1 NOMAD Science Working Team meeting 4 Overall Technical Status ESA/ESRIN, September
2 Overview General status & Overview Optical design Mechanical design Electronic design Firmware/Software Breadboards LNO UVIS Challenges 2
3 PDR closure General Status Most major topics closed Reliability documents to be finalized E-ICD signature Interface agreements reached in last weeks Signature expected 14/09/2012 CDR Designs maturing, but not yet at CDR level 3
4 NOMAD Block Diagram 4
5 General view 5
6 Overview LNO 6
7 Overview SO 7
8 Overview UVIS 8
9 Overview Electronic Section 9
10 Optical Design 10
11 SO & LNO Optical Design: status Optical design frozen LNO SNR remains point of attention UVIS Optical design essentially frozen SNR remains point of attention Temperature of detector: dedicated thermal strap? Stray light subtraction algorithm Simulations in progress 11
12 Optical design: alignment procedure NOMAD contributions to pointing error reduced Special alignment procedure for periscope mirrors at S/C integration facility Detailed pointing budget: 0.58 mrad S/C pointing performance remains fixed at 1 mrad Science need 1.23 mrad max 12
13 Mechanical Design 13
14 3 blade design Mechanical Design - Interface Allows thermal contraction of NOMAD Insensitive to deck deformation 3x3 M8 bolts Interface forces OK Stiffness OK 14
15 Mechanical Design - Structural Design well advanced Major mass reduction achieved: 26.7 kg Within allocation of 28.9 kg Margin too small for comfort Internal structural analysis (subsystems) to be done 15
16 Mechanical Design Optomechanics SO/LNO well advanced LNO grating in progress - manufacturing starts soon UVIS well advanced see OU Periscope design see CSL Second iteration in progress Mass reduction needed Some Interferences to be solved Shift of SO line of sight to be implemented 16
17 Mechanical Design: Radiators Design well advanced Stiffeners cryoradiator determined, to be implemented in design Side wall now does double duty as general radiator Changes probably needed after new thermal analyses 17
18 Mechanical Design: Cryoradiator 18
19 Mechanical Design: Cryoradiator with MLI 19
20 Thermal design 20
21 Thermal design: model Current thermal model predicts: 80 C variation between hot and cold cases Cold case: -60 C predicted / -80 C qualification Too cold for survival! ESA doubts some assumptions made in thermal modelling No transient analysis available Improvements may impact SNR! Biggest technical challenge for NOMAD 21
22 Electronic Design 22
23 Electronic Design: Interface Interface defined and essentially frozen in E-ICD Power Some doubt on consumed survival power Connectors Data volume and rate TC/TM structures 23
24 SO/LNO Electronic design: status Completely heritage - follow up for production UVIS & SINBAD Schematics exist Component selection in progress Layout to be started UVIS: iteration with PCB mechanics in progress Budget partialy approved for long lead components (1 Meuro) 24
25 Electronic Design: Harnessing Subcontractor selected: Glenair Harness definition almost finished Harness routing to be decided 25
26 On board software/firmware design 26
27 On board software/firmware design Instrument Software Model (ISM) delivered in August Flight firmware/software in progress 27
28 LNO Breadboard Assembly and alignment completed June/July Test campaign completed end of August: Room temperature Cold section -80 C Cold section -110 C Room temperature 28
29 LNO Breadboard 29
30 LNO Breadboard 30
31 LNO Breadboard 31
32 LNO Breadboard 32
33 LNO Breadboard Observations Image shift with temperature change of cold section Thermal leak to cold section Noise levels in image not completely as expected Design changes to flight model to be decided asap 33
34 UVIS breadboard Assembly of UVIS breadboard stalled Mirror delivery delayed due to problems with polishing 34
