1 Floating Power Plant A/S POSEIDON project Report: Certification Qualification and Documentation for Certification Process Work package: WP3 Subtask: D.3.2 Date: 28 February 2017 Revision: 1 External Public Lead: Jørund Moseid This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No

2 Contents 1 Background Purpose Task Description References Availability of Certification Procedure Objectives Identification of Certification Entities Bidding Process Evaluation Criteria Results and Selection Development of Certification Documentation Basis of Certification Process Practical Application Appraisal - Stage Plan and Execute - Stage Review and Certification - Stage Key Recommendations This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No

3 1 Background 1.1 Purpose The purpose of this deliverable D.3.2 is to define the identification process of certification and the road to developing standards for certification of a combined wave and wind power device. The work builds on work done in Work Package 3.1 and Ref /1/. 1.2 Task Description D3.2: Report on needed certifications and documentation for certification process [21] A report will be written describing the currently available certification procedures, and their suitability for Floating Power Plant s device. Also included will be potential options for developing further certification procedures more specifically applicable to Floating Power Plant. Comparisons will be made regarding the time-lines, costs and reputation associated with each procedure. 1.3 References /1/ D.3.1 Classification in Key Markets /2/ Guidance Notes for, Lloyds Register, December Availability of Certification Procedure The process of identifying the availability of certification procedures has been described in Ref. /1/. In that process the need for development of new certification procedures were identified. 2.1 Objectives A tender was issued from FPP in order to: establish the level of details needed for certification process identify activities and knowledge around the process of development of certification standards reduce cost and expenditure of time of such development draw on reputation and experience 2.2 Identification of Certification Entities Bidding Process Two major certification entities were identified representing the two most reputable companies for third party validation in the market place. The tender goals were based on the objectives in the tender and developed to the following evaluation criteria: Evaluation Criteria Lump sum price Hour rate CV/People Experience with similar technology Quality of proposal Based on a defined scope, cost was defined. Hour Rates for extra work Qualifications/References. Rating based on industry market knowledge to wave and wind industry and new technology development of certification standards. Evaluation based on submission of proposal. 3 This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No

4 Long term certification option What role certification entity wold have in key markets Results and Selection Based on a full evaluation between the two tenderers, one was selected based on the sum of all weighted evaluation criteria. 3 Development of Certification Documentation 3.1 Basis of Certification Process The hybrid device is a floating installation on a fixed location with temporary manning. There is no requirement to apply a flag to the unit and hence the Classification approach is not suitable. A certification process has been identified. In order to define standards applicable, the following was required: Design Goals for the Project (tangible goals for design and operation) Project Goal Matrix Registry of Applicable Rules and Regulations Regulatory Matrix 3.2 Practical Application In the process of developing an innovative solution and defining the Regulatory Matrix to design to, there is an inherent risk that standards covers only partly the solution. Where there are gaps in the available standards, a bridging is needed to fill in the gaps. Such activity can be done by the developer themselves, but this process is often complex and confusing. A technology qualification process is offered by the certification bodies, as a standardized process of defining the various components and the applicable standards and the lack of those. Typical Regulatory Matrix format shown in Figure 1. Figure 1: Regulatory Matrix FPP Poseidon Project 4 This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No

5 4 Process of technology qualification is combined with a set of design goals for the project and the defined regulatory framework. Main activities once the design goals are made is to define the decomposition of the technology before moving into the assessment stage. A technology qualification scheme is outlined in 2. Figure 2: Scheme, Outline (Source: Lloyds Register) 4.1 Appraisal - Stage 1 Activities carried out for definition of Plan system decomposition: Desktop screening establishing available standards within the industry, gathering and presentation of these. Review of design documents and design goals Definition of system decomposition Workshop (risk-based approach) The outcome of such activities would be found in a Plan, defining the requirements for development on an individual component/system level. The plan and assessment deals with the following two categories Level of Technology Maturity, similar to Technology Readiness Level (TRL) Level of Integration Maturity, deals with how well developed the technology is within this particular service/application. Further information in Ref /2/. 4.2 Plan and Execute - Stage 2 The Plan is established based on the agreed activities that needs to be carried out for each system to reach the acceptable maturity level. Once the plan is agreed and the methods and tests have been established, acceptance criteria has been defined and comments and remarks have been cleared off, this phase is decorated by the issuance of a Statement of Endorsement as a first certificate in the process as a proof of that the Plan is sound. 5 This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No

