1 Fault Diagnostic Devices FDD-EPT TM or FAN-EPT TM Saving Transformers Worldwide Presented to: IEEE-TC, WG C revision April 13, 2015 Hyatt Regency Riverwalk San Antonio, TX By: Hemchandra M. Shertukde, Ph.D. 8 Professor, ECE, UHART And; President/CTO, DDI, 2015 Diagnostic Devices, Inc.

2

3

4 Fault Diagnostic Products Transformers Submarine structures Aircraft fuselages Bridges Petroleum Tanks DDI was established in 1992 as a defense contractor Dr. H. Shertukde developed this product in 1996 and now Exclusive License for product is with DDI Services Engineering Design Field service and monitoring

5 KINDS OF SYSTEMS ON-LINE, ON-SITE - FDD-EPT Transformer is in-service, test equipment and personnel are also on site

6 Kinds of Systems contd. ON-LINE, OFF-SITE FAN-EPT Transformer and test equipment are in-service at site and test personnel off-site in remote control room SITE REMOTE OFFICE

7 Data Acquisition System System can be configured for six to sixteen channels or higher per requirement Gen 1: 2 CHANNELS (SENSORS) ISA Gen 2: 4 CHANNELS (SENSORS) PCI Gen 3: 2 CHANNELS/SENSOR PC 104 FORM FACTOR > or = 1 MHz sampling rate per channel BW: 50kHz 350kHz BW for each sensor

8 Standard X mer tank model with sensors Need to detect and locate PD co-ordinates (x,y,z)

9 FDD-EPT TM /FAN-EPT TM Innovative Approach Utilizes advanced Wavelet Transform digital signal processing techniques Passive externally located Acoustic Sensors Compact lunch-box device DDI is developing a Gold Standard for online transformer diagnostics

10 Intellectual Property Existing patent on signal processing Patent # 6,178,386 Patents pending on other systems Future additional patents on hardware and software Copyright protection on software already with DDI Exclusive License for FDD-EPT now with DDI

11 Case I 5 MVA, 33 kv three phase distribution transformer - NU PD fault location estimates were provided to the customer at the average location of [18.2, , ] inside the tank. Actual evaluation and verification of the location by customer indicated the coordinates of the failure to be at [23, , 18 ] inside the tank.

12 Case II - 30 MVA, 245/13.8 kv, Delta/Wye, Three Phase, Mobile Transformer Testimonials "...Your test pinpointed the problem very accurately in this case. We might have saved $20,000 and 5-6 weeks in shipping time..." -Mr. George Reitter, Corporate Technical Director of Delta Star, Inc. in CA, USA (1998)

13 Aluminum Crepe paper failure Saving Transformers Worldwide

14 Locations of failure pinpointed Saving Transformers Worldwide

15 Testing with shelf-top FDD- EPT

16 Pinpointed locations Saving Transformers Worldwide

17 HVDC CONVERTER TRANSFORMER 315 MVA, SINGLE PHASE, 400Y/213Y/213D Saving Transformers Worldwide

18 Failure at LV Delta connection of GSU Case III Bad flexible link surface front and back

19 FDD-EPT at the back of a Utility truck or SUV Operator at a distance of 30 from X mer

20 Case IV MVA, 3-phase, 525/18 kv, Wye/Delta, GSU Test conducted using FAN-EPT MVA, 525 kv GSU transformers monitored simultaneously One healthy Other faulty

21 Signals on several sensors monitored 24/7 by FAN-EPT

22 FAN-EPT Saving Transformers Worldwide

23 Briefcase This is our portable lunchbox -style Briefcase technology.

24 More Briefcase Pictures Saving Transformers Worldwide

25 EASY PLACEMENT OF SENSORS ON TANK No need to cross voltage barrier

26 LV Turret view Failure at the ZNOX connections

27 Failure at the cleats of OLTC lead outs

28 180 MVA, 345 kv GSU Saving Transformers Worldwide

29 Large 345 kv Transformer Saving Transformers Worldwide

30 500 kv, GSU, Single Phase, CANDU CANADA Failure detected in HV HISERCAP winding Westinghouse Design of the eighties.

