1 ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3C (DDVP) Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Ground System Application Yes 1 Yes 1 Yes 1 Yes 1 Applicable Development Phase(s) Definition Technology Product Demonstration Yes 1 Yes 1 Yes 1 Yes 1 1 The table of contents identifies additional requirements specific to Domains and Development Phases. Proposal Submission Requirements A separate and self-contained Part 3C of the Technical Proposal shall be included for each Development Phase for which support is being requested under the ARTES C&G Call for Proposals. Notes on the Content of this Document This style is used for explanatory notes and guidance to help you to develop the Full Proposal content. 1 This numbered style in bold font identifies the main sections to be completed in this Part of the Proposal. 1.2 This numbered style identifies requirements for the Full Proposal content for each of the main sections of this Part of the Proposal. Page 1 of 12

2 Contents 1 General Requirements Objective of the Proposed Development Phase Models/Prototypes to be Developed within the Proposed Development Phase Risk Mitigation Activities within the Proposed Development Phase Qualification, Certification and Type Approval Activities within the Proposed Development Phase Verification Activities within the Proposed Development Phase Work to be Performed in the Proposed Development Phase Specific Requirements for the Definition Phase (All Domains) Specific Requirements for the Technology Phase (All Domains) Specific Requirements for the Space Segment Product Phase Specific Requirements for the Ground Segment and System Product Phases Specific Requirements for the Application Product Phase Specific Requirements for the Space Segment Demonstration Phase Specific Requirements for the Ground Segment and System Demonstration Phases Specific Requirements for the Application Demonstration Phase Page 2 of 12

3 1 General Requirements The DDVP defines the plan to develop the product from its current state of development (Readiness Level) to the end of the planned Development Phase and shall result in achieving the required outputs of the 1.1 The Tenderer shall provide an independent detailed (DDVP) for each of the proposed Development Phases. This Part of the Proposal zooms in from the high or top level presented in Product Development Plan presented in response to Part 3B for a specific Developments Phase included in the Tenderer s Proposal. The ECSS DRDs may be used as a reference for the content and layout of the elements of the DDV Plan (e.g. ECSS-E-ST-10-02C Annex A). The phase DDVP shall only answer the applicable set of requirements corresponding to the proposed Development Phase it describes (excluding requirements from other Development Phases). 1.2 The Tenderer shall identify the specific Development Phase to which the detailed development logic applies. 1.3 Stand-alone documents referenced as supporting information in the DDVP element of the Proposal shall be delivered to the Agency as part of the Proposal documentation package. The use of stand-alone documents is encouraged. These documents should be referenced in the Development Plan and attached (not copied) to the Proposal. 2 Objective of the Proposed Development Phase This section of the Proposal establishes the top-level objectives of the work to be performed. The details of how these objectives shall be achieved are then detailed in the section responding to the requirements relating to the work to be performed in the proposed 2.1 The Tenderer shall establish the objectives of the proposed Development Phase, including the key outputs and achievements. 2.2 The Tenderer shall indicate the target (ending) readiness level (RL) of the product, and of its major subsystems and key enabling technologies, to be achieved at the end of the proposed Development Phase. Readiness Levels for Space Segment, Ground Segment, System and Application Domains are defined in Appendix 1, Part 3B of the Technical Proposal. 2.3 The Tenderer shall confirm that the outputs of the planned Development Phase shall include an updated Business Plan reflecting the maturity of the development. For example, at the end of the Definition Phase the Business Plan should be sufficiently mature to initiate the next proposed development phase (e.g. Technology Phase). Details of the Business Plan content requirements are provided in Part 2 of this call for proposals. 2.4 The Tenderer shall confirm that the outputs of the planned Development Phase shall include updated plans to organise, direct and conduct the remaining development work in the following Development Phase, defining: i) schedule, ii) cost, iii) reviews, iv) deliverables. Page 3 of 12

4 3 Models/Prototypes to be Developed within the Proposed Development Phase 3.1 The Tenderer shall identify the Model(s) to be developed in the proposed The models to be developed should include any iterations of a given model that the Tenderer proposes to undertake within the 3.2 The Tenderer shall identify the characteristics/functionality of product to be verified by the each of the models in the proposed 4 Risk Mitigation Activities within the Proposed Development Phase 4.1 The Tenderer shall identify any risk mitigation activities to be undertaken within the proposed 5 Qualification, Certification and Type Approval Activities within the Proposed Development Phase Qualification refers to demonstrating that the product is capable of operating in the specified environment. For the Ground Segment, the term validation is often used in place of qualification. Certification refers to meeting the safety or regulatory requirements (e.g. CE marking). Type approval refers to a demonstration, by test to the extent practicable, that a product meets the technical requirements for its use within a given satellite system, with a certification that all units of the same product type will meet the requirements in a similar manner. 5.1 The Tenderer shall define the qualification, certification or type approval activities that shall be carried out within the proposed Development Phase (as applicable). 5.2 The Tenderer shall identify the model(s) to be used to achieve qualification/certification/type approval within the proposed 5.3 The Tenderer shall identify the standard(s)/procedure(s) that shall be used to achieve qualification, certification or type approval during the proposed Development Phase, for each of the models to be used for this purpose. 6 Verification Activities within the Proposed Development Phase Reference may be made to a separate test plan document (or set of documents), a copy of which should be attached to the Proposal. 6.1 The Tenderer shall identify and describe the verification activities to be performed in the proposed 6.2 The Tenderer shall give an overview of: i) The tests to be performed; ii) The model on which the tests will be performed; iii) The test environment. This information may be presented in the form of a test matrix. 6.3 The Tenderer shall identify and define the various analyses and simulations foreseen within the proposed Development Phase (if relevant). 6.4 The Tenderer shall identify the simulation tools to be utilised (if relevant). Page 4 of 12

