1 DATE: November 29, 2011 ADDENDUM NUMBER: 3 MODIFYING: Specifications 1662 PROJECT: Copper Basin Reservoir Outlet Structure Rehabilitation BID TIME AND DATE: 2:00 p.m., December 8, 2011 FROM: TO: THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA 700 North Alameda Street, Third Floor Los Angeles, California (213) All prospective bidders This addendum forms a part of the contract documents. Use Specifications 1662 as originally issued to submit bids, in conjunction with this addendum and all previously issued addenda, and acknowledge receipt of this addendum by completing Item 4 in Document 00420, Bidder's General Information, in the specifications. Failure to acknowledge this addendum will render a bid non-responsive and the bid will be rejected. This addendum consists of 4 pages of text and 8 pages of attached documents. CHANGES TO PRIOR ADDENDA 1. In Section 01590, Field Offices, (issued in Addendum 1), subparagraph 1.04A.2, delete the first sentence, and replace with the following: After Metropolitan has connected all utilities, the Contractor shall maintain them in good order for the duration of the project. 2. In Addendum 2, Item 2, change the time of bid opening to read: 2:00 p.m. 3. In Document 00800, issued in Addendum 2, Item 3, change the words: Paragraph (3) to read: Paragraph (b) 4. Delete Section 11295,, dated November 2, 2011(issued in Addendum 1), and replace with the attached section 11295, dated November 29, CHANGES TO SPECIFICATIONS 5. In Section 01010, after subparagraph 1.06E.2, insert the following subparagraph 1.06E.3: 2. The sequence of work on the slide gates, including the field verification, submittals, fabrication, and installation shall be in accordance with Section CHANGES TO DRAWINGS: 6. Metropolitan has made changes to the following drawings without issuing revised drawings at this time; however, Metropolitan will issue revised drawings showing these changes after the contract is awarded. Reference Sheet Drawing 1. M-3 B-4995 Description of Changes After Note 3, add the following Notes 4, 5, and 6: 4. Drawing indicates existing structure and equipment based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified for each gate assembly. November

2 Addendum Number 3 Reference Sheet Drawing 2. M-3 B M-5 B M-6 B M-7 B M-8 B M-9 B M-10 B Description of Changes 5. Contractor shall perform detailed field survey of existing conditions 6. This drawing represents a typical gate assembly. Contractor shall verify the layout and dimensions of each gate assembly separately At Grids B-1 and B-8, change the callout Gate Housing to read: Gear Motor Housing After Note 3, add the following Note 4: 4. Drawing indicates existing part based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified prior to submission of shop drawings and prior to fabrication. After Note 3, add the following Notes 4 and 5: 4. Drawing indicates existing fabricated parts based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified. 5. Contractor shall perform detailed field survey of existing conditions After Note 2, add the following Notes 3 and 4: 3. Drawing indicates existing fabricated parts and subassemblies based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified. 4. Contractor shall perform detailed field survey of existing conditions After Note 3, add the following Notes 4 and 5: 4. Drawing indicates existing fabricated parts and gate assembly based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified. 5. Contractor shall perform detailed field survey of existing conditions After Note 4, add the following Notes 5 and 6: 5. Drawing indicates existing fabricated parts and gate assembly based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified. 6. Contractor shall perform detailed field survey of existing conditions After Note 5, add the following Notes 6 and 7: 6. Drawing indicates existing fabricated parts and gear pedestal assembly based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified. 7. Contractor shall perform detailed field survey of existing conditions November

3 Addendum Number 3 Reference Sheet Drawing 9. M-11 B M-12 B-5004 Description of Changes After Note 4, add the following Note 5: 5. Drawing indicates existing fabricated part based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified prior to submission of shop drawings and prior to fabrication. After Note 2, add the following Notes 3 and 4: 3. Drawing indicates existing fabricated parts and assembly based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be verified. 4. Contractor shall perform detailed field survey of existing conditions QUESTIONS AND CLARIFICATIONS: Requests for clarification of details on the drawings or of provisions of the specifications have been identified. The questions with the appropriate Metropolitan responses are as follows: (1) Question: We need to know the width of the two gate entrances at the job site? We need at least 12 to get our truck into the job site. Answer: The Copper Basin Outer Gate is 16 ft. wide. The Inner gate is 14 ft.-10 inches wide. (2) Question: What is the height of the power lines that cross over the road? I believe I saw at least 3 different power lines cross the road from the entrance to the job site? I need to know the lowest one. Or if it is on the drawings I need to know what page? Will Metropolitan be able to lift those lines or wrap them the day the building is delivered? Answer: As shown on Sheet G-4, Grid B-2, of the drawings, the overhead electrical lines have a minimum 14-foot clearance. Metropolitan will not perform any lifting or wrapping of the overhead electrical lines. (3) Question: Will we be able to set up a crane in the clear area during the winter months to unload and set the new precast electrical building? If so how long would we have to do this? Answer: Clear Zone is required to allow chemical deliveries three times a day. Therefore no equipment can be stored. See Section 01010, Paragraph1.06A. (4) Question: Is the Contractor required to treat the water between drop gates after dewatering? Answer: (5) Question: Section 01590, Field Offices: Subparagraph 1.04A.2 states: The Contractor shall connect and maintain electricity, water and sewer, for each field office and shall pay all charges related to the installation of these services for the duration of the project. Paragraph 2.01A states: Piping materials and components for water service piping system shall be supplied and installed by Metropolitan. Paragraph 2.02A states: Piping materials and components for sanitary sewerage piping shall be supplied and installed by Metropolitan. Please clarify.. It was stated at the Pre-Bid meeting that MWD would be responsible for supplying and installing electric, water and sewer for the field office. Answer: In this addendum, see Changes to Prior Addenda for changes in Section November

