State Radio Project. July Monthly Progress Report

Size: px
Start display at page:

Download "State Radio Project. July Monthly Progress Report"

Transcription

1 State Rad o Project State Radio Project July 2013 Monthly Progress Report

2 Project Goals Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend the useful life of the existing Oregon Department of Transportation and Oregon State Police wireless communications systems. Narrowbanding Comply with the approved Federal Communications Commission waiver deadline to transition state radios from wideband to narrowband transmission by Nov. 1, 2013, and position for future narrowbanding requirements. Consolidation Consolidate the ODOT and OSP wireless communications systems into a single unit and allow for shared efficiencies and integration between the four existing state systems. Interoperability Provide limited, local interoperability for public safety agencies and lay the foundation for expanded and improved interoperability in the future. Cover photo: The lookout at Bosley Butte in Curry County burned to the ground last year, leaving only melted aluminum, broken plates and nails. Work on the site will get underway this summer.

3 CONTENTS Project Map ii Project Update 1 Project Success 3 Project Progress by WBS 5 WBS 1.0 Project Management Summary 6 WBS 2.0 Narrowbanding 9 WBS 3.0 Microwave Modernization 12 WBS 4.0 Trunked radio System 14 WBS 5.0 Interoperability 16 WBS 6.0 Partnerships 17 WBS 7.0 Planning AND Engineering 21 WBS 8.0 System Testing 23 Staffing & Vendor Summary 24 Sites by County 28 Project Cost Summary 34 Estimated Project Cash Flow 35 July No. 34 Page i

4 Project Map Visit ODOT s Radio Project website at See previous progress reports and an interactive map at Page ii July No. 34

5 Project Update The State Radio Project realized a milestone in June as cutover from wideband to narrowband transmission got underway. Cutover was completed in four Oregon Department of Transportation districts and corresponding Oregon State Police offices in the southwestern area of the state. Overall, the process is on schedule and going very well. The project identified some lessons learned, including the need to rework the wiring around site controllers on a couple of sites. From a customer perspective, we ve had no complaints about coverage, which was a concern when moving from wideband to narrowband. Anecdotally, the project is hearing from users that coverage is actually better in some instances, especially when using the portable radios. The newly narrowbanded Harris Unity radio seems to be a more powerful handheld. Assuming the process stays on schedule, narrowbanding will be complete by the end of August, two months ahead of the project s Federal Communications Commission waiver deadline. In support of cutover, ODOT/OSP Wireless Section staff, led by Chuck Kummer, has taken up the mantle of installing the office remotes, which have to be in place before cutover. We are back in full motion on the sites. Based on our earlier delay, some sites do now extend into 2015, but we are working on the critical ones to bring them back into 2014 delivery. We were really getting backed into a corner Dick Upton, State Radio Project manager around office remotes, and Chuck is marching through the state doing an excellent job, said State Radio Project Manager Dick Upton. He s gotten ahead of the cutover process and is getting the office remotes in place as we need them. Looking ahead to microwave and trunked system deployment, the radio project s schedule success hinges on sites, and we did hit a bump this spring. Site delivery wasn t occurring at the rate it needed to, and project management did a top-to-bottom assessment of the entire site delivery process. As a result, we ve improved our tracking and identified where the handoffs were being missed and where information wasn t coming in at the right time. We were not making decisions and producing preliminary drawings when our site acquisition folks needed them in order to set off federal and county processes, Upton said. We ve got that well under control now: The site delivery tracker is in place, and we re using it to drive weekly meetings to identify where we need to put in extra effort and we re being successful in doing that. What I call the Rosetta Stone is the drawing tracker, he added, which includes site-by-site renderings of work on the sites. We are back in full motion on the sites. Based on our earlier delay, some sites do now extend into 2015, but we are working on the critical ones to bring them back into 2014 delivery to close out the trunked system and microwave by then. We recognize now there will be some built in 2015, but they are not sites on the trunked or the microwave system, Upton said. Two significant contracts were signed in June. The project s existing contract with Harris Corp. aligned with the previous OWIN system and was becoming increasingly problematic in terms of managing the work. The new contract realigns Harris work with the project s current needs. The project also signed a contract with Aviat for the purchase of the remaining equipment for the entire digital microwave system, as well as installation services for that equipment and the equipment already in the warehouse. The project will now begin strategically deploying microwave in earnest later this summer as we align when sites will be ready with logical segments of the microwave system. July No. 34 Page 1

6 INFRASTRUCTURE The project expanded its effort to install narrowband and replacement antennas in June by awarding three more contracts, increasing the number of sites available for installation to almost 100. Work continues at Hulse Ranch and Bend ODOT sites. At Euchre Mountain, the contractor mobilized to the site and began excavation for the new solar array and equipment shelter. Bid results have been received for several sites, including Four Mile, Bosley Butte, McCully Mountain, Saddlebag and Bald Mountain. Project staff is finalizing the contracts to get construction underway. A construction pre-bid walk took place June 6 at the Bosley Butte site in Curry County. NARROWBANDING During June, cutover was completed for ODOT Districts 4, 5, 7 and 8 and OSP offices in Grants Pass, Central Point, Roseburg, Coos Bay, Gold Beach, Albany, Florence, Newport, Oakridge, Corvallis and Springfield. The reprogramming effort is ongoing; Harris contractors are working in parallel to the cutover list, completing necessary radio updates ahead of the transition to narrowband. CONSOLIDATION The State Radio User Group worked with the State Interoperability Executive Council to respond to legislative questions and prepare final drafts of amendments relating to Senate Bill 665. The bill would have established the roles and responsibilities of the SIEC and moved it under the authority of the Oregon Department of Administrative Services. The bill was not passed by this Legislature and is anticipated to be revisited in the future. ODOT and the Oregon Department of Forestry also worked on amendments to House Bill 3415, which stipulates that state agencies should charge the equivalent of commercial rates for use of communications towers by private business. The bill was passed with amendments and signed by Gov. Kitzhaber on June 18; it takes effect Jan. 1, INTEROPERABILITY Oregon was used as a case study to help the Office of Emergency Communications and FirstNet develop criteria that could be used by each state to develop FirstNet coverage objectives. This material will be used in the development of Oregon s state and local Grant Implementation Program effort in support of FirstNet, Oregon s First Responder Network Authority. Oregon s information was presented at each of the FirstNet regional sessions and at the Public Safety Communications Research conference in Colorado in June. Overall, our stakeholder community was chosen to do the case study for FirstNet coverage objectives because of our collaborative approach and general interest in supporting the FirstNet efforts. The planning documents developed by ODOT s Major Projects Branch for FirstNet have been used as a benchmark nationally, and the coverage case study is a further example of those efforts. Page 2 July No. 34

7 Project Success Summer interns are an asset to the State radio project In the warehouse, on the road or out in the field is where you are most likely to find the State Radio Project s four new asset management technicians. Geoff Zeller and Dan Eddleman started in March as six-month temporary employees, joined by Kevin Tongue in May and Nick Noel in June. The four interns are assisting the radio project s asset management staff with this summer s increased workload. Four interns are assisting with this summer s increased asset management workload. From left are Nick Noel, Kevin Tongue, Dan Eddleman and Geoff Zeller. Not only are we doing our normal annual inventory, but we also have the Oregon State Police inventory so we can show OSP what they ve got out in the field, said Jack Williams, the radio project s current asset manager and new training and project manager. The team is also verifying the ODOT Wireless equipment in preparation for MCM, the computer system that will track all the parts for the State Radio System. But the big push this summer involves the cutover to narrowband transmission. For the narrowbanding, there are literally thousands of parts coming in here, said We put in a lot of miles. I think I ve done about 6,000 to 7,000 miles since I started. I put in almost 1,500 miles in a week with Nick. That was his first trip; he kind of got thrown in the fire. Dennis Mansfield, who is leading the charge on the narrowband antenna installations. Parts are being ordered in phases, and sites go out in bundles. We have parts coming in from different distributors. When we get the go-ahead that the contractor has notice to proceed on a site and they re going to go out into the field on a particular date, that s when we put the sites together. Putting the sites together is where the interns come in. Working off site lists, they prepare site kits with the specific parts and equipment for the contractors to install. All the site lists are very similar, depending on the size of the site. There is always some sort of narrowbanding antenna, cable and all the hardware and hanger kits that go with the cable to string it up the tower, said Zeller, 21. We don t assemble anything, we just have bits and pieces here and there with part numbers on them, and it s on the list so we put it in the box. But assembling the site kits correctly is important, and attention to detail is critical having a contractor get up to a site only to find the wrong part in the box would be a wasted visit. We strive for quality control. We do find discrepancies, it s just human error, but the timing of it is critical to get things corrected. These guys have been Kevin Tongue, asset management technician intern instrumental in seeing these parts come in, Mansfield said. All of the narrowband antennas come to the radio project warehouse before they are issued to the contractors. One group is ordering parts, we re receiving parts and we re sending parts out. We re trying to do a complete inventory control, Mansfield said. Not having an inventory control system proved to be a little difficult at first but we re getting a handle on it. July No. 34 Page 3

