Octal ASD Certification Tests at Michigan

Size: px
Start display at page:

Download "Octal ASD Certification Tests at Michigan"

Transcription

1 Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN

2 Goals of Michigan Test Confirm actual deadtime vrs setting. Hits/event vrs trigger rate (I/O traffic test). (Have observed a feature above 20KHz). Operate in pair & edge modes. Measure drift spectrum & pulse width. Test general stability with time. Examine high-rate behavior.

3 17 AMT2 Octal Mezz cards were installed. One for a trigger injector. Hardware on Chamber

4 AMT & ASD settings To the right is the setup screen for the ASD. Below is the AMT setup Important settings: Search Window = 1.825µs Match Window = 1.2µs ASD Deadtime = 790 ns Cosmic data is taken with leading/trailing mode. Other tests are done in pair mode

5 Online Data Monitor Data Integrity Check EVID Match BCID Match Data Structure Data size of each TDC Head/Trailer correct Parity Error TDC Errors Error details are recorded for further analysis TDC error reports are checked at end of run

6 Triggers 1. Cosmic trigger (24Hz) ORed with 1. Continuous pulser trigger from 100Hz to 100KHz. 400 Ticks

7 High Rate Test Difficulties AMT-2 level 1 buffer address bug has two effects that complicate precise testing. At high trigger rates & modest hit rate, hits lost. At high trigger rates, readout of hits not in the match window occur. Noise is exaggerated. With DAQ used, full readout is limited to a few KHz. For trigger rates up to 100KHz+ prescale sampling was employed.

8 Conditions for Hit Miss

9 False hits above 20KHz ~8 fold Rise at 20KHz Plot shows hit rate at 60mV threshold in a 1.2 µs match window. Rate is a few hits per 10,000 events in each channel below 20KHz & rises 8 fold at high rates.

10 Noise Performance Unshielded hedgehogs Shielded hedgehogs have much smaller noise rate.

11 Deadtime Measurement 20ns width 50ns period pulse injected into Mezz.Card TDC 3 Channel 6 TDC 1 Channel 4 TDC 2 Channel 4 TDC 2 Channel 0 TDC 1 Channel Expected Deadtime (ns) Measured Deadtime (ns)

12 Deadtime vrs DAQ Rate Average Deadtime vs. DAQ Rate TDC 3, Channel Setting 370 Setting 440 Setting 510 Setting 580 Setting 650 Setting 720 Setting 790 Setting DAQ Rate (Hz) Deadtime (ns)

13 ASD Noise Pulse Width ASD noise feature ASD main threshold is set to 10mV. One expects that most hits are introduced by ASD For this case the pulse width seen is narrow, around 20ns

14 Hit Width Distribution ASD Noise Real Hit Noise Measurements are done with nominal 60mV threshold & chamber HV on, so width distribution includes real ionization hits from chamber & ASD noise hits.

15 Hit Rate vs Threshold At low threshold hits are from ASD noise falling with threshold. At 60mV & above the hits per channel reach a plateau & are mostly real chamber signals

16 Time & Width Measurement For this test the trigger signal is injected into a mezz card for digitization & to the trigger. The measured time should be uniformly distributed in a 25ns window since the digitization clock is not synchronized to the trigger pulser. A uniform, narrow & large width is expected for these pulses. Width encodes amplitude

17 Fine Time Measurement Hits from Cosmic Ray

18 Cosmic Ray Observation

19 Cosmic Ray Spectrum ASD Noise

20 Reconstruction Efficiency Was 0.45 for unshielded Low reconstruction efficiency of 6 layer cosmic tracks is due to dead channels. Most of the loss is traced to shorts & open circuits on the shielded hedgehog cards.

21 Stability Test at 100KHz 17 Mezzanine Cards are tested at 100KHz DAQ rate including cosmic ray trigger. System runs without any problems. Average event size is (= 0.29 hits per event) & is constant over a long periods. (ASD is stable & quite)

22 DAQ for Long Drift Time Operate Mezzanine Card for long drift times without problems (ASD is stable & quiet over long periods) Hits with leading edge > 1.6µs are lost Pair mode cannot be used with long drift times due to limited number of bits. Can a) slow down clock or b) use leading & trailing edge mode.

23 Conclusions From an operational standpoint the ASD works without problem & is capable of triggering at 100KHz. The measured average ASD deadtime is as expected. One ASD channel was outside the typical pattern. The measured hit rate for a HV-on-chamber is about 1KHz per mezzanine card when the ASD threshold is 60mV or above. We observe cosmic rays at low trigger rate. We are unable to perform high rate tests due to the known AMT problem. We observe no ASD problems. It is possible to operate ASD/AMT mezzanine card with long drift times but with deadtime less than 800ns.

