Issue No : 2 Dt of Revision :

Size: px
Start display at page:

Download "Issue No : 2 Dt of Revision :"

Transcription

1 PURCHASE DIVISION DEPARTMENT QUALITY MANUAL Revision No. : 02 Issue No : 2 Dt of Revision : Issue Dt. : Page No. : 1 OF 3 Issued by : Q A Section : 0 Document : DQM-01 Topic : FORMAT 6 OF PROCUREMENT PROCEDURE OF CPRI (NON-WORKS) FORMAT NO.:PUR/TENDDOC/P6/06 CPRI Section II -Technical Specification Tender Enquiry No : PUR/PSD-09/16-17 Name of the Equipment: Phasor Data Concentrator (PDC) with Software Note :The Offers should be submitted only in this format otherwise the offer will be liable for rejection Name of the Vendor Offer Number and Date Sl.No. Parameters CPRI Specification/Requirements Qty To be completed by the Bidder 1.0 Scope Supply, Installation, commissioning and training of Phasor Data Concentrator (PDC) with software. 1.No. Guaranteed Technical Particulars (GTP) Deviation/ Remarks Specify if any 2.0 Purpose of use To study the different case of power system scenario. To develop the online monitoring Graphical User Interface tool to analysis the condition of the Power system under different case studies. Implementation of the different algorithm to improve the monitoring of the power system. Different case studies can be modelled and analysed. To collect data, perform mathematical operations, moniter measurements.used for archiving data, event triggering, wide area situational awarness, disturbance data recording and also for Real time wide-area monitering, protection, automation and control.visualization of live or recorded synchronized phasor data. 3.0 Equipment Requirements Shall be installed in Power Systems Division, CPRI, Bangalore Page 1 of 8

2 3.1 The maximum number of PMUs shall be connected to PDC is Data rates shall be atleast: 240 Messages/sec. 3.3 The input format shall be as per : IEEE C The output Format shall be as per : IEEE C The output shall be selectable. 3.6 The multiple input rate shall be selectable. 3.7 Ethernet and serial input shall be provided. 4.0 Functional Requirements 4.1 Real-time streamed PMU data handling functions 4.2 Data Storage Management It shall include PMU data receiving, PMU data time alignment and PMU data repacking in compliance to IEEE C The online data storage for storing data for a period of time that is configurable by users and retrieved in data formats as per IEEE C PDC shall provide online storage for storing as a maximum of 30 days of a full record of all received processed and outputted data The stored data shall, as a minimum, be able to be retrieved at the granularity of an individual event within a user specified time period PDC event archive data storage historian shall provide, as a maximum a data storage that is capable of storing atleast 10 days of event data. The real-time event detection functions shall, as a minimum, support the detection of the following events: System frequency out of specified range (f> and f<). The rate of change of the system frequency exceeding the specified threshold (df/dt>). Combined system frequency and the rate of change of the system frequency exceeding specified thresholds (f+ df/dt > and f+df/dt<). Page 2 of 8

3 Bus voltage phasor magnitude out of specified range. The rate of change of the bus voltage phasor magnitude exceeding the specified threshold Combined bus voltage phasor magnitude and the rate of change of the bus voltage phasor magnitude exceeding specified threshold. Phase angle difference of two bus voltage phasors exceeding specified. The rate of change of the phase angle difference of two bus voltage phasor exceeding the specified threshold. Combined the phase angle difference of two bus voltage phasors and the rate of change of the phase angle difference exceeding specified threshold. Symmetric fault occurrence indicated by protective relay operation status and breaker operation status included in the PMU data packet. Asymmetric permanent fault occurrence indicated by protective relay operation status and breaker operation status indicated in the PMU data packet. Pole-slipping condition indicated by pole-slipping protective relay. 4.3 Communications Functions PDC should support multiple communication profiles so that it can seamlessly communicate with PMU's from various vendors. PMU's have the ability to send data over TCP & UDP.(with various combinations like Data messages over UDP,Command messages over TCP). So the communication profile that should be supported shall be documented. PDC shall support data streaming with user selected data points as per IEEE C PDC shall support both IPv4 and IPv6 Internet protocols PDC shall support send output data steam as multicast IP data packet. The Destination multicast IP address shall be user configurable PDC shall provide adequate Human-Machine Interface (HMI) to a Control Center or PMU. PDC shall as a minimum include Graphical User Interface (GUI) for PDC configuration, test and diagnose purpose PDC shall provide functions and means to enable a WAMS to meet all physical cyber security requirements. 4.4 Network Interfaces PDC shall support communication from multiple physical Ethernet ports simultaneously. Page 3 of 8

