EM-minitower experience
|
|
- Reynard Turner
- 5 years ago
- Views:
Transcription
1 EM-minitower experience flight hardware (SSDs, Fes, Trays, tower, TEM, PSA) ground I&T read-out tools (DAQ/online) system test tower test-plans developement and tuning (LAT-TD-00191) CR and V.D.G. 17.6MeV gamma test
2 Single tray test sequence towards tower testing MCM test prior to mounting onto trays: read-out redundancy - for all possible configurations: load/read back registers pulse two random channels and read them out after FE trigger request dead / noisy channels systematic search det bias isolation before micro-bonding (MCM was taped) Tray test: leakage current vs bias voltage noise trigger rate vs discriminator 70 V and 115 V bias dead / noisy strips systematic search (@ 115 V bias voltage) noise trigger rate vs discriminators threshold (@ 115 V) with noisy strips masked full data acquisition triggering on cosmics rays or beta source
3 MCM test Several bad behaviours found: readout of not strobed channels and/or missing strobed channels channels masking not always working some chips do not allow the transmission of data and/or trigger (bad I/O cells) sensitivity to system CLOCK some MCMs must be read at higher than nominal 2.5V voltage (~lower clock) New V6 FE and wafer test system improved 100% yield for new chips tested up to 28MHz and down to 2.25V
4 Single tray test leakage current TG001Down 4000 TG001Up Leakage current (na) Tray-lab encpsulated ladders sum ladders sum Leakage current (na) Tray-lab encpsulated ladders sum ladders sum Leakage current (na) Bias Voltage (V) TG002Down Tray-lab 8000 encpsulated ladders sum ladders sum Tray-lab-repaired Shield bond removed as inverted traces on bias-circuit caused shorts at high voltages Leakage current (na) TG002Up Tray-lab encpsulated ladders sum ladders sum Bias Voltage (V) Bias Voltage (V) 2500 Bias Voltage (V) TS001Up TG017Down Leakage current (na) Tray-lab encpsulated ladders sum ladders sum Leakage current (na) Tray-lab encpsulated ladders sum ladders sum Bias Voltage (V) Bias Voltage (V)
5 Noise measurement grounding problem Some problems at the beginning: honeycomb basically floating, huge increase of noise when trying to ground the box containing the tray. Handles MCM ground point Good electrical contacts (handles-honeycomb and MCM ground-honeycomb) done through longer screws touching the honeycomb - all grounding problems solved. Production: honeycomb grounded via a wire welded between honeycomb and closeout
6 Single tray test noise trigger rate Threshold 70 V Threshold 115 V Counting rate of noisy strips slightly 115 V bias voltage. Threshold 115 V with 7 noisy strips masked When noisy strips are masked the behavior of the counting rate as a function of threshold is quite uniform over the whole tray.
7 Threshold 115 V with 6 noisy strips masked. Noise measurement reveals disconnected Fes (as expected) Ladder n. 4 is almost completely not connected (bad pitch adapter not) and disconnected single channels Many disconnected channels expected from pitch adapter problems (too small bonding pads, bad gluing, cracked traces) new design with: extended traces optimized layout no spheres inside glue no cover layer 25% higher bending radius PCB test board under construction to test MCM+pitch adapter with strip-like capacitance load
8 Single tray test noise trigger rate the working point is defined as the DAC value as to have a counting rate below a given threshold significant differences among live channels seem to suggest quite a large spread in channels amplification, even in the same chip NB: this test was performed on a reduced number of channels by masking all channels but the one under investigation and by measuring the trigger request rate to the TEM Not seen before at UCSC but seems confirmed by current measurements at SLAC FE V6 should have minimal spread
9 Single tray test CR hitmaps TS001FRONT TG001FRONT Y-stack TG001BACK X-stack TG002BACK TG002FRONT TG017BACK
10 From Online display ToT : cuts on event size giving flat distribution revealed a bug that passed stripids instead of ToT values for single-strip events cured with new TEM firmware Number of clusters Event size
11 Minitower test at SLAC Minitower assembled at SLAC on march Flex cables: wrong routing (reverse orientation on TEM-side) extra length (had to be trimmed on MCM-side) weak CLOCK line, broke on all of them after cable bending repaired with extra wire MCM-side connectors fragile, subject to torque from cable, glued with fast-drying glue onto small spots new design with correct routing bending tools MUST be used for cables (only partly used for minitower); will investigate if possible to build less rigid cables new MCM-side connectors with locating pins, metal body will be glued onto cables with better epoxy, solder pins will be glued too