Coincidence Rates. QuarkNet. summer workshop June 24-28, 2013

Coincidence Rates. QuarkNet. summer workshop June 24-28, 2013 Coincidence Rates QuarkNet summer workshop June 24-28, 2013 1 Example Pulse input Threshold level (-10 mv) Discriminator output Once you have a digital logic pulse, you can analyze it using digital electronics

More information

MuLan Experiment Progress Report

MuLan Experiment Progress Report BV 37 PSI February 16 2006 p. 1 MuLan Experiment Progress Report PSI Experiment R 99-07 Françoise Mulhauser, University of Illinois at Urbana Champaign (USA) The MuLan Collaboration: BERKELEY BOSTON ILLINOIS

More information

Study of the ALICE Time of Flight Readout System - AFRO

Study of the ALICE Time of Flight Readout System - AFRO Study of the ALICE Time of Flight Readout System - AFRO Abstract The ALICE Time of Flight Detector system comprises about 176.000 channels and covers an area of more than 100 m 2. The timing resolution

More information

A Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University

A Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University A Modular Readout System For A Small Liquid Argon TPC Carl Bromberg, Dan Edmunds Michigan State University Abstract A dual-fet preamplifier and a multi-channel waveform digitizer form the basis of a modular

More information

Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC

Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC K. Schmidt-Sommerfeld Max-Planck-Institut für Physik, München K. Schmidt-Sommerfeld,

More information

Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System. Yasuyuki Okumura. Nagoya TWEPP 2008

Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System. Yasuyuki Okumura. Nagoya TWEPP 2008 Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System Yasuyuki Okumura Nagoya University @ TWEPP 2008 ATLAS Trigger DAQ System Trigger in LHC-ATLAS Experiment 3-Level Trigger System

More information

Cosmic Ray Detector Hardware

Cosmic Ray Detector Hardware Cosmic Ray Detector Hardware How it detects cosmic rays, what it measures and how to use it Matthew Jones Purdue University 2012 QuarkNet Summer Workshop 1 What are Cosmic Rays? Mostly muons down here

More information

DAQ & Electronics for the CW Beam at Jefferson Lab

DAQ & Electronics for the CW Beam at Jefferson Lab DAQ & Electronics for the CW Beam at Jefferson Lab Benjamin Raydo EIC Detector Workshop @ Jefferson Lab June 4-5, 2010 High Event and Data Rates Goals for EIC Trigger Trigger must be able to handle high

More information

Analogue to Digital Conversion

Analogue to Digital Conversion Analogue to Digital Conversion Turns electrical input (voltage/current) into numeric value Parameters and requirements Resolution the granularity of the digital values Integral NonLinearity proportionality

More information

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group ~ Contents ~ 1. ATLAS Level1 Trigger 2. Endcap

More information

Characterization of the stgc Detector Using the Pulser System

Characterization of the stgc Detector Using the Pulser System Characterization of the stgc Detector Using the Pulser System Ian Ramirez-Berend Supervisor: Dr. Alain Bellerive Carleton University, Ottawa, Canada Outline Background New Small Wheel Small-Strip Thin

More information

Current Status of ATLAS Endcap Muon Trigger System

Current Status of ATLAS Endcap Muon Trigger System Current Status of ATLAS Endcap Muon Trigger System Takuya SUGIMOTO Nagoya University On behalf of ATLAS Japan TGC Group Contents 1. Introduction 2. Assembly and installation of TGC 3. Readout test at assembly

More information

Analog Peak Detector and Derandomizer

Analog Peak Detector and Derandomizer Analog Peak Detector and Derandomizer G. De Geronimo, A. Kandasamy, P. O Connor Brookhaven National Laboratory IEEE Nuclear Sciences Symposium, San Diego November 7, 2001 Multichannel Readout Alternatives

More information

Requirements and Specifications of the TDC for the ATLAS Precision Muon Tracker

Requirements and Specifications of the TDC for the ATLAS Precision Muon Tracker ATLAS Internal Note MUON-NO-179 14 May 1997 Requirements and Specifications of the TDC for the ATLAS Precision Muon Tracker Yasuo Arai KEK, National High Energy Accelerator Research Organization Institute

More information

The trigger system of the muon spectrometer of the ALICE experiment at the LHC

The trigger system of the muon spectrometer of the ALICE experiment at the LHC The trigger system of the muon spectrometer of the ALICE experiment at the LHC Francesco Bossù for the ALICE collaboration University and INFN of Turin Siena, 09 June 2010 Outline 1 Introduction 2 Muon

More information

Scintillators as an external trigger for cathode strip chambers

Scintillators as an external trigger for cathode strip chambers Scintillators as an external trigger for cathode strip chambers J. A. Muñoz Department of Physics, Princeton University, Princeton, NJ 08544 An external trigger was set up to test cathode strip chambers

More information

PMT tests at UMD. Vlasios Vasileiou Version st May 2006

PMT tests at UMD. Vlasios Vasileiou Version st May 2006 PMT tests at UMD Vlasios Vasileiou Version 1.0 1st May 2006 Abstract This memo describes the tests performed on three Milagro PMTs in UMD. Initially, pulse-height distributions of the PMT signals were

More information

Nyquist filter FIFO. Amplifier. Impedance matching. 40 MHz sampling ADC. DACs for gain and offset FPGA. clock distribution (not yet implemented)