4 4.4.1 PDC shall provide both optical and metallic physical port options for port. 4.5 PDC System Time PDC system time shall meet the following specifications The system clock of PDC shall be synchronized to Universal Time Coordinated (UTC) within 1 microsecond PDC system clock shall have a time resolution of better than 1 microsecond PDC s Human Machine Interface(HMI)/Graphical User Interface(GUI) shall be able to display UTC time and date in compliance to ISO 8601 format. PDC s HMI/GUI shall be able to display UTC time and date in local time and date display format. PDC shall record all time as UTC time and date in compliance to ISO 8601 format. 5.0 Configurable Parameters It shall be possible to enable and disable each output data stream independently. 5.1 Wait Time Settings The wait time settings shall be configurable by the user. 5.2 Alaram Settings The number of times that data not received occurs shall be configurable by the user. The number of input data streams that has the problem shall be configurable by the user. The alarm shall indicate which data stream has the problem. System frequency related event detection criteria System frequency range f min and f max, as well as the time period that the frequency stays out of the range, the rate of change of the system frequency df/dt detection threshold shall be configurable by the user. 5.3 f + a*df/dt >: a shall be configurable ; and the threshold shall be from nominal system frequency to 2 times the nominal system frequency as selectable by user. Voltage magnitude related event detection f + b*df/dt <: b shall be configurable ; and the threshold shall be from 0 Hz to nominal system frequency as selectable by the user. All frequency related detection criteria shall be global criteria. Bus voltage phasor magnitude range, time period that voltage stays out of the range shall be configurable. criteria 5.4 The threshold for rate of change of the bus voltage phasor magnitude dv/dt shall be configurable by the user. A time period that dv/dt stays above the threshold shall be configurable user. Page 4 of 8

5 V + a*dv/dt >: a shall be configurable ; and the threshold shall be configurable by the user. V + b*dv/dt <: b shall be configurable ; and the threshold shall be configurable by the user. Voltage Phase angle The threshold for phase angle difference of two bus voltage phasors shall be configurable. difference related event detection criteria 5.5 The threshold for rate of change of the phase angle difference of two bus voltage phasors shall be configurable. 6.0 Software requirements The threshold for combined phase angle difference of two bus voltage phasors and the rate of change of the phase angle difference shall be configurable. 6.1 Upgradability General software shall be upgradable, adding new features and functionalities, fixing bugs and deficiencies. 6.2 Self-monitering and alaraming 6.3 Local and Remote configuration PDC shall provide self-monitoring functions to monitor the operating conditions and the performance of the PDC. Any detected problems shall be reported through local display by Work Station Console, built-in event logging and to remote control centers when remote reporting is enabled. Severe problems, such as loss of communication, shall generate alarms both locally and remotely. The configuration software shall support both local and remote configuration of the PDC Local and remote configuration functions shall have adequate security features such as User Login, access control. 6.4 Logging Each log entry shall be time stamped Each log entry shall contain details including the applicable thresholds violated. 7.0 Visualization Display/ Alaram Generation Page 5 of 8

6 7.1 The user interface application software is required to visualize & analyze the online and stored phasor data. User interface shall be provided for the configuration, monitoring and analysis of multiple synchronized phasor data on single and multiple displays. PDC real time data and displays shall be displayed on the consoles using internet browsers such as Internet explorer, fire fox etc. It shall be possible to get streaming data from PDC to Windows PC environment connected to PDC on LAN in order to publish the real time data on website or sending real time data to other system. 7.2 The Visualization Software should directly communicate with the PDC to display the data in real time. Provision to display Phasor magnitude, angle, frequency, df/dt, dv/dt, MW, MVAR should be provided. The time window of the real time display should be configurable along with the provision to visualize multiple displays. 7.3 The Visualization Software should be able to access and display the archived data.the time window for display or analysis of historic data should be user selectable. It should be possible to select data for output via/ieee/xml/open Document format (ODF). Page 6 of 8

7 It shall be possible for a user to define, modify and verify alarm conditions on-line. It shall be possible to trigger alarms & trigger storage of data on the following: Deviation of frequency from nominal 7.4 Rate-of-change of frequency exceeding a set value Voltage magnitude outside upper or lower boundaries Active or reactive power exceeding limits Voltage /angle difference between selected nodes exceeding limits 7.5 For each quantity triggering alarms, it shall be possible to define three states such as Normal, Alert and Alarm state. The visualization shall include; Phase angle difference between selected voltage measurement locations 7.6 Topological Phasor display for voltages 8.0 General specification Polar diagrams Strip charts (Voltage / Frequency / Active & Reactive Power) Total Vector Error display 8.1 Input Supply voltage Power Input Universal: VDC, VAC 50/60 Hz. 8.2 Operating condition Temp: 15 C to 35 C. 8.3 Safety regulation Shall comply with relevant International standards. 8.4 EMI/EMC Shall comply with relevant International standards. 8.5 PDC function Factory certificate/test certificate shall be provided covering the required parameters. 8.6 Warranty Shall have 1 year warranty period. Page 7 of 8

8 8.7 Manual The following manual shall be provided; Operating and User manual. 8.8 Training The training shall be provided for usage of the Phasor Data Concentrator (PDC) with software for CPRI Engineers for two(02) working days at CPRI, Bangalore. 8.9 Supply, Installation and commissioning The bidder shall be responsible for supply, installation and commissioning and training of Phasor Data Concentrator (PDC) with software at Power Systems Division, CPRI, Bangalore. PN : 1. A detailed technical catalogue/literature/phamplet and any other technical details shall be sent in hard copy in a sealed cover super scribing tender enquiry number and due date so as to reach the following address within the due date and time. This is very much essential to evaluate your offer. 2. Letter of authorization issued by the foreign Principal shall also be sent by the Indian agents who have offered on behalf of their Principals. Address : Joint Director (Purchase) Central Power Research Institute, Sir C.V.Raman Road, P.B.No.8066, BANGALORE PH. No / Extn: 2271/2274. Fax : Page 8 of 8