8 That s where MCM comes into play. Eddleman loaded into the system all the antennas that are going out for installation right now. If it has an asset tag then it gets entered into the system its part, serial number, what it is so that it can be queried. That will tell you where it s been, where it s going, and sometimes costs and dates, said Eddleman, 39. Despite the heavy warehouse workload, 75 percent of the time the four men pair up and head out into the field. We put in a lot of miles, said Tongue, 20. I think I ve done about 6,000 to 7,000 miles since I started. I put in almost 1,500 miles in a week with Nick. That was his first trip; he kind of got thrown in the fire. The interns coordinate their site visits with the contractors, sometimes hitting the road as early as 4 a.m. They work from a schedule and arrange meeting places so they don t have to worry about site access or finding Wireless technicians to go up with them. For the most part, the hardest part of getting to the sites is just that the roads getting up to the sites are pretty nasty, Tongue said. Reaching Cottonwood Mountain involved fourwheel driving over about 20 miles of dirt trail. It s always an adventure. Each site is different and has a different set of rules, Eddleman said. The land owner determines what kind of equipment is required for site access. Edson Butte required an ax and a fire extinguisher, for example. Once on site, everyone goes about their tasks. When we re out there at the mountain, we take pictures, write down serial numbers and do tagging, said Noel, 18. The contractors go to work installing the site kits the interns prepared, often working all day to complete one site, whereas the asset tagging done by the interns is a pretty quick process. We let them do their thing, they let us do our thing and we re done in about an hour or so, Zeller said. Then it s off to the next site. But In June, the asset management interns assisted with the delivery of a shelter slated for McCully Mountain. as is typical with this type of work, you have to expect the unexpected. A couple of rattlesnakes greeted the crew at Dodson Butte. Inside the shelters they ve encountered spiders, bats, snakes and rats. Along the way they often see rabbits, deer and farm animals. As far as weather goes, you have to plan for just about anything, Tongue said. It ll be nice and sunny down here, then at Fall Mountain over by John Day it was snowing almost the whole time I was there. Then we went over by Ontario and it was 114 degrees. Come fall, the four men will take their experiences gained on the radio project to their next adventures. Zeller, a recent graduate of Chemeketa Community College in Salem with a degree in electrical engineering, joins Intel in October as a microprocessor technician. Eddleman goes to work for the Salem-Keizer School District in September as a substitute special education instructor. Tongue will return to the Cornish College of the Arts in Seattle as a junior pursuing a degree in music performance. And Noel will be a freshman at Portland State University. I didn t really know what I would be doing, Noel said. But I m doing a bunch of different things and I ve learned a lot. Page 4 July No. 34

9 Project Progress by WBS The budget for the radio project in the biennium is $89.2 million. Work will continue into the next biennium for a total cost of $154.4 million. The work components necessary to launch the revised State Radio Project include project management, narrowbanding, microwave modernization, trunking, tactical interoperability and partner obligations. The budget and schedule for the project s active components are provided in the following pages of this report, which are based upon the work breakdown structure detailed in the State Radio Project s Project Management Plan Overall Project Engineering Narrowbanding Microwave Trunking Partnerships June 30, 2013 Total Project Budget $209,991,920 Actual Expenditures $125,226,532 60% Forecast Expenditures $141,009,234 67% Total Budget Remaining $84,765,388 40% $84,765,388 40% $125,226,532 60% OWIN expenditures account for $55.5 million of expenditures to date. In Millions $180 $160 $140 $120 $100 $80 $60 $40 $20 $0 Current Expenditures actual Planned July No. 34 Page 5

10 WBS 1.0 Project Management Summary Project management consists of those elements that are projectwide and affect all other WBS sections. Budget Expenditures For WBS 1.0 Project Management, 43 percent of the total budget has been expended to date. Total Section Budget $15,910,286 Actual Expenditures $6,882,132 43% Forecast Expenditures $7,941,013 50% Section Budget Remaining $9,028,154 57% $9,028,154 57% $6,882,132 43% In Millions $18 $16 $14 $12 $10 $8 $6 $4 $2 $0 Current Expenditures actual Planned Activities and Progress Asset Management The project continues to deploy narrowband antennas for installation. To date, equipment for 43 sites has been released by the project for installation by third-party contractors. Implementation of the State Radio System s work order tracking system continued in June. Training on the system has been scheduled for ODOT/OSP Wireless Section field technicians to ensure staff can properly access and modify work tickets while in the field. Asset staff also completed an expansion of the project s warehouse space during June, adding 1,900 square feet to the facility. Page 6 July No. 34

11 Change Management There are two types of change requests, administrative and formal. Administrative changes are those that do not affect the project s baseline scope, schedule or budget. Formal changes are those that affect those project baselines. During June, eight change requests were processed and approved. To date, 229 changes have been approved: 51 were administrative and 178 were formal. May 2013 June 2013 Total to date Administrative Formal Total The following chart represents the value of the project s contingency budget at the end of the two most recent months. The change noted is due to approval of formal budget changes executed in June. May 2013 June 2013 Total Change Contingency budget, end-of-month value $4,315,880 $4,315,382 $0 Communications Management Communications staff provided the following project information/materials during June: Produced June 2013 Monthly Progress Report Produced June 2013 Project Dashboard Produced June 2013 Key Project Facts sheet Distributed nine bulletins about narrowband cutover work to project stakeholders Updated communications messaging plan and timeline Updated project website on Oregon.gov Distributed project information notices via GovDelivery Produced and published project feature story in Inside ODOT Reported on radio project activities to ODOT public affairs staff Project management and staff also conducted the following outreach activities: Participation in and facilitation of the monthly State Radio Users Group meeting Participation in and facilitation of the monthly Delivery Team meeting Participation in the monthly Oregon Broadband Advisory Council meeting Participation in the weekly Oregon Public Safety Broadband Network conference call Participation in the weekly Emergency Response Interoperability Center/Public Safety Advisory Committee conference call July No. 34 Page 7

12 Quality Management Public Knowledge delivered its Quarterly Project Status and Improvement Report detailing activities from April 1 through June 30, May 2013 June 2013 Total findings reported by Public Knowledge 8 8 Active recommendations provided 7 8 Closed no further action required 1 0 Watch list items 2 0 The following table is a snapshot of the issues, categorized by WBS section, managed by the project during June. Project management develops planned actions and target dates for resolving these issues. Until an issue has a target resolution date, it is not included in the planned for resolution count. Number of active issues Number planned for resolution Total resolved 1.0 Project Management Narrowbanding Microwave Modernization Trunked Radio Interoperability Partnerships Planning and Engineering Total Page 8 July No. 34

13 WBS 2.0 Narrowbanding Narrowbanding includes work at mountaintop tower sites and at ODOT and OSP office sites. To meet the new federal narrowbanding deadine of Nov. 1, 2013, the radio project must install repeaters and make site improvements at the mountaintop tower sites and, at emergency communication offices statewide, install office controllers as well as deploy portable radios and mobile radios. Schedule Summary Narrowbanding Repeaters Office Deployments Radio Deployments Site Improvements June 30, 2013 Budget Expenditures For WBS 2.0 Narrowbanding, 69 percent of the total budget has been expended to date. Total Section Budget $39,988,653 Actual Expenditures $27,736,863 69% Forecast Expenditures $35,033,197 88% Section Budget Remaining $12,251,791 31% $12,251,791 31% $27,736,863 69% In Millions $45 $40 $35 $30 $25 $20 $15 $10 $5 $0 Current Expenditures actual Planned July No. 34 Page 9

14 Activities and Progress 2.1 Narrowband Repeaters June 2013 Total to date Forecast Actual Forecast Actual Repeaters installed 160 sites Antennas installed 319 units Office Remotes June 2013 Total to date Forecast Actual Forecast Actual Radios installed 157 units Sites completed 137 sites Radio Deployment The radio deployment consists of two elements for both ODOT and OSP: training and deployment of mobile radio equipment, and training and deployment of handheld, portable radio units. In addition to ODOT and OSP deployments, the radio project will also deploy radios to other state agencies, including the Oregon Department of Corrections and the Office of Emergency Management. The following table shows the number of units deployed in June and the total deployed to date. Efforts continued to complete necessary reconciliation of all installation work. June 2013 Total to date ODOT Forecast Actual Forecast Actual Agency locations/crews completed COMPLETE Mobile radios deployed 0 0 2,491 2,290 Portable radios deployed 0 0 1,059 1,291 Employees trained NA 0 NA 966 OSP Agency locations/crews completed COMPLETE Mobile radios deployed Portable radios deployed Employees trained NA 0 NA 370 Other Agencies Agency locations/crews completed COMPLETE 7 7 Mobile radios deployed Portable radios deployed Employees trained NA 0 NA 0 Page 10 July No. 34

15 2.4 Cut-Over Testing Project staff determined that cutover will take place in stages, with the state divided into 10 zones. June 2013 Total to date Forecast Actual Forecast Actual Region cutovers completed 10 zones The radio project began to transition the state s radios from wideband to narrowband operation in June, starting in the southwest with ODOT District 8 and associated OSP offices. Narrowband cutover will continue through August. July No. 34 Page 11

16 WBS 3.0 Microwave Modernization The microwave component of the radio project involves replacing old and outdated ODOT and OSP analog microwave with digital microwave and making associated site improvements. Microwave installation includes the acquisition, installation, implementation and optimization of the new digital microwave radios, antenna dishes, wave guide, routers and ancillary equipment to support both conventional and trunked radio systems. Network implementation consists of integrating routing, switching and monitoring equipment into the microwave system to move both voice and data messages over the digital microwave system. Improvements to towers, shelters, power supplies and other facilities required by the upgraded microwave and trunked radio systems are anticipated at most sites. New leases, permits and agreements will be obtained as needed. The revised budget for the biennium for this project component is $7.3 million for installation, $4.3 million for network implementation and $619,000 for site work, for a total of $12.2 million. Work will continue into the next biennium for a total project cost of $35.3 million. Schedule Summary Microwave Modernization Microwave Implementation Network Implementation Site Improvements June 30, 2013 Budget Expenditures For WBS 3.0 Microwave Modernization, 19 percent of the total budget has been expended to date Total Section Budget $35,266,340 Actual Expenditures $6,817,129 19% Forecast Expenditures $12,196,664 35% Section Budget Remaining $28,449,211 81% $28,449,211 81% $6,817,129 19% Page 12 July No. 34

17 Budget Expenditures (Cont.) In Millions $40 $35 $30 $25 $20 $15 $10 $5 $0 Current Expenditures actual Planned Activities and Progress 3.1 Microwave Installation and 3.2 Network Implementation The microwave installation phase includes those tasks involved in the installation of microwave equipment, from initiation to completion. Microwave installations may occur during a site s construction phase or after it has been completed. June 2013 Total to date Forecast Actual Forecast Actual Microwave installation complete Microwave Site Improvements The site improvement process includes three phases: pre-design, design and construction. Pre-design phase: Tasks completed from inception to approval by the Site Review Committee, the project s change review board. Design phase: Tasks completed from site planning through acquisition of the site building permit. Construction phase: Tasks completed from the acquisition of the building permit to the completion of site construction. June 2013 Total to date Site improvements Forecast Actual Forecast Actual Pre-design complete Design complete Construction complete July No. 34 Page 13