35 Challenges Thermal model & Thermal design Mass Under control, but remains a point of attention Pointing Under control, due to NOMAD efforts No improvement from S/C side Transfer of PCB production to Belgian company: significant schedule and financial risk 35
ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan
ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3B Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Segment
More informationSWOT PROJECT STATUS T. LAFON. SDT Toulouse 7 JULY SWOT Status
SWOT PROJECT STATUS T. LAFON SDT Toulouse 7 JULY 2015 1 ITEM System Satellite RFU/ DUPLEXER NADIR Ku DORIS Mission ground segment (SDS) MAJOR PHASE B ACTIVITIES OVERVIEW Status System engineering & architecture,
More informationA LATERAL SENSOR FOR THE ALIGNMENT OF TWO FORMATION-FLYING SATELLITES
A LATERAL SENSOR FOR THE ALIGNMENT OF TWO FORMATION-FLYING SATELLITES S. Roose (1), Y. Stockman (1), Z. Sodnik (2) (1) Centre Spatial de Liège, Belgium (2) European Space Agency - ESA/ESTEC slide 1 Outline
More informationHTHGA System TDA by Kongsberg Team TSR Presentation at ESTEC 23 February 05
HTHGA System TDA by Kongsberg Team TSR Presentation at ESTEC 23 February 05 Aud Fossdal / Johan Mürer WORLD CLASS through people, technology and dedication WORLD CLASS through people, technology and dedication
More informationLIDAX AT A GLANCE. CORPORATE PRESENTATION. ASTROMADRID - Jornadas de Instrumentación Espacial. 29th and 30th June 2011, Madrid
LIDAX AT A GLANCE. CORPORATE PRESENTATION ASTROMADRID - Jornadas de Instrumentación Espacial 29th and 30th June 2011, Madrid INDEX GENERAL HISTORY SERVICES Space Engineering Integration, Test and Validation
More informationPrime Focus Imaging Spectrograph
Prime Focus Imaging Spectrograph Status 8 of 9 collimator and 6 of 9 camera lenses received (including all lenses) Slitmask mechanism assembled and wired, waveplate mechanism assembled Structure in fabrication
More informationMonthly Progress Report April 2004
Heliosiesmic & Magnetic Imager Contract #: PY-2223 Cage Code: 65113 Total Pages: 7 Monthly Progress Report April 2004 Lockheed Martin Space Systems Company Advanced Technology Center Lockheed Martin Solar
More informationLow Cost Earth Sensor based on Oxygen Airglow
Assessment Executive Summary Date : 16.06.2008 Page: 1 of 7 Low Cost Earth Sensor based on Oxygen Airglow Executive Summary Prepared by: H. Shea EPFL LMTS herbert.shea@epfl.ch EPFL Lausanne Switzerland
More informationARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal
ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3C (DDVP) Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space
More informationLarge Aperture Telescope Technology: a design for an active lightweight multi-segmented fold-out space mirror
Large Aperture Telescope Technology: a design for an active lightweight multi-segmented fold-out space mirror Presenter: Samantha Thompson, University College London UK LATT Team Martin Whalley Ruben Edeson
More informationGLAST Large Area Telescope: Planning Meeting March 10, 2004 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6
Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Planning Meeting March 10, 2004 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard Space
More informationThe Application of SE Methodologies to the design and development of a Space Telescope
SWISSED15 The Application of SE Methodologies to the design and development of a Space Telescope Mike Johnson CSEP, Systems Engineering Teamleader at RUAG Space Overview / Aim / Agenda Aim: That you and
More informationThe Challenge. SPOT Vegetation. miniaturization. Proba Vegetation. Technology assessment:
The Challenge Spot-5 lifetime expires in 2012. The next French satellite, Pleiades, is solely dedicated to HiRes. The Belgian Federal Science Policy Office (BELSPO) declared their interest to develop an
More information1. SMOS Status 1.1 Payload 1.2 Platform 1.3 Satellite 1.4 Launcher 1.5 FOS 1.6 DPGS 2. Other Developments 3. Future (Near & Far) 4.
