1 CONSTRUCTION OCUMENTS FOR ARCHITECT STRUCTURAL ENGINEER 67 PURTIS CREEK LANE TELEPHONE (52) BUILER CONSTRUCTION OCUMENTS RAWING INEX: GENERAL RAWINGS COVER COVER SHEET NOTES GENERAL NOTES FASTENER FASTENER SPECIFICATION CONCRE CONCRETE GENERAL NOTES ARCHITECTURAL RAWINGS A0 FLOOR PLAN STRUCTURAL RAWINGS S0 FIRST FLOOR WALLS AN JOISTS S02 SECON FLOOR JOISTS S0 ROOF S04 FOUNATION S05 FOUNATION ETAILS S06 BRACE WALL PLAN S07 FRAMING AN BRACE WALL ETAILS X COVER SHEET //207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 NONE XX.WG COVER
2 COORINATION CAST IN PLACE CONCRETE ABBREVIATIONS. THE ETAILS ESIGNATE AS "GENERIC" ETAILS APPLY GENERALLY TO THE RAWINGS IN ALL AREAS WHERE CONTIONS ARE SIMILAR TO THOSE ESCRIBE IN THE ETAILS. 2. THE ESIGN AN PROVISION OF ALL TEMPORARY SUPPORTS SUCH AS GUYS, BRACES, FALSEWORK, SUPPORTS AN ANCHORS FOR SAFETY LINES, CRIBBING OR OTHER TEMPORARY ELEMENTS REQUIRE FOR THE EXECUTION OF THE CONTRACT ARE NOT INCLUE IN THESE RAWINGS AN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. TEMPORARY SUPPORTS SHALL NOT RESULT IN THE OVERSTRESS OR AMAGE OF THE ELEMENTS TO BE BRACE NOR ANY ELEMENTS USE AS BRACE SUPPORTS. COES. BUILING COE: 202 INTERNATIONAL BUILING COE AN 205 INTERNATIONAL RESIENTIAL COE 2. STRUCTURAL CONCRETE: BUILING COE REQUIREMENTS FOR REINFORCE CONCRETE, AMERICAN CONCRETE INSTITUTE ACI STURCTURAL STEEL: STEEL CONSTRUCTION MANUAL, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, THIRTEENTH EITION, AS ESIGN LOAS. LIVE LOAS: A. WIN LATERAL LOAS ON THE STRUCTURAL FRAME ARE BASE ON ASCE 7-0, AN INCLUE THE FOLLOWING: BASIC WIN SPEE MPH EXPOSURE... B IMPORTANCE FACTOR B. STANAR LIVE LOA FROM ASCE 7-0 UNINHABITABLE ATTICS W/O STORAGE... 0 PSF UNINHABITALBE ATTICS W/ STORAGE PSF HABITABLE ATTICS & SLEEPING AREAS... 0 PSF ALL OTHER AREAS EXCEPT STAIRS AN BALCONIES PSF 2. EA LOAS INCLUE THE SELF WEIGHT OF THE STRUCTURAL ELEMENTS.. SEISMIC ESIGN PARAMETERS - SEISMIC LATERAL LOA ON THE STRUCTURAL FRAME IS BASE ON THE FOLLOWING: A. IMPORTANCE FACTOR, IE B. OCCUPANCY CATEGORY... II C. MAPPE SPECTRAL RESPONSE ACCELERATIONS SS %g S.... %g. SITE CLASS... E. SPERCTRAL RESPONSE COEFFICIENTS SS %g S %g F. SEISMIC ESIGN CATEGORY... A G. SEISMIC FORCE RESISTING SYSTEM.. Light framed walls with shear panels H. RESPONSE MOIFICATION FACTOR, R 2 2 I. SEISMIC RESPONSE COEFFICIENT, Cs 2.2 %g J. ANALYSIS PROCEURE EQUIVALENT LATERAL FORCE ANALYSIS HEAER BEAMS. HEAER BEAMS MAY USE EITHER CONSTRUCTION METHO SHOWN AS A ETAIL ON SHEET S. 2. HEAERS SHALL BE PLACE OVER EACH WINOW AN OOR OPENING AN SHALL BE SUPPORTE BY A SINGLE TRIMMER MEMBER ON EACH SIE OF OPENING.. HEAER BEAMS ARE NOT SHOWN ON RAWINGS BY ARE LISTE IN THE "HEAER BEAM SCHEULE ON THIS SHEET. HEAERS ARE LISTE BY OPENING SIZE. 4. IF THE FILLER OPTION IS CHOSEN THE FILLER SHALL BE WITHIN 4" OF ALL EGES OF THE HEAER BEAM.. CAST IN PLACE CONCRETE SHALL MEET THE FOLLWOING REQUIREMENTS: SLAB CLASS 28 AY AGGREGATE SLUMP USE STRENGTH TYPE SIZE A 4,000 PSI C 4" MAX 4" - FLOOR CLASS A STANAR WEIGHT STRUCTURAL CONCRETE (~50 PCF) 2. CONCRETE MAY HAVE UP TO 20% FLY ASH REPLACEMENT OF PORTLAN CEMENT BY WEIGHT. FLAY ASH SHALL BE ASTM 68 TYPE "C" OR "F".. PROVIE 4 2 % ± 2% OF ENTRAINE AIR IN CONCRETE PERMANANENTLY EXPOSE TO THE WEATHER AN ELSEWHERE AT THE CONTRACTOR'S OPTION. 4. SUMITTAL; SUBMIT PROPOSE MIX ESIGNS IN ACCORANCE WITH ACI 0, CHAPTER.9 EACH PROPOSE MIX ESIGN SHALL BE ACCOMPANIE BY A RECOR OF THE PAST PERFORMANCE BASE ON AT LEAST 0 CONSECUTIVE STRENGTH TESTS, OR BY THREE LABORATORY TRIAL MIXTURES WITH CONFIRMATION TESTS. CONCRETE REINFORCEMENT. REINFORCING STEEL SHALL BE EFORME NEW BILLET STEEL BARS IN ACCORANCE WITH ASTM A65 GRAE 60 U.N.O. 2. WELING OF REINFORCING STEEL WILL NOT BE PERMITTE.. HEAT SHALL NOT BE USE IN THE FABRICATION OR INSTALLATION OF REINFORCEMENT. 4. REINFORCING STEEL CLEAR COVER SHALL BE " AT SIES & BOTTOM OF RILLE PIERS AN 2" AT THE TOP OF THE PIER. STRUCTURAL STEEL. MATERIAL SPECIFICATIONS; A. STRUCTURAL STEEL WIE FLANGE SHAPES SHALL CONFORM TO ASTM 992 OR ASTM A6 WHERE NOTE. B. PLATES ANGLES, CHANNELS, AN S-SHAPES SHALL CONFORM TO ASTM A6/A (UAL GRAE) C. STEEL PIPE SHALL CONFORM TO ASTM A5 GRAE B, Fy = 5 KSI. RECTANGULAR STEEL TUBING SHALL CONFORM TO ASTM A500 GRAE B Fy=46 KSI E. ROUN STEEL TUBE SHALL CONFORM TO ASTM A500 GRAE B Fy = 42 KSI 2. COLUMN BASE PLATES SHALL BE GROUTE WITH PREMIXE CEMENTITIOUS COMPOUN CONTAINING NON-METTALIC AGGREGATE AN CAPABLE OF EVELOPING A MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI IN 28 AYS. GROUT SHALL CONFRM TO ASTM C07, GRAE "B" WHEN TESTE AT A FLUI CONSISTENCY. THE FOLLOWING PROUCTS ARE ACCEPTABLE: A. "EUCO NS" EUCLI CHEMICAL COMPANY B. "MASTERFLOW 7 PLUS" BY BASF CONSTRUCTION CHEMICALS. SPLICING OF STRUCTURAL STEEL MEMBERS IS PROHIBITE WITHOUT PRIOR APPROVAL OF THE ENGINEER AS TO THE LOCATION AN TYPE OF SPLICE TO BE MAE. ANY MEMBER HAVING A SPLICE NOT SHOWN AN ETAILE ON SHOP RAWINGS WILL BE REJECTE. 