12 Minitower test at SLAC Bias detector: Had two shorts after stacking trays in the tower MCM has a diffused HV + uncovered vias which cause shorts when MCM is pressed onto the closeout at ground) one dummy MCM was changed with one that had undamaged protection on vias one plastic layer slit between MCM and closeout production: will have a thicker kapton insulating layer over the MCM backside Read-out: crazy Fes always populating the event were causing phase errors in data stream and preventing proper read-out had to mute those Fes individually will be cured with bew Fes
13 Conclusions ongoing work EM-Minitower is a good test bench for all system aspects: Mechanics, sensors, electronics, software, test tools and strategies weak points caused delays but were clearly identified problems involved all aspects of the system (flex cables, MCM-connectors, MCM bias lines isolation, pitch adapter, FE bad functionalities, TEM firmware) solutions required a collaboration effort starting from the tracker group and involving I&T and the electronics groups temporary solutions were provided for the minitower run more stable solutions are being tested for production A task force with people from Pisa and SLAC is currently carrying on testing (noise studies, uniformities, dead/noisy channels monitoring, alignment, hitdetection efficiencies, resolution, trigger efficiencies) The minitower will be equipped with new MCMs and flex cables, will be retested and integrated with the calorimeter (due July 03) Tower test procedures are being finalized on the minitower
GLAST Large Area Telescope: EM1/TKR Test Results Summary
GLAST Large Area Telescope: EM1/TKR Test Results Summary Gamma-ray Large Area Space Telescope Hiro Tajima SU-SLAC I&T TKR Test Manager (representing the LAT EM/TKR Crew) htajima@slac.stanford.edu 650-926-3035
More informationAssembly 30 cm x 30 cm Gem detectors Amilkar Quintero Florida Institute of Technology July 2009
Assembly 30 cm x 30 cm Gem detectors Amilkar Quintero Florida Institute of Technology July 2009 Test foils Approval criteria, 500 V with a leakage current less than 5nA each sector. Never touch the active
More informationA Prototype Amplifier-Discriminator Chip for the GLAST Silicon-Strip Tracker
A Prototype Amplifier-Discriminator Chip for the GLAST Silicon-Strip Tracker Robert P. Johnson Pavel Poplevin Hartmut Sadrozinski Ned Spencer Santa Cruz Institute for Particle Physics The GLAST Project
More informationThe GLAST LAT Tracker a Large-Scale Application of Solid-State Detectors in Space SLAC AIS October 31, 2007
The GLAST LAT Tracker a Large-Scale Application of Solid-State Detectors in Space SLAC AIS October 31, 2007 Robert P. Johnson Physics Department and Institute for Particle Physics University of California
More informationStatus of UVa
Status of GEM-US @ UVa Kondo Gnanvo University of Virginia, Charlottesville, SoLID Collaboration Meeting @ JLab 05/15/2015 Outline GEM trackers for SoLID GEM R&D program @ UVa Plans on SoLID-GEM specific
More informationAttilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties
10 th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors Offline calibration and performance of the ATLAS Pixel Detector Attilio Andreazza INFN and Università
More informationFirst Results with the Prototype Detectors of the Si/W ECAL
First Results with the Prototype Detectors of the Si/W ECAL David Strom University of Oregon Physics Design Requirements Detector Concept Silicon Detectors - Capacitance and Trace Resistance Implications
More informationTracker Timing Margin MRB
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004 NCRs 107: failure of the strip data readout in the burn-in system at +60C. 114: same as 107. 118: same as 107. 139: same as 107,
More informationStudy of gain fluctuations with InGrid and TimePix
Study of gain fluctuations with InGrid and TimePix Michael Lupberger 5th RD51 Collaboration Meeting 24-27 May 2010 Freiburg, Germany Summary Hardware Timepix Chip + InGrid Experimental setup and calibration
More informationhttp://clicdp.cern.ch Hybrid Pixel Detectors with Active-Edge Sensors for the CLIC Vertex Detector Simon Spannagel on behalf of the CLICdp Collaboration Experimental Conditions at CLIC CLIC beam structure
More informationNew fabrication and packaging technologies for CMOS pixel sensors: closing gap between hybrid and monolithic
New fabrication and packaging technologies for CMOS pixel sensors: closing gap between hybrid and monolithic Outline Short history of MAPS development at IPHC Results from TowerJazz CIS test sensor Ultra-thin
More informationThe Readout Electronics for Silicon Tracker of the GLAST Beam Test Engineering Model
SLAC-PUB-8549 August 2000 The Readout Electronics for Silicon Tracker of the GLAST Beam Test Engineering Model R. P. Johnson et al Presented at 4th International Symposium on Development and Application
More informationCommissioning and operation of the CDF Silicon detector
Commissioning and operation of the CDF Silicon detector Saverio D Auria On behalf of the CDF collaboration International conference on Particle Physics and Advanced Technology, Como, Italy, 15-19 October
More informationCMOS Detectors Ingeniously Simple!