1. SMOS Status 1.1 Payload 1.2 Platform 1.3 Satellite 1.4 Launcher 1.5 FOS 1.6 DPGS 2. Other Developments 3. Future (Near & Far) 4. Schedule 1 1.1 Payload General: Structural / Thermal Model test campaigns
More informationCover. DLR-ESA Workshop on ARTES-11. SGEO: Implementation of of Artes-11. Dr. Andreas Winkler
Cover DLR-ESA Workshop on ARTES-11 SGEO: Implementation of of Artes-11 Dr. Andreas Winkler June June29, 29, 2006 2006 Tegernsee, Tegernsee, Germany Germany Slide 1 Table Table of of Contents - Introduction
More informationDATA COMPRESSION & PROCESSING
DATA COMPRESSION & PROCESSING Telemetry Encryption Unit (TMEU) Video Signal Processing Unit IR (BEV-IR) Video Electronic Unit (VEU) CCD Detection Electronics TELEMETRY ENCRYPTION UNIT (TMEU) Satellite
More informationPLATO Preliminary Requirements Review Technical Report
PLATO Preliminary Requirements Review Technical Report Prepared by Review Team Reference SRE-F/2013.075/ Issue 1 Revision 1 Date of Issue 16/12/2013 Status Issued Document Type Distribution Title Issue
More informationOPAL Optical Profiling of the Atmospheric Limb
OPAL Optical Profiling of the Atmospheric Limb Alan Marchant Chad Fish Erik Stromberg Charles Swenson Jim Peterson OPAL STEADE Mission Storm Time Energy & Dynamics Explorers NASA Mission of Opportunity
More informationCubeSat Proximity Operations Demonstration (CPOD) Mission Update Cal Poly CubeSat Workshop San Luis Obispo, CA
CubeSat Proximity Operations Demonstration (CPOD) Mission Update Cal Poly CubeSat Workshop San Luis Obispo, CA 04-22-2015 Austin Williams VP, Space Vehicles ConOps Overview - Designed to Maximize Mission
More informationHelioseismic Magnetic Imager Program at LMSAL
Helioseismic Magnetic Imager Program at LMSAL Contract PY-2223 Progress Report for December 2002 Introduction This is the third monthly progress report for the HMI program at LMSAL. We/LMSAL are collaborators
More informationProgress on 30K-50K Two-Stage EM PT Cold Finger for Space Applications
Progress on 30K-50K Two-Stage EM PT Cold Finger for Space Applications T. Prouvé 1, I. Charles 1, H. Leenders 2, J. Mullié 2, J. Tanchon 3, T. Trollier 3, T. Tirolien 4 1 Univ. Grenoble, Alpes, CEA INAC-SBT,
More informationStatus of the CNES / MicroCarb small
Status of the CNES / MicroCarb small satellite for CO 2 measurements D. Jouglet on behalf of the MicroCarb team (F. Buisson, D. Pradines, V. Pascal, C. Pierangelo, C. Buil, S. Gaugain, C. Deniel, F.M.
More informationLISA AIV/T. N. Dinu Jaeger ARTEMIS. [joint work with APC and CNES]
LISA AIV/T N. Dinu Jaeger ARTEMIS [joint work with APC and CNES] Outline General configuration of LISA payload & MOSA Top level MOSA AIV/T flow description Main French MOSA AIV/T activities Proposal for
More informationIntroduction to Design Process ME122
Introduction to ME122 https://www.nasa.gov 1. Identify the problem Often identified by a customer need. Would typically be a statement such as How can I design a that will? 2. Define requirements (criteria)
More informationTHE SPACE TECHNOLOGY RESEARCH VEHICLE 2 MEDIUM WAVE INFRA RED IMAGER
THE SPACE TECHNOLOGY RESEARCH VEHICLE 2 MEDIUM WAVE INFRA RED IMAGER S J Cawley, S Murphy, A Willig and P S Godfree Space Department The Defence Evaluation and Research Agency Farnborough United Kingdom
More informationMONS Field Monitor. System Definition Phase. Design Report
Field Monitor System Definition Phase Design Report _AUS_PL_RP_0002(1) Issue 1 11 April 2001 Prepared by Date11 April 2001 Chris Boshuizen and Leigh Pfitzner Checked by Date11 April 2001 Tim Bedding Approved
More informationSWIM RMA HIGH ANTENNA LIFETIME MECHANISM
SWIM RMA HIGH ANTENNA LIFETIME MECHANISM D. SUCHER (1), D. CHASSOULIER (1), X. FRANCOIS (1), F. CHAMPANDARD (1) (1) THALES ALENIA SPACE CANNES 5, allée des gabians BP 99-06156 Cannes - France Email: damien.sucher@thalesaleniaspace.com
More informationT2L2 and beyond next generation time transfer schemes