To be completed by the Bidder. Sl.No. Parameters CPRI Specification / Requirements Qty

To be completed by the Bidder. Sl.No. Parameters CPRI Specification / Requirements Qty Revision N : 03 Issue No : 2 Dt of Revis : 25.07.207 Issue Dt. : 30.06.2003 Page No. : of 5 Issued by : P A CENTRAL POWER RESEARCH INSTITUTE, BHOPAL, Web: www.cpri.in, www.tenderwizard.com/cpri, Telefax:

More information

SI.No Parameters CPRI Specification/Requirements To be Completed by the Bidder Guaranteed Technical

SI.No Parameters CPRI Specification/Requirements To be Completed by the Bidder Guaranteed Technical Section II Technical Specifications Tender enquiry no. : STDS/12-1/2016-17/PUR/STL/A-1849 Name of the equipment : SPECIFICATIONS OF SYSTEM FOR CONDUCTING DETERMINATION OF ERRORS TEST ON INSTRUMENT TRANSFORMERS

More information

PURCHASE DIVISION DEPARTMENT QUALITY MANUAL Revision No. : 02 Issue No: : 2 Dt of Revision : Issue Dt. :

PURCHASE DIVISION DEPARTMENT QUALITY MANUAL Revision No. : 02 Issue No: : 2 Dt of Revision : Issue Dt. : Section : 0 Document : DQM-01 Topic : FORMAT 6 OF PROCUREMENT PROCEDURE OF CPRI (NON-WORKS) Section I(B)-Technical Specification Tender Enquery No PUR/UARC-02/14-15 Name of the Equipment: Damped Oscillatory

More information

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 Baselining using large quantities of historical phasor data to identify and understand patterns in interconnection-wide grid behavior, to

More information

CONVERT ERLPhase TESLA DMEs TO PHASOR MEASUREMENT UNITS (PMUs)

CONVERT ERLPhase TESLA DMEs TO PHASOR MEASUREMENT UNITS (PMUs) CONVERT ERLPhase TESLA DMEs TO PHASOR MEASUREMENT UNITS (PMUs) Tony Weekes Manitoba Hydro Krish Narendra ERLPhase Power Technology Ltd. OUTLINE Introduction (Krish) Device Overview (Krish) Site Selection

More information

PRC Compliance Using Bitronics 70 Series Recorders

PRC Compliance Using Bitronics 70 Series Recorders PRC-002-2 Compliance Using Bitronics 70 Series Recorders Introduction The North American Electric Reliability Council (NERC) has defined standards for disturbance monitoring and reporting requirements

More information

PHASOR TECHNOLOGY AND REAL-TIME DYNAMICS MONITORING SYSTEM (RTDMS) FREQUENTLY ASKED QUESTIONS (FAQS)

PHASOR TECHNOLOGY AND REAL-TIME DYNAMICS MONITORING SYSTEM (RTDMS) FREQUENTLY ASKED QUESTIONS (FAQS) PHASOR TECHNOLOGY AND REAL-TIME DYNAMICS MONITORING SYSTEM (RTDMS) FREQUENTLY ASKED QUESTIONS (FAQS) Phasor Technology Overview 1. What is a Phasor? Phasor is a quantity with magnitude and phase (with

More information

Synchrophasors: Definition, Measurement, and Application

Synchrophasors: Definition, Measurement, and Application 1. Abstract Synchrophasors: Definition, Measurement, and Application Mark Adamiak GE Multilin King of Prussia, PA William Premerlani GE Global Research Niskayuna, NY Dr. Bogdan Kasztenny GE Multilin Markham,

More information

Phasor Measurement Unit and Phasor Data Concentrator test with Real Time Digital Simulator

Phasor Measurement Unit and Phasor Data Concentrator test with Real Time Digital Simulator Downloaded from orbit.dtu.dk on: Apr 26, 2018 Phasor Measurement Unit and Phasor Data Concentrator test with Real Time Digital Simulator Diakos, Konstantinos; Wu, Qiuwei; Nielsen, Arne Hejde Published

More information

Summary of Relaying Reviews Reporting

Summary of Relaying Reviews Reporting Revised Attachment B (Agenda Item 6) Summary of Relaying Reviews -- 12-31-04 Reporting This form shall be used without modification to provide a summary of relaying reviews performed by each Transmisission

More information

MICROPROCESSOR-BASED METERING EQUIPMENT SECTION 16901C PART 2

MICROPROCESSOR-BASED METERING EQUIPMENT SECTION 16901C PART 2 PART 1 PART 2 PRODUCTS 2.01 MANUFACTURERS A. Eaton products B.. C.. The listing of specific manufacturers above does not imply acceptance of their products that do not meet the specified ratings, features