CMOS Detectors Ingeniously Simple! A.Schöning University Heidelberg B-Workshop Neckarzimmern 18.-20.2.2015 1 Detector System on Chip? 2 ATLAS Pixel Module 3 ATLAS Pixel Module MCC sensor FE-Chip FE-Chip
More informationStudies on MCM D interconnections
Studies on MCM D interconnections Speaker: Peter Gerlach Department of Physics Bergische Universität Wuppertal D-42097 Wuppertal, GERMANY Authors: K.H.Becks, T.Flick, P.Gerlach, C.Grah, P.Mättig Department
More informationAssembly Instructions for the 1.5 Watt Amplifier Kit
Assembly Instructions for the 1.5 Watt Amplifier Kit 1.) All of the small parts are attached to a sheet of paper indicating both their value and id. 2.) Leave the parts affixed to the paper until you are
More informationB. Flip-Chip Technology
B. Flip-Chip Technology B1. Level 1. Introduction to Flip-Chip techniques B1.1 Why flip-chip? In the development of packaging of electronics the aim is to lower cost, increase the packaging density, improve
More informationOperational Experience with the ATLAS Pixel Detector
The 4 International Conferenceon Technologyand Instrumentation in Particle Physics May, 22 26 2017, Beijing, China Operational Experience with the ATLAS Pixel Detector F. Djama(CPPM Marseille) On behalf
More informationA Readout ASIC for CZT Detectors
A Readout ASIC for CZT Detectors L.L.Jones a, P.Seller a, I.Lazarus b, P.Coleman-Smith b a STFC Rutherford Appleton Laboratory, Didcot, OX11 0QX, UK b STFC Daresbury Laboratory, Warrington WA4 4AD, UK
More informationSilicon Sensor and Detector Developments for the CMS Tracker Upgrade
Silicon Sensor and Detector Developments for the CMS Tracker Upgrade Università degli Studi di Firenze and INFN Sezione di Firenze E-mail: candi@fi.infn.it CMS has started a campaign to identify the future
More informationLine Following Circuit Board Wiring Guide
Line Following Circuit Board Wiring Guide Soldering the Analog Optosensors 1. Obtain a line following printed circuit board from the store as well as three analog optosensors (w/6 resistors). 2. Remove
More informationThe LHCb Silicon Tracker: lessons learned (so far)
The LHCb Silicon Tracker: lessons learned (so far) A. Vollhardt a on behalf on the LHCb Silicon Tracker collaboration 1 a Universität Zürich, Physik Institut, 8057 Zürich, Switzerland avollhar@physik.uzh.ch
More informationReview of Silicon Inner Tracker
Review of Silicon Inner Tracker H.J.Kim (KyungPook National U.) Talk Outline Configuration optimization of BIT and FIT Silicon Sensor R&D Electronics R&D Summary and Plan Detail study will be presented
More informationReminder on the TOB electronics architecture Test of the first SS rod prototype
Reminder on the TOB electronics architecture Test of the first SS rod prototype Results Further steps Duccio Abbaneo CMS Electronics Week November 2002 1 The rod CCU Module SC out LV out SC in LV in LV
More informationITk silicon strips detector test beam at DESY
ITk silicon strips detector test beam at DESY Lucrezia Stella Bruni Nikhef Nikhef ATLAS outing 29/05/2015 L. S. Bruni - Nikhef 1 / 11 Qualification task I Participation at the ITk silicon strip test beams
More informationHOTBAR REFLOW SOLDERING
HOTBAR REFLOW SOLDERING Content 1. Hotbar Reflow Soldering Introduction 2. Application Types 3. Process Descriptions > Flex to PCB > Wire to PCB 4. Design Guidelines 5. Equipment 6. Troubleshooting Guide
More informationWord Clock. Enclosure Construction Notes
Word Clock Enclosure Construction Notes DougsWordClocks.com Pty Ltd April 2013 V2.0 Licence The Word Clock Design, PCB layout, Manual, and Firmware is Copyright 2009-2013, by DougsWordClocks.com Pty Ltd.
