1 AUGUST 2015 MONTHLY PROGRESS REPORT

2

3 Cover photo: Smoke from a nearby wildfire is visible from the Lime Hill radio site in Baker County. A crew from Summit Solutions Group was on site recently to tighten the tower assembly bolts.

4 State Radio Project MONTHLY PROGRESS REPORT PROJECT AND GOALS UPDATE We continue to build sites and install microwave and trunked radio repeaters, and the process is going quite well, said Dick Upton, State Radio Project manager. The big summer build season has the radio project on target to complete civil site work by October, with the exception of four sites that have presented a variety of challenges: Applegate Butte, Cabbage Hill, Glass Butte and Sugar Pine. We are working hard to coordinate with regulators and site managers to get Applegate Butte and Sugar Pine up and running this fall, Upton said. We recognize that these sites may come down to the wire, and we may even consider continuing technology installations with snowcats if required. Glass Butte, being built by the Bonneville Power Administration, will not be finished until 2016 or possibly In the meantime, the project team is developing a plan to close the microwave loop with short-term installations on other facilities. A few additional sites may push into early 2016 for completion if winter weather is an issue, but those are not critical trunked radio or microwave sites. Work on the new console system is also progressing. During July, dispatch consoles were installed at the ODOT dispatch center in Bend, at the ODOT and Oregon State Police Southern Command Center in Central Point, and at the ODOT Transportation Maintenance Operations Center in Portland. We really appreciate the patience of the dispatchers. Even though they are excited to be getting a new console system, the installation process can be disruptive and adds additional equipment to their desks, said Lisa Strader, State Radio Project assistant manager. The first redundancy test between console systems installed in Salem and Bend proved successful, with each center seamlessly taking over operations when the other was deliberately taken down for testing. The formal fail-over test will occur in August during system acceptance testing. An issue came to light during the console installation process relating to the multiple voter configuration structure the State Radio System uses to manage radio traffic. Vendor Pantel International is designing a solution to address incompatibilities between the console and voting systems. The new design and the appropriate testing require four additional weeks to implement. Consequently, the console team will defer field and system acceptance testing until the new solution is ready. To avoid a gap between end-user training and the beginning of the 90-day confidence test, team leaders rescheduled the training for September. The schedule extension allows for more pre-testing and clearing of punch-list items to ensure a smooth cutover from the existing system. Weekly meetings continue leading up to the installations of the wireless infrastructure management system, including the two manager-of-manager units in Salem and Bend. The ODOT Wireless Communications Section has completed a detailed review of each radio site to identify equipment needed to install the remaining 200-plus WIMS units. Ordering of that equipment has begun. Our current assessment of work volume versus progress shows we are still on track to finish the project by June 30, 2016, with the system being fully operational and within budget, Upton said. INFRASTRUCTURE S ix sites received notice to proceed in July: Criterion Summit and Shaniko Tanager in Wasco County, Howard Butte in Wallowa County, Klamath Falls in Klamath County, Ontario District Office in Malheur County, and Tillamook Head in Clatsop County. Work includes shelter August 2015 No. 59 Page 1

5 MONTHLY PROGRESS REPORT State Radio Project improvements at four sites, a new tower at one site, HVAC work at three sites, new ice bridges at two sites, grounding and electrical work at three sites, and a new propane tank, generator, signage and fencing. Substantial completion was achieved at the Ontario District Office site. NARROWBANDING T he radio project met the required Federal Communications Commission mandate to transition to narrowband operations ahead of the November 2013 deadline. Work on several narrowbandingrelated items, including antenna installations, office remotes and power system upgrades, and construction of a number of infill sites will continue through CONSOLIDATION T he radio project goal to consolidate the ODOT and OSP wireless communications systems into a single unit and allow for shared efficiencies and integration between the existing state systems is complete. OSP staff, communications sites and communications systems were consolidated with ODOT as of July 1, The work to transfer the OSP sites to ODOT is complete. INTEROPERABILITY T he State Interoperability Executive Council issued an opportunity for public safety radio systems to apply for funds from the radio project s $2.3 million interoperability budget. Applications are due by Sept. 30 and will be reviewed by an SIEC subcommittee with recommendations to the Executive Committee. Award of funds will occur later this year. A request for proposals is in development to survey public safety users in the state about current interoperability capabilities and needs. PROJECT PROGRESS The total budget for the radio project is $229,991,920. Less expenditures from the previous biennia and those expended by the Oregon Wireless Interoperability Network program, or OWIN, the remaining budget is $175.1 million. The work components necessary to launch the revised State Radio Project include project management, narrowbanding, microwave modernization, trunking, tactical interoperability and partner obligations. The budget and schedule for the project s active components are provided in the State Radio Project monthly dashboard; supplemental information in this report is based upon the work breakdown structure detailed in the State Radio Project s Project Management Plan. WBS 1.0 PROJECT MANAGEMENT SUMMARY Project management consists of those elements that are projectwide and affect all other WBS sections. For WBS 1.0 Project Management, 92 percent of the total budget has been expended to date. Page 2 August 2015 No. 59

6 State Radio Project MONTHLY PROGRESS REPORT ASSET MANAGEMENT Microwave equipment was released during July for Black Cap, Brothers Maintenance, DC 911, Grizzly Peak, Ladd Canyon, Lone Pine and Murdock, and additional equipment was released for Bend Maintenance and Table Mountain (Jackson). Narrowband radio equipment was released for Hogback, Pine Mountain and Wampus Butte. Asset management staff continues to work with the radio project s Finance and Financial Services staff to reconcile expenditures to sites. Preparations are underway to relocate the project warehouse by Dec. 1. The asset management team is coordinating with the ODOT Wireless Communications Section. Staff are working closely with ODOT Surplus to recycle and surplus decommissioned equipment returned from field sites, including buildings, obsolete analog microwave radios and microwave antennas, and generators that are being replaced as they reach end of life. CHANGE MANAGEMENT There are two types of change requests, administrative and formal. Administrative changes are those that do not affect the project s baseline scope, schedule or budget. Formal changes are those that affect those project baselines. During July, 13 change requests were processed and approved. June 2015 July 2015 Total to date Administrative Formal Total The following table represents the value of the project s contingency budget at the end of the two most recent months. The change is due to approval of formal budget changes executed in July. June 2015 July 2015 Total Change Contingency budget, end-of-month value $2,289,858 $2,444,245 $154,387 COMMUNICATIONS MANAGEMENT Communications staff provided the following project information/materials during July: Produced July 2015 Monthly Progress Report Produced July 2015 Project Dashboard Produced July 2015 Key Project Facts sheet Updated project website on Oregon.gov Distributed project information notices via GovDelivery Produced and published project feature story in Inside ODOT Provided update on radio project activities to ODOT public affairs staff August 2015 No. 59 Page 3