4 Addendum Number 3 (6) Question: Section Article 1.05, (Engineer s Field Office At Off Site Facilities) Is this requirement applicable to the project and if so, where is the Field Office to be located. Answer: Yes, it s applicable. This is for fabrication shops, batch plants, etc., that are off site. (7) Question: It was stated at the pre bid meeting that the three 2400V transformers to be demolished may contain PCB s. What is the volume of oil in the three transformers? Should the bidders include the PCB disposal costs in the bid or would this be covered by extra work? Answer: One 15kVA transformer has 18-gallon capacity. The other two 25kVA transformers are estimated to have 30 gallon capacity each. The bidders shall include the cost of PCB disposal in their bids. (8) Question: What is the model number of the existing Gear Motors on the gates? Answer: The model number for existing gear motor is Sterling Slo-Speed Motor Reducer and Magnetic Brake, Serial (9) Question: Reference Drawing B-4997: Wear liners. Grid I-3, the drawing states After final finishing cut has been taken. See note in reference to brazing. Do the Wear Liners need to be machined already installed on the Gate Frame? Answer: Yes. (10) Question: Reference Drawing B-4997 (and B-4998): Will the Gate leaf be removed by Metropolitan and sent to the machining vendor or should these wear liners be matched drilled to your Gate Frame and your Gate Leaf on-site or does the vendor supply Bronze wear lines only for Metropolitan to install? If so, how accurate are the existing hole locations on the Gate Frame and Gate Leaf on your site? Answer: The wear liners shall be matched drilled to the Gate Frame and Gate Leaf on-site. (11) Question: Reference Drawing B-4997: Will there be possible accumulation errors if we stick to your drawings with only fraction Answer: tolerances called out for the Gate Frame bolt holes? Drawing indicates existing part based on available record drawings and this information is not guaranteed to be accurate or complete. All dimensions shall be field verified so there will not be any accumulation errors. (12) Question: Also in Grid D2-F2 it says on the print Braze all joints in place and take final finishing cut on surface of liners. Again I m going to state the same as above where this all needs to be done while the Wear Liners are installed on the gate frame prior to finish machine. Is this correct? Answer: On B-4997note at Grid I-3 states the dimension after the finishing cut has been made; The note at Grid D-2, states that brazing shall occur before to the finishing cut is made. (13) Question: We would like to know if the anchors that are shown in Detail A & B on Sheet S-5 can be inside of Answer: the furred walls versus the middle of the walls. Yes the location of the anchors can be adjusted several inches. The location of the anchors shall be between 6-inches to 10-inches from the outside edge of the footing. (14) Question: Section 01590, subparagraph 1.04A.1.c, issued in Addendum 1, calls out to place aggregate base (A.B) material for road from trailer to the nearest A.C. road. How long and wide would be the A.B. placement? Answer: The length will depend on the location of the trailer from the A.C. road. The minimum width shall be 12 feet. (15) Question: Who is the manufacturer of the existing slide gates? Answer: Joshua Hendy Iron Works (16) Question: Sheet M-10: In the Installation of the Bevel Gear Angular Contract Bearings will there be a preload requirement? If so, what will it be? Answer: There are no pre-load requirements (17) Question: Sheet M-10: In the setup of the Bevel Gear Bearings, what are the endplay tolerance requirements? Answer: Endplay tolerance requirements is END OF ADDENDUM November

5 SECTION SLIDE GATE ACTUATION SYSTEM PART 1 GENERAL 1.01 THE WORK A. The work includes refurbishing three (3) slide gate actuation systems at the Copper Basin Reservoir Outlet Structure. The work will consist of verifying existing dimensions, removing existing components as required, refurbish/replace, reassemble, install, and test the actuation system and other appurtenances as required, as shown on the drawings, and as specified herein without any shutdowns of the CRA System. All actuation systems shall be furnished complete with design calculations, drawings, actuating mechanisms, special erection and repair tools, and all other appurtenances for complete assembly, installation and operation. Main components include, but are not limited to the following: 1. New gear motors with motor brake, gears, and controllers. 2. New stems, stem nuts, bearings, and packing glands. 3. New base plates 4. Coating of existing and new components, as specified on the drawings. B. Refurbishment of the existing actuation systems shall be performed in a sequential order to provide two operational slide gates at all times. Slide Gate 3 shall be the first system to be refurbished. The slide gate system must be completely refurbished, tested, and put into service before the next second slide gate system refurbishment can commence. C. The plans indicate the scope of work with structural and equipment dimensions; however, these dimensions are for reference only for each existing slide gate system. The Contractor shall field measure and verify the dimensions for the refurbishment design of each existing slide gate system since the slide gate system dimensions will be different due to the actual installed conditions. The design and installation of the refurbished slide gate systems must consider the actual site constraints. The submitted shop drawings for each slide gate system shall be provided separately for each gate, and can only be submitted after the measurements have been taken. Measurements shall be taken under two different conditions: 1. Measurements of the slide gate leaf and frame can be performed after the two drop gates are installed to isolate the slide gate, and the area between the drop gates is dewatered. 2. Measurements of the actuation system including the stem can be performed after the slide gate is taken out of service by Metropolitan and then can be disassembled for measurement and refurbishment MANUFACTURER S QUALIFICATIONS A. Gear motors: The gear motor manufacturer shall have experience in the design and manufacture of similar equipment as required to be furnished which is in successful operation for a minimum of 5 years. Similar equipment is defined as at least 10 gear motors with soft gearing in the 10 to 30 horse power range within the last 2 years. B. Stems and other machined components: The machined component manufacturer shall have experience in the design and machining of components similar to be furnished. Similar components are defined as the machining of at least five ACME thread shafts at least 4 inches in diameter and 7 feet long within the last 2 years. C. Stem nuts and other cast components: The foundry used shall have experience in the design and cast of components similar to those to be furnished. Similar components are defined as casting at least five components of similar size within the last 2 years. D. The Contractor shall bear the burden of proof that the proposed manufacturers meet the experience requirements. Metropolitan reserves the sole right to reject a manufacturer with inadequate experience with no consequence to any provisions of the contract REFERENCES A. General: 1. The publications listed below form a part of this specification to the extent referenced. November 29, (construction contract) Addendum 3

