Chapter 33: Lofts (Or Second Floors)
|
|
- Jason Glenn
- 5 years ago
- Views:
Transcription
1 Chapter 33: Lofts (Or Second Floors) Most Common Mistakes: 1. Designing loft yourself and installing later. 2. Inadequate height either below or above. 3. Not enough headroom for stairs. 4. Failure to plan sheathing use to minimize waste. 5. Area not square prior to installing sheathing. 6. Not installing any conflicting framing members (rafters, etc.) prior to sheathing. Do not attempt to design a loft floor. Under-designed elevated floors pose a serious injury or death risk. Have only a design professional (engineer or architect) attempt this design. Beams Beams are usually LVLs or multiple large dimension lumber plies. Beams will be mounted to columns, typically, in one of three methods. The particular application will be specified on building plans. Beam top will be located 3/4 below floor top. Beam may be installed on column face, with a bearing pressure treated trimmer or cripple below. See Figure Figure 33-1 Page 210
2 Trimmer or cripple bears directly on concrete collar top, surrounding the column base. Nail trimmer to column with (2) 10d nails minimum at 12 o.c. Beam may be partially notched into column. Beam may be entirely notched into columns. See Figure Figure 33-2 For multiple ply beams, nail each together with (3) 10d minimum at 8 o.c. Verify nail quanity and spacing from plans. See Figure Figure 33-3 Prior to cutting any notches, or installing any beams, verify marks for all beam tops are at same height. Cut any notches for a tight fit and place beams in notches. Put any trimmers in place below beams. Page 211
3 If beams are spaced apart (on each side of a column) add 2x blocking to align with floor joists. See Figure Figure 33-4 Floor Joists Mark floor joist hanger locations on beams. First floor joist outside face will often be even with inside column edges. See Figure Page 212
4 Figure 33-5 Joist spacing will start from first joist outside edge, to second joist center, and continue from there at on-center spacing. Install floor joist hangers at spacings marked. Locate joist hangers on beam faces so top floor joist edges will be flush with floor beam top edges. Stairwell Openings Stairwell opening framed width is to be at least 1 greater than stair width. For example: 3 1 for 3 wide stairs. See Figure Figure 33-6 Page 213
5 Under the International Building Codes, maximum rise and minimum run for stairs has been changed. This affects stairwell opening lengths, as a 80 (6 8 ) minimum vertical clear height is to be provided above stairs. With maximum allowable rise and minimum allowable run, a 10 in length opening will generally be adequate. Once all floor beams are securely in place, stairwell openings located, and floor joist hangers are in place, cut floor joists to length and install crowned up into joist hangers. After floor framing system is completed, check area for square and install floor sheeting perpendicular to floor joists. Floor sheeting is usually 3/4 Tongue & Groove (also known as T & G), osb or plywood. Start with tongued edge closest to wall and work away from wall. Install with side marked This Side Down toward floor joists. A 1/8 gap should be left between panel ends and the T & G edges should be lightly butted (note gap in photo below). Place a block of wood on the grooved edge and tap it with a hammer to protect the grooves. See Figure Page 214
6 Figure 33-7 Snap a chalk line across sheets (as they are installed) to mark joist centers for a nailing guide. Do not nail edge joists where sheathing meets until adjoining sheet is in place. This will enable joist to be moved a bit, if needed, so sheathing meets in joist center. While not required by code, best installation staggers splices from row to row. Staggering each sheathing course joints frequently helps avoid waste. This can be done efficiently by starting each course with any cutoffs from prior course. Done correctly, no cutoff waste pieces will be 2 or longer. Panels are best laid so as to be supported by a minimum of three floor joists. To prevent squeaking floors, glue sheeting to floor joists with a high quality sub-floor adhesive. Do not use standard construction adhesive. Page 215
7 Nail sheets with minimum 8d common nails, 4 o.c. on all edges and 10 o.c. for intermediate framing members. Fasteners should be 3.8 away from any panel edges. To further reduce squeaking possibilities, use 2 ring or deformed shank nails or ideally, 1-3/4 long #10 screws (drywall screws are not recommended). Guardrails Are not included in Hansen Buildings kit packages. Any raised floor surface located more than 30 inches above the floor or ground shall have guards not less than 36 inches in height. Guards shall have intermediate rails which prohibit the passage of a sphere four inches or more in diameter. Consult with your Building Department for specifics which meet their requirements. Page 216
Description. Lesson Outcomes. Assumptions. Build a Floor. Carpenter
Carpenter Description Floors are an integral part of residential construction and must be built to specifications that meet building code requirements. In this Activity Plan, students will be cutting and
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationFastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More information4. Components and Stairs
4. Components and Stairs 4.1 BUILDING WINDOW AND DOOR COMPONENTS 4.2 BUILDING STAIRS Tools needed by volunteer: Hammer Nail apron Tape measure Square Utility knife Pencil Tools and equipment needed: Materials
More information12' Octagon Wood Gazebo
12' Octagon Wood ANY REPRODUCTION, ALTERNATION, OR USE OF STARTING ANY DISCEPANCY SHALL BE REPORTED IN WRITTING BEFORE STARTING DESIGN REQUIREMENTS 1. Governing Code: Including, not limited to: IBC 2015
More informationDECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.