Nyquist filter FIFO. Amplifier. Impedance matching. 40 MHz sampling ADC. DACs for gain and offset FPGA. clock distribution (not yet implemented) The Digital Gamma Finder (DGF) Firewire clock distribution (not yet implemented) DSP One of four channels Inputs Camac for 4 channels 2 cm System FPGA Digital part Analog part FIFO Amplifier Nyquist filter

More information

Motivation Overview Grounding & Shielding L1 Trigger System Diagrams Front-End Electronics Modules

Motivation Overview Grounding & Shielding L1 Trigger System Diagrams Front-End Electronics Modules F.J. Barbosa, Jlab 1. 2. 3. 4. 5. 6. 7. 8. 9. Motivation Overview Grounding & Shielding L1 Trigger System Diagrams Front-End Electronics Modules Safety Summary 1 1. Motivation Hall D will begin operations

More information

TPC Readout with GEMs & Pixels

TPC Readout with GEMs & Pixels TPC Readout with GEMs & Pixels + Linear Collider Tracking Directional Dark Matter Detection Directional Neutron Spectroscopy? Sven Vahsen Lawrence Berkeley Lab Cygnus 2009, Cambridge Massachusetts 2 Our

More information

Analogue to Digital Conversion

Analogue to Digital Conversion Analogue to Digital Conversion Turns electrical input (voltage/current) into numeric value Parameters and requirements Resolution the granularity of the digital values Integral NonLinearity proportionality

More information

Micromegas for muography, the Annecy station and detectors

Micromegas for muography, the Annecy station and detectors Micromegas for muography, the Annecy station and detectors M. Chefdeville, C. Drancourt, C. Goy, J. Jacquemier, Y. Karyotakis, G. Vouters 21/12/2015, Arche meeting, AUTH Overview The station Technical

More information

Results on the LED Pulser System for the Hall A DVCS Experiment

Results on the LED Pulser System for the Hall A DVCS Experiment Results on the LED Pulser System for the Hall A DVCS Experiment Fernando J. Barbosa, Pierre Bertin Jefferson Lab 28 February 2003 System Description The LED Pulser System Diagram is shown in figure 1.

More information

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ATLAS Muon Trigger and Readout Considerations Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ECFA High Luminosity LHC Experiments Workshop - 2016 ATLAS Muon System Overview

More information

Development of Front-end Electronics and TDC LSI. for the ATLAS MDT

Development of Front-end Electronics and TDC LSI. for the ATLAS MDT Development of Front-end Electronics and TDC LSI for the ATLAS MDT Y. Arai KEK, National High Energy Accelerator Research Organization Institute of Particle and Nuclear Studies, 1-1 Oho, Tsukuba, JAPAN

More information

A Prototype Amplifier-Discriminator Chip for the GLAST Silicon-Strip Tracker

A Prototype Amplifier-Discriminator Chip for the GLAST Silicon-Strip Tracker A Prototype Amplifier-Discriminator Chip for the GLAST Silicon-Strip Tracker Robert P. Johnson Pavel Poplevin Hartmut Sadrozinski Ned Spencer Santa Cruz Institute for Particle Physics The GLAST Project

More information

Diamond sensors as beam conditions monitors in CMS and LHC

Diamond sensors as beam conditions monitors in CMS and LHC Diamond sensors as beam conditions monitors in CMS and LHC Maria Hempel DESY Zeuthen & BTU Cottbus on behalf of the BRM-CMS and CMS-DESY groups GSI Darmstadt, 11th - 13th December 2011 Outline 1. Description

More information

Overview of talk AGATA at LNL Electronics needed for gamma ray tracking System overview Digitisers Pre-processing GTS Results Software Connecting othe

Overview of talk AGATA at LNL Electronics needed for gamma ray tracking System overview Digitisers Pre-processing GTS Results Software Connecting othe AGATA Electronics Overview of talk AGATA at LNL Electronics needed for gamma ray tracking System overview Digitisers Pre-processing GTS Results Software Connecting other experiments to AGATA International

More information

Recommissioning the Qweak Drift Chambers Using a Cosmic-Ray Telescope

Recommissioning the Qweak Drift Chambers Using a Cosmic-Ray Telescope Recommissioning the Qweak Drift Chambers Using a Cosmic-Ray Telescope Christian Davison Christopher Newport University Thomas Jefferson National Accelerator Lab Participant: Signature Research Advisor:

More information

CALICE AHCAL overview

CALICE AHCAL overview International Workshop on the High Energy Circular Electron-Positron Collider in 2018 CALICE AHCAL overview Yong Liu (IHEP), on behalf of the CALICE collaboration Nov. 13, 2018 CALICE-AHCAL Progress, CEPC

More information

EM-minitower experience

EM-minitower experience EM-minitower experience flight hardware (SSDs, Fes, Trays, tower, TEM, PSA) ground I&T read-out tools (DAQ/online) system test tower test-plans developement and tuning (LAT-TD-00191) CR and V.D.G. 17.6MeV

More information

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data S. Abovyan, V. Danielyan, M. Fras, P. Gadow, O. Kortner, S. Kortner, H. Kroha, F.