6 2. Where a date is given for reference standards, that edition shall be used. Where no date is given for reference standards, the latest edition available on the date of Notice Inviting Bids shall be used. B. American Society for Testing and Materials (ASTM) C. Institute of Electrical and Electronics Engineers (IEEE): 1. IEEE 112, Standard Test Procedure for Polyphase Induction Motors and Generators D. National Electrical Manufacturers Association (NEMA): 1. NEMA 250, Enclosures for Electrical Equipment (1000 volt maximum) 2. NEMA MG 1, Motors and Generators E. National Fire Protection Association (NFPA): 1. NFPA 70, National Electrical Code (NEC) F. Uniform Building Code (UBC) 1.04 SUBMITTALS A. Complete fabrication, assembly, enclosure device layout, wiring diagram, and installation drawings, together with detailed specifications and data covering material used, parts, devices, and other accessories forming a part of the equipment furnished, shall be submitted in accordance with the requirements of Section The following specific information shall be included: 1. A Master Document List to include the title, drawing or document number, revision and date of all contractor documentation to be submitted. 2. Manufacturer Qualification Documentation. 3. Outline drawing of the equipment and component assemblies showing overall dimensions, required clearances and conduit/piping locations and sizes based on detailed field survey measurements of existing fabricated parts, assemblies, and equipment arrangement 4. Cross-sectional drawings showing materials of construction of the gear motors. 5. Detailed scaled dimensional drawing including weights and material of construction of: a. Gear motor, b. Motor brake, c. Pedestals, d. Bevel gearing system, e. Gate stem, Stem nuts, Packing glands, and all related components, f. Base plates. 6. A routine test report for each integral-horsepower motor furnished shall be submitted for approval before shipment. Tests on duplicate motors to those being furnished will be acceptable. Each routine test shall be in accordance with NEMA MG , with the results tabulated on IEEE 112, Appendix A. 7. All motor characteristics required in Section shall be submitted. 8. Certified Material test reports for the stems, stem nuts, bearings, and packing glands. 9. Operation and Maintenance (O&M) manuals in accordance with the requirements of Section Qualifications of the workers that will be repairing or upgrading slide gate actuation system. 11. Detailed field survey measurements of existing conditions of each slide gate assembly NAMEPLATES: In addition to the manufacturer standard nameplate, each gear motor shall have a stainless steel nameplate attached with a minimum of 2 stainless steel screw stamped with the following: Contract number, specification number, manufacturer, model number, horsepower, output rpm, output torque November 29, 2011 Addendum 3 (construction contract)

7 1.06 DELIVERY, STORAGE, AND HANDLING A. In addition to the requirements of Section 01610, equipment shall be prepared for shipment as follows: 1. After testing and before shipment, all mechanical connections shall be matchmarked or tagged to ensure proper field assembly. PART 2 2. Arrangements shall be made for extra protection if units are to be stored outside prior to final erection. 3. All equipment shall be filled with lubricant and/or lubricated per the manufacturer recommendation. 4. The contractor shall keep a log of all components that leave the job site for, blasting, coating, or other reasons. The Contractor shall obtain the Engineer signature on the log for each component before it leaves the job site. 5. Contractor will be responsible to escort all deliveries from site security posts to the drop off site and return them to the security post at the end of the delivery. Metropolitan is not responsible for deliveries or vendor notification. All material storage shall comply with regional Haz-mat regulations. PRODUCTS 2.01 REFERENCE DRAWINGS A. The Contractor shall confirm reference drawings dimensions where applicable with field measurements GENERAL A. The slide gate outlet structure consists of three gates installed in the late 1930 s. The existing motor actuator system for each gate consists of a gear motor driving a bevel gear connected to the gate s stem. Rehabilitation of the drive system shall consist of replacing the existing gear motor and gearing systems and recoating the housing/pedestals. All gear motors where furnished by Sterling Electric, Inc, located in Irvine California. The Contractor shall provide new Sterling gear motors or equal for all three gates and provide new mounting plates as required GEAR MOTOR: A. Design Requirements: 1. Each gear motor shall be designed to position the gate from fully open to fully closed position and any position between at the speed specified. Gear motors shall be designed for heavy-duty service and for mounting in the horizontal position. 2. The gear motor shall be selected based on the specified operating conditions and design requirements specified herein: a. Design Seating Head: 15 feet b. Weight of Gate: 10,600 lbs c. Stroke of Gate: 10 feet d. Gate Rate of Travel: 11 to 12 inches per minute e. Operating Thrust: 56,781 lbs 3. The gear motor with the pinion gear and motor brake shall fit within the existing gear motor housing with new mounting pedestals and base plates. See reference drawings for dimensional details. 4. All gear motors shall be by the same manufacturer. 5. Each gear motor shall be designed to operate between an ambient temperature of 20 F and +120 F. 6. All gearing shall be Class 2 type. 7. Minimum gear unit efficiency shall be at least 95% 8. Gear motors with soft gearing shall be constructed of the following materials: a. Housing shall be ASTM A 48 Class 20 minimum b. Gearing shall be ASTM A220 Grade minimum c. Pinion shall be ASTM A 311 Class B Grade 1144 November 29, (construction contract) Addendum 3