18 WBS 4.0 Trunked radio System A trunked radio system is used to maximize available capacity in a two-way radio system. Because not everyone in a group talks at once and radio transmissions are usually short, a trunked computer can assign talk frequencies in a manner that allows multiple groups of users to share a small set of frequencies without hearing each other s conversations. This effectively compresses the voice signals and enhances the capacity of the system. The trunked system will allow local radio communications between public safety personnel; microwave will distribute those signals over a larger area, enabling distance and interagency communications. The revised budget for the trunked system portion of this radio project component includes $4.1 million for repeaters, $3.3 million for switches and $3.4 million for dispatch consoles, for a total of $10.8 million, of which $7.8 million is projected to be used in the biennium. Schedule Summary Trunking TRS Repeaters Trunk Switches June 30, 2013 Budget Expenditures For WBS 4.0 Trunked Radio System, 46 percent of the total budget has been expended to date. $4,928,363 46% Total Section Budget $10,790,434 Actual Expenditures $4,928,363 46% Forecast Expenditures $6,898,423 64% Section Budget Remaining $5,862,071 54% $5,862,071 54% Page 14 July No. 34

19 Budget Expenditures (Cont.) Current Expenditures $12 $10 In Millions $8 $6 $4 $2 $0 actual Planned Activities and Progress Development of the trunked radio system includes three categories of work: repeater and site control equipment, central trunking switches and dispatch consoles. Section 7.0 Planning and Engineering also includes progress on the design efforts related to the trunked radio system. 4.1 Trunked radio Repeaters June 2013 Total to date Forecast Actual Forecast Actual Repeaters installed 8 units Sites completed 8 sites TRUNKED RADIO SWITCHES June 2013 Total to date Forecast Actual Forecast Actual Switches installed 2 units Sites completed 2 sites DISPATCH CONSOLES June 2013 Total to date Forecast Actual Forecast Actual Consoles installed 60 units Sites completed 4 sites July No. 34 Page 15

20 WBS 5.0 Interoperability Improvements to state interoperability will be captured in this section. The State Interoperability Executive Council is currently heading statewide planning efforts to develop the overarching plan for interoperability in Oregon. Once the SIEC has finalized its plan, the project will initiate work on this effort. The project budget for this section is $2.3 million. No schedule information is currently available. See 7.5 Interoperability Design for progress related to other interoperability activities. Budget Expenditures No expenditures have been made related to interoperability to date. Activities and Progress No procurement, installation or implementation has been initiated for this work section. Page 16 July No. 34

21 WBS 6.0 Partnerships Partnerships were developed between the former OWIN program and local jurisdictions with the intent to reduce costs to both parties. These agreements created interdependency among participants for a functional system. The radio project has identified the partnership groups listed below as including sites that require work to meet the needs associated with these agreements. Schedule Summary All Partnerships CSEPP Lincoln County North Coast North Vally Southwest Seven Klamath County Additional Partnerships June 30, 2013 Budget Expenditures For WBS 6.0 Partnerships, 67 percent of the total budget has been expended to date. Total Section Budget $10,632,219 Actual Expenditures $7,126,739 67% Forecast Expenditures $5,282,092 50% Section Budget Remaining $3,505,480 33% $3,505,480 33% $7,126,739 67% $12 Current Expenditures $10 In Millions $8 $6 $4 $2 $0 actual Planned July No. 34 Page 17

22 Activities and Progress 6.1 OWIN Obligations For each partnership cluster, forecast and actual progress is reported for the month and for the project cumulatively through June. The following correspond to all tables in this section: Agreements: Umbrella and supplemental agreements executed in a given region. Design phase: Tasks completed from site planning through acquisition of the site building permit. Construction phase: Tasks completed from the acquisition of the building permit to the completion of site construction. Microwave installation phase: All tasks involved in the installation of microwave equipment, from initiation to completion. Microwave installations may occur during a site s construction phase or after it has been completed. Obligation complete: All work has been completed and associated quality reviews have been conducted and work approved. Quality reviews include those conducted by the partner(s), ODOT/OSP Wireless technicians and by representatives of the Oregon Office of Emergency Management Chemical Stockpile Emergency Preparedness Program June 2013 Total to date CSEPP Forecast Actual Forecast Actual Agreements complete 9 agreements COMPLETE 9 9 Design phase complete 1 site COMPLETE 1 1 Construction phase complete 4 sites COMPLETE 4 4 Microwave installation phase complete 3 sites Obligations complete 11 obligations The remaining obligation for this section of work is installation of microwave equipment and connecting two sites. The concern regarding the stability of one tower, noted in last month s report, was substantiated during June, causing the radio project to initiate work to construct a new tower. Due to the time required to complete construction, the project anticipates microwave equipment to be installed during 2014, revising the expected completion date of WBS section from December 2013 to August Lincoln County June 2013 Total to date Lincoln County Forecast Actual Forecast Actual Agreements complete 6 agreements COMPLETE 6 6 Design phase complete 4 sites COMPLETE 4 4 Construction phase complete 3 sites COMPLETE 3 3 Microwave installation phase complete 4 sites COMPLETE 4 4 Obligations complete 4 obligations COMPLETE 4 4 All work included in WBS section is complete. Page 18 July No. 34

23 6.1.3 North Coast June 2013 Total to date North Coast Forecast Actual Forecast Actual Agreements complete 13 agreements Design phase complete 3 sites Construction phase complete 3 sites Microwave installation phase complete 9 sites Obligations complete 13 obligations Work for one site remains scheduled for the 2013 construction season; currently, partners have connectivity through an adjacent site. Once construction is complete, the project will address the installation of microwave equipment, revising the expected completion date for WBS section from July 2013 to March North Valley June 2013 Total to date North Valley Forecast Actual Forecast Actual Agreements complete 1 agreements COMPLETE 1 1 Design phase complete 2 sites COMPLETE 2 2 Construction phase complete 2 sites COMPLETE 2 2 Microwave installation phase complete 2 sites COMPLETE 2 2 Obligations complete 2 obligations COMPLETE 2 2 All work included in WBS section is complete Southwest Seven June 2013 Total to date Southwest Seven Forecast Actual Forecast Actual Agreements complete 6 agreements Design phase complete 3 sites COMPLETE 3 3 Construction phase complete 5 sites Microwave installation phase complete 4 sites Obligations complete 6 obligations Work at two sites remains for this section. The expected completion date for WBS section is November Klamath County June 2013 Total to date Klamath County Forecast Actual Forecast Actual Agreements complete 7 agreements Design phase complete 3 sites COMPLETE 3 3 Construction phase complete 2 sites Microwave installation phase complete 4 sites Obligations complete 5 obligations The three outstanding agreements are with project partners for signature; however, until executed, the radio project will not initiate any site work. The project has been informed of tribal concerns related to one site, which likely extends the anticipated completion date for WBS section to late July No. 34 Page 19

24 6.1.7 Additional Partnerships June 2013 Total to date Additional Partnerships Forecast Actual Forecast Actual Agreements complete 1 agreement Design phase complete 1 site Construction phase complete 1 site Microwave installation phase complete 1 site Obligations complete 1 obligation Work on the remaining site will extend into the 2014 build season due to delays in acquiring the site. The expected completion date for WBS section is August Future Partnerships These sections have been reserved for future partnership-related activities, should the need arise. 6.5 Strategic Technology Reserve Activities related to the deployment of the Strategic Technology Reserve have been completed. Operations of the reserve have been transferred to the ODOT/OSP Wireless Section. Page 20 July No. 34

25 WBS 7.0 Planning AND Engineering The planning and engineering section of the work breakdown includes design and development activities associated with the previous WBS sections. Schedule Summary engineering Statewide Planning narrowband Planning & engineering Microwave Modernization engineering trunked Radio System engineering Interoperability Planning & engineering Partnership development Sites under Review Budget Expenditures June 30, 2013 For WBS 7.0 Planning and Engineering, 54 percent of the total budget has been expended. Total Section Budget $30,083,544 Actual Expenditures $16,230,743 54% Forecast Expenditures $18,153,281 60% Section Budget Remaining $13,852,801 46% $16,230,743 $13,852,801 54% 46% In Millions $35 $30 $25 $20 $15 $10 $5 $0 Current Expenditures actual Planned July No. 34 Page 21

26 Activities and Progress 7.1 Statewide Planning These activities are captured under 7.5 Interoperability Design and 7.6 Partnership Development. 7.2 Narrowband Planning and Engineering All planning efforts for transitioning the state to narrowband operation have been completed. Radio project staff began to implement necessary system updates in June and will continue through the summer to meet the radio project s narrowband deadline of Nov. 1, Microwave Modernization Engineering Eight site-to-site microwave design proposals and 11 site-to-site microwave design submittals were completed in June, furthering the progress toward a final microwave design. 7.4 Trunked Radio System Engineering Development on the radio project s trunked radio system design is ongoing. 7.5 Interoperability Design The project has no update to report on the development of an interoperability design. Planning and development of the interoperability design continues to be in the hands of the SIEC. Once the SIEC has established a plan, the project will begin work to develop its implementation strategy. 7.6 Partnership Development Also see 6.0 Partnerships for progress on site-specific work related to previous OWIN obligations. The following bullets correspond to the table below: Agreements: Umbrella and supplemental agreements executed. Design phase: Tasks completed from site planning through acquisition of the site building permit. June 2013 Total to date All OWIN Obligations Forecast Actual Forecast Actual Agreements complete 42 agreements Design phase complete 17 sites Page 22 July No. 34

