1 Crashing into Field to Finish in one (1) hour Let s see what we can do!

2 Using the term Field to Finish For todays purpose, we will be using the term field to finish as a generic term for using codes, to draw linework, symbology and other items automatically into a CADD file. SUCCESS The key to success when beginning your field to finish adventure is consistency and dedication.

3 3 Primary Functions of Field to Finish Separate points onto layers, based on codes Draw symbology for points (water meters, hydrants, etc.) Draw and process linework for linear features (roadways, walks, etc.)

4 3 Reasons to Utilize Field to Finish Save time in office - No need to connect dots - No need to manually separate/filter points - Draw 2d and 3d linework at the same time Save time in field - No need to keep track of breaklines - Descriptions take care of a lot of measurements Consistency throughout the office

5 3 Part to a Full Code An alpha-numeric code - IE (Invert elevation) or 4 (set to draw as needed) A descriptor, if needed - IE-12 RCP, with 12 RCP as the descriptor A controlling command - EP_PC (PC being the controlling command, telling the line to begin curve)

6 CODES The easiest way to begin setting up a code file would be to review your last 2 to 3 larger files and find what your crews use for commons items. Work with your field crews to develop a code list, as the field crews will be the people typing the codes. Include them in on this process! Try to keep codes short for fewer key strokes in the field and for time saving!

7 Sample Code List EP (edge of Pavement) EC (Edge of Concrete) HWL (Headwall) SMH (Sanitary Manhole) SSMH (Storm Sewer Manhole) FNC (Fencing) FD (Found Monument) FH (Fire Hydrant)

8 Building Office File When you are building your office file (to process points) there are many things to consider. First you will need to decide whether you want a particular code to be for linework (2d, 3d or both) or point symbology. We will look at 4 examples over the next few slides.

9 Fence 2d Polyline

10 Utility Pole - Symbology

11 EP 2d and 3d Polylines

12 Invert Elevation Text and Point

13 Additional Details in Office File Code Used in Field Full Code Your use Description - Display Main Layer Layer drawn objects are on Distinct Point Layer Layer for point number and code Dual 3d Polyline Layer Layer for 3d line Locate on real Z Locates points and symbol on elevation Non-Surface (fire hydrants, flag poles, finish floor, invert elevations)

14 Additional Details in Office File, cont. Point Groups can be used to separate control and corners, or topo Entity Type Draw 2 nd Symbol for items such as a water meter GIS/Note/Point Attribute Labels

15 GIS / Note / Point Attribute Labels

16 Command Codes NE No Elevation NOS Non-Surface B (+7) Begin Linework E (-7) End Linework PC Start Curve PT End Curve or Carlson automatically uses a 3 point curve if no PT CLO Close linework to first point of code CR Close Rectangle (Uses 3 points to draw a rectangle) JPT Joins to point # specified OFL Offset left

17 Command Codes

18 Command Codes, cont. Learning to use, and HOW to use, command codes seem to be the most time consuming and complex part of field to finish for most.

19 Suggestions from me to you CHEAT!!! Use Carlson s, or your software s, templates to begin your work. Talk to your colleague s and see if they are willing to give you their template.

20 What we didn t touch on Combined codes Additional special codes (command codes)

21 No Field to Finish

22 With Field to Finish

23 Thank you for your attendance and continued support for KAPS!!! My name is Jason Graves and my address is if you need to contact me.

Montana Association of Registered Land Surveyors Conference 2013

Montana Association of Registered Land Surveyors Conference 2013 AutoCAD CIVIL 3D Survey Features - Field to Finish This session is an introduction to the Civil 3D Survey Tools. We will cover some basics of working with Survey Databases and Automated Linework. We will

More information

The Good, The Bad, The Ugly of Field-to-Finish

The Good, The Bad, The Ugly of Field-to-Finish The Good, The Bad, The Ugly of Presented by: Michael Hyman - Carlson Software Objectives Understand the history of Field-2-Finish Best Practices processing Field Collected Data within Carlson Survey (2D

More information

Getting Started. Carlson Field to Finish

Getting Started. Carlson Field to Finish Professional Land Surveyors of Ohio 2016 Annual Conference -- Dayton Ohio Getting Started with Carlson Field to Finish Presented by Who Is That CAD Girl? Jennifer DiBona is a long time CAD consultant and

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

Clarifications in italics added July 2018

Clarifications in italics added July 2018 SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

Ohio Department of Transportation, VBA Documentation

Ohio Department of Transportation, VBA Documentation Contents 1.1 Current Versions... 2 1.2 Overview... 3 1.3 Supporting Files and Standards... 4 1.3.1 ODOT_Drainage.cel... 4 1.3.2 ODOT2013.ddb... 5 1.4 ODOT_StormSewerPlan2013.mvba... 6 1.4.1 Mode: Place

More information

CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY PROJECT NO CONSULTANT PROJECT NO.

CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY PROJECT NO CONSULTANT PROJECT NO. EXHIBIT A CONSULTING SERVICE AUTHORIZATION DATE: CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY P.O. NO. CITY EXPENSE CODE CITY PROJECT NO. 14-073 CONSULTANT

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

New Jersey American Water Geospatial Asset Planning Department. CAD to GIS Submission and Format Conversion

New Jersey American Water Geospatial Asset Planning Department. CAD to GIS Submission and Format Conversion New Jersey American Water Geospatial Asset Planning Department CAD to GIS Submission and Format Conversion Donna Short GIS Supervisor New Jersey American Water 1025 Laurel Oak Rd Voorhees NJ 08043 P: 856-309-4744

More information

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

10010 RECORD DRAWING INFORMATION

10010 RECORD DRAWING INFORMATION SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes BWSC CAD Standards for Site Plans (Design and As-Built) Type A The following CAD standards are for Type A application and involve no work in Public Street, except for connection(s) to the Boston Water

More information

Connecting the Dots Is for Kids: Advanced Survey Workflows in Autodesk AutoCAD Civil 3D

Connecting the Dots Is for Kids: Advanced Survey Workflows in Autodesk AutoCAD Civil 3D Connecting the Dots Is for Kids: Advanced Survey Workflows in Autodesk AutoCAD Civil 3D Brian Levendowski, PE CAD Technology Center, Inc. CI3217-P Collection and processing of survey data is a crucial

More information

City of Kitchener Infrastructure Services Department Engineering Services Division. CAD Standards for Engineering

City of Kitchener Infrastructure Services Department Engineering Services Division. CAD Standards for Engineering City of Kitchener Infrastructure Services Department Engineering Services Division CAD Standards for Engineering Printed: October 29, 2012 Revision History Revision Description Date Layer revisions. June

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

WATER WASTEWATER CAD DELIVERABLES SUBMISSION STANDARDS

WATER WASTEWATER CAD DELIVERABLES SUBMISSION STANDARDS WATER WASTEWATER CAD DELIVERABLES SUBMISSION STANDARDS New Braunfels, TX 78130 Approved November 15, 2004 PREFACE In order to create a consistency and increase efficiency, Comal County, Comal Appraisal

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

4) Click on Load Point Cloud to load the.czp file from Scene. Open Intersection_Demo.czp

4) Click on Load Point Cloud to load the.czp file from Scene. Open Intersection_Demo.czp Intersection 2D Demo 1) Open the Crash Zone or Crime Zone diagram program. 2) Click on to open the CZ Point Cloud tool. 3) Click on 3D/Cloud Preferences. a) Set the Cloud File Units (Feet or Meters). b)

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

SECTION GNSS & GIS MAPPING AND GEODATA

SECTION GNSS & GIS MAPPING AND GEODATA PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 83 02 A. The contractor shall collect GeoData with Global Navigation Satellite System (GNSS) coordinate locations and elevations for the work to be performed

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012 SECTION 01950 - RECORD DRAWINGS & SPACE FLOOR PLANS 1.1 RECORD DRAWINGS MATERIAL AND FORMAT A. Definition 1. Final record drawings, or as-builts, are drawings, which are revised to reflect the changes

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

Survey Control Point Observations

Survey Control Point Observations Level Name SURVEY_CTRL SURVEY_CTRL_CHK_NODE SURVEY_CTRL_NODE SURVEY_CTRL_OBS SURVEY_CTRL_REF_SYM SURVEY_CTRL_SETUPS SURVEY_CTRL_SYM SURVEY_CTRL_TXT SURVEY_DTM_BREAKLINE SURVEY_DTM_BREAKLINE_NODE SURVEY_DTM_CHECK_NODE

More information

RFP$%071114% Design%Services%Natural%Playground%Project% Village%of%Bible%Hill%

RFP$%071114% Design%Services%Natural%Playground%Project% Village%of%Bible%Hill% RFP$071114 DesignServicesNaturalPlaygroundProject VillageofBibleHill TheVillageofBibleHill(the Village )isinvitinginterestedpartiestosubmitaproposal fordesignservicesfromaqualifiedconsultanttopreparedesignservices,construction

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

CAD STANDARDS & DRAWING RECORD REQUIREMENTS

CAD STANDARDS & DRAWING RECORD REQUIREMENTS CAD STANDARDS & DRAWING RECORD REQUIREMENTS Version 3.0 City of Coquitlam * Engineering & Public Works * September 2016 3000 Guildford Way, Coquitlam, British Columbia V3B 7N2 File #: 11-5220-02/000/2