More information

Wide Area Measurement System Integration. GE Consumer & Industrial Multilin

Wide Area Measurement System Integration. GE Consumer & Industrial Multilin Wide Area Measurement System Integration The Need for Wide-Area Measurements Following the blackout, a federal commission was appointed Fault found with utility companies: no real-time knowledge of the

More information

F6052 Universal Time Synchronizer

F6052 Universal Time Synchronizer F6052 Universal Time Synchronizer Doble Engineering Company March 2014 2013 Doble Engineering Company. All Rights Reserved 1 2013 Doble Engineering Company. All Rights Reserved History of Portable Time

More information

Qualitrol s PMU Technologies

Qualitrol s PMU Technologies Qualitrol s PMU Technologies IDM NASPI Conference June 2008 BEN 6000 Agenda 1. Qualitrol s experience 2. Recording functions that compliment Phasor Measurement 3. A Multi function PMU 4. PMU Case Study

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Synchrophasors for Distribution Applications

Synchrophasors for Distribution Applications 1 Synchrophasors for Distribution Applications Greg Hataway, PowerSouth Energy Cooperative Bill Flerchinger, Schweitzer Engineering Laboratories, Inc. Roy Moxley, formerly of Schweitzer Engineering Laboratories,

More information

PROCUREMENT PROCEDURE OF CPRI (NON WORKS) Dt of Revision : Issue Dt. :

PROCUREMENT PROCEDURE OF CPRI (NON WORKS) Dt of Revision : Issue Dt. : Revision No. : 03 Page 1 of 5 1 Place where equipment to be supplied 1. CPRI, Hyderabad 2. CPRI, Bhopal 3. CPRI, Noida 4. EMC, Trivandrum 1 set at each location 2 Scope (supply / supply & Installation

More information

State Estimation Advancements Enabled by Synchrophasor Technology

State Estimation Advancements Enabled by Synchrophasor Technology State Estimation Advancements Enabled by Synchrophasor Technology Contents Executive Summary... 2 State Estimation... 2 Legacy State Estimation Biases... 3 Synchrophasor Technology Enabling Enhanced State

More information

SULTANATE OF OMAN METERING AND DATA EXCHANGE CODE

SULTANATE OF OMAN METERING AND DATA EXCHANGE CODE 1.0 GENERAL SULTANATE OF OMAN METERING AND DATA EXCHANGE CODE STANDARD: OES-22F THREE PHASE KILOWATT-HOUR DIGITAL METERS, CURRENT TRANSFORMER OPERATED, CONNECTED FOR SERVICE CONNECTIONS Electronic three

More information

ROSE - Real Time Analysis Tool for Enhanced Situational Awareness

ROSE - Real Time Analysis Tool for Enhanced Situational Awareness ROSE - Real Time Analysis Tool for Enhanced Situational Awareness Marianna Vaiman V&R Energy Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved. WECC JSIS Salt Lake City, UT October

More information

Power Processor - Series 700F 10KVA to 150KVA

Power Processor - Series 700F 10KVA to 150KVA Power Processor - Series 700F 10KVA to 150KVA Power Conditioning and Regulation for Commercial & Industrial Equipment General Specifications PART 1 - GENERAL 1.1 DESCRIPTION This specification defines

More information

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES THE OLE OF SYNCHOPHASOS IN THE INTEGATION OF DISTIBUTED ENEGY ESOUCES Alexander APOSTOLOV OMICON electronics - USA alex.apostolov@omicronusa.com ABSTACT The introduction of M and P class Synchrophasors

More information

VEB Series. TCP/IP Network Matrix PA System. 32 simultaneous Audio Buses. Up to 60 Network Paging Consoles. Up to 128 Audio Output channels

VEB Series. TCP/IP Network Matrix PA System. 32 simultaneous Audio Buses. Up to 60 Network Paging Consoles. Up to 128 Audio Output channels 32 simultaneous Audio Buses Up to 60 Network Paging Consoles Up to 128 Audio Output channels Up to 1,500 Speaker Zones Up to 600 Control Inputs UP to 600 Control Outputs VEB Series TCP/IP Network Matrix

More information

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK Sealed quotations are invited under Two-Bid system from reputed agencies, either by themselves or as a joint venture/consortium/partnership

More information

Wide Area Monitoring with Phasor Measurement Data

Wide Area Monitoring with Phasor Measurement Data Wide Area Monitoring with Phasor Measurement Data Dr. Markus Wache Siemens E D EA, Nuremberg, Germany Content Content Basics of Phasor Measurement Realization of PMUs Power System Stability Standard IEEE

More information

Study and Simulation of Phasor Measurement Unit for Wide Area Measurement System

Study and Simulation of Phasor Measurement Unit for Wide Area Measurement System Study and Simulation of Phasor Measurement Unit for Wide Area Measurement System Ms.Darsana M. Nair Mr. Rishi Menon Mr. Aby Joseph PG Scholar Assistant Professor Principal Engineer Dept. of EEE Dept. of

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area

More information

GPSR400 Quick Start Guide

GPSR400 Quick Start Guide GPSR400 Quick Start Guide Rev. 6 Introduction Microlab s digital GPS repeater system can be used for cellular communications UTC synchronization for locations where the GPS signals are not readily available.