6 Figure 3: Flowchart for activities within the Plan and Execution stage for a wind and wave device. Source: Lloyds Register) 4.3 Review and Certification - Stage 3 Once the results from the risk assessments and test plans have been cleared out, the plan moves into execution, which ultimately leads into a Certificate of. References herein are to Ref /2/. Figure 4: Final Stage of, Wave and Wind Device (Source: Lloyds Register) 5 Key Recommendations The process of technology qualification is one way of approaching the lack of those design standards that are required for defining a roadmap for certification. The alternative route, which in broad terms is to develop the design standard together with other stakeholders and competitors, is also feasible, however this process is less predictable and requires a very clear timeframe and agreement between the parties and industry stakeholders. The process of technology qualification may be more time consuming, however it is easier to influence in terms of defining required activities and enter into direct discussions with the certification body about the level of details that would be required at different stages of the process. It is therefore FPP s recommendation to follow this process by defining 1) the rules available, 2) design goals for the project and 3) design premises. Together these three form a great basis for evaluation into stage 1 of the technology qualification process. 6 This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No

7 Guidance Notes for Technology Qualification December 2014

8 Guidance Notes for Technology Qualification December 2014

9 A guide to the Guidance Notes and published requirements Guidance Notes for Introduction These Guidance Notes are intended to be a live document and are subject to change without notice. A comprehensive List of Contents is placed at the beginning of these Notes. Numbering and Cross-References A decimal notation system has been adopted throughout. Five sets of digits cover the divisions, i.e., Part, Chapter, Section, sub-section and paragraph. The textual cross-referencing within the text is as follows, although the right hand digits may be added or omitted depending on the degree of precision required: (a) In same Chapter, e.g., see (i.e., down to paragraph). (b) In same Part but different Chapter, e.g., see Ch 3,2.1 (i.e., down to sub-section). (c) In another Part, e.g., see Pt 5, Ch 1,3 (i.e., down to Section). The cross-referencing for Figures and Tables is as follows: (a) In same Chapter, e.g., as shown in Fig (i.e., Chapter,Section and Figure Number). (b) In same Part but different Chapter, e.g., as shown in Fig in Chapter 2. (c) In another Part, e.g., see Table in Pt 3, Ch 2. Lloyd s Register is a trading name of Lloyd s Register Group Limited and its subsidiaries. For further details please see Lloyd s Register Group Limited, its subsidiaries and affiliates and their respective officers, employees or agents are, individually and collectively, referred to in this clause as Lloyd s Register. Lloyd s Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd s Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract. Lloyd s Register

10 Guidance Notes for, December 2014 Contents Section 1 Introduction 2 2 Abbreviations and Definitions 4 3 Principles 4 4 TQ Stage 1: Technology Appraisal 6 5 TQ Stage 2: Plan and Execution 11 6 TQ Stage 3: Performance Review and Certification 14 Appendix 1 Existing Guidance on 16 2 Roadmap 17 3 Technology Maturity Level 18 4 Integration Maturity Level 19 5 IML Adjusted TML Assignment Methods 19 Lloyd s Register Group Limited All rights reserved. Except as permitted under current legislation no part of this work may be photocopied, stored in a retrieval system, published, performed in public, adapted, broadcast, transmitted, recorded or reproduced in any form or by any means, without the prior permission of the copyright owner. Enquiries should be addresse Lloyd s Register Group Limited 2014 Published by Lloyd s Register Group Limited Registered office (Reg. no ) 71 Fenchurch Street, London, EC3M d to Lloyd s Register Group Limited, 71 Fenchurch Street, London, EC3M 4BS. Lloyd s Register 1