8 d. Counter shaft shall be ASTM A576 Grade Gear motors with hardened gearing shall be constructed of the following materials: a. Housing shall be ASTM A 48 Class 20 minimum b. Gearing shall be ASTM A837 UNSG86200 c. Pinion shall be ASTM A837 UNSG86200 d. Counter shaft shall be ASTM A837 UNSG Each gear motor reducer shall be capable of 28 to 1 speed reduction ratio based on an 1800 rpm motor. 11. All motors shall have a maximum speed of 1800 rpm and a minimum speed of 1600 rpm. 12. All gearing and bearings shall be oil lubricated and fittings shall be provided where necessary for lubrication during operation. Seals shall be provided at all shaft penetrations to prevent leakage of lubricant, regardless of position. 13. The output drive sleeve shall be fully supported on both ends with roller or ball bearings. 14. Gear reducers shall be enclosed in a dustproof and watertight cast-iron or carbon steel case, only helical gears shall be used in the gear trains. 15. All bolted connections between the gear motor and connecting components shall be dowelled with not less than 2 dowels. Pilot dowel hole shall be drill in the actuator mounting plate at accessible location so dowel holes can be drilled in the field. Dowel pins shall be provided with the gear motor. 16. Gear Motor shall be coated per section of the specification. 17. Gear motors shall be provided by Sterling Electric, Inc or equal. B. Electric Motors: 1. Each electric motor shall be rated 230/460 Vac, 3 phase, 60 Hz 2. The motor shall be in accordance with Section The motor shall be equipped with a motor brake to lock the motor shaft from rotating when the slide gate position is set. a. The motor brake shall be of the spring-set disc and electrically released type. b. Motor brake shall be provided by Stearns or equal. C. Gear motor pedestal: 1. The Contractor shall furnish and install heavy duty pedestal for attaching the gear motor to the base plate. 2. New motor pedestal shall be fabricated from carbon steel ASTM A All mounting surfaces shall be accurately machined flat and parallel. 4. Full size stainless steel shim shall be provided for final alignment of the gear motor. 5. The gear motor pedestal shall be coated per Section of the Specifications. 6. Bolts and studs shall be ASTM A193, Grade B-7 and nuts shall be per ASTM A194 Grade 2H GEARS, PINION SHAFT, GEAR PEDESTAL A. The pinion shaft, bevel gear, and associated bearing and components shall be replaced. B. The gear pedestal and cover shall be recoated as shown on the drawing. C. All ball bearings and glands shall be replaced GATE ASSEMBLIES A. The Contractor shall provide gate liners, gate stem, gate stem nut, bevel gear, pinion shaft, guide bearings, and bevel gear bearings for each gate as shown on the plans and fabricated from the materials specified in Table November 29, 2011 Addendum 3 (construction contract)

9 Table 1 Gate Assembly Material List Component Material Gate Leaf Liner ASTM B Class B Bronze Gate Frame Liner ASTM B Class C Bronze Gate Stem ASTM A479, UNS S21800 Nitronic 60 Gate Stem Nut ASTM B 584 C85700, Naval Brass Bevel Gear ASTM A564 SUS303 Pinion Shaft ASTM A564 SUS303 Guide Bearing ASTM A48 Bevel Gear Bearings Balls- SAE Seals Nitrile Rubber Shields 302 Stainless Pressed Steel Ball Cage Pressed Steel B. Stems: 1. The contractor shall provide stems and couplers for each gate based on field-verified dimensions. a. ACME nominal diameter: 5 inch b. ACME Thread: 1 pitch, 1 lead, single R.H. 2. Welding of bar stock to achieve the required stem length shall not be done. 3. Threads on the gate operating stems shall be cut to a thread gage to insure interchangeability. After the stems have been approved for shipment the Contractor shall forward to Metropolitan the ring and plug gages used for the ACME screw thread cutting. The ring and plug gages will become the property of Metropolitan. C. Stem Nuts and Guide Bearing: 1. The Contractor shall provide stem nuts and guide bearing for each gate D. Gate Stem Guard 1. The stem guard shall be cleaned and recoated Base Plates A. Gate Base Plates: 1. The Contractor shall furnish and install new cover plates for each gate to accommodate the new gear motor. 2. New plates shall be fabricated from ASTM A36 Steel. 3. New pedestals shim plates shall be provided. 4. All new bolting shall be provided SOURCE QUALITY CONTROL A. Gear Motors: 1. Test procedures for actuators shall be submitted to the Engineer for approval before testing begins. 2. Motor Test (in addition to the requirements of Section 15170): a. A typical test report and complete motor characteristic curves for each motor shall be prepared in accordance with NEMA standards. b. A typical table or curve showing the variation of locked-rotor current, full-load current, and no load current requirements of the motor with variation in voltage of ±10 percent from the nameplate voltage. c. A typical curve of speed versus torque shall be provided. d. Complete nameplate markings. e. A typical curve of temperature rise versus torque shall be provided for the duty cycle specified. November 2, (construction contract) Addendum 3