T2L2 and beyond next generation time transfer schemes Etienne Samain Patrick Vrancken (patrick.vrancken@oca.eu) Optical Clocks Workshop for ESA Cosmic Vision, Uni Düsseldorf, March 9, 2007 Toulouse, 13
More informationThe RVS3000 rendezvous and docking sensor technology
The RVS3000 rendezvous and docking sensor technology ESA Clean Space Industry Days, 23 25 Oct 2018 Hans K. Raue, Sales Director, Jena-Optronik Dr. Sebastian Dochow, Director LIDAR Products, Jena-Optronik
More informationF. Barillot Cedrat Technologies MEFISTO Design & tests of a demonstrator for filet compensation mechanism
F. Barillot Cedrat Technologies MEFISTO Design & tests of a demonstrator for filet compensation mechanism CEDRAT TECHNOLOGIES Project goal Future matrix sensors will acquire an area on ground and are then
More informationCoronal and heliospheric imaging instrumentation development at RAL Space
Coronal and heliospheric imaging instrumentation development at RAL Space JA Davies, CJ Eyles, DK Griffin, RA Harrison, KF Middleton, AG Richards, JK Rogers, SJ Tappin, IAJ Tosh, NR Waltham Heritage (1)
More informationESPA Satellite Dispenser
27th Annual Conference on Small Satellites ESPA Satellite Dispenser for ORBCOMM Generation 2 Joe Maly, Jim Goodding Moog CSA Engineering Gene Fujii, Craig Swaner ORBCOMM 13 August 2013 ESPA Satellite Dispenser
More informationThoughts on noise in LISA What do we learn from LPF? M Hewitson LISA Consortium Meeting Paris 13th October 2015
Thoughts on noise in LISA What do we learn from LPF? M Hewitson LISA Consortium Meeting Paris 13th October 2015 About the noise Noise in LISA has some sources similar to LPF, and some new sources Local
More informationMETimage Calibration & Performance Verification. Xavier Gnata ICSO 2016
METimage Calibration & Performance Verification Xavier Gnata ICSO 2016 METimage factsheet Mission Passive imaging radiometer (multi-spectral) 20 spectral channels (443 13.345nm) Global coverage within
More informationThe Virtual Spacecraft Reference Facility
The Virtual Spacecraft M.Schön, M.Arcioni, D.Temperanza, K.Hjortnaes Michael.Schoen@esa.int On-Board Software Systems Section 1 Agenda Why? What? How? When? 2 The Virtual Spacecraft architecture view EuroSim
More informationEPS Bridge Low-Cost Satellite
EPS Bridge Low-Cost Satellite Results of a Concept Study being performed for Dr. Hendrik Lübberstedt OHB-System AG OpSE Workshop Walberberg 8th November 2005 EPS Bridge Key System Requirements Minimum
More informationOPTI 521 OPTOMECHANICAL DESIGN. Tutorial: Overview of the Optical and Optomechanical Design Process. Professor: Jim Burge
OPTI 521 OPTOMECHANICAL DESIGN Tutorial: Overview of the Optical and Optomechanical Design Process Professor: Jim Burge Sara Landau Date: December 14, 2007 1 I. Introduction A wise mentor told me as I
More informationRAX: Lessons Learned in Our Spaceflight Endeavor
RAX: Lessons Learned in Our Spaceflight Endeavor Matt Bennett University of Michigan CubeSat Workshop Cal Poly, San Luis Obispo April 21 st, 2010 Background Sponsored by National Science Foundation University
More informationDFMC SBAS Receiver Development. Please note that this presentation is also published on the GSA website
DFMC SBAS Receiver Development Please note that this presentation is also published on the GSA website DFMC SBAS Receiver Prototype Objective This DFMC SBAS Receiver Prototype activity is envisaged by
More informationHosted Payload Interface Guide for Proposers CII for Earth Science Instruments Overview. Randy Regan NASA CII Team Chief Engineer
Hosted Payload Interface Guide for Proposers CII for Earth Science Instruments Overview Randy Regan NASA CII Team Chief Engineer CII Overview Agenda CII Purpose and Goal Approach Workshop #3 Purpose and
More informationPackaging of Cryogenic Components
Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?
More informationSpace-Friendly. Mini Active GPS-L1 Patch Antenna. minipatch-l1. Product Datasheet Rev. A/2017. Intended to cover all CubeSat Project needs.
