1 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month January 11, 2018 Laramie January 18, 2018 November 10, 2017 December 14, $15,700,000 Prefix Name Funding Intent Letting Cost I NHPPI RAWL-WALC/FTST SEC Federal MILL/OVERLAY/SEAL COAT $8,600,000 Sum: $8,600,000 R/W 1 CB Thomas Aaron Spenny Kladianos /Allen #MULTIVALUE Prefix Name Funding Intent Letting Cost STP RIVE/GAS HILLS RD/RM 1.04 Federal HOT IN PLA RECYCLE&SEAL COAT $1,000, STP BUFF-UCRS/HOT RECYCLE/OVERLAY Federal HOT IN PLA RECYCLE&SEAL COAT $2,300,000 Sum: $3,300,000 R/W 4 JO Thomas Isaac Finkle Douma /Pecenka None 5 FR Thomas Robert Scheidemantel Douma /Pecenka None WYDOT #68205, Rule Pit Reservoir Outlet to SEO 9/14/17. Rec'd 09/22/17 WYDOT #51723, Little Wind River, to SEO 12/5/17, Rec'd 12/11/17 WYDOT #68205, Rule Pit Reservoir Outlet to SEO 9/14/17. Rec'd 09/22/17 WYDOT #51723, Little Wind River, to SEO 12/5/17, Rec'd 12/11/17 Prefix Name Funding Intent Letting Cost B STP-PM DIST 4/VAR LOC/CHIP SEAL Federal CHIP SEAL $1,500,000 Sum: $1,500,000 R/W 4 VA Thomas John Leahy Potter /Pecenka None Prefix Name Funding Intent Letting Cost PEG1831 PEG DIST 3/VAR LOC/STOCKPILE/18 State STOCKPILE $1,300,000 PEG3A19 EVANSTON/STOCKPILE State PURCHASE MATERIAL $100,000 ARSCT PEG3A20 WAMSUTTER/STOCKPILE State PURCHASE MATERIAL $100,000 Sum: $1,500,000 R/W SW Thomas Mike Garner Potter /Pecenka None 3 UI Thomas Mike Garner Potter /Pecenka None VA Thomas Mike Garner Potter /Pecenka None 1/21 12/12/17

2 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month January 11, 2018 Laramie January 18, 2018 November 10, 2017 December 14, $15,700,000 Prefix Name Funding Intent Letting Cost AGMP25X AERO 2146 STATEWE GROUP MAINTENAN State CRACK SEAL $600,000 Sum: $600,000 R/W Thomas None Unassigned None Prefix Name Funding Intent Letting Cost CN05080 RHC AL CO/HOWE RD/PAVEMENT Federal CONCRETE CROSSING SYSTEM $200,000 Sum: $200,000 R/W 1 AL Thomas Kory Cramer #MULTIVALUE #MULTIVALUE 2/21 12/12/17

3 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month February 8, 2018 Cheyenne February 15, 2018 December 8, 2017 January 11, $13,400,000 Prefix Name Funding Intent Letting Cost CN16024 IRP IRP/JO CO/CR 204/T W ROAD State RECONSTRUCTION $4,900,000 Sum: $4,900,000 R/W 4 JO Isaac Finkle Stogsdill /Allen Unassigned Prefix Name Funding Intent Letting Cost B STP-PM DIST 3/VAR LOC/CONTRACT PATCH Federal CONTRACT PATCH $2,400,000 Sum: $2,400,000 R/W 3 VA Mike Garner Potter /Pecenka None Prefix Name Funding Intent Letting Cost SCP-TC TORR/SUGR/WEST SEC/WY 156 State OVERLAY/DRAINAGE $2,300,000 Sum: $2,300,000 R/W 2 GO Thomas Buck Klemola Doering /Allen #MULTIVALUE Prefix Name Funding Intent Letting Cost DR51724 NHPP ER / HUDSON-RIVERTON Federal FLOOD REPAIR $600,000 DR51725 STP ER / ETHT-KINN/N ETHT Federal FLOOD REPAIR $500,000 DR51726 NHPP ER/TOWN OF HUDSON Federal FLOOD REPAIR $200,000 DR51728 NHPP ER / FT WASH-DIVR Federal FLOOD REPAIR $200,000 DR51730 STP ER / LAND-ETHT Federal FLOOD REPAIR $300,000 DR51732 NHPP HUDS-RIVE/N RIVE Federal FLOOD REPAIR $400,000 Sum: $2,200,000 R/W 5 FR Thomas Erik Smith DePew /Allen None Weber/McKee 3/21 12/12/17

4 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month February 8, 2018 Cheyenne February 15, 2018 December 8, 2017 January 11, $13,400,000 Prefix Name Funding Intent Letting Cost B HSIP DIST 1 & 4/VAR LOC/EPOXY Federal EPOXY STRIPING $800,000 Sum: $800,000 R/W V VA Thomas None Potter /Pecenka None Prefix Name Funding Intent Letting Cost B HSIP DIST 3/I-80/EPOXY STRIPING Federal EPOXY STRIPING $800,000 Sum: $800,000 R/W 3 VA Peter Stinchcomb Potter /Pecenka None 4/21 12/12/17

5 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month March 8, 2018 Casper March 15, 2018 January 5, 2018 February 8, $44,900,000 Prefix Name Funding Intent Letting Cost STP GILL-MONT/GARNER LAKE RD/PHS I Federal NEW CONSTRUCTION $17,600,000 Sum: $17,600,000 R/W 4 CL **PoDI** -- Josh Jundt Stogsdill /Allen Weber/McKee Hard water Well #5, Order No AMD3, Permit No. U.W Prefix Name Funding Intent Letting Cost STP ETHT/ETHT SO Federal RECONSTRUCTION $16,600, STP-E ETHT/ETHT SO/ENHC Federal PATHWAY $600,000 Sum: $17,200,000 R/W 5 FR **PoDI** - Thomas Erik Smith Stogsdill /Pecenka Weber/McKee To SEO 6/26/17, Little Wind River WTDOT # Rec'd 6/30/17 To SEO 6/26/17, Little Wind River WTDOT # Rec'd 6/30/17 Prefix Name Funding Intent Letting Cost N SCP-TC RAWL-MUDG/LAMONT SEC State MILL/LEVEL/OVRLY/PASSING LANE $6,500,000 Sum: $6,500,000 R/W 2 CB Thomas Jack Stone Potter /Pecenka Edmonds/Alexander Prefix Name Funding Intent Letting Cost SCP-TC MAND-HYAT State LEVEL/OVERLAY/CHIP/ISO SAFETY $1,700,000 Sum: $1,700,000 R/W 5 BH Kelly Erickson DePew /Allen None 5/21 12/12/17