27 WBS 8.0 System Testing The system testing section of the work breakdown includes quality assurance activities developed to ensure that project components perform and interact as intended. This section of work was developed and incorporated into the project budget during February. Schedule Summary Activities related to system testing are anticipated to begin near the end of Budget Expenditures The budget established for this section of work is $200,000. No expenditures have been made related to system testing to date. Activities and Progress No procurement, installation or implementation has been initiated for this work section. July No. 34 Page 23

28 Staffing & Vendor Summary Full-time state employees and contractors are working on the radio project throughout Oregon. In June, the project employed 22 full-time equivalent state positions. Staffing Summary Contract Summary Including historic values of the previous OWIN program, the State Radio Project has spent $81,879,464 of the $122,157,190 currently available across the project s 15 contracts. This represents an overall expenditure of approximately 67 percent. $81,879,464 67% To date in the biennium, $50,375,191 has been spent. This represents 41 percent of the total contract amount available and approximately 56 percent of the contract amount available for the biennium. $40,277,726 33% Percentage of the total contract value expended to the total value of work available Page 24 July No. 34

29 Contract Summary By Vendor $99,965 $2,550,095 $15,743,049 $20,881,241 $951,175 $10,016,838 $11,010,231 $45,812,325 $2,919,347 $70,124 $5,248,028 $702,896 $145,820 $2,863,582 $3,142,475 ABN Engineering ABN Engineering provides supplemental architecture and engineering design services. Activities and Progress Deliverables Submitted Planned Actual Preliminary Construction Drawing, stamped and signed 1 1 Tower structural analysis report 1 1 July No. 34 Page 25

30 AECOM AECOM provides consulting services to the project in the selection and engagement of the radio system contractor (Harris) and provides project and quality management of the radio system. Activities and Progress Deliverables Submitted Planned Actual Delivered microwave design proposals, site-to-site 8 8 Delivered microwave design submittals, site-to-site Submitted Quality Assurance Report on Narrowbanding Reprogramming Work 1 1 Submitted System Architecture Document 1 1 State Radio Project meetings attended Radio Vendor Progress Update meeting 2 2 Trunked Radio System Planning meeting 3 3 Increment Zero Status meeting 4 4 Microwave Update meeting 3 3 Technology Collaboration meeting 4 4 Black & Veatch Black & Veatch provides professional services in connection with the planning, design, engineering and administration for all phases of the project. Activities and Progress Deliverables Submitted Planned Actual Construction oversight visits completed 8 15 Site surveys completed 2 2 Geotechnical reports completed 1 2 Land use surveys completed 5 5 Harris Corp. Harris provides services, software and equipment for the design, installation and implementation of the project s radio system. Work products generated from these efforts are reported in sections 2.0 Narrowbanding and 4.0 Trunked Radio System. Activities and Progress State Radio Project meetings attended Planned Actual Radio Vendor Progress Update meeting 2 2 Trunked Radio System Planning meeting 3 3 Increment Zero Status meeting 4 4 Technology Collaboration meeting 4 4 Page 26 July No. 34

31 HDR Engineering HDR Engineering provides contract management and coordination support services and information systems development support for the project. Activities and Progress Work products generated from these efforts are reported elsewhere in this report. HDR employees provided support in project schedule management, project mapping, environmental analysis and project delivery improvement. State Radio Project meetings attended Planned Actual Site Review Committee meeting 3 3 Trunked Radio System Planning meeting 3 3 Technology Collaboration meeting 4 4 Legacy Wireless Legacy Wireless provides personnel resources capable of providing ongoing project management services for the project. Personnel acquired through this contract must have experience with design and construction of telecommunications sites, the implementation of a public safety radio system and the operations of a complex network of microwave systems to transport information. Activities and Progress Work products generated from these efforts are reported elsewhere in this report. Legacy employees provided support in the following areas: Site project management design through construction Design team coordination State Radio Project meetings attended Planned Actual Site Review Committee meeting 3 3 Increment Zero Status meeting 3 3 Technology Collaboration meeting 4 4 Public Knowledge Public Knowledge provides independent quality management services for the project. Activities and Progress Deliverables Submitted Planned Actual Quarterly Project Status and Improvement Report 1 1 SAIC SAIC Inc. provides personnel resources similar to those provided by Legacy Wireless. SAIC personnel must have experience with design and construction of telecommunications sites, the implementation of public safety radio systems and the operations of a complex network of microwave systems to transport information. Activities and Progress Work products generated from these efforts are reported elsewhere in this report. July No. 34 Page 27

32 Sites by County For site-specific scope, schedule and budget, see the interactive map at Baker Baker City Maintenance Baker City Patrol Office Baker Scale Beaver Mountain M/W Beaver Ridge OSP Elkhorn Mountain M/W Halfway Hill Lime Hill M/W Lone Pine M/W Richland Maintenance Summit Point Whitney Sand Shed Benton Corvallis Maintenance M/W Marys Peak M/W OSU Patrol Office Vineyard Hill Clackamas Brightwood Estacada Maintenance Goat Mountain Government Camp Maintenance Government Camp Patrol Office Lawnfield District Maintenance M/W Linhart Butte Milwaukie Maintenance M/W Mount Hood (Timberline) Mount Scott M/W (District 2B) PCC Patrol Office Petes Mountain Portland Patrol Office Sand Shed (District 2C) Sandy Maintenance Suncrest M/W Clatsop Astoria Area Manager PM Astoria District Office 1 Astoria M/W Astoria Patrol Office Camp Rilea District 1 Bridge Crew Double Peak Humbug Maintenance Nicolai Mountain M/W OSP Seaside 911 Tillamook Head Warrenton M/W Warrenton Maintenance Wickiup Mountain M/W Columbia Clatskanie (County 911 Site) Clatskanie Maintenance Clatskanie Mountain Rainier M/W St Helens Patrol Office Coos Baldy Butte (Coos Bay) Bandon BPA Bennett Butte M/W Blue Ridge North Coos Bay Maintenance M/W Coos Bay Patrol Office Coquille Maintenance M/W Davis Slough Maintenance (Coos Bay) Four Mile Noah Butte Signal Tree (Ram Cell) Signal Tree M/W Crook Barnes Butte Grizzly Mountain M/W (Crook) Powell Butte Prineville Maintenance Prineville Patrol Office Curry Black Mound Bosley Butte Cape Blanco Cape Blanco (Curry) Carpenterville Curry Co Courthouse Edson Butte Gold Beach Maintenance (Hunters Creek) Gold Beach Patrol Office Grizzly Butte (Curry) Harbor Hill Iron Mountain Port Orford Maintenance Stone Butte Page 28 July No. 34

33 Sites by County (Cont.) Deschutes Awbrey Butte Bend District Office 10 Bend Maintenance M/W Bend Patrol Office Brothers Maintenance Hampton Butte La Pine Maintenance Long Butte Long Butte ODOT Mount Bachelor OSP East Headquarters Pine Mountain M/W Region 4 TOC (Bend) Sisters Maintenance Sugar Pine Wampus Butte Wanoga Butte Wanoga Sand Shed Douglas Boswell Springs Maintenance Canyonville Maintenance Chilcoot Mountain Cinnamon Butte Cougar Pass Dean Mountain Debris Hwy 38 Dean Mountain Rd Debris Hwy 38 Scottsburg Dodson Butte M/W Elkton Ridge Harness Mountain (LCSO) Harness Mountain M/W Lemolo Sand Shed Mount Nebo Mount Scott (Klamath) Red Butte Reedsport Maintenance Roman Nose Rose Hill Roseburg Maintenance (Shady) M/W Roseburg Patrol Office Roseburg Region 3 Office Scott Mountain (Douglas) Steamboat Maintenance Yellow Butte Gilliam Arlington Maintenance Arlington Patrol Office Condon Condon Maintenance Grant Aldrich Mountain Austin Maintenance Dixie Butte Fall Mountain M/W John Day M/W Airport John Day Maintenance/Canyon City John Day Patrol Office John Day Scale Tamarack Mountain Harney Beatys Butte Burns Butte M/W Burns Maintenance Burns Patrol Office Devine Ridge M/W Jack Mountain King Mountain Steens Mountain Stinkingwater Pass Sand Shed Hood River Cascade Locks Maintenance Cascade Locks POE Debris I-84 M/W Cascade Locks Hood River (CRITFC) Hood River 911 Middle Mountain (US Cellular) Parkdale Maintenance Jackson Ashland Maintenance Ashland POE Central Point Maintenance Halls Point Lincoln Maintenance Sand Shed Medford ODOT M/W Mount Ashland Mount Isabelle OSP SW Headquarters Prospect Maintenance Region 3 TOC (Central Point) Robinson Butte Roxy Ann Mountain M/W SCC/Central Point Dispatch/SW HQ July No. 34 Page 29

34 Sites by County (Cont.) Siskiyou Summit Fill Siskiyou Summit Sand Shed Soda Mountain M/W Starveout Mountain M/W Table Mountain (Jackson) Table Mountain BLM (Jackson) White City Maintenance District M/W Jefferson Agency Plains Deer Ridge, DOC - Madras Gray Butte Madras Maintenance Madras Patrol Office Stephenson Josephine Cave Junction Maintenance Debris US 199 Road Closure Eight Dollar Fiddler Mountain Grants Pass Maintenance Grants Pass Patrol Office Onion Mountain Sexton Mountain M/W Klamath Applegate Butte Chemult Maintenance Chiloquin Maintenance Gilchrist Patrol Office Hamaker Mountain (KCSO) Hamaker Mountain ODOT Hogback Mountain Klamath Falls M/W Klamath Falls Maintenance Klamath Falls Patrol Office Klamath Falls POE Lake of the Woods Maintenance Medicine Mountain M/W Odell Butte Odell Lake Maintenance Pelican Butte Swan Lake Point Walker Mountain M/W (Klamath) Lake Adel Maintenance Adel Remote (Fish Rim) Alkalai Lake Maintenance M/W Black Cap Glass Butte M/W Grizzly Peak M/W (Lake) Lakeview Maintenance M/W Lakeview Patrol Office Picture Rock (DI) M/W Round Pass Silver Lake Maintenance Lane Bear Mountain Blanton Heights Buck Mountain M/W Dead Mountain Florence Maintenance Florence Patrol Office Glenada Ridge Glenwood Maintenance Goodwin Peak Herman Peak McKenzie Bridge Maintenance Mount Hagan Oakridge Maintenance Oakridge Patrol Office Prairie Peak M/W Springfield District Office M/W Springfield Patrol Office Table Rock (Lane) Veneta Maintenance Vida Walker Point (Lane) Wallace Butte Wolf Mountain (ATT) Wolf Mountain Lincoln Cape Perpetua Cape Perpetua (Lincoln) Euchre Mountain Lincoln County Newport Patrol Office Ona Beach Maintenance Rose Lodge Maintenance Saddlebag Table Mountain (Lincoln) Yaquina Head M/W Linn Albany Maintenance Albany Patrol Office Page 30 July No. 34