4. SHOP PAINTING: NO PAINT REQUIRE. STRUCTURAL STEEL CONNECTIONS BM. BTM BTWN BOM BOS CL CJP CONT. CONV. CLR ET IA IAG N WG EA EQ EW EL FS FV GALV GNRL GRTG HORIZ HS HSS IP KB L LLBB LLH LLO LLV LOCS LSH LSV MAX MECH'L MFG MIN N N/A NOM NO NS NTS OC OH OVS PJP PL REQ' BEAM BOTTOM BETWEEN BILL OF MATERIALS BOTTOM OF STEEL CENTER LINE COMPLETE JOINT PENETRATION (GROOVE WEL) CONTINUOUS, CONTINUE CONVEYOR CLEAR ETAIL IAMETER IAGONAL OWN RAWING EACH EQUAL EACH WAY ELEVATION FAR SIE FIEL VERIFY GALVANIZE() GENERAL GRATING HORIZONTAL HEAE STU HOLLOW STRUCTURAL STEEL IN PLACE KNEE BRACE ANGLE LONG LEG BACK TO BACK LONG LEG HORIZONTAL LONG LEG OUTSTANING LONG LEG VERTICAL LOCATIONS LONG SIE HORIZONTAL LONG SIE VERTICAL MAXIMUM MECHANICAL MANUFACTURER MINIMUM NEW NOT APPLICABLE NOMINAL NUMBER NEAR SIE / NON-SHRINK NOT TO SCALE ON CENTER OPPOSITE HAN OVERSIZE PARTIAL JOINT PENETRATION (GROOVE WEL) PLATE REQUIRE JOISTS. ALL FLOOR JOISTS ARE REQUIRE TO EITHER HAVE AN EGE BAN OR BLOCKING INSTALLE BETWEEN EACH JOIST. ALONG THE PERIMETER WALLS. 2. FLOOR JOISTS GREATER THAN 6' ARE TO HAVE, ATA MINIMUM, BLOCKING INSTALLE NEAR THE CENTER OF THE JOIST. STAIRS. STAIR STRINGERS ARE TO BE ATTACHE TO WALL SECTIONS WHERE THEY CROSS STUS. 2. IT IS ACCEPTABLE TO ATTACH AN INTERMEIATE PLY TO WALL STUS AN FASTEN STAIR STRINGER TO INTERMEIATE PLY.. THE STAIR STRINGER IS TO BE ATTACHE TO SUPPORTING STRUCTURE USING 0d COMMON NAILS OR EQUIVALENT. WHERE POSSIBLE TWO (2) FASTENERS ARE TO BE INSTALLE ROUGHLY EQUALLY SPACE AN NO CLOSER THAN 2" FROM THE FREE EGE OF THE STRINGER. 4. STAIR HEAER IS TO BE ATTACHE WITH FOUR (4) 0d OR EQUIVALENT FASTENERS, EQUALLY SPACE AN NO CLOSER THAN 2" FROM THE FREE EGE IN EACH STRINGER BAY. ROOF. ALL RAFTERS ARE TO BE FASTENE TO THE COMPANION JOIST OR THE JOIST IS TO BE E AT THE INTERIOR AN EXTERIOR WALLS. 2. IF THE JOIST AN RAFTER ARE NOT CONNECTE BLOCKING SHALL BE INSTALLE TO PREVENT ROTATION OF THE JOIST OR RAFTER.. ROOF ECKING IS TO BE FASTENE IN COMPLIANCE WITH IBC 202 REQUIREMENTS AN IS TO USE PLYWOO CLIPS BETWEEN ECKING SHEETS INSTALLE PER MANUFACTURER'S RECOMMENATION. 4. ALL RAFTERS ARE TO BE CONNECTE TO THE TOP PLATE USING SIMPSON H2.5T.. WELING SHALL CONFORM TO ANSI/AWS. LATEST EITION. 2. BOLTS SHALL CONFORM TO ASTM A25. BOLTS SHALL BE ESIGNE USING VALUES FOR BEARING TYPE CONNECTIONS WITH THREAS ALLOWE IN THE SHEAR PLANE.. ANCHOR BOLTS SHALL BE: ASTM F554 GR BOLTS SHALL BE "SNUG TIGHT", U.N.O. 5. SHORT SLOTTE HOLES SHALL BE PERMITTE. PROVIE HARENE WASHERS ARE INSTALLE IN ACCORANCE WITH AISC REQUIREMENTS. 6. FILLET WEL WITH NO SIZE SPECIFIE SHALL BE 6 " OR MINIMUM SIZE REQUIRE BY AISC, WHICHEVER IS LARGER. MATERIAL MINIMUM THICKNESS FILLET WEL UP TO 2" OVER 2" TO 4" 4" OVER 4" 5 SCH SIM SLBB SLO STIFF SUPT THR T&B TO TOC TOP TOS TOSC TYP UNO VERT VB WF WP WW 2L SCHEULE SIMILAR SHORT LEG BACK TO BACK SHORT LEG OUTSTANING STIFFENER SUPPORT THREAE TOP AN BOTTOM TOP OF... TOP OF CENTER TOP OF PIPE TOP OF STEEL TOP OF STRUCTURAL CONCRETE TYPICAL UNLESS NOTE OTHERWISE VERTICAL VERTICAL BRACE WIE FLANGE WORKING POINT WATER WALL OUBLE ANGLE GENERAL NOTES //207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 NONE.WG NOTES
