install the Faceplate. INSTALLING THE SLIDING DOOR JAMB: 1. Put the Mortise Lock into the Locked position to expose the Deadbolt. 2. Measure the distance from the bottom of the Door to the top flat surface of the Dead bolt. 3. Add 15/16 to that dimension and make a note of this new dimension. 4. Locate the appropriate Sliding Door Jamb with the routed Lock Hole. NOTE: The Sliding Door Jambs have a routed lock hole. Be sure to cut the appropriate Sliding Door Jamb for the corresponding configuration. 5. Mark the Sliding Door Jamb with the dimension from the top of the routed Lock Hole. This will be the bottom of the Sliding Door Jamb. 6. Cut the Sliding Door Jamb at the mark. 7. Measure from the finished floor to the bottom of the installed Crown Cover at each location. NOTE: Due to floor run out, do not assume that every Jamb will be cut to the same height. 8. Cut the corresponding hole-less TrendWall Side Rail, Transition Post (if not installed), and Sliding Door Jamb off of the top of the jamb. ALL CUT LENGTHS ARE CRITICAL. ALL GAPS SHOULD BE LESS THAN 1/64. NOTE: The Sliding Door Jambs have a routed lock hole. Be sure to cut the appropriate Sliding Door Jamb for the corresponding configuration. 9. Mount the hole-less TrendWall Side Rail to the adjacent Transition Post by drilling a 1/8 hole through the Side Rail and Transition Post near the top, middle, and bottom and then using the supplied #10x3/4 screws. NOTE: The holes will be about 3/8 off-center on both parts. 10. Measure and mark a center hole location 3/4" from the top and 1-3/32 from the back face of the door groove of the Sliding Door Jamb. 11. Drill a 3/16 hole on the mark through (2) walls. 12. Attach the Track Support Block to the Sliding Door Jamb by aligning the top hole of the Track Support Block with a provided painted 1/4"-20 flat head screw. 13. Align the top surface of the Track Support Block parallel to the top of the Sliding Door Jamb. Drill the other 3/16 hole and fasten another provided painted 1/4-20 flat head screw. 14. Position the Sliding Door Jamb on the Side Rail so that the door groove is flush with the front face of the Crown Cover. Mark the hole locations on the Side Rail. 15. Remove the Sliding Door Jamb and drill a 3/16 hole at each mark. 16. Mount the Sliding Door Jamb to the Side Rail using the provided painted 1/4-20 flat head screws. 31

TrendWall Floor-To-Ceiling Panels Installation Instruction

TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Components Covered by this Instruction: Crown (and accessories) Floor Plate Solid Panel Filler Panel Wall Channel Door Section Pilaster

More information

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels Phone # 800-440-8785 www.lajolladoors.com La Jolla Doors Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels Thank you for choosing La Jolla Doors In this manual you will

More information

PORTA-FAB Cleanroom Wall Systems

PORTA-FAB Cleanroom Wall Systems PORTA-FAB Cleanroom Wall Systems FABLINE BATTEN 2000 INSTALLATION INSTRUCTIONS IMPORTANT Porta-Fab Advises A Thorough Reading of These Instructions Before Beginning Installation. INTRODUCTION Porta-Fab

More information

Lightline Movable Wall Installation Manual. Preliminary Draft #

Lightline Movable Wall Installation Manual. Preliminary Draft # Installation Manual Preliminary Draft #3 9-0-3 Table of Contents Parts Identification Tools Aluminum Extrusions Layout Typical Panel Installation Ceiling Channel Ceiling Corner Bracket Hard Floor Securing

More information

Frameless Inline Door With Return QCI5263

Frameless Inline Door With Return QCI5263 INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

Frameless Fixed Panel Slider

Frameless Fixed Panel Slider INSTALLATION INSTRUCTIONS Frameless Fixed Panel Slider QCI-5279 SINGLE ROLLER WITH ANTI-JUMP DOUBLE ROLLERS QCI5279 Rev Page Certified 08/09/6 Tools: To install your New Shower Enclosure, you may need