11 Guidance Notes for, December 2014 Section 1 Section 1 Introduction 2 Abbreviations and Definitions 3 Principles 4 TQ Stage 1: Technology Appraisal 5 TQ Stage 2: Plan and Execution 6 TQ Stage 3: Performance Review and Certification Section 1 Introduction 1.1 General The increasing complexity and innovation in new technology can often lead to the development of novel designs, concepts or applications not covered by existing rules, normative standards and industry practices. Innovative engineering concepts and/or the application of existing technology to new environments challenge the certification bodies, regulators and standard procedures. Therefore the unknown associated with the deployment of novel technology needs to be assessed to prevent undesired outcomes. 1.2 Purpose These Guidance Notes present Lloyd s Register s Technology Qualification (TQ) methodology to quantify the risks brought in by novel technologies, which should be applied prior to deployment of the new technology. The is a robust and systematic risk assessment process that demonstrates to interested parties that the uncertainties introduced by a novel technology, or new application of an existing technology have been considered and any associated risks mitigated. The is a goal risk-based process that uses the readiness level framework, total system perspective and whole lifecycle approach to qualify new technologies, unconventional designs and new ways of applying existing technology. TQ is a methodology that provides assurance to owners, operators, suppliers and investors at the different stages of novel technology development. The TQ process is a methodology developed with specific acceptance criteria for technology under review. This is focused on, but not limited to, the following areas: Safety Environmental Functionality Performance Reliability Availability This includes, but is not limited to, the following activities: Identifying technology elements and their readiness levels Assessing risks posed by the elements Establishing acceptance criteria and goals Evidence collection Further analysis and testing including test failure analysis Performance review. The TQ process can be applied at any stage during the lifecycle of development of systems or technology. The outcomes of the process at one stage of the TQ process will be used as inputs for the next stage. Traceability from qualification requirements, qualification activities, testing results, qualification results (including recommendations to mitigate identified risks) is ensured throughout the whole process. 1.3 Overview of the Process Figure 1.2 shows the stages in the TQ process and is followed by a summary of the stages in Sections 4, 5 and 6. Figure 1.1 Lifecycle of development of systems or technology Business feasibility Concept Design Detailed Engineering Construction Operation & Maintenance Decommission 2 Lloyd s Register

12 Guidance Notes for, December 2014 Section 1 Figure 1.2 TQ process stages Stage 1: Appraisal (see Section 4) Technology Assessment System Decomposition Risk Assessment Risk Assessment The analysis identifies which technological elements drive the risk and issues risk reducing measures. It is recommended that the risk assessment uses methods acceptable to LR to analyze the risks of failure, which means estimating the consequence and frequency of occurrence Plan & Execute (Section 5) At this stage qualification methods are selected based on inputs from the previous stages. LR can prepare the TQ plan or support its development or provide an independent review of the plan. A Statement of Endorsement can be provided upon satisfactory review of the TQ. The TQ plan is implemented and outcomes of qualification activities according to the plan are documented. Stage 2: Plan & Execute (see Section 5) Stage 3: Review & Certification (see Section 6) 1.4 Summary of TQ stages: Appraisal (Section 4) There are two steps within the Appraisal Stage; System Decomposition and Technology Assessment & Risk Assessment (as two separate activities) System Decomposition The first stage in the Technology Appraisal is to break down the technology into distinct elements that can be individually assessed. System Decomposition is a structural and functional breakdown of the overall system into subsystems, equipment, and components down to the smallest element that can be assessed. The outcome of System Decomposition step will provide the basis for review and assessment. It defines, but is not limited to, the scope for the review, document system and operating conditions, functions and sub-functions requirements, process sequences and operations and capabilities with respect to qualitative and quantitative claims and goals Review and Certification (Section 6) For those TQ activities which are not undertaken by LR, the results are submitted to LR for review and assessment. Qualification activities on critical technologies that govern safety systems or provide safety functions are witnessed by LR s approved personnel. Once the evidence, analysis and reasonable arguments have been documented the content may be submitted to LR for review whereupon LR will issue a Certificate of Technology Qualification, approving the readiness of the technology for application or as regulatory compliance documents, if the documentation is found to be in accordance with this TQ process specified in this guidance note. In the scenario where the documentation does not satisfy the process specified in this Guidance Note the documentation (including all the gathered evidence and analyses) may be developed further for those areas that were not satisfied Technology Assessment Technology Assessment uses the Technology Readiness Level (TRL) approach to screen the maturity and integration of the technology or items of equipment. Based on the assigned TRL and the operating experience for each technology or each item of equipment, a screening level from 0 to 7 is determined. This score dictates how thorough and intensive the qualification activities should be. Integration of technology or equipment into a system can provide challenges even for matured technology or equipment; therefore, an integration readiness review is performed as part of the TRL assessment. Lloyd s Register 3