Space-Friendly Mini Active GPS-L1 Patch Antenna Product Datasheet Rev. A/2017 Intended to cover all CubeSat Project needs. Made in Czech Republic, a country with space heritage since 1978. 2014-2017 SkyFox
More informationDESIGN AND QUALIFICATION OF THE MECHANISMS FOR THE ALADIN INSTRUMENT
DESIGN AND QUALIFICATION OF THE MECHANISMS FOR THE ALADIN INSTRUMENT Dr. G.S. Székely (1) and F. Henzelin (1) (1) Contraves Space AG, Schaffhauserstr. 580, CH-5082, Zürich-Seebach, Switzerland. Email:
More informationGlass Membrane Mirrors beyond NGST
Glass Membrane Mirrors beyond NGST J.H. Burge, J. R. P. Angel, B. Cuerden, N. J Woolf Steward Observatory, University of Arizona Much of the technology and hardware are in place for manufacturing the primary
More informationX band downlink for CubeSat
Eric PERAGIN CNES August 14th, 2012 Existing telemetry systems Downlink systems in UHF or S band derived from HAM protocol and equipments Allow to download few hundred of Mb to 1. Gb per pass Limitation
More informationCommissioning of Advanced Virgo
Commissioning of Advanced Virgo VSR1 VSR4 VSR5/6/7? Bas Swinkels, European Gravitational Observatory on behalf of the Virgo Collaboration GWADW Takayama, 26/05/2014 B. Swinkels Adv. Virgo Commissioning
More informationA 1m Resolution Camera For Small Satellites
A 1m Resolution Camera For Small Satellites Paper SSC06-X-5 Presenter: Jeremy Curtis 1 Introduction TopSat launched October 2005 carrying RAL s 2.5m GSD camera into a 686km orbit Built and operated by
More informationLV-POD Executive Summary Report
ISIS.LVPOD.TN.008 Release information Issue 1.1 Written by: Checked by: Approved by: C. Bernal G. Lebbink J. Rotteveel Distribution List: ISIS, ESA Page: 1 of 17 Disclaimer The contents of this document
More informationOptical Telescope Design Study Results
Optical Telescope Design Study Results 10 th International LISA Symposium Jeff Livas 20 May 2014 See also poster #19: Shannon Sankar UF and GSFC Telescope Design for a Space-based Gravitational-wave Mission
More informationOPTO-PYROTECHNICS INITIATOR DEVELOPMENTS
OPTO-PYROTECHNICS INITIATOR DEVELOPMENTS Henry MOULARD Michel CASTAREDE Opto-Pyrotechnics Workshop - Toulouse Nov. 17, 2008 Denis DILHAN CNES Toulouse Space Center Propulsion & Pyrotechnics Department
More informationMission Operations for LISA Pathfinder
Albert Einstein Institute Max Planck Institute for Gravitational Physics and Leibniz Universität Hannover Mission Operations for LISA Pathfinder Martin Hewitson for the LISA Pathfinder Team COSPAR Moscow,
More informationThe Asteroid Finder Focal Plane
The Asteroid Finder Focal Plane H. Michaelis (1), S. Mottola (1), E. Kührt (1), T. Behnke (1), G. Messina (1), M. Solbrig (1), M. Tschentscher (1), N. Schmitz (1), K. Scheibe (2), J. Schubert (3), M. Hartl
More informationThe NaoSat nanosatellite platform for in-flight radiation testing. Jose A Carrasco CEO EMXYS Spain
Jose A Carrasco CEO EMXYS Spain Presentation outline: - Purpose and objectives of EMXYS NaoSat plattform - The Platform: service module - The platform: payload module and ICD - NaoSat intended missions
More informationNASA s X2000 Program - an Institutional Approach to Enabling Smaller Spacecraft
NASA s X2000 Program - an Institutional Approach to Enabling Smaller Spacecraft Dr. Leslie J. Deutsch and Chris Salvo Advanced Flight Systems Program Jet Propulsion Laboratory California Institute of Technology
More informationPassive Microwave Products. Facts - Products - Applications
Passive Microwave Products Facts - Products - Applications High technology for the global satellite market 1. The Motive page 4 Over the course of five decades, Tesat-Spacecom has developed in-depth expertise
More informationMichigan Multipurpose MiniSat M-Cubed. Kiril Dontchev Summer CubeSat Workshop: 8/9/09
Michigan Multipurpose MiniSat M-Cubed Kiril Dontchev Summer CubeSat Workshop: 8/9/09 Michigan NanoSat Pipeline Inputs Outputs U of M Ideas Innovative technology Entrepreneurial thought Science Papers Flight
More informationEngineering the Power Delivery Network
C HAPTER 1 Engineering the Power Delivery Network 1.1 What Is the Power Delivery Network (PDN) and Why Should I Care? The power delivery network consists of all the interconnects in the power supply path
More informationOur Acquisition Challenges Moving Forward
