1 D Proposal for condition monitoring method for cable network Pertti Pakonen, Bashir Siddiqui, Antti Hilden, 19 February,

2 Contents of the presentation Goal of condition monitoring tests Priorization of cables for condition monitoring Proposed condition monitoring method for cable network High priority cables Medium priority cables Low priority cables Description of the proposed condition monitoring methods Measurement from primary vs. secondary substation Measurement from phase conductors vs. ground straps Examples of condition monitoring measurements in city and rural networks 2

3 Condition monitoring of 6 36 kv cables Goal of condition monitoring To reveal potential defects in materials and installation during their warranty period To prevent unplanned interruptions caused by deterioration of the cable and cable accessories during operation due to electrical, mechanical and thermal stresses To extend the useful life of cables at the end of their lifecycle To produce condition information for Network maintenance Network operation Planning of network renewals 3

4 Priorisation of the cables The extent and methods of condition monitoring should be defined based on the priority of the cable The priority depends on, among others, Criticality of the cable from the customer point of view Number and importance of the customers fed by the cable Harm due to fault (outage costs) Criticality of the cable from structural and installation environment point of view Cable type and accessories (e.g. resilience to environmental stresses, the amount and degree of difficulty of handcrafting in the installation phase) Installation method and soil type (e.g. ploughing in rocky soil is a risk) Environmental stresses (humidity, salt, impurities of air, temperature, temperature variations) 4

5 Condition monitoring methods for different cable priority classes 5

6 Condition monitoring methods Proposed condition monitoring method for cable network High priority cables Continuous on-line PD monitoring, disturbance records Periodic thermal imaging and ultrasonic mapping of terminations Periodic tan-delta Medium priority cables Periodic on-line PD, disturbance records Periodic thermal imaging and ultrasonic mapping of terminations Low priority cables Thermal imaging of terminations Optional periodic on-line PD Disturbance records 6

7 High priority cables Primary method: continuous on-line PD measurement Secondary methods: periodic thermal imaging, analysis of disturbance records (see Task 6.12) Supporting methods: continuous or periodic ultrasonic monitoring discrimination between internal (harmful) and external discharges in terminations Preferred PD measurement method Inductive PD sensor installed permanently at the cable terminations above the ground strap (see figure) to measure PD pulses in the phase conductor 50 Hz synchronization of the PD data From MV busbar voltage transformer secondary (primary substations) or voltage sensor integrated into the cable termination From the LV phase voltages (if MV measurement is not available) Recommeded installation (least susceptible to interference) Alternative installation (more susceptible to interference) 7

8 Medium priority cables Periodic inspections for example 12, 20, 60, 120, 180, 240, 270, 300 etc. months from commissioning (twice during guarantee period, then 5 year intervals and 2.5 year intervals after e.g. 20 years) Primary method: periodic on-line PD detection, disturbance records Supporting methods: Thermal imaging: detection of discharges in terminations Ultrasonic mapping: discrimination between internal (harmful) and external discharges in terminations Methods to enable periodic on-line measurement Installation of permanent low cost inductive sensors on the cable termination Preferably above the ground strap (see figure on the previous page) to measure PD pulses in the phase conductor or alternatively On the ground strap (more susceptible to disturbances) or modification of the cable termination ground strap routing so that PD sensor can be safely installed without supply interruption. Modification could be done e.g. during scheduled secondary substation maintenance or repair outage. 8

9 Low priority cables Periodic inspections for example 20, 60, 240, 360 etc. months from commissioning (once during guarantee period, then 5 year intervals) Primary method Thermal imaging (+ optionally ultrasonic mapping) of cable terminations conducted in conjunction with regular secondary substation inspections: detection of internal and external discharges in terminations Optional periodic on-line PD detection detection of internal discharges in joints and cable itself Secondary method: Analysis of disturbance records detection of e.g. intermittent earth faults in the cable 9

10 Condition monitoring process High priority cables Medium priority cables Low priority cables Continuous on-line PD monitoring Periodic on-line PD detection Periodic - thermal imaging + optional ultrasonic mapping - optional on-line PD det. On-line PD analyzer Thermal+ultrasonic -PD location and assesment Temporarily installed continuous on-line PD monitoring Cable repair or replacement, commissioning measurements Off-line PD, tan delta Provided by a network construction/ maintenance contractor Provided by network operator and/or a service provider Provided by a service provider 10

11 Condition monitoring process Measurement times (months from commissioning): High priority Medium priority 0 0 Continuous monitoring 12 Continuous monitoring if neccessary Low priority

12 Equipment and implementation of PD measurements 12

13 Continuous on-line PD monitoring equipment and implementation Goal: to detect (and locate) partial discharges in Terminations Joints Cable itself Measurement equipment: Permanently installed PD sensors Inductive (most commonly used in cable condition monitoring) Or capacitive Automatic PD measuring unit Recording at least PD intensity trend PRPD pattern Preferably also PD location information 13

14 Measurement sensitivity requirements Reference: Ossi Bergius, Implementation of on-line PD measurements in MV cable networks, MSc thesis,

15 Potential installation locations for inductive sensors Potential locations for HFCT, around: 1. Ground strap of cable 2. Cable sheath 3. A single phase conductor (the recommended method) 4. A single transformer-busbar cable 5. Ground strap of transformer-busbar cable 6. Transformer ground strap Reference: P.C.J.M. Van Der Wielen, J. Veen, P.A.A.F. Wouters, E.F. Steennis, On-line Partial Discharge Detection of MV Cables with Defect Localisation (PDOL) Based on Two Time Synchronised Sensors, 18 th International Conference on Electricity Distribution (CIRED),