7 MONTHLY PROGRESS REPORT State Radio Project Project management and staff also conducted the following outreach activity: Participation in and facilitation of the monthly State Radio User Group meeting QUALITY MANAGEMENT The following table is a snapshot of the past two Quarterly Project Status and Improvement Reports issued by Public Knowledge. First quarter 2015 Second quarter 2015 Overall risk the project will not meet scope, budget or timing goals High High Total number of risks identified during the review period Total number of high-rated risks identified during the review period 3 2 In addition to reporting risk findings, Public Knowledge evaluates 35 quality standards each quarter, which are also ranked as high, medium or low risks. The following table is a summation of those ratings. First quarter 2015 Second quarter 2015 Standards rated as high risk 14% 17% Standards rated as moderate risk 66% 66% Standards rated as low risk 20% 17% The following table is a snapshot of the issues, categorized by WBS section, managed by the project during July. Project management develops planned actions and target dates for resolving these issues. Until an issue has a target resolution date, it is not included in the planned for resolution count. Number of active issues Number planned for resolution Total resolved 1.0 Project Management Narrowbanding Microwave Modernization Trunked Radio Interoperability Partnerships Planning and Engineering Total Page 4 August 2015 No. 59

8 State Radio Project MONTHLY PROGRESS REPORT WBS 2.0 NARROWBANDING The narrowbanding component of the radio project involves two primary work efforts. First is to transition ODOT and Oregon State Police radio operations to narrowband mode, which the radio project completed in August 2013 in advance of the revised federal deadline of Nov. 1, The second effort includes implementing equipment upgrades, beyond those required for narrowband operation, to mountaintop tower sites and office locations throughout the state. For WBS 2.0 Narrowbanding, 98 percent of the total budget has been expended to date. The radio deployment section of work (WBS 2.3) consists of two primary elements: training and deployment of mobile radio equipment, and training and deployment of handheld, portable radio units. Recipients of this equipment include ODOT and OSP employees, along with select groups with the Oregon Department of Corrections and the Oregon Office of Emergency Management, as identified by the agency. The radio deployment effort is complete. The project s effort to complete closeout work for the radio deployment, including final reconciliation of all work, is ongoing. WBS 3.0 MICROWAVE MODERNIZATION The microwave component of the radio project involves replacing old and outdated ODOT and OSP analog microwave with digital microwave and making associated site improvements. Microwave installation includes the acquisition, installation, implementation and optimization of the new digital microwave radios, antenna dishes, wave guide, routers and ancillary equipment to support both conventional and trunked radio systems. Network implementation consists of integrating routing, switching and monitoring equipment into the microwave system to move both voice and data messages over the digital microwave system. Improvements to towers, shelters, power supplies and other facilities required by the upgraded microwave and trunked radio systems are anticipated at most sites. New leases, permits and agreements will be obtained as needed. The budget for this project component, totaling $52 million, is comprised of $19 million for installation, $5.6 million for network implementation, $26.1 million for site work and $1.3 million for wireless infrastructure management system implementation. For WBS 3.0 Microwave Modernization, 62 percent of the total budget has been expended to date. INSTALLATION AND IMPLEMENTATION The project is tracking the implementation of the microwave network in two ways: by individual sites and by individual hops. A microwave hop connects two sites to each other. In most cases, a single site will require equipment sets to support multiple hops. The microwave network is established by connecting the hops together. August 2015 No. 59 Page 5

9 MONTHLY PROGRESS REPORT State Radio Project The radio project will report a site as microwave installation complete when all equipment needed to support all hops has been installed at the site. The project will report a microwave hop complete when equipment connecting two sites has been installed. SITE IMPROVEMENTS The site improvement process includes three phases: pre-design, design and construction. Pre-design phase: Tasks completed from inception to approval by the Site Review Committee, the project s change review board. Pre-design scoping activities at all sites are complete; however, radio project staff will revisit sites as necessary to address any needs that may arise during the design process. Design phase: Tasks completed from site planning through acquisition of the site building permit. Construction phase: Tasks completed from the acquisition of the building permit to the completion of site construction. WIRELESS INFRASTRUCTURE MANAGEMENT SYSTEM The wireless infrastructure management system, previously referred to as the network management system, will provide monitoring, alarming and control capabilities for system components and associated equipment. WBS 4.0 TRUNKED RADIO SYSTEM A trunked radio system is used to maximize available capacity in a two-way radio system. Because not everyone in a group talks at once and radio transmissions are usually short, a trunked computer can assign talk frequencies in a manner that allows multiple groups of users to share a small set of frequencies without hearing each other s conversations. This effectively compresses the voice signals and enhances the capacity of the system. The trunked system will allow local radio communications between public safety personnel; microwave will distribute those signals over a larger area, enabling distance and interagency communications. The $27.2 million budget for the trunked radio system includes five primary work efforts: procurement and installation of trunked radio repeaters for $15.1 million, switches for $2.1 million, dispatch consoles for $4.8 million, testing and training for $3.6 million and VHF integration for $1.6 million. For WBS 4.0 Trunked Radio System, 60 percent of the total budget has been expended to date. Development of the trunked radio system includes three categories of work: repeater and site control equipment, central trunking switches and dispatch consoles. Section 7.0 Planning and Engineering also includes progress on the design efforts related to the trunked radio system. Page 6 August 2015 No. 59

10 State Radio Project MONTHLY PROGRESS REPORT WBS 5.0 INTEROPERABILITY Improvements to state interoperability will be captured in this section. The State Interoperability Executive Council is currently heading statewide planning efforts to develop the overarching plan for interoperability in Oregon. Once the SIEC has finalized its plan, the project will initiate work on this effort. The project budget for this section is $2.3 million. For WBS 5.0 Interoperability, 1 percent of the total budget has been expended to date. No interoperability activities took place during July. WBS 6.0 PARTNERSHIPS Partnerships were developed between the former OWIN program and local jurisdictions with the intent to reduce costs to both parties. These agreements created interdependency among participants for a functional system. The radio project has identified the partnership groups listed below as including sites that require work to meet the needs associated with these agreements: Chemical Stockpile Emergency Preparedness Program (CSEPP) (WBS 6.1.1) Lincoln County (WBS 6.1.2) North Coast (WBS 6.1.3) North Valley (WBS 6.1.4) Southwest Seven (WBS 6.1.5) Klamath County (WBS 6.1.6) Additional partnerships (WBS 6.1.7) For WBS 6.0 Partnerships, 92 percent of the total budget has been expended to date. OWIN OBLIGATIONS All partnership work is complete with the exception of Klamath County. Radio project staff is working with the site contractor to resume work at the remaining site. The expected completion date for Klamath County partnership obligations is October Agreements: Umbrella and supplemental agreements executed in a given region. Design phase: Tasks completed from site planning through acquisition of the site building permit. Construction phase: Tasks completed from the acquisition of the building permit to the completion of site construction. Microwave installation phase: All tasks involved in the installation of microwave equipment, from initiation to completion. Microwave installations may occur during a site s construction phase or after it has been completed. August 2015 No. 59 Page 7