More information

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL The following information is provided by Plascore, Inc., as a general guideline for the installation of the F5075 Frame Wall System. This information

More information

Closet System Installation Manual

Closet System Installation Manual Closet System Manual Thank you For choosing our Custom Closet Collection to fit all your needs Closets come fully assembled to make your project an enjoyable and satisfying experience. With quality Custom

More information

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815) Steel Solutions USA 602 E. Walnut Street Watseka, IL 60970 p: (888) 875-5004 f: (815) 432-3364 sales@steelsolutionsusa.com Published February 2011 2011 Steel Solutions USA. All rights reserved. version

More information

Privacy Wall Glass Selections - Polished Edge Slider Door

Privacy Wall Glass Selections - Polished Edge Slider Door Privacy Wall Glass Selections - Polished Edge Slider Door 3/6" HEX BIT PUTTY KNIFE #2 ACR BIT SUCTION CUP HOLDERS DOOR LEAF: Satin Tempered Clear Tempered LOCTITE 425 SIDE LIGHT ETCHED GLASS STYLES: Satin

More information

FIXED PANEL SLIDER QCI5241

FIXED PANEL SLIDER QCI5241 INSTALLATION INSTRUCTIONS FIXED PANEL SLIDER QCI5241 FRAMELESS PANEL / DOOR / PANEL FRAMELESS DOOR / PANEL QCI5241 REV. 0 Page 1 Certified 06/16/2016 Parts List *Quantities may vary QCI5241 REV. 0 Page

More information

Frameless Inline Door QCI5250

Frameless Inline Door QCI5250 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5250 FRAMELESS PANEL / DOOR / PANEL QCI0249 REV. 3 Page 1 Certified 10/12/12 Parts List with pivot hinges *Quantities may vary. QCI0249 REV. 3 Page 2

More information

Frameless Bypass Slider

Frameless Bypass Slider INSTALLATION INSTRUCTIONS Frameless Bypass Slider QCI-5301 Heavy Glass Bypass Slider with Exposed Rollers QCI5301 Rev 0 Page 1 Certified 11/1/2016 Tools: To install your New Shower Enclosure, you may need

More information

UNIT No FRAMELESS PIVOT SHOWER DOOR

UNIT No FRAMELESS PIVOT SHOWER DOOR INSTALLATION INSTRUCTIONS UNIT No. 3600 FRAMELESS PIVOT SHOWER DOOR NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time QCI0020 Rev. 3 Page 1 of 8

More information

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A 1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com

More information

Assembly Instructions

Assembly Instructions Unite Panel System Hinge Door July 2016 #12 x / slotted hex washer head bolt Figure 1 threshold bracket frame Detail F threshold bracket threshold bracket (installed) #12 x / slotted hex washer head bolt

More information

Frameless Inline Door QCI5248

Frameless Inline Door QCI5248 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5248 FRAMELESS PANEL / DOOR / PANEL QCI5248 REV. 0 Page 1 Certified 06/16/2016 Parts List with glass to glass hinges *Quantities may vary. **Support Bar

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information on last page. Review

More information

Two Panel Frameless Bypass Door

Two Panel Frameless Bypass Door INSTALLATION INSTRUCTIONS Two Frameless Bypass Door Series 00 Please Record Model Number From Carton Label Here Please read these instructions carefully to familiarize yourself with the required tools,

More information

Frameless Heavy Glass Door with Header

Frameless Heavy Glass Door with Header INSTALLATION INSTRUCTIONS Frameless Heavy Glass Door with Header QCI5243 QCI5243 REV. 0 Page 1 Certified 06/16/16 Frameless Heavy Glass Door with Pivot Hinges ITEM NUMBER DESCRIPTION QUANTITY 1 DOOR GLASS