10 3. Gear Motor Tests: a. The no load RPM of the gear motor output shaft shall be recorded. B. Four certified copies of all test reports shall be submitted to the Engineer for approval before shipping SPARE PARTS A. The Contractor shall furnish spare parts as follows: 1. Two spare stems. 2. Two spare stem nuts. 3. One set of bevel gear and pinion shaft 4. One complete gear motor. 5. One motor brake PART 3 EXECUTION 3.01 WORKMANSHIP/WORKER QUALIFICATIONS A. All work shall be done and completed in a thorough workmanlike manner to meet or exceed industry standards and these written specifications. The work shall follow the best modern manufacturing practices, notwithstanding any omission from these specifications. All work shall be performed by mechanics skilled in their trades (millwrights), and all parts shall be made accurately to standard gage to facilitate replacement and repair. B. Machine work shall in all cases be of high grade workmanship and finish. C. Bolt holes on surfaces not otherwise machined shall be spot faced and all exposed surfaces shall be neat in appearance. All sharp edges, burrs, and unnecessary projections shall be removed. D. All unmachined corners shall be ground smooth, and all machined corners shall be beveled, unless otherwise shown on the drawings. E. Tolerances and clearances specified on the drawings shall be closely adhered to so that actuation system can be successfully reassembled, mated with the slide gate, and will perform per the requirements of this specification. Where tolerances or fits are not specified on the drawings, the Contractor shall follow the best modern shop practices for apparatus of the type covered by these specifications, due consideration being given to the special nature or function of the parts and to the corresponding accuracy required to secure proper operation. All tolerances shall be specified on the shop drawing submittals INSTALLATION A. General 1. Installation of components and other required work will require the complete disassembly of the slide gate actuating drive train and supporting structure. Unless indicated otherwise on the drawings or in the specifications, all components shall be thoroughly cleaned, coated (as specified), replaced, and/or reused. The Contractor shall provide new bolts, studs and nuts of equivalent size to the original when reassembling all components. B. Gear Motors, Adapter Mounting Plates, and Gears 1. The Contractor shall replace existing gear motors, existing gear motor pinion gear, and bevel gear. The Contractor shall replace couplers as required. Existing plates and pedestals that can be re-used shall be cleaned and coated per Specification Section The new gear motor and mounting pedestal shall be installed, properly shimmed and aligned with the new bevel gear in the existing gear pedestal. C. Pedestals and Base Plate Assemblies: 1. The pedestals and base plates have coatings that contain lead and shall be handled per Specification Section and Pedestals and appurtenances shall be completely disassembled, thoroughly cleaned, coated per Section 09900, reassembled and reinstalled. All machined surfaces shall be protected during the blasting and coating process. Stem bearings in the pedestals shall be replaced November 29, 2011 Addendum 3 (construction contract)

11 D. Stems and Packing assemblies: 1. The Contractor shall install new stems, stem nuts, guide bearings, and related components. All components shall be pre-lubricated with lubricant that is designed for the service as specified herein. Non gear surface shall be coated per Section The stem guard shall be removed, cleaned, and recoated. 3. After installation, the Contactor shall make adjustments as necessary so the gates are level and plumb. E. Limit Switches and Gate Position Transducers: 1. The Contractor shall remove the existing limit switches on the existing stem and re-install the limit switches on the new stem. 2. Two (2) new cable-extension position transducers shall be provided per Specification Section and respectively. The Contractor shall replace one (1) existing position transducer and add one (1) position transducer. The Contractor shall design and fabricate mounting bracket and attachment to the gate. The mounting bracket and attachment hardware material shall be stainless steel. Contractor shall submit drawings of the mounting bracket and gate attachment for Metropolitan approval. F. All gate drive components to be replaced shall be removed intact and brought to the Contractor storage area for inspection. Contractor, with Engineer present, shall compare, match, and mate new components with removed components. Contractor shall inspect removed stems and lifting nuts with new stem and lifting nut plugs and gages. Engineer will advise Contractor which removed items, if any, Metropolitan will keep as spares. Contractor shall dispose of items Metropolitan does not want to keep FIELD TESTS A. Testing: 1. All testing shall be completed with the new drop gates (as shown on Sheet S-2) in their installed position. The slide gates shall be dry and wet tested one at a time, before the slide gate is put into service. See Section 01010, Article 1.06, Special Restrictions, Paragraphs 1.06E and 1.06F. 2. The Contractor shall correct all maladjustments, misfits, excessive looseness, or improper functioning. Test shall be repeated until systems operate satisfactory. The slide gates shall not leak and shall be fully operational per the satisfaction of the Engineer. 3. All tests shall be conducted in the presence of the Engineer. B. Dry Testing: 1. After installation of the equipment and the area between the drop gates is de-watered, the Contractor shall test the slide gate by operating it through at least 5 complete open and close cycles to confirm proper operations of the gear motor and gearing system, controls, stems, and stem nuts. The slide gate shall operate smoothly and be free of any binding or vibration through its entire stroke. The slide gate shall be checked for 100% closure and opening and speed. C. Wet Testing: 1. Remove the upstream drop gate. 2. Operate (test) slide gate per Dry Testing as specified above. 3. Close slide gate, pump out water between slide gate and the downstream drop gate then check seal for leakage. 4. Remove the downstream drop gate. 5. Operate (test) slide gate per Dry Testing as specified above. 6. Put slide gate into service. D. The following data shall be recorded for each gate raising and lowering operations: 1. Maximum gate traveling speed (inches/min). 2. Motor voltages and currents at maximum traveling speed (all phases). 3. Motor voltages and currents at start up (all phases) with gate in closed position. November 2, (construction contract) Addendum 3

12 4. Motor voltages and currents at speeds directed by the Engineer MANUFACTURER'S SERVICES A. The services of the gear motor manufacturer representative shall be provided for installation supervision, inspection, startup assistance, equipment testing, and certification. Startup services shall be at such times as requested by the Engineer. B. The Contractor and gear motor manufacturer shall be responsible for training ten (10) Metropolitan personnel, for one day, at the Gene Pumping Plant and at the work site, on maintenance of the gear motors. Training date will be scheduled by Metropolitan. Contractor shall coordinate operational training of gear motors. C. The Contractor shall coordinate with the manufacturer all field services needed to assist in the erection, installation, inspection and testing of the equipment. END OF SECTION November 29, 2011 Addendum 3 (construction contract)

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification. Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.