31

32

33

34

35

36 Advantages of Acoustic System for PD Detection and Location Can be used when Transformer is on-line & in the field Can be used when Transformer is being tested during Applied Voltage or Induced Voltage test Non-invasive and considerably safe and personnel kept far from harms way System robust enough to differentiate between actual PD and other noise

37 Transformer Failure Facts Transformer failure rate in the USA by % * 100,000 units Transformer failure rate worldwide by % * 400,000 units Recent studies by Mr. Bill Bartley, IEEE Fellow, 14 of erstwhile HSB have shown that the average failure age is 14.9 yrs vs. 25 years as traditionally envisaged ** * Transformer Asset Management A New Paradigm, Energy Central, Energy Plus, 2004 ** An Analysis of Transformer Failures, Part 1 & An Analysis of Transformer Failures, Part through 1997, By William H. Bartley, P.E.

38 Wavelet Transforms (WT) Methodology Benefits A powerful preventative maintenance tool Early detection of incipient faults avoids costly repairs and downtime Extends the life of costly transformers and minimizes premature failure Maximizes uninterrupted power generation and distribution Minimizes customer-outage minutes

39 WT Method contd. Can diagnose type and level of problem from remote or local stations Used for quality acceptance test on new transformers and generates base-line data Minimizes health & safety problems Reduces insurance costs for equipment and personnel

40 Briefcase Saving Transformers Worldwide

41 800 MVA, 161 kv, GSU, high LV currents

42

43

44 Recent tests in Cabanatuan S.Luzon, Philippines 100 MVA Saving Transformers Worldwide

45 Das Marinas Sub-Station, Philippines, 300 MVA Auto Saving Transformers Worldwide

46 90 MVA shell Saving Transformers Worldwide

47 25 MVA, 34.5 kv Rectifier Transformers Saving Transformers Worldwide

48 PD due to Bubbles 1) Temperature onset-150 deg C 2) Signal characteristics - similar to being an arrow-head with a considerable amount of signal pile-up. BW : 100 k Hz to 200 khz 3) Sensors are typically mounted on the cover of the transformer with care to see if the electrical clearances for specific voltage levels are met and with the permission of the use/client in shop testing and linemen in the field operations. Sensor relocation to be done only by qualified individuals not by the PD testers by acoustic methods. 4) DGA gases to be simultaneously checked: are large quantities of Hydrogen. Carbon monoxide and Carbon dioxide ratio of least concern. Roger's test to be watched carefully.

49 26 MVA, 34.5 kv Rectifier Transformer PD Test during Heat Run Saving Transformers Worldwide

50 450 MVA Core type Saving Transformers Worldwide

51 UHART Go Hawks! UCONN-Go Huskies! Tel: (860) Fax: (860) DDI Tel: (860) Fax: (860) USA

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION - S K Mishra & S K Das NHPC Ltd O&M Division 1 PRESENTATION COVERS Introduction DESCRIPTION OF EVENTS INITIAL RESPONSE DETAILED INSPECTION

More information

RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS

RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS Authored by: Sanjay Srivastava, Chief Engineer (HE&RM), Rakesh Kumar, Director (HE&RM), R.K. Jayaswal, Dy. Director (HE&RM)

More information

The Polytransformer. The Multivoltage Substation Power Transformer

The Polytransformer. The Multivoltage Substation Power Transformer The Polytransformer The Multivoltage Substation Power Transformer The need for a single transformer for different transmission systems. Change of electric power industry to a fully competitive and deregulated

More information

Matz Ohlen Director Transformer Test Systems. Megger Sweden

Matz Ohlen Director Transformer Test Systems. Megger Sweden Matz Ohlen Director Transformer Test Systems Megger Sweden Frequency response analysis of power transformers Measuring and analyzing data as function of frequency, variable frequency diagnostics Impedance

More information

Transformer Factory Testing

Transformer Factory Testing Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification

More information

The importance of partial discharge testing throughout the development and operation of power transformers

The importance of partial discharge testing throughout the development and operation of power transformers The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense

More information

Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers

Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers in cooperation with Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers BZ-MS/1 pazifik power Complete Transformer Monitoring System (TMS) ZVCM-1001 Bushing Monitoring

More information

PD Solutions. On-Line PD Measurement Devices

PD Solutions. On-Line PD Measurement Devices On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed

More information

Benefits of SFRA - Case Studies

Benefits of SFRA - Case Studies 6 th International Conference on Large Power Transformers- Modern Trends Benefits of SFRA - Case Studies B B Ahir Gujarat Energy Transmission Corporation Limited 1 Outline Condition Monitoring in GETCO

More information

Acoustic Emission in power transformers. Ajusco 15, Colonia Portales, Delegación Benito Juárez, C.P , México, D.F.

