1 Typical Project Life Cycle D. KANIPE 1/29/2015
2 Contract Initiation VISION REQUEST FOR INFORMATION REQUEST FOR PROPOSAL SOURCE EVALUATION BOARD RFI RFP Proposals Evaluated Companies Respond Companies Submit Proposals SOW IS WRITTEN PRIOR TO CONTRACT AWARD Statement of Work Winner Selected Develop Requirements, Etc. 2
3 Project Life Cycle NASA Life-Cycle Phases Formulation Approval Implementation Project Life- Cycle Phases Pre-Phase A/Phase A Concept Studies & Technology Development First Semester Phase B Phase C Phase D Phase E Phase F Preliminary System Operations Final Design & Assembly, & End Design & Technology Integration, Sustaining of Fabrication Completion Test/LaunchEngineering Life Second Semester Robotic Mission Reviews MCR SRR SDR PDR CDR SIR ORR FRR PLAR Supporting Reviews Peer Reviews, Subsystem Reviews, and System Reviews Figure 2 Student Project Life Cycle 3
4 Key Definitions Formulation: System requirements are baselined Feasible concepts are developed System architecture definition is baselined for the selected concept(s) Implementation: Detailed design of system products is completed Products to be deployed are fabricated, assembled, integrated and tested Products are delivered to their customers or users Baseline: Design solution that meets the stakeholder s expectations Everyone focuses on this one design Baseline is documented Begin configuration management of the design 4
5 Developing a Baseline Stakeholder Expectations Trade Studies & Iterative Design Loop Start Mission Objectives & Constraints Operational Objectives High Level Requirements Functional And Logical Decomposition Product Breakdown Structure ConOps Requirements Mission Success Criteria No Functional & Performance Analysis Sufficient Level? Yes No Yes Re-baseline Requirements? No Works Safe & Reliable Affordable? Yes Select Baseline 5
6 Life Cycle Relationships Organizations & People Concept Studies Phase A Phase B Phase C Phase D Phase E Concept & Technology Development Preliminary Design Completion Final Design & Fabrication System Assembly, Int/Test, Launch Operations & Sustainment Artifacts Problems CONOPS Prelim. Design Design-to Specs As-built Asdeployed Concepts System Reqmts. Subsystem Reqmts. Build-to Specs As-verified Asoperated Expectations Validation Plan Verificat n Plan Verificat n Procedures Anomalies
7 Project Phase Definitions (1/2) Pre-Phase A (Concept Studies) Purpose: To produce a broad spectrum of ideas and alternatives for missions from which new projects can be selected. Phase A (Concept and Technology Development) Purpose: To determine the feasibility of a suggested new system in preparation for seeking funding. Phase B (Preliminary Design and Technology Competition) Purpose: To define the project in enough detail to establish an initial baseline capable of meeting mission needs. Phase C (Final Design and Fabrication) Purpose: To design a system (and its associated subsystems, including its operations systems) so that it will be able to meet its requirements. 7
8 Project Phase Definitions (2/2) Phase D (System Assembly, Integration and Test, and Launch)) Purpose: To build the subsystems (including operations systems) and integrate them to create the system, while developing confidence that it will be able to meet the systems requirements. Phase E (Operations and Sustainment) Purpose: To ensure that the certified system is ready for operations. Implement the Mission Operations Plan developed in earlier phases. Collect and archive mission and science data. Phase F (Closeout) Purpose: To dispose of the system in a responsible manner. 8
9 Project Manager Technical Integration Classical Systems Engineering Design and Analytical Integration Hardware & Software Integration Operations Requirements Mgt Functional Analysis System Analysis & Trades Software Management Technology Dev. Req ts WBS Risk Management Verification Plan Configuration/Data Mgt Cost Effective Design Design/Discipline Eng. Software Development Cost Estimates Performance Estimates Verification Requirements Testing Analysis and Simulation Manufacturing/Assembly Interface Management Verification Validation Assembly Ground Mission Logistics Figure 1 Technical Integration Model 9