More informationConstruction of the silicon tracker for the R3B experiment.
Construction of the silicon tracker for the R3B experiment. M.Borri (STFC) on behalf of the teams at Daresbury Laboratory, Edinburgh and Liverpool Universities. Outline: FAIR and R3B. Overview of Si tracker.
More informationThe Useless Machine. DIY Soldering Edition. Instruction Guide v0004
The Useless Machine DIY Soldering Edition Instruction Guide v0004 TM For the best outcome, follow each step in order. We recommend reading this guide entirely before you get started. Tools required: Soldering
More informationAl-core TPC collection plane test results CENBG option J. Giovinazzo, J. Pibernat, T. Goigoux (R. de Oliveira CERN)
Al-core TPC collection plane test results CENBG option J. Giovinazzo, J. Pibernat, T. Goigoux (R. de Oliveira CERN) Collection plane R&D Prototypes characterization - collection plane tests - individual
More informationA new strips tracker for the upgraded ATLAS ITk detector
A new strips tracker for the upgraded ATLAS ITk detector, on behalf of the ATLAS Collaboration : 11th International Conference on Position Sensitive Detectors 3-7 The Open University, Milton Keynes, UK.
More informationQRS14 User s Guide. MEMS GYROSCOPE Model QRS14. Systron Donner Inertial Sales and Customer Service. Phone: Fax:
RELEASED DOCUMENT DATE: 0-25-206 QRS4 User s Guide MEMS GYROSCOPE Model QRS4 Systron Donner Inertial Sales and Customer Service Phone: + 925.979.4500 Fax: + 925.349.366 E-Mail: sales@systron.com www.systron.com
More informationASIC Development for the GLAST Tracker
Robert P. Johnson Santa Cruz University of California at Santa Cruz GLAST Instrument Concept GLAST Tracker Electronics Requirements Analog Channel Preamplifier Shaper Comparator Performance Readout Architecture
More informationStrip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips
Strip Detectors First detector devices using the lithographic capabilities of microelectronics First Silicon detectors -- > strip detectors Can be found in all high energy physics experiments of the last
More informationDesign and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer
Advancements in Nuclear Instrumenta2on Measurement Methods and their Applica2ons 20-24 April 2015, Lisbon Congress Center Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1
More informationThe trigger system of the muon spectrometer of the ALICE experiment at the LHC
The trigger system of the muon spectrometer of the ALICE experiment at the LHC Francesco Bossù for the ALICE collaboration University and INFN of Turin Siena, 09 June 2010 Outline 1 Introduction 2 Muon
More informationA Large Low-mass GEM Detector with Zigzag Readout for Forward Tracking at EIC
MPGD 2017 Applications at future nuclear and particle physics facilities Session IV Temple University May 24, 2017 A Large Low-mass GEM Detector with Zigzag Readout for Forward Tracking at EIC Marcus Hohlmann
More informationStream NXT - assembly instructions
Stream NXT - assembly instructions Recommended settings CG (measured from root leading edge): Speed/launch camber (+down, near the wing root): Cruise camber (+down, near the wing root): Thermal camber
More informationPixel hybrid photon detectors
Pixel hybrid photon detectors for the LHCb-RICH system Ken Wyllie On behalf of the LHCb-RICH group CERN, Geneva, Switzerland 1 Outline of the talk Introduction The LHCb detector The RICH 2 counter Overall
More informationDevelopment of a large area silicon pad detector for the identification of cosmic ions
Development of a large area silicon pad detector for the identification of cosmic ions M.Y. Kim 1,2 P.S. Marrocchesi 1, C. Avanzini 2, M.G. Bagliesi 1, G. Bigongiari 1,A. Caldarone 1,R. Cecchi 1,, P. Maestro
More informationOctal ASD Certification Tests at Michigan
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, 2002 - CERN Goals of Michigan Test Confirm actual deadtime vrs setting. Hits/event vrs trigger rate (I/O traffic
More informationSingle Sided and Double Sided Silicon MicroStrip Detector R&D