6 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month March 8, 2018 Casper March 15, 2018 January 5, 2018 February 8, $44,900,000 Prefix Name Funding Intent Letting Cost STP WILS-TEVL/TEVL RD/WY 390 Federal MILL/LEVEL/OVERLAY $1,400,000 Sum: $1,400,000 R/W 3 TE Bob Hammond Douma /Pecenka None WYDOT# 65365, Snake River/Granite Cr. to SEO 4/19/17 epermit. Recd 05/01/17. Prefix Name Funding Intent Letting Cost STPU-TO TORR/INDUSTRIAL PARK AV/PHS II Federal PAVING $300,000 Sum: $300,000 R/W 2 GO Thomas Buck Klemola Stogsdill /Allen Unassigned Prefix Name Funding Intent Letting Cost P STP-E LABG STS/US 189/ENHANMENT Federal ENHANMENT; SHRUBS; LIGHTING $200,000 Sum: $200,000 R/W 3 LN None Stogsdill /Pecenka None 6/21 12/12/17

7 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month April 12, 2018 Gillette April 19, 2018 February 9, 2018 March 15, $25,100,000 Prefix Name Funding Intent Letting Cost N NHPP THAY-ALPN/ETNA NORTH Federal WEN 5 LANES $14,100,000 Sum: $14,100,000 R/W 3 LN **PoDI** Mike Garner DePew /Allen Henderson/Alexander Prefix Name Funding Intent Letting Cost STP CODY-MONT/CODY NORTH Federal LEVEL/OVERLAY/CHIP SEAL $3,500,000 Sum: $3,500,000 R/W 5 PA Todd Frost Stogsdill /Allen Unassigned Prefix Name Funding Intent Letting Cost B STP-PM DIST 2/VAR LOC/CONTRACT PATCH Federal CONTRACT PATCHING $3,300,000 Sum: $3,300,000 R/W 2 VA Jack Stone Potter /Pecenka None Prefix Name Funding Intent Letting Cost B HSIP DIST 1&5/SIGNAL DETECTION UPGR Federal SIGNAL DETECTION UPGRADE $1,600,000 Sum: $1,600,000 R/W V VA Kevin Erickson Traffic Lead None Prefix Name Funding Intent Letting Cost B STPU-LN LAND STS/JEFF ST & MAIN ST Federal RECONSTRUCTION $900,000 B185A01 ARSCT ARS/LANDER/JEFFERSON ST State WATER & SEWER $500,000 Sum: $1,400,000 R/W 5 FR Erik Smith Doering /Allen Edmonds/Alexander None Doering /Allen None 7/21 12/12/17

8 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month April 12, 2018 Gillette April 19, 2018 February 9, 2018 March 15, $25,100,000 Prefix Name Funding Intent Letting Cost B HSIP GILL/JACK/VAR LOC/TRAF SIGNALS Federal DILEMMA ZONE PROTECTION $600,000 Sum: $600,000 R/W V VA Bob Hammond Traffic Lead None Prefix Name Funding Intent Letting Cost NHPP CASP STS/HAT SIX RD Federal NEW TRAFFIC SIGNAL $300,000 Sum: $300,000 R/W 2 NA Jack Stone Traffic Lead None Prefix Name Funding Intent Letting Cost TRFSN18 SCP STWD/I-25/I-90/LOGO SIGNS State UPGRADE & REPAIR LOGO SIGNS $200,000 Sum: $200,000 R/W V VA Isaac Finkle Potter /Pecenka None Prefix Name Funding Intent Letting Cost N NHPP-RF AHO ST LINE-AFTON Federal NEW RIGHT OF WAY FEN $100,000 Sum: $100,000 R/W 3 LN #MULTIVALUE #MULTIVALUE #MULTIVALUE 8/21 12/12/17

9 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month May 3, 2018 Cody May 10, 2018 March 2, 2018 April 5, $17,700,000 Prefix Name Funding Intent Letting Cost N NHPP LUSK-VNTS/E SEC Federal RECONSTRUCTION $11,400,000 Sum: $11,400,000 R/W 2 NI James Barnes Douma /Pecenka #MULTIVALUE To SEO 7/25/16, Recd 09/12/16, WYDOT 67338, McMaster Res. To SEO 09/27/16 Van Tassell Ditch, WYDOT 67440, Recd 10/04/16 Prefix Name Funding Intent Letting Cost DR51740 STP ER/FARS-LAND/S LAND/BACKSLOPES Federal SLE REPAIR $500,000 DR51742 NHPP ER/LAND-RIVE/N LAND/RM Federal SLE REPAIR $300,000 DR51743 STP SINKS CANYON/S LAND Federal SLE REPAIR $200,000 DR51776 STP ER / LANDSLE CLEANUP Federal SLE REPAIR $400,000 Sum: $1,400,000 R/W 5 FR Erik Smith DePew /Allen Wasson/McKee Prefix Name Funding Intent Letting Cost N NHPP RIVE-SHOS Federal MICROSURFA $1,200,000 N NHPP SHOS/NORTH Federal MICROSURFA $200,000 Sum: $1,400,000 R/W 5 FR Robert Scheidemantel Potter /Pecenka None Prefix Name Funding Intent Letting Cost STP-GM KAYC-BARN/CULVERT LINING Federal CULVERT LINING/MAINTENAN $200,000 I NHPPI-GM CASP-KAYC/CULVERT LINING Federal CULVERT LINING/MAINTENAN $900,000 Sum: $1,100,000 R/W 2 JO Chad Aagard Stogsdill /Allen Unassigned VA Chad Aagard Stogsdill /Allen Unassigned 9/21 12/12/17