10 Alternatives to the Linear Project Life Cycle The development life cycle is dependent upon the technical nature of what s being developed => the project life cycle may need to be tailored accordingly. Spiral development The development and construction activities proceed in parallel Follows the doctrine of successive refinement. Rapid prototyping Produce partially operational mock-ups/prototypes early in the design Allow for learning prior to production of expensive flight unit. Skunkworks (Lockheed trademark) A small team charged to achieve unusual results Work outside the usual rules Minimal management constraints Product design thereafter may be developed more conventionally 10
Mid Term Exam SES 405 Exploration Systems Engineering 3 March Your Name
Mid Term Exam SES 405 Exploration Systems Engineering 3 March 2016 --------------------------------------------------------------------- Your Name Short Definitions (2 points each): Heuristics - refers
More informationARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan
ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3B Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Segment
More informationMichael Gaydar Deputy Director Air Platforms, Systems Engineering
Michael Gaydar Deputy Director Air Platforms, Systems Engineering Early Systems Engineering Ground Rules Begins With MDD Decision Product Focused Approach Must Involve Engineers Requirements Stability
More informationACE3 Working Group Session, March 2, 2005
ACE3 Working Group Session, March 2, 2005 Intensive s The Synergy of Architecture, Life Cycle Models, and Reviews Dr. Peter Hantos The Aerospace Corporation 2003-2005. The Aerospace Corporation. All Rights
More informationARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal
ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3C (DDVP) Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space
More informationNASA Space Exploration 1 st Year Report
Exploration Systems Mission Directorate NASA Space Exploration 1 st Year Report Rear Admiral Craig E. Steidle (Ret.) Associate Administrator January 31, 2005 The Vision for Space Exploration THE FUNDAMENTAL
More informationFundamentals of Systems Engineering
16.842 Fundamentals of Systems Engineering Prof. Olivier de Weck TA: Maj. Jeremy Agte 16.842 1 16.899 Fundamentals of Systems Engineering H (permanent number 16.842) Prereq: Permission of Instructor Units:
More informationA Case Study of Changing the Tires on the Bus While Moving
Bridging the ABYSS Transitioning An In- Motion Development Program From DoD Information Assurance Certification and Accreditation Process (DIACAP) to Risk Management Framework (RMF) A Case Study of Changing
More informationFundamentals of Systems Engineering
Fundamentals of Systems Engineering Prof. Olivier L. de Weck Session 9 Verification and Validation 1 General Status Update A5 is due next week! 2 3 Outline Verification and Validation What is their role?
More informationSpace Technology FY 2013
Space Technology FY 2013 Dr. Mason Peck, Office of the Chief Technologist ASEB April 4, 2012 O f f i c e o f t h e C h i e f T e c h n o l o g i s t Technology at NASA NASA pursues breakthrough technologies
More informationSystems Engineering Overview. Axel Claudio Alex Gonzalez
Systems Engineering Overview Axel Claudio Alex Gonzalez Objectives Provide additional insights into Systems and into Systems Engineering Walkthrough the different phases of the product lifecycle Discuss
More informationStakeholder Expectations Definition Process
Stakeholder Expectations Definition Process Stakeholder Expectations Definition Requirement 5 (Section 3.2..) The Center Directors or designees shall establish and maintain a process, to include activities,
More informationPACE Science Definition Team Kickoff Meeting. Paula Bontempi, Betsy Edwards, Eric Ianson, Hal Maring, Woody
PACE Science Definition Team Kickoff Meeting Paula Bontempi, Betsy Edwards, Eric Ianson, Hal Maring, Woody Turner NASA Headquarters PACE Program Science and Engineering 16-18 November 2011 PACE Mission
More informationDoDI and WSARA* Impacts on Early Systems Engineering
DoDI 5000.02 and WSARA* Impacts on Early Systems Engineering Sharon Vannucci Systems Engineering Directorate Office of the Director, Defense Research and Engineering 12th Annual NDIA Systems Engineering
More informationExploration Systems. Program Overview. July 15, 2004 Associate Administrator, Office of Exploration Systems Rear Admiral Craig E. Steidle (Ret.