11 MONTHLY PROGRESS REPORT State Radio Project Obligation complete: All work has been completed and associated quality reviews have been conducted and work approved. Quality reviews include those conducted by the partner(s), Wireless Communications Section technicians and by representatives of OEM. STRATEGIC TECHNOLOGY RESERVE Activities related to the deployment of the Strategic Technology Reserve (WBS 6.5) have been completed. Operations of the reserve have been transferred to the Wireless Communications Section. WBS 7.0 PLANNING & ENGINEERING The planning and engineering section of the work breakdown includes design and development activities associated with the previous WBS sections. For WBS 7.0 Planning and Engineering, 96 percent of the total budget has been expended. Statewide planning activities (WBS 7.1) are captured under 7.5 Interoperability Design. The project has completed all narrowband planning (WBS 7.2) efforts and has transitioned ODOT and OSP radios to operate in narrowband mode. The microwave design (WBS 7.3) is considered substantially complete. Small adjustments continue to be made in response to needs identified during the site acquisition and construction processes. Coordination of microwave implementation is well underway. Development on the radio project s trunked radio system (WBS 7.4) design is ongoing. The project has no update to report on the development of an interoperability design (WBS 7.5). Planning and development of the interoperability design continues to be in the hands of the SIEC. Once the SIEC has established a plan, the project will begin work to develop its implementation strategy. Partnership development (WBS 7.6) is complete. WBS 8.0 INTEGRATION TRAINING This section of work was developed and incorporated into the project budget during February It includes limited funding for training activities for Wireless Communications Section technicians and stakeholders. Activities related to integration training began in the third quarter of 2014 and will extend into For WBS 8.0 Integration Training, 61 percent of the total budget has been expended to date. No training activities took place during July. Page 8 August 2015 No. 59

12 State Radio Project MONTHLY PROGRESS REPORT STAFFING SUMMARY Full-time state employees and contractors are working on the radio project throughout Oregon. In July, the project employed 17 full-time equivalent state positions Number of Jobs State Radio Project Employees Site Development Staff (B&V) Contractors (SAIC, Legacy, HDR) Radio Staff (Harris & AECOM) August 2015 No. 59 Page 9

13 MONTHLY PROGRESS REPORT State Radio Project CONTRACT SUMMARY Including historic values of the previous OWIN program, the State Radio Project has spent $134,578,062 of the $180,853,202 currently available across the project s 16 contracts. This represents an overall expenditure of approximately 72 percent. To date in the biennium, $1,437,518 has been spent. This represents 1 percent of the total contract amount available and approximately 3 percent of the contract amount available for the biennium. CONTRACT SUMMARY BY VENDOR Expended Before 6/30/2011 Expended After 6/30/2011 Available Balance (7/31/2015) Contract amount available ABN Engineering - 574,232 85, ,935 AECOM 294,656 4,347, ,465 4,999,931 Aviat 9,456,115 9,827,316 12,451,021 31,734,452 Black & Veatch 6,168,224 5,568,365 11,401,803 23,138,392 CSGI 951, ,175 Federal Engineering 7,932, ,111 1,380,972 10,016,838 GDIT 3,750,794 6,417, ,644 11,010,231 Harris - 49,396,963 8,627,332 58,024,295 HDR 261,091 3,546,078 1,913,178 5,720,347 JLA Consulting - 70,124-70,124 Legacy Wireless 1,656,972 4,118,944 1,037,657 6,813,573 Misc. small contracts - 10,844,912 3,742,684 14,587,595 OBEC - 141,045 4, ,820 Pantel International - 2,249,498 1,949,951 4,199,449 Public Knowledge - 1,749,150 1,114,433 2,863,582 SAIC 1,032,492 3,518,448 1,366,523 5,917,463 Total 31,504, ,073,789 46,275, ,853,202 17% 57% 26% Page 10 August 2015 No. 59