3 FASTENER SCHEULE CONNECTION FASTENING a,m LOCATION. JOIST SILL OR GIRER - 8d COMMON (2 2" X 0.") - " X 0." NAILS - " 4 GAUGE STAPLES 2. BRIGING TO JOIST 2-8d COMMON (2 2" X 0.") 2 - " X 0." NAILS 2 - " 4 GAUGE STAPLES. "X SUBFLOOR OR LESS TO EACH JOIST 4. WIER THAN "X SUBFLOOR TO EACH JOIST 5. 2" SUBFLOOR TO JOIST OR GIRER 6A.SOLE PLATE TO JOIST OR BLOCKING 6B. SOLE PLATE TO JOIST OR BLOCKING AT BRACE WALL PANEL EACH EN 2-8d COMMON (2 2" X 0.") - 8d COMMON (2 2" X 0.") 2-6d COMMON ( 2" X 0.62") BLIN AN 6d ( 2"X O.C. "X 0." 8" O.C. "4 GAUGE 2"O.C. -6d( 2"X O.C. 4-"X 0." O.C. 4-" 4 GAUGE STAPLES 7. TOP PLATE TO STU 2-6d COMMON( 2"X 0.62") -"X 0." NAILS -" 4 GAUGE STAPLES 8A. STU TO SOLE PLATE 4-8d COMMON (2 2"X 0.") 4-"X 0." NAILS -" 4 GAUGE STAPLES 8B. STU TO SOLE PLATE 2-6d COMMON ( 2"X 0.62") -"X 0." NAILS -" 4 GAUGE STAPLES 9. OUBLE STUS 6d ( 2"X 24" O.C. "X 0." O.C. " 4 GAUGE 8"O.C. 0A. OUBLE TOP PLATES 6d ( 2"X O.C. "X 0." O.C. " 4 GAUGE 2"O.C. 0B. OUBLE TOP PLATES 8-6d COMMON ( 2"X 0.62") 2-"X 0." NAILS 2-" 4 GAUGE STAPLES. BLOCKING BETWEEN JOIST OR RAFTERS TO TOP PLATE -8d COMMON (2 2"X 0.") -"X 0." NAILS -" 4 GAUGE STAPLES 2. RIM JOIST TO TOP PLATE 8d (2 2"X O.C. "X 0." O.C. " 4 GAUGE TOP PLATES, LAPS AN INTERSECTIONS 4. CONTINUOUS HEAER, TWO PIECES 2-6d COMMON ( 2"X 0.62") -"X 0." NAILS -" 4 GAUGE STAPLES 6d COMMON ( 2"X 0.62") 5. CEILING JOISTS TO PLATE - 8d COMMON (2 2"X 0.") 5- " X 0." NAILS 5- " 4 GAUGE STAPLES TYPICAL BRACE WALL PANELS EN NAIL EN NAIL TYPICAL LAP SPLICE O.C. ALONG EGE 6. CONTINUOUS HEAER TO STU 4-8d COMMON (2 2"X0.") FASTENER SCHEULE CONNECTION FASTENING a,m LOCATION A. WOO STRUCTURAL PANELS AN PARTICLEBOAR; SUBFLOOR ROOF AN WALL SHEATHING TO FRAMING B. SINGLE FLOOR (COMBINATION SUBFLOOR-UNERLAYMENT TO FRAMING) 2" AN LESS 6d c,l 2 8 " X 0." NAILn 4" 6 GAUGE STAPLE o 9 2 " TO 4" 8d OR 6d e 2 8 " X 0." NAILp 2" 6 GAUGE STAPLE p 7 8 " TO " 8d c 8 " TO 4" 0d d OR 8d e 4" AN LESS 6d e 7 8 " TO " 8d e 8 " TO 4" 0d d OR 8d e 2. PANEL SIING TO FRAMING 2 " OR LESS 6d f 5 8 " 8d f. FIBERBOAR SHEATHING 2 " No. GAUGE ROOFING NAIL h 4. INTERIOR PANELS 4 " 4d j 6d COMMON NAIL (2"X 0.") No. 6 GAUGE STAPLES i 25 2 " No. GAUGE ROOFING NAIL h 8d COMMON NAIL (2 2"X0.") No. 6 GAUGE STAPLES i 8 " 6d k a. Common or box nails are permitted to be used except where otherwise stated. b. Nails spaced at 6 inches on center at edges, 2 inches at intermediate supports except 6 inches at supports where spans are 48 inches or more. For nailing wood structural panel and particleboard diaphrams and shear walls refer to IBC section 205. Nails for wall sheathing are permitted to be common, box or casing. c. Common or deformed shank (6d " x 0.", 8d 2 2" x 0.", 0d " x 0.48"). d. Common (6d " x 0.", 8d 2 2 " x 0.", 0d " x 0.48"). e. eformed shank (6d " x 0.", 8d 2 2" x 0.", 0d " x 0.48"). f. Corrosion resistant (6d 7 8 " x 0.0, 8d 2 8 " x 0.28") or casing (6d 2" x 0.099", 8d 2 2" x 0.") nail. g. Fasteners spaced inches on center at exterior edges and on center at intermediate supports, when used as structural sheathing. Spacing shall be 6 inches on center on the edges and 2 inches on center at intermediate supports for nonstructural applications. h. Corrosion resistant roofing nails with 6 7 2" length for 2" sheathing and 4" length for 25 2 " sheathing. i. Corrosion resistant staples with nominal 6 7 4" length for 2" sheathing and 2" length for 25 2 " sheathing. j. Casing ( 2" x 0.080") or finish ( 2" x 0.072") nails spaced 6 inches on panel edges, 2 inches at intermediate supports. k. Panel supports at 24 inches. Casing or finish nails spaced 6 inches on panel edges, 2 inches at intermediate supports. l. For roof sheathing applications, 8d nails (2 2" x 0.") are the minimum required for wood structural panels. m. Staples shall have a minimum crown width of 7 6 ". n. For roof sheathing applications, fasteners spaced 4 inches on center at edges, 8 inches at intermediate supports. o. Fasteners spaced 4 inches on center at edges, 8 inches at intermediate supports for subfloor and wall sheathing and inches on center at edges, 6 inches at intermediate supports for roof sheathing. p. Fasteners spaced 4 inches on center at edges, 8 inches at intermediate supports. HEAER BEAM SCHEULE OPENING SIZE HEAER EPTH (in.) PLYS '-0" 4 2 '-8" 6 2 2'-0" 6 2 2'-4" 8 2 2' '-8" 0 2 '-0" 0 2 4'-0" 2 2 4' '-0" 2 2 HANGER SCHEULE LOCATION SIMPSON PN QUANTITY H SUL20 H2 LU20 0 H U T 4 H4 ABU44Z (POST BASE) H5 ACE-4 ( SET) H6 HUC22-2 H7 LU28 8 H8 LU26 LU24 7 NOTE: ALL CEILING AN FLOOR JOISTS ALONG THE EXTERIOR WALL ARE REQUIRE TO BE BRACE USING ONE () SIMPSON H2.5T PER JOIST. 7. CEILING JOIST LAPS OVER PARTITIONS 8. CEILING JOISTS TO PARALLEL RAFTERS - 6d COMMON ( 2"X 0.62") MINIMUM 4- "X 0." NAILS 4- " 4 GAUGE STAPLES - 6d COMMON ( 2"X 0.62") MINIMUM 4- "X 0." NAILS 4- " 4 GAUGE STAPLES 9. RAFTERS TO PLATE - 8d COMMON (2 2"X 0.") - "X 0." NAILS - " 4 GAUGE STAPLES 20. " IAGONAL BRACE TO EACH STU AN PLATE 2. " X 8" SHEATHING TO EACH BEARING 2-8d COMMON (2 2"X 0.") - "X 0." NAILS - " 4 GAUGE STAPLES - 8d COMMON (2 2" X 0.") 