13 Guidance Notes for, December 2014 Sections 2 & 3 Section 2 Abbreviations and Definitions Section 3 Principles The following abbreviations are applicable to these Guidance Notes unless otherwise stated. CTE FHA FMECA HAZID HAZOP IML KAOS LR LR TQ Team* MDR MODU MOU RCA SME SWIFT TQ TQP TML TRL Critical Technology Element Functional Hazard Assessment Failure Mode, Effects and Criticality Analysis Hazard Identification Hazard & Operability Analysis Integration Maturity Level Knowledge Acquisition in Automated Specification Lloyd's Register Lloyd's Register Team* Master Document Register Mobile Offshore Drilling Unit Mobile Offshore Unit Root Cause Analysis Subject Matter Expert Structured What-If Technique Plan Technology Maturity Level Technology Readiness Level *Lloyd s Register Team (LR TQ Team) LR can provide a LR TQ Team (independent third party) comprised of all required, authorized competencies in representative design, manufacturing, operation and maintenance (end-users). The LR TQ Team will also have or be able to access the necessary technical expertise in risk assessment, implementation, integration and installation of the technology and systems. The LR TQ Team will be assigned to evaluate the TQ Program and analyse the independent tests, the evidence, claims, and arguments which confirm compliance to this TQ procedure and specified Rules & Standards through witnessing and assessing implementation of the TQ Process or specific tests and analyses. Proven technology elements can be verified to be in compliance with standards which are acceptable to LR or to be required to provide relevant evidence of their performance records. Participation of the LR TQ Team at each TQ stage is advised, as stated in the guidance. Where applicable, the managerial and/or organizational relationship between the facilities where testing and/or validation activities are being performed and the LR TQ Team may be documented. The Team might also comprise of members from other stakeholders In the TQ process. 3.1 General At early stages of TQ and/or early development stages of the technology elements, expert opinions contribute a significant role to TQ. The opinion includes identification of elements to be qualified, safety and reliability evidence to be developed, and interpretation of the evidence provided. It is recommended to use a structured process for drawing expert opinions, and demonstration of systematically analysing this information to the satisfaction of the technology element s safety and reliability claims and goals. TQ is an iterative process and before deployment, a technology concept may be reviewed and improved several times using observations and the results at different steps of the TQ process at different development stages of the technology. Traceability to demonstrate the link among identified technology elements, identified risks, and collected evidence is hence required throughout the TQ process for the whole development lifecycle of the technology. TQ cost is mainly accounted for by evidence collection (mainly testing); therefore resources should be focused on building and improving the relevant data and information of the right evidence. The structured and systematic process and approach should be able to determine which aspects of the evidence are required to be enhanced and to easily identify main factors contributing to the uncertainty about the satisfaction of TQ requirements. In this procedure, a systematic and structured assessment approach built on the notion of goal-based assurance cases might be applied for modelling goals and claims, expert opinion elicitation, structuring arguments and evidence, identifying and decomposing qualification acceptance criteria, qualification plans, and arriving at conclusions. Several goal modelling languages exist, such as i* and KAOS. The basic objectives of the process should be established and agreed before the start of the TQ process. These objectives should be documented as measurable criteria covering all aspects of the technology such as already mentioned; Safety, Environmental, Functionality, Performance, Reliability and Availability. 3.2 Basic Inputs to TQ Throughout the TQ process, documentation needs to be clear, transparent, traceable and well defined to avoid misinterpretations and where specifically required by LR, documentation should be recorded in the standard format approved by LR. The information submitted for TQ review by LR should aim to satisfy and confirm that performance requirements, goals and claims of the technology in its target operating environment are met. 4 Lloyd s Register