16 Temporary continuous on-line PD monitoring: an example of low cost equipment 4 Channel 2 x HFCT sensors, 2 x TEV sensors Discrimination between cable/switchgear PD PD magnitude monitoring 3G/GPRS data upload to FTP server with 30 min intervals, 6 months local data storage Alerts or alarms from high PD levels PD criticality display with 7 color coded LEDs 16

17 Periodic on-line PD detector measurement - equipment and implementation Goal: to detect partial discharges in Terminations Joints Cable itself Quick and simple measurement for surveying a large cable population with equipment that are easy enough to use for any electrician Measurement equipment: Handheld PD detector indicating PD level Inductive PD sensor (to detect cable PD) TEV (transient earth voltage) sensor and US ( ultrasonic) sensor (to detect PD in terminations and switchgear) Handheld detectors available from HVPD (HFCT, TEV, acoustic, tablet application) IPEC (HFCT, TEV, acoustic) at least one manufacturer for cable measurements (also HFCT sensor) IPEC (TEV, acoustic) several manufacturers for switchgear measurements (TEV and US sensor) EA Technology (TEV, acoustic) Various measurements functionalities: PD level (handheld), PD pattern (advanced) 17

18 Periodic on-line PD analyzer measurement - equipment Goal: to detect, locate and evaluate partial discharges in Terminations Joints Cable itself Measurement equipment: Inductive PD sensors for three phases (HFCT or Rogowski) Oscilloscope capable of sampling 20 ms continuously with a sampling rate of at least 50 MS/s At least 1 Mpoints/channel memory Preferably selectable MHz low-pass filtering (bandwidth limit) Differential probe for 50 Hz phase voltage signal from MV busbar voltage transformer secondary (if possible) LV mains outlet (note the phase (L1, L2 or L3) where outlet is connected and the vector group of the MV/LV transformer) 18

19 Periodic on-line measurement - procedure 1. PD sensor test/calibration, aiming to: check that all sensors and cables work and a correctly connected determine the amplitude correction factor of each sensor store the calibration pulse waveforms (for use in the interpretation of the PD measurement results) 2. Pulse injection test, aiming to: to determine the pulse propagation velocity in the cable if the cable length is known based on the network information system or cable path measurement (or if the propagation velocity is known, to detetrmine the cable length) store a reference waveform of the pulse reflections (joints, cable end) 3. PD measurement, aiming to: to store several (or preferably tens or hundreds of) 50 Hz cycles of 3- phase PD data and 50 Hz phase voltage reference for further analysis 19

20 PD sensor test/calibration: Measurement setup (sensors around the cable termination): R=50 ohm 3 x HFCT PD calibrator Oscilloscope Fig. 1. Sensors around the cable terminations. Fig. 2. On-site demonstration (sensors around the ground straps). 20

21 Pulse injection: HFCT 3 x HFCT Pulse generator (10 Vp-p voltage) Oscilloscope Fig. 1. Diagram of the pulse injection setup. Fig. 2. On-site demonstration (sensors around the ground straps). 21

22 PD measurement: PRPD pattern measured at a rural secondary substation PD measurement setup at a city primary substation Important considerations: Install the sensors at the cable terminations above the ground strap (see figure) to measure PD pulses in the phase conductor make sure that the volts/div setting is high enough so that there are no range overflows in the measurement data (if some of the pulses are clipped, filtering and data analysis results will be degraded) 22

23 Documentation of the PD measurements The following information is proposed to be documented from PD measurement setup: Measuring device + sensor(s), firmware/software version Connection method/place of the sensor Measurement date/time, temperature and humidity (outdoor locations) Network configuration, cable load currents From PD measurements of each phase: Background noise level [pc], approximation between the PD pulse trains Measurement voltage (optional) PD levels [pc] in each phase - largest repeatedly occurring pulse (LROP), max pulse PRPD (phase resolved PD) patterns in each phase PD location(s) in each phase 23

24 Which PD magnitude is harmful? The harmfulness of the discharge depends on, among others: The dielectric material in or on which the partial discharge takes place Magnitude and direction of electric field at the discharge location The gas in which the partial discharge occurs Practical apparent charge limits for XLPE and paper-oil insulated cables: In product standards of cables and cable accessories the following requirements are specified for maximum apparent charges XLPE cables < 5 pc terminations and joints of XLPE cables < 20 pc 24

25 PD measurement system vendors and service providers (underground cable monitoring) IPEC Ltd, UK, HVPD, UK, EA technology, UK, Iris Power LP, Canada, Omicron, Austria, Power Diagnostix Systems GmbH, Germany, Doble Lemke, Germany, SebaKMT, Germany, Dynamic Ratings, Inc., USA, DNV GL (Smart Cable Guard on-line PD monitoring services) Emerson Electric Co, USA, (measurement services) Prysmian Group (Pry-Cam, continuous and periodic on- line PD monitoring) Dekra Industrial Oy (off-line PD, tan delta) 25

26 Thermal imaging 26

27 Thermal imaging Thermal imaging may detect loose contacts e.g. in cable lugs internal and external partial discharges in cable terminations and support insulators/metal oxide arresters (MOAs) Equipment: the existence of PD should be confirmed by electrical PD measurements thermal imaging supports PD location based on electrical PD measurement Thermal camera Resolution: at least 120 x 160 Documentation of the results: Thermal camera model and software version, distance btw. lens and terminations Date and time, temperature and humidity (outdoor locations), cable load currents Thermal image with locations of the hotspots Temperatures and locations of the hotspots in numerical form Average cable termination temperature (+ optionally temperature difference between the hotspots and average cable termination temperature) 27