More information

SEL-311C TRANSMISSION PROTECTION SYSTEM

SEL-311C TRANSMISSION PROTECTION SYSTEM SEL-3C TRANSMISSION PROTECTION SYSTEM ADVANCED TRANSMISSION LINE PROTECTION, AUTOMATION, AND CONTROL Bus ANSI NUMBERS/ACRONYMS AND FUNCTIONS 52 3 3 2 P G 8 O U 27 68 50BF 67 P G Q 50 P G Q 59 P G Q 5 P

More information

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System NERC Synchronized Measurement Subcommittee (SMS) Scope Document Objective The objective of the

More information

Kassandra Charalampidou

Kassandra Charalampidou Fidelity and Yield in a Volcano Monitoring Sensor Network Geoff Werner-Allen, Konrad Lorincz, Jeff Johnson, Jonathan Lees and Matt Welsh OSDI 2006 October 19th, 2010 Duration: 20 min Kassandra Charalampidou

More information

Power Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL

Power Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL Power Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL 1.01 SUMMARY: The following technical specification describes the requirements of the high accuracy standalone 3 phase Power

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors

A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors Dinesh Rangana Gurusinghe Yaojie Cai Athula D. Rajapakse International Synchrophasor Symposium March 25,

More information

6135A/PMUCAL Phasor Measurement Unit Calibration System

6135A/PMUCAL Phasor Measurement Unit Calibration System Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) 6135A/PMUCAL Phasor Measurement Unit Calibration System Fast, automated, traceable calibrations that comply with IEEE

More information

Smart Grid Panel Presentation

Smart Grid Panel Presentation Smart Grid Panel Presentation Robert J. Thomas Cornell University PSerc Summer Workshop Lake Tahoe, CA August 4, 2008 Smart Grid Values (Why are we doing this?) Some reasons A more reliable grid - power

More information

ENA33LCD. Power line analyzer. User and service manual. Obrezija 5 SI-1411 Izlake

ENA33LCD. Power line analyzer. User and service manual.   Obrezija 5 SI-1411 Izlake ENA33LCD Power line analyzer User and service manual version 2.9 (FW version 6.8 and newer) ETI, d.o.o. Obrezija 5 SI-1411 Izlake www.etigroup.eu/products-services 1. Front control panel and terminal plate

More information

UNIT II: WIDE AREA MONITORING SYSTEM

UNIT II: WIDE AREA MONITORING SYSTEM UNIT II: WIDE AREA MONITORING SYSTEM Fundamentals of Synchro phasor Technology - concept and benefits of wide area monitoring system-structure and functions of Phasor Measuring Unit (PMU) and Phasor Data

More information

DPM - Mesta Electronics, Inc. Low Voltage Active Harmonic Filters

DPM - Mesta Electronics, Inc. Low Voltage Active Harmonic Filters DPM - Mesta Electronics, Inc. Low Voltage Active Harmonic Filters Section [26 35 26][16280] Active Harmonic Filters (Low Voltage) Part 1 General 1.1 Summary A. Scope: Provide design and engineering, labor,

More information

APPLICATION: The heart of the system is a DSR 100 Digital Static Regulator used in conjunction with standard SCR based rectifier bridges.

APPLICATION: The heart of the system is a DSR 100 Digital Static Regulator used in conjunction with standard SCR based rectifier bridges. APPLICATION: Basler Electric offers a New Line of digitally controlled brush (static) or brushless excitation systems designed for use with existing Hydro, Gas as well as Diesel driven generators requiring

More information

Model 1133A Power Sentinel. with. Digital Signal Analysis SYNCHRONIZED POWER QUALITY/REVENUE STANDARDS

Model 1133A Power Sentinel. with. Digital Signal Analysis SYNCHRONIZED POWER QUALITY/REVENUE STANDARDS Model 1133A Power Sentinel with Digital Signal Analysis Synchronized via GPS Revenue Accuracy: 0.025% Power Quality: Harmonics, Flicker, Interruptions Phasor Measurements for Stability & Flow Analysis

More information

A proven distribution feeder solution with integrated protection, monitoring, and control

A proven distribution feeder solution with integrated protection, monitoring, and control SEL-35 Protection System A proven distribution feeder solution with integrated protection, monitoring, and control Achieve sensitive and secure fault detection using comprehensive protection functions.