14 Guidance Notes for, December 2014 Section 3 In addition, the following information would need to be submitted: Requirements definition List of Codes and Standards applied General descriptions Context of use If a Master Document Register (MDR) is available then this should also be submitted. Operation and Maintenance: Relevant operating and maintenance manuals Allowable values of operating, maintenance, and, environmental conditions Specification and procedures of maintenance, inspection, and repair, upgrade, or modification in the intended context of use. 3.3 Requirements Definition Define the functional behavior and performance requirements of the technology in the environments to which the technology is intended to be operating in and identify the source of requirements. 3.4 General Description Introduce the technology, its intended functionality, capability and performance when operating in the target environment. The general description should be supported by the following information as applicable for the Technology under consideration: Technology: Basis of design: Documentation of justifications to applied codes and boundary limits if exceeding recognised scope of standard, standards, and regulations for design criteria Capacity and performance requirements, reliability philosophy, operation and maintenance and repair philosophies, etc. Reference to other criteria Functional descriptions and drawings: Equipment list General arrangement drawings System block diagrams Single line diagrams Description of operating modes Description of safety related arrangements Description of interfaces to other machinery, equipment and systems Plans of physical arrangements Changes or modifications from original approved qualified design or context of use Software-architecture, functional specifications, user interface, data flow, control logic sequences, etc. Detailed drawings and descriptions of technology elements to be qualified Records and content of document revisions 3.5 Confidentiality Confidentiality agreements should be established among involved parties where applicable. However, this requirement also needs to take account of legislative requirements or when disclosure is authorised by the involved parties. Availability of the required documentation for TQ review should not be restrained by confidentiality agreements. More thorough testing and analysis may be expected in the scenario that the original documents are unavailable or inaccessible. 3.6 Context of use The context of the equipment or system undergoing Technology Qualification needs to be defined. The context should refer to the operating environment, the integration with existing systems, the human interactions, and the operation and maintenance. A comprehensive statement describing in detail the operating environment where the technology is deployed should cover the following points, as a minimum: Fully and clearly describe the manner and purpose of use for the technology Identify existing key points of reference Address any important criteria regarding the circumstances under which the technology is qualified Define the boundaries within which the available data adequately justifies deployment in operating environment Potential value outside these boundaries Outline of the goals of the technology and the context of use in which the technology is intended Data from additional studies obtained over time may be submitted to expand the qualified context of use Manufacturing and installation: Manufacturing, installation, and software development process, procedures, certification, records Specification of tools, machinery, and materials (including relevant certificates) Other certificates as relevant Lloyd s Register 5