Presented to: NDIA Space and Missile Defense Working Group Our Acquisition Challenges Moving Forward This information product has been reviewed and approved for public release. The views and opinions expressed
More informationHuman Spaceflight Programmes and Possible Greek Participation
Human Spaceflight Programmes and Possible Greek Participation By G. Reibaldi, R.Nasca, Directorate of Human Spaeflight European Space Agency Thessaloniki, Greece, December 1st, 2008 HSF-SP/2008.003/GR
More informationNIRCam Instrument Overview
NIRCam Instrument Overview Larry G. Burriesci Lockheed Martin Advanced Technology Center 3251 Hanover St., Palo Alto, CA 94304 ABSTRACT The Near Infrared (NIRCam) instrument for NASA s James Webb Space
More informationPHOTONICALLY WIRED SPACECRAFT PANELS AN ECONOMIC ANALYSIS AND DEMONSTRATOR FOR TELECOMMUNICATION SATELLITES
Philipp Putzer philipp.putzer@ohb.de 18.10.2016, Biarritz (FR) PHOTONICALLY WIRED SPACECRAFT PANELS AN ECONOMIC ANALYSIS AND DEMONSTRATOR FOR TELECOMMUNICATION SATELLITES Photonically Wired Spacecraft
More informationestec EJSM/Laplace Cosmic Vision 2015/25 L-Mission Review Board Report - Part A
estec European Space Research and Technology Centre Keplerlaan 1 2201 AZ Noordwijk The Netherlands T +31 (0)71 565 6565 F +31 (0)71 565 6040 www.esa.int EJSM/Laplace Cosmic Vision 2015/25 L-Mission Review
More informationWind Imaging Spectrometer and Humidity-sounder (WISH): a Practical NPOESS P3I High-spatial Resolution Sensor
Wind Imaging Spectrometer and Humidity-sounder (WISH): a Practical NPOESS P3I High-spatial Resolution Sensor Jeffery J. Puschell Raytheon Space and Airborne Systems, El Segundo, California Hung-Lung Huang
More informationTechnical Synopsis and Discussion of:
OPTI-521, Fall 2008 E.D. Fasse, Page 1 Technical Synopsis and Discussion of: Optical Alignment of a Pupil Imaging Spectrometer by Stephen Horchem and Richard Kohrman Proc. of SPIE Vol. 1167, Precision
More informationMission requirements and satellite overview
Mission requirements and satellite overview E. BOUSSARIE 1 Dual concept Users need Defence needs Fulfil the Defence needs on confidentiality and security Civilian needs Fulfillment of the different needs
More informationSPACE. DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Space Policy and Research Unit
1 SPACE DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Policy and Research Unit mario.amaral@ec.europa.eu Lisbon, 14-15 September 2016 2017 call topics Competitiveness of the European
More informationUSER MANUAL. S-Band Patch Antenna Type I
USER MANUAL S-Band Patch Antenna Type I 1 Change Log... 3 2 Acronyms List... 4 3 Overview... 5 4 Highlighted Features... 5 5 Antenna Layout... 5 6 Antenna Parameters... 8 7 Included In The Shipment...
More informationARCADE EXPERIMENT ON BOARD BEXUS 13 AND 17: DESIGN, INTEGRATION AND FLIGHT OF A TECHNOLOGY TEST PLATFORM WITHIN A STUDENT BALLOON PROGRAMME
CISAS G. Colombo, University of PADOVA, Via Venezia 15, 35131 Padova (ITALY) ARCADE EXPERIMENT ON BOARD BEXUS 13 AND 17: DESIGN, INTEGRATION AND FLIGHT OF A TECHNOLOGY TEST PLATFORM WITHIN A STUDENT BALLOON
More informationInterplanetary CubeSat Launch Opportunities and Payload Accommodations
Interplanetary CubeSat Launch Opportunities and Payload Accommodations Roland Coelho, VP Launch Services Tyvak Nano-Satellite Systems Inc. +1(805) 704-9756 roland@tyvak.com Partnered with California Polytechnic
More informationµsada Solar Array Drive Mechanism (ESA Contract No /17/NL/PS)
ISD Cubesat Panel µsada Solar Array Drive Mechanism (ESA Contract No 4000121485/17/NL/PS) G. Cucinella - A. Negri - 11/09/2018 The Company IMT is a private SME, founded in 1991 and active in the space
More informationSoftware Project Management 4th Edition. Chapter 3. Project evaluation & estimation
Software Project Management 4th Edition Chapter 3 Project evaluation & estimation 1 Introduction Evolutionary Process model Spiral model Evolutionary Process Models Evolutionary Models are characterized
More informationBAFFLES DESIGN OF THE PROBA-V WIDE FOV TMA
BAFFLES DESIGN OF THE PROBA-V WIDE FOV TMA A. Mazzoli 1, P. Holbrouck 2, Y. Houbrechts 1, L. Maresi 3, Y. Stockman 1, M.Taccola 3, J. Versluys 2. 1 Centre Spatial de Liège (CSL), University of Liège, Avenue
More informationExperience with Insertion Device Photon Beam Position Monitors at the APS
Experience with Insertion Device Photon Beam Position Monitors at the APS 27.6 meters (The APS has forty sectors - 1104 meters total circumference) Beam Position Monitors and Magnets in One Sector 18m