5 7 Work to be Performed in the Proposed Development Phase This section provides a narrative description of the work to be performed in the activity. A detailed breakdown should be provided in the work package descriptions. 7.1 The Tenderer shall define the development approach to be undertaken within the proposed This section zooms in from the high or top level presented in the previous section. The development approach defines the plan to develop the product from its current state of development (Readiness Level) to the end of the planned Development Phase and shall result in achieving the required outputs of the 7.2 The development logic for the proposed Development Phase shall achieve the specific objectives of that Phase. 7.3 The Tenderer shall identify the key enabling technologies that will be developed during the proposed 7.4 The Work Description shall identify the item(s) (e.g. technology, technique, system, performance, environment etc.) to be assessed or developed within the proposed 7.5 The Tenderer shall identify the adopted manufacturing approach and associated resources required (if relevant). 8 Specific Requirements for the Definition Phase (All Domains) The requirements stated in this section only apply for a Definition Phase. Requirements Related to the Objective of the Definition Phase 8.1 The Tenderer shall confirm that the objectives of the Definition Phase include: i) Generation of a complete set of Product Requirements. ii) Completion of an initial design concept that will allow development work to continue. iii) Generation of supporting analyses that are sufficient to demonstrate the technical and economic feasibility of the product. Requirements Related to the Work to be Performed in the Definition Phase 8.2 For Application activities, the Tenderer shall include in the Proposal an initial version of the System and Service Architecture Document. The content of the document is set out in the document content definition section in Part 5C of the Management Proposal. Page 5 of 12

6 9 Specific Requirements for the Technology Phase (All Domains) The requirements stated in this section only apply for a Technology Phase. Requirements Related to the Objectives of the Technology Phase 9.1 The Tenderer shall confirm that the work to be undertaken in the Technology Phase does not include any of the following: - Materials qualification activities; - Component qualification activities; - Process qualification activities; - Qualification activities on the equipment; - Industrialisation of the product. All qualification or industrialisation activities should be carried out as part of a Product Phase. 9.2 The Tenderer shall confirm that the output of the Technology Phase shall include Breadboard(s), Prototype(s) or EM(s) of the product. The Hardware/Software developed under the Technology Phase shall be identified in the definition of the Model to be developed within the current Development Phase (see requirement 3.1). 9.3 The Tenderer shall confirm that, upon completion of the Technology Phase, all the hardware (Breadboard(s), Prototype(s) or EM(s)) and software developed during the Technology Phase shall have been subjected to an appropriate test campaign to demonstrate the functionality and/or performance of the product. Requirements Related to the Work to be Performed in the Technology Phase 9.4 For Application Segment activities, the Tenderer shall include in the Proposal an initial version of the System and Service Architecture Document. The content of the document is set out in the document content definition section in Part 5C of the Management Proposal. Requirements Related to Risk Mitigation Activities within the Technology Phase 9.5 The Tenderer shall identify the specific technology risks to be retired during the Technology Phase. Requirements Related to Verification Activities within the Technology Phase 9.6 The Tenderer shall define, for each of the items to be developed in the Technology Phase, the criteria that provide the necessary confidence to proceed with the development (e.g. success criteria). 9.7 The Tenderer shall identify the test/verification method(s) to be used during the Technology Phase to demonstrate that each technology risk has been retired. Page 6 of 12

7 10 Specific Requirements for the Space Segment Product Phase The requirements stated in this section only apply for a Space Segment Product Phase. The objective of the Product Phase is to have completed the development of the product such that the product is ready for commercial exploitation. The Product Phase activities shall conform to the following principles: a. For the development of a product to be used on a spacecraft, the Product Phase shall be related to the qualification and to non-recurring development activities preparing for its commercial production. b. Product Phase shall include a test program suitable for validating the final product. c. The result of the Product Phase shall be a product ready for commercial exploitation. Requirements Related to Objective of the Space Segment Product Phase 10.1 The Tenderer shall confirm that at the end of the Product Phase, the Tenderer shall have completed (as applicable and/or included in the activity): i) All qualification testing of the product for flight on the specified spacecraft and launch vehicles, i.e. TRL 7 shall have been reached. ii) All non-recurring development activities to prepare for the commercial production of the product. iii) All materials qualifications required for the product. iv) All parts qualifications required for the product. v) All process qualifications required for the product. vi) The industrialisation of the product. vii) The development of the product test system The Tenderer shall indicate in its Proposal which of these objectives are applicable. Requirements Related to Qualification Activities Qualification is the demonstration that an item is capable of operating in its specified operational environment with adequate margins. The decision to use a developed product for an operational mission or flight demonstration rests with its customer and is dependent upon the outcome of a separate qualification and suitability review. Thus, completion of any qualification activity in the contract does not ensure that the item will be accepted for use in a specific operational programme. Specific requirements for reviews to be held for each Development Phase are given in Part 5C of the Requirements for the Content of the Management Proposal The Tenderer shall define any component qualifications that will be performed in the proposed 10.4 The Tenderer shall define any material qualifications that will be performed in the proposed 10.5 The Tenderer shall define any process qualifications that will be performed in the proposed Requirements for the Work to be Performed in the Product Phase 10.6 The Tenderer shall detail any development activities required to prepare the product for commercial production (if applicable). For example, development of automated test software. Page 7 of 12

8 10.7 The Tenderer shall detail any product industrialisation activities to be undertaken in the Product Phase (if applicable). 11 Specific Requirements for the Ground Segment and System Product Phases The requirements stated in this section only apply for a Ground Segment and/or a System Product Phase. The objective of the Product Phase is to have completed the development of the product to the extent that it is ready for commercial exploitation. The Product Phase activities shall conform to the following principles: a. For the development of a product to be used in the Ground Segment or a System, the Product Phase shall be related to verification and industrialisation of the product (i.e. readiness for commercial production). b. The Product Phase shall include a test program suitable for verifying the final product. c. The result of the Product Phase shall be a product ready for commercial exploitation. Requirements Related to the Objective of the Product Phase 11.1 For Ground Segment and System activities the objectives of the Product Phase shall include: i) Verification of the product in a representative, non-operational environment. ii) Completion of the product design and industrialisation, ready for commercial exploitation. iii) Completion of the verification of the product performance, via a suitable test program. This verification shall confirm that the performance of the product is adequate for the target market. iv) Industrialisation of the product, or product test system (if applicable) The Tenderer shall indicate whether or not requirement 12.1 iv) is applicable. Requirements for the Work to be Performed in the Product Phase 11.3 The Tenderer shall detail any development activities required to prepare the product for commercial production (if applicable). For example, development of automated test software The Tenderer shall detail any product industrialisation activities to be undertaken in the Product Phase (if applicable). 12 Specific Requirements for the Application Product Phase The requirements stated in this section only apply for an Application Product Phase. Requirements Related to the Objective of the Product Phase 12.1 The objective of the Product Phase shall be to complete the verification of the product performance via a suitable test program. This verification shall confirm that the application/service is ready for entering into a validation stage with operational users. Requirements for the Work to be Performed in the Product Phase 12.2 If the Proposal includes software, the Tenderer shall detail any development activities required to prepare the product for commercialisation. E.g.: preparation of user manuals, getting started materials, and the transformation of the software into a self-installing package. For example, preparation of installation files. Page 8 of 12