15 Guidance Notes for, December 2014 Section 4 Section 4 TQ Stage 1: Technology Appraisal Stage 1: Appraisal (see Section 4) Technology Assessment System Decomposition This stage describes the principles to derive the list of technology elements through decomposition analysis, a goal-based structured and systematic approach to handle expert opinions elicitation, TQ cost, traceability, hazard identification, risk assessment and the input to the next TQ stage System decomposition Risk Assessment Stage 2: Plan & Execute (see Section 5) Stage 3: Review & Certification (see Section 6) System Decomposition Principles A system is defined as a group of interacting elements or technologies having a functional relationship that when grouped or integrated, provide some processes or services. System performance is often as strong as its weakest technology element(s). The outcome of the system decomposition provides the basis for review and assessment. It defines, but is not limited to, the scope for review, document system and operating conditions, functions and sub-functions requirements, process sequences and operations, control-logic sequences, and capabilities with respect to qualitative and quantitative claims and goals. The decomposition methodologies should be selected and agreed upon by the LR TQ team with respect to the complexity of the integration and the development stage of the systems and/or technology elements under qualification. If the system is software-intensive, the selected methodologies are applicable to such systems. The decomposition process should start with the functions at the highest level, which is usually at the system-level. The decomposition process stops at components and/or technology elements whose maturity and operating experience is identifiable and assessable and their novelty or uncertainties, including the interfaces and integration technology between them, allow the technology to be assessed by codes or good practice. The decomposition process should also apply to both hardware and software elements. There are several possible approaches which can be used together or alone. A structure-based breakdown of hardware or architecture-based approach for software-based systems is one avenue. Another method is a function-based approach to sub-divide main functions into sub-functions in order to identify which (sub-) functions are performed by which elements and then to derive the physical and logical location and/or connection with other components/sub-systems/systems. These approaches are to determine how the functions should be accomplished, the expected performance level by which technology elements need to perform those functions Approach to System Decomposition System engineering principles and processes should be adopted in the decomposition analysis starting from system-level functions and structure, human-machine interaction, roles and responsibilities of organizations and personnel participating in the system development. A goal-based analysis should be applied in the decomposition analysis to identify relevant functions, boundary conditions, interfaces and sub-goals for each identified element. Descriptions of the purpose of use, operating modes, and integration issues for each decomposed element should be documented. A goal-based scheme might be applied to structure the goals, claims, arguments, and evidences for all elements. High level goals and/or claims of the system or technology elements should be documented together with the context of use in the target operating environment which is identified and confirmed by SMEs in the LR TQ team. The decomposition can be either full or partial. Full decomposition means that a parent goal has been completely refined and that no more sub-goals will be added to the decomposition; whereas partial decomposition means that more sub-goals may be added in the future Critical Technology Elements A technology element is critical if Its application or the element itself is either new or novel, or in an area that poses major technological, business, environmental or safety risk for each phase of its development life cycle, such as detailed design, manufacture, installation, commissioning, operation, or decommissioning; and The LR TQ team will determine if each technology element identified in the decomposition step is a CTE. All CTEs should be identified and qualified. The CTEs are labelled using a decision matrix, a criticality rating scheme and a criticality 6 Lloyd s Register