28 Thermal imaging Important considerations related to thermal imaging: Before making any maintenance or repair decisions based on partial discharges detected, verify that Detected hot-spots are really due to internal discharges and not, e.g. due to External discharges on the surface of the termination, which are usually caused by condensed moisture at the surface of the termination and, according to termination manufacturers, not harmful (if necessary, they can be removed by cleaning and drying the termination surface) This may be verified e.g. based on ultrasonic measurements (internal discharges usually cannot be detected using the horn or parabolic sensor) location of the hot-spots in thermal image (internal discharges are usually located around the end of the insulation screen) the extent of temperature rise compared to surrounding surfaces (in internal discharges this is usually relatively small) Detection of loose contacts requires that there is a considerable (e.g. 50 % of the nominal) load current running through the cable 28

29 An example of external discharges in 20 kv heat shrink terminations Photo: Seppo Suurinkeroinen, Kymenlaakson Sähköverkko Oy Thermal image: Seppo Suurinkeroinen, Kymenlaakson Sähköverkko Oy Visible white oxidation caused by tracking discharges over the dry bands Not harmful according to the termination manufacturer Discharge sites at varying locations Relatively high temperature increase (> 10 C) 29

30 Examples of external discharges in 20 kv secondary substations Photo: Seppo Suurinkeroinen, Kymenlaakson Sähköverkko Oy Photo: Seppo Suurinkeroinen, Kymenlaakson Sähköverkko Oy Surface discharges at the end of a cable termination Surface discharges at the end terminal of a metal oxide surge arrester 30

31 Optional wireless measurements connected to thermal camera Many new thermal cameras support wireless sensors, e.g. Voltage sensors Current sensors Temperature sensors The sensor reading is recorded to the thermal image data Thermal image Thermal image data File Location C:\Fluke\IR IS2 Image Time 12/10/2014 7:31:00 PM Emissivity 0.95 Background Temp 2.0 C Transmission 100% Image Range 2.5 C to 14.8 C Average Temp 4.6 C Severity Camera model Ti110 IR Sensor Size 120 x 160 Camera Manufacturer Fluke Thermography Calibration Range C to C Camera serial number Ti Camera Firmware Compass NE I AAC A AAC A AAC Sensor type: I3000 AC current A A3000 AC current 0-400A Optional measurement data from wireless sensors (max. 5 or 10 sensors) at IR imaging instant 31

32 Ultrasonic mapping 32

33 Ultrasonic mapping Goal: to discriminate btw. two discharge types visible in thermal images Harmful internal discharges e.g. due to problems in stress control at the end of insulation screen (e.g. installation faults) Usually not detectable by ultrasonic measurement Usually less harmful external discharges due to condensed moisture and dry band forming on the surface of the termination Detectable by ultrasonic measurement Equipment: Ultrasonic detector with Center frequency f = 40 khz Bandwidth (-6 db) f = ±2 khz Documentation of the results: Ultrasonic detector model and software version Date and time, temperature and humidity (outdoor locations), cable load currents Location of the highest ultrasonic source in each phase, average and maximum ultrasonic noise voltage in dbµv at those locations, measured at a distance of 1,5 m from the termination 33

34 Ultrasonic mapping Detector types Detector with cone form concentrator Most suitable for measurement distances of 1-2 m Detector with parabolic reflector Most suitable for measurement distances of 5-50 m Detector with parabolic detector Note that depending on the construction of the detector there may be a considerable parallax error between the focus points of the laser pointer and parabolic reflector (ultrasound) if the measurement is done closer to the target than recommended (e.g. < 5 m) Fig. 1. Ultrasonic detector with cone form concentrator. Fig. 2. Ultrasonic detector with parabolic reflector. 34

35 Analysis of disturbance records Disturbance recordings made by feeder terminals or dedicated earth fault indicators may be utilised to detect incipient faults (such as intermittent earth faults) in the network This may give an early warning of the developing fault already before it causes an actual tripping An example of U 0 and I 0 measured from a feeder having an intermittent earth fault. 35

36 Implementation of PD measurements 36

37 Measurement from primary vs. secondary substation Primary substation (PS) Secondary substation (SS) - Recommended + many cables available for measurement (efficient) + often lower noise level compared to PS + MV phase voltages available from busbar PT s for sync. - no potential transformers for 50 Hz sync of PD meas. + warm and dry environment - usually only 1-4 cables available for measurement - often higher noise level compared to SS - usually outdoor environment especially at rural SS PD site PS - PD site =120 m PD Primary substation site SS =1160 m Secondary substation Reflections from secondary substation Direct pulse from PD site Direct pulse from PD site Reflections from primary substation Fig. 1. Measurement from primary substation. Fig. 2. Measurement from secondary substation. 37

38 Measurement from phase conductor vs. ground strap Phase conductor - Recommended + less phase to phase crosstalk and disturbances compared to ground strap Ground strap + lower 50 Hz current - higher 50 Hz current -> HFCT saturation + usually accessible - not accessible in plug-in terminations - more susceptible to phase-to-phase crosstalk and disturbances compared to phase conductor Fig. 1. Measurement from phase conductor, no phase to phase cross-talk. Fig. 2. Measurement from ground strap, same PD appears in all three phases. 38

39 Measurement from phase conductor vs. ground strap Ground strap measurement Identical HFCT s in both. Phase conductor measurement Fig. 1. Full 50 Hz cycle. Fig. 2. Single PD pulse and its reflections. The pulses measured from ground strap are equal to those measured from phase conductor, but opposite in polarity (measurement location: a rural secondary substation). 39

40 50 Hz synchronization for PD measurement from switchgear bay capacitive voltage outputs Comparison for the 50 Hz synchronization for PD measurement capacitive voltage detector outputs of primary substation switchgear busbar phase voltage transformers Both connected to oscilloscope using LeCroy AP031 differential probes Results: Phase difference between the measurements approx. 4.8 degrees (bay capacitive voltage detector output leading) Waveform excellent in both measurements 40