More information

ASIC/TRB Readout Status in Jülich

ASIC/TRB Readout Status in Jülich ASIC/TRB Readout Status in Jülich Peter Wintz (IKP, FZ Jülich) STT RO WShop, Krakow, Jan-30/31 2016 Outline: ASIC/TRB Readout Status in Jül WPs in Jülich System overview Production status Readout status

More information

The CMS ECAL Laser Monitoring System

The CMS ECAL Laser Monitoring System The CMS ECAL Laser Monitoring System IPRD 2008 11th Topical Seminar On Innovative Particle and Radiation Detectors Adi Bornheim California Institute of Technology On behalf of the CMS ECAL Collaboration

More information

Testing the Electronics for the MicroBooNE Light Collection System

Testing the Electronics for the MicroBooNE Light Collection System Testing the Electronics for the MicroBooNE Light Collection System Kathleen V. Tatem Nevis Labs, Columbia University & Fermi National Accelerator Laboratory August 3, 2012 Abstract This paper discusses

More information

E. Delagnes 1 H. Grabas 1 D. Breton 2 J Maalmi 2

E. Delagnes 1 H. Grabas 1 D. Breton 2 J Maalmi 2 REACHING A FEW PS PRECISION WITH THE 16-CHANNEL DIGITIZER AND TIMESTAMPER SAMPIC ASIC E. Delagnes 1 H. Grabas 1 D. Breton 2 J Maalmi 2 1 CEA/IRFU Saclay 2 CNRS/IN2P3/LAL Orsay This work has been funded

More information

1 Detector simulation

1 Detector simulation 1 Detector simulation Detector simulation begins with the tracking of the generated particles in the CMS sensitive volume. For this purpose, CMS uses the GEANT4 package [1], which takes into account the

More information

Signal Reconstruction of the ATLAS Hadronic Tile Calorimeter: implementation and performance

Signal Reconstruction of the ATLAS Hadronic Tile Calorimeter: implementation and performance Signal Reconstruction of the ATLAS Hadronic Tile Calorimeter: implementation and performance G. Usai (on behalf of the ATLAS Tile Calorimeter group) University of Texas at Arlington E-mail: giulio.usai@cern.ch

More information

Advanced Lab LAB 6: Signal Acquisition & Spectrum Analysis Using VirtualBench DSA Equipment: Objectives:

Advanced Lab LAB 6: Signal Acquisition & Spectrum Analysis Using VirtualBench DSA Equipment: Objectives: Advanced Lab LAB 6: Signal Acquisition & Spectrum Analysis Using VirtualBench DSA Equipment: Pentium PC with National Instruments PCI-MIO-16E-4 data-acquisition board (12-bit resolution; software-controlled

More information

Dark Current Kicker Studies at FLASH

Dark Current Kicker Studies at FLASH Dark Current Kicker Studies at FLASH F. Obier, J. Wortmann, S. Schreiber, W. Decking, K. Flöttmann FLASH Seminar, DESY, 02 Feb 2010 History of the dark current kicker 2005 Vertical kicker was installed

More information

A tracking detector to study O(1 GeV) ν μ CC interactions

A tracking detector to study O(1 GeV) ν μ CC interactions A tracking detector to study O(1 GeV) ν μ CC interactions Laura Pasqualini on behalf of the mm-tracker Collaboration IPRD16, 3-6 October 2016, Siena Motivations ν/μ Tracking system for a light magnetic

More information

Gain and Breakdown Voltage Measurements

Gain and Breakdown Voltage Measurements Gain and Breakdown Voltage Measurements CLICdp: ECAL Lab Meeting (CERN) Magdalena Munker March 2, 215 Setup for study of Scintillator tiles with SiPM Readout Setup in cooled dark room ( temperature about

More information

Final Results from the APV25 Production Wafer Testing

Final Results from the APV25 Production Wafer Testing Final Results from the APV Production Wafer Testing M.Raymond a, R.Bainbridge a, M.French b, G.Hall a, P. Barrillon a a Blackett Laboratory, Imperial College, London, UK b Rutherford Appleton Laboratory,

More information

Development of the FVTX trigger

Development of the FVTX trigger Development of the FVTX trigger Rikkyo University Toru Nagashima Nov.7 2014 RadLab student seminar 1 OVERVIEW Physics motivation Test bench setup in RIKEN Timing measurement FVTX trigger design Trigger

More information

OPERA RPC: installation and underground test results

OPERA RPC: installation and underground test results VII Workshop on Resistive Plate Chambers and Related Detectors Korea University, Seoul October 10-12, 2005 The OPERA RPC system: installation and underground test results A. Longhin (INFN & Padova University)

More information

Data Quality Monitoring of the CMS Pixel Detector

Data Quality Monitoring of the CMS Pixel Detector Data Quality Monitoring of the CMS Pixel Detector 1 * Purdue University Department of Physics, 525 Northwestern Ave, West Lafayette, IN 47906 USA E-mail: petra.merkel@cern.ch We present the CMS Pixel Data

More information

Verification of a novel calorimeter concept for studies of charmonium states Guliyev, Elmaddin

Verification of a novel calorimeter concept for studies of charmonium states Guliyev, Elmaddin University of Groningen Verification of a novel calorimeter concept for studies of charmonium states Guliyev, Elmaddin IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's PDF)

More information

CTA-WhiteRabbit - an update.