14 State Radio Project MONTHLY PROGRESS REPORT PROJECT COST SUMMARY Original Budget 09/07/2011 Rebaselined Budget 09/30/2013 Prior Budget Changes as of 06/30/2015 Current Month Budget Changes as of 07/31/2015 Current Budget as of 07/31/2015 Funds Spent through 07/31/2015 Balance Narrowbanding Repeaters 6,100,000 4,415, , ,694 4,748,786 4,710,654 38,132 Office Remotes 2,000,000 2,116,600 (972,488.00) 56,939 1,201, , ,733 Hand Helds/Portables 33,200,000 25,742, , ,560 26,658,708 26,479, ,565 Cutover/Testing - 300,000 (69,295.00) - 230, ,705 - Narrowbanding Subtotal 41,300,000 32,574,329 99, ,193 32,839,250 32,252, ,430 Microwave Modernization Purchase & Installation 29,300,000 17,568,049 1,403,095 66, ,038,121 9,968,434 9,069,687 Network 5,498,992 22,310 87,144 5,608,446 5,198, ,172 Site Improvements 45,550,000 25,150,000 1,118,183 (223,139) 26,045,045 16,837,249 9,207,796 Network Management System 1,386,984 (141,984) - 1,245,000 60,407 1,184,593 Training & Equipment Acquisition 500,000 (500,000) Microwave Modernization Subtotal 74,850,000 50,104,025 1,901,605 (69,018) 51,936,612 32,064,364 19,872,248 Trunking Receivers 5,250,000 14,803, ,779 (362,841) 15,049,388 11,155,589 3,893,799 Switches 2,403,062 (288,813) - 2,114,249 2,114,248 1 Consoles 1,400,000 3,941, , ,833,651 2,337,976 2,495,675 Testing & Training 4,193,867 (576,250) - 3,617, ,469 3,064,149 VHF Integration 1,500,000 70,013-1,570, ,938 1,322,076 Trunking Subtotal 6,650,000 26,841, ,268 (362,275) 27,184,918 16,409,219 10,775,698 Interoperability Procurement & Installation 2,300,000 2,300,000 2,300,000 29,479 2,270,521 Interoperability Subtotal 2,300,000 2,300, ,300,000 29,479 2,270,521 Partnerships Construction 10,400,000 10,469,802-10,469,802 9,643, ,395 Partnerships Subtotal 10,400,000 10,469, ,469,802 9,643, ,395 Engineering Narrowbanding 1,300,000 1,532, ,339-1,864,111 1,817,486 46,625 Microwave Modernization 17,750,000 18,468, , ,712 19,557,135 19,901,317 (344,182) Trunking 1,850,000 9,299, ,424-9,661,800 8,419,871 1,241,929 Interoperability - 3,064,792 (1,431,054) - 1,633,738 1,374, ,630 Partnerships 410,155 (50,270) - 359, , Engineering Subtotal 20,900,000 32,775, , ,712 33,076,669 31,872,616 1,204,053 Integration Training Integration Training 500,000 (350,000) - 150,000 91,581 58,419 Integration Training Subtotal - 500,000 (350,000) - 150,000 91,581 58,419 Totals by Phase Narrowbanding 42,600,000 34,107, , ,193 34,703,361 34,070, ,055 Microwave Modernization 92,600,000 68,572,892 2,878,160 42,694 71,493,747 51,965,681 19,528,066 Trunking 8,500,000 36,141,301 1,067,692 (362,275) 36,846,718 24,829,091 12,017,627 Interoperability 2,300,000 5,364,792 (1,431,054) - 3,933,738 1,403,586 2,530,151 Partnerships 10,400,000 10,879,957 (50,270) - 10,829,687 10,003, ,445 Integration Training - 500,000 (350,000) - 150,000 91,581 58,419 Phase Subtotal 156,400, ,566,043 2,545,595 (154,388) 157,957, ,363,487 35,593,764 Project Management - 15,069,054 (343,837) - 14,725,217 13,513,721 1,211,496 Project Contingency Reserve - 3,852,259 (1,562,401) 154,388 2,444,245-2,444,245 Total State Radio Project 156,400, ,487, , ,126, ,877,208 39,249,504 Old OWIN Project Spending 45,000,000 49,256,733 (639,356) - 48,617,377 48,617,377 - Treasury Loan 8,000,000 6,247,831 6,247,831 6,247,831 - Total Old OWIN 53,000,000 55,504,564 (639,356) - 54,865,208 54,865,208 - Grand Total 209,400, ,991, ,991, ,742,416 39,249,504 August 2015 No. 59 Page 11

15 MONTHLY PROGRESS REPORT State Radio Project ESTIMATED PROJECT CASH FLOW $180 $160 $140 $120 Dollars in Millions $100 $80 $60 $40 $20 $0 Project Management Engineering Contingency Narrowbanding Microwave Modernization Trunking Interoperability Partnerships Page 12 August 2015 No. 59

Cover photo: Snow blanketed the State Radio Project s Mount Aldrich site in early November. The Grant County site sits at nearly 7,000 feet in

Cover photo: Snow blanketed the State Radio Project s Mount Aldrich site in early November. The Grant County site sits at nearly 7,000 feet in DECEMBER 2015 MONTHLY PROGRESS REPORT Cover photo: Snow blanketed the State Radio Project s Mount Aldrich site in early November. The Grant County site sits at nearly 7,000 feet in elevation. State Radio

More information

Cover photo: From the conference room between the Oregon State Police Northern Command Center and the Oregon Department of Transportation Northwest

Cover photo: From the conference room between the Oregon State Police Northern Command Center and the Oregon Department of Transportation Northwest NOVEMBER 2015 MONTHLY PROGRESS REPORT Cover photo: From the conference room between the Oregon State Police Northern Command Center and the Oregon Department of Transportation Northwest Transportation

More information

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. April 2015

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. April 2015 State Rad o Project STATE RADIO PROJECT April 2015 Monthly Progress Report PROJECT GOALS INFRASTRUCTURE Repair or replace critical components of Oregon s deteriorating state radio network and extend the

More information

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. January 2015

State Rad o Project STATE RADIO PROJECT. Monthly Progress Report. January 2015 State Rad o Project STATE RADIO PROJECT January 2015 Monthly Progress Report PROJECT GOALS INFRASTRUCTURE Repair or replace critical components of Oregon s deteriorating state radio network and extend

More information

State Radio Project. January Monthly Progress Report

State Radio Project. January Monthly Progress Report State Rad o Project State Radio Project January 2014 Monthly Progress Report Project Goals Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend

More information

State Radio Project. July Monthly Progress Report

State Radio Project. July Monthly Progress Report State Rad o Project State Radio Project July 2013 Monthly Progress Report Project Goals Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend the

More information

Sept 28, Mukhtar mook-tar Thakur

Sept 28, Mukhtar mook-tar Thakur MnDOT Office of Statewide Radio Communications (OSRC) Overview -Summary and ARMER Status Update Central Region Summit- Alexandria, MN Sept 28, 2016 Mukhtar mook-tar Thakur The Office of Statewide Radio

More information

2-800 MHz CCCS Sys Extension

2-800 MHz CCCS Sys Extension 2-800 MHz CCCS Sys Extension 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner. 3. Is the Strategic Priority new or previously identified in an earlier Strategic

More information

Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ)

Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ) Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ) Goals... 2 1. What is WyoLink supposed to accomplish?... 2 2. Who will oversee WyoLink

More information

Public Safety Interoperable Communications (PSIC)

Public Safety Interoperable Communications (PSIC) State of New Mexico Department of Information Technology 2013 National Association of State Chief Information Officers State IT Recognition Awards Public Safety Interoperable Communications (PSIC) Category:

More information

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner 3. Is the Strategic Priority new

More information

Radio System Replacement Project

Radio System Replacement Project Radio System Replacement Project City Council Briefing December 6, 2017 William Finch, Chief Information Officer, Communication & Information Services Presentation Overview Background Procurement Process

More information

State Radio Project. January Monthly Progress Report

State Radio Project. January Monthly Progress Report State Rad o Project State Radio Project January 2013 Monthly Progress Report Project Goals Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend

More information

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Conceptual Design for Radio System, Revision 1 (November 30, 2006) (Deliverable 9-D)