Exploration Systems Program Overview July 15, 2004 Associate Administrator, Office of Exploration Systems Rear Admiral Craig E. Steidle (Ret.) The Vision for Space Exploration THE FUNDAMENTAL GOAL OF THIS
More informationTest & Evaluation Strategy for Technology Development Phase
Test & Evaluation Strategy for Technology Development Phase Ms. Darlene Mosser-Kerner Office of the Director, Developmental Test & Evaluation October 28, 2009 Why T&E? PURPOSE OF T&E: - Manage and Reduce
More informationPragmatic Strategies for Adopting Model-Based Design for Embedded Applications. The MathWorks, Inc.
Pragmatic Strategies for Adopting Model-Based Design for Embedded Applications Larry E. Kendrick, PhD The MathWorks, Inc. Senior Principle Technical Consultant Introduction What s MBD? Why do it? Make
More informationA System Maturity Index for Decision Support in Life Cycle Acquisition
Over the next 5 years, many of the programs in our assessment plan to hold design reviews or make a production decisions without demonstrating the level of technology maturity that should have been there
More informationDigital Engineering. Phoenix Integration Conference Ms. Philomena Zimmerman. Deputy Director, Engineering Tools and Environments.
Digital Engineering Phoenix Integration Conference Ms. Philomena Zimmerman Deputy Director, Engineering Tools and Environments April 2018 Apr 2018 Page-1 DISTRIBUTION STATEMENT A: UNLIMITED DISTRIBUTION
More informationA New Way to Start Acquisition Programs
A New Way to Start Acquisition Programs DoD Instruction 5000.02 and the Weapon Systems Acquisition Reform Act of 2009 William R. Fast In their March 30, 2009, assessment of major defense acquisition programs,
More informationModel Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction
Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction Prepared for: National Defense Industrial Association (NDIA) 26 October 2011 Peter Lierni & Amar Zabarah
More informationDEFENSE ACQUISITION UNIVERSITY EMPLOYEE SELF-ASSESSMENT. Outcomes and Enablers
Outcomes and Enablers 1 From an engineering leadership perspective, the student will describe elements of DoD systems engineering policy and process across the Defense acquisition life-cycle in accordance
More informationObject-Oriented Design
Object-Oriented Design Lecture 2: USDP Overview Department of Computer Engineering Sharif University of Technology 1 Review The Unified Modeling Language (UML) is a standard language for specifying, visualizing,
More informationCC532 Collaborative System Design
CC532 Collaborative Design Part I: Fundamentals of s Engineering 5. s Thinking, s and Functional Analysis Views External View : showing the system s interaction with environment (users) 2 of 24 Inputs
More informationHuman System Integration: Challenges and Opportunities
Headquarters U.S. Air Force Human System Integration: Challenges and Opportunities Dr. Mica Endsley USAF Chief Scientist I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Surveying the Science
More informationGAO NASA. Agency Has Taken Steps Toward Making Sound Investment Decisions for Ares I but Still Faces Challenging Knowledge Gaps
GAO United States Government Accountability Office Report to the Chairman, Committee on Science and Technology, House of Representatives October 2007 NASA Agency Has Taken Steps Toward Making Sound Investment
More informationExploration Systems Research & Technology
Exploration Systems Research & Technology NASA Institute of Advanced Concepts Fellows Meeting 16 March 2005 Dr. Chris Moore Exploration Systems Mission Directorate NASA Headquarters Nation s Vision for
More informationModels, Simulations, and Digital Engineering in Systems Engineering Restructure (Defense Acquisition University CLE011)
Models, Simulations, and Digital Engineering in Systems Engineering Restructure (Defense Acquisition University CLE011) Ms. Philomena Phil Zimmerman Deputy Director, Engineering Tools & Environments Office
More informationOther Transaction Authority (OTA)
Other Transaction Authority (OTA) Col Christopher Wegner SMC/PK 15 March 2017 Overview OTA Legal Basis Appropriate Use SMC Space Enterprise Consortium Q&A Special Topic. 2 Other Transactions Authority
More informationSystems Engineering Process
Applied Systems Engineering Les Bordelon US Air Force SES Retired NATO Lecture Series SCI-176 Mission Systems Engineering November 2006 An Everyday Process 1 Most Acquisition Documents and Standards say:
More informationBy the end of this chapter, you should: Understand what is meant by engineering design. Understand the phases of the engineering design process.