35 Sites by County (Cont.) Cascadia Green Peter Hoodoo Butte ATC Hoodoo Butte M/W McCully Mountain Santiam Junction Maintenance Scott Mountain Lookout (Linn) Snow Peak Sweet Home Maintenance Washburn Butte Malheur Basque Maintenance Black Butte (Juntura) Blue Mountain Cottonwood Mountain M/W Farewell Bend POE Jordan Valley Maintenance Jordan Valley Patrol Office Juntura Maintenance Mahogany Mountain ODOT District 14 Office Ontario District Office 14 Ontario Maintenance M/W Ontario Patrol Office Pharmacy Hill Snake River, DOC - Ontario Succor Creek Summit Fill Vale Butte M/W Vale Maintenance Vale, District 14 Bridge Crew Marion ARC (Anderson Readiness Center) Capitol Mall Patrol Office Detroit Maintenance Green Peter (ODOT) Halls Ridge ODOT T-Building M/W Oregon Department of Forestry Oregon Emergency Management Oregon Motor Carrier HQ Oregon State Fire Marshall Prospect, Lower (Hill) M/W Prospect, Main M/W Region 2 TOC (Salem) Salem, Battery Room Salem, District 3 HQ Salem, District Office 3 Salem, Facilities Salem, Maintenance Salem, Material Lab Salem, OSP Office M/W Salem, Patrol Office Salem, PM & Sign Shop Salem, Radio, Building D Salem, Region 2 Electrical Building T Salem, Region 2 Stripping Salem, Region EOC/ HQ, Building B Salem, Repair Shop, Building M Salem, State Radio Project Salem, Transport Services Building K Salem, Wireless Building C State Fairgrounds State Penitentiary, DOC - Salem Wipper M/W Woodburn Maintenance Woodburn POE Morrow Black Mountain (OSP) Black Mountain M/W Boardman Gleason Peak Heppner Maintenance Heppner Patrol Office Jordan Butte Wilkinson Hill Multnomah 200 Market Ashforth Building (CRITFC HQ) Baldock Maintenance Barlow Maintenance M/W Council Crest Debris I-84 M/W Troutdale East Portland Maintenance Fremont Bridge M/W Interstate Bridge/Jantzen Beach Multnomah M/W System North Portland, Parkrose Maintenance Portland Bridge Office Portland Region 1 office Region 1 TOC (Portland) Sylvan District Office Maintenance M/W Troutdale District Office Troutdale Maintenance M/W Willatin Tank July No. 34 Page 31

36 Sites by County (Cont.) Polk Bald Mountain (Polk) Doane Creek Eagle Crest Grand Rhonde Maintenance Sherman Moro Maintenance Tillamook Cape Lookout (L190) Cape Meares Debris Field Hwy 6 Tillamook Neahkahnie Tillamook Clatsop Connection Tillamook DMV Maintenance M/W Tillamook Patrol Office Wilson River M/W Umatilla Bone Point Cabbage Hill (CTUIR) Cabbage Hill (US Cell) Cabbage Hill M/W Cold Springs Scalehouse Coombs Canyon Hermiston Maintenance Hermiston Patrol Office Lorenzen Rd (Exit 198) Meacham Maintenance Milton Freewater Patrol Office Mount Weston Mount Weston (Broadcast Building) Pendleton East Pendleton Justice Center Pendleton Maintenance M/W (IH) Pendleton Patrol Office Two Rivers, DOC - Umatilla Ukiah Maintenance Umatilla POE Umatilla Ridge Whitmore Rd Union Elgin Maintenance La Grande Maintenance M/W La Grande Patrol Office La Grande Scales Ladd Canyon Mount Emily M/W Mount Fanny Spout Springs Fill Wallowa Devil s Ridge Enterprise Maintenance Enterprise Patrol Office Flora Fill Station Howard Butte Mount Howard Wallowa Visitor Center Wasco Criterion Summit M/W Foremans Point Hulse Ranch M/W Kaser Maupin Maintenance Shaniko The Dalles East (US Cell) The Dalles Maintenance M/W The Dalles Patrol Office Tygh Ridge Warm Springs Maintenance Wasco Butte M/W Washington Banks Patrol Office Beaverton Area Manager PM Buxton Mountain M/W Cedar Hills Coffee Creek, DOC - Wilsonville Debris Field Hwy 6 Banks Manning Maintenance North Plains Patrol Office Round Top Tualatin Patrol Office Wheeler Keyes Mountain FTN Keyes Summit (Mitchell Remote) Mount Pisgah Rancharea Rock Spray Maintenance Yamhill Boulder Crest Chehalem Mountain M/W High Heaven McMinnville Maintenance Station Page 32 July No. 34

37 Sites by County (Cont.) McMinnville Patrol Office Mount Hebo M/W Mount Hebo South Point Newberg Maintenance Out-of-Oregon Augspurger Mountain M/W (CRITFC) Augspurger Mountain M/W (US Cell) Biddle Butte Golgotha Butte Golgotha Butte (BCES) Green Mountain Haystack Butte M/W Juniper (Klickitat) Megler (Chinook) Megler Bridge (Astoria) Roosevelt Mountain M/W Sheepy Ridge Sillusi Butte (BCES) Sillusi Butte Fill Skamania Mountain M/W Stacker Butte M/W Underwood July No. 34 Page 33

38 Project Cost Summary Original Budget 9/07/2011 Project Budget Revised Budget as of 06/30/13 Change in Budget through 06/30/13 Budget Biennium Budget Funds Spent through 06/30/13 Balance Narrowbanding Repeaters 6,100,000 7,519,853 1,419,853 3,475,947 3,024, ,784 Office Remotes 2,000,000 2,116, ,600 1,557,250 74,595 1,482,655 Hand Helds/Portables 33,200,000 30,000,000 (3,200,000) 30,000,000 24,602,150 5,397,850 Cutover/Testing - 352, ,200-35,954 (35,954) Site Work - Moved under microwave moderization 6,600,000 (6,600,000) - Narrowbanding Subtotal 47,900,000 39,988,653 (7,911,347) 35,033,197 27,736,863 7,296,335 Microwave Modernization Purchase & Installation 29,300,000 12,296,216 (17,003,784) 7,265, ,148 7,049,798 Network 5,644,000 5,644,000 4,310,909 4,104, ,994 Site Improvements 38,950,000 14,826,124 (24,123,876) 619,809 2,496,066 (1,876,257) Network Management System 2,000,000 2,000, Training & Equipment Acquisition 500, , Microwave Modernization Subtotal 68,250,000 35,266,340 (32,983,660) 12,196,664 6,817,129 5,379,535 Trunking Receivers 5,250,000 4,122,861 (1,127,139) 1,100,976 3,380,685 (2,279,709) Switches 3,263,466 3,263,466 3,263,466 1,544,681 1,718,785 Consoles 1,400,000 3,404,107 2,004,107 3,404,107 2,997 3,401,110 Trunking Subtotal 6,650,000 10,790,434 4,140,434 7,768,549 4,928,363 2,840,186 Interoperability Procurement & Installation 2,300,000 2,300, Interoperability Subtotal 2,300,000 2,300, Partnerships Construction 10,400,000 10,632, ,219 5,365,092 7,126,739 (1,761,647) Partnerships Subtotal 10,400,000 10,632, ,219 5,365,092 7,126,739 (1,761,647) Engineering Narrowbanding 1,300,000 4,025,231 2,725,231 3,466,342 1,265,823 2,200,520 Microwave Modernization 17,750,000 20,294,925 2,544,925 12,143,397 9,695,076 2,448,322 Trunking 1,850,000 3,654,589 1,804,589 2,320,597 2,538,178 (217,581) Interoperability - 1,911,120 1,911,120 1,339,675 1,126, ,314 Partnerships 197, , , ,208 (100,529) COPS Grant 30,083,544 30,083,544-1,288,885 (1,288,885) First Net Grant - 8,374 (8,374) IECGP Grant - 9,837 (9,837) Engineering Subtotal 60,167,088 39,267,088 19,467,691 16,230,743 3,236,948 End System Testing End System Testing 200, , End System Testing Subtotal - 200, , Totals by Phase Narrowbanding 49,200,000 44,013,884 (5,186,116) 38,499,539 29,002,685 9,496,854 Microwave Modernization 86,000,000 55,561,265 (30,438,735) 24,340,061 17,156,647 7,183,414 Trunking 8,500,000 14,445,023 5,945,023 10,089,146 7,466,541 2,622,605 Interoperability 2,300,000 4,211,120 1,911,120 1,339,675 1,770,804 (431,129) Partnerships 10,400,000 10,829, ,898 5,562,771 7,424,947 (1,862,176) First Net/IECGP Grant 18,211 (18,211) End System Testing - 200, ,000 Subtotal 156,400, ,261,190 (27,138,810) 79,831,193 62,839,837 16,991,356 Project Management - 15,910,286 15,910,286 7,941,013 6,882,132 1,058,881 Contingency - 4,315,880 4,315,880 1,452,382-1,452,382 Harris Discount Loss 5,000,000 5,000,000 Total State Radio Project 156,400, ,487,356 (1,912,644) 89,224,588 69,721,968 19,502,620 Old OWIN Project Spending 45,000,000 49,256,733 4,256,733 Treasury Loan 8,000,000 6,247,831 (1,752,169) Total Old OWIN 53,000,000 55,504,564 2,504,564 Grand Total 209,400, ,991, ,920 Page 34 July No. 34