Single Sided and Double Sided Silicon MicroStrip Detector R&D Tariq Aziz Tata Institute, Mumbai, India SuperBelle, KEK December 10-12, 2008 Indian Effort Mask Design at TIFR, Processing at BEL Single Sided
More informationTL4100 Top 5 Build Tips
TL4100 Top 5 Build Tips 1: Top Plate When assembling the top plate, align the top of the top plate brackets with the top of the rods. This can be done by placing a hard flat object (such as a ruler) on
More informationCable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Top Support Kit: (x2) - 2 Top Supports. Quantities are per bench
Parts Included (per back to back bench) Column Kit: (x2) - 1 LH & 1 RH Column - Control Box - Hand Switch Cable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Depth Support Kit: -
More informationThe BaBar Silicon Vertex Tracker (SVT) Claudio Campagnari University of California Santa Barbara
The BaBar Silicon Vertex Tracker (SVT) Claudio Campagnari University of California Santa Barbara Outline Requirements Detector Description Performance Radiation SVT Design Requirements and Constraints
More informationPM124 Installation Instructions. See important note about revisions of this board on the last page.
Marchand Electronics Inc. PO Box 473, Webster, NY 14580 Tel:(716) 872-0980 Fax:(716) 872-1960 info@marchandelec.com http://www.marchandelec.com (c)1997 Marchand Electronics Inc. PM124 Installation Instructions
More informationThe Multigap RPC: The Time-of-Flight Detector for the ALICE experiment
ALICE-PUB-21-8 The Multigap RPC: The Time-of-Flight Detector for the ALICE experiment M.C.S. Williams for the ALICE collaboration EP Division, CERN, 1211 Geneva 23, Switzerland Abstract The selected device
More informationStudy of the ALICE Time of Flight Readout System - AFRO
Study of the ALICE Time of Flight Readout System - AFRO Abstract The ALICE Time of Flight Detector system comprises about 176.000 channels and covers an area of more than 100 m 2. The timing resolution
More informationSilicon Sensor Developments for the CMS Tracker Upgrade
Silicon Sensor Developments for the CMS Tracker Upgrade on behalf of the CMS tracker collaboration University of Hamburg, Germany E-mail: Joachim.Erfle@desy.de CMS started a campaign to identify the future
More informationMAPS-based ECAL Option for ILC
MAPS-based ECAL Option for ILC, Spain Konstantin Stefanov On behalf of J. Crooks, P. Dauncey, A.-M. Magnan, Y. Mikami, R. Turchetta, M. Tyndel, G. Villani, N. Watson, J. Wilson v Introduction v ECAL with
More informationStatus of the PRad Experiment (E )
Status of the PRad Experiment (E12-11-106) NC A&T State University Outline Experimental apparatus, current status Installation plan Draft run plan Summary PRad Experimental Setup Main detectors and elements:
More informationCalorimeter Monitoring at DØ
Calorimeter Monitoring at DØ Calorimeter Monitoring at DØ Robert Kehoe ATLAS Calibration Mtg. December 1, 2004 Southern Methodist University Department of Physics Detector and Electronics Monitoring Levels
More informationA Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University
A Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University Abstract A dual-fet preamplifier and a multi-channel waveform digitizer form the basis of a modular
More informationQuality Assurance for the ATLAS Pixel Sensor
Quality Assurance for the ATLAS Pixel Sensor 1st Workshop on Quality Assurance Issues in Silicon Detectors J. M. Klaiber-Lodewigs (Univ. Dortmund) for the ATLAS pixel collaboration Contents: - role of
More informationThe Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland
Available on CMS information server CMS CR -2010/043 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 23 March 2010 (v4, 26 March 2010) DC-DC
More informationLAT Test Results. GLAST Large Area Telescope. LAT Pre-Shipment Review. Gamma-ray Large Area Space Telescope. J. Eric Grove NRL
GLAST Large Area Telescope Gamma-ray Large Area Space Telescope LAT Pre-Shipment Review LAT Test Results J. Eric Grove NRL Stanford Linear Accelerator Center LAT Test Results 1 Purpose / Contents Demonstrate