Acoustic Emission in power transformers. Ajusco 15, Colonia Portales, Delegación Benito Juárez, C.P , México, D.F. Acoustic Emission in power transformers 1 More expensive equipment in the substation Many years of operation First indication of a problem: Dissolved Gases Begin investigation to determine the origin of

More information

Diagnostic testing of cast resin transformers

Diagnostic testing of cast resin transformers Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com

More information

Transformer condition assessment with an integrated test van

Transformer condition assessment with an integrated test van Transformer condition assessment with an integrated test van 1 2012 SebaKMT Measuring and locating techniques MADE in GERMANY 2 Testing and Standards for Power Transformers CIGRE CIGRE Brochure 342 (SFRA-FRAX)

More information

Cable fault location in power cables. Systematics for cable testing, diagnosis and cable fault location

Cable fault location in power cables. Systematics for cable testing, diagnosis and cable fault location Cable fault location in power cables Systematics for cable testing, diagnosis and cable fault location CABLE JOINTS, CABLE TERMINATIONS, CABLE GLANDS, CABLE CLEATS FEEDER PILLARS, FUSE LINKS, ARC FLASH,

More information

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA Taking into account that power transformer is the major item of equipment in power systems, its correct operation is vital to system operation. It is well known that transformer failures are sometimes

More information

Advanced Diagnostic Testing Services. Provides detailed and reliable results

Advanced Diagnostic Testing Services. Provides detailed and reliable results Advanced Diagnostic Testing Services Provides detailed and reliable results Advanced Diagnostic Testing Services from the world s leading manufacturer of power transformers ABB leadership begins with our

More information

DIFFERENTIAL PROTECTION METHODOLOGY FOR ARBITRARY THREE-PHASE POWER TRANSFORMERS

DIFFERENTIAL PROTECTION METHODOLOGY FOR ARBITRARY THREE-PHASE POWER TRANSFORMERS DFFERENTAL PROTECTON METHODOLOGY FOR ARBTRARY THREE-PHASE POWER TRANSFORMERS Z. Gaji ABB AB-SA Products, Sweden; zoran.gajic@se.abb.com Keywords: power transformer, phase shifting transformer, converter

More information

Chapter 7 Conclusion 7.1 General

Chapter 7 Conclusion 7.1 General Chapter 7 7.1 General The mechanical integrity of a transformer winding is challenged by several mechanisms. Many dielectric failures in transformers are direct results of reduced mechanical strength due

More information

DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER

DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER JESSE M LOPEZ CPS ENERGY USA EMILIO MORALES CRUZ QUALITROL USA SUMMARY Power transformers are essential

More information

A Process for Evaluating the Degree of Susceptibility of a fleet of Power Transformers to Effects of GIC

A Process for Evaluating the Degree of Susceptibility of a fleet of Power Transformers to Effects of GIC 1 A Process for Evaluating the Degree of Susceptibility of a fleet of Power Transformers to Effects of GIC Ramsis Girgis, Kiran Vedante, and Gary Burden ABB Power Transformers Abstract: There has been

More information

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS n Quality made in Germany n Standardized and customized solutions n Turn key projects, all from one hand 0.1-1/1 Product Portfolio Test and Measuring Systems

More information

Power Transformers Basics

Power Transformers Basics Power Transformers Basics Transformer Basic Objective Introduce Basic Transformer Theory as it Relates to Diagnostics Provide a Better Understanding of the Diagnostic Test Environment Identify Important

More information

Autotransformer Condition Monitoring Systems

Autotransformer Condition Monitoring Systems Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following

More information

GENERATOR TESTING APPLICATION GUIDE. reliable. precision.