22. WIER THAN " X 8" SHEATHING TO EACH BEARING - 8d COMMON (2 2" X 0.") 2. BUILT UP CORNER STUS 6d COMMON( 2"X0.62") "X0." NAILS " 4 GAUGE STAPLES 24A. BUILT-UP GIRER AN BEAMS 20d COMMON (4" X 2"O.C. " X 0." 24" O.C. " 4 GAUGE 24"O.C. 24B. BUILT-UP GIRER AN BEAMS 2-20d COMMON ( 2" X 0.92") - " X 0." NAILS - " 4 GAUGE STAPLES 24" O.C. O.C. O.C. AT TOP AN BOTTOM STAGGERE ON OPPOSITE SIES AT ENS AN AT EACH SPLICE 25. 2" PLANKS 6d COMMON ( 2"X0.62") AT EACH BEARING 26. COLLAR TIE TO RAFTER -0d COMMON ("X0.48") 4-"X0." NAILS 4-" 4 GAUGE STAPLES 27A. JACK RAFTER TO HIP -0d COMMON("X0.48") 4-"X0." NAILS 4-" 4 GAUGE STAPLES 27B. JACK RAFTER TO HIP 2-6d COMMON ( 2"X0.62") -"X0." NAILS -" 4 GAUGE STAPLES 28A. ROOF RAFTER TO 2X RIGE BOAR 28B. ROOF RAFTER TO 2X RIGE BOAR 2-6d COMMON ( 2"X0.62") -"X0." NAILS -" 4 GAUGE STAPLES 2-6d COMMON ( 2"X0.62") -"X0." NAILS -" 4 GAUGE STAPLES 29. JOIST TO BAN JOIST -6d COMMON ( 2"X0.62") 4-"X0." NAILS 4-" 4 GAUGE STAPLES 0. LEGER STRIP -6d COMMON ( 2"X 0.62") 4 - "X 0." NAILS 4 - " 4 GAUGE STAPLES AT EACH JOIST FASTENER SPECIFICATIONS //207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 NONE t.wg FASTENER
4 80 90 BAR ESIGNATION INSIE BEN IAMETER '' 90 HOOK 'A' OR 'G' 'A' OR 'G' 80 HOOK 'J' # " 7" 4" #4 " 8" 7" 5" #5 4" 0" 8" #6 5" 2" 9" 7" #7 4" 0" 8" #8 " 8" #9 9" 8" 5" " #0 0" 20" 7" 2" # " 25" 22" 7" #4 7" " 27" 2" #8 22" 40" 4" 27" STANAR EN HOOKS BASIC LAP SPLICE LENGTHS ( d) BAR ESIGNATION COMPRESSION (ALL BARS) TOP BARS CLASS 'A' TENSION CLASS 'B' CLASS 'C' # 2" " #4 2" 7" #5 5" 2" #6 8" 25" #7 2" 2" #8 0" 42" #9 8" 5" 90 BAR ESIGNATION # #4 46 #6 & > INSIE BEN IAMETER '' 45 (TO BE USE ONLY WHEN SPECIFICALLY ETAILE) 90 HOOK 'A' OR 'G' 4" 4" STANAR HOOK 'A' OR 'G' STANAR STIRRUP & TIE HOOKS " 5 5 HOOK 'H'(APPROX) 4" ". 2. #0 48" 67" # 59" 8" FACTORS MUST BE APPLIE TO THE BASIC EVELOPMENT LENGTH, d, AS TABULATE ABOVE FOR FOLLOWING SPECIAL CONITIONS OF USE: (a) STRUCTURAL LOW-ENSITY CONCRETE - MULTIPLY BY. (b) STRUCTURAL SEMI-LOW-ENSITY CONCRETE - MULTIPLY BY.8 (c) TOP (HORIZONTAL) BARS WITH MORE THAN 2" EPTH OF CONCRETE CAST BELOW THEM - MULTIPLY BY.4 (d) BARS SPACE c/c OR MORE - MULTIPLY BY 0.8 (e) EXCESS AREA OF STEEL - MULTIPLY BY THE RATIO OF THE AREA A S REQUIRE/A PROVIE S AFTER MULTIPLICATION BY ALL APPLICABLE FACTORS, THE STRAIGHT BAR EVELOPMENT LENGTH, d, SHALL NOT BE TAKEN AS LESS THAN 2" CONCRETE GENERAL NOTES //207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 NONE.WG CONCRETE
5 24' " " 5' 9'- 5 8 " " 9'- 7 8 " 0'-4" 7'- 7 8 " 7'- 8 " '-2" '-2" 5'-6 2 " 6'-4" 5' '- 5'-4" 7' 0'-4" 5' '- 7 8 " 5' '-2" 4' " 9' 7'-2 2 " '-0" '-4" 2'-8" 5' '- '-2" 29'-2" 2 '-2" '-8" 29'-2" 5' " '-2" 2'- 5' " 2'-4" '-0" 4'-0" 4'-4" 9' 2'-" 4' '-2" 4'-4" 0" '-7 7 " '-2" '-2" 8 '- 7 " '- 9' 8 27' " SECON FLOOR PLAN VIEW FIRST FLOOR PLAN VIEW FLOOR PLAN 8/26/207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 /8" = '.WG A0
6 2 " 4'-4" 2 " 4'-" '-2" "h"+ "h" "h" -" B5 6 O.C. 9'- 5 8 " '-2 2 " '-4" '-4" 4" 7 6 " H7 H7 H7 H7 H7 H7 H7 H7 H7 H7 H7 2x6 LEGER BOAR H7 H7 H7 H7 H7 H7 H7 HEAER OPTION ETAILS " = '-0" SEE HEAER SCHEULE ON THE FASTENER SPECIFICATION SHEET 7 6 " STAIR LANING ETAILS 4" = '-0" 4 6 " 2'-6 2 " '-4 4 " 5'-7 8 " 6 O.C. '-2" '-4 4 " 6 O.C. 0" 5'-6 8 " '-0 2 " B4 6 O.C. 2'-2" 7 6 " 7 4 " 4' 2'-2 8 " 4' -0 6 " 2'-4" 6 O.C. 6 O.C. 4' 7 6 " 2'-" 4'- H H2 H2 H2 H2 H2 H2 H2 6 O.C. '-0 2 " B H H H H FLOOR JOIST LAYOUT FIRST FLOOR 2 " = ' 0" 9'-4" 6 O.C. 9' " B2 H2 H2 B H2 H6 H4H5 4'-0 8 " BEAM SCHEULE CALLOUT THICKNESS (in.) EPTH (in.) PLYS SPACER (in.) B 2 2 NONE B '-0 /2" B NONE B4 2 2 NONE B '-0 /2" STAIR STRINGER ETAILS 4" = '-0" NOTES: ALL LUMBER IS TO BE COMMOITY GRAE OR BETTER. FIRST FLOOR WALLS AN JOISTS //207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 /2"=' 0".WG S0
7 NOTES: ALL LUMBER IS TO BE COMMOITY GRAE OR BETTER. ' " 6 O.C. 6 O.C. 4'-" 6 O.C " 6 O.C. 0'-0" H8 6 O.C. 6 O.C. 6 O.C. 2'- 7 8 " 7'-4" CEILING JOIST LAYOUT SECON FLOOR 2 " = '-0" SECON FLOOR JOISTS 8/26/207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 /2"=' 0".WG S02