41 Examples of condition monitoring measurements in city and rural networks 41

42 Examples of PD in city network cables (primary substation measurement) Void discharges in cable junction + noise Corona in switchgear (phase L2) Instrument LeCroy WaveRunner LT354 ML Cable 1682 m PILC m XLPE Phase Noise [pc] LROP [pc] Max [pc] L L L Instrument LeCroy WaveRunner LT354 ML Cable 881 m PILC m XLPE Phase Noise [pc] LROP [pc] Max [pc] L L L

43 Examples of internal discharges in cable terminations of a rural secondary substation PD-measurement before repair 20 ms Thermal image before repair partial discharges PD-measurement after repair Discharge sites at the ends of insulation screens Very small temperature increase - approx. 1 C 43

44 An example of the summary documentation of a periodic on-line condition monitoring measurement of a rural secondary substation Date PRPD patterns Secondary substation Bay, network configuration Bay 4 Thermal image ID of the secondary substation Instrument Fluke Ti 32 SDT 170 MD Time 10:04:50 PM 10:15:00 PM Phase d [cm] T [deg C] d [cm] L [dbuv] L L L Thermal image data File Location C:\Mxxx.IS2 Image Time 12/10/ :04:50 PM Emissivity 0.94 Background Temp 2.0 C Transmission 100% Image Range 3.5 C to 16.5 C Average Temp 5.0 C Severity None Camera model Fluke Ti32 IR Sensor Size 320 x 240 Camera Manufacturer Fluke Thermography Calibration Range C to C Camera serial number Ti (9Hz) DSP Version OCA Version Ultrasound level d Hot spot or max. ultrasound L1 568 pc /div L2 568 pc /div L3 227 pc /div PD calibration: 1000 pc = 88 mv PD levels Instrument LeCroy WaveSurfer 44 MXs-B Time 09:59:08 PM Phase Noise [pc] LROP [pc] Max [pc] L L L LROP = largest repeatedly occurring pulse 44

45 Conclusions: proposed condition monitoring methods for cables of different priority Condition monitoring method (P)eriodic/ (C)ontinuous, On-/off-line Cable priority High Medium Low PD monitor c on x c - PD detector p on - x o PD analyzer p on c 1) c 1) c 1) Tan delta (+ off-line PD) p off o 2) - - Thermal imaging p on x x x Ultrasonic mapping p on x x o Visual inspection/camera p on x x x Analysis of disturbance records c on o o o x = mandatory, o = optional, c = conditional, to monitor or to locate and evaluate the harmfulness of PD detected earlier by other means 1) If PD is detected by continuous or periodic monitoring, on-line PD analyzer measurement (or off-line PD measurement) is used to locate and assess the harmfulness of the discharge 2) If cable is repaired, these measurements are conducted before re-energizing the cable, otherwise optional (may be used as an alternative to PD analyzer measurements in noisy environments, requires a supply interruption) 45

46 Acknowledgements: We would like to thank the following distribution network operators for offering us a possibility to make measurements in their networks: Helen Sähköverkko Oy Measurements of several city network cables at three primary substations Tampereen Sähköverkko Oy Measurements of a city network underground cable from primary and secondary substation ends Kymenlaakson Sähköverkko Oy Measurements of rural network cable terminations (external discharges) Kouvolan Seudun Sähköverkko Oy Measurements of rural network cable terminations (internal discharges) 46

47 References: P.C.J.M. van der Vielen, On-line detection and location of partial discharges in medium voltage power cables, Ph.D. Thesis, Eindhoven, Netherlands 2005, Eindhoven University of Technology. 207 p. A. Gerstner, A. Borlinghaus, C. Goy, Integral cable condition assesment, 21 st International Conference on Electricity Distribution (CIRED), Frankfurt, 6-9 June C. Eastham, C. Smith, F-C Chen, Detection and Location of PD in MV cables in electrically noisy industrial environments, 21 st International Conference on Electricity Distribution (CIRED), Frankfurt, 6-9 June B. Lanz, Assuring Critical Cable System Reliability with Effective Diagnostic, ICC Subcommittee F working group F10 meeting March 22, HVPD Technical Guide for PD Levels in MV and HV Cables and Joints, HVPD Ltd. Manchester, UK, P. Nevalainen, P. Pakonen, M. Takala, P. Verho, Inspection of MV underground cables using partial discharge, tan and sheath integrity measurements, Nordic Insulation Symposium, Gothenburg, Sweden, June 15-17, O. Bergius, Implementation of on-line PD measurements in MV cable networks, MSc thesis, J. Vepsäläinen, Mittaavan kunnossapidon hyödyntäminen keskijänniteverkon häiriöiden vähentämisessä ja elinkaarihallinnassa, Diplomityö,

48 References: O. Vuorinen, Using process data in condition based maintenance, MSc thesis, H. Kuisti, J. Altonen, Intermittent earth faults challenge conventional protection schemes, 15 th International Conference on Electricity Distribution (CIRED), Nice, Italy P.C.J.M. Van Der Wielen, J. Veen, P.A.A.F. Wouters, E.F. Steennis, On-line Partial Discharge Detection of MV Cables with Defect Localisation (PDOL) Based on Two Time Synchronised Sensors, 18 th International Conference on Electricity Distribution (CIRED), 2005 R.R. Macinlay, M. Michel, C.W. Walton, Tools for partial discharge testing MV cables and plant, 18 th International Conference on Electricity Distribution (CIRED), S.M. Gargari, P.A.A.F. Wouters, P.C.J.M. Van Der Wielen, E.F. Steennis, Practical Experiences with On-line PD Monitoring and Interpretation for MV Cable Systems, 2010 International Conference on Solid Dielectrics, Potsdam, Germany, July 4-9, 2010 H.M. Pereira, M. Marques, M.B. Pinheiro, R. Palhares, T. Raczy, E.F. Steennis, P.M.F. Almeida, Partial Discharge On-line Monitoring in MV Underground Power Cables as Part of Condition Based Maintenance Strategy, 22 nd International Conference on Electricity Distribution (CIRED), 2013 M. de Witte, Y. Tits, M. Arens, A. Francois, M.Van Den Berg, J. Van Slycken, Partial Discharge Monitoring on MV Switchgear, 22 nd International Conference on Electricity Distribution (CIRED),