CTA-WhiteRabbit - an update. CTA-WhiteRabbit - an update. First WR-light: Cerenkov shower detection Digital trigger Longterm tests Ralf Wischnewski (DESY) Martin Brueckner (HumboldtUniv Berlin) Chicago, 20130529 TriggerWG SeeVogh,

More information

MEG II 実験液体キセノン検出器実機 MPPC のコミッショニング. Commissioning of all MPPCs for MEG II LXe detector 小川真治 他 MEG II 日本物理学会 2017 年秋季大会

MEG II 実験液体キセノン検出器実機 MPPC のコミッショニング. Commissioning of all MPPCs for MEG II LXe detector 小川真治 他 MEG II 日本物理学会 2017 年秋季大会 1 MEG II 実験液体キセノン検出器実機 MPPC のコミッショニング Commissioning of all MPPCs for MEG II LXe detector 小川真治 他 MEG II コラボレーション @ 日本物理学会 217 年秋季大会 217.9.13 Table of contents 2 1. Introduction 2. MPPC commissioning 3.

More information

Al-core TPC collection plane test results CENBG option J. Giovinazzo, J. Pibernat, T. Goigoux (R. de Oliveira CERN)

Al-core TPC collection plane test results CENBG option J. Giovinazzo, J. Pibernat, T. Goigoux (R. de Oliveira CERN) Al-core TPC collection plane test results CENBG option J. Giovinazzo, J. Pibernat, T. Goigoux (R. de Oliveira CERN) Collection plane R&D Prototypes characterization - collection plane tests - individual

More information

Data Acquisition System for the Angra Project

Data Acquisition System for the Angra Project Angra Neutrino Project AngraNote 012-2009 (Draft) Data Acquisition System for the Angra Project H. P. Lima Jr, A. F. Barbosa, R. G. Gama Centro Brasileiro de Pesquisas Físicas - CBPF L. F. G. Gonzalez

More information

Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center

Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center A. Garonna, A. Wastl, C. Kurfuerst, T. Kulenkampff, C. Schmitzer, L. Penescu, M. Pivi, M. Kronberger, F. Osmic, P. Urschuetz On

More information

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

Beam Condition Monitors and a Luminometer Based on Diamond Sensors Beam Condition Monitors and a Luminometer Based on Diamond Sensors Wolfgang Lange, DESY Zeuthen and CMS BRIL group Beam Condition Monitors and a Luminometer Based on Diamond Sensors INSTR14 in Novosibirsk,

More information

Pixel module under X-rays

Pixel module under X-rays Pixel module under X-rays Alexey Petrukhin, Daniel Pitzl (DESY) 20/04/2012 X-ray box Ag spectrum Bias V scan Module map X-ray test with psi46expert Gain calibration for M1207 Status and plans Uni HH Bldg

More information

SG2525A SG3525A REGULATING PULSE WIDTH MODULATORS

SG2525A SG3525A REGULATING PULSE WIDTH MODULATORS SG2525A SG3525A REGULATING PULSE WIDTH MODULATORS 8 TO 35 V OPERATION 5.1 V REFERENCE TRIMMED TO ± 1 % 100 Hz TO 500 KHz OSCILLATOR RANGE SEPARATE OSCILLATOR SYNC TERMINAL ADJUSTABLE DEADTIME CONTROL INTERNAL

More information

Analog-to-Digital-Converter User Manual

Analog-to-Digital-Converter User Manual 7070 Analog-to-Digital-Converter User Manual copyright FAST ComTec GmbH Grünwalder Weg 28a, D-82041 Oberhaching Germany Version 2.0, July 7, 2005 Software Warranty FAST ComTec warrants proper operation

More information

Trigger and Data Acquisition (DAQ)

Trigger and Data Acquisition (DAQ) Trigger and Data Acquisition (DAQ) Manfred Jeitler Institute of High Energy Physics (HEPHY) of the Austrian Academy of Sciences Level-1 Trigger of the CMS experiment LHC, CERN 1 contents aiming at a general

More information

SPM Series Quick Start Experiment Guide Rev.1.0, May 2011

SPM Series Quick Start Experiment Guide Rev.1.0, May 2011 Experiment Guide Rev.1.0, May 2011 This document will assist a new user of SPM detectors to make observations and measurements that will verify that the detector is set-up and functioning correctly. The

More information

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Deliverable Report. CERN pixel beam telescope for the PS

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Deliverable Report. CERN pixel beam telescope for the PS AIDA-2020-D15.1 AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators Deliverable Report CERN pixel beam telescope for the PS Dreyling-Eschweiler, J (DESY) et al 25 March 2017 The AIDA-2020