GENERATOR TESTING APPLICATION GUIDE.  reliable. precision. GENERATOR TESTING APPLICATION GUIDE www.haefely-hipotronics.com reliable. precision. 2 GENERATOR TESTING CONTENTS Product Line Overview 3 AC Hipot Testing 4 Partial Discharge Measurement 5 DC Hipot Testing

More information

HVI - The World s Source For High Voltage Test Equipment

HVI - The World s Source For High Voltage Test Equipment HVI - The World s Source For High Voltage Test Euipment HVI Products Are Designed to Surpass All Others in Features, Specifications, and Ease in Use The World s Source for High Voltage Test EuipmentMADE

More information

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES Thomas Steiner HIGHVOLT Prüftechnik Dresden GmbH Lifecycle of utilities time schedule utilities Tests during life cycle of utilities

More information

Ariadna Instruments. Power cable identifier & LV live network phase and feeder identifier

Ariadna Instruments. Power cable identifier & LV live network phase and feeder identifier Ariadna Instruments Power cable identifier & LV live network phase and feeder identifier Cable identifiers Cable identifiers There are situations where it is necessary a correctly identification the distribution

More information

N S Sodha, Former Executive Director, POWERGRID Corpn, Gurgaon

N S Sodha, Former Executive Director, POWERGRID Corpn, Gurgaon N S Sodha, Former Executive Director, POWERGRID Corpn, Gurgaon POWER TRANSFORMERS Factory condition POWER TRANSFORMERS Site condition POWER TRANSFORMER FAULTS Faults in a Transformer 1. Internal Faults

More information

Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers

Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Dr. Michael Krüger, Alexander Kraetge, OMICRON electronics GmbH, Austria Alexander

More information

SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING

SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING 9.11/2 Transformer Testing n Type tests n Routine tests n Special tests n Applicable for tests on power and distribution transformers in factory and on-site

More information

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results 2016 International Conference on Electrical Engineering and Automation (ICEEA 2016) ISBN: 978-1-60595-407-3 Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results Cristian DAN

More information

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor 500 kva Dry-type Isolation Transformer - 13200V-Delta to 208Y/120V 3PH - NEMA 1/Indoor Part #: MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Page: 1 The MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Dry-type Isolation

More information

MODEL INFORMATION. AccuLoss MODELS ALMS 2100, ALMS 4100, ALMS 4200, ALMS 6200 & ALMS 4300

MODEL INFORMATION. AccuLoss MODELS ALMS 2100, ALMS 4100, ALMS 4200, ALMS 6200 & ALMS 4300 AccuLoss MODELS ALMS 2100, ALMS 4100, ALMS 4200, ALMS 6200 & ALMS 4300 The measurement of electric power and energy at high voltages and currents at low power factors is becoming increasingly important

More information

ALWAYS SWITCHED ON TO YOUR SUBSEA CABLES

ALWAYS SWITCHED ON TO YOUR SUBSEA CABLES ALWAYS SWITCHED ON TO YOUR SUBSEA CABLES The critical role performed by submarine cables in enabling power transmission via subsea interconnectors from offshore wind farms is threatened by an increasing

More information

Mobile Power Transformer Test Systm

Mobile Power Transformer Test Systm TMPTTS Series Mobile Power Transformer Test Systm MPTTS Series Mobile Power Transformer Test System is design to test and diagnose in both single phase and three phase power transformer up to 500MVA. The

More information

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate

More information

ABB Power Products Service

ABB Power Products Service Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?

More information

Use of On and Offline Oil Analysis on the ESB, Distribution and Generation Networks

Use of On and Offline Oil Analysis on the ESB, Distribution and Generation Networks Reliability Ireland Conference 2016, Grand Hotel Malahide, 12-13 April 2016, Dublin, Ireland. Use of On and Offline Oil Analysis on the ESB, Distribution and Generation Networks J. Carpenter*, ESB International,

More information

TRANSFORMER SERVICES OUR KNOWLEDGE. YOUR EXPERTS.

TRANSFORMER SERVICES OUR KNOWLEDGE. YOUR EXPERTS. TRANSFORMER SERVICES OUR KNOWLEDGE. YOUR EXPERTS. WWW.REINHAUSEN.COM Diagnostics Consulting Service TRANSFORMER LIFECYCLE PARTNER Modernization TRANSFORMER SERVICES 2 MAXIMUM AVAILABILITY. IDEALLY PLANNED.