10 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month May 3, 2018 Cody May 10, 2018 March 2, 2018 April 5, $17,700,000 Prefix Name Funding Intent Letting Cost B STP-BR DIST 4/VAR LOC/BR REHAB Federal BRGE REHAB $800,000 Sum: $800,000 R/W 4 VA Josh Jundt Potter /Pecenka Unassigned Prefix Name Funding Intent Letting Cost DR42894 NHPPI ER/I-90 Federal SLE REPAIR $800,000 Sum: $800,000 R/W 4 SH #MULTIVALUE #MULTIVALUE None Prefix Name Funding Intent Letting Cost N NHPP TMOP-WORL Federal LEFT TURN LANE $700,000 Sum: $700,000 R/W 5 HS Kaia Tharp Doering /Allen Edmonds/Alexander Prefix Name Funding Intent Letting Cost DR15574 DR CHEY MARG/I-25/I-80 INTERCHGE State DAMAGE REPAIR $100,000 Sum: $100,000 R/W 1 LA Wayne Shenefelt Stogsdill /Allen None 10/21 12/12/17

11 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month July 12, 2018 Casper July 19, 2018 May 11, 2018 June 14, $3,500,000 Prefix Name Funding Intent Letting Cost STP DVLT/HWY 24 Federal WENING & SIGNALIZATION $1,600,000 Sum: $1,600,000 R/W 4 CR Warren Oyler Douma /Pecenka Weber/McKee Prefix Name Funding Intent Letting Cost B STP-GM DIST 5/VAR LOC/CULVERT/SIPHON Federal SIPHON VALVE/CULVERT CLEANING $600,000 Sum: $600,000 R/W 5 VA Erik Smith Stogsdill /Allen Henderson/Alexander Prefix Name Funding Intent Letting Cost I NHPPI-GM CHUG MARG/ROCK SCALING Federal ROCK SCALING $600,000 Sum: $600,000 R/W 2 PL Tim Rasnake Crosby /Pecenka Henderson/Alexander Prefix Name Funding Intent Letting Cost I SSP-TO I-25/N CHEY State CLOSURE GATES/SIGNS/FLASHERS $200,000 Sum: $200,000 R/W 1 LA Wayne Shenefelt Traffic Lead None Prefix Name Funding Intent Letting Cost DR51741 STP ER/FARS-LAND/WOODEN BIN WALL Federal FLOOD REPAIR $200,000 Sum: $200,000 R/W 5 FR #MULTIVALUE DePew /Allen #MULTIVALUE 11/21 12/12/17

12 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month July 12, 2018 Casper July 19, 2018 May 11, 2018 June 14, $3,500,000 Prefix Name Funding Intent Letting Cost N SSP-TO YENP-CODY State SPEED LIMIT SIGNING $200,000 Sum: $200,000 R/W 5 PA None #MULTIVALUE None Prefix Name Funding Intent Letting Cost N SSP-TO CODY STS/VAR LOCATIONS State LEFT TURN/SERVI POINTS $100,000 Sum: $100,000 R/W 5 PA None Traffic Lead None 12/21 12/12/17

13 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month September 6, 2018 Sheridan September 13, 2018 July 6, 2018 August 9, $25,200,000 Prefix Name Funding Intent Letting Cost I NHPPI RKSP-RAWL/POINT OF ROCKS WEST Federal RESURFA/STRUCTURE REPAIR $17,500,000 Sum: $17,500,000 R/W 3 SW Peter Stinchcomb DePew /Allen #MULTIVALUE Prefix Name Funding Intent Letting Cost I NHPPI I-25/I-90 INTG Federal CONCRETE REHAB $3,300,000 Sum: $3,300,000 R/W 4 JO Thomas Isaac Finkle Douma /Pecenka None WYDOT #68205, Rule Pit Reservoir Outlet, sent SEO on 9/14/17. Rec'd Prefix Name Funding Intent Letting Cost B HSIP DIST 3/RKSP STS/SIGNALS Federal SIGNAL REPLAMENTS $1,200,000 Sum: $1,200,000 R/W 3 SW #MULTIVALUE #MULTIVALUE #MULTIVALUE Prefix Name Funding Intent Letting Cost PEG1851 PEG DIST 5/VAR LOC/STOCKPILE/18 State STOCKPILE $1,200,000 Sum: $1,200,000 R/W 5 VA Unassigned Potter /Pecenka None Prefix Name Funding Intent Letting Cost B HSIP STWD/CORROR PENNANT SIGNING Federal PENNANT SIGNING $1,000,000 Sum: $1,000,000 R/W V VA None Potter /Pecenka None 13/21 12/12/17

14 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month September 6, 2018 Sheridan September 13, 2018 July 6, 2018 August 9, $25,200,000 Prefix Name Funding Intent Letting Cost B HSIP STWD/CURVE ALIGNMENT/CHEVRON Federal CURVE ALIGNMNT/CHEVRON SIGNING $700,000 Sum: $700,000 R/W V VA None Potter /Pecenka None Prefix Name Funding Intent Letting Cost B SSP-TO DIST 3/ROAD CLOSURE/VAR LOC State ROAD CLOSURE/LUMINAIRES $300,000 Sum: $300,000 R/W 3 VA Jennifer Hoffman Traffic Lead None 14/21 12/12/17