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE Fred STEENNIS, KEMA, (the Netherlands), fred.steennis@kema.com Peter VAN DER WIELEN, KEMA,

More information

Partial Discharge Trends in Medium Voltage Cables measured while in-service with PDOL

Partial Discharge Trends in Medium Voltage Cables measured while in-service with PDOL 1 Partial Discharge Trends in Medium Voltage Cables measured while in-service with PDOL André N. Cuppen, E. Fred Steennis, and Peter C. J. M. van der Wielen, Member, IEEE Abstract-- This paper presents

More information

Directional Sensing for Online PD Monitoring of MV Cables Wagenaars, P.; van der Wielen, P.C.J.M.; Wouters, P.A.A.F.; Steennis, E.F.

Directional Sensing for Online PD Monitoring of MV Cables Wagenaars, P.; van der Wielen, P.C.J.M.; Wouters, P.A.A.F.; Steennis, E.F. Directional Sensing for Online PD Monitoring of MV Cables Wagenaars, P.; van der Wielen, P.C.J.M.; Wouters, P.A.A.F.; Steennis, E.F. Published in: Nordic Insulation Symposium, Nord-IS 05 Published: 01/01/2005

More information

SMART CABLE GUARD A TOOL FOR ON-LINE MONITORING AND LOCATION OF PD S AND FAULTS IN MV CABLES ITS APPLICATION AND BUSINESS CASE

SMART CABLE GUARD A TOOL FOR ON-LINE MONITORING AND LOCATION OF PD S AND FAULTS IN MV CABLES ITS APPLICATION AND BUSINESS CASE SMART CABLE GUARD A TOOL FOR ON-LINE MONITORING AND LOCATION OF PD S AND FAULTS IN MV CABLES ITS APPLICATION AND BUSINESS CASE Fred STEENNIS Paul WAGENAARS Denny HARMSEN DNV GL the Netherlands DNV GL the

More information

PD Solutions. On-Line PD Measurement Devices

PD Solutions. On-Line PD Measurement Devices On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed

More information

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA

More information

Partial discharge trends in medium voltage cables measured while in-service with PDOL Cuppen, A.N.; Steennis, E.F.; van der Wielen, P.C.J.M.

Partial discharge trends in medium voltage cables measured while in-service with PDOL Cuppen, A.N.; Steennis, E.F.; van der Wielen, P.C.J.M. Partial discharge trends in medium voltage cables measured while in-service with PDOL Cuppen, A.N.; Steennis, E.F.; van der Wielen, P.C.J.M. Published in: Proceedings of the IEEE PES Transmission and Distribution

More information

Extending the Functionality of On-line PD Monitoring Equipment for MV Power Cables

Extending the Functionality of On-line PD Monitoring Equipment for MV Power Cables 24 th Nordic Insulation Symposium on Materials, Components and Diagnostics 152 Extending the Functionality of On-line PD Monitoring Equipment for MV Power Cables Y. Li 1, P.A.A.F. Wouters 1, P. Wagenaars

More information

Partial Discharge, Survey or Monitor?

Partial Discharge, Survey or Monitor? July 2014 Partial Discharge, Survey or Monitor? 24-7 Partial Discharge monitoring is the ultimate tool for finding insulation weaknesses before they fail. Introduction It s well established that Partial

More information

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM D. Clark¹ R. Mackinlay² M. Seltzer-Grant² S. Goodfellow² Lee Renforth² Jamie McWilliam³ and Roger

More information

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NETWORK INNOVATION COMPETITION PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NOVEMBER 17 Version: 1.0 Authored by: Andrew Moon Engineering Consultant and Project Manager Kevin Smith Lead

More information

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment

More information

Partial discharge diagnostics on very long and branched cable circuits

Partial discharge diagnostics on very long and branched cable circuits 11 Nordic Insulation Symposium Stockholm, June 11-13, 2001 Partial discharge diagnostics on very long and branched cable circuits Nico van Schaik, E. Fred Steennis, Wim Boone and Dick M. van Aartrijk KEMA

More information

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. THE POWER OF LIFE WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. Mr. Neal Yang Pro.E.E. Engineer About Us The flaw of dielectric material

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge The University of New South Wales School of Electrical Engineering and Telecommunications High Voltage Systems ELEC9712 Appendix Partial Discharge Content Introduction Quantities measured Test circuits

More information

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method

More information

Why partial discharge testing makes good sense

Why partial discharge testing makes good sense Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

Equipment under Measurement: 6.6kV Alstom AIS Switchgear. Date of Measurement: 10 th August 2017

Equipment under Measurement: 6.6kV Alstom AIS Switchgear. Date of Measurement: 10 th August 2017 Case History - 24: Online PD measurement using TEV, Ultrasonic Inductive UHF & HFCT Sensors Equipment under Measurement: 6.6kV Alstom AIS Switchgear Date of Measurement: 10 th August 2017 Sensor Used:

More information

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May 26 2011 St Pete Beach, Fl HDW ELECTRONICS, INC. THE BEST IN CABLE FAULT LOCATING TECHNOLOGY by Henning Oetjen Frank

More information

PD Monitoring of MV/HV Power Cables December 2016

PD Monitoring of MV/HV Power Cables December 2016 PD Monitoring of MV/HV Power Cables December 216 Malcolm Seltzer-Grant m.seltzer-grant@hvpd.co.uk Introduction to HVPD Our global presence Introduction to HVPD Ltd HVPD are experts in the growing industry

More information

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables 21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria

More information

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY Lorenzo PERETTO Luigi FODDAI Simone ORRU Luigi PUDDU Altea Switzerland ENEL Italy ENEL Italy REPL Italy lperetto@alteasolutions.com

More information

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.