39 Estimated Project Cash Flow $160 $140 $120 $100 Dollars in Millions $80 $60 $40 $20 $0 Project Management engineering contingency narrowbanding Microwave Modernization trunking interoperability Partnerships July No. 34 Page 35

Cover photo: Smoke from a nearby wildfire is visible from the Lime Hill radio site in Baker County. A crew from Summit Solutions Group was on site

Cover photo: Smoke from a nearby wildfire is visible from the Lime Hill radio site in Baker County. A crew from Summit Solutions Group was on site AUGUST 2015 MONTHLY PROGRESS REPORT Cover photo: Smoke from a nearby wildfire is visible from the Lime Hill radio site in Baker County. A crew from Summit Solutions Group was on site recently to tighten

More information

Cover photo: Snow blanketed the State Radio Project s Mount Aldrich site in early November. The Grant County site sits at nearly 7,000 feet in

Cover photo: Snow blanketed the State Radio Project s Mount Aldrich site in early November. The Grant County site sits at nearly 7,000 feet in DECEMBER 2015 MONTHLY PROGRESS REPORT Cover photo: Snow blanketed the State Radio Project s Mount Aldrich site in early November. The Grant County site sits at nearly 7,000 feet in elevation. State Radio

More information

Cover photo: From the conference room between the Oregon State Police Northern Command Center and the Oregon Department of Transportation Northwest

Cover photo: From the conference room between the Oregon State Police Northern Command Center and the Oregon Department of Transportation Northwest NOVEMBER 2015 MONTHLY PROGRESS REPORT Cover photo: From the conference room between the Oregon State Police Northern Command Center and the Oregon Department of Transportation Northwest Transportation

More information

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. January 2015

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. January 2015 State Rad o Project STATE RADIO PROJECT January 2015 Monthly Progress Report PROJECT GOALS INFRASTRUCTURE Repair or replace critical components of Oregon s deteriorating state radio network and extend

More information

State Radio Project. January Monthly Progress Report

State Radio Project. January Monthly Progress Report State Rad o Project State Radio Project January 2013 Monthly Progress Report Project Goals Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend

More information

State Radio Project. January Monthly Progress Report

State Radio Project. January Monthly Progress Report State Rad o Project State Radio Project January 2014 Monthly Progress Report Project Goals Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend

More information

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. April 2015

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. April 2015 State Rad o Project STATE RADIO PROJECT April 2015 Monthly Progress Report PROJECT GOALS INFRASTRUCTURE Repair or replace critical components of Oregon s deteriorating state radio network and extend the

More information

State Radio Project. May Monthly Progress Report

State Radio Project. May Monthly Progress Report State Rad o Project State Radio Project May 2012 Monthly Progress Report PROject GOALS Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend the

More information

Sept 28, Mukhtar mook-tar Thakur

Sept 28, Mukhtar mook-tar Thakur MnDOT Office of Statewide Radio Communications (OSRC) Overview -Summary and ARMER Status Update Central Region Summit- Alexandria, MN Sept 28, 2016 Mukhtar mook-tar Thakur The Office of Statewide Radio

More information

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Implementation Plan (Deliverable 13-A)

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Implementation Plan (Deliverable 13-A) OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT Implementation Plan (Deliverable 13-A) Prepared by: Federal Engineering, Inc. 10600 Arrowhead Dr, Suite 160 Fairfax, VA 22030 703 359-8200 December

More information

2-800 MHz CCCS Sys Extension

2-800 MHz CCCS Sys Extension 2-800 MHz CCCS Sys Extension 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner. 3. Is the Strategic Priority new or previously identified in an earlier Strategic

More information

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner 3. Is the Strategic Priority new

More information

Public Safety Interoperable Communications (PSIC)

Public Safety Interoperable Communications (PSIC) State of New Mexico Department of Information Technology 2013 National Association of State Chief Information Officers State IT Recognition Awards Public Safety Interoperable Communications (PSIC) Category:

More information

Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ)

Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ) Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ) Goals... 2 1. What is WyoLink supposed to accomplish?... 2 2. Who will oversee WyoLink

More information

IFERN / IFERN 2 Radio Base Stations for all Wisconsin MABAS Divisions/Counties

IFERN / IFERN 2 Radio Base Stations for all Wisconsin MABAS Divisions/Counties Project Name IFERN / IFERN 2 Radio Base Stations for all Wisconsin MABAS Divisions/Counties Sponsoring Agency MABAS Wisconsin - The Mutual Aid Box Alarm System (known as MABAS) Senate Bill SB 642 was approved

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

Radio Technology Overview. January 2011

Radio Technology Overview. January 2011 Radio Technology Overview January 2011 Presentation Objectives The objective of this presentation is to: Review terms as related to radio technology Review the challenges facing the City o FCC mandate

More information

Radio System Replacement Project

Radio System Replacement Project Radio System Replacement Project City Council Briefing December 6, 2017 William Finch, Chief Information Officer, Communication & Information Services Presentation Overview Background Procurement Process

More information

Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal)

Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal) Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal) Goal: 95% in-street portable coverage based on a 3 watt portable radio Network infrastructure consisting

More information

TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors

TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors Date: September 6, 8 To: Through: From: Subject: TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors Dale Shaw, TRWC Executive Director Randy Thompson Administrator Update Capital Projects )

More information

EMERGENCY COMMUNICATIONS

EMERGENCY COMMUNICATIONS EMERGENCY COMMUNICATIONS FY2004-2010 1. BACKGROUND ISSUES The Emergency Communications element of the capital plan is comprised of three projects concerning emergency radio communications, computer aided

More information

2 ESF 2 Communications. (includes Alert and Warning)

2 ESF 2 Communications. (includes Alert and Warning) 2 ESF 2 Communications (includes Alert and Warning) THIS PAGE LEFT BLANK INTENTIONALLY Table of Contents 1 Purpose... ESF 2-1 2 Scope... ESF 2-1 3 Roles and Responsibilities... ESF 2-2 3.1 Primary Agencies...

More information

PALMETTO 800 History Project Cost

PALMETTO 800 History Project Cost PALMETTO 800 South Carolina has implemented the largest statewide emergency communications radio system in the nation. With over twenty thousand users, the system is available to federal, state, and local

More information

Radio Communications Essentials. Module 9: Narrowbanding Pete Peterson

Radio Communications Essentials. Module 9: Narrowbanding Pete Peterson Radio Communications Essentials Module 9: Narrowbanding Pete Peterson 1 Topics Why is it Necessary? Who is Affected? Key Deadlines & Exceptions What are the Challenges? Sample Steps to Narrowband Frequently

More information

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Conceptual Design for Radio System, Revision 1 (November 30, 2006) (Deliverable 9-D)

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Conceptual Design for Radio System, Revision 1 (November 30, 2006) (Deliverable 9-D) OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT Conceptual Design for Radio System, Revision 1 () (Deliverable 9-D) Prepared by: Federal Engineering, Inc. 10600 Arrowhead Drive, Suite 160 Fairfax,

More information

Guide for Short Term Interoperability

Guide for Short Term Interoperability Oregon State Interoperability Executive Council Guide for Short Term Interoperability Adopted: by the SIEC Technical Committee The Oregon State Interoperability Executive Council (SIEC) and the State of

More information

Columbia Communications District Request for Information New Radio Communications System

Columbia Communications District Request for Information New Radio Communications System Columbia 9-1-1 Communications District Request for Information New Radio Communications System Submission Deadline January 2, 2018 1 1 Overview 1.1 Introduction The Columbia 911Communications District

More information

Guide for Short Term Interoperability Revised June 24, 2009

Guide for Short Term Interoperability Revised June 24, 2009 Oregon State Interoperability Executive Council Guide for Short Term Interoperability Revised The Oregon State Interoperability Executive Council (SIEC) and the State of Oregon encourage Oregon s public

More information

Steven W. Jennings, CIO Harris County ITC

Steven W. Jennings, CIO Harris County ITC Steven W. Jennings, CIO Harris County ITC Harris County operates an 800 MHz Motorola Multi-cast SmartZone Regional Radio System that supports 33,000 users in 512 departments in the region, covering nine

More information

Public Safety Communications Commission

Public Safety Communications Commission Public Safety Communications Commission Report to Governor and Joint Transportation, Highways and Military Affairs Committee June 2017 Matthew H. Mead Governor Wyoming Public Safety Communications Commission

More information

Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016

Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016 Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016 PURPOSE AND NEED The proposed Hutch Mountain Communications Site project is part of a broader wireless industry strategy

More information

Business Plan Summary

Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Mike Bushby Division Manager Fleet Services and

More information

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * *

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * * REVIEWED LEGAL COUNSEL For Recording Stamp Only BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON An Ordinance Amending Deschutes County Code Title 18 to Provide a Definition of Agricultural

More information

The Professional Consulting Services Communications Consultant E-911. Design Alternatives

The Professional Consulting Services Communications Consultant E-911. Design Alternatives The Communications Consultant E-911 Sullivan County, New York April 21, 2010 Table of Contents 1. OVERVIEW... 4 2. TECHNOLOGY OPTIONS... 5 2.1 Analog Conventional... 5 2.2 Project 25 Conventional... 5

More information

MEMA Narrowbanding Planning Primer

MEMA Narrowbanding Planning Primer 1. The State of Maine is required to narrowband its public safety communications radios, as are all county and local governments, in accordance with the Federal Communications Commission (FCC) mandate,

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

ATLAS. P25 Systems. LMR communications made simple.