15 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month October 11, 2018 Rock Springs October 18, 2018 August 10, 2018 September 13, $53,400,000 Prefix Name Funding Intent Letting Cost I NHPPI LYMAN-GRNG/COUNTY LINE WEST Federal MILL & OVERLAY $15,100,000 Sum: $15,100,000 R/W 3 UI Damon Newsome Potter /Pecenka None Prefix Name Funding Intent Letting Cost STP GILL/LAKEWAY SO SEC Federal RECONSTRUCTION/5 LANES $11,600, A03 ARSCT ARS/CL CO/LAKEWAY SOUTH SECT State SEWALK & CRUSHED BASE $400,000 Sum: $12,000,000 R/W 4 CL Josh Jundt Kladianos /Allen Henderson/Alexander None Unassigned None Hard water Well #5, Order No AMD3, Permit No. U.W Hard water Well #5, Order No AMD3, Permit No. U.W Prefix Name Funding Intent Letting Cost I NHPPI RAWL-LARA/HERRICK-QUEALY DOME Federal MILL/OVERLAY/SEAL COAT $9,100,000 Sum: $9,100,000 R/W 1 AL Kory Cramer #MULTIVALUE #MULTIVALUE Prefix Name Funding Intent Letting Cost P STP JO CO-CL CO/DIST BOUNDARY Federal MILL/LEVEL/2" OVERLAY $7,600,000 Sum: $7,600,000 R/W 2 JO Chad Aagard Kladianos /Allen Unassigned Prefix Name Funding Intent Letting Cost P SCP-TC CRST-BAGGS/MUDDY CR SOUTH State MILL/OVERLAY/SEAL COAT $3,800,000 Sum: $3,800,000 R/W 1 CB #MULTIVALUE #MULTIVALUE #MULTIVALUE 15/21 12/12/17

16 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month October 11, 2018 Rock Springs October 18, 2018 August 10, 2018 September 13, $53,400,000 Prefix Name Funding Intent Letting Cost B STP-PM DIST 3/VAR LOC/CRACK SEAL Federal CRACK SEAL $2,000,000 Sum: $2,000,000 R/W 3 VA Clint Lockman Potter /Pecenka None Prefix Name Funding Intent Letting Cost STP BASIN-BURL/OTTO EAST Federal LEVEL/OVERLAY/CHIP SEAL $1,600,000 Sum: $1,600,000 R/W 5 BH Thomas Michael E. Miller Doering /Allen Unassigned Prefix Name Funding Intent Letting Cost B STP-PM DIST 4/VAR LOC/CRACK SEAL Federal CRACK SEAL $600,000 Sum: $600,000 R/W 4 VA Isaac Finkle Potter /Pecenka None Prefix Name Funding Intent Letting Cost B STP-GM DIST 5/VAR LOC/CRACK SEAL Federal CRACK SEAL $600,000 Sum: $600,000 R/W 5 VA Kelly Erickson Potter /Pecenka None Prefix Name Funding Intent Letting Cost B STP-PM DIST 1/VAR LOC/CRACK SEAL Federal CRACK SEAL $500,000 Sum: $500,000 R/W 1 VA Unassigned Potter /Pecenka None 16/21 12/12/17

17 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month October 11, 2018 Rock Springs October 18, 2018 August 10, 2018 September 13, $53,400,000 Prefix Name Funding Intent Letting Cost B HSIP STWD/RUMBLE STRIPS/STRIPE Federal RUMBLE STRIPS/STRIPE $500,000 Sum: $500,000 R/W V VA John Leahy Kladianos /Allen None 17/21 12/12/17

18 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month November 8, 2018 Laramie November 15, 2018 September 7, 2018 October 11, $47,700,000 Prefix Name Funding Intent Letting Cost I NHPPI LARA-CHEY/COUNTY LINE WEST Federal MILL/OVERLAY/SEAL COAT $7,700,000 Sum: $7,700,000 R/W 1 AL #MULTIVALUE Doering /Allen #MULTIVALUE Prefix Name Funding Intent Letting Cost N NHPP HUDS-RIVE/HUDS NORTH Federal LEVEL/OVLY/CHIPSEAL/PASS LANES $7,600,000 Sum: $7,600,000 R/W 5 FR Erik Smith Douma /Pecenka Edmonds/Alexander Prefix Name Funding Intent Letting Cost AUBN-AFTON/AUBN NORTH State OVERLAY $900,000 SCP-TC AUBN-AFTON State OVERLAY/FDR $6,400,000 Sum: $7,300,000 R/W 3 LN Mike Garner Potter /Pecenka Weber/McKee Prefix Name Funding Intent Letting Cost I NHPPI MOOR-SUND/MOOR EAST Federal MILL AND OVERLAY $5,800,000 Sum: $5,800,000 R/W 4 CR Warren Oyler Doering /Allen Unassigned Prefix Name Funding Intent Letting Cost N SCP-TC CHEY-TORR/GUN BARREL SOUTH State MILL/OVERLAY/SEAL COAT $5,100,000 Sum: $5,100,000 R/W 1 LA Wayne Shenefelt Douma /Pecenka #MULTIVALUE 18/21 12/12/17

19 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month November 8, 2018 Laramie November 15, 2018 September 7, 2018 October 11, $47,700,000 Prefix Name Funding Intent Letting Cost N NHPP DANL JCT-HOBK/RIM SOUTH Federal LEVEL & OVERLAY $5,000,000 Sum: $5,000,000 R/W 3 SB Thomas Daniel McGillivray Doering /Allen None Prefix Name Funding Intent Letting Cost N SCP-TC MUDG-CASP/ALCOVA SEC State MILL/LEVEL/4"OVRLY/PASSING LAN $5,000,000 Sum: $5,000,000 R/W 2 NA Jack Stone Douma /Pecenka Wasson/McKee Prefix Name Funding Intent Letting Cost B NHPP-BR DIST 1/VAR LOC/BRGE REHAB Federal BRGE REHAB $3,500,000 Sum: $3,500,000 R/W 1 VA Kevin Erickson Potter /Pecenka Edmonds/Alexander Prefix Name Funding Intent Letting Cost CN18057 STP-BROS CR CO/BRDG ARCH CREEK/DXC Federal BRGE REPLAMENT $700,000 Sum: $700,000 R/W 4 CR Warren Oyler Potter /Pecenka Wasson/McKee recd 05/20/14 Hard Water Well #5 WYDOT #32975 to SEO 05/10/16, Recd 05/16/16. 19/21 12/12/17