9 12.3 The Tenderer shall include an initial version of the System and Service Architecture Document. The content of the document is set out in the document content definition section in Part 5C of the Requirement for the Content of the Management Proposal. 13 Specific Requirements for the Space Segment Demonstration Phase The requirements stated in this section only apply for a Space Segment Demonstration Phase (Atlas). Requirements Related to the Objective of the Demonstration Phase 13.1 The objective of the Demonstration Phase within the Space Segment shall be to: - Demonstrate the product in its operational environment i.e. TRL 9 shall have been reached, or - Support the launch of in-orbit flight hardware to be used in a system, service or application product, or - Support the launch of in-orbit flight hardware to be used in demonstrators to verify the functioning of the technology in a system context The outputs of the Demonstration Phase shall include: i) Measurement of the on-ground performance of the product. This shall include: - Unit Acceptance Testing; - Performance of the unit during Spacecraft Acceptance Testing. ii) Measurement of the in-orbit performance of the product. This data shall be compared to the data collected during ground testing. iii) Measurement of the in-orbit performance during the first year after the completion of in-orbit testing. This data shall be compared to the data collected during ground testing and that collected during In-Orbit-Testing. Flight Configuration Information The Flight Configuration information defines the specific information required for a Space Segment Demonstration Phase ( Atlas ) activity The Tenderer shall identify by name all products to be developed and flown as part of the Demonstration Phase The Tenderer shall explicitly state whether its request for support is an embedded case or a passenger case. The difference between an embedded and a passenger case are detailed in the cover letter of this Call for Proposals For each of the identified products, the Tenderer shall state whether or not the first flight unit is fully representative of the recurrent flight product For each of the identified products, if the first flight unit is not fully representative of the recurrent flight product, the Tenderer shall: - describe the differences with respect to the recurrent product; - justify why a fully representative example of the recurrent product is not proposed to be flown. Page 9 of 12

10 13.7 For each of the identified products, the Tenderer shall provide a description of the flight configuration, including: - the total number of units of the product to be flown, including additional units of the same type for which the Agency is not providing support; - The number of units that are proposed to be developed and flown with Atlas support; - how these units are embedded into the main mission; - How the unit(s) will be used in the context of the payload/platform architecture (e.g. redundant unit within a redundancy ring, with the rest of the hardware being standard hardware) The Tenderer shall describe the intended operational use of the product, in the proposed flight opportunity, i.e. whether these products will be part of the nominal operation or used in a redundant mode only, and whether there is an equivalent conventional item(s) installed as a redundant unit. Examples of operational use are: - the primary functional element with no other backup; - a redundant element to a primary functional element; - the primary functional element, backed up by a redundant element For each of the identified products, the Tenderer shall include information on the nature of the innovation that justifies the need for Atlas support for this particular product (first flight heritage of a new product or product variant). For example, the Tenderer has never manufactured this type of equipment before and hence has no heritage for the product The Tenderer shall, for all cases where more than one unit of the same product is proposed to be flown and supported under Atlas, explain why it is necessary to fly more than one unit: - what function(s) would not be adequately demonstrated by flying only one unit, and - how would these function(s) be adequately demonstrated by flying the proposed number of units. Atlas support is provided for the minimum number of flight units of the same product that is necessary to obtain first flight heritage for that product The development plan shall specifically identify any accommodation studies to be performed (if applicable) The development plan shall specifically identify any activities associated with the accommodation of the flight item, including assembly, integration and test at spacecraft level (if applicable) The nature of any work to be carried out by the spacecraft manufacturer shall be identified by the Tenderer. For example, accommodation studies, design modifications performed to accommodate the innovative item, hardware specifically required for accommodation purposes and satellite-level assembly, integration and test (AIT), specific activities related to the innovative product during the AIT and launch campaigns. Flight Configuration Passenger Case The requirements stated in this subsection shall only apply if the Proposal is for a Passenger case within the Space Segment Demonstration Phase (Atlas) For passenger cases, the Tenderer shall state the operator of the main Mission. Page 10 of 12

11 13.15 For Passenger cases, the Tenderer shall identify the name of and objective of the main mission of the spacecraft. Please note that the main mission does not have to be a telecommunications mission For Passenger cases, the Tenderer shall identify the launch vehicle (if it is known) For Passenger cases, the development plan shall specifically identify activities associated with the launch campaign (testing and early operation phase activities specific to the item, for verification of function and performance, or monitoring). Note: these activities can only be supported for the Passenger case For Passenger cases, the development plan shall specifically identify activities associated with the IOT and verification of the performance and function of the product. Note: these activities can only be supported for the Passenger case. 14 Specific Requirements for the Ground Segment and System Demonstration Phases The requirements stated in this section only apply for a Ground Segment and/or System Demonstration Phase. Requirements Related to the Objective of the Demonstration Development Phase 14.1 The objective of the Demonstration Phase shall be a product validated in its operational environment The output of the Demonstration Phase for the Ground Segment or System Domain shall be the performance of the product as measured in an operational environment. This data shall demonstrate that the product is fully validated in all its technical and operational elements, and is ready to be offered to a well-identified customer(s). Pilot Configuration Information The Pilot Configuration information defines the specific information required for a Ground Segment and/or System Demonstration Phase activity For each of the identified products, the Tenderer shall confirm that the product under validation is fully representative of the recurrent product The Tenderer shall confirm that the pilot configuration is of a scale sufficient to demonstrate the commercial attractiveness of the product For each of the identified products, the Tenderer shall provide a description of the operational configuration, including: - the total number of units of the product to be validated, including additional units of the same type for which the Agency is not providing support; - how these units are embedded into the Ground Segment architecture; - how the unit(s) will be used in the context of the end-to-end system The Tenderer shall describe the intended operational use of the product in the proposed pilot phase The Tenderer shall include in the Proposal an initial version of the Pilot Utilisation Plan (PilUP). The content of the document is set out in the document content definition section in Part 5C of the Requirement for the Content of the Management Proposal. Page 11 of 12

