Message from the Americas

Size: px
Start display at page:

Download "Message from the Americas"

Transcription

1 Message from the Americas G. Dugan, Cornell Univ. for the United States Linear Collider Steering Group (USLCSG) First ILC Workshop KEK, Tsukuba, Japan Nov. 13, 2004

2 Outline Perspectives on the ILC from the ILC-Americas Workshop (SLAC, Oct , 2004) Workshop overview Summary of issues, by accelerator system Interests and capabilities of universities and national laboratories in the Americas for accelerator R&D on the ILC Conclusions Message from the Americas 2

3 ILC-Americas Workshop This workshop, sponsored by the USLCSG and held at SLAC from Oct , 2004, was open to all parties in the Americas interested in participation in accelerator R&D for the ILC. There were 156 registered participants, from national laboratories, universities, and industry. This reflects the considerable interest and excitement in the American community at the prospect of participation in the ILC project. Proceedings are at project.slac.stanford.edu/ilc/meetings/workshops/us- ILCWorkshop/workshop.html Message from the Americas 3

4 ILC-Americas Workshop The goals of the workshop, and the working group structure, mirrored those of this international workshop. To set the stage for working group discussions, the opening plenary session of the workshop included review talks on two cold LC designs: TESLA, and the US Linear Collider Technology Options Study cold design. Subsequent slides here review the discussions and conclusions from this workshop. Message from the Americas 4

5 Overall system design considerations: Beam parameters Flexibility in parameter space desirable (essential) to meet luminosity goals. Consider reduction in beam power to ease design issues and reduce cost. Beam power (bunch charge): x2 reduction Issues: single bunch density/damage threshold, detector backgrounds Benefits: DR space charge reduced, ML wakes and beam tails reduced, e+ production easier, RF cost reduced, operating margins improved Disadvantages: luminosity loss by x4. Reduce bunch spacing in ML by x 2, increase bunch number by x 2, reduce IP beta value product β y β x by x4. Benefits: Compensate L loss from x2 bunch charge reduction Disadvantages: DR s kickers harder, collective effects worse, IP optics more complex, bunch length reduction also required. Bunch length reduction by x2 in the bunch compressor Benefits: reduce transverse wakes, reduce IP disruption, reduce β y for more L Disadvantages: HOM s worse, probably need more complex two-stage compressor, CSR needs checking Message from the Americas 5

6 Overall system design considerations: Cavity gradient Good reasons to go to higher gradients are to reduce costs or to meet specific site requirements Cost drivers for gradients higher than 35 MV/m seem weak Need to update cost curves and sensitivity to input parameters Need to perform 2/3-D optimization Lorentz detuning (proportional to square of gradient) gets more difficult above ~35 MV/m Dark current could be a problem Significant payback for higher Q 0 at given gradient Lower cryogenic losses Less dark current Message from the Americas 6

7 Overall system design considerations: USLCSG Availability and 1 vs 2 tunnels Pro - for 1 tunnel Cost!!! Need to understand actual delta in cost for the 2nd tunnel and the delta in cost to equalize availability. A near-surface tunnel with gallery (SLAC) may be the cheapest solution. Possible European safety regs that prevent entry to 2nd tunnel during operations. Con - against 1 tunnel Higher component availability required to achieve luminosity. US safety regs permit (desire?) 2nd tunnel for egress. Risk associated with commissioning due to limited access. Remnant fields near the SC cavities - trapped fields. Message from the Americas 7

8 Overall system design considerations: Commissioning 1.5 or 2.5 Tunnels for use with a dogbone DR? Pros: Avoid delays in commissioning, helps operations by separating DR & ML, avoids klystron & DR coupling, adds time to dump fault condition beam from DR s & BC Cons: Minor increase in phase 1 cost, adds length to the transfer lines Conventional source + civil construction for future undulator Pros: Could complete commissioning ~15 month earlier, no undulator (or required R&D), no undulator insertion with narrow bandpass, operations friendly due to separation of systems Cons: Target issues, larger production emittance (~x2), may need predamping ring Group consensus was that both of these are good ideas Message from the Americas 8

9 Electrons: Injectors-Sources Polarized e - source technology well in hand. R&D is needed to develop laser system to meet specs, improve photocathode, develop bunching system. Positrons: Positron source system needs better modeling, and technology development to support the design. The design is strongly coupled to the dynamic aperture of the positron damping ring. A conventional (electron-beam-driven) positron source is possible. An undulator-based system is radiologically cleaner and can produce polarized positrons. It has significantly more operational complexity than a conventional source. E-166 at SLAC will provide a demonstration of such a source. Message from the Americas 9

10 Injectors-Damping Rings Acceptance, vertical emittance and beam stability are issues. A wide range of design options are being considered: Circumferences of candidate rings vary between 3 km and 17 km; Use of pre-damping ring may provide benefits. Design choices are strongly coupled to e+ source and kicker performance: faster kicker will allow reduced circumference (subject to collective effects) conventional source produces larger emittance beam, which may require pre-damping ring to achieve necessary acceptance. Fast kicker: Basic choice: fast pulsed kicker or a (more exotic) RF device. Speed (2-20 ns), stability, impedance are all issues. Message from the Americas 10

11 Main Linacs Warm RF System Components Proof-of-principle demonstrations show TESLA designs can generate, transport and control required power. A good start has been made toward component industrialization, especially for the modulators. However, need better evaluation of component efficiency, serviceability and long-term reliability. Alternative designs were presented that are aimed at reducing cost and improving reliability, serviceability and functionality. GDE organization will need to decide on strategy for developing such designs based on likely project schedule and funding scenario. Message from the Americas 11