20 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month December 5, 2018 December 12, 2018 October 4, 2018 November 7, $15,200,000 Prefix Name Funding Intent Letting Cost B STP-PM DIST 3/VAR LOC/CONTRACT PATCH Federal CONTRACT PATCH $3,400,000 Sum: $3,400,000 R/W 3 VA Mike Garner Potter /Pecenka None Prefix Name Funding Intent Letting Cost B STP-PM DIST 3/VAR LOC/CHIP SEAL Federal CHIP SEAL $2,600,000 Sum: $2,600,000 R/W 3 VA Clint Lockman Potter /Pecenka None WYDOT# Green River to SEO 10/06/17, Recd 10/12/17. Prefix Name Funding Intent Letting Cost P STP LARA/GRAND AVE/3RD-15TH Federal MILL/OVERLAY/ADA $2,500,000 Sum: $2,500,000 R/W 1 AL Thomas Kory Cramer Kladianos /Allen Wasson/McKee Dowlin Ditch WYDOT# to SEO 09/13/17, Rec'd 09/25/17. Prefix Name Funding Intent Letting Cost STP CHEY/HORS CR/SO LODGPL CR SEC Federal MILL & OVERLAY $2,300,000 Sum: $2,300,000 R/W 1 LA Kevin Erickson #MULTIVALUE Weber/McKee Prefix Name Funding Intent Letting Cost STP RIVE-SAND/BEAVER RIM Federal LEVEL/OVERLAY/CHIP SEAL $2,200,000 Sum: $2,200,000 R/W 5 FR Robert Scheidemantel Doering /Allen #MULTIVALUE 20/21 12/12/17

21 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month December 5, 2018 December 12, 2018 October 4, 2018 November 7, $15,200,000 Prefix Name Funding Intent Letting Cost N SCP-TC TMOP-WORL/LU NO State LEVEL/OVERLAY/CHIPSEAL $2,200,000 Sum: $2,200,000 R/W 5 HS Kelly Erickson Douma /Pecenka Unassigned 21/21 12/12/17

March 8, 2018 Casper March 15, 2018 January 5, 2018 February 8, $25,600,000

March 8, 2018 Casper March 15, 2018 January 5, 2018 February 8, $25,600,000 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month March 8, 2018 Casper March 15, 2018 January 5, 2018 February 8, 2018 7 $25,600,000 Prefix Name Funding

More information

April 12, 2018 Gillette April 19, 2018 February 9, 2018 March 15, $26,700,000

April 12, 2018 Gillette April 19, 2018 February 9, 2018 March 15, $26,700,000 Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total s Total for Month April 12, 2018 Gillette April 19, 2018 February 9, 2018 March 15, 2018 9 $26,700,000 Prefix Name Funding

More information

ATTENTION! Beginning with the January 2019 letting, sealed bids will be. received until 9:00 AM. Any bids received at the letting after

ATTENTION! Beginning with the January 2019 letting, sealed bids will be. received until 9:00 AM. Any bids received at the letting after ATTENTION! Beginning with the January 2019 letting, sealed bids will be received until 9:00 AM. Any bids received at the letting after 9:00 AM will be returned to the bidders unopened. Scheduled Letting

More information

UTILITY SERVICE/REPAIR PERMIT

UTILITY SERVICE/REPAIR PERMIT Form M-21 Revised: September TRANSPORTATION COMMISSION OF WYOMING and its UTILITY SERVICE/REPAIR PERMIT 1. Parties. The parties to this License are, hereinafter referred to as Permittee, whose address

More information

2018 District 1 Highway Construction Program

2018 District 1 Highway Construction Program District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last

More information

SUCCESSFUL IMPLEMENTATION OF STEEL COATING AND BRIDGE REHAB PROJECTS

SUCCESSFUL IMPLEMENTATION OF STEEL COATING AND BRIDGE REHAB PROJECTS SUCCESSFUL IMPLEMENTATION OF STEEL COATING AND BRIDGE REHAB PROJECTS Aaron Garza, P.E. 10/11/17 Table Of Contents 1 Rainbow Bridge: Overview 3-4 2 Rainbow Bridge: Inspection Records 5 3 Rainbow Bridge:

More information

2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast

2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast 2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast Our Mission is to upgrade and maintain a safe and efficient road system We are making a difference! Miles of roads in GT

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56 OF INDEX OF 1 7 FOUNDATION TREATMENT, COMPACTION & SUBGRADING DETAIL 8 SALVAGED TOPSOIL 15 SIDEROAD PLAN-PROFILE 16 RIGHT OF WAY MONUMENT INSTALLATION DETAIL SHEET -23 PAVING DETAILS 24-29 PAVEMENT DETAILS

More information

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median

More information

2018 PARKING LOT MAINTENANCE & REPAIR

2018 PARKING LOT MAINTENANCE & REPAIR Drawing Name: D:\Projects\CSU Parking Lot\Dwg\Sheets\Cover Monday, Sheet.dwg May 14, 2018 10:28 AMBy: RhondaBunner 2018 PARKING LOT MAINTENANCE & REPAIR BENCHMARKS Coordinate Control VERTICAL DATUM: HORIZONTAL

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

Yavapai County Development Services

Yavapai County Development Services Yavapai County Development Services Prescott Office 1120 Commerce Dr., Prescott, AZ 86305 (928) 771-3214 Fax: (928) 771-3432 Cottonwood Office 10 S. 6 th Street, Cottonwood, AZ 86326 (928) 639-8151 Fax:

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL 1730 VARSITY DRIVE, SUITE 500, RALEIGH, NC 27606 TEL (919) 233-8091 FAX (919) 233-8031 LETTER OF TRANSMITTAL ADDRESS: ATTENTION: 80-A East Street Pittsboro, NC 27312-0130 Lynn Richardson Chatham County

More information

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, FEBRUARY 24, 2014

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, FEBRUARY 24, 2014 The Board of Public Works and Safety of Plymouth, Indiana, met in Regular Session on February 24, 2014, at 6:00 p.m. in the Council Chambers of the City Building, 124 N. Michigan St., Plymouth, IN. Mayor