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last

More information

Frameless Inline Door QCI5254

Frameless Inline Door QCI5254 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied

More information

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay

More information

Frameless Bypass Slider

Frameless Bypass Slider INSTALLATION INSTRUCTIONS Frameless Bypass Slider QCI-5301 3/8 or 1/4 Glass Bypass Slider with Exposed Rollers QCI5301 Rev 1 Page 1 Certified 6/5/2017 Tools: To install your New Shower Enclosure, you may

More information

INSTALLATION MANUAL STOREFRONT DOORS

INSTALLATION MANUAL STOREFRONT DOORS INSTALLATION MANUAL STOREFRONT DOORS www.aluflam-usa.com SYSTEM DESCRIPTION - Extruded and filled aluminum framing, tested and approved by UL - 3-3/8 frame depth - Clear, fire-rated safety glazing - Door

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Special-Lite Restroom Partitions IMPORTANT - BEFORE YOU START... 1. Read through these installation instructions first to understand the order of work. 2. Check all components

More information

Installation And Care Instructions. Vertical Honeycomb Shades

Installation And Care Instructions. Vertical Honeycomb Shades Installation And Care Instructions Vertical Honeycomb Shades Rev 5/2013 Table Of Contents Getting Started... 3 Parts Overview... 4 Materials Required... 5 Tools Required... 6 Outside Mount Installation...

More information

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY COMPACT LAMINATE TOILET PARTITIONS 2080 DuraLineSeries 2180 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and

More information

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION

More information

YSD 400 Sliding Door System Installation Manual

YSD 400 Sliding Door System Installation Manual System Installation Manual 2006 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii PARTS DESCRIPTION

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLine Series 1180 DuraLine Series Class-A Fire Rated IMPORTANT: Review these instructions thoroughly prior to installation. FLOOR ANCHORED

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 1350 COMBAT SERIES TOILET PARTITIONS IMPORTANT: Review these instructions thoroughly prior to installation. In the United States: BOBRICK WASHROOM EQUIPMENT INC. 200 Commerce

More information

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

Preference Collection 5580 Treatment Console INSTALLATION GUIDE Preference Collection 5580 Treatment Console INSTALLATION GUIDE 0 WARNING Failure to install the 5580 as described in this installation guide may cause the unit to collapse, resulting in serious injury

More information

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283 FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283 QCI5283 Page 1 Date Certified: 06/16/2016 Parts List with wall mount clamp ITEM NO. DESCRIPTION QTY. 1 FIXED GLASS PANEL 1 2 WALL MOUNT CLAMP 1 3 U-CHANNEL

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. These instructions are intended for use with InPro s standard toilet partitions, which include 58 high doors and wall panels, when deviating from

More information

4-lite Patio Door. Installation Instructions

4-lite Patio Door. Installation Instructions 4-lite Patio Door Installation Instructions IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. Note: Only the 5-0 x 6-8

More information

Storefront Installation Guide

Storefront Installation Guide Storefront General Notes: 1. Check Contract Documents and Shop Drawings. Understand and clarify any Field Verify Notes and approvals of drawings and products to be familiar with the project. Installation

More information

INSTALLATION INSTRUCTION

INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION Soild Phenolic Series contents page 1080 DuraLineSeries...2-21 1180 DuraLineSeries...2-21 2080 DuraLineSeries Maximum Privacy...22-41 2180 DuraLineSeries Maximum Privacy...22-41

More information

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) IMPORTANT: Please read before you begin. Table of Contents

More information

Installation Instructions and Details

Installation Instructions and Details Installation Instructions and Details Contents Page General Notes 2 Typical System Perspective 3 Panel, Hardware & Trim Details 4-6 Hardware & Trim Fabrication Details 7-9 Installation Procedures 10-12

More information

Frameless Fixed Panel Slider QCI5279

Frameless Fixed Panel Slider QCI5279 Frameless Fixed Panel Slider QCI5279 F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com Frameless Fixed Panel