DECKS Max. riser height-7 ¾ Min. tread depth-10 Landings required at (R311.7.5.1) (R311.7.5.2) top and bottom of stairs (R311.7.6) Notched guardrail post NOT allowed Graspable handrail required Spacing
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More informationChapter 9: Truss Preparation
Chapter 9: Truss Preparation Most Common Mistakes: 1. Placing purlins at a spacing other than what is shown on building plans. 2. Not following a continuous layout (keep spacing the same, unless noted
More informationChapter 7 - Porch Framing
Chapter 7 - Porch Framing Contents Chapter 7 - Porch Framing... 7-1 Timing & Prerequisites... 7-2 Concrete Porches Caps (Contractor)... 7-3 Organize the Porch Framing Lumber... 7-3 Types of Porch Roofs...
More informationDECKING INSTALLATION GUIDE
STAIR TREAD INSTALLATION GUIDE Step 7: Install the Remaining Treads Repeat steps 2 to 6 for the remaining stair treads. Step 8: Install the Fascia 1. Measure the riser height. 2. Rip the fascia to the
More information24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2
NOTE: All exposed lumber to be pressure treated (P.T.) or decay resistant. Fasteners for P.T. wood shall be hot-dipped galv. or stainless steel, typical. see pages 2 & 5 for footings 8'-0" -10'-0" Beam
More informationinstallation Guide What you don t Safety I-Joist Storage and Handling United states Installation Instructions for Residential Floor Systems
Safety GP Lam lvl installation Guide wood i beam joists. Walking on the joists should not be permitted until they are properly braced. 2. Lateral restraint, such as an existing deck or braced end wall,
More informationVertical Offset Base and Safety Rail System Installation Instructions
Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat
More informationDeck Evaluation Checklist
Date: Reported By: Project Name/Client: Year Deck was Built: I. Stairs A. Not Applicable B. Are there any visible signs of cracks, decay or over-notching? No Yes 1. If yes, where? C. Stairway width: (Hint:
More informationFeaturing TJ Rim Board and TimberStrand LSL
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationChapter 6 - Walls & Stairs
Chapter 6 - Walls & Stairs Contents Chapter 6 - Walls & Stairs... 6-1 Timing & Prerequisites... 6-3 Wall Panel Components... 6-5 Headers... 6-7 Box Headers... 6-7 Solid Wood Headers... 6-8 Non-Load Bearing
More informationIntroducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA
The SIMPLE FRAMING SYSTEMSM INSTALLATION GUIDE USA for Floors This Installation Guide is intended to provide general information for the designer and end-user. For further information, please refer to
More informationGambrel Barn with Overhang Manual
Tools Needed: -Cordless Drill (12V or higher) -#2 Square Drive Bit -Hammer -6 Step Ladder -Tape Measure -Square utility knife w/ blade & hook blade -Speed Square Little Cottage Co. PO Box 455 Berlin, OH
More informationINSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.
INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety. Safety PRE-INSTALLATION Compliance with all applicable local, state
More informationSite Installation Guide
Site Installation Guide Site Checklist Stop and read this now. Tick box when checked. Floor Joist Layout If a floor joist design/layout was done, was a site copy of the layout provided with the joists,
More informationFine Homebuilding. Cottage Shed Plans
Fine Homebuilding Cottage Shed Plans 1 Front Elevation Designed with a cottage look, this small shed has clapboard siding on the front, a double door, a ramp to allow access for motorized yard equipment,
More informationOhlson Project Property Owner: Kathy Ohlson Property Address: Deer Lake Rd. Derwood MD 20855
Ohlson Project Property Owner: Kathy Ohlson Property Address: 16116 Deer Lake Rd. Derwood MD 20855 Trademark LLC Prepared By: Travis Murphy Drawing Index 1. Cover 2. Rear Elevation 3. Top View 4. Dimensions
More informationExterior Wall Fastener Schedule
City of Republic Community Development Department Exterior Wall Fastener Schedule REVISION DATE: JANUARY 2017 Design and construction (2012 IRC Section R602.3): Exterior walls of wood frame construction
More informationLateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later
Lateral Support Decks over 24 above grade require lateral support* *Exceptions to be discussed later Decking Types of Decking: -2x4s & 2x6s -five quarter span rated decking boards -Wood plastic composite
More informationEngineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully inspect all materials before installation. Materials installed
More informationT-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY
August 10, 2010 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY ST - T-BRACE 2 R MiTek Industries, Chesterfield, MO Page 1 of 1 Note: T-Bracing / I-Bracing to be used when continuous lateral bracing is impractical.
More informationPacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation
Pacifica Pool House Assembly Manual Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST Package ships as shown Simpson Hurricane Straps Double Insulated Raised-Panel Door in back wall (71 x71 Total opening)
More informationChapter 24: Residential Overhead Door Openings
Chapter 24: Residential Overhead Door Openings Most Common Mistakes: 1. Column(s) next to door turned wrong direction. 2. Header placed at incorrect height. 3. Wall not square prior to framing opening.
More informationUse the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7
www.garyklinka.com page 1 of 16 Truss Joist I-Joist Quiz Instructions: www.garyklinka.com 1. Print these pages. 2. Print referencing manual from my site at http://garyklinka.com/manuals/tj-4000.pdf or
More informationAPA Performance Rated Rim Boards
D a t a F i l e APA Performance Rated Rim Boards A Rim Board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationinstallation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty
installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper
More informationChapter 22. Shed Construction
Chapter 22. Shed Construction 22.1 BUILDING SHED FLOOR 22.2 BUILDING SHED WALLS 22.3 BUILDING SHED ROOF 22.4 ASSEMBLING SHED Tools needed by volunteers: Hammer Nail apron Tape measure Square Utility knife
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 19, 2015 the Arlington-R Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This
More informationChapter 23. Garage Construction
Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES
More informationKeystone Garage Assembly Manual
Keystone Garage Assembly Manual 14x24 Garage Kit ships as shown Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST 13 8 deep AMISH ORIGINAL KEYSTONE 14x24 GARAGE s p e c i f i c a t i o n s Optional
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationItem #BUILD SHED. build your shed today HOW TO BUILD A SHED. Copyright windows.
WWW.SHED-WINDOWS.COM build your shed today Item #BUILD SHED HOW TO BUILD A SHED www.shed-windows.com 1 These shed plans will show you how to build a 10 x14 storage shed using T1 11 for sheathing and asphalt
More informationConstruction Manual. 1. Delivery Day
1. Delivery Day By now you should have the construction site for your new log home prepared for delivery. Your logs will be coming on a large flatbed semi trailer truck that will require you to plan ahead
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised February 4, 2016 the Millcreek-R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationSAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Belmont with pocket doors. Building Size 12'x16' or 12'x20' Revised January 10, 2012
Best Barns USA Assembly Book Revised January 10, 2012 SAMPLE INSTRUCTIONS the Belmont with pocket doors Building Size 12'x16' or 12'x20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive
More informationCity of Virginia Beach, Virginia Typical Deck Details
City of Virginia Beach, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential, single-level decks only. Construction cannot
More informationTypical Deck Details
Based on the 2009 Michigan Statewide Building Code guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachement to existing house s footing beam
More informationLoad Tables, Technical Data and Installation Instructions
W22. W22. W22. W22. W22 W22.. Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting
More informationSections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES
2 Sections & Details WOOD SILL and FLOOR CONSTRUCTION NOTES 1 Commonly Used Lumber Common LENGTHS include: 8, 10, 12, 14, 16 NOMINAL SIZES 2 x 4 2 x 6 2 x 8 2 x 10 2 x 12 ACTUAL SIZES 1 ½ x 3 ½ 1 ½ x 5
More informationFMJ AJS 24 & BCI 60s Joist for Fire Protection of Floors Installation Guide
Materials FMJ AJS 24 & BCI 60s Joist for Fire Protection of Floors Installation Guide (A) Floor Sheathing: Materials and installation per Section R503 of the IRC (B) I-Joists (marked with FMJ after series
More informationPulaski County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code
Pulaski County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential, single-level decks only. Construction cannot deviate
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 13, 2017 the Belmont Building Size 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationPRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE. Based on the 2015 International Residential Code
MULTI- JURISDICTIONAL BROCHURE PRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE Based on the 2015 International Residential Code BP-68 guard decking ledger board fasteners existing house floor construction
More informationVERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA
INSTALLATION GUIDE VERSA-LAM BCI LIMIT STATES DESIGN CANADA The information in this document pertains use in the CANADA ONLY, Limit States Design. Refer the appropriate Specifier Guide US for use in the
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationCountry Cabin. Assembly Manual. HomePlace Structures
Country Cabin Assembly Manual Country Cabin Assembly Manual revised 3/20/10 Dear Customer, Thank you for your purchase of our Country Cabin. The craftsmanship and detail in this building is unmatched.