More information

Board Members Present: Bettina M. Martin (Chair), Raymond E. Carlton, Norine H. Clarke, James L. Desjardins. of Meeting)

Board Members Present: Bettina M. Martin (Chair), Raymond E. Carlton, Norine H. Clarke, James L. Desjardins. of Meeting) TOWN OF DIXFIELD Minutes of Meeting Board of Selectmen/Assessors/Overseers of the Poor Monday, July 9, 2007 5:00 p.m., Ludden Memorial Library Board Members Present: Bettina M. Martin (Chair), Raymond

More information

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE San Francisco Water Power Sewer SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS CONTRACT NO. WW-654 ADDENDUM NO. 3 Signatures: 9i;,.,,:.._\

More information

PL N 84TH PL N IVES CT N. Mills Creek 85TH AVE N LN N WEAVER LAKE RD N. PUD Concept Stage Plan 83RD PL N NEIGHBORHOOD LOCATION MAP

PL N 84TH PL N IVES CT N. Mills Creek 85TH AVE N LN N WEAVER LAKE RD N. PUD Concept Stage Plan 83RD PL N NEIGHBORHOOD LOCATION MAP ARROWWOOD LN N 88TH PL N JONQUIL LN N IVES CT N 88TH PL N 88TH AVE N 88TH PL N 88TH AVE N COTTONWOOD LN N ZACHARY LN N 87TH AVE N 87TH PL N GOLDENROD LN N Mills Creek ZACHARY LN N 86T H AVE N 86TH AVE

More information

Jointed Precast Concrete Pavement

Jointed Precast Concrete Pavement NATIONAL PRECAST CONCRETE ASSOCIATION Manual for Jointed Precast Concrete Pavement 3rd Edition Authors Peter Smith, P.E. Mark B. Snyder, Ph.D., P.E. Graphic Designer Deborah Templeton NPCA Precast Concrete

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND

More information

Permits Weekly Report

Permits Weekly Report 11-112650-000-00-BA Status: Issued Create Date: 11/07/2011 Issue Date: 01/03/2012 Tax ID: 21831310103 Sub Code: Accessory Structure Work Code: Addition Site Location: 9627 MULLEN RD SE, OLYMPIA R/T/S:

More information

Design and Construction of Highway Pavement Joint Systems

Design and Construction of Highway Pavement Joint Systems Design and Construction of Highway Pavement Joint Systems Troubleshooting Joint Design and Construction Issues Mark B. Snyder, Ph.D., P.E. Engineering Consultant to the American Concrete Pavement Association

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

1

1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

More information

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM YAKIMA COUNTY PUBLIC SERVICES DEPARTMENT 6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2018 2023 COUNTY COMMISSIONERS J. Rand Elliott Ron Anderson Michael D. Leita DIRECTOR Vern M. Redifer, P.E. COUNTY ENGINEER

More information

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES October 9, 2017

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES October 9, 2017 CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES October 9, 2017 The Supervisors of Clay Township met on a regularly scheduled meeting date of October 9, 2017, at the Clay Township Municipal

More information

744 Kent Minh, Project Engineer

744 Kent Minh, Project Engineer San Francisco Water Power Sewer Senricos of the San Francisco Public Utilities Commis 'on SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS

More information

SR Participant Directory

SR Participant Directory Charles Aardema Name: Charles Aardema Current Position(s): Asst Scoutmaster, Troop 2822 Experience: 14 years Name: Cathy Ball Current Position(s): Unit Commissioner District: Rivers Experience: 6 years

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work PROGRAM/PROJT NAME (COUNTY) ADA Curb Ramp Implementation (Various) STP $1,000,000 Airport Improvement Program (Various) STATE $4,000,000 Betterments, Dams (Various) Betterments, Roadway Preservation (Various)

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

Company. Signed: Date:

Company. Signed: Date: ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

Page 1 of 6. June 1, 2017 BOARD MATTER D-3. Consider Assignments of Grazing and Agricultural Lease and Special Use Lease

Page 1 of 6. June 1, 2017 BOARD MATTER D-3. Consider Assignments of Grazing and Agricultural Lease and Special Use Lease June 1, 2017 BOARD MATTER D-3 ACTION: Consider Assignments of Grazing and Agricultural Lease and Special Use Lease AUTHORITY: W.S. 36-5-105(d); Board of Land Commissioners Rules and Regulations, Chapter

More information

PERSONS TO ADDRESS THE BOARD

PERSONS TO ADDRESS THE BOARD Penn Bio Organics Conditional Use September 5, 2000 The Conditional Use hearing for Penn Bio Organics was called to order at 7:36 p.m. by the Chairman, Michael Kelleher with members Richard Lahr and Dave

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

SUPERVISORS MEETING, WEDNESDAY, JULY 20, 2016 PAGE 1

SUPERVISORS MEETING, WEDNESDAY, JULY 20, 2016 PAGE 1 SUPERVISORS MEETING, WEDNESDAY, JULY 20, 2016 PAGE 1 Phillip Kline, Chairperson of the Board, called the meeting of the Alsace Township Board of Supervisors to order. Present were Phillip Kline, Michael

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

BOOK 92 PAGE 36 April 16, 2014 Workshop

BOOK 92 PAGE 36 April 16, 2014 Workshop WASHINGTON COUNTY BOARD OF COUNTY COMMISSIONERS, Commission Board Room 1331 South Blvd., Chipley, FL 32428 BOOK 92 PAGE 36 DISTRICT 1 DISTRICT 2 DISTRICT 3 DISTRICT 4 DISTRICT 5 Alan Bush Joel Pate Charles

More information

Kansas Department of Transportation DISTRICT 4. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 4. Project(s): Min: Max: Page 1 of 11 BETTIS ASPHALT & (2) APAC-KANSAS INC SHEARS DIVISION (3) KILLOUGH SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD

More information

Kansas Department of Transportation Construction and Materials EARLIEST START DATE: LATEST START DATE: CONSTRUCTION OFFICE:

Kansas Department of Transportation Construction and Materials EARLIEST START DATE: LATEST START DATE: CONSTRUCTION OFFICE: Tuesday, March 19, 2019 1 PROJECT NO.: U073-007 KA 52-01 COUNTY: BROWN CONVT AUGUST 26, 2019 HORTON PROJECT NO.: 043 C 4897-01 COUNTY: JACKSON DESCRIPTION: SIGNING JUNE 24, 2019 HORTON PROJECT NO.: I035-046

More information

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction

More information

LA DOTD s Nighttime Standards for Construction Operations. Presented by: Tom Ervin Traffic Solutions, Inc.