More information

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES Frank WESTER, Edward GULSKI, Johan SMIT, Edwin GROOT*, Mark VAN VLIET* Delft University of Technology The Netherlands * NUON The Netherlands

More information

UltraTEV Locator Portable Partial Discharge (PD) investigation system.

UltraTEV Locator Portable Partial Discharge (PD) investigation system. UltraTEV Locator Portable Partial Discharge (PD) investigation system Locates, measures and records PD activity in all substation assets including cables www.eatechnologyusa.com Benefits Locating and measuring

More information

UltraTEV Locator. Portable PD (Partial Discharge) investigation system. benefits. features. FACT: 85% of disruptive substation failures are PD-related

UltraTEV Locator. Portable PD (Partial Discharge) investigation system. benefits. features. FACT: 85% of disruptive substation failures are PD-related UltraTEV Locator Portable PD (Partial Discharge) investigation system Locates, measures and records PD activity in all substation assets including cables benefits Locating and measuring PD activity to

More information

PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT

PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT WELCOME TO PRY-CAM A REVOLUTION IN PARTIAL DISCHARGE MANAGEMENT The worlds of partial discharge (PD) measurement, asset management

More information

Cable testing and diagnostics

Cable testing and diagnostics Cable testing and diagnostics To ensure the flow Cost-optimised maintenance through cable diagnostics The sheath and cable testing supports you in assessing whether a cable system is safe and ready to

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager Doble Solutions for Partial Discharge Greg Topjian Solutions Manager 617-393-3129 gtopjian@doble.com Why do we need to conduct PD measurements PD a major cause of early failure for HV insulation. Partial

More information

TECHIMP Power Transformer Monitoring

TECHIMP Power Transformer Monitoring TECHIMP Power Transformer Monitoring Kontakt: Martin Hesse Techimp Germany GmbH i.g. E-Mail: mhesse@techimp.com Tel.: +49 5724 391 007 Mobil: +49 170 2364 735 PD Monitoring of Power Transformers Power

More information

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors IRIS POWER TGA-B Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors We have not found another test method that produces as much decision support data for generator

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM,

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM, ONLINE OFFLINE VERSUS FEATURE PARTIAL DISCHARGE TESTING FOR CABLE ASSESSMENT B Y WIL L IAM H IG INBOT H AM, EA Technology, LLC Medium voltage cables have three distinct phases to their lifecycle: (1) new

More information

Application Note. Detection of Partial Discharge Using Ultrasound. Detection of Partial Discharge Using Ultrasound. Problem. iriss.

Application Note. Detection of Partial Discharge Using Ultrasound. Detection of Partial Discharge Using Ultrasound. Problem. iriss. Detection of Partial Discharge Using Ultrasound Problem In electrical systems, especially above 1,000 Volts, sufficient and properly maintained equipment insulation helps ensure equipment longevity. However,

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES Engr. IÑIGO V. ESCOPETE, JR. ITC Level 2 Certified Thermographer PHIL-NCB NDT-UT Level 2 Partial Discharge testing is a Condition Based Maintenance tool

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Using optical couplers to monitor the condition of electricity infrastructure S.G. Swingler, L. Hao, P.L. Lewin and D.J. Swaffield The Tony Davies High Voltage Laboratory, University of Southampton, Southampton

More information

Online Localisation of Partial Discharge Using Pulse Propagation Parameters in Medium Voltage Cable Network

Online Localisation of Partial Discharge Using Pulse Propagation Parameters in Medium Voltage Cable Network 2015 17th UKSIM-AMSS International Conference on Modelling and Simulation Online Localisation of Partial Discharge Using n Parameters in Medium Voltage Cable Network Tauqeer Ahmed Shaikh, Abdulrehman Al-Arainy,

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017 Ref: ART-B22-D70, ART-B22-D125, ART-B22-D175, ART-B22-D300 Flexible clip-around Rogowski coil for the electronic measurement of AC current with galvanic separation between the primary circuit (power) and

More information

PD Testing Considerations for MV Plant Cables

PD Testing Considerations for MV Plant Cables PD Testing Considerations for MV Plant Cables Cable Testing Philosophy Damage Mistake Aging Repair Manufacturing Transportation Installation Operation Power frequency 50/60 Hz Power frequency 50/60 Hz

More information

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR Neil DAVIES and Chris LOWSLEY EA Technology Ltd. - United Kingdom Neil.Davies@eatechnology.com INRODUCTION The trend for extending

More information

BY JASON SOUCHAK, Megger

BY JASON SOUCHAK, Megger IMPROVING SYSTEM RELIABILITY WITH OFFLINE PD TESTING BY JASON SOUCHAK, Megger Partial discharge (PD) testing is a new generation of diagnostic testing for medium- and high-voltage underground power cable

More information

Investigation of PD Detection on XLPE Cables

Investigation of PD Detection on XLPE Cables Investigation of PD Detection on XLPE Cables Hio Nam O, T.R. Blackburn and B.T. Phung School of Electrical Engineering and Telecommunications The University New South Wales, Australia Abstract- The insulation

More information

PDS100 Application Note: The use of High Frequency Current Transformer as sensor for Transformer diagnostics

PDS100 Application Note: The use of High Frequency Current Transformer as sensor for Transformer diagnostics PDS100 Application Note: The use of High Frequency Current Transformer as sensor for Transformer diagnostics CASE STUDY 1 (Doble Client Conference 2011, ACCA committee meeting) Dissolved Gas Analysis (DGA)