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Conceptual Design for Radio System, Revision 1 (November 30, 2006) (Deliverable 9-D) OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT Conceptual Design for Radio System, Revision 1 () (Deliverable 9-D) Prepared by: Federal Engineering, Inc. 10600 Arrowhead Drive, Suite 160 Fairfax,

More information

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION STAFF REPORT MEETING DATE: August 20, 2013 TO: City Council 75 Rowland Way #200 Novato, CA 94945-3232 (415) 899-8900 FAX (415) 899-8213 www.novato.org FROM: James Berg, Chief of Police SUBJECT: MARIN EMERGENCY

More information

EMERGENCY COMMUNICATIONS

EMERGENCY COMMUNICATIONS EMERGENCY COMMUNICATIONS FY2004-2010 1. BACKGROUND ISSUES The Emergency Communications element of the capital plan is comprised of three projects concerning emergency radio communications, computer aided

More information

PALMETTO 800 History Project Cost

PALMETTO 800 History Project Cost PALMETTO 800 South Carolina has implemented the largest statewide emergency communications radio system in the nation. With over twenty thousand users, the system is available to federal, state, and local

More information

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Implementation Plan (Deliverable 13-A)

OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT. Implementation Plan (Deliverable 13-A) OREGON WIRELESS INTEROPERABILITY NETWORK (OWIN) PROJECT Implementation Plan (Deliverable 13-A) Prepared by: Federal Engineering, Inc. 10600 Arrowhead Dr, Suite 160 Fairfax, VA 22030 703 359-8200 December

More information

Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal)

Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal) Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal) Goal: 95% in-street portable coverage based on a 3 watt portable radio Network infrastructure consisting

More information

Communications Interoperability- Current Status

Communications Interoperability- Current Status Communications Interoperability- Current Status Stephen Mitchell Abstract Over the past decade, the public-safety community in partnership with local, state, and federal agencies have worked to develop

More information

MOTOBRIDGE IP Interoperable Solution

MOTOBRIDGE IP Interoperable Solution MOTOBRIDGE IP Interoperable Solution BRIDGING THE COMMUNICATIONS GAP Statewide, regional and local now public safety organizations can make the connection without replacing their existing radio systems

More information

Guide for Short Term Interoperability

Guide for Short Term Interoperability Oregon State Interoperability Executive Council Guide for Short Term Interoperability Adopted: by the SIEC Technical Committee The Oregon State Interoperability Executive Council (SIEC) and the State of

More information

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania Information Communications Technology Innovation Commonwealth of Pennsylvania Executive Summary In the mid-1990s, the Commonwealth of Pennsylvania faced the prospect of replacing an aging analog radio

More information

IFERN / IFERN 2 Radio Base Stations for all Wisconsin MABAS Divisions/Counties

IFERN / IFERN 2 Radio Base Stations for all Wisconsin MABAS Divisions/Counties Project Name IFERN / IFERN 2 Radio Base Stations for all Wisconsin MABAS Divisions/Counties Sponsoring Agency MABAS Wisconsin - The Mutual Aid Box Alarm System (known as MABAS) Senate Bill SB 642 was approved

More information

Radio Technology Overview. January 2011

Radio Technology Overview. January 2011 Radio Technology Overview January 2011 Presentation Objectives The objective of this presentation is to: Review terms as related to radio technology Review the challenges facing the City o FCC mandate

More information

Guide for Short Term Interoperability Revised June 24, 2009

Guide for Short Term Interoperability Revised June 24, 2009 Oregon State Interoperability Executive Council Guide for Short Term Interoperability Revised The Oregon State Interoperability Executive Council (SIEC) and the State of Oregon encourage Oregon s public

More information

Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment and Facilitate Infrastructure R56 Grounding Work

Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment and Facilitate Infrastructure R56 Grounding Work CITY OF MARTINEZ CITY COUNCIL AGENDA March 21, 2012 TO: FROM: SUBJECT: Mayor and City Council Gary D. Peterson, Chief of Police Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of Police Lower Merion Township Radio System Replacement DATE: June 25, 2014

Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of Police Lower Merion Township Radio System Replacement DATE: June 25, 2014 EXHIBIT B TOWNSHIP OF LOWER MERION POLICE DEPARTMENT DEPARTMENTAL MEMORANDUM INTEGRITY PROFESSIONALISM RESPECT TO: FROM: SUBJECT: Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of

More information

WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & SYSTEM for sheriff, police, fire

WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & SYSTEM for sheriff, police, fire 2018-2019 WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & 9-1-1 SYSTEM for sheriff, police, fire departments ems first responders & ambulance Operating from a

More information

Capability Statement. Brisbane. Dalby. Mackay. Moranbah

Capability Statement. Brisbane. Dalby. Mackay. Moranbah Capability Statement Brisbane Dalby Mackay Moranbah Who we are RCS Telecommunications was created in 2013 through the merger of Queensland Communications and Networking (QCN) and Radio Communications Solutions

More information

State Radio Project. May Monthly Progress Report

State Radio Project. May Monthly Progress Report State Rad o Project State Radio Project May 2012 Monthly Progress Report PROject GOALS Infrastructure Repair or replace critical components of Oregon s deteriorating state radio network and extend the

More information

Public Safety Communications Commission

Public Safety Communications Commission Public Safety Communications Commission Report to Governor and Joint Transportation, Highways and Military Affairs Committee June 2017 Matthew H. Mead Governor Wyoming Public Safety Communications Commission

More information

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT AUDIT OF EMERGENCY COMMUNICATIONS DEPARTMENT INTERGOVERNMENTAL RADIO PROGRAM Ken Burke, CPA* Clerk of the Circuit Court Ex Officio County Auditor Robert

More information

CONCEPTS TO OPERATIONS, INC.

CONCEPTS TO OPERATIONS, INC. CHANNEL 16 PROJECT Presented by CONCEPTS TO OPERATIONS, INC. E-mail: cto@concepts2ops.com Web Site: www.concepts2ops.com APCO International Annual Conference Denver, Colorado Professionals Putting Good

More information

Public Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011

Public Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011 Public Safety Radio Communications System Update Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011 Purpose Review state of the current radio system Council to consider M&C P11234

More information

SHARED COMMUNICATIONS 40,000 8,500 SERVICES FOR OHIO PUBLIC

SHARED COMMUNICATIONS 40,000 8,500 SERVICES FOR OHIO PUBLIC MARCS TODAY Statewide, robust, stable platform STATE OF OHIO MARCSIP Business Plan/Rollout May 9, 2012 Ohio APCO/NENA Combined Chapter Business Meeting Over 40,000 radios activated Originally designed

More information

Public Safety Radio Communications

Public Safety Radio Communications Public Safety Radio Communications Dare County, North Carolina September 18, 2006 INDEPENDENT PROFESSIONAL QUALITY DRIVEN EXPERIENCED User Organizations Sheriff County Fire Departments County EMS Departments

More information

2 ESF 2 Communications. (includes Alert and Warning)

2 ESF 2 Communications. (includes Alert and Warning) 2 ESF 2 Communications (includes Alert and Warning) THIS PAGE LEFT BLANK INTENTIONALLY Table of Contents 1 Purpose... ESF 2-1 2 Scope... ESF 2-1 3 Roles and Responsibilities... ESF 2-2 3.1 Primary Agencies...