More informationGLAST Large Area Telescope: Planning Meeting March 10, 2004 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6
Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Planning Meeting March 10, 2004 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard Space
More informationCharacterisation of the VELO High Voltage System
Characterisation of the VELO High Voltage System Public Note Reference: LHCb-2008-009 Created on: July 18, 2008 Prepared by: Barinjaka Rakotomiaramanana a, Chris Parkes a, Lars Eklund a *Corresponding
More informationGLAST Tracker Subsystem Tracker Multi Chip Module Fabrication and Assembly Specifications
SIPP-10/31/00 SLA PUB#??? GLAST Tracker Subsystem Tracker Multi hip Module Fabrication and Assembly Specifications Gwelen Paliaga 10/31/00 This document is intended to describe the GLAST Tracker Multi
More informationRepairing your Porsche 928 Central Warning System (CWS) controller
Repairing your Porsche 928 Central Warning System (CWS) controller Disclaimer: This procedure is for a 1984 Porsche 928 S controller. Overview: Under the left foot pedal (dead pedal) of the Porsche 928
More informationLevel-1 Calorimeter Trigger Calibration
December 2004 Level-1 Calorimeter Trigger Calibration Birmingham, Heidelberg, Mainz, Queen Mary, RAL, Stockholm Alan Watson, University of Birmingham Norman Gee, Rutherford Appleton Lab Outline Reminder
More informationData acquisition and Trigger (with emphasis on LHC)
Lecture 2 Data acquisition and Trigger (with emphasis on LHC) Introduction Data handling requirements for LHC Design issues: Architectures Front-end, event selection levels Trigger Future evolutions Conclusion
More informationPixel sensors with different pitch layouts for ATLAS Phase-II upgrade
Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade Different pitch layouts are considered for the pixel detector being designed for the ATLAS upgraded tracking system which will be operating
More informationSlide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:
RYCA CS-1 BODY PARTS INSTALLATION GUIDE [The CS-1 installation guides should be used as supplements to the videos found on our Youtube Channel. There is no strict order to the build process, but it is
More informationThe LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group
The LHCb Vertex Locator : status and future perspectives Marina Artuso, Syracuse University for the VELO Group The LHCb Detector Mission: Expore interference of virtual new physics particle in the decays
More informationDevelopment of LYSO detector modules for a charge-particle EDM polarimeter
Mitglied der Helmholtz-Gemeinschaft Development of LYSO detector modules for a charge-particle EDM polarimeter on behalf of the JEDI collaboration Dito Shergelashvili, PhD student @ SMART EDM_Lab, TSU,
More informationAssembly Instructions for B7971 Smart Socket
Assembly Instructions for B7971 Smart Socket Identification and installation of the resistors, Fig1 Segment 1,R1, 22k Segment 4, R4, 22k Segment 2, R2, 27k Segment 3, R3, 27k Segment 5, R5, 27k Segment
More informationMASW P. SURMOUNT PIN Diode Switch Element with Thermal Terminal. Features. Description. Ordering Information 2.
Features Specified Bandwidth: 45MHz 2.5GHz Useable 30MHz to 3.0GHz Low Loss 40dB High C.W. Incident Power, 50W at 500MHz High Input IP3, +66dBm @ 500MHz Unique Thermal Terminal for
More informationConstruction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade
Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade Givi Sekhniaidze INFN sezione di Napoli On behalf of ATLAS NSW community 14th Topical Seminar on Innovative Particle
More informationMonolithic Pixel Sensors in SOI technology R&D activities at LBNL
Monolithic Pixel Sensors in SOI technology R&D activities at LBNL Lawrence Berkeley National Laboratory M. Battaglia, L. Glesener (UC Berkeley & LBNL), D. Bisello, P. Giubilato (LBNL & INFN Padova), P.