12 Main Linacs Linac Beam Dynamics Effectiveness of beam-based dispersion control likely limited by systematics, which may not be discovered in small scale tests. Meeting cavity alignment tolerances is non-trivial in a cryomodule and could be aided with HOM signal information. Damping of relevant dipole modes appears to be under control although not fully tested with latest HOM coupler design. Test Facilities JLab and FNAL have proposed to jointly lead a major program to develop US cavity and cryomodule production capability for the ILC in the next several years. FNAL also proposes to construct a cryomodule test area with beam capability (called SMTF) that initially tests a TESLA-built cryomodule. LANL has a large dedicated facility for cavity/cryomodule assembly and vertical tests. Message from the Americas 12

13 Cavities, Modules, and Cryogenics Status To address the charge, a spreadsheet was developed which categorized issues in this area as follows. Recommend action 1 solved 1 Acceptable as is 2 worth thought, review When needed Cost & effort 1 soon, under 2y 1 minor 1 minor Benefit expected 2 Mature design, needs refinement/ optimization 2 medium 5y 2 significant 2 medium 3 optimization required 4 really needs work 5 alternative ideas needed 6 optional or upgrade 3 Good concept needs significant work 3 long ~10y 3 major 3 significant 4 Significant concern may want to consider alternatives 4 critical 5 little done, must initiate Message from the Americas 13

14 Cavities, Modules, and Cryogenics Examples of the sorts of conclusions from spreadsheet: Cryomodule Cryomodule overall- optimization required, mature design, benefit to effort ratio large Cryomodule support alignment & vibration- really needs work, significant concern, needed in ~5 yr, benefit critical Cavity Cavity point design overall- worth review - optimization in 5 yr time scale, effort minor, benefit medium Cavity modifications- superstructure- significant effort, medium time scale~5 yr, significant benefit Cavity new ideas- new shapes & traveling wave, Major effort ~10 yr, significant benefit Fabrication & Processing- material pre-scanning- really needs work, significant effort, significant benefit other ideas- NbCu, Hydroforming, spinning, medium benefit; snow (CO 2 ) cleaning- significant benefit Tuner- really needs work-soon, effort significant, benefit significant Message from the Americas 14

15 Cavities, Modules, and Cryogenics-Industrialization We all recognize that it is urgent to get going on industrial partnership & tech transfer In particular - How does the cavity module engineering design and processing evolve toward industrial design & procedure Action item: A well planned workshop on how to proceed on industrialization program would be of great value Thoughts from Jlab: The National Lab s role is to transfer technology to industry Transfer process knowledge, not define how to do it. We need to form an industrialization team with members from all regions to: Define a list of the process steps as we know them today Start an industrial forum to open up discussion, court appropriate industry and start the educating process What problems, if any, need addressing to get an industrial effort started? One US Industry s (AES) thoughts on INDUSTRIAL PARTICIPATION SUMMARY DETERMINE WHICH COMPANIES ARE INTERESTED INVOLVE THEM EARLY IN A FUNDED TECH TRANSFER PROGRAM FUND THEM TO DEVELOP MANUFACTURING PLANNING AND TO CONDUCT R & D TO DEVISE MANUFACTURING TECHNIQUES REQUIRED FOR HIGH RATE PRODUCTION Message from the Americas 15

16 ILC BDIR design choices Crossing Angle head on (or very small horizontal or vertical crossing angle) 7-20 mrad, 35 mrad Final Doublet Technology Compact SC or PM quad, large bore SC L* e.g. 3, 4, 5 m Detector VD inner radius Choices of options in instrumentation, MPS, detector, collimation, beam stabilization Risk Mitigation Beam Delivery System Options Gamma-gamma Consequence of 35 mrad crossing angle on e+e- luminosity e-e- e+ polarized Above 1 TeV running Consequence of simultaneous running of both IRs Based on regional tasks lists, a unified task list is being put together at: ks/task_list.html Message from the Americas 16

17 Beam Delivery System Urgent work for next 8 months, to make progress on the most critical choices 7-20mrad Complete optics design, based on NLC BDS, but IR2: include upstream & downstream polarimetry and energy diagnostics, use compact SC quad IR1: extra drift before IP for γ dump, TDR SC quad Energy deposition 176ns 500GeV/beam & 337ns 250GeV/beam in BDS & extraction line (including fast feedback BPMs, electrostatic separator & septa.) IR2 IR1 Head-on (0,V0.3mrad,H2mrad) Optics studies & optimize L*, consumable or passive collimation Message from the Americas 17

18 Beam Delivery System Urgent work for next 8 months, to make progress on the most critical choices (continued) Electrostatic separator beam test Optimization of extraction lines: Head on, & 7-20mrad Engineering design studies of crab cavity with electronics Commitment to start long-lead-time test beam program (ESA, ATF,..) Comparative physics study related to x-ing angle and apertures (SUSY, VD radius) Civil engineering plan to upgrade one of IRs to ~35mrad when needed (footprint should support γγ from the start) Message from the Americas 18

19 Interests and capabilities in ILC R&D- US Labs Injectors System ANL Cornell FNAL JLab LBNL LLNL MSU SLAC e- source e+ source DR-design and simulation DR-Fast kickers Bunch compressor Message from the Americas 19

20 System Interests and capabilities in ILC R&D- US Labs Main Linacs and Beam Delivery Systems BNL Cornell FNAL JLab LANL LLNL MSU SLAC Main Linac: Modulators, RF distribution, LLRF Main Linac: Klystrons Beam dynamics, DR to IP Beam delivery systems Main Linacs: Cavities and Cryomodules ANL, BNL, Cornell, FNAL, JLab, LANL, LBNL, MSU, ORNL, SLAC Message from the Americas 20