8 6 O.C. NOTES:. ALL LUMBER IS TO BE COMMOITY GRAE OR BETTER. 2. ALL RAFTERS ARE TO BE ATTACHE IN COMPLIANCE WITH IBC 202 REQUIREMENTS.. RIGE BOAR IS TO HAVE A MINIMUM OF A 2X4 BRACE EXTENING TO THE WALL TOP PLATE ON EACH EN AN AITIONAL BRACES AT A SPACING NO GREATER THAN 0'. 4. ANY REQUIRE SPLICES IN RIGE BOAR REQUIRE A LAP SPLICE EXTENING A MINIMUM OF PAST BOTH SIES OF THE SPLICE LOCATION. SPLICES REQUIRE A MINIMUM OF () 0d COMMON FASTENERS ON EITHER SIE OF SPLICE. 5. HIP RAFTER IS TO BE BRACE AT THE JUNCTION OF THE HIP TO THE COMMON RAFTER AN NO MORE THAN 0' BETWEEN BRACE POINTS. 6. ECKING IS TO BE 5 8 " THICK AN SHALL HAVE PLYWOO CLIPS INSTALLE BETWEEN SHEETS OF ECKING PER THE MANUFACTURER'S RECOMMENATION. 7. FASTENING OF THE ROOF ECKING IS TO COMPLY WITH IRC 205 REQUIREMENTS. 8/2 SLOPE 2x8 HIP RAFTER 9'- 5 8 " 8/2 SLOPE 8/2 SLOPE 6 O.C. 2x8 RIGE BOAR 6 O.C. 8/2 SLOPE 2x4 LEGER BOAR /2 SLOPE 6 O.C. 6 O.C. - 4 " ROOF LAYOUT 2 " = ' 0" ROOF 8/26/207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 /2"=' 0".WG S0
9 24' " 5" '- 2" Min. CLR Cover 7" max 2 " ' '- 9'- 5 8 " 2" BELOW HOUSE ELEVATION 2" BELOW HOUSE ELEVATION " Min. CLR Cover Min. CLR Cover Both Sides ' SEE LAYOUT Perimeter Beam Section SCALE: 2"=' '- 4' " 5" 4' " 6'- 5 8 " 2 " Min. CLR Cover Both Sides 7" max ' " 29'-2" Min. CLR Cover SEE LAYOUT 2 Interior Beam Section SCALE 2" = ' 2" BELOW SLAB ELEVATION 5 4 " '- '- NOTES:. ALL BEAMS ARE TO HAVE TWO (2) #5 T & B. 2. SLAB ECK IS TO HAVE 6 X 6 W4 OR 8" O.C. BOTH WAYS. BRICK LUG, PORCH, AN GARAGE ELEVATIONS ARE TO BE 2" BELOW HOUSE SLAB ELEVATION. 4. ALL CORNERS ARE TO BE TIE WITH #5 BARS AS SHOWN ON SHEET S STIRRUPS ARE TO BE # 0" O.C. 6. REINFORCING STEEL SHALL BE EFORME NEW BILLET STEEL BARS IN ACCORANCE WITH ASTM A65 GRAE 60 U.N.O. 7. WELING OF REINFORCING STEEL IS NOT BE PERMITTE. 8. HEAT SHALL NOT BE USE IN THE FABRICATION OR INSTALLATION OF REINFORCEMENT. 9. ANCHOR BOLTS ARE MAY BE INSTALLE URING PLACEMENT OF CONCRETE OR WEGE ANCHORS MAY BE USE AFTER CONCRETE HAS AEQUATELY CURE. 0. IF WEGE ANCHORS ARE USE THEY SHALL BE 5 8 " IAMETER X 7 2" LONG WITH A WASHER BETWEEN THE NUT AN SILL PLATE. THE MINIMUM EMBEMENT IS 5".. IF PLACE ANCHOR BOLTS ARE USE THEY ARE TO MEET THE REQUIREMENTS SHOWN ON SHEET S05. '- '- 2" BELOW HOUSE ELEVATION ' '- 4' '-2" '- '-2" 2" BELOW SLAB ELEVATION 24' " FOUNATION LAYOUT FOUNATION 8/26/207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 AS NOTE.WG S04
10 Place st # bar 2" from corner Place st # bar 2" from corner # Saddles on 0" spacing on all beams # Saddles on 0" spacing on all beams #5 Corner bar top and bottom all outside corners NOTE: Bar overlaps are to be a length equal to 0 bar diameters. # stirrup at the end of each beam. Only one beam shown with stirrup for clarity. NOTE: Bar overlaps are to be a length equal to 0 bar diameters. # stirrup at the end of each beam. Only one beam shown with stirrup for clarity. #5 Corner bar top and bottom on outside bars both sides TYPICAL EXTERIOR CORNER BARS SCALE " = ' # Saddles on 24" spacing on all perimeter beams TYPICAL EXTERIOR BEAM INTERSECTION SCALE " = " 4" 5 8 " " clear of concrete NOTES:. ANCHORS ARE TO BE 5 8 " IAMETER. 2. ALL EXTERIOR ANCHOR BOLTS ARE TO HAVE A MAXIMUM SPACING OF 6' AN BE NO NEARER THAN 4" TO THE FREE EGE OF THE CONCRETE.. THERE IS TO BE A MINIMUM OF 2 BOLTS PER PLATE SEGMENT WITH THE FOLLOWING CLARIFICATIONS:.. AN ANCHOR IS TO BE LOCATE BETWEEN 4 4" AN 2"FROM THE PLATE EN..2. PLATE SEGMENTS GREATER THAN 2" AN LESS THAN OR EQUAL TO 24" CONNECTING TWO AJACENT BRACE WALLS SHALL HAVE AN ANCHOR LOCATE IN THE MILE OF THE PLATE... PLATE SEGMENTS LESS THAN OR EQUAL TO 2" IN LENGTH AN CONNECTE TO BRACE WALLS MAY HAVE ANCHORS OMITTE. 4. INTERIOR WALLS ARE TO BE POSITIVELY ANCHORE WITH APPROVE FASTENERS. " A 4" X 2" SQUARE PLATE AN NUT SHALL BE INSTALLE. A SINGLE NUT MAY BE USE IF THE THREAS ARE EFORME TO PREVENT ISENGAGEMENT OR THE NUT MAY BE WELE. Embedded Anchor Bolts SCALE: 2"=' FOUNATION ETAILS 8/26/207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: 8/26/207 " = '.WG S05