More informationChapter 16. Underlayment and Finish Stairs
Chapter 16. Underlayment and Finish Stairs 16.1 INSTALLING UNDERLAYMENT & DRICORE 16.2 FINISHING STAIRS Tools needed by volunteers: Hammer Nail apron Tape measure Tools and equipment needed: Extension
More informationBeam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE
U.S. Technical Guide U.S. TECHNICAL GUIDE LP SolidStart LVL & Header Technical Guide 2900F b -2.0E Please verify availability with the LP SolidStart Engineered Wood Products distributor in your area prior
More informationTHE ENGINEERED WOOD ASSOCIATION
D A T A F I L E APA Performance Rated Rim Boards A rim board is the wood component that fills the space between the sill plate and bottom plate of a wall or, in second floor construction, between the top
More informationJoshua Woodsman
CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x32' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationMain Floor Revisions: 38' 0" Rm1 H3 50' 0" Bk1 B1 Rm2 B5 (26)-2 H2 B2 H3 (3)-3 B3 (11)-4 Bk1 B1 (5)-5 Rm4 Bk1 Rm3 Bk1 24' 0" 6' 0" 20' 0" START FRAMIN
Main Floor Revisions: 38' 0" Rm1 H3 50' 0" B1 Rm2 B5 (26)-2 H2 B2 H3 (3)-3 B3 (11)-4 B1 (5)-5 Rm4 Rm3 24' 0" 6' 0" 20' 0" START FRAMING HERE 18" BCI 90'S @ 16"OC Products PlotID Net Qty Product Length
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 19, 2015 the Arlington-R Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x20' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 12, 2017 the Arlington Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.
More informationAssembly Instructions
10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x28' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 12, 2017 the Arlington Building Size 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x24' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationDeck Design Guide. One and Two Family Residential Dwellings
Deck Design Guide One and Two Family Residential Dwellings The City of Lake Oswego is providing this information to help you design your deck, obtain a building permit and pass inspections. The standards
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised February 4, 2016 the Millcreek-R 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationCOMPOSITE RAILING INSTALLATION
COMPOSITE RAILING INSTALLATION Tools All you ll need is a hammer and screw gun, circular saw (carbidetipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line.
More informationinstallation care & maintenance instructions moistureshield.com limited lifetime warranty
installation care & maintenance instructions 866.729.2378 moistureshield.com limited lifetime warranty It s comforting to know that you re about to build a deck that gives you every possible advantage.
More informationWOOD INSTALLATION GUIDE
WOOD INSTALLATION GUIDE WOOD INSTALLATION DEFINITION FLOOR PREPARATION UNDERLAYMENT INSTALLATION MOULDINGS TOOLS NEEDED WHAT IS WOOD FLOORING? WOOD COMES IN A VARIETY OF SIZES, COLORS, SHADES AND INSTALLATION
More informationChapter 51: Sidewall Overhang(s) Only - Enclosed
Chapter 51: Sidewall Overhang(s) Only - Enclosed Most Common Mistakes: 1. Incorrect eave height. 2. Placing eave girt below truss tails. 3. Fascia board top edges not bevel cut to match roof slope. 4.