21 ILC Cryomodule Fabrication and SMTF It is imperative to establish a US-based capability in the fabrication of high gradient superconducting accelerating structures. Assume the fabrication of ~20,000 ILC accelerating structures will be shared among the three regions. Significant U.S. SCRF expertise at: Argonne, Cornell, Fermilab, Jefferson Lab, Los Alamos, Michigan State Experience extends to both development and fabrication (e.g. SNS), but at gradients significantly below 35 MV/m JLab has made an SRF proposal to DOE for ILC cryomodule fabrication and technology transfer. The vehicle is the SMTF (Superconducting Module and Test Facility). The goal is to strengthen U.S. capabilities in high gradient and high Q superconducting accelerating structures in support of the International Linear Collider (ILC) and other accelerator projects of interest to U.S. laboratories. Collaboration of major DOE and NSF laboratories and universities, with international participation. Incorporate ILC, β<1 (Proton Driver, RIA), and CW test areas. Message from the Americas 21

22 ILC Cryomodule Fabrication and SMTF Expression of Interest submitted to Fermilab Director. Based on commitment to play a leading role following the cold decision. Provisional goal is fabrication and testing of three U.S. plus one European high gradient cryomodules by (in close coordination with the GDE). Cryomodule test facility to be constructed at Fermilab Interested partners: ANL, BNL, Cornell, FNAL, JLab, LANL, LBNL, MIT, MSU, NIU, ORNL, Pennsylvania, SLAC (, DESY, INFN, KEK) Concept of a possible evolution (ILC portion): Possible ILC test bed Message from the Americas 22

23 Interests in ILC R&D- Universities Two groups of universities in the US, the Linear Collider R&D Group (LCRD, DOE-funded), and the University Consortium for Linear Collider R&D (UCLC, NSF-funded), have proposed to do both accelerator and detector R&D for the International Linear Collider. Together, the two groups assembled 71 sub-proposals from 47 universities. The accelerator R&D proposals offer the opportunity for university-based physics and engineering groups to bring their considerable intellectual resources to bear on the challenges of the ILC. Accelerator R&D work, funded by both DOE and NSF, has been started at 12 universities in the past year. Message from the Americas 23

24 Universities-currently funded ILC accelerator R&D University Mass. Institute of Technology North Carolina A&T Ohio State University Univ. British Columbia Univ. Cal., Berkeley Univ. Cal., Davis Univ. Cal., Los Angeles Univ. Illinois Univ. New Mexico Univ. South Carolina, Univ. Tennessee, Princeton Univ. Wisconsin Vanderbilt University Topic Beam loss control in klystrons Damping ring studies Radiation-Hard Electronics Final quadrupole doublet stabilization RF BPMs Radiation damage studies Optical Diffraction Radiation RF breakdown, RF fast kicker schemes Coherent Synchrotron Radiation Undulator-based polarized positron production Polarized photocathode development Electro-optic and diffraction radiation Message from the Americas 24

25 Conclusions There is enormous interest, from a wide spectrum of national laboratories and universities in the Americas, in participation in the development of the ILC. These institutions and individuals have substantial expertise, intellectual resources and capabilities to contribute to the ILC. For these groups, the first steps in the discussion of how to proceed was undertaken at the ILC-Americas workshop, and will be continued here at the First ILC Workshop. We all look forward to a productive workshop as the first step in the formation of a global collaborative effort to design and build the ILC. Message from the Americas 25

26 Conclusions We pledge to work with the GDE central team to make the best possible use of our resources under their guidance. Message from the Americas 26

Short report on the First ILC Workshop

Short report on the First ILC Workshop 1 EU contract number RII3-CT-2003-50639 CARE/ELAN Document-2004-027 Short report on the First ILC Workshop G. Guignard 1 1) CERN, Geneva, Switzerland Abstract The First International Linear Collider (ILC)

More information

X-Band Linear Collider Report*

X-Band Linear Collider Report* SLAC DOE Program Review X-Band Linear Collider Path to the Future X-Band Linear Collider Report* D. L. Burke NLC Program Director * Abstracted from recent presentations to the International Technical Recommendation

More information

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration The TESLA Linear Collider Winfried Decking (DESY) for the TESLA Collaboration Outline Project Overview Highlights 2000/2001 Publication of the TDR Cavity R&D TTF Operation A0 and PITZ TESLA Beam Dynamics

More information

The ILC Accelerator Complex

The ILC Accelerator Complex The ILC Accelerator Complex Nick Walker DESY/GDE UK LC meeting 3 rd September 2013 Oxford University, UK. 1 ILC in a Nutshell 200-500 GeV E cm e + e - collider L ~2 10 34 cm -2 s -1 upgrade: ~1 TeV central

More information

TESLA TeV Collider Project Overview

TESLA TeV Collider Project Overview Hamburg-Zeuthen Linear Collider Meeting TESLA TeV Collider Project Overview Carlo Pagani Milano & DESY carlo.pagani@desy.de The TESLA Challenge Physical limit is 50 MV/m > 25 MV/m could be obtained Common

More information

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,

More information

NLC - The Next Linear Collider Project. NLC Update. CLIC Group. CERN September D. L. Burke SLAC

NLC - The Next Linear Collider Project. NLC Update. CLIC Group. CERN September D. L. Burke SLAC NLC Update CLIC Group September 2003 SLAC Configuration Electron Injector 560 m ~10 m 170 m Pre-Linac 6 GeV (S) Compressor 136 MeV (L) 2 GeV (S) ~100 m 0.6 GeV (X) ~20 m Compressor Damping Ring e (UHF)