By the end of this chapter, you should: Understand what is meant by engineering design. Understand the phases of the engineering design process. Be familiar with the attributes of successful engineers.
More informationProgram Success Through SE Discipline in Technology Maturity. Mr. Chris DiPetto Deputy Director Developmental Test & Evaluation October 24, 2006
Program Success Through SE Discipline in Technology Maturity Mr. Chris DiPetto Deputy Director Developmental Test & Evaluation October 24, 2006 Outline DUSD, Acquisition & Technology (A&T) Reorganization
More informationSynopsis and Impact of DoDI
Synopsis and Impact of DoDI 5000.02 The text and graphic material in this paper describing changes to the Department of Defense (DoD) Acquisition System were extracted in whole or in part from the reissued
More informationOCEAN OBSERVATORIES INITIATIVE. Release 2 Schedule. OOI CI Release 2 Kickoff M a y 2,
OCEAN OBSERVATORIES INITIATIVE Release 2 Schedule M a y 2, 2 0 11 1 Top-Down Through the Schedule Project Releases Anatomy of a Release 2 Phases in a Release Inception Phase in Detail: Iterations Milestones
More informationDeveloping and Distributing a CubeSat Model-Based Systems Engineering (MBSE) Reference Model Interim Status
Developing and Distributing a CubeSat Model-Based Systems Engineering (MBSE) Reference Model Interim Status Dave Kaslow Chair: International Council on Systems Engineering (INCOSE) Space Systems Working
More informationAsteroid Redirect Mission (ARM) Update to the Small Bodies Assessment Group
National Aeronautics and Space Administration Asteroid Redirect Mission (ARM) Update to the Small Bodies Assessment Group Michele Gates, Program Director, ARM Dan Mazanek, Mission Investigator, ARM June
More informationSpace Systems Engineering
Background of Systems Engineering NASA program planning phases Scheduled milestones Requirements document Work breakdown structure Technology readiness levels Project management tools Design reference
More informationTechnology Readiness for the Smart Grid
CIGRE US National Committee 2013 Grid of the Future Symposium Technology Readiness for the Smart Grid Presented by Keith E. Lindsey President Lindsey Manufacturing Co. Outline What is Technology Readiness?
More informationBROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE.
OMB Approval Number 2700-0085 Broad Agency Announcement NNM12ZZP03K BROAD AGENCY ANNOUNCEMENT FY12 TECHNOLOGY DEMONSTRATION MISSIONS PROGRAM OFFICE OF THE CHIEF TECHNOLOGIST PROPOSALS DUE April 30, 2012
More informationA FRAMEWORK FOR PERFORMING V&V WITHIN REUSE-BASED SOFTWARE ENGINEERING
A FRAMEWORK FOR PERFORMING V&V WITHIN REUSE-BASED SOFTWARE ENGINEERING Edward A. Addy eaddy@wvu.edu NASA/WVU Software Research Laboratory ABSTRACT Verification and validation (V&V) is performed during
More informationTechnical Exploitation Support Request for Information (RFI)
Technical Exploitation Support Request for Information (RFI) This announcement constitutes a Sources Sought, Request for Information (RFI) ONLY. The Virginia Contracting Activity (VaCA) solely for information,
More informationSERC Technical Overview: First-Year Results and Future Directions. Barry Boehm, USC Rich Turner, Stevens. 15 October 2009
SERC Technical Overview: First-Year Results and Future Directions Barry Boehm, USC Rich Turner, Stevens 15 October 2009 Outline General context First year objectives Show ability to herd academic cats
More informationDisruptive Effects of Additive Technologies on SE Product Lifecycle
See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/327142011 Disruptive Effects of Additive Technologies on SE Product Lifecycle Conference Paper
More informationRecommendations for Intelligent Systems Development in Aerospace. Recommendations for Intelligent Systems Development in Aerospace
Recommendations for Intelligent Systems Development in Aerospace An AIAA Opinion Paper December 2017 1 TABLE OF CONTENTS Statement of Attribution 3 Executive Summary 4 Introduction and Problem Statement
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationTechnology & Manufacturing Readiness RMS
Technology & Manufacturing Readiness Assessments @ RMS Dale Iverson April 17, 2008 Copyright 2007 Raytheon Company. All rights reserved. Customer Success Is Our Mission is a trademark of Raytheon Company.