11 ' 24'-9 7 8" 9'- 7 8" 9' 25'-0 8" BWL B 9'-0 8" BWL 9' BWL B 9' BWL 2' 4'-7 7 9'- 5 8" '- '-9" 9'-5 5 8" '-0" 29'-2" 2-0" 2-0" 29'-2" ' " 5'-0 5 8" 5'-0 5 8" " 6'-7" 9'-7 2" 2'-9" 2'-0" BWL C BWL BWL 5 2'-" BWL BWL 4 BWL 5 2'-" '-" '- 7 8" 7'-0 4" BWL C 2'-" BWL A 2'-5" 4' BWL BWL BWL 2 25'-0 8" BWL 2 9'-7 2" BWL A 2' '-4 7 8" 4'-" 9'- 7 8" SECON FLOOR BWL 4 9' 2'-" 7'- 5'-6 7 8" 2' 6' 27'- 7 8" FIRST FLOOR BRACE WALL LINE SCHEULE BWL SPACING (FT) BRACING METHO REQUIRE BRACING LENGTH (FT) EXPOSURE TYPE EXPOSURE TYPE VALUE EAVES TO RIGE HEIGHT AJUSTMENT FACTORS WALL HEIGHT #BWL IN SAME IRECTION A'L 800 LB. HOL OWN INT GYP BOAR OMITTE REQUIRE BWP LENGTH (FT) (AJUSTE) PROVIE BWP LENGTH (FT) POSITIVE RESULT? CONTINUOUS SHEATHING EN CONITION(S) 25'-" CS-WSP ( 5 8 ") 9'-0" B " 6'-0" YES HU5-SS '-" CS-WSP ( 5 8 ") 9'-0" B " 2'-8" YES HU5-SS2.5 2' CS-WSP ( 5 8 ") '- B '-" '-5" YES HU5-SS ' LIB (45 ) 6'- B '-7" -0" YES HU5-SS '-0" LIB (45 & 60 ) '- B '-" 2'-7" YES HU5-SS2.5 A 5'-" CS-WSP ( 5 8 ") '- B '-" 5'-9" YES HU5-SS2.5 B 5'-" CS-WSP ( 5 8 ") '- B '-" 24'-9" YES HU5-SS2.5 C 2-0" CS-WSP ( 5 8 ") 9'-0" B " 0'-" YES HU5-SS " CS-WSP ( 5 8 ") 9'-0" B " 9'-4" YES HU5-SS2.5 BRACE WALL PLAN /5/207 WG FILE: ATE: SCALE: RAWN BY: APPROVE BY: SHEET: /5/207.WG S06
12 2' RAFTER RAFTER BRACE CEILING JOIST '-4" CORNER STU - 8" SOLE PLATE 4" BLOCKING OUBLE TOP PLATE LAI IN BRACING LAYOUT FOR 45 BRACE LAI IN BRACING LAYOUT FOR 60 BRACE FASTENERS ARE 8d COMMON NAILS WITH A MINIMUM OF 2 NAILS PER SUPPORT AN APPROXIMATELY CENTERE. 4" = '-0" FASTENERS ARE 8d COMMON NAILS WITH A MINIMUM OF 2 NAILS PER SUPPORT AN APPROXIMATELY CENTERE. 4" = '-0" 4" CRIPPLE STU JOIST '-4" CORNER STU 9'- 8" JACK STUS FULL LENGTH STU 4" TYP ' TYP TYP CRIPPLE STU SILL PLATE ANCHOR BOLTS (PERIMETER BEAM IS NOT SHOWN FOR CLARITY) '-4" TYP 6'-0" MAX TYPICAL FRAMING ETAIL ALL FASTENERS ARE TO COMPLY WITH IBC 202 REQUIREMENTS 2" = '-0" CONTINUOUS SHEATHING WOO STRUCTURAL PANEL LAYOUT WOO STRUCTURAL PANEL IS TO BE 58" (NOMINAL) THICKNESS APA 40/2 RATING. FASTENERS ARE 8d COMMON NAILS SPACING ALONG EGES AN 2" SPACING IN FIEL. 4" = '-0" HU5-SS2.5 INSTALLATION BETWEEN LEVELS FOLLOW OEM RECCOMENATIONS PORTAL FRAME BRACING AT GARAGE NO AITIONAL ANCHORS REQUIRE HU5-SS2.5 INSTALLATION IN CONCRETE FOLLOW OEM RECCOMENATIONS REV ESCRIPTION ATE APPROVE BRACE WALL ETAILS /5/207 ATE: /5/207 SCALE: WG FILE:.WG RAWN BY: APPROVE BY: SHEET: S07
Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More informationR030096GP2SS06 30x96 PRO SOLAR GREENHOUSE W/CORRUGATED POLYCARBONATE ROLL-FORM STRUCTURE: 30' X 6' RAFTER SPACING & GROUND POST
R00096GPSS06 0x96 PRO SOLAR GREENHOUSE W/CORRUGATE POLYCARBONATE ROLL-FORM STRUCTURE: 0' X 96' @ 6' RAFTER SPACING & GROUN POST eveloped By A ivision of 440 8th Ave. SW yersville, IA 5040 P: 56.875.6 F:
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationExterior Wall Fastener Schedule
City of Republic Community Development Department Exterior Wall Fastener Schedule REVISION DATE: JANUARY 2017 Design and construction (2012 IRC Section R602.3): Exterior walls of wood frame construction
More informationField Notching and Drilling of Glued Laminated Timber Beams
T E C H N I C A L N O T E Fiel Notching an Drilling of Glue Laminate Timber Beams Note: This version is supersee by a more current eition. Check the current eition for upate esign an application recommenations.
More information3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?
Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:
More information10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationSECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION
PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationPANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D " NAILS/ SPACING " o.c. SILL BOLT SPACING 1 2 " 36" O.C. 1 2 " Ø
PANEL NOTATION (3) D2 X2 SHEATHING THICKNESS (IN.) 32 " NAILS/ SPACING 32 " 8d @3" o.c. SILL BOLT SPACING 2 " Ø @ 36" O.C. 2 " Ø @ 2" O.C. 2 " Ø @ O.C. 2 " Ø @ 6" O.C. 2 " Ø @ '-0" O.C. 980 PLF D2X2 32
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationField Notching and Drilling of Glued Laminated Timber Beams
T E C H N I C A L N O T E Fiel Notching an Drilling of Glue Laminate Timber Beams Number EWS S560H November 2014 INTRODUCTION Glue laminate timber (glulam) beams are highly engineere components manufacture
More informationField Notching and Drilling of Glued Laminated Timber Beams
T E C H N I C A L N O T E Fiel Notching an Drilling of Glue Laminate Timber Beams Number EWS S560C June 1999 Introuction Glue laminate timber (glulam) beams are highly engineere components manufacture
More informationTrusted ICC ES PASLODE, Evaluation. report, or as to any. ICC-ES Evaluation
0 ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.orgg Most Widely Accepted and Trusted ESR 3072 Reissued 09/2018 Revised 10/2018 This report is subject to renewal 09/2020.