ATLAS. P25 Systems. LMR communications made simple. P25 Systems LMR communications made simple. We make your critical communication system safe and simple to use. IS THE MOST MODERN & FLEXIBLE P25 SYSTEM Our patented Latitude technology makes the P25 application

More information

Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of Police Lower Merion Township Radio System Replacement DATE: June 25, 2014

Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of Police Lower Merion Township Radio System Replacement DATE: June 25, 2014 EXHIBIT B TOWNSHIP OF LOWER MERION POLICE DEPARTMENT DEPARTMENTAL MEMORANDUM INTEGRITY PROFESSIONALISM RESPECT TO: FROM: SUBJECT: Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of

More information

Clark County Fire Prevention Las Vegas Nevada

Clark County Fire Prevention Las Vegas Nevada Clark County Fire Prevention Las Vegas Nevada PUBLIC SAFETY/FIRST RESPONDER RADIO AMPLIFICATION SYSTEMS SCOPE: This guideline sets forth requirements for the design, installation and testing of Public

More information

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION STAFF REPORT MEETING DATE: August 20, 2013 TO: City Council 75 Rowland Way #200 Novato, CA 94945-3232 (415) 899-8900 FAX (415) 899-8213 www.novato.org FROM: James Berg, Chief of Police SUBJECT: MARIN EMERGENCY

More information

Public Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011

Public Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011 Public Safety Radio Communications System Update Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011 Purpose Review state of the current radio system Council to consider M&C P11234

More information

SERS primary mission was to design, purchase, build and operate a county-wide 800 MHz radio system along with supporting infrastructure and

SERS primary mission was to design, purchase, build and operate a county-wide 800 MHz radio system along with supporting infrastructure and * Established in 1999 * The Snohomish County Emergency Radio System SERS Mission SERS primary mission was to design, purchase, build and operate a county-wide 800 MHz radio system along with supporting

More information

A Bill Regular Session, 2017 HOUSE BILL 1926

A Bill Regular Session, 2017 HOUSE BILL 1926 Stricken language would be deleted from and underlined language would be added to present law. 0 0 0 State of Arkansas st General Assembly As Engrossed: H// A Bill Regular Session, 0 HOUSE BILL By: Representative

More information

Motorola Deployable Solutions

Motorola Deployable Solutions Motorola Deployable Solutions Fully integrated site solution on wheels for rapid response to additional capacity, additional coverage, or disaster recovery. Rapid Response Advanced planning, preparation,

More information

Communications Interoperability- Current Status

Communications Interoperability- Current Status Communications Interoperability- Current Status Stephen Mitchell Abstract Over the past decade, the public-safety community in partnership with local, state, and federal agencies have worked to develop

More information

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania Information Communications Technology Innovation Commonwealth of Pennsylvania Executive Summary In the mid-1990s, the Commonwealth of Pennsylvania faced the prospect of replacing an aging analog radio

More information

Narrow-banding What It Means to Public Safety Webinar

Narrow-banding What It Means to Public Safety Webinar Narrow-banding What It Means to Public Safety Webinar Rick Mulvihill Director Presenters Charlie Stephenson Director of Outreach and Technology Assistance Robert Rhoads Office of Emergency Communications,

More information

EXHIBIT 2 Page 1 of 5 Reasonable Necessity for Eminent Domain Action Tuttle Property Final Report PREPARED JANUARY 2018 FOR BROWARD COUNTY, FLORIDA MissionCriticalPartners.com State College Office 690

More information

West Region Wildfire Council Meeting Minutes 8/9/12

West Region Wildfire Council Meeting Minutes 8/9/12 West Region Wildfire Council Meeting Minutes 8/9/12 Meeting Attendance Name Agency Email 1 Tom Austin Log Hill Fire Toma67@aol.com 2 Chris Barth Montrose Interagency Fire cbarth@blm.gov 3 Lilia Colter

More information

ESF 2. Communications

ESF 2. Communications ESF 2 Communications This page left blank intentionally. 1 Introduction: Purpose and Scope ESF 2 organizes, establishes, and maintains the communications capabilities among appropriate agencies/entities

More information

2 ESF 2 Communications

2 ESF 2 Communications 2 ESF 2 Communications THIS PAGE LEFT BLANK INTENTIONALLY ESF 2 Communications Table of Contents 1 Purpose and Scope... ESF 2-1 2 Policies and Agreements... ESF 2-1 3 Situation and Assumptions... ESF 2-1

More information

MINUTES REGULAR COMMISSION MEETING THE PORT OF PORTLAND January 9, 2008

MINUTES REGULAR COMMISSION MEETING THE PORT OF PORTLAND January 9, 2008 1 MINUTES REGULAR COMMISSION MEETING THE PORT OF PORTLAND January 9, 2008 In response to due notice, the regular meeting of the Commissioners of the Port of Portland was held at 9:00 a.m. in the Commission

More information

Appointments are available the first two weeks of June 2001 (06/04/01 06/15/01) from 9:00 a.m. to 4:00 p.m.

Appointments are available the first two weeks of June 2001 (06/04/01 06/15/01) from 9:00 a.m. to 4:00 p.m. ATTN: Potential Land Mobile Radio Systems Integrators The Commonwealth of Virginia will be issuing a Request for Proposal in the near future to establish a Contract with a Systems Integrator to upgrade

More information

HOUSE COMMITTEE ON VETERANS AND EMERGENCY PREPAREDNESS

HOUSE COMMITTEE ON VETERANS AND EMERGENCY PREPAREDNESS HOUSE COMMITTEE ON VETERANS AND EMERGENCY PREPAREDNESS MAY 16, 2017 TESTIMONY BY JOHN CORE, OREGON SECTION AMERICAN RADIO RELAY LEAGUE ON THE AMATEUR RADIO EMERGENCY SERVICE PURPOSE: REVIEW POSSIBLE POLICIES

More information

The work under the Environment under Review subprogramme focuses on strengthening the interface between science, policy and governance by bridging

The work under the Environment under Review subprogramme focuses on strengthening the interface between science, policy and governance by bridging The work under the Environment under Review subprogramme focuses on strengthening the interface between science, policy and governance by bridging the gap between the producers and users of environmental

More information

Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment and Facilitate Infrastructure R56 Grounding Work

Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment and Facilitate Infrastructure R56 Grounding Work CITY OF MARTINEZ CITY COUNCIL AGENDA March 21, 2012 TO: FROM: SUBJECT: Mayor and City Council Gary D. Peterson, Chief of Police Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment

More information

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250) The Office of the Finance and Purchasing Manager Telephone : (250) 352-8204 Fax : (250) 352-6594 REQUEST FOR PREQUALIFICATIONS RADIO COMMUNICATIONS INFRASTRUCTURE UPGRADE CONTRACTOR SERVICES 2018-PRQ-01

More information

MAKING THE CALL ON A NATIONAL PUBLIC SAFETY WIRELESS NETWORK

MAKING THE CALL ON A NATIONAL PUBLIC SAFETY WIRELESS NETWORK MAKING THE CALL ON A NATIONAL PUBLIC SAFETY WIRELESS NETWORK A white paper from L.R. Kimball May 2010 866.375.6812 info@lrkimball.com www.lrkimball.com ARchitecture Engineering Communications technology

More information

Current Systems. 1 of 6

Current Systems. 1 of 6 Current Systems Overview Radio communications within the State of California s adult correctional institutions are vital to the daily safety and security of the institution, staff, inmates, visitors, and

More information

Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018

Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018 Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018 Shannon Dennie Ministry of Northern Development and Mines Presentation Content 2 1. Provide

More information

SECTION GPS WIRELESS CLOCK SYSTEMS

SECTION GPS WIRELESS CLOCK SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. G.P.S. Receiver B. Primary Transmitter C. Satellite Transmitter D. Analog Clocks E. Digital Clocks 1.2 REGULATORY REQUIREMENTS SECTION 27 53 13 GPS WIRELESS CLOCK

More information

Oregon. Bolts to Blocks 133 Broadalbin St SW Albany OR The Quilt Loft 405 1st Ave W Albany OR

Oregon. Bolts to Blocks 133 Broadalbin St SW Albany OR The Quilt Loft 405 1st Ave W Albany OR Bolts to Blocks 133 Broadalbin St SW Albany OR 97321 541-704-0386 The Quilt Loft 405 1st Ave W Albany OR 97321 541-928-7242 Aloha Sewing & Vacuum 18335 SW TV Hwy Aloha OR 97003 503-649-6050 Sew Creative

More information

MEMBERS ABSENT Buffalo Grove Fire Department, Rolling Meadows Fire Department.

MEMBERS ABSENT Buffalo Grove Fire Department, Rolling Meadows Fire Department. MINUTES OF THE REGULAR MEETING OF THE EXECUTIVE COMMITTEE OF THE NORTHWEST CENTRAL DISPATCH SYSTEM, HELD IN THE MOUNT PROSPECT VILLAGE HALL, MOUNT PROSPECT, COOK COUNTY, ILLINOIS, ON THURSDAY, MARCH 21,

More information

Public Safety Radio System. August 6, 2018

Public Safety Radio System. August 6, 2018 Public Safety Radio System August 6, 2018 Project overview Phase I Needs Assessment Coverage Capacity Resiliency & Redundancy Interoperability Encryption Phase II RFP Development Response Review Selection

More information

SECTION 35 ANTENNAS AND TOWERS

SECTION 35 ANTENNAS AND TOWERS SECTION 35 ANTENNAS AND TOWERS Section: 515-35-1 Purpose and Intent 515-35-2 General Standards 515-35-3 Certification, Inspection and Maintenance 515-35-4 Tower Design 515-35-5 Co-Location Requirement

More information

Telecommunications Law

Telecommunications Law FCC s Wireless Facility Rules Implementing Section 6409(a) League of California Cities City Attorneys Conference Monterey, May 6, 2015 PRESENTED BY Harriet A. Steiner City Attorney, Davis 2015 Best Best

More information

S 0342 S T A T E O F R H O D E I S L A N D

S 0342 S T A T E O F R H O D E I S L A N D LC000 01 -- S 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - SMALL CELL SITING ACT Introduced By: Senators DiPalma,

More information

SARASOTA COUNTY GOVERNMENT

SARASOTA COUNTY GOVERNMENT SARASOTA COUNTY GOVERNMENT Emergency Services TO: Sarasota County Commission THROUGH: Thomas A. Harmer, County Administrator FROM: Richard Collins, Director of Emergency Services Jerry Wheeler, Manager,