12 15 Specific Requirements for the Application Demonstration Phase The requirements stated in this section only apply for an Application Demonstration Phase. Requirements Related to the Objective of the Demonstration Development Phase 15.1 The Objective of the Demonstration Phase shall be an application/service validated with relevant users and customers and ready for a commercial rollout The output of the Demonstration Phase for the Application shall be a service fully defined and validated in all its technical and operational elements, and ready to be offered by a well-identified service provider, under clear contractual and commercial conditions. Requirements Related to the Work to be Performed in the Demonstration Phase The Tenderer shall include in the Proposal an initial version of the System and Service Architecture Document. The content of the document is set out in the document content definition section in Part 5C of the Management Proposal. Pilot Configuration Information 15.4 The Tenderer shall include in the Proposal an initial version of the Pilot Utilisation Plan (PilUP). The content of the document is set out in the document content definition section in Part 5C of the Management Proposal. Page 12 of 12

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3B Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Segment

More information

General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO)

General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO) General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO) Open Call for Technology Flight Demonstrators and Carrier Flight Opportunities Introduction The Agency

More information

GALILEO JOINT UNDERTAKING

GALILEO JOINT UNDERTAKING GALILEO Research and development activities First call Activity A User receiver preliminary development STATEMENT OF WORK GJU/03/094/issue2/OM/ms Issue 2 094 issue2 6th FP A SOW 1 TABLE OF CONTENTS 1.

More information

Satellite Technology for Future Applications

Satellite Technology for Future Applications Satellite Technology for Future Applications WSRF Panel n 4 Dubai, 3 March 2010 Guy Perez VP Telecom Satellites Programs 1 Commercial in confidence / All rights reserved, 2010, Thales Alenia Space Content

More information

TECHNOLOGY QUALIFICATION MANAGEMENT

TECHNOLOGY QUALIFICATION MANAGEMENT OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

Benefits of Standardization in National Space Activities: ASI and the European Cooperation for Space Standardization (ECSS)

Benefits of Standardization in National Space Activities: ASI and the European Cooperation for Space Standardization (ECSS) Benefits of Standardization in National Space Activities: ASI and the European Cooperation for Space Standardization (ECSS) Francesco LONGO ASI Technical Authority in ECSS Content The Italian Space Agency

More information

Technology qualification management and verification

Technology qualification management and verification SERVICE SPECIFICATION DNVGL-SE-0160 Edition December 2015 Technology qualification management and verification The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

Typical Project Life Cycle

Typical Project Life Cycle Typical Project Life Cycle D. KANIPE 1/29/2015 Contract Initiation VISION REQUEST FOR INFORMATION REQUEST FOR PROPOSAL SOURCE EVALUATION BOARD RFI RFP Proposals Evaluated Companies Respond Companies Submit

More information

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods The Preliminary Risk Approach: Merging Space and Aeronautics Methods J. Faure, A. Cabarbaye & R. Laulheret CNES, Toulouse,France ABSTRACT: Based on space industry but also on aeronautics methods, we will

More information

PLATO Preliminary Requirements Review Technical Report

PLATO Preliminary Requirements Review Technical Report PLATO Preliminary Requirements Review Technical Report Prepared by Review Team Reference SRE-F/2013.075/ Issue 1 Revision 1 Date of Issue 16/12/2013 Status Issued Document Type Distribution Title Issue

More information

GENERAL SUPPORT TECHNOLOGY PROGRAMME. ESA Thematic Information Day Belspo, June 2012

GENERAL SUPPORT TECHNOLOGY PROGRAMME. ESA Thematic Information Day Belspo, June 2012 GENERAL SUPPORT TECHNOLOGY PROGRAMME ESA Thematic Information Day Belspo, June 2012 GSTP OBJECTIVES Enabling missions of ESA and national programmes by developing technology Fostering innovation by creating

More information

DFMC SBAS Receiver Development. Please note that this presentation is also published on the GSA website

DFMC SBAS Receiver Development. Please note that this presentation is also published on the GSA website DFMC SBAS Receiver Development Please note that this presentation is also published on the GSA website DFMC SBAS Receiver Prototype Objective This DFMC SBAS Receiver Prototype activity is envisaged by

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

EGS-CC. System Engineering Team. Commonality of Ground Systems. Executive Summary

EGS-CC. System Engineering Team. Commonality of Ground Systems. Executive Summary System Engineering Team Prepared: System Engineering Team Date: Approved: System Engineering Team Leader Date: Authorized: Steering Board Date: Restriction of Disclosure: The copyright of this document

More information

SPECIAL CONDITIONS OF TENDER

SPECIAL CONDITIONS OF TENDER Page 1 SPECIAL CONDITIONS OF TENDER INTRODUCTION For the purposes of this Announcement of Opportunity ( the AO ), the Agency s General Conditions of Tender for ESA Contracts (Annex IV to the ESA Procurement

More information

Model Based AOCS Design and Automatic Flight Code Generation: Experience and Future Development

Model Based AOCS Design and Automatic Flight Code Generation: Experience and Future Development ADCSS 2016 October 20, 2016 Model Based AOCS Design and Automatic Flight Code Generation: Experience and Future Development SATELLITE SYSTEMS Per Bodin Head of AOCS Department OHB Sweden Outline Company

More information

ARTES 33 ESA Telecommunication Public Private Partnership

ARTES 33 ESA Telecommunication Public Private Partnership ARTES 33 ESA Telecommunication Public Private Partnership November 13 th, 2012 Juan Carlos Munoz-Delgado Rationale for ESA Telecom PPPs 1. What is a PPP? a. The Public-Private Partnership is a business

More information

estec REQUEST FOR INFORMATION Technologies, science payloads, and commercial services for lunar missions ESA UNCLASSIFIED - For Official Use

estec REQUEST FOR INFORMATION Technologies, science payloads, and commercial services for lunar missions ESA UNCLASSIFIED - For Official Use REQUEST FOR INFORMATION estec European Space Research and Technology Centre Keplerlaan 1 2201 AZ Noordwijk The Netherlands T +31 (0)71 565 6565 F +31 (0)71 565 6040 www.esa.int Technologies, science payloads,

More information

GUIDELINES FOR STRATEGIC RESEARCH CLUSTER ON IN-SPACE

GUIDELINES FOR STRATEGIC RESEARCH CLUSTER ON IN-SPACE GUIDELINES FOR STRATEGIC RESEARCH CLUSTER ON IN-SPACE ELECTRICAL PROPULSION AND STATION KEEPING HORIZON 2020 SPACE CALL 2016 1. INTRODUCTION... 2 2. OVERVIEW OF THE SRC ON IN-SPACE ELECTRICAL PROPULSION

More information

NEW TECHNOLOGIES. Philippe Francken. WSRF 2012, Dubai 1

NEW TECHNOLOGIES. Philippe Francken. WSRF 2012, Dubai 1 NEW TECHNOLOGIES Philippe Francken 1 Introduction Insertion of new technologies in space systems is not a goal in itself, but needs to be viewed within the broader context of innovation the ultimate objective

More information

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE.

BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE. OMB Approval Number 2700-0085 Broad Agency Announcement NNM12ZZP03K BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE April 30, 2012

More information

Italian Space Agency perspective on Small Satellites

Italian Space Agency perspective on Small Satellites Italian Space Agency perspective on Small Satellites Agenzia Spaziale Italiana (ASI) CIRA 10 February 2016 Technology and Engineering Division G. Varacalli Outline National and global scenario Challenges

More information

GeneSat-1 Quick Look Mission Report

GeneSat-1 Quick Look Mission Report GeneSat-1 Bruce Yost Mission Manager (650)691-0676 GeneSat-1 Project Team GeneSat-1Project M J. Hines Payload Segment C. Friedericks Space Segment C. Freidericks MIssion Managemen

More information

The ESA SME Initiative

The ESA SME Initiative The ESA SME Initiative J. Kauffmann 22/03/2017 ESA UNCLASSIFIED - For Official Use Outline European Space Agency ESA Industrial Policy ESA SME Policy SME Initiative Opportunities ESA UNCLASSIFIED - For

More information

SPACE. DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Space Policy and Research Unit

SPACE. DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Space Policy and Research Unit 1 SPACE DG GROW Internal Market, Industry Entrepreneurship and SMEs GROW/I1 - Policy and Research Unit mario.amaral@ec.europa.eu Lisbon, 14-15 September 2016 2017 call topics Competitiveness of the European

More information

GALILEO Research and Development Activities. Second Call. Area 3. Statement of Work

GALILEO Research and Development Activities. Second Call. Area 3. Statement of Work GALILEO Research and Development Activities Second Call Area 3 Innovation by Small and Medium Enterprises Statement of Work Rue du Luxembourg, 3 B 1000 Brussels Tel +32 2 507 80 00 Fax +32 2 507 80 01

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)05 ON THE PROVISION OF INFORMATION ON THE

More information

REQUEST FOR PROPOSAL For Color Orthogonal & Color Oblique Imagery

REQUEST FOR PROPOSAL For Color Orthogonal & Color Oblique Imagery REQUEST FOR PROPOSAL For Color Orthogonal & Color Oblique Imagery OVERVIEW Austin County Appraisal District is seeking services from a qualified and experienced vendor for the delivery of color Orthogonal

More information

TECHNOLOGY WITH A HUMAN TOUCH

TECHNOLOGY WITH A HUMAN TOUCH TECHNOLOGY WITH A HUMAN TOUCH 2 SILVER TECHNOLOGY WITH A HUMAN TOUCH TECHNOLOGY WITH A HUMAN TOUCH The SILVER project searches for new technologies to assist the elderly people in their everyday lives.

More information

The ARTES Technologies and Products programme and the Megaconstellations opportunity

The ARTES Technologies and Products programme and the Megaconstellations opportunity Portugal National Space Info Day The ARTES Technologies and Products programme and the Megaconstellations opportunity Pavilhão do Conhecimento, Alameda dos Oceanos, Lisboa, Portugal October 28 th, 2015

More information

ASSEMBLY 37TH SESSION

ASSEMBLY 37TH SESSION International Civil Aviation Organization WORKING PAPER A37-WP/195 1 22/9/10 (Information paper) ASSEMBLY 37TH SESSION TECHNICAL COMMISSION Agenda Item 35: The Global Air Traffic Management (ATM) System

More information

Review of Technology Level 3 achievement and Level 3 and 4 unit standards. Graphics Design Graphic Communication

Review of Technology Level 3 achievement and Level 3 and 4 unit standards. Graphics Design Graphic Communication Page 1 of 18 Fields Engineering and and Sciences Review of Level 3 achievement and Level 3 and 4 unit standards Unit standards Field Subfield Domain ID Engineering and Design Design Computer 19355 Graphics

More information

SCOE SIMULATION. Pascal CONRATH (1), Christian ABEL (1)

SCOE SIMULATION. Pascal CONRATH (1), Christian ABEL (1) SCOE SIMULATION Pascal CONRATH (1), Christian ABEL (1) Clemessy Switzerland AG (1) Gueterstrasse 86b 4053 Basel, Switzerland E-mail: p.conrath@clemessy.com, c.abel@clemessy.com ABSTRACT During the last

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit) Incentive Guidelines Aid for Research and Development Projects (Tax Credit) Issue Date: 8 th June 2017 Version: 1 http://support.maltaenterprise.com 2 Contents 1. Introduction 2 Definitions 3. Incentive

More information

Guidance on design of work programmes for minerals prospecting, exploration and mining permits

Guidance on design of work programmes for minerals prospecting, exploration and mining permits MINERALS GUIDELINES JUNE 2017 CROWN MINERALS ACT 1991 MINERALS PROGRAMME FOR MINERALS (EXCLUDING PETROLEUM) 2013 CROWN MINERALS (MINERALS OTHER THAN PETROLEUM) REGULATIONS 2007 Guidance on design of work

More information

learning progression diagrams

learning progression diagrams Technological literacy: implications for Teaching and learning learning progression diagrams The connections in these Learning Progression Diagrams show how learning progresses between the indicators within

More information

Aerospace Software* Cost and Timescale Reduction *and complex electronic hardware

Aerospace Software* Cost and Timescale Reduction *and complex electronic hardware Aerospace Software* Cost and Timescale Reduction *and complex electronic hardware Andrew Hawthorn Deputy Director, Intelligent Systems / Altran UK and SECT-AIR WP4 Lead on behalf of the SECT-AIR Consortium

More information

Technology Transfer: An Integrated Culture-Friendly Approach

Technology Transfer: An Integrated Culture-Friendly Approach Technology Transfer: An Integrated Culture-Friendly Approach I.J. Bate, A. Burns, T.O. Jackson, T.P. Kelly, W. Lam, P. Tongue, J.A. McDermid, A.L. Powell, J.E. Smith, A.J. Vickers, A.J. Wellings, B.R.

More information

Understand that technology has different levels of maturity and that lower maturity levels come with higher risks.