More information

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

Section Heavy Duty Slide Gates Tender No. [ ] Page 1

Section Heavy Duty Slide Gates Tender No. [ ] Page 1 Tender No. [ ] Page 1 1.0 GENERAL 1.1 REFERENCES.1 Provide heavy duty slide gates in accordance with the following standards (latest revision) except where specified otherwise..2 American Society for Testing

More information

Reliance SG800 Series Steel Water Gage Valves

Reliance SG800 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

CAUTION! This manual contains important information for the correct installation, operation and maintenance of the equipment described herein.

CAUTION! This manual contains important information for the correct installation, operation and maintenance of the equipment described herein. CAUTION! This manual contains important information for the correct installation, operation and maintenance of the equipment described herein. All persons involved in such installation, operation, and

More information

Rodney Hunt. A GA Industries Company Glydaseal Gates

Rodney Hunt. A GA Industries Company Glydaseal Gates Rodney Hunt A GA Industries Company Glydaseal Gates GUIDE BRONZE GUIDE BAR FRAME NUT POCKET SEAT FACING RESILIENT INVERT SEAT DISC GUIDE BAR ADJUSTMENT BOLT WITH LOCK NUT GUIDE BAR ATTACHING BOLT The Glydaseal

More information

KEEP YOUR RESOURCE MOVING.

KEEP YOUR RESOURCE MOVING. LINER BOLTS KEEP YOUR RESOURCE MOVING. COLUMBUS McKINNON CORPORATION Leading the Industry Downtime in the grinding mill operation is caused by one of two things: regularly scheduled maintenance or unscheduled

More information

Features. Continuous Duty Cycle Actuators

Features. Continuous Duty Cycle Actuators Features Predictable life. Continuous operation. Oil lubricated. High mechanical and thermal efficiency 2 models available. Capacity 3,500 to 27,000 pounds Available with C-Face motor adaptors and speed

More information

Replacement of Pitch Link Retainer and Service Improvement of the Pitch Control System. Effectivity: Helicopters manufactured prior to January, 1981

Replacement of Pitch Link Retainer and Service Improvement of the Pitch Control System. Effectivity: Helicopters manufactured prior to January, 1981 Page 1 of 12 Date: December 2, 1981 Subject: Models: Replacement of Pitch Link Retainer and Service Improvement of the Pitch Control System F-28C and 280C Effectivity: Helicopters manufactured prior to

More information

UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 55 80.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

Reliance SG777 Series Steel Water Gage Valves

Reliance SG777 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.SG777 10/16/2016 Reliance SG777 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

Operating Instructions and Parts Manual SLT-1100 Jumbo Scissor Lift Table

Operating Instructions and Parts Manual SLT-1100 Jumbo Scissor Lift Table Operating Instructions and Parts Manual SLT-1100 Jumbo Scissor Lift Table JET 427 New Sanford Road LaVergne, Tennessee 37086 Part No. M-140780 Ph.: 800-274-6848 Revision B1 05/2014 www.jettools.com Copyright

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance

More information

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INTRODUCTION During manufacture and assembly of equipment great care is taken to ensure accuracy in mating the sealing faces on frame and doors, especially

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

Booster Pumping Station 115 Booster Pump Procurement

Booster Pumping Station 115 Booster Pump Procurement Madison Water Utility Tom Heikkinen General Manager 119 E. Olin Avenue Alan L. Larson PE, BCEE Principal Engineer Madison, Wisconsin 53713 Telephone: 608 266-4653 FAX: 608 266-4426 email: allarson@cityofmadison.com

More information

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section 02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,

More information

Mechanical Actuators

Mechanical Actuators Mechanical Actuators Rotating Machine Screw Actuators 2-Ton and Larger Capacity Installation, Operation & Maintenance Instructions Publication Part No. SK-2389-R CAUTION This manual contains important

More information

Fisher 667 Diaphragm Actuators Size 80 and 100

Fisher 667 Diaphragm Actuators Size 80 and 100 Instruction Manual 667 Size 80 and 100 Actuators Fisher 667 Diaphragm Actuators Size 80 and 100 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Maximum Pressure Limitations...

More information

30DC Speed Lathe Manual

30DC Speed Lathe Manual 30DC Speed Lathe Manual The Crozier Model 30DC Speed Lathe is our most popular model. It has many standard features not found on any other machine in its class or price range. Standard Features 3/4 HP

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

VERSAtoolTM SAE J533 & SAE J1453. Safety and Operating Manual

VERSAtoolTM SAE J533 & SAE J1453. Safety and Operating Manual VERSAtoolTM Mechanically Assisted / Manual Tube End Flare & Flange Machine SAE J533 & SAE J1453 Safety and Operating Manual I. Safety Instructions................................. Page 2 II. Specifications.....................................

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Horizontal and Vertical. Metal Cutting Band Saw MODEL: BS-115

Horizontal and Vertical. Metal Cutting Band Saw MODEL: BS-115 Horizontal and Vertical Metal Cutting Band Saw MODEL: BS-5 SAFETY. Know your band saw. Read the operator s Manual carefully. Learn the operations, applications and limitation.. Use recommended accessories.