More information

CATIROC a multichannel front-end ASIC to read out the SPMT system of the JUNO experiment

CATIROC a multichannel front-end ASIC to read out the SPMT system of the JUNO experiment CATIROC a multichannel front-end ASIC to read out the SPMT system of the JUNO experiment Dr. Selma Conforti (OMEGA/IN2P3/CNRS) OMEGA microelectronics group Ecole Polytechnique & CNRS IN2P3 http://omega.in2p3.fr

More information

Central Neutron Detector: settings/calibrations/performances. P. Chatagnon, S. Niccolai, R. Wang IPN Orsay CLAS12 workshop - 3/6/2018

Central Neutron Detector: settings/calibrations/performances. P. Chatagnon, S. Niccolai, R. Wang IPN Orsay CLAS12 workshop - 3/6/2018 Central Neutron Detector: settings/calibrations/performances P. Chatagnon, S. Niccolai, R. Wang IPN Orsay CLAS12 workshop - 3/6/2018 Central Neutron Detector in CLAS12 24 sectors 3 layers of coupled paddles

More information

PARISROC, a Photomultiplier Array Integrated Read Out Chip

PARISROC, a Photomultiplier Array Integrated Read Out Chip PARISROC, a Photomultiplier Array Integrated Read Out Chip S. Conforti Di Lorenzo a, J.E. Campagne b, F. Dulucq a, C. de La Taille a, G. Martin-Chassard a, M. El Berni a, W. Wei c a OMEGA/LAL/IN2P3, centre

More information

M Hewitson, K Koetter, H Ward. May 20, 2003

M Hewitson, K Koetter, H Ward. May 20, 2003 A report on DAQ timing for GEO 6 M Hewitson, K Koetter, H Ward May, Introduction The following document describes tests done to try and validate the timing accuracy of GEO s DAQ system. Tests were done

More information

Level-1 Regional Calorimeter System for CMS

Level-1 Regional Calorimeter System for CMS Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski, J. Lackey, P. Robl, W.H.Smith Physics Department, University of Wisconsin, Madison, WI, USA CHEP March 2003 The pdf file of

More information

What s a Counter Plateau. An introduction for the muon Lab

What s a Counter Plateau. An introduction for the muon Lab What s a Counter Plateau An introduction for the muon Lab Counters have noise and signal If you are lucky, a histogram of the pulse heights of all the signals coming out of a photomultiplier tube connected

More information

FBK SiPM test with a charge integration FE

FBK SiPM test with a charge integration FE FBK SiPM test with a charge integration FE F.Giordano 1, E.Bissaldi 2, M. Cilmo 3, G.Pastore 4, R.Rando 5 1 INFN Bari, 2 INFN Trieste, 3 INFN Napoli, 4 INFN Pisa, 5 INFN Padova For the CTA INFN R&D Project

More information

vxs fpga-based Time to Digital Converter (vftdc)

vxs fpga-based Time to Digital Converter (vftdc) vxs fpga-based Time to Digital Converter (vftdc) 18Mbit RAM Generic 8 differential In 8 ECL out 32 differential in VME64x: Register, Data Readout 32 LVTTL in Trigger Interface Trg/Clk/Reset/Busy VXS P0:

More information

Gas Electron Multiplier Detectors

Gas Electron Multiplier Detectors Muon Tomography with compact Gas Electron Multiplier Detectors Dec. Sci. Muon Summit - April 22, 2010 Marcus Hohlmann, P.I. Florida Institute of Technology, Melbourne, FL 4/22/2010 M. Hohlmann, Florida

More information

Technical Datasheet UltraScope USB

Technical Datasheet UltraScope USB Technical Datasheet UltraScope USB www.daselsistemas.com Revision INDEX 1 CHANNELS... 3 2 PULSER... 3 3 RECEIVER... 4 4 FILTERS... 4 5 TRIGGER MODES... 5 6 SIGNAL PROCESSING... 5 7 CONTROL SIGNALS... 6

More information

Tutors Dominik Dannheim, Thibault Frisson (CERN, Geneva, Switzerland)

Tutors Dominik Dannheim, Thibault Frisson (CERN, Geneva, Switzerland) Danube School on Instrumentation in Elementary Particle & Nuclear Physics University of Novi Sad, Serbia, September 8 th 13 th, 2014 Lab Experiment: Characterization of Silicon Photomultipliers Dominik

More information

Contents. The AMADEUS experiment at the DAFNE collider. The AMADEUS trigger. SiPM characterization and lab tests

Contents. The AMADEUS experiment at the DAFNE collider. The AMADEUS trigger. SiPM characterization and lab tests Contents The AMADEUS experiment at the DAFNE collider The AMADEUS trigger SiPM characterization and lab tests First trigger prototype; tests at the DAFNE beam Second prototype and tests at PSI beam Conclusions

More information

arxiv: v2 [physics.ins-det] 17 Oct 2015

arxiv: v2 [physics.ins-det] 17 Oct 2015 arxiv:55.9v2 [physics.ins-det] 7 Oct 25 Performance of VUV-sensitive MPPC for Liquid Argon Scintillation Light T.Igarashi, S.Naka, M.Tanaka, T.Washimi, K.Yorita Waseda University, Tokyo, Japan E-mail:

More information

Specification of the kicker Measurement of the magnetic field inside the kicker Optimisation of the kicker impedance to 50 Status and picture of the

Specification of the kicker Measurement of the magnetic field inside the kicker Optimisation of the kicker impedance to 50 Status and picture of the Specification of the kicker Measurement of the magnetic field inside the kicker Optimisation of the kicker impedance to 50 Status and picture of the kicker The Specification of the Feedbackkicker technical

More information

Hardware Trigger Processor for the MDT System

Hardware Trigger Processor for the MDT System University of Massachusetts Amherst E-mail: tcpaiva@cern.ch We are developing a low-latency hardware trigger processor for the Monitored Drift Tube system for the Muon Spectrometer of the ATLAS Experiment.

More information

Pixel hybrid photon detectors

Pixel hybrid photon detectors Pixel hybrid photon detectors for the LHCb-RICH system Ken Wyllie On behalf of the LHCb-RICH group CERN, Geneva, Switzerland 1 Outline of the talk Introduction The LHCb detector The RICH 2 counter Overall

More information

ASD Amplifier-Shaper-Discriminator

ASD Amplifier-Shaper-Discriminator ATLAS Internal Document 2/14/21 ATLAS Muon Spectrometer MDT - Monitored Drift Tubes ASD Amplifier-Shaper-Discriminator Eric Hazen, Boston University John Oliver, Harvard University Christoph Posch, Boston

More information

mesytec GmbH & Co. KG Wernher-von-Braun-Str Putzbrunn Germany Tel.: Fax: REPRESENTED BY:

mesytec GmbH & Co. KG Wernher-von-Braun-Str Putzbrunn Germany Tel.: Fax: REPRESENTED BY: short form catalogue nuclear physics 2006 Wernher-von-Braun-Str. 1 85640 Putzbrunn Germany Tel.: +49-89-456007-30 Fax: +49-89-456007-39 info@mesytec.com REPRESENTED BY: Overview Readout Electronics for

More information

Reminder on the TOB electronics architecture Test of the first SS rod prototype

Reminder on the TOB electronics architecture Test of the first SS rod prototype Reminder on the TOB electronics architecture Test of the first SS rod prototype Results Further steps Duccio Abbaneo CMS Electronics Week November 2002 1 The rod CCU Module SC out LV out SC in LV in LV

More information

Agilent AN 1275 Automatic Frequency Settling Time Measurement Speeds Time-to-Market for RF Designs

Agilent AN 1275 Automatic Frequency Settling Time Measurement Speeds Time-to-Market for RF Designs Agilent AN 1275 Automatic Frequency Settling Time Measurement Speeds Time-to-Market for RF Designs Application Note Fast, accurate synthesizer switching and settling are key performance requirements in

More information

Time Stamp Synchronization of MBS (DAQ) Systems with White Rabbit Distributed High Precision TOF with White Rabbit

Time Stamp Synchronization of MBS (DAQ) Systems with White Rabbit Distributed High Precision TOF with White Rabbit ime Stamp Synchronization of MBS (DAQ) Systems with White abbit Distributed High Precision F with White abbit Synchronization of globally triggered MBS systems Synchronization of locally triggered (free

More information

Timing accuracy of the GEO 600 data acquisition system

Timing accuracy of the GEO 600 data acquisition system INSTITUTE OF PHYSICS PUBLISHING Class. Quantum Grav. 1 (4) S493 S5 CLASSICAL AND QUANTUM GRAVITY PII: S64-9381(4)6861-X Timing accuracy of the GEO 6 data acquisition system KKötter 1, M Hewitson and H

More information

NI 6731/6733 Specifications

NI 6731/6733 Specifications NI 6731/6733 Specifications This document lists the specifications for the NI 6731/6733 analog output devices. The following specifications are typical at 25 C unless otherwise noted. Note With NI-DAQmx,

More information

Calorimeter Monitoring at DØ

Calorimeter Monitoring at DØ Calorimeter Monitoring at DØ Calorimeter Monitoring at DØ Robert Kehoe ATLAS Calibration Mtg. December 1, 2004 Southern Methodist University Department of Physics Detector and Electronics Monitoring Levels

More information

NI 6013/6014 Family Specifications

NI 6013/6014 Family Specifications NI 6013/6014 Family Specifications This document lists the I/O terminal summary and specifications for the NI 6013/6014 family of devices. This family includes the following devices: NI PCI-6013 NI PCI-6014

More information

The HPD DETECTOR. Michele Giunta. VLVnT Workshop "Technical Aspects of a Very Large Volume Neutrino Telescope in the Mediterranean Sea"

The HPD DETECTOR. Michele Giunta. VLVnT Workshop Technical Aspects of a Very Large Volume Neutrino Telescope in the Mediterranean Sea The HPD DETECTOR VLVnT Workshop "Technical Aspects of a Very Large Volume Neutrino Telescope in the Mediterranean Sea" In this presentation: The HPD working principles The HPD production CLUE Experiment