Understand that technology has different levels of maturity and that lower maturity levels come with higher risks. Technology 1 Agenda Understand that technology has different levels of maturity and that lower maturity levels come with higher risks. Introduce the Technology Readiness Level (TRL) scale used to assess

More information

1. Introduction. defining and producing new materials with advanced properties, or optimizing industrial processes.

1. Introduction. defining and producing new materials with advanced properties, or optimizing industrial processes. Call for Interest Commercial Agents to market and sell the use of the facilities, resources and services on board the International Space Station in the Materials and Processes sector across Europe 1.

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

ESPA Satellite Dispenser

ESPA Satellite Dispenser 27th Annual Conference on Small Satellites ESPA Satellite Dispenser for ORBCOMM Generation 2 Joe Maly, Jim Goodding Moog CSA Engineering Gene Fujii, Craig Swaner ORBCOMM 13 August 2013 ESPA Satellite Dispenser

More information

Method for CubeSat Thermal-Vacuum testing specification

Method for CubeSat Thermal-Vacuum testing specification IAC-16.C2.IP.16.x35704 Method for CubeSat Thermal-Vacuum testing specification Roy Stevenson Soler Chisabas Eduardo Escobar Bürger Gabriel Coronel Geilson Loureiro INTRODUCTION The CubeSat is a type of

More information

GALILEO Research and Development Activities. Second Call. Area 1A. Statement of Work

GALILEO Research and Development Activities. Second Call. Area 1A. Statement of Work GALILEO Research and Development Activities Second Call Area 1A GNSS Introduction in the Maritime Sector Statement of Work Rue du Luxembourg, 3 B 1000 Brussels Tel +32 2 507 80 00 Fax +32 2 507 80 01 www.galileoju.com

More information

Robotics in Horizon 2020 IMPACT and Technology Readiness Levels

Robotics in Horizon 2020 IMPACT and Technology Readiness Levels Robotics in Horizon 2020 IMPACT and Technology Readiness Levels Franco Mastroddi Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission v3 H2020 Robotics Info Day Luxembourg

More information

Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction

Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction Prepared for: National Defense Industrial Association (NDIA) 26 October 2011 Peter Lierni & Amar Zabarah

More information

EU Support for SME Innovation: The SME Instrument

EU Support for SME Innovation: The SME Instrument Audit preview Information on an upcoming audit EU Support for SME Innovation: The SME Instrument April 2019 2 Traditionally, start-ups and small and medium-sized enterprises (SMEs) in the EU have faced

More information

NASA Cost Symposium Multivariable Instrument Cost Model-TRL (MICM-TRL)

NASA Cost Symposium Multivariable Instrument Cost Model-TRL (MICM-TRL) NASA Cost Symposium Multivariable Instrument Cost Model-TRL (MICM-TRL) Byron Wong NASA Goddard Space Flight Center Resource Analysis Office (RAO) March 2, 2000 RAO Instrument Cost Model Drivers SICM (366

More information

High Performance Engineering

High Performance Engineering Call for Nomination High Performance Engineering Ref. IO/16/CFT/70000243/CDP Purpose The purpose of this Framework Contract is to provide high performance engineering and physics development services for

More information

Space Debris Mitigation Status of China s Launch Vehicle

Space Debris Mitigation Status of China s Launch Vehicle Space Debris Mitigation Status of China s Launch Vehicle SONG Qiang (Beijing Institute of Aerospace Systems Engineering) Abstract: China s launch vehicle has being developed for more than 40 years. Various

More information

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

GAMMa - A modular ascender concept for sample return missions

GAMMa - A modular ascender concept for sample return missions GAMMa - A modular ascender concept for sample return missions IPPW 15, Boulder, Colorado, USA 14 th June 2018 R. Buchwald, F. Ebert, O. Angerer Lunar Polar Sample Return (LPSR) Mars Sample Return (MSR)

More information

Using COTs components to Reduce Space Mission Costs: Facts, Myths, Advantages & Pitfalls

Using COTs components to Reduce Space Mission Costs: Facts, Myths, Advantages & Pitfalls Changing the economics of space Using COTs components to Reduce Space Mission Costs: Facts, Myths, Advantages & Pitfalls Andy Bradford Director of Special Programmes, Surrey Satellite Technology Limited

More information

Human Spaceflight Programmes and Possible Greek Participation

Human Spaceflight Programmes and Possible Greek Participation Human Spaceflight Programmes and Possible Greek Participation By G. Reibaldi, R.Nasca, Directorate of Human Spaeflight European Space Agency Thessaloniki, Greece, December 1st, 2008 HSF-SP/2008.003/GR

More information

Technology and Manufacturing Readiness Levels [Draft]

Technology and Manufacturing Readiness Levels [Draft] MC-P-10-53 This paper provides a set of scales indicating the state of technological development of a technology and its readiness for manufacture, derived from similar scales in the military and aerospace

More information

Strategic Research Cluster on Electric Propulsion H2020 Space call text 2016 & related Guidelines document

Strategic Research Cluster on Electric Propulsion H2020 Space call text 2016 & related Guidelines document Strategic Research Cluster on Electric Propulsion H2020 Space call text 2016 & related Guidelines document J. Gonzalez del Amo ESA - EPIC Coordinator H2020 International Space Information Day Warsaw, 29

More information

EUROPEAN GNSS APPLICATIONS IN H2020

EUROPEAN GNSS APPLICATIONS IN H2020 EUROPEAN GNSS APPLICATIONS IN H2020 Introduction to Call H2020-Galileo-2014-1 Marta Krywanis-Brzostowska Market Development European GNSS Agency www.gsa.europa.eu/r-d/h2020 Agenda R&D in the European GNSS

More information

Announcement of Opportunity for the JUICE Payload

Announcement of Opportunity for the JUICE Payload Announcement of Opportunity for the JUICE Payload Reference ESA/SRE(2012)4 Issue 1 Revision 0 Date of Issue 22.06.2012 Status Authorised Document Type PL Distribution Title Announcement of Opportunity

More information

Fault Management Architectures and the Challenges of Providing Software Assurance

Fault Management Architectures and the Challenges of Providing Software Assurance Fault Management Architectures and the Challenges of Providing Software Assurance Presented to the 31 st Space Symposium Date: 4/14/2015 Presenter: Rhonda Fitz (MPL) Primary Author: Shirley Savarino (TASC)

More information

GUIDELINE DOCUMENT FOR FUNDING APPLICATION

GUIDELINE DOCUMENT FOR FUNDING APPLICATION GUIDELINE DOCUMENT FOR FUNDING APPLICATION 1 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. FUNDING AND SUPPORT SCHEMES... 3 2.1 Risk funding schemes... 3 3. ELIGIBILITY... 4 3.1 Who is eligible?... 4 3.2 Minimum