More information

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls) Installing your new Bevella Top L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls) Bevella RTI Countertops are engineered and manufactured to the highest quality standards, built

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

Thermally Broken Framing and Door Installation

Thermally Broken Framing and Door Installation INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems

More information

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

Laminate Cabinet Installation Instructions

Laminate Cabinet Installation Instructions Laminate Cabinet Installation Instructions www.easygaragestorage.com/installation How To Use These Instructions Thank you for your purchase! Please read each step of this manual thoroughly to ensure proper

More information

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

Frameless Inline Door QCI5288

Frameless Inline Door QCI5288 Frameless Inline Door QCI5288 QCI5288 Rev. 0 Page 1 Date Certified: 06/21/2016 Tools: To install your New Shower Enclosure, you may need the following: Pencil Drill Hack Saw Low Tack Tape 1/8 & 3/16 Drill

More information

Heavy Wall Applied Stop Tube Frame and Door Installation

Heavy Wall Applied Stop Tube Frame and Door Installation INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems

More information

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE: redi DOOR INSTALLATION INSTRUCTIONS tile redi Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE: 3000 Door-Door Header, sliding doors RDQCI5301

More information

A-935 RODA WALL MOUNT HINGES

A-935 RODA WALL MOUNT HINGES INSTALLATION INSTRUCTIONS A-935 RODA WALL MOUNT HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time FRAMELESS DOOR / PANEL CELESTA QCI0274 REV.

More information

Office Installation Guidelines

Office Installation Guidelines UH Structures Inc. dba Ebtech Industrial 2241 Industrial Drive Connellsville, PA 15425-6181 Telephone: 724-628-6100 Fax: 1-412-774-2429 www.ebtechindustrial.com Office Installation Guidelines INTRODUCTION

More information

Preference Collection and Treatment Console INSTALLATION GUIDE

Preference Collection and Treatment Console INSTALLATION GUIDE Preference Collection 5580.69 and 5580.96 Treatment Console INSTALLATION GUIDE WARNING Failure to install the 5580 as described in this installation guide may cause the unit to collapse, resulting in serious

More information

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232 INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232 QCI5232 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

YOW 225 TU Window System

YOW 225 TU Window System ThermaBond Plus Poured & Debridged Technology YOW 225 TU SYSTEM DESCRIPTION YOW 225 TU PERFORMANCE FEATURES 2-1/4 Overall Depth ThermaBond Plus Poured & Debridged Thermal Break Variations: Casement, Projected

More information

Installation Instructions

Installation Instructions by Plato Woodwork Installation Instructions Plato Woodwork, Inc. 200 Third Street SW P.O. Box 98 Plato, MN 55370 www.platowoodwork.com 800.328.5924 SECTION GUIDE GETTING STARTED PAGE # Installation Methods...

More information

Installation Instructions

Installation Instructions Installation Instructions Follow these simple instructions to install your OneDayCab! IMPORTANT: Unpack and check shipment for damage. Verify color, size and parts before demolition. Installation of interiors

More information

INSTALLATION INSTRUCTIONS. Unit No. 126, 726 Classic Pivot Panel/Door/Panel Shower Enclosure

INSTALLATION INSTRUCTIONS. Unit No. 126, 726 Classic Pivot Panel/Door/Panel Shower Enclosure INSTALLATION INSTRUCTIONS Unit No. 126, 726 Classic Pivot Panel/Door/Panel Shower Enclosure QCI0027 Rev. 0 Page 1 of 10 Certified 11/07/2006 MAINTENANCE: Two primary materials are used to manufacture your

More information

bridges Installation Manual

bridges Installation Manual bridges Installation Manual 0 OHSAS 800:007 CGSB #0HS-009 ISO 900:008 CGSB #96- ISO 00:00 CGSB #EMS-00 Global Contract Inc. 6 Petrolia Road North York, Ontario, MJ X8 Visit us on the Internet at globalcontract.com