LA DOTD s Nighttime Standards for Construction Operations. Presented by: Tom Ervin Traffic Solutions, Inc. LA DOTD s Nighttime Standards for Construction Operations Presented by: Tom Ervin Traffic Solutions, Inc. NIGHTTIME CONSTRUCTION OPERATIONS (02/06) NIGHTTIME CONSTRUCTION OPERATIONS (02/06): Section 105,

More information

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 The Asphalt Indexes for the Month of August 2016 are: ACI -

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

Chairman called regular meeting to order; Mr. Lawson led all in attendance in Prayer and pledge of allegiance.

Chairman called regular meeting to order; Mr. Lawson led all in attendance in Prayer and pledge of allegiance. The Brooks County Board of Commissioners met for its Monthly Workshop and Regular Monthly Meeting on Monday, March 5, 2012 at 5:00 p.m. in the Commissioners Meeting Room located at the Brooks County Office

More information

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES September 11, 2017

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES September 11, 2017 CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES September 11, 2017 The Supervisors of Clay Township met on a regularly scheduled meeting date of September 11, 2017, at the Clay Township Municipal

More information

SUPERVISORS MEETING, WEDNESDAY, MARCH 16, 2016 PAGE 1

SUPERVISORS MEETING, WEDNESDAY, MARCH 16, 2016 PAGE 1 SUPERVISORS MEETING, WEDNESDAY, MARCH 16, 2016 PAGE 1 Phil Kline, Chairperson, called the meeting of the Alsace Township Board of Supervisors to order. Present were Phil Kline, Michael Stump, Sam Mallatratt,

More information

What s Inside? Free Flu Shot Clinic in the Activity Center Monday, September 17th 9:00 am - 10:30am

What s Inside? Free Flu Shot Clinic in the Activity Center Monday, September 17th 9:00 am - 10:30am A newsletter for the residents of the Williston Woods Cooperative Housing CORP. September 2018 Edition BAND CONCERT ICE CREAM SOCIAL Tues. Sept. 11 th 7:00 P.M. RAIN OR SHINE Bring your family, a friend,

More information

2007 Year Review File: c Date: December Slide Location

2007 Year Review File: c Date: December Slide Location 2007 YEAR REVIEW OF GEOHAZARD SITES TABLE 1: LISTING OF SITES AND RISK ASSESSMENT (2007) Slide Site Name 2007 Active Inactive Site GP1 Hwy 40:42 Wapiti Hill (5 km S. of Wapiti River Bridge) 11 * 4 44 GP2

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

Magnolia Church Road has a box culvert that is deteriorating; and in need of repair; County Engineer will look at it.

Magnolia Church Road has a box culvert that is deteriorating; and in need of repair; County Engineer will look at it. The Brooks County Board of Commissioners met for its Monthly Workshop and Regular Monthly Meeting on Monday, September 10, 2012 at 5:00 p.m. in the Commissioners Meeting Room located at the Brooks County

More information

MARQUETTE GREENWAY TRAIL

MARQUETTE GREENWAY TRAIL ------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES August 8, 2011

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES August 8, 2011 CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES August 8, 2011 The Supervisors of Clay Township met on a regularly scheduled meeting date of August 8, 2011, at the Clay Township Municipal Office,

More information

PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS

PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS Project Design Services Unit June 2018 http://ihub/projectdelivery/design/index.html PROJECT RATING FORM This is filled out for ALL Process B projects.

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

Special Provision No. 999S29 May 2010

Special Provision No. 999S29 May 2010 DOWELS INTO CONCRETE - Item No. Special Provision No. 999S29 May 2010 1.0 SCOPE This special provision covers the requirements for the installation and acceptance of metallic dowels in concrete. 2.0 REFERENCES

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

To: All Holders of the Virginia Department of Transportation s 2001 Road and Bridge Standards

To: All Holders of the Virginia Department of Transportation s 2001 Road and Bridge Standards DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 PHILIP A. SHUCET COMMISSIONER July 21, 2004 MOHAMMAD MIRSHAHI, P.E. STATE LOCATION AND DESIGN ENGINEER MEMORANDUM To: All

More information

Section 1. Introduction

Section 1. Introduction Overview of Manual Acknowledgements i x Section 1. Introduction 1.0 Overview of Section 1 1-1 1.1 The GESC and DESC Permits 1-2 1.2 Reasons for the GESC and DESC Permits 1-2 1.3 Legislative Mandate 1-3

More information

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES March 14, 2016

CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES March 14, 2016 CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES March 14, 2016 The Supervisors of Clay Township met on a regularly scheduled meeting date of March 14, 2016, at the Clay Township Municipal Office,

More information

Minutes of a Regular meeting of the Council of the Village of Warburg held Monday, April 11, 2016 in Council Chambers, Village of

Minutes of a Regular meeting of the Council of the Village of Warburg held Monday, April 11, 2016 in Council Chambers, Village of : Minutes of a Regular meeting of the Council of the Village of Warburg held Monday, April 11, 2016 in Council Chambers, Village of Warburg Municipal Office. Call to Order Mayor Ralph van Assen called

More information

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD) DOCUMENT 01105 FOR PRELIMINARY REVIEW/APPROVAL PART I: SUBMITTAL 1.1 CITY OF FRIENDSWOOD (COF) A. Submit four (4) copies of drawings. B. Submit by 5:00 PM a minimum of fourteen calendar days (14 cd) prior