More informationResults of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades
for High Luminosity LHC Upgrades R. Carney, K. Dunne, *, D. Gnani, T. Heim, V. Wallangen Lawrence Berkeley National Lab., Berkeley, USA e-mail: mgarcia-sciveres@lbl.gov A. Mekkaoui Fermilab, Batavia, USA
More informationFront-End and Readout Electronics for Silicon Trackers at the ILC
2005 International Linear Collider Workshop - Stanford, U.S.A. Front-End and Readout Electronics for Silicon Trackers at the ILC M. Dhellot, J-F. Genat, H. Lebbolo, T-H. Pham, and A. Savoy Navarro LPNHE
More informationWire Epoxy filled groove
147 Appendix D Finger construction steps In this procedure, \Upper mask" refers to a piece of copper which has been photomasked with the resist pattern for the upper electrodes and \lower mask" refers
More informationMEASUREMENT OF TIMEPIX DETECTOR PERFORMANCE VICTOR GUTIERREZ DIEZ UNIVERSIDAD COMPLUTENSE DE MADRID
MEASUREMENT OF TIMEPIX DETECTOR PERFORMANCE VICTOR GUTIERREZ DIEZ UNIVERSIDAD COMPLUTENSE DE MADRID ABSTRACT Recent advances in semiconductor technology allow construction of highly efficient and low noise
More informationThe performance of a Pre-Processor Multi-Chip Module for the ATLAS Level-1 Trigger
The performance of a Pre-Processor Multi-Chip Module for the ATLAS Level-1 Trigger J. Krause, U. Pfeiffer, K. Schmitt, O. Stelzer Kirchhoff-Institut für Physik, Universität Heidelberg, Germany Abstract
More informationHorizon User s Guide
RELEASED DOCUMENT DATE: 01-25-2016 Horizon User s Guide MEMS Angular Rate Sensor Model Horizon (HZ1) Systron Donner Inertial Sales and Customer Service Phone: +1 925.979.4500 Fax: +1 925.349.1366 E-Mail:
More informationRepairing Microsoft Wedge Touch Mouse Battery Cover Retaining Clip
Repairing Microsoft Wedge Touch Mouse Battery Cover Retaining Clip Disassembly, repair and reassembly of Wedge Touch mouse when the battery cover will not stay closed. Also is a good guide to repair other
More informationAvalanche statistics and single electron counting with a Timepix-InGrid detector
Avalanche statistics and single electron counting with a Timepix-InGrid detector Michael Lupberger EUDET Annual Meeting 29.09-01.10.2010 DESY, Hamburg, Germany Outline Hardware Timepix Chip + InGrid Experimental
More informationPM24 Installation Instructions
Marchand Electronics Inc. PO Box 473, Webster, NY 14580 Tel:(716) 872-0980 Fax:(716) 872-1960 info@marchandelec.com http://www.marchandelec.com (c)1997 Marchand Electronics Inc. PM24 Installation Instructions
More informationGamma-ray Large Area Space Telescope (GLAST) Large Area Telescope (LAT) Silicon Detector Specification
GLAST LAT PROCUREMENT SPECIFICATION Document # Document Title GLAST LAT Silicon Detector Specification Date Effective Page 1 of 21 GE-00011-A 1rst Draft 8/20/00 Author(s) Supersedes H. Sadrozinski T. Ohsugi
More informationPMF the front end electronic for the ALFA detector
PMF the front end electronic for the ALFA detector P. Barrillon, S. Blin, C. Cheikali, D. Cuisy, M. Gaspard, D. Fournier, M. Heller, W. Iwanski, B. Lavigne, C. De La Taille, et al. To cite this version:
More informationProduction of HPDs for the LHCb RICH Detectors
Production of HPDs for the LHCb RICH Detectors LHCb RICH Detectors Hybrid Photon Detector Production Photo Detector Test Facilities Test Results Conclusions IEEE Nuclear Science Symposium Wyndham, 24 th
More informationThe Design and Characterization of an 8-bit ADC for 250 o C Operation
The Design and Characterization of an 8-bit ADC for 25 o C Operation By Lynn Reed, John Hoenig and Vema Reddy Tekmos, Inc. 791 E. Riverside Drive, Bldg. 2, Suite 15, Austin, TX 78744 Abstract Many high
More informationThe HGTD: A SOI Power Diode for Timing Detection Applications
The HGTD: A SOI Power Diode for Timing Detection Applications Work done in the framework of RD50 Collaboration (CERN) M. Carulla, D. Flores, S. Hidalgo, D. Quirion, G. Pellegrini IMB-CNM (CSIC), Spain
More informationCALICE AHCAL overview
International Workshop on the High Energy Circular Electron-Positron Collider in 2018 CALICE AHCAL overview Yong Liu (IHEP), on behalf of the CALICE collaboration Nov. 13, 2018 CALICE-AHCAL Progress, CEPC