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY HIGH PRESSURE LAMINATE (HPL) TOILET PARTITIONS 2030 TrimLineSeries 2040 DesignerSeries IMPORTANT: Storage and Handling Information on last page. Review these instructions

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS COMPACT LAMINATE TOILET PARTITIONS 1080 DuraLineSeries 1180 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information

More information

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS 3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. TOOLS NEEDED: Tape Measure

More information

Frameless Heavy Glass Door with Wall Mount Hinges

Frameless Heavy Glass Door with Wall Mount Hinges INSTALLATION INSTRUCTIONS Frameless Heavy Glass Door with Wall Mount Hinges QCI-5245 QCI5245 REV. 0 Page 1 Certified 06/16/16 Frameless Door with Wall Mount Hinges ITEM NUMBER DESCRIPTION QUANTITY 1 DOOR

More information

Installation Instructions

Installation Instructions Installation Instructions For Models: Model Number / Description File Name 1540 Classic Series P-Lam Toilet Partitions 1540.pdf 1 INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET PARTITIONS 1540 Classic

More information

INSTALLATION AND CARE INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS INSTALLATION AND CARE INSTRUCTIONS Vertical Applications Honeycomb Shades 52 C8-10-3401 Rev 2/14 CONTENTS Introduction...2 Before You Begin...3 Vertical Application Parts Overview...4 Materials Required...5

More information

Vinyl Sliding Glass Door Assembly Instructions

Vinyl Sliding Glass Door Assembly Instructions Vinyl Sliding Glass Door Assembly Instructions SERIES SGD 5470/5570 Para instrucciones en español, visite: http://bit.ly/pgtassemblyinstructions Parts List ITEM 4 5 6 7 8 9 0 4 5 6 7 8 SGD 5470/5570 PARTS

More information

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time ANGLED FRAMELESS PANEL / DOOR / PANEL

More information

Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS

Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS MAINTENANCE: Two primary materials are used to manufacture your new Basco enclosure: tempered glass and anodized

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

C.R. LAURENCE CO. INC Installation Instructions

C.R. LAURENCE CO. INC Installation Instructions IMPORTANT: PLEASE READ BEFORE INSTALLING THE WINDOW The following instructions will reduce your chances of experiencing problems during installation, and ensure smooth, trouble-free operation of these

More information

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com Step by Step Installation Instructions Poly Shutters Customer Service 800.248.8888 or visit us online at smithandnoble.com THANK YOU for purchasing from smith+noble. Your new window treatments have been

More information

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS.  DOORS/DRAWERS/LIDS DOORS/DRAWERS/LIDS 55 56 NOTES DOORS/DRAWERS/LIDS Swing s 73 74 NOTES INSTALLATION OF A GDM-SWING DOOR Phillips Head Screwdriver (2) - 1/8" Drift Punches (forged) Top Bracket NOTE: It may be necessary

More information

Double Swing Door With Header QCI5114

Double Swing Door With Header QCI5114 Double Swing Door With Header QCI5114 QCI5114 REV. 0 Page 1 of 9 Certified 06/22/2016 MAINTENANCE: Two primary materials are used to manufacture your new shower enclosure: tempered glass and anodized aluminum.

More information

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure INSTALLATION INSTRUCTIONS Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure QCI0235 Page 1 of 11 Certified 08/20/10 MAINTENANCE: Two primary materials are used to manufacture

More information

Shetland Stalls Installation Instructions

Shetland Stalls Installation Instructions Shetland Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 1/9/18 Before you start Kit can accommodate up to 12 wide stall front

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last

More information

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING JANUARY, 2014 1 INSTALLATION Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING INSTRUCTIONS 2 FRAME ASSEMBLY JANUARY, 2014 601442 SHEAR BLOCK BALL BEARING NRP BUTT (FACTORY APPLIED