16 Guidance Notes for, December 2014 Section 4 assessment approach which is fully documented and is approved by LR. The following are documented: How the CTEs are identified Why the CTEs are important (criticality assessment) Maturity assessment of CTEs Novelty, areas of major risks, and adequate performance in the appropriate environment of CTEs further review to reduce uncertainty are to be based on the technology readiness level and the operating maturity level (see ). This screening step is to reduce economic cost of qualification through eliminating the identified proven technology elements; hence the qualification resources and scope are to focus only on the unproven elements. It is allowable, after review by and where acceptable to LR, for a non-critical technology element to avoid subsequent qualification steps. In that scenario, the assumptions and justifications for the decision of skipping the qualification of those elements and all information related to the skipped elements should be documented and reported, and the elements should also be listed in the goal-based analysis Measurable criteria for the selection of CTE It should be ensured that the decision on CTE-related aspects such as selection or ranking choice(s), traceability of recommendations, solutions or opinions is documented and verified by SMEs and reviewed LR. Documentation should be unambiguous. Figure 2 Proven Limited experience New Initial screening matrix For example, available supporting evidence documented in a database containing different sets of numerical data and using different datasets of the same database can result in different qualification states/levels. Hence, expert opinions should be gathered and utilized as the basis to deciding the most relevant set of data for a specific goal/function used in a specific application in a specific environment. 4.2 Technology Assessment The technology assessment considers the technology readiness level and its operating environment, and also requires an integration review for the areas which are recognized as well proven in the same application but are connected to a novel system. Technology assessment is performed through a structured workshop with participation of SMEs in the systems design, technologies, maintenance and operations, and third party independent technical authorities. In this stage, the following items are considered: Equipment List Readiness level for each item Operational, reliability and maintainability aspects for each item Integration issues Review of relevant philosophies Report that identifies the technology readiness for each item of equipment, and overall systems. Established areas to be considered during a risk assessment Technology Initial Screening All elements identified in the system decomposition step should be screened and assigned an uncertainty rating colour-coded rating of red, green or yellow. Screening of technology elements for The color-coded category matrix depicted in Fig.2 with respect to the experience level in the target operating environment and the technology readiness level should be used to assign uncertainty level for each element. Qualification review requirements for each uncertainty level are briefly described in Fig.3 Figure Technology Readiness Level Qualification review levels No new technical uncertainties review medium review high The elements in the red category are highly likely to introduce new technical uncertainties and should be subjected to the high qualification review comprising of the most intensive review requirements in the subsequent qualification steps (see 5.3.1) High qualification review attempts to reduce technical uncertainties and/or bring up the TRL of these elements. Requirements and recommendations about (including but not limited to) testing, risk mitigation, and design improvements aiming at moving those elements to categories of a higher certainty in the same or subsequent technology and/or system development stages should be determined and provided. Lloyd s Register 7