More information

SEL Serial Radio Transceiver. The industry-recognized standard for reliable, low-latency wireless communications

SEL Serial Radio Transceiver. The industry-recognized standard for reliable, low-latency wireless communications The industry-recognized standard for reliable, low-latency wireless communications Optimized Mirrored Bits communications increases speed and reliability for protection and control. SEL Hop-Sync technology

More information

ULTRA RAPID POWER QUALITY ANALYZER

ULTRA RAPID POWER QUALITY ANALYZER ULTRA RAPID POWER QUALITY ANALYZER Ultra rapid (cycle by cycle) advanced electrical network analysis Complete network harmonics analysis, up to 63 rd harmonic High visibility, 5 graphic LCD screen with

More information

Introduction to micropmu. PSL Australasian Symposium 2017 September 29 Thomas Pua Product Engineer

Introduction to micropmu. PSL Australasian Symposium 2017 September 29 Thomas Pua Product Engineer Introduction to micropmu PSL Australasian Symposium 2017 September 29 Thomas Pua Product Engineer What are synchrophasors? What are synchrophasors? Synchrophasors compare the phase angle of the voltage

More information

Testing and Validation of Synchrophasor Devices and Applications

Testing and Validation of Synchrophasor Devices and Applications Testing and Validation of Synchrophasor Devices and Applications Anurag K Srivastava The School of Electrical Engineering and Computer Science Smart Grid Demonstration and Research Investigation Lab Washington

More information

DIGICELL ANYNET NETWORK ACCESS MODULE

DIGICELL ANYNET NETWORK ACCESS MODULE Comm Activity Network Status Service DigiCell Any NET Network Access Module Network Interface Network Service AMPS Cellemetry GSM SMS CDMA GPRS Ethernet 1xRTT RS-232 TCP/IP Input 1 Standard S3 off, S4

More information

DAA AES/EBU Digital Audio Distribution Amplifier. User Manual. I.R.T. Communications Pty Ltd

DAA AES/EBU Digital Audio Distribution Amplifier. User Manual. I.R.T. Communications Pty Ltd AES/EBU Digital Audio Distribution Amplifier User Manual Revision 02 AES/EBU DIGITAL AUDIO DISTRIBUTION AMPLIFIER Revision History: Revision Date By Change Description Applicable to: 00 15/03/2005 AL Original

More information

System Protection Schemes in Power Network based on New Principles

System Protection Schemes in Power Network based on New Principles System Protection Schemes in Power Network based on New Principles Daniel Karlsson, ABB Automation Products AB S-721 59 Västerås, SWDN daniel.h.karlsson@se.abb.com Abstract This report describes how a

More information

Synchrometrology and PMU Testing at NIST

Synchrometrology and PMU Testing at NIST Synchrometrology and PMU Testing at NIST Jerry FitzPatrick and Tom Nelson National Institute of Standards and Technology i-pcgrid Workshop 2013 March 27, 2013 2 Topics for Today NIST Mission SGIP NIST

More information

ALP-UDR Universal Detection Relay user-defined protection, automation, and monitoring

ALP-UDR Universal Detection Relay user-defined protection, automation, and monitoring ALP-UDR Universal Detection Relay user-defined protection, automation, and monitoring The first Real-Time Protection and Automation platform that can be adapted to a wide variety of applications. While

More information

Introduction DIN rail mounted electricity meters

Introduction DIN rail mounted electricity meters Introduction DIN rail mounted electricity meters Modular DIN Rail Products offer a wide range of functions to be integrated in electrical installations with significant benefits for the user. DIN rail

More information

PRC Disturbance Monitoring and Reporting Requirements

PRC Disturbance Monitoring and Reporting Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED SECTION 16280 LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED PART 1 - GENERAL 1.1 SUMMARY This specification defines the requirements for active harmonic filter systems in order to meet IEEE-519-2014

More information

Experiences of Using Synchrophasors at Duke Energy

Experiences of Using Synchrophasors at Duke Energy 1 Experiences of Using Synchrophasors at Duke Energy Tim Bradberry, Megan Vutsinas, Kat Sico Duke Energy IEEE PES Tutorial July 19 th, 2016 Duke Energy s Phasor Plans Carolinas West Currently have 125

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK SIG:EMS 1 of 6 APPR:LWB:DBP:07-14-15 FHWA:APPR:07-28-15 a. Description. This work consists of site

More information

Real-time Monitoring of Power Oscillations and Modal Damping in the European ENTSO-E System

Real-time Monitoring of Power Oscillations and Modal Damping in the European ENTSO-E System Mats Larsson, ABB CRC Switzerland; Luis-Fabiano Santos, ABB SAS Switzerland; Galina Antonova, AB B SA Canada, Reynaldo Nuqui, ABB CRC USA NASPI meeting, February 20, 2013 Real-time Monitoring of Power

More information

GPSR116 Quick Start Guide

GPSR116 Quick Start Guide GPSR116 Quick Start Guide .21 [ 5,3] [482,6] 18.12 [460,3] GPSR116 Quick Start Guide Rev 2.35 [8,9] Introduction Microlab s digital GPS repeater system can be used for cellular communications UTC synchronization

More information

INTREPID Model 336 Digital Microwave Link

INTREPID Model 336 Digital Microwave Link Southwest Microwave, Inc. 9055 S. McKemy Street Tempe, Arizona 85284 USA +1(480) 783-0201 Fax +1(480) 783-0401 Product Specifications INTREPID Model 336 Digital Microwave Link Purpose of document This

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAFFIC SIGNAL WIRELESS COMMUNICATIONS LINK SIG:CJS 1 of 6 APPR:EMS:DBP:06-29-17 FHWA:APPR:08-14-17 a. Description. This work consists of completing