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

B17. Sewer Site Plans BULLETIN

B17. Sewer Site Plans BULLETIN BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

Bestall Collaborative Limited Planning Environment Construction Management Development

Bestall Collaborative Limited Planning Environment Construction Management Development November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

SECTION SITE SURVEYS

SECTION SITE SURVEYS SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design

More information

Module 10. Assemblies and Corridors. Objectives

Module 10. Assemblies and Corridors. Objectives NOTES Module 10 Assemblies and Corridors In this module, you learn to work with assemblies and corridors in AutoCAD Civil 3D. Corridor models are used to represent road designs in Civil 3D. An assembly

More information

Record Drawing Standards for Projects Version 2.1

Record Drawing Standards for Projects Version 2.1 for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission

More information

SURVEY GUIDANCE AND FORMS

SURVEY GUIDANCE AND FORMS Appendix H Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN SURVEY GUIDANCE AND FORMS Version 2.0 April 2014 1 Table of Contents Section 1 Survey and Mapping... 1 1.1 Introduction...

More information

1. Land survey Work. 2. Civil and Structural engineering services.

1. Land survey Work. 2. Civil and Structural engineering services. SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

Memorandum. Mayor and Board of Aldermen. Benjamin Requet, Senior Planner. Date: February 21, Request for Water and Sewer Service for Clay Canvas

Memorandum. Mayor and Board of Aldermen. Benjamin Requet, Senior Planner. Date: February 21, Request for Water and Sewer Service for Clay Canvas Memorandum To: From: Mayor and Board of Aldermen Benjamin Requet, Senior Planner February 21, 2017 Re: Request for Water and Sewer Service for Clay Canvas Please consider this request for granting water

More information

Carlson Software Inc. 102 West 2 nd Street Maysville, KY m Phone: (606) Fax: (606)

Carlson Software Inc. 102 West 2 nd Street Maysville, KY m Phone: (606) Fax: (606) Page 1 of 18 Field-to-Finish, SurvCE and Hardware Updated 1/26/2017 Survey Field-to-Finish, in Carlson Survey and SurvCE Minnesota Surveyor s Conference February 8-9, 2017 Bruce Carlson, PE President bcarlson@carlsonsw.co

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Everything Begins & Ends with a Survey Autodesk

Everything Begins & Ends with a Survey Autodesk Everything Begins & Ends with a Survey Overview: Topics Covered Survey Database Field to Finish Integrating GIS Data Additional Survey Attribute Data Survey Objects in Design Process Questions Civil 3D

More information

Charlotte County Utilities DESCRIPTION

Charlotte County Utilities DESCRIPTION As-built Drawings / Surveyor 1. Electronic copy of survey data in tabular form of the utility assets 2. A signed and sealed letter with the following statement: "I hereby certify that the as-built location

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56 OF INDEX OF 1 7 FOUNDATION TREATMENT, COMPACTION & SUBGRADING DETAIL 8 SALVAGED TOPSOIL 15 SIDEROAD PLAN-PROFILE 16 RIGHT OF WAY MONUMENT INSTALLATION DETAIL SHEET -23 PAVING DETAILS 24-29 PAVEMENT DETAILS

More information

What's the Latest with InRoads Storm & Sanitary SS1?

What's the Latest with InRoads Storm & Sanitary SS1? What's the Latest with InRoads Storm & Sanitary SS1? Joe Waxmonsky, Bentley Civil Why implement S&S? To avoid this: 2 WWW.BENTLEY.COM Single-source it 3 WWW.BENTLEY.COM StormCAD reads S&S files! StormCAD

More information

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers

More information

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

SUPPLEMENTARY STANDARD DETAIL DRAWINGS CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit

More information

Perimeter and Area: The Mysterious Connection Assessment

Perimeter and Area: The Mysterious Connection Assessment Perimeter and Area: The Mysterious Connection Assessment 1. Given the polygon below, which of the following polygons does not have the same perimeter? A. B. C. D. The Mysterious Connection Assessment Materials

More information

Autodesk Architectural Desktop Functionality for the Autodesk Building Systems User

Autodesk Architectural Desktop Functionality for the Autodesk Building Systems User 11/28/2005-1:00 pm - 2:30 pm Room:N. Hemispheres (Salon A1) (Dolphin) Walt Disney World Swan and Dolphin Resort Orlando, Florida Autodesk Architectural Desktop Functionality for the Autodesk Building Systems

More information

Engineering Department DRAWING STANDARD SPECIFICATIONS

Engineering Department DRAWING STANDARD SPECIFICATIONS DRAWING STANDARD SPECIFICATIONS June 2017 City of Surrey TABLE of CONTENTS Page i Page 1 INTRODUCTION... 1 1.1 Overview... 1 1.2 Measurements / Units... 1 1.3 Hardcopy and Digital Template... 1 2 DRAWING