More information

CHAPTER 3 REVIEW OF POWER TRANSFORMER PROTECTION SCHEMES

CHAPTER 3 REVIEW OF POWER TRANSFORMER PROTECTION SCHEMES CHAPTER 3 REVIEW OF POWER TRANSFORMER PROTECTION SCHEMES 3.1. Introduction Power Transformer is the nerve centre of any power distribution system. The capacity of power transformers is generally decided

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser - OMICRON Transformers Diagnostic Testing - OVERALL DGA Oil Screen Power Factor / Capacitance Exciting Current Transformer

More information

Maintenance & Diagnosis Strategies. for. High Voltage Substations

Maintenance & Diagnosis Strategies. for. High Voltage Substations Maintenance & Diagnosis Strategies for High Voltage Substations 1/ 52 Robin Fischer, 28 April 2004 Diagnosis of Substation Equipment Power Transformers Instrument Transformers Switch-Gears Breakers Coils

More information

TECHIMP Power Transformer Monitoring

TECHIMP Power Transformer Monitoring TECHIMP Power Transformer Monitoring Kontakt: Martin Hesse Techimp Germany GmbH i.g. E-Mail: mhesse@techimp.com Tel.: +49 5724 391 007 Mobil: +49 170 2364 735 PD Monitoring of Power Transformers Power

More information

SIGNATURE ANALYSIS FOR ON-LINE MOTOR DIAGNOSTICS

SIGNATURE ANALYSIS FOR ON-LINE MOTOR DIAGNOSTICS Page 1 of 10 2015-PPIC-0187 SIGNATURE ANALYSIS FOR ON-LINE MOTOR DIAGNOSTICS Ian Culbert Senior Member, IEEE Qualitrol-Iris Power 3110 American Drive Mississauga, ON Canada Abstract - Stator current signature

More information

SHORE TO SHIP FREQUENCY

SHORE TO SHIP FREQUENCY POWER SYSTEMS INTERNATIONAL SHORE POWER POWER CONVERSION SYSTEMS 50Hz, 60Hz and 400Hz three phase and single phase There is a growing world focus on energy conservation with the drive towards reducing

More information

Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers

Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Alexander Dierks, Herman Viljoen, Alectrix (Pty) Ltd, South Africa

More information

Effective maintenance test techniques for power transformers

Effective maintenance test techniques for power transformers Effective maintenance test techniques for power transformers by Alexander Dierks, Herman Viljoen, Alectrix, South Africa, and Dr. Michael Krüger, Omicron Electronics, Austria Due to ever-increasing pressure

More information

HVA SERIES VLF TEST SETS. Hipot Testers HVA Series for VLF (0.1 Hz) testing of MV and HV cables.

HVA SERIES VLF TEST SETS. Hipot Testers HVA Series for VLF (0.1 Hz) testing of MV and HV cables. HVA SERIES VLF TEST SETS Hipot Testers HVA Series for VLF (0.1 Hz) testing of MV and HV cables. INNOVATIVE, RELIABLE, ECONOMICAL HIGH VOLTAGE TESTING FROM b2 HIGH VOLTAGE VLF, DC, cable sheath testing

More information

A Comparative Diagnosis Approach on Transformer s Insulating Oil Ming-Jong Lin

A Comparative Diagnosis Approach on Transformer s Insulating Oil Ming-Jong Lin Information Technology and Mechatronics Engineering Conference (ITOEC 2015) A Comparative Approach on Transformer s Insulating Oil Ming-Jong Lin No. 11 North Road Nanke, Shanhua District, Tainan City,

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012 Ref: ART-B22-D70, ART-B22-D125, ART-B22-D175 Flexible clip-around Rogowski coil for the electronic measurement of AC current with galvanic separation between the primary circuit (power) and the secondary

More information

TECHNIQUES AND STANDARD

TECHNIQUES AND STANDARD TRANSFORMER TESTING TECHNIQUES AND STANDARD DEVELOPMENT BY DIEGO M. ROBALINO, PhD, PMP, MEGGER-AVO Training Institute Transformer manufacturers and field operators have always benefitted when new technologies

More information

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Dominique Bolliger, Ph.D. HV TECHNOLOGIES, Inc. Manassas, VA, USA d.bolliger@hvtechnologies.com Abstract In

More information

PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT

PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT WELCOME TO PRY-CAM A REVOLUTION IN PARTIAL DISCHARGE MANAGEMENT The worlds of partial discharge (PD) measurement, asset management

More information

A Novel Technique to Precise the Diagnosis of Power Transformer Internal Faults

A Novel Technique to Precise the Diagnosis of Power Transformer Internal Faults A Novel Technique to Precise the Diagnosis of Power Transformer Internal Faults U. Mohan Rao 1 & D.Vijay Kumar 2 1 Department of Electrical Engineering, National Institute of Technology, Hamirpur, H.P,