More informationSABRE-I: An End-to-End Hands-On CubeSat Experience for the Educate Utilizing CubeSat Experience Program
SABRE-I: An End-to-End Hs-On CubeSat Experience for the Educate Utilizing CubeSat Experience Program Bungo Shiotani Space Systems Group Dept. of Mechanical & Aerospace Engineering University of Florida
More informationImpact of Technology Readiness Levels on Aerospace R&D
Impact of Technology Readiness Levels on Aerospace R&D Dr. David Whelan Chief Scientist Boeing Integrated Defense Systems Presented to Department of Energy Fusion Energy Science Advisory Committee Who
More informationWin and Influence Design Engineers--- Change Their Affordability DNA
Win and Influence Design Engineers--- Change Their Affordability DNA Authors: Timothy G. Morrill Sr. Principal Electrical Engineer Design Performance, Architecture and Testability Department Raytheon Missile
More informationTRLs and MRLs: Supporting NextFlex PC 2.0
TRLs and MRLs: Supporting NextFlex PC 2.0 Mark A. Gordon Mfg Strategy, Inc. mark.gordon@mfgstrategy.org 1 1 TRLs and MRLs: Supporting NextFlex PC 2.0 Outline Purpose and Scope of Webinar Readiness Levels:
More informationOur Acquisition Challenges Moving Forward
Presented to: NDIA Space and Missile Defense Working Group Our Acquisition Challenges Moving Forward This information product has been reviewed and approved for public release. The views and opinions expressed
More informationJerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011
LESSONS LEARNED IN PERFORMING TECHNOLOGY READINESS ASSESSMENT (TRA) FOR THE MILESTONE (MS) B REVIEW OF AN ACQUISITION CATEGORY (ACAT)1D VEHICLE PROGRAM Jerome Tzau TARDEC System Engineering Group UNCLASSIFIED:
More informationDEVELOPING MANUFACTURING CAPABILITY: RE-SHAPING THE ENTERPRISE
Nathan W. Hartman, Ed.D. Dauch Family Professor of Advanced Manufacturing Director, Product Lifcycle Management Center DEVELOPING MANUFACTURING CAPABILITY: RE-SHAPING THE ENTERPRISE What drives manufacturing
More informationIntermediate Systems Acquisition Course. Lesson 2.2 Selecting the Best Technical Alternative. Selecting the Best Technical Alternative
Selecting the Best Technical Alternative Science and technology (S&T) play a critical role in protecting our nation from terrorist attacks and natural disasters, as well as recovering from those catastrophic
More informationTechnology Program Management Model (TPMM) Overview
UNCLASSIFIED Technology Program Management Model (TPMM) Overview 05-10-2006 Jeff Craver Project Manager Space and Missile Defense Technical Center Jeff.Craver@US.Army.Mil 1 1 UNCLASSIFIED Report Documentation
More informationin the New Zealand Curriculum
Technology in the New Zealand Curriculum We ve revised the Technology learning area to strengthen the positioning of digital technologies in the New Zealand Curriculum. The goal of this change is to ensure
More informationModel Based Design Of Medical Devices
Model Based Design Of Medical Devices A Tata Elxsi Perspective Tata Elxsi s Solutions - Medical Electronics Abstract Modeling and Simulation (M&S) is an important tool that may be employed in the end-to-end
More informationCRITIQUE OF COST-RISK ANALYSIS
CRITIQUE OF COST-RISK ANALYSIS AND FRANKENSTEIN SPACECRAFT DESIGNS: A PROPOSED SOLUTION 2014 ICEAA Workshop Denver, CO June 10-13, 2014 Eric Plumer, NASA CAD HQ Mohamed Elghefari, Pasadena Applied Physics
More informationManufacturing Readiness Level Deskbook
Manufacturing Readiness Level Deskbook 25 June 2010 Prepared by the OSD Manufacturing Technology Program In collaboration with The Joint Service/Industry MRL Working Group FORWARDING LETTER WILL GO HERE
More informationThe Impact of Conducting ATAM Evaluations on Army Programs
The Impact of Conducting ATAM Evaluations on Army Programs Software Engineering Institute Carnegie Mellon University Pittsburgh, PA 15213 Robert L. Nord, John Bergey, Stephen Blanchette, Jr., Mark Klein
More informationGALILEO JOINT UNDERTAKING
GALILEO Research and development activities First call Activity A User receiver preliminary development STATEMENT OF WORK GJU/03/094/issue2/OM/ms Issue 2 094 issue2 6th FP A SOW 1 TABLE OF CONTENTS 1.