More information

Double Frameless Swing Door QCI5247

Double Frameless Swing Door QCI5247 INSTALLATION INSTRUCTIONS Double Frameless Swing Door QCI5247 WALL MOUNT HINGES QCI5247 REV. 0 Page 1 Certified 06/16/2016 Parts List with wall mount hinges *Quantities may vary **Quantities double where

More information

1. TOOLS + MATERIALS REQUIRED

1. TOOLS + MATERIALS REQUIRED R INSTALLATION INSTRUCTIONS PRODUCT: BALDUR + ODEN CONFIGURATION: BI-PARTING DOOR MOUNT: TOP MOUNT Product is covered by U.S. patents. For more information visit www.krownlab.com. TOOLS + MATERIALS REQUIRED

More information

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A 1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com

More information

INOVO 2-LITE SLIDING PATIO DOOR

INOVO 2-LITE SLIDING PATIO DOOR INOVO 2-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05 QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05 MAINTENANCE: Two primary materials are used to manufacture your new Basco enclosure: tempered glass and anodized aluminum. To assure a long lasting finish

More information

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4 VYTEX PREMIUM SLIDING GLASS DOOR Table of Contents Precautions and Safety 2 Tools Required...3 Inspect and Prepare Door...4 Hardware and Parts Check List....4 Master Frame Assembly 5 Master Frame Installation..7

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS TOOLS REQUIRED Rechargeable, variable speed drill 3/8 diameter drill bit 3 Robertson bits #0, #1 and #2 Slot screwdriver Non marring hammer with 1 head Level Caulk or sealant

More information

Sliding Glass Door Assembly and Installation Guide

Sliding Glass Door Assembly and Installation Guide Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all

More information

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation SL-450TB (2" x 4-1/2" with 1" Glazing) & SL-600TB (2" x 6" with 1" Glazing) IMPORTANT: Read all instructions before beginning installation.

More information

a.k.a. casegoods instructions

a.k.a. casegoods instructions a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly

More information

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit R INSTALLATION INSTRUCTIONS PRODUCT: LOKI CONFIGURATION: SINGLE DOOR MOUNT: GLASS MOUNT Product is covered by U.S. patents. For more information visit www.krownlab.com . TOOLS + MATERIALS REQUIRED TOOLS

More information

EURO (3876) Euro-C2 Installation Instructions Euro-Wall Systems, LLC

EURO (3876)   Euro-C2 Installation Instructions Euro-Wall Systems, LLC 888.989.EURO (3876) www.euro-wall.com Euro-C2 Installation Instructions Installation Instructions Euro-C2 step A.1) Assemble Bottom corner Pre-caution: it is recommended to use screw wax to prevent screw

More information

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure INSTALLATION INSTRUCTIONS 675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure Call Technical Dept @ 1-800-452-2726 QCI1003 Page 1 of 9 Certified 10/01/09 INSTALLATION NOTES: Unpack your unit carefully

More information

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( )

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( ) INSTALLATION INSTRUCTIONS 935 RODA DOUBLE ROLLERS FRAMELESS DOOR NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday VINESSE QCI0286 1 XX/XX/XXXX 935 Roda Parts List With double rollers

More information

Cabinetry Installation

Cabinetry Installation Cabinetry Installation Easy to follow step-by-step kitchen cabinet installation Hammer Pry bar Screwdriver Phillips Flathead Level TOOL AND MATERIAL LIST Tape measure Pencil Straight edge Drill 3/16" drill

More information

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST INSTALLATION INSTRUCTIONS UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST QCI0240 Page 1 of 13 Certified 8/2/10 INSTALLATION NOTES: Unpack your

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS BUILDERS CHOICE FRAMED Bypass Door Model: L0516 (Tub Height), L0517 (Shower Height) Rev. 09.20.13 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage.

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information

OXYGEN INSTALLATION. Revision date

OXYGEN INSTALLATION. Revision date 12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex

More information

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A 1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com

More information