More information

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR)

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR) PROJECT SPONSOR AND LEAD AGENCY MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR) The Marin Emergency Radio Authority (MERA) is a

More information

SAN DIEGO COUNTY MUTUAL AID RADIO PLAN

SAN DIEGO COUNTY MUTUAL AID RADIO PLAN ATTACHMENT A SAN DIEGO COUNTY MUTUAL AID RADIO PLAN 1.1 General Mutual aid channels are a critical part of San Diego County's radio system requirements. The San Diego County Mutual Aid Radio Plan will

More information

Current Systems. 1 of 6

Current Systems. 1 of 6 Current Systems Overview Radio communications within the State of California s adult correctional institutions are vital to the daily safety and security of the institution, staff, inmates, visitors, and

More information

SERS primary mission was to design, purchase, build and operate a county-wide 800 MHz radio system along with supporting infrastructure and

SERS primary mission was to design, purchase, build and operate a county-wide 800 MHz radio system along with supporting infrastructure and * Established in 1999 * The Snohomish County Emergency Radio System SERS Mission SERS primary mission was to design, purchase, build and operate a county-wide 800 MHz radio system along with supporting

More information

Appointments are available the first two weeks of June 2001 (06/04/01 06/15/01) from 9:00 a.m. to 4:00 p.m.

Appointments are available the first two weeks of June 2001 (06/04/01 06/15/01) from 9:00 a.m. to 4:00 p.m. ATTN: Potential Land Mobile Radio Systems Integrators The Commonwealth of Virginia will be issuing a Request for Proposal in the near future to establish a Contract with a Systems Integrator to upgrade

More information

FDOT Upgrades for Interoperability

FDOT Upgrades for Interoperability Images courtesy Florida Department of Transportation FDOT Upgrades for Interoperability The Florida Department of Transportation (FDOT) has used low-band VHF analog radios operating between 45 and 47 MHz

More information

TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors

TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors Date: September 6, 8 To: Through: From: Subject: TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors Dale Shaw, TRWC Executive Director Randy Thompson Administrator Update Capital Projects )

More information

BUTLER COUNTY RADIO RFP RESPONSES TO VENDOR QUESTIONS. Butler County 700 MHz, P25 Public Safety Radio Network Issued July 8, 2016

BUTLER COUNTY RADIO RFP RESPONSES TO VENDOR QUESTIONS. Butler County 700 MHz, P25 Public Safety Radio Network Issued July 8, 2016 County of Butler, Pennsylvania Request for Proposals 700 MHz, Project 25 Public Safety Radio Network BUTLER COUNTY RADIO RFP RESPONSES TO VENDOR QUESTIONS Request for Proposal: Butler County 700 MHz, P25

More information

Business Plan Summary

Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Mike Bushby Division Manager Fleet Services and

More information

Columbia Communications District Request for Information New Radio Communications System

Columbia Communications District Request for Information New Radio Communications System Columbia 9-1-1 Communications District Request for Information New Radio Communications System Submission Deadline January 2, 2018 1 1 Overview 1.1 Introduction The Columbia 911Communications District

More information

Motorola Deployable Solutions

Motorola Deployable Solutions Motorola Deployable Solutions Fully integrated site solution on wheels for rapid response to additional capacity, additional coverage, or disaster recovery. Rapid Response Advanced planning, preparation,

More information

DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776)

DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) AGENCY Department of Management Services TITLE Mutual Aid Communication Microwave Short description of the commodity or service desired: Microwave

More information

Public Safety Radio System Update September 9, 2013

Public Safety Radio System Update September 9, 2013 Public Safety Radio System Update September 9, 2013 Bill Greeves, CIO John Higgins, Deputy CIO 1 Timeline Beginning in 2016, Motorola will no longer support the current system. Also, future upgrades are

More information

MEMA Narrowbanding Planning Primer

MEMA Narrowbanding Planning Primer 1. The State of Maine is required to narrowband its public safety communications radios, as are all county and local governments, in accordance with the Federal Communications Commission (FCC) mandate,

More information

Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building

Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building City of Tacoma Steve Victor, Deputy City Attorney 253-591-5638 svictor@ci.tacoma.wa.us Pierce

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical - NA. Protection & Control - NA. \\Q 30 JuLy Transmission & Distribution - NA A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical - NA Protection & Control - NA \\Q 30 JuLy Transmission & Distribution - NA Telecontrol System Planning - NA Replace MDR-4000 Microwave

More information

ATLAS. P25 Systems. LMR communications made simple.

ATLAS. P25 Systems. LMR communications made simple. P25 Systems LMR communications made simple. We make your critical communication system safe and simple to use. IS THE MOST MODERN & FLEXIBLE P25 SYSTEM Our patented Latitude technology makes the P25 application

More information

The Professional Consulting Services Communications Consultant E-911. Design Alternatives

The Professional Consulting Services Communications Consultant E-911. Design Alternatives The Communications Consultant E-911 Sullivan County, New York April 21, 2010 Table of Contents 1. OVERVIEW... 4 2. TECHNOLOGY OPTIONS... 5 2.1 Analog Conventional... 5 2.2 Project 25 Conventional... 5

More information

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250) The Office of the Finance and Purchasing Manager Telephone : (250) 352-8204 Fax : (250) 352-6594 REQUEST FOR PREQUALIFICATIONS RADIO COMMUNICATIONS INFRASTRUCTURE UPGRADE CONTRACTOR SERVICES 2018-PRQ-01

More information

Eaton County Public Safety Radio System Recommendation

Eaton County Public Safety Radio System Recommendation Eaton County Public Safety Radio System Recommendation AUGUST 1, 2017 EATON COUNTY CENTRAL DISPATCH RADIO SYSTEM ADVISORY WORKGROUP TABLE OF CONTENTS Executive Summary... 3 Overview of the Radio System

More information

You Think You ve Got Problems?