More information

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems Summary for Call for Nominations 1. Background and scope ITER will be the world's largest experimental facility to demonstrate

More information

ESA Technology Programmes: Spanish Participation in TRP and GSTP

ESA Technology Programmes: Spanish Participation in TRP and GSTP ESA Technology Programmes: Spanish Participation in TRP and GSTP U. Becker E.Kircher J. Amador Technology Programmes Office ESA/CDTI Technology Development: Opportunities and Challenges Information Meeting

More information

ASSESSMENT OF THE USE OF C-BAND FOR GNSS AO 5410, closing 30/05/2007

ASSESSMENT OF THE USE OF C-BAND FOR GNSS AO 5410, closing 30/05/2007 ASSESSMENT OF THE USE OF C-BAND FOR GNSS AO 5410, closing 30/05/2007 GNSS EVOLUTIONS PROGRAMME SYSTEM EXPLORATION STUDIES Information Day 23 rd April 2007 This presentation is for information purposes

More information

EXPERIENCE OF PARTICIPATION IN INTERNATIONAL SCIENTIFIC AND EDUCATIONAL SPACE PROJECTS BY THE EXAMPLE OF QB50 PROJECT

EXPERIENCE OF PARTICIPATION IN INTERNATIONAL SCIENTIFIC AND EDUCATIONAL SPACE PROJECTS BY THE EXAMPLE OF QB50 PROJECT EXPERIENCE OF PARTICIPATION IN INTERNATIONAL SCIENTIFIC AND EDUCATIONAL SPACE PROJECTS BY THE EXAMPLE OF QB50 PROJECT Postgraduate student of Inter-University Space Research Department Denis Davydov Samara,

More information

Annex B: HEO Satellite Mission

Annex B: HEO Satellite Mission Annex B: HEO Satellite Mission Table of Content TABLE OF CONTENT...I 1. INTRODUCTION...1 1.1. General... 1 1.2. Response Guidelines... 1 2. BRAODBAND CAPACITY...2 2.1. Mission Overview... 2 2.1.1. HEO

More information

TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS.

TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS. TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS. 1. Document objective This note presents a help guide for

More information

SMR Conference Manchester 2014 Regulator s view UK and International. Bob Jennings Systems Lead for ONR s Generic Design Assessment (GDA)

SMR Conference Manchester 2014 Regulator s view UK and International. Bob Jennings Systems Lead for ONR s Generic Design Assessment (GDA) SMR Conference Manchester 2014 Regulator s view UK and International Bob Jennings Systems Lead for ONR s Generic Design Assessment (GDA) Contents Approach to New Nuclear Build Regulation in Great Britain:

More information

LOGICAL FRAMEWORK MATRIX LFM

LOGICAL FRAMEWORK MATRIX LFM Wider Objective: What is the overall broader objective, to which the project will contribute? To contribute to the establishment of institutional framework for the third mission of the universities in

More information

System Architecture Module Exploration Systems Engineering, version 1.0

System Architecture Module Exploration Systems Engineering, version 1.0 System Architecture Module Exploration Systems Engineering, version 1.0 Exploration Systems Engineering: System Architecture Module Module Purpose: System Architecture Place system architecture development

More information

A Methodology for Effective Reuse of Design Simulators in Operational Contexts: Lessons Learned in European Space Programmes

A Methodology for Effective Reuse of Design Simulators in Operational Contexts: Lessons Learned in European Space Programmes A Methodology for Effective Reuse of Design Simulators in Operational Contexts: Lessons Learned in European Space Programmes 11th International Workshop on Simulation & EGSE facilities for Space Programmes

More information

EUROPEAN SPACE AGENCY INDUSTRIAL POLICY COMMITTEE GENERAL SUPPORT TECHNOLOGY PROGRAMME GSTP-5 ELEMENT-2 INITIAL WORK PLAN

EUROPEAN SPACE AGENCY INDUSTRIAL POLICY COMMITTEE GENERAL SUPPORT TECHNOLOGY PROGRAMME GSTP-5 ELEMENT-2 INITIAL WORK PLAN Att.: Annexes Paris, 9 April 2009 (English only) EUROPEAN SPACE AGENCY INDUSTRIAL POLICY COMMITTEE GENERAL SUPPORT TECHNOLOGY PROGRAMME GSTP-5 ELEMENT-2 INITIAL WORK PLAN SUMMARY This document presents

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

Attitude Determination and Control Specifications

Attitude Determination and Control Specifications Attitude Determination and Control Specifications 1. SCOPE The attitude determination and control sub system will passively control the orientation of the two twin CubeSats. 1.1 General. This specification

More information

Floating Power Plant A/S POSEIDON project

Floating Power Plant A/S POSEIDON project Floating Power Plant A/S POSEIDON project Report: Certification Qualification and Documentation for Certification Process Work package: WP3 Subtask: D.3.2 Date: 28 February 2017 Revision: 1 External Public

More information

D/SCI/DJS/SV/val/21851 Paris, 5 March 2007 CALL FOR PROPOSALS FOR THE FIRST PLANNING CYCLE OF COSMIC VISION

D/SCI/DJS/SV/val/21851 Paris, 5 March 2007 CALL FOR PROPOSALS FOR THE FIRST PLANNING CYCLE OF COSMIC VISION D/SCI/DJS/SV/val/21851 Paris, 5 March 2007 CALL FOR PROPOSALS FOR THE FIRST PLANNING CYCLE OF COSMIC VISION 2015-2025 1. Introduction In the well established tradition of the Horizon 2000 (1984) and Horizon

More information

SURREY GSA CATALOG. Surrey Satellite Technology US LLC 8310 South Valley Highway, 3rd Floor, Englewood, CO

SURREY GSA CATALOG. Surrey Satellite Technology US LLC 8310 South Valley Highway, 3rd Floor, Englewood, CO SURREY CATALOG Space-Qualified flight hardware for small satellites, including GPS receivers, Attitude Determination and Control equipment, Communications equipment and Remote Sensing imagers Professional

More information

GANOMIC. Disruptive technologies for PPU cost & volume efficiency

GANOMIC. Disruptive technologies for PPU cost & volume efficiency The project leading to this application has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 730038 GANOMIC Disruptive technologies for

More information

Cover. DLR-ESA Workshop on ARTES-11. SGEO: Implementation of of Artes-11. Dr. Andreas Winkler