More information

Series 80 In-Line Mounted Centrifugal Pumps

Series 80 In-Line Mounted Centrifugal Pumps Bulletin B-G Bell & Gossett Series In-Line Mounted Centrifugal Pumps Applications Hydronic Heating & Cooling Systems Industrial Process General Service Pressure Boosting Advantages Close Coupled Space

More information

Type XTSR71 Sizes

Type XTSR71 Sizes (Page 1 of 13) s 494-5258 Type XTSR71 s 494-5258 Figure 1 Thomas XTSR71 Coupling 1. General Information 1.1 Thomas Couplings are designed to provide a mechanical connection between the rotating shafts

More information

TK 1014 A POWER SHEAR

TK 1014 A POWER SHEAR TIN KNOCKER TK 1014 A POWER SHEAR Parts Diagram & Operating Instructions TAAG INDUSTRIES CORP. 1550 SIMPSON WAY, ESCONDIDO, CA 92029 Tel: (800) 640-0746 Fax: (760) 727-9948 Website: www.tinknocker.com

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

Installation Instructions

Installation Instructions Installation Instructions XLC Generation 2 Self-aligning split bearing Experience In Motion 1 Equipment Check 1.1 Follow plant safety regulations prior to equipment disassembly: Lock out motor. Wear designated

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping

More information

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks Mounting Instructions For DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks WARNING: Because of the possible danger to person(s) or property from accidents which may result from the

More information

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM). PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3

More information

VARIABLE SPEED WOOD LATHE

VARIABLE SPEED WOOD LATHE MODEL MC1100B VARIABLE SPEED WOOD LATHE INSTRUCTION MANUAL Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference. Version: 2015.02.02

More information

25000 Series Lo-T TM Butterfly Control Valve Instructions

25000 Series Lo-T TM Butterfly Control Valve Instructions November 2001 25000 Series Lo-T TM Butterfly Control Valve Instructions Instruction No. 25.1:IM PRELIMINARY STEPS Before installation, note the flow direction arrow on the valve body. The flow should enter

More information

NAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

NAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods NAVSEA STANDARD ITEM ITEM NO: 009-48 DATE: 29 JUL 2011 CATEGORY: II 1. SCOPE: 1.1 Title: Pressure Seal Bonnet Valve; repair (shop) 2. REFERENCES: 2.1 S9086-CJ-STM-010/CH-075, Fasteners 2.2. T9074-AS-GIB-010/271,

More information

Pioneers in Gate Design

Pioneers in Gate Design Stop Logs Pioneers in Gate Design Hydro Gate 3888 E. 45th Ave. #120 Denver, CO 80216 Your Source for Water Control Gates No matter what type of gates your project demands, chances are excellent Hydro Gate

More information

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16 R K C T I Repair Kit Product Compatibility Repair Kit # Linear Actuator Assembly # LACPACC-002 LACPACC-003 LACP-16TxxLP5 (0.5-in lead screw pitch) LACP-16TxxL1 (1-in lead screw pitch) C P I R K 4 ea Flanged

More information

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Issued by: Approved by: Engineering Department Energy+ Inc. September 2016 Shawn Jackson, P.Eng. Approval is given in accordance with

More information

General Four-Way Operation, Maintenance & Service Manual

General Four-Way Operation, Maintenance & Service Manual General Four-Way Operation, Maintenance & Service Manual SCOPE Included in the following pages you will find assembly drawings, exploded views, parts lists, assembly tips, operational descriptions and

More information

Installation Instructions

Installation Instructions Installation Instructions XLC Series Self-aligning split bearing Experience In Motion 1 Equipment Check 1.1 Follow plant safety regulations prior to equipment disassembly: Lock out motor. Wear designated

More information

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS ROTARY VANE POSITIVE DISPLACEMENT DRY-AIR PUMPS VAPOR-OIL PUMPS MADE IN AMERICA SINCE 1939 CONGRATULATIONS! You have purchased one of the most dependable and thoroughly proven Rotary

More information

Vipros 357 User Pre-installation Guide

Vipros 357 User Pre-installation Guide Amada America Inc. Vipros 357 User Pre-installation Guide Amada America Inc. 7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111 Fax.: (714) 739 4099 Email infoamada.com Print Date 04/02/99

More information

Project: # Solano Community College District

Project: # Solano Community College District ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District

More information

Installation Instructions

Installation Instructions Installation Instructions Durametallic PSS III Split Seal Experience In Motion While the PSS III has been designed for rugged industrial application and ease of installation, it does require assembly in

More information

Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation

Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation Instruction Manual 1052 Size 20 Actuator (H) Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications...

More information

SERIES M MIXER MASTS

SERIES M MIXER MASTS SERIES M MIXER MASTS T AB L E O F C O N T E N T S V e n d o r D a t a Material Data Sheet 4-in. Mixer Mast Specification 3-in. Mixer Mast Specification 2 - in. M i x e r M a s t S p e c i f i c a t i o

More information

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available. SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE GENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.

More information

Publication Part No. SK

Publication Part No. SK Publication Part No. SK-463- Translating Tube Actuators Model Numbers M-464 & M-465 Rotating Screw Actuators Model Numbers M-46 & M-463 Caution This manual contains important information for the correct

More information

SECTION Display Case Door Series 1301-CM

SECTION Display Case Door Series 1301-CM 1 SECTION 12 3559 Display Case Door Series 1301-CM PART 1 - GENERAL 1.01 SUMMARY A. This section includes: 1. Display Case Glass Doors. 2. Sidelites. B. Related work in other sections: 1. 08 8000- Glazing

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

LOCOMOTIVE ENGINEERING DEPTT.

LOCOMOTIVE ENGINEERING DEPTT. SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved

More information

SECTION 7. SAFETYING

SECTION 7. SAFETYING 9/8/98 AC 43.13-1B SECTION 7. SAFETYING 7-122. GENERAL. The word safetying is a term universally used in the aircraft industry. Briefly, safetying is defined as: Securing by various means any nut, bolt,

More information

ROCK DRILLS Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A.