More informationE-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'
E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20' BUILD You can construct your own E-Z frame shed with the help of this step by step guide. North American softwood dimensional lumber sizes: Nominal Actual in
More informationStep 2 - Measure and install joist hangers every 16". See Figure "B" above. Fill every hole in each
Adding a deck is one of the most useful projects a homeowner can do to improve their home. Each deck is different and presents it's own set of challenges, so contact us with unique questions if they are
More informationHow to Build Good Decks..
How to Build Good Decks.. Worldwide Sleeping Company, Inc Cary, North Carolina Decking Overview.. Decking Overview.. more Decking Joist.... Joist Hanger Ledger Lag Screw House Wall Decking House Floor
More informationBuild Outdoor Stairs. Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs:
Build Outdoor Stairs Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs: The Total Run (Fig. 1) is the total horizontal distance covered by the
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 19, 2015 the Glenwood Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual
More informationPerennial Wood Decking Installation Guide
Perennial Wood Decking Installation Guide 1 WARNING! Read this entire Installation Guide prior to installing your Perennial Wood decking. Leave this guide at the job site. Table of Contents Perennial Wood
More informationDouble Beam Freestanding Pergola Installation Guide
Double Beam Freestanding Pergola Installation Guide Patent Pending. Copyright 2011 USAVinyl, LLC - All Rights Reserved The information contained in these instructions are proprietary to USAVinyl, LLC and
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised June 14, 2017 the Belmont-R Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.
More informationVinyl Gazebo Instructions
P a g e 1 Vinyl Gazebo Instructions 10 Vinyl Gazebo Shown Thank you for the purchase of your New Gazebo. Depending on the size of your Gazebo, installation can usually be completed in 1 to 2 days. These
More informationTypical Deck Details
Botetourt County guard decking ledger board fasteners existing house floor construction guard post attachment ledger board attachment to existing house s footing beam -to-beam connection post-to-beam connection
More informationOctagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationBUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame
BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 5-in x 84-in x 3/8-in 12.7 cm x 213.36 cm x 9.525 mm 10 planks 29 sq.ft. IMPORTANT INFORMATION Open cartons 2 3 days prior to the install and allow material to adjust to the relative
More information- Before You Begin - Standard Apex / Tall Apex Shed Kit Instructions IMPORTANT!
Customer Service: (801)754-3334 810 W Utah Ave #8 Payson, Utah 84651 email: apexshedcompany@gmail.com Standard Apex / Tall Apex Shed Kit Instructions Tools Needed: Framing Hammer Tape Measure (25 ft.)
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised March 6, 2017 the Arlington Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.
More informationthe Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April
Best Barns USA Assembly Book Revised April 28 2015 the Greenbriar 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised December 6, 2013 the Denver-R 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationE-Z BUILD SHED BUILDING GUIDE 10' 10' 10' 12' 10' 14' 10' 16' 10' 20'
E-Z BUILD SHED BUILDING GUIDE 12' 14' 16' 20' North American softwood dimensional lumber sizes: NOMINAL in in 1 4 1 6 2 4 2 6 ACTUAL in in ¾ 3½ ¾ 5½ 1½ 3½ 1½ 5½ Shown with rollup door Construct your own
More informationOctagon Vinyl Gazebo Assembly Instructions
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 19, 2017 the Millcreek 12'x 20' Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted Under the
More informationTRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load capacity of 2x
More informationPRAIRIE 24 Barn Kit - STANDARD MODEL
CEDAR CUPOLA 5 12 12x SPLIT SLIDING DOOR 0 6 3X3 1x8 CEDAR CORNER TRIM 2x6 T&G SIDING FRONT ELEVATION CEDAR CUPOLA 5 12 12x SPLIT SLIDING DOOR 1x8 CEDAR CORNER TRIM 2x6 T&G SIDING REAR ELEVATION CEDAR
More informationthe Lakewood 12' x 24' Sentry Buildings Assembly Book November 22, 2017
Sentry Buildings Assembly Book November 22, 2017 the Lakewood Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 12' x 24' This manual is copyrighted Under the copyright
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised July 6, 2015 Garage Door by Owner Tahoe-R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual
More informationBest Barns USA Assembly Book Revised October 24, 2017
Best Barns USA Assembly Book Revised October 24, 2017 Garage Door by Owner the Tahoe 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.
More informationUnit 9. Wall and Ceiling Framing
Unit 9 Wall and Ceiling Framing Wall construction Wall framing includes the assembly of horizontal and vertical members that make up exterior walls and interior partitions. Theses walls support the ceilings