More information

PD Diagnostic Applications and TechImp solutions

PD Diagnostic Applications and TechImp solutions PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

HZJF-9007 Fully Functional Partial Discharge Inspector USER MANUAL. Huazheng Electric Manufacturing(Baoding) Co.,Ltd

HZJF-9007 Fully Functional Partial Discharge Inspector USER MANUAL. Huazheng Electric Manufacturing(Baoding) Co.,Ltd HZJF-9007 Fully Functional Partial Discharge Inspector USER MANUAL Huazheng Electric Manufacturing(Baoding) Co.,Ltd Safety Terms and Symbols This manual may contain the terms: Warning! Indicate the conditions

More information

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS Anne Pfeffer 1*, Stefan Tenbohlen 1 and Stefan Kornhuber 2 1 Institute of Power Transmission and High Voltage Technology, Pfaffenwaldring

More information

The importance of partial discharge testing throughout the development and operation of power transformers

The importance of partial discharge testing throughout the development and operation of power transformers The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense

More information

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results 2016 International Conference on Electrical Engineering and Automation (ICEEA 2016) ISBN: 978-1-60595-407-3 Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results Cristian DAN

More information

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012 Ref: ART-B22-D70, ART-B22-D125, ART-B22-D175 Flexible clip-around Rogowski coil for the electronic measurement of AC current with galvanic separation between the primary circuit (power) and the secondary

More information

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland Company HV Diagnostics Sarl is a Swiss based company in the field of high voltage test equipment for cable testing and diagnosis.

More information

INSULATION DIAGNOSIS OF HIGH VOLTAGE POWER CABLES

INSULATION DIAGNOSIS OF HIGH VOLTAGE POWER CABLES INSULATION DIAGNOSIS OF HIGH VOLTAGE POWER CABLES Edward GULSKI, Delft University of Technology, (The Netherlands), e.gulski@tudelft.nl Johan J SMIT, Delft University of Technology, (The Netherlands),

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

The Application of Partial Discharge Measurement and Location on CGIS

The Application of Partial Discharge Measurement and Location on CGIS International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing

More information

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate

More information

Chapter 7 Conclusion 7.1 General

Chapter 7 Conclusion 7.1 General Chapter 7 7.1 General The mechanical integrity of a transformer winding is challenged by several mechanisms. Many dielectric failures in transformers are direct results of reduced mechanical strength due

More information

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer Scientific Journal of Impact Factor(SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 2,Issue 7, July -2015 e-issn(o): 2348-4470 p-issn(p): 2348-6406 Comparison

More information

Software System for Finding the Incipient Faults in Power Transformers

Software System for Finding the Incipient Faults in Power Transformers Software System for Finding the Incipient Faults in Power Transformers Nikolina Petkova Technical University of Sofia, Department of Theoretical Electrical Engineering, 1156 Sofia, Bulgaria Abstract In

More information

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES D. Götz*, H.T. Putter* *Megger Germany INTRODUCTION High voltage termintions are essential components in high voltage cable

More information

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales

More information

PHG 70 TD PD / PHG 80 TD PD

PHG 70 TD PD / PHG 80 TD PD PHG 70 TD PD / PHG 80 TD PD BAUR VLF test and diagnostics system Functions Universal test and diagnostics system flexible, modular, extendable Cutting-edge testing and diagnostics technology: VLF truesinus

More information

Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus

Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Michał Kunicki 1,* 1 Opole University of Technology, ul. Prószkowska 76, 45-758

More information

Partial Discharge Patterns in High Voltage Insulation

Partial Discharge Patterns in High Voltage Insulation 22 IEEE International Conference on Power and Energy (PECon), 2-5 December 22, Kota Kinabalu Sabah, Malaysia Partial Discharge Patterns in High Voltage Insulation Hazlee Illias, Teo Soon Yuan, Ab Halim

More information

Field Measurement of Transmission Cable Dissipation Factor

Field Measurement of Transmission Cable Dissipation Factor Workshop 2000, Alexandria, Virginia, 13 & 14 September 2000 paper No.: 1 Field Measurement of Transmission Cable Dissipation Factor John H. Cooper, Power Delivery Consultants, Inc. Abstract This presentation

More information

Diagnostic testing of cast resin transformers

Diagnostic testing of cast resin transformers Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com

More information

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery Application of EMI Diagnostics to Hydro Generators James Timperley Doble Global Power Services Columbus, Ohio jtimperley@doble.com

More information

APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS

APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS David Larochelle NDB Technologies Reasons leading to acoustic testing are different weather it is a manufacturing or field environment

More information

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES Gonzalo MAIZ, Iberdrola Distribución, (Spain), gmaiz@iberdrola.es Armando RODRIGO, Instituto

More information

OFFLINE PD DIAGNOSTICS USING SEVERAL EXCITATION VOLTAGES

OFFLINE PD DIAGNOSTICS USING SEVERAL EXCITATION VOLTAGES OFFLINE PD DIAGNOSTICS USING SEVERAL EXCITATION VOLTAGES Hein PUTTER Frank PETZOLD Philipp LEGLER Megger Germany Megger Germany Megger - Germany hein.putter@megger.com frank.petzold@megger.com philipp.legler@megger.com

More information

SDMF based Interference Rejection and PD Interpretation for Simulated Defects in HV Cable Diagnostics

SDMF based Interference Rejection and PD Interpretation for Simulated Defects in HV Cable Diagnostics SDMF based Interference Rejection and PD Interpretation for Simulated s in HV Cable Diagnostics Xiaosheng Peng, Jinyu Wen, Zhaohui Li, Guangyao Yang State Key Laboratory of Advanced Electromagnetic Engineering