More information

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience Lars Hagge, Benno List SLAC, 31.03.2014 Agenda > Introduction: Collaborative Engineering > Collaborative Design &

More information

Superstructures; First Cold Test and Future Applications

Superstructures; First Cold Test and Future Applications Superstructures; First Cold Test and Future Applications DESY: C. Albrecht, V. Ayvazyan, R. Bandelmann, T. Büttner, P. Castro, S. Choroba, J. Eschke, B. Faatz, A. Gössel, K. Honkavaara, B. Horst, J. Iversen,

More information

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

Structures for RIA and FNAL Proton Driver

Structures for RIA and FNAL Proton Driver Structures for RIA and FNAL Proton Driver Speaker: Mike Kelly 12 th International Workshop on RF Superconductivity July 11-15, 2005 Argonne National Laboratory A Laboratory Operated by The University of

More information

3 General layout of the XFEL Facility

3 General layout of the XFEL Facility 3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and

More information

Current Industrial SRF Capabilities and Future Plans

Current Industrial SRF Capabilities and Future Plans and Future Plans Capabilities in view of Design Engineering Manufacturing Preparation Testing Assembly Taking into operation Future Plans Participate in and contribute to development issues, provide prototypes

More information

SNS LLRF Design Experience and its Possible Adoption for the ILC

SNS LLRF Design Experience and its Possible Adoption for the ILC SNS LLRF Design Experience and its Possible Adoption for the ILC Brian Chase SNS - Mark Champion Fermilab International Linear Collider Workshop 11/28/2005 1 Why Consider the SNS System for ILC R&D at

More information

Summary of Industrialization

Summary of Industrialization Summary of Industrialization Symposium Short list of highlights Summary of findings &discussions Conclusion 1 Time Agenda Industrialization Symposium at SFR 2005, status 4 July 2005, D.Proch Topics Speaker

More information

DESY Project. Introduction. E Elsen

DESY Project. Introduction. E Elsen ILC @ DESY Project Introduction E Elsen ILC@DESY E Elsen 2.12.2004 Why ILC @ DESY? Welcome to ILC Asian Regional Team for Linear Collider Accelerator Development KEK Home KEK Acc. Lab. ILC-Asia Accelerator

More information

Snowmass WG5: Superconducting Cavities and Couplers (Draft August 12, 2005 Rong-Li Geng) Topic 1: Cavity Shape

Snowmass WG5: Superconducting Cavities and Couplers (Draft August 12, 2005 Rong-Li Geng) Topic 1: Cavity Shape Snowmass WG5: Superconducting Cavities and Couplers (Draft August 12, 2005 Rong-Li Geng) Topic 1: Cavity Shape Overview The cavity shape determines the fundamental mode as well as the higher order modes

More information

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * T.O. Raubenheimer # for the LCLS-II Collaboration, SLAC, Menlo Park, CA 94025, USA Abstract The LCLS-II will be a CW X-ray FEL upgrade to the existing

More information

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at FLASH @ DESY N. Baboi, DESY, Hamburg for the HOM team : S. Molloy 1, N. Baboi 2, N. Eddy 3, J. Frisch 1, L. Hendrickson

More information

TESLA Progress on R1 & R2 issues

TESLA Progress on R1 & R2 issues TESLA Progress on R1 & R2 issues Carlo Pagani Milano & DESY carlo.pagani@desy.de The TESLA Challenge for LC Physical limit at 50 MV/m > 25 MV/m could be obtained Common R&D effort for TESLA Higher conversion

More information

LLRF Plans for SMTF. Ruben Carcagno (Fermilab) Nigel Lockyer (University of Pennsylvania) Thanks to DESY, PISA, KEK, Fermilab, SLAC Colleagues

LLRF Plans for SMTF. Ruben Carcagno (Fermilab) Nigel Lockyer (University of Pennsylvania) Thanks to DESY, PISA, KEK, Fermilab, SLAC Colleagues LLRF Plans for SMTF Ruben Carcagno (Fermilab) Nigel Lockyer (University of Pennsylvania) Thanks to DESY, PISA, KEK, Fermilab, SLAC Colleagues Outline Near-term (< 1.5 years) SMTF LLRF plan Long-term (>

More information

THE CRYOGENIC SYSTEM OF TESLA

THE CRYOGENIC SYSTEM OF TESLA THE CRYOGENIC SYSTEM OF TESLA S. Wolff, DESY, Notkestr. 85, 22607 Hamburg, Germany for the TESLA collaboration Abstract TESLA, a 33 km long 500 GeV centre-of-mass energy superconducting linear collider

More information

ILC Reference Design Report Accelerator Executive Summary

ILC Reference Design Report Accelerator Executive Summary SLAC-PUB-13044 ILC Reference Design Report Accelerator Executive Summary Nan Phinney, SLAC Editor on behalf of the ILC Global Design Effort The International Linear Collider (ILC) is a 200-500 GeV center-of-mass

More information

The Art and Science of Making a Major Technical Decision Choosing the Technology for the International Linear Collider

The Art and Science of Making a Major Technical Decision Choosing the Technology for the International Linear Collider The Art and Science of Making a Major Technical Decision -------------------- Choosing the Technology for the International Linear Collider Barry Barish Caltech RPM - LBNL 7-Oct-04 Why ITRP? Two parallel

More information

CEBAF Overview June 4, 2010

CEBAF Overview June 4, 2010 CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications

More information

LC Technology Hans Weise / DESY

LC Technology Hans Weise / DESY LC Technology Hans Weise / DESY All you need is... Luminosity! L σ 2 N e x σ y σ y σ x L n b f rep Re-writing reflects the LC choices... L P E b c. m. N e σ σ x y... beam power... bunch population... Ac-to-beam