More informationApplication Note 58 Crystal Considerations with Dallas Real Time Clocks
Application Note 58 Crystal Considerations with Dallas Real Time Clocks Dallas Semiconductor offers a variety of real time clocks (RTCs). The majority of these are available either as integrated circuits
More informationKindle 3 Remote Page Turn Switch Replacement
Kindle 3 Remote Page Turn Switch Replacement How to add a remote (wired) page turning switch to the Kindle 3. Written By: AnotherBrian ifixit CC BY-NC-SA www.ifixit.com Page 1 of 10 INTRODUCTION This guide
More informationILC Prototype Muon Scintillation Counter Tests
ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University August 23, 2005 ALCPG R.J. Abrams 1 Update on Testing At FNAL New Test Setup in Lab 6 with Fermilab Support Testing Two New
More informationUltra fast single photon counting chip
Ultra fast single photon counting chip P. Grybos, P. Kmon, P. Maj, R. Szczygiel Faculty of Electrical Engineering, Automatics, Computer Science and Biomedical Engineering AGH University of Science and
More informationPreparing for the Future: Upgrades of the CMS Pixel Detector
: KSETA Plenary Workshop, Durbach, KIT Die Forschungsuniversität in der Helmholtz-Gemeinschaft www.kit.edu Large Hadron Collider at CERN Since 2015: proton proton collisions @ 13 TeV Four experiments:
More informationThe on-line detectors of the beam delivery system for the Centro Nazionale di Adroterapia Oncologica(CNAO)
The on-line detectors of the beam delivery system for the Centro Nazionale di Adroterapia Oncologica(CNAO) A. Ansarinejad1,2, A. Attili1, F. Bourhaleb2,R. Cirio1,2,M. Donetti1,3, M. A. Garella1, S. Giordanengo1,
More informationSilicon W Calorimeters for the PHENIX Forward Upgrade
E.Kistenev Silicon W Calorimeters for the PHENIX Forward Upgrade Event characterization detectors in middle PHENIX today Two central arms for measuring hadrons, photons and electrons Two forward arms for
More informationPlans for RPC DHCAL Prototype. David Underwood Argonne National Laboratory
Plans for RPC DHCAL Prototype David Underwood Argonne National Laboratory Linear Collider Meeting, SLAC 7-10 January 2004 Outline Collaborators Goals Motivation Mechanical Structure Chamber Description
More information12/31/11 Analog to Digital Converter Noise Testing Final Report Page 1 of 10
12/31/11 Analog to Digital Converter Noise Testing Final Report Page 1 of 10 Introduction: My work this semester has involved testing the analog-to-digital converters on the existing Ko Brain board, used
More informationSPUNKY ASSEMBLY MANUAL
SPUNKY ASSEMBLY MANUAL Please read the tips section at the back of this manual regarding the use of laser cut parts. The proper removal and preparation of these parts is important. When laser cut, some
More informationStatus of Front-end chip development at Paris ongoing R&D at LPNHE-Paris
Status of Front-end chip development at Paris ongoing R&D at LPNHE-Paris Paris in the framework of the SiLC R&D Collaboration Jean-Francois Genat, Thanh Hung Pham, Herve Lebbolo, Marc Dhellot and Aurore
More informationLHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring
LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Olloqui on behalf of the LHCb Collaboration Universitat de Barcelona, Facultat de Física,
More informationIntroduction to TOTEM T2 DCS
Introduction to TOTEM T2 DCS Leszek Ropelewski CERN PH-DT2 DT2-ST & TOTEM Single Wire Proportional Chamber Electrons liberated by ionization drift towards the anode wire. Electrical field close to the
More informationActive Sensors Unit assembly process for the ATLAS High Granularity Timing Device
Active Sensors Unit assembly process for the ATLAS High Granularity Timing Device D. Lacour for LPNHE Paris group 1. Introduction: Calice Si-W calorimeter concept 2. Gluing and positioning automated device
More information2 Pixel readout of Micro-Pattern Gas Detectors. The InGrid Concept
53 Studies of sensitive area for a single InGrid detector A. Chaus a,b, M.Titov b, O.Bezshyyko c, O.Fedorchuk c a Kyiv Institute for Nuclear Research b CEA, Saclay c Taras Shevchenko National University
More information