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

Supervision and analyse of the electrical network EN50160 & POWER QUALITY

Supervision and analyse of the electrical network EN50160 & POWER QUALITY Supervision and analyse of the electrical network EN50160 & POWER QUALITY Controls the quality of the network following EN50160 and CEI 61000-3-6/7 Complies to the CEI 61000-4-30 class A Standard! Records

More information

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst

More information

Utility Communications Teleprotection Equipment TPT-200

Utility Communications Teleprotection Equipment TPT-200 Utility Communications Teleprotection Equipment TPT-200 5C Communications Inc. All rights reserved Teleprotection is designed to transfer protection commands coming, in most cases, from distance protection

More information

SPECIFICATION FOR HORIZONTAL AIRFLOW OUTDOOR RESISTIVE LOAD BANK

SPECIFICATION FOR HORIZONTAL AIRFLOW OUTDOOR RESISTIVE LOAD BANK SPECIFICATION FOR HORIZONTAL AIRFLOW OUTDOOR RESISTIVE LOAD BANK PART 1.0 GENERAL 1.1 SCOPE A. This specification contains the minimum requirements for the design, manufacture and testing of a UL listed,

More information

Distribution Level Metering and Visualization Applications

Distribution Level Metering and Visualization Applications Distribution Level Metering and Visualization Applications Jason Bank May 1, 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated

More information

DeltaV SIS Logic Solver

DeltaV SIS Logic Solver DeltaV SIS Process Safety System Product Data Sheet September 2017 DeltaV SIS Logic Solver World s first smart SIS Logic Solver Integrated, yet separate from the control system Easy compliance with IEC

More information

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax:

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax: POWER CORPORATION Power Quality Specifications and Guidelines for Customers Phone: 403-514-3700 Fax: 403-514-3719 1 GENERAL OVERVIEW........................................ 1.1 WHAT DOES THIS SPECIFICATION

More information

MT 560/UMT TRANSDUCER & ANALYZER

MT 560/UMT TRANSDUCER & ANALYZER MT 560/UMT 560 - TRANSDUCER & ANALYZER USE The MT 560/UMT 560 multi transducer and analyzer is used for a permanent analysis of electricity supply quality in compliance with the SIST EN 50160 standard.

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Embedded Generation Information Package

Embedded Generation Information Package Embedded Generation Information Package Remote Monitoring (RM) Remote Shutdown (RS) Prepared by: Station Design and Standards Embedded Generation Revision: 1.6 December 2015 Page 1 of 10 1. Background:

More information

1 of 12 Amendment to HTTV Meter Spec Category-A,B & C

1 of 12 Amendment to HTTV Meter Spec Category-A,B & C CENTRAL ELECTRICITY SUPPLY UTILITY OF ORISSA Head. Office : IDCO TOWER, 2 nd Floor, Janpath, Bhubaneswar - 751022 Tel : 0674-2545681, 2542895 Fax : 0674-2543125 Website : www.cescoorissa.com No. CESU Hqrs/P&S/

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Electronic AC Load ZSAC Series. 400 W up to 21,000 W 260 V up to 440 V 3 A up to 100 A. Rev. 3.03

Electronic AC Load ZSAC Series. 400 W up to 21,000 W 260 V up to 440 V 3 A up to 100 A. Rev. 3.03 Electronic AC Load Series 400 W up to 21,000 W 260 V up to 440 V 3 A up to 100 A Rev. 3.03 Electronic AC Loads, Series Interface overview RS-232 USB GPIB LAN System bus Analog / Analog isolated X X Standard

More information

PHASOR MEASUREMENT UNIT: - A Revolution in Power System

PHASOR MEASUREMENT UNIT: - A Revolution in Power System PHASOR MEASUREMENT UNIT: - A Revolution in Power System Sonal Kumar Singh Electrical engineering, JECRC University, Jaipur -------------------------------------------------------------------------***------------------------------------------------------------------------

More information

RT- HIL Implementation of Hybrid Synchrophasor and GOOSE- based Passive Islanding Schemes

RT- HIL Implementation of Hybrid Synchrophasor and GOOSE- based Passive Islanding Schemes RT- HIL Implementation of Hybrid Synchrophasor and - based Passive Islanding Schemes M. Shoaib Almas E- mail: msalmas@kth.se PhD Candidate Electric Power Systems Department KTH Royal Institute of Technology

More information

PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE

PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE IFB NO. KGEC/DST-WB/EE /2018-19/995 PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE Kalyani Government Engineering College Kalyani 741 235; Nadia, West Bengal 1 Government of West Bengal Office of the

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

9200 Series, 300 MHz Programmable Pulse Generator

9200 Series, 300 MHz Programmable Pulse Generator 9200 Series, 300 MHz Programmable Pulse Generator Main Features Variable edge pulses (1 nsec to 1 msec) at rates to 250 MHz Fast 300 psec edges to 300 MHz Wide output swings to 32 V at pulse rates to 50

More information

Synchrophasors and the Smarter Grid

Synchrophasors and the Smarter Grid Synchrophasors and the Smarter Grid Synchrophasor A synchrophasor is a phasor measurement with respect to an absolute time reference. With this measurement we can determine the absolute phase relationship