More information

FLASH Operation at DESY From a Test Accelerator to a User Facility

FLASH Operation at DESY From a Test Accelerator to a User Facility FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012 Vocabulary DESY: Deutsches Elektronen-Synchrotron, Hamburg, Germany

More information

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University Overview of ERL Projects: SRF Issues and Challenges Matthias Liepe Cornell University Overview of ERL projects: SRF issues and challenges Slide 1 Outline Introduction: SRF for ERLs What makes it special

More information

ILC Status. Time line SCRF status Test Facilities Design Improvement Summary Kaoru Yokoya IPAC2010 May , Kyoto. K.Yokoya, IPAC2010, Kyoto

ILC Status. Time line SCRF status Test Facilities Design Improvement Summary Kaoru Yokoya IPAC2010 May , Kyoto. K.Yokoya, IPAC2010, Kyoto ILC Status Time line SCRF status Test Facilities Design Improvement Summary Kaoru Yokoya IPAC2010 May.26.2009, Kyoto Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 1 RDR (Reference Design Report) RDR published

More information

HOM/LOM Coupler Study for the ILC Crab Cavity*

HOM/LOM Coupler Study for the ILC Crab Cavity* SLAC-PUB-1249 April 27 HOM/LOM Coupler Study for the ILC Crab Cavity* L. Xiao, Z. Li, K. Ko, SLAC, Menlo Park, CA9425, U.S.A Abstract The FNAL 9-cell 3.9GHz deflecting mode cavity designed for the CKM

More information

EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF

EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF Y. Yamamoto #, H. Hayano, E. Kako, T. Matsumoto, S. Michizono, T. Miura, S. Noguchi, M. Satoh, T. Shishidio, K. Watanabe, KEK, Tsukuba,

More information

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011 Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs Josef Frisch Pohang, March 14, 2011 Room Temperature / Superconducting Very different pulse structures RT: single bunch or short bursts

More information

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension XFEL Cryo System Possible extension 1 st stage Project X Collaboration Meeting, FNAL September 8-9, 2010 (XFEL WP10 & WP13) Outline 2 XFEL accelerator structure TESLA technology Basic cryogenic parameters

More information

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES S. Belomestnykh HPC workshop JLAB, 30 October 2002 Introduction Many aspects of the high-power coupler design, fabrication, preparation, conditioning, integration

More information

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY

More information

Status of Warm-Cold Linear Collider Competition

Status of Warm-Cold Linear Collider Competition Status of Warm-Cold Linear Collider Competition Nick Walker (DESY) SRF 2003 Travemünde 12.09.2003 What s in Store? Pedestrians Guide to e + e - linear colliders The Findings of the 2 nd International Linear

More information

BESSY VSR: SRF challenges and developments for a variable pulse-length next generation light source

BESSY VSR: SRF challenges and developments for a variable pulse-length next generation light source BESSY VSR: SRF challenges and developments for a variable pulse-length next generation light source Institut SRF - Wissenschaft und Technologie (FG-ISRF) Adolfo Vélez et al. SRF17 Lanzhou, 17-21/7/2017

More information

International Technology Recommendation Panel. X-Band Linear Collider Path to the Future. RF System Overview. Chris Adolphsen

International Technology Recommendation Panel. X-Band Linear Collider Path to the Future. RF System Overview. Chris Adolphsen International Technology Recommendation Panel X-Band Linear Collider Path to the Future RF System Overview Chris Adolphsen Stanford Linear Accelerator Center April 26-27, 2004 Delivering the Beam Energy

More information

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First

More information

Packaging of Cryogenic Components

Packaging of Cryogenic Components Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?

More information

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report UC Berkeley Senior Personnel Yury G. Kolomensky Collaborating Institutions Stanford Linear Accelerator Center: Marc

More information

ILC Status K.Yokoya, SRF2009, Berlin

ILC Status K.Yokoya, SRF2009, Berlin ILC Status Time line Test Facilities SCRF status Rebaseline Detectors Kaoru Yokoya Sep.25.2009 SRF2009 Berlin Sep.25, 2009 K.Yokoya, SRF2009, Berlin 1 ILC/GDE Timeline RDR Baseline TDP Baseline Technical

More information

The HOMSC2018 Workshop in Cornell A Brief Summary

The HOMSC2018 Workshop in Cornell A Brief Summary The HOMSC2018 Workshop in Cornell A Brief Summary Nicoleta Baboi, DESY DESY-TEMF Meeting DESY, Hamburg, 15 Nov. 2018 Overview http://indico.classe.cornell.edu/event/185/overview Page 2 Scientific Program

More information

SMTF R&D Status. Nigel Lockyer. University of Pennsylvania 10/27/05

SMTF R&D Status. Nigel Lockyer. University of Pennsylvania 10/27/05 SMTF R&D Status Nigel Lockyer University of Pennsylvania 10/27/05 SMTF Institutions & Contact Persons: Argonne National Laboratory: Kwang-Je Kim Brookhaven National Laboratory: Ilan Ben-Zvi Center of Advanced

More information

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW* Presented at the 13th International Workshop on RF Superconductivity, Beijing, China, 2007 SRF 071120-04 OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW* S. Belomestnykh #, CLASSE, Cornell

More information

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group 7+(7(6/$;)(/352-(&7 H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group $EVWUDFW The overall layout of the X-Ray FEL to be built in international collaboration at DESY will