More informationClass Integration with projects Assignments Notes Texts and resources Syllabus Facilities and resources Meeting Building Grading Elements
Purpose Learning objectives Design Audience Projects Types Students Advisors Sponsors Design process Capstone vs. NASA vs. the book Project milestones Class Integration with projects Assignments Notes
More informationEXPLORING HOW ENGINEERING ENTREPRENEURSHIP COMPETENCIES ALIGN WITH ABET CRITERION 3A-K
EXPLORING HOW ENGINEERING ENTREPRENEURSHIP COMPETENCIES ALIGN WITH ABET CRITERION 3A-K ELIZABETH KISENWETHER PENN STATE UNIVERSITY EXK13@PSU.EDU NATHALIE D UVAL-COUETIL & JACOB WHEADON PURDUE UNIVERSITY
More informationHow Cost Arises How We Can Reduce Cost
How Cost Arises How We Can Reduce Cost Presented at 2011 ISPA/SCEA Joint Annual Conference & Training Workshop June 7-10, 2011 Albuquerque, New Mexico by Edwin B. Dean, Consultant designforvalue@att.net
More informationNASA Mars Exploration Program Update to the Planetary Science Subcommittee
NASA Mars Exploration Program Update to the Planetary Science Subcommittee Jim Watzin Director MEP March 9, 2016 The state-of-the-mep today Our operational assets remain healthy and productive: MAVEN has
More informationSYSTEMS ENGINEERING MANAGEMENT IN DOD ACQUISITION
Chapter 2 Systems Engineering Management in DoD Acquisition CHAPTER 2 SYSTEMS ENGINEERING MANAGEMENT IN DOD ACQUISITION 2.1 INTRODUCTION The DoD acquisition process has its foundation in federal policy
More information2014 New Jersey Core Curriculum Content Standards - Technology
2014 New Jersey Core Curriculum Content Standards - Technology Content Area Standard Strand Grade Level bands Technology 8.2 Technology Education, Engineering, Design, and Computational Thinking - Programming:
More informationREPORT ON CIVA ICT SYSTEMS
CIVA Meeting 2014 Wroclaw, Poland REPORT ON CIVA ICT SYSTEMS Vladimir Machula 1 Introduction The purpose of this document is to identify and describe different aspects of software, hardware and technical
More informationManufacturing Readiness Assessment (MRA) Deskbook
DEPARTMENT OF DEFENSE Manufacturing Readiness Assessment (MRA) Deskbook 2 May 2009 Prepared by the Joint Defense Manufacturing Technology Panel (JDMTP) Version 7.1 This version of the MRA Deskbook will
More informationUnderstand that technology has different levels of maturity and that lower maturity levels come with higher risks.