More information

Triple GEM detector as beam monitor Monitors for Crystal experiment at SPS A compact Time Projection chamber with GEM

Triple GEM detector as beam monitor Monitors for Crystal experiment at SPS A compact Time Projection chamber with GEM Applications with Triple GEM Detector B.Buonomo, G.Corradi, F.Murtas, G.Mazzitelli, M.Pistilli, M.Poli Lener, D.Tagnani Laboratori Nazionali di Frascati INFN P.Valente Sezione Roma INFN Triple GEM detector

More information

Status of the PRad Experiment (E )

Status of the PRad Experiment (E ) Status of the PRad Experiment (E12-11-106) NC A&T State University Outline Experimental apparatus, current status Installation plan Draft run plan Summary PRad Experimental Setup Main detectors and elements:

More information

WaveStation Function/Arbitrary Waveform Generators

WaveStation Function/Arbitrary Waveform Generators Function/Arbitrary Waveform Generators Key Features High performance with 14-bit waveform generation, up to 500 MS/s sample rate and up to 512 kpts memory 2 channels on all models Large color display for

More information

2520 Pulsed Laser Diode Test System

2520 Pulsed Laser Diode Test System Complete pulse test of laser diode bars and chips with dual photocurrent measurement channels 0 Pulsed Laser Diode Test System Simplifies laser diode L-I-V testing prior to packaging or active temperature

More information

WaveStation Function/Arbitrary Waveform Generators

WaveStation Function/Arbitrary Waveform Generators WaveStation Function/Arbitrary Waveform Generators Key Features High performance with 14-bit, 125 MS/s and 16 kpts 2 channels on all models Large 3.5 color display for easy waveform preview Over 40 built-in

More information

Data acquisi*on and Trigger - Trigger -

Data acquisi*on and Trigger - Trigger - Experimental Methods in Par3cle Physics (HS 2014) Data acquisi*on and Trigger - Trigger - Lea Caminada lea.caminada@physik.uzh.ch 1 Interlude: LHC opera3on Data rates at LHC Trigger overview Coincidence

More information

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics How to compose a very very large jigsaw-puzzle CMS ECAL Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin,

More information

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Olloqui on behalf of the LHCb Collaboration Universitat de Barcelona, Facultat de Física,

More information

Radiation Test Report Paul Scherer Institute Proton Irradiation Facility

Radiation Test Report Paul Scherer Institute Proton Irradiation Facility the Large Hadron Collider project CERN CH-2 Geneva 23 Switzerland CERN Div./Group RadWG EDMS Document No. xxxxx Radiation Test Report Paul Scherer Institute Proton Irradiation Facility Responsibility Tested

More information

GFT1504 4/8/10 channel Delay Generator

GFT1504 4/8/10 channel Delay Generator Features 4 independent Delay Channels (10 in option) 100 ps resolution (1ps in option) 25 ps RMS jitter (channel to channel) 10 second range Channel Output pulse 6 V/50 Ω, 3 ns rise time Independent control

More information

Level-1 Calorimeter Trigger Calibration

Level-1 Calorimeter Trigger Calibration December 2004 Level-1 Calorimeter Trigger Calibration Birmingham, Heidelberg, Mainz, Queen Mary, RAL, Stockholm Alan Watson, University of Birmingham Norman Gee, Rutherford Appleton Lab Outline Reminder

More information

DATA SHEET. TDA4852 Horizontal and vertical deflection controller for autosync monitors INTEGRATED CIRCUITS

DATA SHEET. TDA4852 Horizontal and vertical deflection controller for autosync monitors INTEGRATED CIRCUITS INTEGRATED CIRCUITS DATA SHEET Horizontal and vertical deflection controller File under Integrated Circuits, IC02 December 1992 FEATURES Low jitter All adjustments DC-controllable Alignment-free oscillators

More information

781/ /

781/ / 781/329-47 781/461-3113 SPECIFICATIONS DC SPECIFICATIONS J Parameter Min Typ Max Units SAMPLING CHARACTERISTICS Acquisition Time 5 V Step to.1% 25 375 ns 5 V Step to.1% 2 35 ns Small Signal Bandwidth 15

More information

How different FPGA firmware options enable digitizer platforms to address and facilitate multiple applications

How different FPGA firmware options enable digitizer platforms to address and facilitate multiple applications How different FPGA firmware options enable digitizer platforms to address and facilitate multiple applications 1 st of April 2019 Marc.Stackler@Teledyne.com March 19 1 Digitizer definition and application

More information

LoadSlammer User Guide LS50 and LS1000

LoadSlammer User Guide LS50 and LS1000 LoadSlammer User Guide LS50 and LS1000 1 CONTENTS 2 Introduction... 2 2.1 Overview... 2 2.2 Hardware... 2 2.3 Specifications LS50... 3 2.4 Specifications LS1000... 4 3... 5 3.1 Physical Connection to DUT...

More information