More information

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST Tract Number and Subdivision Name: Engineering Firm: Contact Person: Address: City: State: Zip: Phone No. Fax No. Assessor s Parcel Number(s) Tentative

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

Table of Contents. List of Tables

Table of Contents. List of Tables T Table of Contents List of Acronyms... II Introduction... 1 1.1 Summary... 1 1.2 Project Overview... 1 1.3 Software Requirements... 2 1.3.1 AutoCAD and AutoCAD Civil 3D Submissions... 3 1.3.2 Other Submissions...

More information

Measuring the Thickness of Fills & Coatings

Measuring the Thickness of Fills & Coatings 1. Why do it? The Dipstick helps you obtain the exact thickness of fills or coatings quickly and non-destructively without coring! Because of the extreme accuracy and repeatability of the Dipstick, you

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc SurvCADDR Section - Profile Module PRODUCT DESCRIPTION engineeringsoftwareforanexpandinguniverse The Section - Profile Module creates

More information

A Practical Guide to Carlson Software Fundamentals 2015 Rick Ellis Douglas L. Aaberg, PLS Duke Gardner

A Practical Guide to Carlson Software Fundamentals 2015 Rick Ellis Douglas L. Aaberg, PLS Duke Gardner A Practical Guide to Carlson Software Fundamentals 2015 Rick Ellis Douglas L. Aaberg, PLS Duke Gardner A Cadapult Press Publication Copyright Copyright Cadapult Press, Inc. 2015 All rights reserved. No

More information

CONTRACT PLANS READING

CONTRACT PLANS READING CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil

More information

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS CITY OF ALBANY DEPARTMENT OF PUBLIC WORKS DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS Prepared By PUBLIC WORKS DEPARTMENT ALBANY, OREGON 97321 Telephone: (541) 917-7676 TABLE OF CONTENTS A 1.00

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

PUBLIC WORKS DEPARTMENT. File: E-2000 July 11, Town of Whitby Design Criteria and Engineering Standard Drawing Revisions

PUBLIC WORKS DEPARTMENT. File: E-2000 July 11, Town of Whitby Design Criteria and Engineering Standard Drawing Revisions PUBLIC WORKS DEPARTMENT File: E-2000 July 11, 2011 To: All Manual Holders and Engineering Standard Drawing Revisions Please find attached a list of the revisions to the and the Engineering Standard Drawings.

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

CONSTRUCTION PLANS. for TOWN OF YORKVILLE 2017 PAVING & DRAINAGE PROGRAM BRAUN ROAD (57TH DRIVE TO WOODLAND TRAIL) 53RD DRIVE

CONSTRUCTION PLANS. for TOWN OF YORKVILLE 2017 PAVING & DRAINAGE PROGRAM BRAUN ROAD (57TH DRIVE TO WOODLAND TRAIL) 53RD DRIVE LOG CT. TR. CONSTRUCTION PLANS for TOWN YORKVILLE INDEX Plan Sheet COVER TYPICAL SECTIONS & CONSTRUCTION DETAILS PLAN & PRILE Sheet No. 1 2 3-8 LEGEND Description EDGE WOODS DECIDUOUS TREE DECIDUOUS TREE

More information

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION SCHEDULE 10 ENGINEERING DRAWING SUBMISSION Subdivision, Development and Servicing Bylaw No. 1535 10. ENGINEERING DRAWING SUBMISSIONS TABLE OF CONTENTS 1.0 General 3 1.1. Introduction 3 1.2. General Requirements

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS SECTION 2.1 INTRODUCTION... 1 (a) Objective...1 (b) Applicability...1 2.2 SUBMITTAL

More information

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location: Rec d Rec d: GWINNETT COUNTY Department of Planning & Development One Justice Square 446 West Crogan Street, Suite 150 Lawrenceville, Georgia 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

Completed project drawing (dimensions added for reference)

Completed project drawing (dimensions added for reference) CHAPTER 5 Fundamentals IV PROJECT EXERCISE This project exercise provides point-by-point instructions for setting up the drawing with layers and then creating the objects shown in the accompanying figure.

More information

AUTOCAD CIVIL 3D 2008

AUTOCAD CIVIL 3D 2008 AUTOCAD CIVIL 3D 2008 AUSTRALIAN COUNTRY KIT 1 TABLE OF CONTENTS 2 Purpose of this document:... 4 3 Drafting and Plans Production Settings... 5 3.1 Sheet Creation... 5 3.2 Drafting and Labeling... 5 3.3

More information