More informationPredicting and measuring non-linear behaviour at spacecraft level NAFEMS France Conference
Predicting and measuring non-linear behaviour at spacecraft level NAFEMS France Conference June the 8th, 2011 Laurent SOULA (ASTRIUM Satellite France) Alfred Newerla (ESTEC) Agenda Purpose of the study
More informationANTENNA DESPIN MECHANISM FOR BEPI COLOMBO
ANTENNA DESPIN MECHANISM FOR BEPI COLOMBO Manfred Schmid 1, Tatsuo Kawamura 2, Christian Hehr 3, Udo Rapp 4 Astrium GmbH 1, 3, 4 NEC TOSHIBA Space Systems, Ltd2 ABSTRACT The Antenna Despin Equipment for
More informationDesign Rules per November Figure 1. Generic Package G5-rev 2.0
General Design Rules G5 rev 2.0 Generic Test Package Design Rules per November 2017 Receiver Public Author I.C. (Elvis) Wan Tech Authorization V. Docter Admin Authorization P. Kat Reference G5-rev1_0-design
More informationDAVINCI Pupil Mask Size and Pupil Image Quality By Sean Adkins April 29, 2010
By Sean Adkins INTRODUCTION 3 This document discusses considerations for the DAVINCI instrument s pupil image quality and pupil mask selections. The DAVINCI instrument (Adkins et al., 2010) requires a
More informationMulti-gigabit photonic transceivers for SpaceFibre data networks
7 TH EUROPEAN CONFERENCE FOR AERONAUTICS AND SPACE SCIENCES (EUCASS) Multi-gigabit photonic transceivers for SpaceFibre data networks Ronald T. Logan Jr.* and Davinder Basuita** *Glenair Inc. 1211 Air
More informationAirbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview. Emanuele Monchieri 6 th March 2017
Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview Emanuele Monchieri 6 th March 2017 Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview Contents L5 Mission Outline Mission Concept
More informationL1 Mission Reformulation. NGO - New Gravitational wave Observer. Technical & programmatic review report
ESA UNCLASSIFIED Releasable to the Public European Space Research and Technology Centre Keplerlaan 1 2201 AZ Noordwijk The Netherlands T +31 (0)71 565 6565 F +31 (0)71 565 6040 www.esa.int L1 Mission Reformulation
More informationStatus of Free-Space Optical Communications Program at JPL
Status of Free-Space Optical Communications Program at JPL H. Hemmati Jet Propulsion Laboratory California Institute of Technology 4800 Oak Grove Dr., Pasadena, CA 91 109, M/S 161-135 Phone #: 8 18-354-4960
More informationCIRiS: Compact Infrared Radiometer in Space August, 2017
1 CIRiS: Compact Infrared Radiometer in Space August, 2017 David Osterman PI, CIRiS Mission Presented by Hansford Cutlip 10/8/201 7 Overview of the CIRiS instrument and mission The CIRiS instrument is
More informationCompact Multispectral and Hyperspectral Imagers based on a Wide Field of View TMA
Compact Multispectral and Hyperspectral Imagers based on a Wide Field of View TMA M. Taccola (AOES),S. Grabarnik (AOES), L. Maresi (ESA/ESTEC), V. Moreau (AMOS), L. de Vos (OIP), Y. Versluys (OIP), G.
More informationNASA Cost Symposium Multivariable Instrument Cost Model-TRL (MICM-TRL)
NASA Cost Symposium Multivariable Instrument Cost Model-TRL (MICM-TRL) Byron Wong NASA Goddard Space Flight Center Resource Analysis Office (RAO) March 2, 2000 RAO Instrument Cost Model Drivers SICM (366
More informationMission Goals. Brandi Casey (Project Manager)
Mission Goals Brandi Casey (Project Manager) 1 What is it? TREADS NanoSat (TREADS-N) Testbed for Responsive Experiments And Demonstrations in Space (TREADS) TREADS is a 'full-service' technology demonstration
More informationSummary. ESPA 6U Mount (SUM) overview SUM qualification status Future SUM enhancements Moog CSA adapters and ESPA family
Summary ESPA 6U Mount (SUM) overview SUM qualification status Future SUM enhancements Moog CSA adapters and ESPA family 1 CubeSat Summer Workshop 11 August 2012 ESPA Six-U Mount SUM Adapter with ESPA standard
More informationGENERAL SUPPORT TECHNOLOGY PROGRAMME. ESA Thematic Information Day Belspo, June 2012
GENERAL SUPPORT TECHNOLOGY PROGRAMME ESA Thematic Information Day Belspo, June 2012 GSTP OBJECTIVES Enabling missions of ESA and national programmes by developing technology Fostering innovation by creating
More informationPhone: , Fax: , Germany
The TET-1 Satellite Bus A High Reliability Bus for Earth Observation, Scientific and Technology Verification Missions in LEO Pestana Conference Centre Funchal, Madeira - Portugal 31 May 4 June 2010 S.