Cover. DLR-ESA Workshop on ARTES-11. SGEO: Implementation of of Artes-11. Dr. Andreas Winkler Cover DLR-ESA Workshop on ARTES-11 SGEO: Implementation of of Artes-11 Dr. Andreas Winkler June June29, 29, 2006 2006 Tegernsee, Tegernsee, Germany Germany Slide 1 Table Table of of Contents - Introduction

More information

Mid Term Exam SES 405 Exploration Systems Engineering 3 March Your Name

Mid Term Exam SES 405 Exploration Systems Engineering 3 March Your Name Mid Term Exam SES 405 Exploration Systems Engineering 3 March 2016 --------------------------------------------------------------------- Your Name Short Definitions (2 points each): Heuristics - refers

More information

Office of Technology Development (OTD) Gap Fund

Office of Technology Development (OTD) Gap Fund The University of Southern Mississippi Office of Technology Development (OTD) Gap Fund SUBMISSION PROCESS The Office of Technology Development (OTD) Gap Fund is intended to further the commercial potential

More information

CONCURRENT EVALUATION - AN APPLICATION FOR DLR S CONCURRENT ENGINEERING FACILITY SECESA OCTOBER 2010

CONCURRENT EVALUATION - AN APPLICATION FOR DLR S CONCURRENT ENGINEERING FACILITY SECESA OCTOBER 2010 CONCURRENT EVALUATION - AN APPLICATION FOR DLR S CONCURRENT ENGINEERING FACILITY SECESA 2010 13-15 OCTOBER 2010 André Weiß, Volker Maiwald, Guido Wübbels Institute of Space System, German Aerospace Center

More information

Manufacturing Readiness Level Deskbook

Manufacturing Readiness Level Deskbook Manufacturing Readiness Level Deskbook 25 June 2010 Prepared by the OSD Manufacturing Technology Program In collaboration with The Joint Service/Industry MRL Working Group FORWARDING LETTER WILL GO HERE

More information

GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE. Section 1 - Introduction

GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE. Section 1 - Introduction GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE Section 1 - Introduction 1.1 Pursuant to section 7(5) of the Telecommunications Ordinance (hereinafter the Ordinance ), the Communications

More information

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 ANNEXURE A TECHNICAL SPECIFICATIONS ICASA 09/2018 1. Purpose of the Request

More information

NZQA registered unit standard version 4 Page 1 of 5. Plan, construct, modify, and report on an electronic prototype

NZQA registered unit standard version 4 Page 1 of 5. Plan, construct, modify, and report on an electronic prototype Page 1 of 5 Title Plan, construct, modify, and report on an electronic prototype Level 3 Credits 6 Purpose This unit standard is intended for use in a senior secondary school environment, pre-employment

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

From concept to launch of remote sensing satellites

From concept to launch of remote sensing satellites ENMAP Summer School on Remote Sensing Data Analysis From concept to launch of remote sensing satellites Roland Doerffer Retired from Helmholtz Zentrum Geesthacht Institute of Coastal Research Now: Brockmann

More information

TYPE APPROVAL PROCEDURE

TYPE APPROVAL PROCEDURE Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated

More information

GALILEO Research and Development Activities. Second Call. Area 1B. Interference Detection Mitigation and Isolation.

GALILEO Research and Development Activities. Second Call. Area 1B. Interference Detection Mitigation and Isolation. GALILEO Research and Development Activities Second Call Area 1B Interference Detection Mitigation and Isolation Statement of Work Rue du Luxembourg, 3 B 1000 Brussels Tel +32 2 507 80 00 Fax +32 2 507

More information

Navigating the Healthcare Innovation Cycle

Navigating the Healthcare Innovation Cycle Navigating the Healthcare Innovation Cycle Introduction: CIMIT s 20 + years of experience in facilitating more than 600 projects is that innovation in Healthcare is a learnable, teachable process, which

More information

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011 LESSONS LEARNED IN PERFORMING TECHNOLOGY READINESS ASSESSMENT (TRA) FOR THE MILESTONE (MS) B REVIEW OF AN ACQUISITION CATEGORY (ACAT)1D VEHICLE PROGRAM Jerome Tzau TARDEC System Engineering Group UNCLASSIFIED:

More information

GENERAL DESCRIPTION OF THE CMC SERVICES

GENERAL DESCRIPTION OF THE CMC SERVICES STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the

More information

Report ITU-R SM.2181 (09/2010)

Report ITU-R SM.2181 (09/2010) Report ITU-R SM.2181 (09/2010) Use of Appendix 10 of the Radio Regulations to convey information related to emissions from both GSO and non-gso space stations including geolocation information SM Series

More information

Aboriginal Consultation and Environmental Assessment Handout CEAA November 2014

Aboriginal Consultation and Environmental Assessment Handout CEAA November 2014 Introduction The Government of Canada consults with Aboriginal peoples for a variety of reasons, including: statutory and contractual obligations, policy and good governance, building effective relationships

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)04 USE OF THE BAND 5 725-5 875 MHz FOR BROADBAND

More information

Software-Intensive Systems Producibility

Software-Intensive Systems Producibility Pittsburgh, PA 15213-3890 Software-Intensive Systems Producibility Grady Campbell Sponsored by the U.S. Department of Defense 2006 by Carnegie Mellon University SSTC 2006. - page 1 Producibility

More information

NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY 11.2 Small Business Innovation Research (SBIR) Proposal Submission Instructions

NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY 11.2 Small Business Innovation Research (SBIR) Proposal Submission Instructions NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY 11.2 Small Business Innovation Research (SBIR) Proposal Submission Instructions GENERAL INFORMATION The mission of the National Geospatial-Intelligence Agency (NGA)

More information

SWOT PROJECT STATUS T. LAFON. SDT Toulouse 7 JULY SWOT Status

SWOT PROJECT STATUS T. LAFON. SDT Toulouse 7 JULY SWOT Status SWOT PROJECT STATUS T. LAFON SDT Toulouse 7 JULY 2015 1 ITEM System Satellite RFU/ DUPLEXER NADIR Ku DORIS Mission ground segment (SDS) MAJOR PHASE B ACTIVITIES OVERVIEW Status System engineering & architecture,

More information

FAA Research and Development Efforts in SHM

FAA Research and Development Efforts in SHM FAA Research and Development Efforts in SHM P. SWINDELL and D. P. ROACH ABSTRACT SHM systems are being developed using networks of sensors for the continuous monitoring, inspection and damage detection

More information