You Think You ve Got Problems? You Think You ve Got Problems? How One County Addressed a Lack of Channels, Site-Acquisition Headaches, Political Opposition, and Funding Issues to Build a New Radio Network By Ray Duncan and Brian Nordlund

More information

MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM

MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM REQUEST FOR PROPOSALS EXECUTIVE SUMMARY When Marin County calls 911, your dispatcher sends help with a Motorola

More information

Broward County Consolidated Communication Committee. Updates. April 20, 2017

Broward County Consolidated Communication Committee. Updates. April 20, 2017 Broward County Consolidated Communication Committee Updates April 20, 2017 Action Plan for Recommendations from Assessment Report (Fitch & Assoc. Report) The high level action plan was provided to City

More information

Narrowbanding and Public Safety Communications

Narrowbanding and Public Safety Communications Narrowbanding and Public Safety Communications Introduction and Overview Jay Sexton Georgia Tech Research Institute Introductions What equipment is used on every call by every public safety responder?

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 3.j REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL DATE: July 24, 2012 SUBJECT: ADOPT RESOLUTION NO. 12-62 APPROVING A SEVEN-YEAR CAPITAL LEASE AGREEMENT WITH MOTOROLA SOLUTIONS,

More information

UPGRADES TO 800 MHZ TRUNK RADIO SYSTEM TECHNOLOGY

UPGRADES TO 800 MHZ TRUNK RADIO SYSTEM TECHNOLOGY INFORMATION PAPER BUSINESS ADMINISTRATION COMMITTEE UPGRADES TO 800 MHZ TRUNK RADIO SYSTEM TECHNOLOGY December 2013 Purpose To provide information on the completed analysis for a phased technology upgrade

More information

2 ESF 2 Communications

2 ESF 2 Communications 2 ESF 2 Communications THIS PAGE LEFT BLANK INTENTIONALLY ESF 2 Communications Table of Contents 1 Purpose and Scope... ESF 2-1 2 Policies and Agreements... ESF 2-1 3 Situation and Assumptions... ESF 2-1

More information

SARASOTA COUNTY GOVERNMENT

SARASOTA COUNTY GOVERNMENT SARASOTA COUNTY GOVERNMENT Emergency Services TO: Sarasota County Commission THROUGH: Thomas A. Harmer, County Administrator FROM: Richard Collins, Director of Emergency Services Jerry Wheeler, Manager,

More information

Santa Barbara County Operational Area Interoperable Communications Study Final Report. June 25, 2012

Santa Barbara County Operational Area Interoperable Communications Study Final Report. June 25, 2012 Santa Barbara County Operational Area Interoperable Communications Study Final Report June 25, 2012 Agenda Review Project Goals and Status Provide Overview of Current Systems Discuss Assessment Findings

More information

Amateur Radio Emergency Communications Interoperability Plan

Amateur Radio Emergency Communications Interoperability Plan Amateur Radio Emergency Communications Interoperability Plan Washington State Regional Homeland Security Coordination District IV Clark County Cowlitz County Skamania County Wahkiakum County v1.0 adopted:

More information

JOB ANNOUNCEMENT. Whitman County Communications Systems Manager

JOB ANNOUNCEMENT. Whitman County Communications Systems Manager JOB ANNOUNCEMENT POSITION: Department: Whitman County Communications Systems Manager Emergency Management Salary Range: $60,000 to 99,000 DOQ : plus Benefits (medical, vision, and dental, PERS) TO APPLY

More information

Radio Communications Essentials. Module 9: Narrowbanding Pete Peterson

Radio Communications Essentials. Module 9: Narrowbanding Pete Peterson Radio Communications Essentials Module 9: Narrowbanding Pete Peterson 1 Topics Why is it Necessary? Who is Affected? Key Deadlines & Exceptions What are the Challenges? Sample Steps to Narrowband Frequently

More information

January 11, 2012 #

January 11, 2012 # Suite 1250 999 West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: 1.778.724.4700 Fax: 1.604.558.7400 January 11, 2012 #2012-02 Midas Gold Outlines Initial Work Plan & Budget for its Golden Meadows Project,

More information

The Partnership Process- Issue Resolution in Action

The Partnership Process- Issue Resolution in Action The Partnership Process- Issue Resolution in Action AAPA- Quality Partnership Initiative rd Annual Project Managers Workshop December 5-6, 5 2007 3 rd Charles A. Towsley The Challenge: Environmental Conflict

More information

Proposal May 17, 2016 Primary Election

Proposal May 17, 2016 Primary Election Proposal May 17, 2016 Primary Election 2 P age January 2016 Table of Contents Executive Summary 5 Background WCCCA History 1990 Bond Measure Population Growth and the Changing Demand for Service Technology

More information

Resource Review and Design Recommendations Public Safety Communications System Assessment and Design. Broome County, New York.

Resource Review and Design Recommendations Public Safety Communications System Assessment and Design. Broome County, New York. Resource Review and Design Recommendations Public Safety Communications System Assessment and Design Broome County, New York Report June 28, 2012 Table of Contents 1 Overview... 5 2 System Design... 6

More information

Steven W. Jennings, CIO Harris County ITC

Steven W. Jennings, CIO Harris County ITC Steven W. Jennings, CIO Harris County ITC Harris County operates an 800 MHz Motorola Multi-cast SmartZone Regional Radio System that supports 33,000 users in 512 departments in the region, covering nine

More information

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5%

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5% Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5% 07/16/2014 PROVIDENCE, R.I.--(BUSINESS WIRE)-- Textron Inc. (NYSE: TXT) today reported

More information

Wicomico County. RFP for new 700/800 hybrid P25 Phase II radio system

Wicomico County. RFP for new 700/800 hybrid P25 Phase II radio system Wicomico County RFP for new 700/800 hybrid P25 Phase II radio system 1 Wicomico County Proposal Team David G. Shipley Director of Emergency Services Rick Konrad Purchasing Agent Charles J. Ryan III, Esq.

More information

Training that is standardized and supports the effective operations of NIIMS.