More informationSEPTA 33 Solar Array Drive Assembly
SEPTA 33 Solar Array Drive Assembly RUAG Space Schaffhauserstrasse 580 CH-8052 Zurich Switzerland Phone +41 44 306 2211 info.space@ruag.com www.ruag.com/space GENERAL DESCRIPTION The SEPTA 33 Solar Array
More informationIncorporating a Test Flight into the Standard Development Cycle
into the Standard Development Cycle Authors: Steve Wichman, Mike Pratt, Spencer Winters steve.wichman@redefine.com mike.pratt@redefine.com spencer.winters@redefine.com 303-991-0507 1 The Problem A component
More informationNASA Mars Exploration Program Update to the Planetary Science Subcommittee
NASA Mars Exploration Program Update to the Planetary Science Subcommittee Jim Watzin Director MEP March 9, 2016 The state-of-the-mep today Our operational assets remain healthy and productive: MAVEN has
More informationENGINE TEST CONFIDENCE EVALUATION SYSTEM
UNCLASSIFIED ENGINE TEST CONFIDENCE EVALUATION SYSTEM Multi-Dimensional Assessment of Technology Maturity Conference 13 September 2007 UNCLASSIFIED Michael A. Barga Chief Test Engineer Propulsion Branch
More informationDesign of the cryo-optical test of the Planck reflectors
Design of the cryo-optical test of the Planck reflectors S. Roose, A. Cucchiaro & D. de Chambure* Centre Spatial de Liège, Avenue du Pré-Aily, B-4031 Angleur-Liège, Belgium *ESTEC, Planck project, Keplerlaan
More informationPeregrine: A deployable solar imaging CubeSat mission
Peregrine: A deployable solar imaging CubeSat mission C1C Samantha Latch United States Air Force Academy d 20 April 2012 CubeSat Workshop Air Force Academy U.S. Air Force Academy Colorado Springs Colorado,
More informationManufacturing Readiness Level Deskbook
Manufacturing Readiness Level Deskbook 25 June 2010 Prepared by the OSD Manufacturing Technology Program In collaboration with The Joint Service/Industry MRL Working Group FORWARDING LETTER WILL GO HERE
More informationLow Vibration, Low Thermal Fluctuation System for Pulse Tube and Gifford- McMahon Cryocoolers
Low Vibration, Low Thermal Fluctuation System for Pulse Tube and Gifford- McMahon Cryocoolers L. Mauritsen, D. Snow, A. Woidtke, M. Chase, and I. Henslee S2 Corporation Bozeman, MT ABSTRACT A compact,
More informationSTM RH-ASIC capability
STM RH-ASIC capability JAXA 24 th MicroElectronic Workshop 13 th 14 th October 2011 Prepared by STM Crolles and AeroSpace Unit Deep Sub Micron (DSM) is strategic for Europe Strategic importance of European
More information[90.03] Status of the HST Wide Field Camera 3
[90.03] Status of the HST Wide Field Camera 3 J.W. MacKenty (STScI), R.A. Kimble (NASA/GSFC), WFC3 Team The Wide Field Camera 3 is under construction for a planned deployment in the Hubble Space Telescope
More informationGeneSat-1 Quick Look Mission Report
GeneSat-1 Bruce Yost Mission Manager (650)691-0676 GeneSat-1 Project Team GeneSat-1Project M J. Hines Payload Segment C. Friedericks Space Segment C. Freidericks MIssion Managemen
More informationAdvanced Parabolic Concentrator for Grid Competitiveness
Advanced Parabolic Concentrator for Grid Competitiveness May 2012 Supported under DOE Contract DE-EE0003584.00 David White Chief engineering Officer, SkyFuel LCOE [Real] (cents/kwhr-e) LCOE [Real] (cents/kwhr-e)
More information