More information

COUPLER DESIGN CONSIDERATIONS FOR THE ILC CRAB CAVITY

COUPLER DESIGN CONSIDERATIONS FOR THE ILC CRAB CAVITY COUPLER DESIGN CONSIDERATIONS FOR THE ILC CRAB CAVITY C. Beard 1), G. Burt 2), A. C. Dexter 2), P. Goudket 1), P. A. McIntosh 1), E. Wooldridge 1) 1) ASTeC, Daresbury laboratory, Warrington, Cheshire,

More information

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction THE LEP PROJECT - STATUS REPORT Herwig Schopper CERN 1211 Geneva 23, Switzerland Introduction LEP is an e + e - collider ring designed and optimized for 2 100 GeV. In an initial phase an energy of 2 55

More information

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER C. Zhang, G.X. Pei for BEPCII Team IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China Abstract BEPCII, the second phase construction

More information

DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX

DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX Speaker: P.N. Ostroumov Contributors: A. Plastun, B. Mustapha and Z. Conway HB2016, July 7, 2016, Malmö, Sweden

More information

OVERVIEW OF REGIONAL INFRASTRUCTURES FOR SCRF DEVELOPMENT

OVERVIEW OF REGIONAL INFRASTRUCTURES FOR SCRF DEVELOPMENT OVERVIEW OF REGIONAL INFRASTRUCTURES FOR SCRF DEVELOPMENT Carlo Pagani, University of Milano and INFN Milano - LASA, Italy Abstract The perspective of building the International Linear Collider, ILC, as

More information

Fabrication Techniques for the X-band Accelerator Structures. Juwen Wang WORKSHOP ON X-BAND RF TECHNOLOGY FOR FELs March 5, 2010

Fabrication Techniques for the X-band Accelerator Structures. Juwen Wang WORKSHOP ON X-BAND RF TECHNOLOGY FOR FELs March 5, 2010 Fabrication Techniques for the X-band Accelerator Structures Juwen Wang WORKSHOP ON X-BAND RF TECHNOLOGY FOR FELs March 5, 2010 Outline 1. Introduction Brief history Achievements 2. Basics of X-Band Accelerator

More information

Crab Cavity Systems for Future Colliders. Silvia Verdú-Andrés, Ilan Ben-Zvi, Qiong Wu (Brookhaven National Lab), Rama Calaga (CERN)

Crab Cavity Systems for Future Colliders. Silvia Verdú-Andrés, Ilan Ben-Zvi, Qiong Wu (Brookhaven National Lab), Rama Calaga (CERN) International Particle Accelerator Conference Copenhagen (Denmark) 14-19 May, 2017 Crab Cavity Systems for Future Colliders Silvia Verdú-Andrés, Ilan Ben-Zvi, Qiong Wu (Brookhaven National Lab), Rama Calaga

More information

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY Abstract HIGH POWER COUPLER FOR THE TESLA TEST FACILITY W.-D. Moeller * for the TESLA Collaboration, Deutsches Elektronen-Synchrotron DESY, D-22603 Hamburg, Germany The TeV Energy Superconducting Linear

More information

HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES *

HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES * HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES * N. Baboi #, N. Eddy, T. Flisgen, H.-W. Glock, R. M. Jones, I. R. R. Shinton, and P. Zhang # # Deutsches Elektronen-Synchrotron

More information

I Illinois. A Fourier Series Kicker for the TESLA Damping Rings. Physics

I Illinois. A Fourier Series Kicker for the TESLA Damping Rings. Physics A Fourier Series Kicker for the TESLA Damping Rings George Gollin Department of University of Illinois at Urbana-Champaign LCRD 2.22 1 Introduction The TESLA damping ring fast kicker must inject/eject

More information

Illinois. Speculations About a Fourier Series Kicker for the TESLA Damping Rings. Physics

Illinois. Speculations About a Fourier Series Kicker for the TESLA Damping Rings. Physics Speculations About a Fourier Series Kicker for the TESLA Damping Rings George Gollin Department of University of llinois at Urbana-Champaign LCRD 2.22 1 llinois ntroduction TESLA damping ring fast kicker

More information

PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB *

PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB * PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB * Stephen D. Holmes, Fermilab, Batavia, IL, 60510, U.S.A. Abstract As the Fermilab Tevatron Collider program draws to a close a strategy has emerged of an

More information

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013 The European Spallation Source Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013 Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average

More information

Niowave s Growth and the Role of STTR in its Development

Niowave s Growth and the Role of STTR in its Development Niowave s Growth and the Role of STTR in its Development Terry L. Grimm Niowave, Inc. Lansing MI Presented at National Academies STTR Workshop, Wash DC, May 2015 Outline Superconducting electron linacs

More information

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute CEBAF waveguide absorbers R. Rimmer for JLab SRF Institute Outline Original CEBAF HOM absorbers Modified CEBAF loads for FEL New materials for replacement loads High power loads for next generation FELs

More information

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY Status of the European XFEL Accelerator Construction Project Reinhard Brinkmann, DESY European XFEL Introduction Some specifications Photon energy 0.3-24 kev Pulse duration ~ 10-100 fs Pulse energy few

More information

FAST RF KICKER DESIGN

FAST RF KICKER DESIGN FAST RF KICKER DESIGN David Alesini LNF-INFN, Frascati, Rome, Italy ICFA Mini-Workshop on Deflecting/Crabbing Cavity Applications in Accelerators, Shanghai, April 23-25, 2008 FAST STRIPLINE INJECTION KICKERS