More information

Case Studies of Electric Power Equipment Diagnostics Using Acoustic Emission

Case Studies of Electric Power Equipment Diagnostics Using Acoustic Emission 17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China Case Studies of Electric Power Equipment Diagnostics Using Acoustic Emission Oswaldo G. SANTOS FILHO 1, Sergio L. ZAGHETTO

More information

Cable testing and diagnostics

Cable testing and diagnostics Cable testing and diagnostics To ensure the flow Cost-optimised maintenance through cable diagnostics The sheath and cable testing supports you in assessing whether a cable system is safe and ready to

More information

Part 7: Thermography

Part 7: Thermography INTERNATIONAL STANDARD ISO 18436-7 Second edition 2014-04-01 Condition monitoring and diagnostics of machines Requirements for qualification and assessment of personnel Part 7: Thermography Surveillance

More information

Using DFR to determine dissipation factor temperature dependence

Using DFR to determine dissipation factor temperature dependence Using DFR to determine dissipation factor temperature dependence by Matz Ohlen and Peter Werelius, Megger With an aging power component population, today s electrical utility industry faces a tough challenge

More information

XYR 5000 Wireless Transmitters SIMPLE. SAFE. SECURE. Honeywell Solutions for Wireless Data Acquisiton and Monitoring

XYR 5000 Wireless Transmitters SIMPLE. SAFE. SECURE. Honeywell Solutions for Wireless Data Acquisiton and Monitoring XYR 5000 Wireless Transmitters SIMPLE. SAFE. SECURE. Honeywell Solutions for Wireless Data Acquisiton and Monitoring No Wire. No Problem. We ve cut the cord that s tethered transmitters to control or data

More information

Problems connected with Commissioning of Power Transformers

Problems connected with Commissioning of Power Transformers Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.

More information

PARTIAL DISCHARGE MEASUREMENT

PARTIAL DISCHARGE MEASUREMENT PARTIAL DISCHARGE MEASUREMENT Partial Discharges are small electrical sparks which occur predominantly at insulation imperfection. It is the phenomenon which occurs in the insulation on application of

More information

Transformers handling and transport

Transformers handling and transport Special tests (Credit: http://www.breakbulk.com/wp-content/uploads/2015/02/20141117160247x.jpg) Transformers handling and transport Damages that may arise and how to find them Table of contents summary

More information

Smart Cities Solutions for Disaster Management Based on Satellites and Wireless Sensor Networks

Smart Cities Solutions for Disaster Management Based on Satellites and Wireless Sensor Networks Smart Cities Solutions for Disaster Management Based on Satellites and Wireless Sensor Networks Presented by Dr. Krishna Dev Kumar Professor of Aerospace Engineering Director, Artificial Intelligence and

More information

MT..KB SERIES 60 A 70 A. Power Modules THREE PHASE BRIDGE. Features. Description. Major Ratings and Characteristics. Bulletin I27500 rev.

MT..KB SERIES 60 A 70 A. Power Modules THREE PHASE BRIDGE. Features. Description. Major Ratings and Characteristics. Bulletin I27500 rev. MT..KB SERIES THREE PHASE BRIDGE Power Modules Features Package fully compatible with the industry standard INT-Apak power modules series High thermal conductivity package, electrically insulated case

More information

Vallabh Vidyanagar, Anand, INDIA

Vallabh Vidyanagar, Anand, INDIA IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE) e-issn: 2278-1676,p-ISSN: 2320-3331, Volume 9, Issue 1 Ver. V (Feb. 2014), PP 01-06 Interpretation of Sweep Frequency Response Analysis

More information

Onsite Mobile AC High Voltage Test System

Onsite Mobile AC High Voltage Test System TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument

More information

Predictive Diagnostics for Pump Seals: Field Trial Learnings. Matthew Miller, John Crane

Predictive Diagnostics for Pump Seals: Field Trial Learnings. Matthew Miller, John Crane Predictive Diagnostics for Pump Seals: Field Trial Learnings Matthew Miller, John Crane Brad D. Lewis Senior Reliability Engineer Authors Bios Matthew Miller Field Service Engineer At INEOS from 2014-2016

More information

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications: SGMF(T) series Onsite Mobile AC High Voltage Test System On-site AC high voltage test systems are used for voltage withstanding test, partial discharge measurement, tan delta measurement on those instrument