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical - NA Protection & Control - NA \\Q 30 JuLy Transmission & Distribution - NA Telecontrol System Planning - NA Replace MDR-4000 Microwave

More information

Excerpts from PG&E s SmartMeter Reports to the California Public Utilities Commission. PG&E s SmartMeter Program is a Massive Technology Rollout

Excerpts from PG&E s SmartMeter Reports to the California Public Utilities Commission. PG&E s SmartMeter Program is a Massive Technology Rollout May 10, 2010 Excerpts from PG&E s SmartMeter Reports to the California Public Utilities Commission PG&E s SmartMeter Program is a Massive Technology Rollout A note about this document: Some terms used

More information

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures February 2014 Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures Aussi disponible en français Contents 1. Intent... 1 2. Mandate... 1 3. Policy... 1 4. Background... 1 5. Review

More information

Public Safety Radio System Update September 9, 2013

Public Safety Radio System Update September 9, 2013 Public Safety Radio System Update September 9, 2013 Bill Greeves, CIO John Higgins, Deputy CIO 1 Timeline Beginning in 2016, Motorola will no longer support the current system. Also, future upgrades are

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

Small Cell Infrastructure in Denver

Small Cell Infrastructure in Denver September 2017 Small Cell Infrastructure in Denver The City and County of Denver is receiving growing numbers of requests from wireless providers and wireless infrastructure companies to construct small

More information

ADDENDUM 1. Forsyth County. Request for Qualifications and Proposals. Consulting Services for Public Safety Radio Communications

ADDENDUM 1. Forsyth County. Request for Qualifications and Proposals. Consulting Services for Public Safety Radio Communications March 27, 2018 Forsyth County Request for Qualifications and Proposals Consulting Services for Public Safety Radio Communications Qualifications and Proposals Will Be Received Until **Date Change** 12:00

More information

CACFP After School Meal & Snack Programs Schools with 50% Free and Reduced Eligibility

CACFP After School Meal & Snack Programs Schools with 50% Free and Reduced Eligibility CACFP After School Meal & Snack Programs Schools with 50% Free and Reduced Eligibility BAKER BAKER SCH DIST 05J Brooklyn Elementary School 0.6226 BAKER BAKER SCH DIST 05J Haines Elementary School 0.5309

More information

TRAFFIC ENGINEERING DIVISION

TRAFFIC ENGINEERING DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GENERAL SUBJECT: Radio Systems/Highway Signs SPECIFIC SUBJECT: Use of Radio Systems by VDOT & Localities: HAR and TIS Informational

More information

ANNUAL REPORT 60 YEARS OF SERVICE

ANNUAL REPORT 60 YEARS OF SERVICE 60 YEARS 2016 ANNUAL REPORT 60 YEARS OF SERVICE In 1956, a group of ten educators gathered together to form a credit union with the idea that together, they were stronger. Today, that group has grown into

More information

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the

More information

[LLOR L DP0000.LXSSH X.HAG ] Notice of Availability of the Draft Resource Management Plan/Environmental

[LLOR L DP0000.LXSSH X.HAG ] Notice of Availability of the Draft Resource Management Plan/Environmental This document is scheduled to be published in the Federal Register on 10/05/2018 and available online at https://federalregister.gov/d/2018-21629, and on govinfo.gov 4310-33 DEPARTMENT OF THE INTERIOR

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

Solving the Problems of Cellular Capacity Constraints, Outages and Technology Upgrades with. Portable Telescoping Masts

Solving the Problems of Cellular Capacity Constraints, Outages and Technology Upgrades with. Portable Telescoping Masts Solving the Problems of Cellular Capacity Constraints, Outages and Technology Upgrades with Portable Telescoping Masts Three major challenges Issues facing today s cellular network infrastructure Several

More information

CACFP Tiering Schools with >50% Free and Reduced Eligibility Data Collected : 10/31/2006 Effective March 1, 2007 to February 28, 2008

CACFP Tiering Schools with >50% Free and Reduced Eligibility Data Collected : 10/31/2006 Effective March 1, 2007 to February 28, 2008 CACFP Tiering Schools with >50% Free and Reduced Eligibility Data Collected : 10/31/2006 Effective March 1, 2007 to February 28, 2008 BAKER BURNT RIVER SCH DIST 30J Burnt River School BAKER HUNTINGTON

More information

Glossary of Terms Black Sky Event: Blue Sky Operations: Federal Communications Commission (FCC): Grey Sky Operations:

Glossary of Terms Black Sky Event: Blue Sky Operations: Federal Communications Commission (FCC): Grey Sky Operations: Glossary of Terms The following is a list of terms commonly used in the electric utility industry regarding utility communications systems and emergency response. The purpose of this document is to provide

More information

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT AUDIT OF EMERGENCY COMMUNICATIONS DEPARTMENT INTERGOVERNMENTAL RADIO PROGRAM Ken Burke, CPA* Clerk of the Circuit Court Ex Officio County Auditor Robert

More information

Allied Radio Matrix for Emergency Response (ARMER) Standards, Protocols, Procedures

Allied Radio Matrix for Emergency Response (ARMER) Standards, Protocols, Procedures Allied Radio Matrix for Emergency Response (ARMER) Standards, Protocols, Procedures Document Section: 3 Interoperability Standards Status: Complete Sub Section: State Procedure Title: 800 MHz Statewide

More information

SHARED COMMUNICATIONS 40,000 8,500 SERVICES FOR OHIO PUBLIC

SHARED COMMUNICATIONS 40,000 8,500 SERVICES FOR OHIO PUBLIC MARCS TODAY Statewide, robust, stable platform STATE OF OHIO MARCSIP Business Plan/Rollout May 9, 2012 Ohio APCO/NENA Combined Chapter Business Meeting Over 40,000 radios activated Originally designed

More information

Technical Services Talk

Technical Services Talk Technical Services Talk Newsletter Overview August 2017 Inside This Issue 1 Newsletter Overview 1 CSA Spotlight 2 CSA Spotlight cont. 3 Fire Dispatch/Comm 3 Fleet 4 Facilities 4 Line Shop 5 Line Shop cont.

More information

January 11, 2012 #

January 11, 2012 # Suite 1250 999 West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: 1.778.724.4700 Fax: 1.604.558.7400 January 11, 2012 #2012-02 Midas Gold Outlines Initial Work Plan & Budget for its Golden Meadows Project,

More information

Radio Communications. New Challenges, New Solutions. Lt. Aaron York (KD6DID)

Radio Communications. New Challenges, New Solutions. Lt. Aaron York (KD6DID) Radio Communications New Challenges, New Solutions Lt. Aaron York (KD6DID) NAPCO October 10, 2013 Experimentation with radio communications began in 1931 First stations were AM Base transmit, and mobile

More information

Minutes of Meeting. Monroe County Solid Waste Management District. Board of Directors. Nat U. Hill III Meeting Room, Monroe County Courthouse

Minutes of Meeting. Monroe County Solid Waste Management District. Board of Directors. Nat U. Hill III Meeting Room, Monroe County Courthouse Minutes of Meeting Monroe County Solid Waste Management District Board of Directors Nat U. Hill III Meeting Room, Monroe County Courthouse Bloomington, Indiana Thursday, September 3, 2009 11:30 am Members

More information

Somerset Homeowners Association Board Meeting Minutes Tuesday, July 12, 2011

Somerset Homeowners Association Board Meeting Minutes Tuesday, July 12, 2011 Somerset Homeowners Association Board Meeting Minutes Tuesday, July 12, 2011 Board Members: Mike Atkins, Dave Edwards, Ajay Sreenivas Property Manager: Al Orendorff, Legal Mark Biddison Community: Garret

More information

B. The designated coverage areas shall include both indoor and outdoor coverage.

B. The designated coverage areas shall include both indoor and outdoor coverage. Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet

More information

NIMS UPDATE 2017 RUPERT DENNIS, FEMA REGION IV, NIMS COORDINATOR. National Preparedness Directorate / National Integration Center.

NIMS UPDATE 2017 RUPERT DENNIS, FEMA REGION IV, NIMS COORDINATOR. National Preparedness Directorate / National Integration Center. NIMS UPDATE 2017 RUPERT DENNIS, FEMA REGION IV, NIMS COORDINATOR National Preparedness Directorate / National Integration Center May 8, 2018 National Incident Management System (NIMS) Overview NIMS provides

More information

MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM

MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM REQUEST FOR PROPOSALS EXECUTIVE SUMMARY When Marin County calls 911, your dispatcher sends help with a Motorola

More information

Oregon 2016 Row by Row Experience ~ Home Sweet Home ~

Oregon 2016 Row by Row Experience ~ Home Sweet Home ~ Bolts To Blocks 133 Broadalbin SW Albany, OR 97321 541-704-0386 The Quilt Loft 405 1st Ave. W Albany, OR 97321 541-928-7242 Aloha Sewing & Vacuum 18335 SW TV Hwy Aloha, OR 97003 503-649-6050 Sew Creative

More information

Narrowbanding and Public Safety Communications

Narrowbanding and Public Safety Communications Narrowbanding and Public Safety Communications Introduction and Overview Jay Sexton Georgia Tech Research Institute Introductions What equipment is used on every call by every public safety responder?

More information

Eaton County Public Safety Radio System Recommendation

Eaton County Public Safety Radio System Recommendation Eaton County Public Safety Radio System Recommendation AUGUST 1, 2017 EATON COUNTY CENTRAL DISPATCH RADIO SYSTEM ADVISORY WORKGROUP TABLE OF CONTENTS Executive Summary... 3 Overview of the Radio System

More information

Consultation Paper on Public Safety Radio Interoperability Guidelines

Consultation Paper on Public Safety Radio Interoperability Guidelines June 2006 Spectrum Management and Telecommunications Consultation Paper on Public Safety Radio Interoperability Guidelines Aussi disponible en français Department of Industry Radiocommunication Act Notice

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information