More information

Electrical Equipment Condition Assessment

Electrical Equipment Condition Assessment Feature Electrical Equipment Condition Assessment Using On-Line Solid Insulation Sampling Importance of Electrical Insulation Electrical insulation plays a vital role in the design and operation of all

More information

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Z. Berler, I. Blokhintsev, A. Golubev, G. Paoletti, V. Rashkes, A. Romashkov Cutler-Hammer Predictive Diagnostics

More information

ON-LINE PARTIAL DISCHARGE MEASUREMENT AND CONTROL

ON-LINE PARTIAL DISCHARGE MEASUREMENT AND CONTROL REPRINT 19TH INTERNATIONAL CONFERENCE AND EXHIBITION ON ELECTRICITY DISTRIBUTION REED MESSE WIEN CONGRESS CENTER, VIENNA MAY 21-24, 2007 ON-LINE PARTIAL DISCHARGE MEASUREMENT AND CONTROL Kristian Winter,

More information

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento Sept. 22-24, 28, Florence, Italy EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS C. Ceretta, R. Gobbo, G. Pesavento Dept. of Electrical Engineering University of

More information

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES Thomas Steiner HIGHVOLT Prüftechnik Dresden GmbH Lifecycle of utilities time schedule utilities Tests during life cycle of utilities

More information

MONTRANO. Continuous monitoring system for power transformers

MONTRANO. Continuous monitoring system for power transformers MONTRANO Continuous monitoring system for power transformers Condition monitoring to extend transformer life Knowing the dielectric condition of insulation is vital Dielectric flashover of insulation in

More information

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV Paul P. SEITZ, Seitz Instruments AG, (Switzerland), pps@seitz-instruments.ch Ben QUAK, Seitz Instruments AG, (Switzerland),

More information

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES COMPANY OVERVIEW EPS is a recognised company specialising in Electrical, Instrumentation, Structural, Mechanical and

More information

Benefits of SFRA - Case Studies

Benefits of SFRA - Case Studies 6 th International Conference on Large Power Transformers- Modern Trends Benefits of SFRA - Case Studies B B Ahir Gujarat Energy Transmission Corporation Limited 1 Outline Condition Monitoring in GETCO

More information

AC/DC Current Probe GCP-100 QUICK START GUIDE ISO-9001 CERTIFIED MANUFACTURER

AC/DC Current Probe GCP-100 QUICK START GUIDE ISO-9001 CERTIFIED MANUFACTURER AC/DC Current Probe GCP-100 QUICK START GUIDE ISO-9001 CERTIFIED MANUFACTURER This manual contains proprietary information, which is protected by copyright. All rights are reserved. No part of this manual

More information

Partial Discharge Detection of High Voltage Switchgear Using a Ultra High Frequency Sensor

Partial Discharge Detection of High Voltage Switchgear Using a Ultra High Frequency Sensor TRANSACTIONS ON ELECTRICAL AND ELECTRONIC MATERIALS Vol. 14, No. 4, pp. 211-215, August 25, 2013 Regular Paper pissn: 1229-7607 eissn: 2092-7592 DOI: http://dx.doi.org/10.4313/teem.2013.14.4.211 Partial

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Fault location on power cables. Fault location on power cables

Fault location on power cables. Fault location on power cables Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 1. Introduction Fault location on communication and power cables

More information

USING DAMPED AC VOLTAGES

USING DAMPED AC VOLTAGES MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States

More information

Best Practice Reducing The Risk of Arc Flash Cross Over

Best Practice Reducing The Risk of Arc Flash Cross Over Best Practice Reducing The Risk of Arc Flash Cross Over 1 2 Electrical Systems Are Critical 3 Why Do We Complete Electrical Maintenance Energized?? 4 Which Bulb Is Not Working?? 5 Functioning Correctly

More information

On-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories

On-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories Workshop 2000, lexandria, Virginia, 13 & 14 September 2000 paper No.: 8 On-Site Partial Discharge Monitoring using the differential LEMKE PROE and its accessories Dirk Russwurm, HV Technologies, Inc. bstract

More information

C I R E D 21 st International Conference on Electricity Distribution Frankfurt, 6-9 June 2011

C I R E D 21 st International Conference on Electricity Distribution Frankfurt, 6-9 June 2011 Use and Problems of On-line PD Measurement Technology on Switchgears in Guangzhou Distribution System XIONG Jun, WANG Yong, HUANG Huihong, HUANG Yanguang,LU Guojun,WU Bihua (Central Test and Researches

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,

More information

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment T/3000 Substation Maintenance and Commissioning Test Equipment MULTI FUNCTION SYSTEM FOR TESTING SUBSTATION EQUIPMENT SUCH AS: CURRENT, VOLTAGE AND POWER TRANSFORMERS, ALL TYPE OF PROTECTION RELAYS, ENERGY

More information

ArresterFacts-002. Field Testing Arresters ArresterWorks.com. ArresterFacts are information modules pertaining to the arrester world.

ArresterFacts-002. Field Testing Arresters ArresterWorks.com. ArresterFacts are information modules pertaining to the arrester world. ArresterFacts are information modules pertaining to the arrester world. This Field Testing of Arresters module will clarify the many questions about assessing the quality of an installed high voltage arrester

More information

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Dominique Bolliger, Ph.D. HV TECHNOLOGIES, Inc. Manassas, VA, USA d.bolliger@hvtechnologies.com Abstract In

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

Ieee Guide For Partial Discharge Testing Of Shielded Power

Ieee Guide For Partial Discharge Testing Of Shielded Power Ieee Guide For Partial Discharge Testing Of Shielded Power We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer,

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers)

Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers) Measurement of transmission line parameters of threecore power cables with common earth screen Wagenaars, P.; Wouters, P.A.A.F.; van der Wielen, P.C.J.M.; Steennis, E.F. Published in: IET Science, Measurement

More information