More informationA. Rough carpentry includes but is not limited to the following:
SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,
More informationBeam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE
U.S. Technical Guide U.S. TECHNICAL GUIDE LP SolidStart LVL & Header Technical Guide 2900F b -2.0E Please verify availability with the LP SolidStart Engineered Wood Products distributor in your area prior
More informationPLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.
TYPICAL HEADER, SEE DETAIL 3/ 4 1 6 2 CEILING FRAMING PLAN SCALE: 3/16" = 1'-0" 2 2 4 600S162-43 FLAT BRACE, 4 CEILING JOIST, SEE SCHEDULE, BOXED BEAM: (2) 600S162-54 + (2)14GA TRACKS 2 CEILING JOIST SCHEDULE
More informationField Notching and Drilling of Glued Laminated Timber Beams Number EWS S560F December 2006
T E C H N I C A L N O T E Fiel Notching an Drilling of Glue Laminate Timber Beams Number EWS S560F December 2006 INTRODUCTION Glue laminate timber (glulam) beams are highly engineere components manufacture
More informationUnit 9. Wall and Ceiling Framing
Unit 9 Wall and Ceiling Framing Wall construction Wall framing includes the assembly of horizontal and vertical members that make up exterior walls and interior partitions. Theses walls support the ceilings
More informationIRC 2012 Code Compliant Wood Framed Residential details. Miss Installed Connectors with code references and remedies, discussion.
IRC 2012 Code Compliant Wood Framed Residential details Miss Installed Connectors with code references and remedies, discussion. You can help avoid this, by being diligent with inspections. Notes to Attendees
More informationIntroducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA
The SIMPLE FRAMING SYSTEMSM INSTALLATION GUIDE USA for Floors This Installation Guide is intended to provide general information for the designer and end-user. For further information, please refer to
More informationShearwall System Installation Guide
Shearwall System Installation Guide Complete HFX product listing with dimensions, weights, connectors, typical installations and accessories. Also includes Hardy Frame Moment Frame information. Easy as
More informationSECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.
PROPOSED 1ST FLOOR PROPOSED 2ND FLOOR Anthony Hatziioannou Architect, P.C. EXISTING 1ST FLOOR ZONING CALCULATION JURISDICTION: TOWN OF OYSTER BAY SECTION: 15 BLOCK: 71 LOT: ZONE: RESIDENCE R1-7 PERMITTED
More informationLoad Tables, Technical Data and Installation Instructions
W22. W22. W22. W22. W22 W22.. Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting
More information24 X32 3 CAR GARAGE POLE BARN STYLE FRAME
24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 3 ENTRY DOOR 2 WINDOWS, 1 @ EA. END 1-16 X8 GARAGE DOOR 1-9 X8 GARAGE DOOR 4 CONCRETE SLAB 10 WALLS 4/12 PITCH METAL ROOF METAL SIDING INDEX PAGE DESCRIPTION 1
More informationESR-1799 Reissued April 2014 This report is subject to renewal June 1, 2015.
ICC-ES Evaluation Report www.icc-es.org (800) 42-6587 (562) 699-054 ESR-799 Reissued April 204 This report is subject to renewal June, 205. A Subsidiary of the International Code Council DIVISION: 0 00
More informationMAT106: Wall Framing. AMERICAN FOREST & PAPER ASSOCIATION American Wood Council Engineered and Traditional Wood Products
MAT106: This portion of the program will address the code requirements for wall framing, although we won t address bracing in this section. The program contains a separate bracing section. 1 FASTEN PLATES
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More informationESR-2403 Reissued October 1, 2009 This report is subject to re-examination in one year.
ICC-ES Evaluation Report ESR-403 Reissued October, 009 This report is subject to re-examination in one year. www.icc-es.org (800) 43-6587 (56) 699-0543 A Subsidiary of the International Code Council DIVISION:
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationLP SolidStart LSL. LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.
LP SolidStart LSL LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.35E LSL Please verify availability with the LP SolidStart Engineered Wood Products
More informationT-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY
August 10, 2010 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY ST - T-BRACE 2 R MiTek Industries, Chesterfield, MO Page 1 of 1 Note: T-Bracing / I-Bracing to be used when continuous lateral bracing is impractical.
More informationIRC 2015 Code Compliant Wood Framed Residential Details. Incorrect Installations of Connectors with code references and remedies, discussion.
IRC 2015 Code Compliant Wood Framed Residential Details Incorrect Installations of Connectors with code references and remedies, discussion. You can help to avoid this, by being diligent with inspections.
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationGarage Design Guide. October 2018
Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief
More informationSECTION ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK:
SECTION 061000 - ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK: A. Definition: Rough carpentry includes carpent~y work not specified as part of other sections and which is generally not exposed, except as otherwise
More informationFIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND
HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION
More informationSECTION ROUGH CARPENTRY
SECTION 06100 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide Rough Carpentry as shown and detailed on the Drawings and
More informationFeaturing TJ Rim Board and TimberStrand LSL
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load
More informationWood Connections. Concepts of Well Designed Connections
Wood Connections Sam Hensen, P.E. Branch Engineering Manager Concepts of Well Designed Connections Must provide sufficient capacity to transfer loads to supporting members Utilize fastener spacing which
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationE-Blueprints. Children s Backyard Playhouse 8 x sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height
SDS-CAD - Specialized Design Systems E-BLUEPRINTS C ABINS G ARAGES Children s Backyard Playhouse 8 x 10 80 sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height Plan sets contain the following:
More information24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2
NOTE: All exposed lumber to be pressure treated (P.T.) or decay resistant. Fasteners for P.T. wood shall be hot-dipped galv. or stainless steel, typical. see pages 2 & 5 for footings 8'-0" -10'-0" Beam
More informationCollins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY
PART 1 GENERAL 1.1 RELATED SECTIONS SECTION 061000 ROUGH CARPENTRY A. Drawings and general provisions of the Construction Contract, including General Conditions and Division 1 Specification Sections, apply
More informationBuilding for High Wind Resistance in Light-Frame Wood Construction
Building for High Wind Resistance in Light-Frame Wood Construction DESIGN GUIDE Meeting the Challenge of High Wind Design Designing a structure to withstand the devastating forces of tornados is one of
More informationChapter 33: Lofts (Or Second Floors)
Chapter 33: Lofts (Or Second Floors) Most Common Mistakes: 1. Designing loft yourself and installing later. 2. Inadequate height either below or above. 3. Not enough headroom for stairs. 4. Failure to
More informationGlasRoc Sheathing Type X
Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity
More informationVERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA
INSTALLATION GUIDE VERSA-LAM BCI LIMIT STATES DESIGN CANADA The information in this document pertains use in the CANADA ONLY, Limit States Design. Refer the appropriate Specifier Guide US for use in the
More informationAPA Performance Rated Rim Boards
D a t a F i l e APA Performance Rated Rim Boards A Rim Board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationDIVISION 6 WOOD AND PLASTICS
DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in two years.