More information

SIMULATIONS OF TRANSVERSE HIGHER ORDER DEFLECTING MODES IN THE MAIN LINACS OF ILC

SIMULATIONS OF TRANSVERSE HIGHER ORDER DEFLECTING MODES IN THE MAIN LINACS OF ILC SIMULATIONS OF TRANSVERSE HIGHER ORDER DEFLECTING MODES IN THE MAIN LINACS OF ILC C.J. Glasman, R.M. Jones, I. Shinton, G. Burt, The University of Manchester, Manchester M13 9PL, UK Cockcroft Institute

More information

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM FOR THE EUROPEAN XFEL Julien Branlard, for the LLRF team TALK OVERVIEW 2 Introduction Brief reminder about the XFEL LLRF system Commissioning goals

More information

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009 Beam for LCLS Henrik Loos Workshop July 29-31, 29 1 1 Henrik Loos Overview Coherent Radiation Sources Timing THz Source Performance 2 2 Henrik Loos LCLS Layout 6 MeV 135 MeV 25 MeV 4.3 GeV 13.6 GeV σ z.83

More information

Report of working group 5

Report of working group 5 Report of working group 5 Materials Cavity design Cavity Fabrication Preparatioin & Testing Power coupler HOM coupler Beam line absorber Tuner Fundamental R&D items Most important R&D items 500 GeV parameters

More information

CLIC Compact Linear Collider

CLIC Compact Linear Collider f1 CLIC Compact LInear Collider Frank Zimmermann for the CLIC Study Team many CLIC contributors! special thanks to Hans Braun, Jean-Pierre Delahaye, & Frank Tecker! Frank Zimmermann UPHUK3 2007, Bodrumr,

More information

Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions

Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions 1 Three Upgrade Options 1 : Half-Empty Build tunnel long enough (41km) for one TeV, but install only 500 GeV

More information

CHALLENGES IN ILC SCRF TECHNOLOGY *

CHALLENGES IN ILC SCRF TECHNOLOGY * CHALLENGES IN ILC SCRF TECHNOLOGY * Detlef Reschke #, DESY, D-22603 Hamburg, Germany Abstract With a baseline operating gradient of 31,5 MV/m at a Q-value of 10 10 the superconducting nine-cell cavities

More information

ILC GDE. Barry Barish Caltech. Global Design Effort July-06 HEPAP - Wash DC

ILC GDE. Barry Barish Caltech. Global Design Effort July-06 HEPAP - Wash DC ILC GDE Barry Barish Caltech 07-July-06 HEPAP - Wash DC Global Design Effort 1 The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable

More information

Superconducting RF System. Heung-Sik Kang

Superconducting RF System. Heung-Sik Kang Design of PLS-II Superconducting RF System Heung-Sik Kang On behalf of PLS-II RF group Pohang Accelerator Laboratory Content 1. Introduction 2. Physics design 3. Cryomodules 4. Cryogenic system 5. High

More information

Slide Title. Bulleted Text

Slide Title. Bulleted Text Slide Title 1 Slide Outline Title Brief view of the C-AD Complex Review of the RHIC LLRF Upgrade Platform Generic Implementation of a Feedback Loop RHIC Bunch by Bunch Longitudinal Damper Cavity Controller

More information

Energy Recovering Linac Issues

Energy Recovering Linac Issues Energy Recovering Linac Issues L. Merminga Jefferson Lab EIC Accelerator Workshop Brookhaven National Laboratory February 26-27, 2002 Outline Energy Recovery RF Stability in Recirculating, Energy Recovering

More information

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main

More information

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint 1 new module C100 Cryomodule Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint Fundamental frequency f 0 Accelerating gradient E acc 1497 MHz >

More information

LOW BETA CAVITY DEVELOPMENT FOR AN ATLAS INTENSITY UPGRADE

LOW BETA CAVITY DEVELOPMENT FOR AN ATLAS INTENSITY UPGRADE LOW BETA CAVITY DEVELOPMENT FOR AN ATLAS INTENSITY UPGRADE M. P. Kelly, Z. A. Conway, S. M. Gerbick, M. Kedzie, T. C. Reid, R. C. Murphy, B. Mustapha, S.H. Kim, P. N. Ostroumov, Argonne National Laboratory,

More information

LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC. Marc Ross 13 January 2014

LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC. Marc Ross 13 January 2014 LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC Marc Ross 13 January 2014 What are the technical and practical limits for DF? 1st limit: Heat load at 2K for each cryomodule

More information

Illinois. I Physics. Fourier engineering: progress on alternative TESLA kickers

Illinois. I Physics. Fourier engineering: progress on alternative TESLA kickers George Gollin, Fourier engineering Victoria, LC 2004 1 I hysics Fourier engineering: progress on alternative TESLA kickers George Gollin Department of hysics University of at Urbana-Champaign USA George

More information

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.

More information

The low level radio frequency control system for DC-SRF. photo-injector at Peking University *

The low level radio frequency control system for DC-SRF. photo-injector at Peking University * The low level radio frequency control system for DC-SRF photo-injector at Peking University * WANG Fang( 王芳 ) 1) FENG Li-Wen( 冯立文 ) LIN Lin( 林林 ) HAO Jian-Kui( 郝建奎 ) Quan Sheng-Wen( 全胜文 ) ZHANG Bao-Cheng(

More information

Illinois. I Physics. Investigation of TESLA Damping Ring Kickers using the A0 Photoinjector Beam

Illinois. I Physics. Investigation of TESLA Damping Ring Kickers using the A0 Photoinjector Beam George Gollin, Investigation of TESLA Damping Ring Kickers using the A0 hotoinjector Beam 1 I hysics Investigation of TESLA Damping Ring Kickers using the A0 hotoinjector Beam George Gollin Department