More information

EverBlu. Wireless fixed data collection system

EverBlu. Wireless fixed data collection system Solution EverBlu Wireless fixed data collection system > Automatic daily meter reads > Graphical data analysis > Reliable self-healing wireless mesh network > Suitable for urban, suburban and rural environments

More information

ITU-T G /Y

ITU-T G /Y I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU G.8273.2/Y.1368.2 (01/2017) SERIES G: TRANSMISSION SYSTEMS AND MEDIA, DIGITAL

More information

Experiences with Steady-State PMU Compliance Testing using Standard Relay Testing Equipment. In:

Experiences with Steady-State PMU Compliance Testing using Standard Relay Testing Equipment. In: http://www.diva-portal.org This is the published version of a paper presented at IEEE PQ 214. Citation for the original published paper: Almas, M., Kilter, J., Vanfretti, L. (214) Experiences with Steady-State

More information

Wide-Area Measurements to Improve System Models and System Operation

Wide-Area Measurements to Improve System Models and System Operation Wide-Area Measurements to Improve System Models and System Operation G. Zweigle, R. Moxley, B. Flerchinger, and J. Needs Schweitzer Engineering Laboratories, Inc. Presented at the 11th International Conference

More information

UCP-Config Program Version: 3.28 HG A

UCP-Config Program Version: 3.28 HG A Program Description HG 76342-A UCP-Config Program Version: 3.28 HG 76342-A English, Revision 01 Dev. by: C.M. Date: 28.01.2014 Author(s): RAD Götting KG, Celler Str. 5, D-31275 Lehrte - Röddensen (Germany),

More information

AC and DC solutions- Multiple AC and DC solutions available, please contact factory for your application.

AC and DC solutions- Multiple AC and DC solutions available, please contact factory for your application. The ATX-3000 antenna tracking controller is a user-friendly microprocessor-based intelligent positioning system to reliably track inclined orbit satellites or for use as a positioner for geosynchronous

More information

Application Example Document ID: SA Rev. - September 24, 2004

Application Example Document ID: SA Rev. - September 24, 2004 Application Example Rev. - September 24, 2004 1 Summary Phasor based control of braking resistors A case study applied to large power oscillations experienced in the Swedish grid 1997 Phasor measurement,

More information

CROSS Chassis from 160 A to 450 A

CROSS Chassis from 160 A to 450 A CROSS Chassis from 160 A to 450 A STS CATALOGUE Important note! The technical data enclosed is for general information. Please note that the operating instructions and references indicated on the products

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

New Standards for Test and Calibration of Phasor Measurement Units

New Standards for Test and Calibration of Phasor Measurement Units New Standards for Test and Calibration of Phasor Measurement Units Jack Somppi Fluke Calibration NCSLI Conference Sacramento, CA August 2, 2012 2012 Fluke Corporation NCSLI PMU 20120802 1 Stability of

More information

SINGLE PHASE STS PREPAID METER

SINGLE PHASE STS PREPAID METER SINGLE PHASE STS PREPAID METER Table of Contents 1 INTRODUCTION... 2 2 STANDARDS REFERENCES... 3 3 TECHNICAL PARAMETERS... 3 3.1 Meter operating voltage... 3 3.2 Meter current parameters... 3 3.3 Meter

More information

Architectural/Engineering Specification for a. Microwave Perimeter Intrusion Detection System

Architectural/Engineering Specification for a. Microwave Perimeter Intrusion Detection System Architectural/Engineering Specification for a Microwave Perimeter Intrusion Detection System µltrawave Disclaimer Senstar, and the Senstar logo are registered trademarks, and µltrawave, Silver Network

More information

Fault Location using PMU Measurements and Wide-area Infrastructure

Fault Location using PMU Measurements and Wide-area Infrastructure Fault Location using PMU Measurements and Wide-area Infrastructure Stéphan D. Picard Mark G. Adamiak GE Digital Energy Grid Automation Markham, Canada stephan.picard@ge.com mark.adamiak@ge.com Vahid Madani

More information

Algorithms to Improve Performance of Wide Area Measurement Systems of Electric Power Systems

Algorithms to Improve Performance of Wide Area Measurement Systems of Electric Power Systems Western University Scholarship@Western Electronic Thesis and Dissertation Repository February 2014 Algorithms to Improve Performance of Wide Area Measurement Systems of Electric Power Systems Sarasij Das

More information

Quick Start Instructions EMV-INspektor V2

Quick Start Instructions EMV-INspektor V2 Connecting the : The illustration below shows the connection diagram for the. Step 1: Before connecting the to the voltage supply, first establish the connection of the to the measuring clamp adapters.

More information

Temperature Controller model MFC-301/T-Dry. Version for Dry Transformers and Motors. Technical Manual. Licht

Temperature Controller model MFC-301/T-Dry. Version for Dry Transformers and Motors. Technical Manual. Licht Temperature Controller model MFC-301/T-Dry Version for Dry Transformers and Motors Technical Manual Licht Contents 1 Introduction 2 2 Operating principle 3 2.1 General principle 3 2.2 RTD operation 3 3

More information