More information

Tom Ernst GE Digital Energy Craig Talbot Minnesota Power

Tom Ernst GE Digital Energy Craig Talbot Minnesota Power Tom Ernst GE Digital Energy Craig Talbot Minnesota Power Introduction Traditional 3-phase testing method Traditional 1-phase testing method Alternate 1-phase testing method Application examples 3-Phase

More information

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017 Ref: ART-B22-D70, ART-B22-D125, ART-B22-D175, ART-B22-D300 Flexible clip-around Rogowski coil for the electronic measurement of AC current with galvanic separation between the primary circuit (power) and

More information

Operational Management of Grid Transformers An Experience of POWERGRID

Operational Management of Grid Transformers An Experience of POWERGRID Operational Management of Grid Transformers An Experience of POWERGRID 1.0 Introduction P.N. Dixit, GM; S. Victor, AGM; V.K. Bhaskar, CM; Gunjan Agrawal, Manager Operation Services Department Power Grid

More information

The Weidmann Conference The Aging of America s Transformers

The Weidmann Conference The Aging of America s Transformers The Weidmann Conference 2006 The Aging of America s Transformers by Jon L. Giesecke, Director, (610) 518-1615 jlgassociatesllc@yahoo.com How Old is Old? The aging of the electrical infrastructure in the

More information

SPECIAL SPECIFICATION 1806 Spread Spectrum Wireless Modem

SPECIAL SPECIFICATION 1806 Spread Spectrum Wireless Modem 1993 Specifications CSJ s 0902-48-442 & 0902-48-432 SPECIAL SPECIFICATION 1806 Spread Spectrum Wireless Modem 1. General. This Item shall govern for the furnishing and installation of Spread Spectrum Wireless

More information

Power transformers for Network, Rectifiers, Furnace

Power transformers for Network, Rectifiers, Furnace E N G L I S H OTN, OTR, OTF Transformers Power transformers for Network, Rectifiers, Furnace TTR TTO OTN, OTR, OTF reactors TTH OTN, OTR, OTF Transformers Technology Design Our designers experience combined

More information

Primary Test Manager (PTM) Testing and management software for primary assets

Primary Test Manager (PTM) Testing and management software for primary assets Primary Test Manager (PTM) Testing and management software for primary assets Asset diagnostics now easier than ever How well do you know your assets? High-voltage assets are subjected to aging and wear

More information

CT Analyzer. Revolution in current transformer testing and calibration

CT Analyzer. Revolution in current transformer testing and calibration CT Analyzer Revolution in current transformer testing and calibration Revolutionary way of CT testing Current transformers are used for relaying and metering purposes in electrical power systems. They

More information

Grid Radar Installation Manual

Grid Radar Installation Manual Grid Radar Installation Manual MODELS GN-RD-001 120V Single Phase / Wye, 240V Single Phase, with Neutral GN-RD-002 277V 3-Phase Wye, with Neutral GN-RD-003 480V 3-Phase Delta, no Neutral GN-RD-004 208V

More information

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved. Pomona, CA, May 24 & 25, 2016 Tertiary Winding Design in wye-wye Connected Transformers Scope of Presentation > Tertiary vs. Stabilizing Winding? Tertiary vs. Stabilizing Winding? Need for Stabilizing

More information

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis feature By brandon dupuis An Introduction to Electrical diagnostic TesTIng of Power Transformers 38 Transformers are the largest, most expensive, and highly critical components of most utility substations.

More information

Progress Report on Failures of High Voltage Bushings with Draw Leads By Jim McBride and Larry Coffeen, JMX Services / NEETRAC 7/26/2010

Progress Report on Failures of High Voltage Bushings with Draw Leads By Jim McBride and Larry Coffeen, JMX Services / NEETRAC 7/26/2010 The Team: Jim McBride: IEEE Member Larry Coffeen: IEEE Senior Member President, JMX Services, Inc. Senior Research Engineer, NEETRAC BS EE Georgia Tech BS EE Georgia Tech Testing, DAQ, and Measurement

More information

Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques

Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Charles Sweetser, Services Manager, PRIM Engineering, Waltham, Mass. Topics of Discussion

More information

USING DAMPED AC VOLTAGES

USING DAMPED AC VOLTAGES MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States

More information

Technical Questionnaire 9.101/6 Transformer Test System. Personal Data. Application. Test of. Delivery scope

Technical Questionnaire 9.101/6 Transformer Test System. Personal Data. Application. Test of. Delivery scope Date: Page: 1 / 10 Personal Data Name: Company / institution: Phone: E-mail: Fax: Application Quotation number: (will be filled in by HIGHVOLT) Test field, stationary research institute mobile on-site

More information

REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD.

REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD. REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD. (DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/2015-16/Mgr(T)O&M-E-2/22

More information

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60060-3 First edition 2006-02 High-voltage test techniques Part 3: Definitions and requirements for on-site testing Reference number IEC 60060-3:2006(E) Publication numbering

More information

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch. Training Title POWER TRANSFORMERS Training Duration 5 days Training Venue and Dates Power transformers 5 20-24 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue will be informed soon. Training

More information

H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C

H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C S O L U T I O N S Y O U R S O U R C E F O R T O P Q U A L I T Y T E S T E Q U I P M E N T w w w. h v t e c h n o l o g i e s. c o m Company

More information

Dielectric analysis of high-voltage power transformers DIAGNOSIS ABSTRACT KEYWORDS. 1. Introduction

Dielectric analysis of high-voltage power transformers DIAGNOSIS ABSTRACT KEYWORDS. 1. Introduction DIAGNOSIS ABSTRACT Dielectric tests have been used for decades for diagnosis of power transformers and bushings. In addition to the traditional tests at line frequency, modern types of dielectric tests

More information

VOTANO 100. Accurate and mobile voltage transformer testing and calibration system

VOTANO 100. Accurate and mobile voltage transformer testing and calibration system VOTANO 100 Accurate and mobile voltage transformer testing and calibration system Sophisticated testing of inductive and capacitive voltage transformers VOTANO 100: accuracy and portability At only 15

More information

Martin Stoessl R&D Manager Siemens Transformers Austria - Weiz

Martin Stoessl R&D Manager Siemens Transformers Austria - Weiz Martin Stoessl R&D Manager Siemens Transformers Austria - Weiz 2007 1979 1892 Transformer reliability Ability to perform its required functions under stated conditions for a specified period of time Failure

More information

Test systems made by SebaKMT. Don t stress over tests! SebaKMT has the right answers: reliability, speed, economy.

Test systems made by SebaKMT. Don t stress over tests! SebaKMT has the right answers: reliability, speed, economy. Test systems made by SebaKMT Don t stress over tests! SebaKMT has the right answers: reliability, speed, economy. Know how to do it. And what happens next. Test first and save later Connected to the future

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

Substation Test Equipment Guidebook

Substation Test Equipment Guidebook Substation Test Equipment Guidebook CONTENTS TRANSFORMER TURNS RATIO TESTERS CURRENT TRANSFORMER TESTERS CIRCUIT BREAKER ANALYZERS CIRCUIT BREAKER POWER SUPPLIES BREAKER ANALYZER ACCESSORIES 4 5 6 7 8

More information

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX Particulate Control O&M Training APC/PCUG Conference July 12-16, 2009 The Woodlands, TX WPCA Particulate Training Seminar July 11, 2009 ESP Power Supply Choices Slide No 1 Precipitator Power Supplies Conventional

More information

FINDINGS AND REPAIR OF WESTINGHOUSE UTT AND McGRAW 550 TAP CHANGERS

FINDINGS AND REPAIR OF WESTINGHOUSE UTT AND McGRAW 550 TAP CHANGERS FINDINGS AND REPAIR OF WESTINGHOUSE UTT AND McGRAW 550 TAP CHANGERS ABSTRACT Chad Tremaine, First Energy Corp. Goran Milojevic, DV Power Raka Levi, DV Power Toledo Edison had several issues with tap changers

More information

We can classify test failure modes in power transformers according to transformer components

We can classify test failure modes in power transformers according to transformer components ON-SITE TESTS We can classify test failure modes in power transformers according to transformer components ABSTRACT To prevent unexpected outages it is necessary to implement a field test programme. It

More information

G. KOBET, I. GRANT, G. GOZA Tennessee Valley Authority USA. R. GIRGIS, M. ESPINDOLA ABB Corporation USA SUMMARY

G. KOBET, I. GRANT, G. GOZA Tennessee Valley Authority USA. R. GIRGIS, M. ESPINDOLA ABB Corporation USA SUMMARY 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Assessment of the Impact of GMD on the TVA 500 kv Grid & Power Transformers Part II:

More information