ROCK DRILLS Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A. S Website: www.apt-tools.com e-mail: info@apt-tools.com TDS-1027 Rev A S TOOL MAINTENANCE & REPAIR INFORMATION FIELD OPERATION: Before use: 1. Fill the reservoir with air tool oil or 10W equivalent for

More information

SECTION BASIC MATERIALS AND METHODS

SECTION BASIC MATERIALS AND METHODS SECTION 15050 BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and Fittings. 1.02 RELATED SECTIONS A. Basic Mechanical Requirements: Section 15010. B. Supports, Anchors, and Seals:

More information

PO STYLE AIR CLUTCH INSTALLATION AND MAINTENANCE MANUAL

PO STYLE AIR CLUTCH INSTALLATION AND MAINTENANCE MANUAL PO STYLE AIR CLUTCH INSTALLATION AND MAINTENANCE MANUAL P.O. Box 8148 Wichita Falls, Texas 76307 1600 Fisher Rd. Wichita Falls, Texas 76305 Phone: (940) 761-1971 Fax: (940) 761-1989 www.wptpower.com email:

More information

Specifications for Lathe L- 45/5000(for items from Sr. No.01 to Sr. No.22 in Indent)

Specifications for Lathe L- 45/5000(for items from Sr. No.01 to Sr. No.22 in Indent) Specifications for Lathe L- 45/5000(for items from Sr. 01 to Sr. 22 in Indent) Annexure-1 Sr. Specification of Parameter Parameter Value 1.0 Capacity 1.1 Height of centers (nominal) (mm) 450 1.2 Type of

More information

4) Drive Mechanisms. Techno_Isel H830 Catalog

4) Drive Mechanisms. Techno_Isel H830 Catalog 4) Drive Mechanisms This section will introduce most of the more common types of drive mechanisms found in linear motion machinery. Ideally, a drive system should not support any loads, with all the loads

More information

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax: 6o ft (18.3 m) sectional MONOPOLE TOWER INSTALLATION MANUAL Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928.779.9463 Fax: 928.779.1485 www.skystreamenergy.com 3-CMLT-1390-01

More information

AFB (AIR FAN BEARING) INSTALLATION GUIDE

AFB (AIR FAN BEARING) INSTALLATION GUIDE 654 AFB (AIR FAN BEARING) INSTALLATION GUIDE AFB PARTS Bearing Housing - Secured together with two 3/8 x 1.25 in. Cap Screws Black Wiper Seals - Secured together with O-ring cord (Subsequently depicted

More information

PRODUCT SERVICE MANUAL FOR CIG Mechanical Seal Triple Pumps

PRODUCT SERVICE MANUAL FOR CIG Mechanical Seal Triple Pumps PRODUCT SERVICE MANUAL FOR CIG Mechanical Seal Triple Pumps WARNING The Imo General Installation Operation, Maintenance, and Troubleshooting Manual, (No. SRM00046), as well as all other component manuals

More information

Looking for a small band saw? The Ellis 1100 band saw might be just what you are looking for.

Looking for a small band saw? The Ellis 1100 band saw might be just what you are looking for. 1100 MITRE BAND SAW Looking for a small band saw? The Ellis 1100 band saw might be just what you are looking for. This portable band saw moves easily to the job site. Use it as horizontal or vertical saw.

More information

MANUFACTURING INC. Specifications

MANUFACTURING INC. Specifications Page 1 of 4 GENERAL 11 Aluminum security screen doors must be tested by a recognized testing laboratory to conform to SMA 6001-2002 Proposed American National Standard Specifications for Metal Protection

More information

PENSTOCK VALVES. Performance through Excellence

PENSTOCK VALVES. Performance through Excellence VALVES & MANUFACTURING (1988) LTD. PENSTOCK VALVES Performance through Excellence SLIDEGATES WEIR GATES STOP LOGS SLIDEGATES PRECISION FACE SEALING VALVES WEIR GATES STOP LOGS SLIDEGATES Actuation Installation

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO. SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

More information

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 6010-34 Inspection 3. Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 3. If spring test equipment is available, check the tension of each spring according to the specifications

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

TECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts

TECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts TECHNICAL CORRECTION October 2006 Process Industry Practices Structural PIP STF05121 Fabrication and Installation of Anchor Bolts PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

1.1 RELATED DOCUMENTS

1.1 RELATED DOCUMENTS SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION TRAFFIC SIGNAGE

SECTION TRAFFIC SIGNAGE SECTION 10 14 53 TRAFFIC SIGNAGE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnishing and installing roadside traffic signage. B. Providing additional traffic signs as required in Sections 01 55 28 Controlling

More information

30AUTO Speed Lathe Manual

30AUTO Speed Lathe Manual 30AUTO Speed Lathe Manual Standard Features 3/4 HP Motor Air-Collet Closure 1800 RPM, Single Speed Electric Brake Cast Housing 5C Collets 3 Phase / 240 Volts DESCRIPTION: The Crozier Model 30AUTO Automotive

More information

OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE

OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE MANUAL AIR MOTOR 04666770 Edition 1 April, 1999 IMPORTANT SAFETY INFORMATION ENCLOSED. READ THIS MANUAL BEFORE OPERATING TOOL. FAILURE TO OBSERVE

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95 Model: SCD430 SCD640 Installation & Operation Guide P/N SCD640-95 Model SCD430 and SCD640 Kurt has two Self-Centering vises, a four-inch jaw width (SCD430) and a six-inch jaw width (SCD640). Jaw opening

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

COYOTE ENTERPRISES, INC. RIMLOC BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL

COYOTE ENTERPRISES, INC. RIMLOC BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL COYOTE ENTERPRISES, INC. RIMLOC BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL Parts & Machinery for the Abrasive Blast Industry 27301 East 121st Street Coweta, Oklahoma 74429 (918) 486-8411 Fax (918) 486-8412

More information

Typical Group D Rear Acoustical Cover Installation

Typical Group D Rear Acoustical Cover Installation SERIES 60 SERVICE MANUAL 1. Gear Case Cover 5. Bolt 2. Gear Case 6. Acoustical Cover 3. Acoustical Cover Snap 7. Acoustical Cover 4. Acoustical Cover Clip 8. Nut Figure 1-179 Typical Group D Rear Acoustical

More information