Training that is standardized and supports the effective operations of NIIMS. HISTORY OF THE INCIDENT COMMAND SYSTEM In the early 1970's, Southern California experienced several devastating wildland fires. The overall cost and loss associated with these fires totaled $18 million

More information

Textron Reports Third Quarter 2014 Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1%

Textron Reports Third Quarter 2014 Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1% Textron Reports Third Quarter Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1% 10/17/ PROVIDENCE, R.I.--(BUSINESS WIRE)-- Textron Inc. (NYSE: TXT) today reported third

More information

Public Safety Radio System. August 6, 2018

Public Safety Radio System. August 6, 2018 Public Safety Radio System August 6, 2018 Project overview Phase I Needs Assessment Coverage Capacity Resiliency & Redundancy Interoperability Encryption Phase II RFP Development Response Review Selection

More information

FINAL REPORT SUBMITTED JUNE 2017 TO: SHENANDOAH COUNTY, VIRGINIA

FINAL REPORT SUBMITTED JUNE 2017 TO: SHENANDOAH COUNTY, VIRGINIA Radio System Needs Assessment FINAL REPORT SUBMITTED JUNE 2017 TO: SHENANDOAH COUNTY, VIRGINIA TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 6 2. METHODOLOGY... 6 2.1. INITIAL MEETING...

More information

HOUSE COMMITTEE ON VETERANS AND EMERGENCY PREPAREDNESS

HOUSE COMMITTEE ON VETERANS AND EMERGENCY PREPAREDNESS HOUSE COMMITTEE ON VETERANS AND EMERGENCY PREPAREDNESS MAY 16, 2017 TESTIMONY BY JOHN CORE, OREGON SECTION AMERICAN RADIO RELAY LEAGUE ON THE AMATEUR RADIO EMERGENCY SERVICE PURPOSE: REVIEW POSSIBLE POLICIES

More information

APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 1. BATTERIES, MODULAR FLOODED LEAD-ACID 2. BATTERIES, MODULAR VALVE REGULATED LEAD ACID

APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 1. BATTERIES, MODULAR FLOODED LEAD-ACID 2. BATTERIES, MODULAR VALVE REGULATED LEAD ACID APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 BIDDER INSTRUCTIONS: All Bidder pricing must be based on the Sample Product provided in Appendix H Mandatory Requirements. Any category in Appendix H that

More information

Project 25 Mission Critical PTT

Project 25 Mission Critical PTT IWCE WEBINAR September 19 2:00 PM ET Project 25 Mission Critical PTT Capabilities and Benefits Presented by: Stephen Nichols, Director PTIG - The www.project25.org 1 Project 25: Summary Designed for public

More information

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the

More information

Federal Partnership for Interoperable Communications

Federal Partnership for Interoperable Communications Federal Partnership for Interoperable Communications Overview, Interoperability Efforts, and P25 Alaska Interoperability Communications Summit July 2006 The (FPIC) serves as a coordination body to address

More information

Digital Two-Way Radio System for the G8 Annual Summit 2007 in Heiligendamm Berlin, November 19, 2007

Digital Two-Way Radio System for the G8 Annual Summit 2007 in Heiligendamm Berlin, November 19, 2007 Digital Two-Way Radio System for the G8 Annual Summit 2007 in Heiligendamm Berlin, November 19, 2007 Speaker: Chief Police Inspector Mario Daether, Dipl. Ing. Director of Area Field 2 Responsible for the

More information

Interoperability Training

Interoperability Training SEGARRN Interoperability Training System Wide Communications Coordination Authored by the SEGARRN Training Committee 5/24/2011 This document aims to educate the SEGARRN user base on the essential interoperability

More information

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch 8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES March 9, 2010 William T. Welch THE AUDIENCE How many individuals here represent companies that are now or have been in the 8(a) program? How many

More information

Nevada Shared Radio System Update. WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11

Nevada Shared Radio System Update. WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11 Nevada Shared Radio System Update WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11 1 NSRS - Current Status NSRS Contract was signed and is in effect as of May 8 th, 2017. RFP

More information

The Eastern Shore of Virginia Radio Analysis

The Eastern Shore of Virginia Radio Analysis The Eastern Shore of Virginia Radio Analysis The Commonwealth of Virginia, Virginia Information Technologies Agency, by request of the Eastern Shore of Virginia 911 Commission 1, has analyzed communications

More information

2016 Smart Cities Survey Summary Report of Survey Results

2016 Smart Cities Survey Summary Report of Survey Results Introduction 2016 Smart Cities Survey Summary Report of Survey Results In 2016, the International City/County Management Association (ICMA) conducted a survey in partnership with the Smart Cities Council

More information

TRAINING BULLETIN. EFFECTIVE DATE: 05/06 DOC NO: TB198 CROSS REF: Communications Checklists

TRAINING BULLETIN. EFFECTIVE DATE: 05/06 DOC NO: TB198 CROSS REF: Communications Checklists INTRODUCTION Communications Support 131 (CS131) is an important asset of the District and plays a significant role in the county and region. The unit has many communications assets, including radios on

More information

Interoperable Communication Sustainment

Interoperable Communication Sustainment Georgia Emergency Management Agency Homeland Security Interoperable Communication Sustainment Nick Brown Statewide Interoperable Communication Coordinator (SWIC) April 7 2015 What drives our Interoperability

More information

3 4 1: 2: SAFECOM : 4: 5: 6: 7: IP

3 4 1: 2: SAFECOM : 4: 5: 6: 7: IP Texas Radio Communications Interoperability Plan 1 TABLE OF CONTENTS Introduction... 3 Levels of Interoperability... 4 Figure 1: Six Levels of Interoperability... 4 Figure 2: SAFECOM Interoperability Continuum...

More information

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1 REGIONAL TRANSIT AUTHORITY RESOLUTION NO. 98-1 BACKGROUND AND COMMENTS Meeting: PGA Committee Board of Directors Date: 1/16/98 1/22/98 Agenda Item: No. 4 No. 7C-1 Staff Contact: Barbara Dougherty, Communications

More information

Missouri Statewide Interoperability Network. DNR Park Rangers Conference April 2018

Missouri Statewide Interoperability Network. DNR Park Rangers Conference April 2018 Missouri Statewide Interoperability Network DNR Park Rangers Conference April 2018 Missouri Statewide Interoperability Network MOSWIN System Administration Develop/Enforce policy and procedure NOC Operations

More information

Capability Statement

Capability Statement Capability Statement Who we are RCS Telecommunications (RCST) is a leading Australian telecommunications service provider for medium to large organisations. With over 35 years experience in communication

More information

Missouri FY 10 Interoperable Grant Guideline Definition and Examples of Eligible Procurement

Missouri FY 10 Interoperable Grant Guideline Definition and Examples of Eligible Procurement Missouri FY 10 Interoperable Grant Guideline Definition and Examples of Eligible Procurement Missouri grant guidelines for interoperable communications equipment are changing for fiscal year 2010. Based

More information