ICC-ES Evaluation Report www.icc-es.org (800) -68 (6) 699-0 ESR-8* Reissued March, 0 This report is subject to renewal in two years. A Subsidiary of the International Code Council DIVISION: 0 00 00 CONCRETE
More informationICC-ES Evaluation Report
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-2608 Reissued January 2016 This report is subject to renewal January 2017. A Subsidiary of the International Code Council DIVISION:
More informationDECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.
DECKS Max. riser height-7 ¾ Min. tread depth-10 Landings required at (R311.7.5.1) (R311.7.5.2) top and bottom of stairs (R311.7.6) Notched guardrail post NOT allowed Graspable handrail required Spacing
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationTypical Deck Details
Botetourt County guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachment to existing house s footing beam -to-beam connection post-to-beam connection
More informationUse the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7
www.garyklinka.com page 1 of 16 Truss Joist I-Joist Quiz Instructions: www.garyklinka.com 1. Print these pages. 2. Print referencing manual from my site at http://garyklinka.com/manuals/tj-4000.pdf or
More informationCity of Virginia Beach, Virginia Typical Deck Details
City of Virginia Beach, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential, single-level decks only. Construction cannot
More informationICC-ES Evaluation Report Reissued June 1, 2011 This report is subject to renewal in one year.
ICC-ES Evaluation Report www.icc-es.org (800) 42-658 (562) 699-054 ESR-99* Reissued June, 20 This report is subject to renewal in one year. A Subsidiary of the International Code Council DIVISION: 0 00
More informationKS SERIES - VERTICAL INSTALLATION
CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV
More informationSDWH TIMBER-HEX Screw
Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections, Including Ledgers Double-barrier coating provides corrosion resistance equivalent to hot-dip galvanization, making it suitable
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION
ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION 1. 2. 3. Scope 1.1 This application standard provides the minimum installation criteria for wood
More informationESR-2024* Reissued September 1, 2011 This report is subject to renewal September 1, 2013.
ICC-ES Evaluation Report ESR-2024* Reissued September, 20 This report is subject to renewal September, 20. www.icc-es.org (800) 42-68 (62) 699-04 A Subsidiary of the International Code Council DIVISION:
More informationROOFING APPLICATION STANDARD (RAS) No. 130
ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used
More informationESR-1254 * DELETED BY CITY OF LOS ANGELES. Reissued April 1, 2006 This report is subject to re-examination in one year.
ESR-1254 Reissued April 1, 2006 This report is subject to re-examination in one year. www.icc-es.org Business/Regional Office 5360 Workman Mill Road, Whittier, California 90601 (562) 699-0543 Regional
More informationSECTION ROUGH CARPENTRY
SECTION 06100 ROUGH CARPENTRY PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. The work includes furnishing all labor, materials and equipment required to complete the Rough Carpentry work as shown on the Drawings
More informationPROJECT INSTRUCTIONS Roofing
PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not
More informationPulaski County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code
Pulaski County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential, single-level decks only. Construction cannot deviate
More informationSHEET INDEX PROJECT LOCATION. ARCHITECTS FORUM 8555 North River Road, Suite 220 Indianapolis, Indiana [P] [F]
TRANSWESTERN 900 West Loop South, Suite 00 Houston, Texas 7707 [P] 7.70.7700 [F] 7.70.685 SYSTEM 8465 Keystone Crossing, Suite 0 4640 [P] 7.46.5544 ARCHITECTS FORUM 8555 North River Road, Suite 0 4640
More informationWall bracing is one of the most important structural elements of
CONTINUINGEDUCATION Wall Bracing and the Codes Introduction Wall bracing is one of the most important structural elements of any house, but it can also be one of the most confusing, because designing houses
More informationTRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load capacity of 2x
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationKOLO SHELTER Installation Instructions Parts List
Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More informationINDEX PAGE RELEASE SECTION NUMBER DATE
INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001
More informationTypical Deck Details
Based on the 2009 Michigan Statewide Building Code guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachement to existing house s footing beam
More informationTHE ENGINEERED WOOD ASSOCIATION
D A T A F I L E APA Performance Rated Rim Boards A rim board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings (see Section
More informationICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1790 Reissued September 1, 2012 This report is subject to renewal September 1, 2013. A Subsidiary of the International Code Council
More informationSamples from
ANCHOR BOLT CORNER LOCATION 1-2x4 or 1-2x6=4 1/4" 1-3/4 or 1-3x6=5 1/4" 2-2x4 or 2-2x6=5 3/4",------------2-3x4 or 2-3x6=7 3/4" 1-4x6 or 1-6x6=8 1/4" 1-4x8 or 1-6x8=1 A" 1-4x10 or 1-6x10=12" I ------1er-----
More informationTurada Hardwood Shingles and Shakes Installation instructions
1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced
More informationICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in two years.
ICC-ES Evaluation Report www.icc-es.org (800) -6587 (56) 699-05 ESR-0 Reissued March, 0 This report is subject to renewal in two years. A Subsidiary of the International Code Council DIVISION: 06 00 00
More informationCHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT
More informationHOW TO BUILD A 12X8 SHED
HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,
More informationFoundation Specifications for 5.6-Meter Modular Earth Station Antennas
Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationICBO Evaluation Service, Inc Workman Mill Road, Whittier, California / 16
ER-5736 Reissued September 1, 2002 ICBO Evaluation Service, Inc. 5360 Workman Mill Road, Whittier, California 90601 www.icboes.org Filing Category: FASTENERS Wood Hangers and Framing Anchors USP LUMBER
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationFoundation Specifications for 7.6-Meter Modular Earth Station Antennas
Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,
More informationTypical Deck Details Based on the City of Nixa Residential Deck Ordinance
Typical Deck Details Based on the City of Nixa Residential Deck Ordinance The use of this package in lieu of submitted drawings applies to Single Span, Single Level, Residential Decks ONLY. Decks must
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationTYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:
City of Aliso Viejo Building Division 12 Journey, Suite 100 Aliso Viejo, CA 92656 (949)425-2540 Fax (949)425-3899 www.cityofalisoviejo.com TYPICAL PATIO COVERS 111 I. GENERAL Patio covers are one-story,
More informationS001 LOWER LEVEL ISO SECOND FLOOR ISO S001 FULL ISO FIRST FLOOR ISO. O="Katahdin Engineering, LLC",
1 LOWER LEVEL ISO 3 SECOND FLOOR ISO Elizabeth Woolf No. Digitally signed by Elizabeth Woolf DN: C=US, E=ewoolf@katadineng.com, O="", CN=Elizabeth Woolf 01.1.30 1:30:53-05'00' Revision / issue Date 0 10/1/1
More informationinstallation Guide What you don t Safety I-Joist Storage and Handling United states Installation Instructions for Residential Floor Systems
Safety GP Lam lvl installation Guide wood i beam joists. Walking on the joists should not be permitted until they are properly braced. 2. Lateral restraint, such as an existing deck or braced end wall,
More information1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"
More informationWindows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016
Windows Installed into Walls with Polyiso and Wood Framing Installation Instructions Standard Method Revised 10/24/2016 Background There are many acceptable ways to mount and detail windows for support
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More information