Technology 1 Agenda Understand that technology has different levels of maturity and that lower maturity levels come with higher risks. Introduce the Technology Readiness Level (TRL) scale used to assess
More informationREQUEST FOR PROPOSAL FOR ENGINEERING DESIGN ROBO INCHWORM. EGR 3380 Engineering Design I SPRING 2011
REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN ROBO INCHWORM photo by Travis Stansbury EGR 3380 Engineering Design I SPRING 2011 Department of Electrical and Computer Engineering Department of Mechanical
More informationThe Role of CREATE TM -AV in Realization of the Digital Thread
The Role of CREATE TM -AV in Realization of the Digital Thread Dr. Ed Kraft Associate Executive Director for Research University of Tennessee Space Institute October 25, 2017 NDIA 20 th Annual Systems
More informationA Translation of the Contracting Alphabet: From BAAs to OTAs
A Translation of the Contracting Alphabet: From BAAs to OTAs February 18, 2016 Rebecca Willsey Chief, Contracting Policy Branch Air Force Research Lab, Rome NY Distribution Statement A: Cleared for Public
More informationDigital Engineering and Engineered Resilient Systems (ERS)
Digital Engineering and Engineered Resilient Systems (ERS) Mr. Robert Gold Director, Engineering Enterprise Office of the Deputy Assistant Secretary of Defense for Systems Engineering 20th Annual NDIA
More informationUNIT VIII SYSTEM METHODOLOGY 2014
SYSTEM METHODOLOGY: UNIT VIII SYSTEM METHODOLOGY 2014 The need for a Systems Methodology was perceived in the second half of the 20th Century, to show how and why systems engineering worked and was so
More informationSection G. Management, Schedule, & Budget
G.1 Overview Section G. Management, Schedule, & Budget The LISA Project is implemented as a partnership between NASA and ESA wherein both partners are essentially equal contributors. In principle, NASA
More informationUSAF Digital Thread Initiative Overview
USAF Digital Thread Initiative Overview Claudia V Kropas-Hughes AFLCMC/XZE Presented to NDIA M&S Committee April 8, 2014 Cleared for Public Release on 4 Apr 14, 88ABW-2014-1407 1 Agenda Digital Thread
More informationAn Integrated Modeling and Simulation Methodology for Intelligent Systems Design and Testing
An Integrated ing and Simulation Methodology for Intelligent Systems Design and Testing Xiaolin Hu and Bernard P. Zeigler Arizona Center for Integrative ing and Simulation The University of Arizona Tucson,
More informationIntroduction to Systems Engineering
p. 1/2 ENES 489P Hands-On Systems Engineering Projects Introduction to Systems Engineering Mark Austin E-mail: austin@isr.umd.edu Institute for Systems Research, University of Maryland, College Park Career
More informationAn Architecture-Centric Approach for Acquiring Software-Reliant Systems
Calhoun: The NPS Institutional Archive Reports and Technical Reports All Technical Reports Collection 2011-05-11 An Architecture-Centric Approach for Acquiring Software-Reliant Systems John Bergey http://hdl.handle.net/10945/33610
More informationUNIT-III LIFE-CYCLE PHASES
INTRODUCTION: UNIT-III LIFE-CYCLE PHASES - If there is a well defined separation between research and development activities and production activities then the software is said to be in successful development
More informationU.S. Exploration EVA: Architecture and ConOps Overview. NASA-JSC EVA Office/J. Buffington
U.S. Exploration EVA: Architecture and ConOps Overview NASA-JSC EVA Office/J. Buffington Introduction EVA Systems are critical to the majority of human space exploration missions EVA Systems include suits,
More informationHuman Spaceflight: The Ultimate Team Activity
National Aeronautics and Space Administration Human Spaceflight: The Ultimate Team Activity William H. Gerstenmaier Associate Administrator Human Exploration & Operations Mission Directorate Oct. 11, 2017
More informationAirborne Observation Platform (AOP)
National Ecological Observatory Network Airborne Observation Platform (AOP) B. Johnson/NEON AOP, PMCS and Project Teams Nov 2009 NEON FDR AOP Core Staff Dr. Brian Johnson is the Product Team Lead responsible
More informationModel Based Systems of Systems Engineering. Fran McCafferty Principal Systems Engineer