More information

SOLISTRAND* Flag Terminal Crimping Dies

SOLISTRAND* Flag Terminal Crimping Dies SOLISTRAND* Flag Terminal Crimping Dies Instruction Sheet 408-8908 22 DEC 10 PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually powered hand tools. Hand tools

More information

ADVANCING PROCESS SAFETY WEBINAR SERIES. 2018: Webinar 1 out of 5 Tuesday, February 27th

ADVANCING PROCESS SAFETY WEBINAR SERIES. 2018: Webinar 1 out of 5 Tuesday, February 27th ADVANCING PROCESS SAFETY WEBINAR SERIES 2018: Webinar 1 out of 5 Tuesday, February 27th Agenda 1. Introduction and Purpose Steve Mason, LyondellBasell Ind. 2. Process Safety Event Collection Sheet Felicia

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February

More information

Mammoth Inc. 320 West College Ave. Pleasant Gap PA EIN PA Contractor Licsense - PA PH-(814) Fax- (814)

Mammoth Inc. 320 West College Ave. Pleasant Gap PA EIN PA Contractor Licsense - PA PH-(814) Fax- (814) 1 Insured: Property: Mullen,Kevin 1991 Fairwood ln State College, PA Contractor: Cellular: (814) 470-5742 Company: E-mail: scott@mammothrestoration. com Business: Pleasant Gap, PA 16823 Claim Number: Policy

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04 Chair, Christina Fugazi, City of Stockton Vice Chair, Leo Zuber, City of Ripon Commissioner, Bob Johnson, City of Lodi Commissioner, Debby Moorhead, City of Manteca Commissioner, Bob Elliott, San Joaquin

More information

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

SUPPLEMENTARY STANDARD DETAIL DRAWINGS CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

76'-0" 10'-5 7/8" 10'-2" 3 7/8 15'-10 1/8" 5'-0" 42'-1 7/8" DINING. IS x83 KITCHEN. 36x80 CLAYTON WAKARUSA

76'-0 10'-5 7/8 10'-2 3 7/8 15'-10 1/8 5'-0 42'-1 7/8 DINING. IS x83 KITCHEN. 36x80 CLAYTON WAKARUSA SHEAR WALL "B" SHEAR WALL "A" '-0" 70'- /" '- /" '- /" 7'-0" '- 7/" '-0 /" '-0" 0'- 7/" 0'-" MASTER BATH / MASTER BEDROOM / DINING 0 WS FURN x0 ES / LAUN. SHELF D W / W/H 9 / WS '-" WS / WS WALK IN / 0E

More information

User: Diane Carter Pages: 1 of 11 5/28/2015 1:44:11 PM

User: Diane Carter Pages: 1 of 11 5/28/2015 1:44:11 PM Type: CV-New Commercial 2015-00001697 Permit Issued DAVID BOWEN CONSTRUCTION VALDOSTA 0109B 147C $2,06000 04/07/2015 STATEN STATION LLC 3277 INNER PERIMETER RD $2,06000 VALDOSTA, GA 31602 Estimated Value:

More information

Figure 1 Site Location Map Joint Permit Application: The Ridge at South Cooper Mountain West Hills Land Development. Project Site WASHINGTON COUNTY

Figure 1 Site Location Map Joint Permit Application: The Ridge at South Cooper Mountain West Hills Land Development. Project Site WASHINGTON COUNTY SKYLINE WOODS LN 30 26 SILER RIDGE LN COUNTRY HAVEN LN 405 Hillsboro Portland H HIL IGH LL N Project Site 205 LN ER OP HORSE C O TAIN N TAIL LN M O U 5 SW E TIL Project Site Bellairs Lolich V U FRIENDLY

More information

September 24-25, Ewing, NJ & Southampton, PA

September 24-25, Ewing, NJ & Southampton, PA September 24-25, 2016 Ewing, NJ & Southampton, PA 2016 Fall Showcase Xtreme Dimensions Sept. 24 25, 2016 Field Address: Armstrong Park, 339 Ewingville Rd, Ewing, NJ 08638 1 EWING 18U PA Burlington Sting

More information

Agenda Item: Revised Master Sign Plan Windsor Run Retirement Center

Agenda Item: Revised Master Sign Plan Windsor Run Retirement Center Agenda Item: Revised Master Sign Plan Retirement Center DATE: November 1, 2017 FROM: Mary Jo Gollnitz, Planner Background/Issue: EMH&T is requesting a revision to Retirement Center Master Sign Plan approved

More information

Status Meeting Agenda

Status Meeting Agenda Status Meeting Agenda WyoLink Contact Number: 307 777 WLNK (9565) Date: August 25, 2014 Time: 10:00 A.M. To 10:35 A.M. Location: WYDOT, 5300 Bishop Blvd, Cheyenne, Planning Building, Geology Conference

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report County of Sonoma Agenda Item Summary Report Agenda Item Number: 43a (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Supervisors

More information

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised

More information

Terminals and Splices 19 OCT 11 Rev D. Crimping Dies for Head Numbers 69065, 69067, and Hand Tool Yoke. Place Screwdriver Here to Remove Dies

Terminals and Splices 19 OCT 11 Rev D. Crimping Dies for Head Numbers 69065, 69067, and Hand Tool Yoke. Place Screwdriver Here to Remove Dies Instruction Sheet Crimping Dies for SOLISTRAND* 408-9786 Terminals and Splices 19 OCT 11 PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually powered hand tools.

More information

Reading Area Water Authority Board Meeting Thursday June 30, 2016

Reading Area Water Authority Board Meeting Thursday June 30, 2016 1801 Kutztown Road Reading, Pennsylvania 19604 Phone: 610-406-6300 Fax: 610-406-6307 TDD: 610-655-6442 Reading Area Water Authority Board Meeting Thursday June 30, 2016 The Stated Board Meeting of the

More information

Minor Site Plan Application and Checklist Land Disturbing Activities

Minor Site Plan Application and Checklist Land Disturbing Activities Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 March 1, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Sunnyside School 3421 SE Salmon Street Portland,

More information