More information

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University ESS RF Development at Uppsala University Roger Ruber for the FREIA team Uppsala University ESS-UU Collaboration 2009 ESS and UU start discussion on 704 MHz RF development proposal for ESS dedicated test

More information

Status, perspectives, and lessons from FLASH and European XFEL

Status, perspectives, and lessons from FLASH and European XFEL 2014 International Workshop on EUV and Soft X-ray Sources November 3-6, 2014 Dublin, Ireland Status, perspectives, and lessons from FLASH and European XFEL R. Brinkmann, E.A. Schneidmiller, J, Sekutowicz,

More information

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team Engineering Challenges and Solutions for MeRHIC Andrew Burrill for the MeRHIC Team Key Components Photoinjector Design Photocathodes & Drive Laser Linac Cavities 703.75 MHz 5 cell cavities 3 rd Harmonic

More information

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting

More information

Progress in High Gradient Accelerator Research at MIT

Progress in High Gradient Accelerator Research at MIT Progress in High Gradient Accelerator Research at MIT Presented by Richard Temkin MIT Physics and Plasma Science and Fusion Center May 23, 2007 MIT Accelerator Research Collaborators MIT Plasma Science

More information

MuCool Test Area Experimental Program Summary

MuCool Test Area Experimental Program Summary MuCool Test Area Experimental Program Summary Alexey Kochemirovskiy The University of Chicago/Fermilab Alexey Kochemirovskiy NuFact'16 (Quy Nhon, August 21-27, 2016) Outline Introduction Motivation MTA

More information

Philippe Lebrun & Laurent Tavian, CERN

Philippe Lebrun & Laurent Tavian, CERN 7-11 July 2014 ICEC25 /ICMC 2014 Conference University of Twente, The Netherlands Philippe Lebrun & Laurent Tavian, CERN Ph. Lebrun & L. Tavian, ICEC25 Page 1 Contents Introduction: the European Strategy

More information

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH INVESTIGATION OF A RIDGE-LOADED WAVEGUIDE STRUCTURE FOR CLIC X-BAND CRAB CAVITY

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH INVESTIGATION OF A RIDGE-LOADED WAVEGUIDE STRUCTURE FOR CLIC X-BAND CRAB CAVITY CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CLIC Note 1003 INVESTIGATION OF A RIDGE-LOADED WAVEGUIDE STRUCTURE FOR CLIC X-BAND CRAB CAVITY V.F. Khan, R. Calaga and A. Grudiev CERN, Geneva, Switzerland.

More information

RF System Models and Longitudinal Beam Dynamics

RF System Models and Longitudinal Beam Dynamics RF System Models and Longitudinal Beam Dynamics T. Mastoridis 1, P. Baudrenghien 1, J. Molendijk 1, C. Rivetta 2, J.D. Fox 2 1 BE-RF Group, CERN 2 AARD-Feedback and Dynamics Group, SLAC T. Mastoridis LLRF

More information

Superconducting Cavity Fabrication for ILC in Japan

Superconducting Cavity Fabrication for ILC in Japan Superconducting Cavity Fabrication for ILC in Japan -Industrial Activities- Masanori MATSUOKA (Mitsubishi Heavy Industries, Ltd.) Norihiko OZAKI (Linear Collider Forum of of Japan) Tuesday, Augsut 16,

More information

Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB

Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB Y. Arimoto (KEK) IMMW 20 @ Diamond Light Source 2017/Jun/8 SuperKEKB Final focus magnet system Magnetic field measurement

More information

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K, New Tracking Gantry-Synchrotron Idea G H Rees, ASTeC, RAL, U.K, Scheme makes use of the following: simple synchrotron and gantry magnet lattices series connection of magnets for 5 Hz tracking one main

More information

Amit Roy Director, IUAC

Amit Roy Director, IUAC SUPERCONDUCTING RF DEVELOPMENT AT INTER-UNIVERSITY ACCELERATOR CENTRE (IUAC) (JOINT PROPOSAL FROM IUAC & Delhi University (DU)) Amit Roy Director, IUAC to be presented by Kirti Ranjan (DU / Fermilab) Overview

More information

Plans for the ESS Linac. Steve Peggs, ESS for the ESS collaboration

Plans for the ESS Linac. Steve Peggs, ESS for the ESS collaboration Plans for the ESS Linac, ESS for the ESS collaboration 8 Work Packages Romuald Duperrier (30 years ago) Cristina Oyon Josu Eguia Work Packages in the Design Upgrade Mats Lindroos 1. Management Coordination

More information

Status of the APEX Project at LBNL

Status of the APEX Project at LBNL at LBNL Fernando Sannibale K. Baptiste, B. Bailey, D. Colomb, C. Cork, J. Corlett, S. De Santis, J. Feng, D. Filippetto, G.Huang, R. Kraft, S. Kwiatkowski, D. Li, M. Messerly, R. Muller, W. E. Norum, H.

More information

Lawrence Berkeley Laboratory UNIVERSITY OF CALIFORNIA

Lawrence Berkeley Laboratory UNIVERSITY OF CALIFORNIA d e Lawrence Berkeley Laboratory UNIVERSITY OF CALIFORNIA Accelerator & Fusion Research Division I # RECEIVED Presented at the International Workshop on Collective Effects and Impedance for B-Factories,

More information

Chapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections

Chapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections Chapter 9 Magnet System This chapter discusses the parameters and the design of the magnets to use at KEKB. Plans on the magnet power supply systems, magnet installation procedure and alignment strategies

More information

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012 Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012 1. Møller Polarimeter 2. Compton Polarimeter Hall C 12 GeV Polarimetry Møller Polarimeter 6 GeV operation: uses 2 quads to

More information