Model Based Systems of Systems Engineering Fran McCafferty Principal Systems Engineer fmccafferty@vitechcorp.com 1 System of Systems v System of Subsystems The major distinction between systems as elements
More informationA Knowledge-Centric Approach for Complex Systems. Chris R. Powell 1/29/2015
A Knowledge-Centric Approach for Complex Systems Chris R. Powell 1/29/2015 Dr. Chris R. Powell, MBA 31 years experience in systems, hardware, and software engineering 17 years in commercial development
More informationSolmetric White Paper: Winning Contracts with PV Array Testing
Solmetric White Paper: Winning Contracts with PV Array Testing Contents Introduction...1 Background: I-V Curves in Field Applications...2 What is an I-V curve?...2 Where has I-V curve tracing been used
More informationObject-oriented Analysis and Design
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Understanding the Client s environment and needs. Analysis Identifying the concepts (classes) in the problem domain
More informationWhen Failure Means Success: Accepting Risk in Aerospace Projects NASA Project Management Challenge 2009
When Failure Means Success: Accepting Risk in Aerospace Projects NASA Project Management Challenge 2009 Daniel L. Dumbacher,, Director Christopher E. Singer, Deputy Director Engineering Directorate Marshall
More informationCSE - Annual Research Review. From Informal WinWin Agreements to Formalized Requirements
CSE - Annual Research Review From Informal WinWin Agreements to Formalized Requirements Hasan Kitapci hkitapci@cse.usc.edu March 15, 2005 Introduction Overview EasyWinWin Requirements Negotiation and Requirements
More informationHelioseismic Magnetic Imager Program at LMSAL
Helioseismic Magnetic Imager Program at LMSAL Contract PY-2223 Progress Report for December 2002 Introduction This is the third monthly progress report for the HMI program at LMSAL. We/LMSAL are collaborators
More informationDeveloping Requirements for Technology-Driven Products
Developing Requirements for Technology-Driven Products Louis S. Wheatcraft Requirements Experts (281)486-9481 louw@reqexperts.com http://www.reqexperts.com Copyright 2005 by Compliance Automation. Published
More informationWSARA Impacts on Early Acquisition
WSARA Impacts on Early Acquisition Sharon Vannucci Systems Engineering Directorate Office of the Director, Defense Research and Engineering OUSD(AT&L) Enterprise Information Policy and DAMIR AV SOA Training
More informationREQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014
REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014 OVERVIEW: This announcement constitutes a Request for Information (RFI) notice for planning purposes.
More informationAddressing International Lunar Surface Operations Click to edit Master title style
Addressing International Lunar Surface Operations Joint Meeting of LEAG-ICEUM/ILEWG-SRR October 28-31, 2008 Cape Canaveral, Florida 0 Participants Mark Lupisella: NASA Goddard Space Flight Center, Exploration
More informationOrbital ATK JT File Use Case Matt Johnston. 5-Oct-16
Orbital ATK JT File Use Case Matt Johnston 5-Oct-16 Overview Orbital ATK at a Glance MBD or 3D Model with PMI Model Based Plan Model in NX and JT file in TcVis What we are doing well Real time use cases
More informationIntroduction to Design Process ME122
Introduction to ME122 https://www.nasa.gov 1. Identify the problem Often identified by a customer need. Would typically be a statement such as How can I design a that will? 2. Define requirements (criteria)
More informationINTEL INNOVATION GENERATION
INTEL INNOVATION GENERATION Overview Intel was founded by inventors, and the company s continued existence depends on innovation. We recognize that the health of local economies including those where our
More informationManufacturing Readiness Assessment Overview
Manufacturing Readiness Assessment Overview Integrity Service Excellence Jim Morgan AFRL/RXMS Air Force Research Lab 1 Overview What is a Manufacturing Readiness Assessment (MRA)? Why Manufacturing Readiness?
More informationReducing Manufacturing Risk Manufacturing Readiness Levels
Reducing Manufacturing Risk Manufacturing Readiness Levels Dr. Thomas F. Christian, SES Director Air Force Center for Systems Engineering Air Force Institute of Technology 26 October 2011 2 Do You Know
More information