17 Guidance Notes for, December 2014 Section 4 The elements in the yellow category should be subjected to the medium qualification review whose qualification activities and requirements are a subset of the high qualification review. Medium qualification review should include required processes and requirements of risk assessment. The elements in the green category should be considered as introducing no new technical uncertainties and screened out in order not to go through the remaining qualification process. They should be subjected to review by established codes and standards Technology Readiness Level Assessment The technology readiness level (TRL) is a function of the Technology Maturity Level (TML) and the Integration Maturity Level (IML) Technology Maturity Level Agreed by the LR TQ team as acceptable to LR, the ranking of TML of technologies should be chosen to be relevant to the industry in which their applications are specifically required by the regulations. This procedure aligns with TML ranking in API 17N. A comparison between different TML ranking regimes such as NASA is provided in Appendix 3. TML assessment of any CTE is tied to the intended application through the performance specifications provided. It is possible that the same technology element will be assigned for different TML in different applications or in different operating environments. For example, the TML of a coating technology may be 7 in a noncritical/low spec application, but could be 3 in a critical/high spec application. Where applicable, the technology maturity level review for an element or set of elements should include the review of and account for the novelty aspects of the integration of the element(s). (See ) A scheme and/or a method to adjust TML assigned to an element with respect to different IMLs of the sub-elements should be determined and agreed with the LR TQ team as acceptable to LR. The scheme and method might be qualitative or quantitative or combined by both and should be consistent throughout the TQ review process. Appendix 5 provides an illustration to qualitative and quantitative aspects of the IML-adjusted TML assignment methods Technology Maturity Level Assignment Process Supporting tools and models to assist TML calculation might be employed; in that case the calculation steps and methods are to be documented in the technology assessment report and be agreed upon by the LR TQ team as acceptable to LR. Where data is limited for concluding a calculable TML assignment, expert opinions should be considered and applied in assigning TML for the elements under review. Expert opinions might be referred to in order to determine the TML for integrated elements whose TML and IML are not identical, in case of limited data available to be used to assess the TML quantitatively. It should be noted that the TML of an element at a higher level in the hierarchy should not be higher than the lowest TML among the integrated CTEs of the element if the element and those integrated CTEs are operating in an identical environment (see Appendix 4) Software-based Technology Elements Software is continually changing and a new release/modification of software could introduce new faults or break down the architectural integrity of software. Therefore software degradation might alter previously confirmed maturity level. Assessment of TML for software-based elements might adopt a different philosophy from mechanical or non-software-based technologies. The TML of the software could be assessed at any development stage without waiting until the actual code is produced. For example, the maturity level of critical algorithms could be assessed through analysing their pseudo code in addition to their implemented code. Software-based technology elements should be categorized as either standalone or non-standalone where applicable. The standalone category is to include elements such as operating system and computer-based process control system. The nonstandalone category is to include elements that are required to operate on non-pc hardware such as PLC-based software, network, and device drivers. Issues related to the integration of software-based elements are often challenging and costly to resolve at the later development stage. The maturity level of the standalone elements might be assessed through techniques, models, and methods in the existing standards, which are acceptable to LR, governing software development lifecycle in the target operating environment. A procedure to assess TML of software-based technology elements should be established and be acceptable to LR Integration Maturity Level Technology elements could pose technology challenges and uncertainties when integrated into a system, even if the standalone element(s) is a matured technology. Review of integration issues should be performed for each element identified at the system decomposition step to determine the novelty of the integration. This review attempts to determine if elements within systems have been previously integrated and to review documented experience or performance of the integration and issues. Information and data used to assess the IML should be provided. For example, processrelated integration issues might be reviewed through process flow diagrams (PFDs), while software-related integration issues might be reviewed through data flow diagrams. More attention might be paid to the integration aspects of elements whose qualification outcomes could affect the critical claims and goals Technology Operating Maturity Level All of the elements identified in the system decomposition step should be assigned to a maturity level of operating in the target operating environment in one of three categories: proven, limited experience and new. 8 Lloyd s Register

18 Guidance Notes for, December 2014 Section 4 A technology element could have the highest TML, but still be new to or have a limited experience in a target environment. The operating maturity of a technology element is relatively determined by the technology s operating performance. The body of knowledge about the operating performance of technology is therefore confirmable, accessible and verifiable. The maturity in an operating environment is determined by the time period the technology has been continuously used in the operating environment, and also by the technical uncertainties posed by the technology as perceived by the LR TQ team, SMEs, third party technical independent assessors and/or determined by the specific guidelines/requirements from regulators and end-users. Where applicable, a consensus-based decision should be applied to determine the operating maturity level in the target operating environment for all elements identified in the system decomposition step. 4.3 Risk Assessment The intended scope of this step is to provide the risk management principles and processes determined via examination by SMEs throughout the lifecycle for each of the technology elements identified at System Decomposition (see 4.1.1) and screened in the technology assessment (see 4.2). The elements include CTEs, equipment and systems where novel technology is used. Each technology element is identified and reviewed individually, and recommendations for qualifications or mitigations are identified, recorded and traceable throughout the qualification process. It is an iterative process until all mitigation and qualification activities are satisfactorily identified. It is possible that the list of technology elements and/or their screening assessments identified at earlier qualification steps might be adjusted during the detailed Risk Assessment steps. The assessment process aims to ensure that all reasonably foreseeable hazards associated with a particular technology are identified and adequately controlled, such as hazards related to novel aspects of system integrity failure, and control/isolation failure. Adequate risk control measures should follow the risk control hierarchy acceptable to LR and/or recommended in respective international standards (e.g. see ISO 17776, ISO/IEC 31010). The adequate measures could be, but are not limited to, such as elimination, prevention, reduction or mitigation, and can be realised in the forms such as physical equipment, process control systems, operating or maintenance procedures for all aspects. Where a technology undergoing qualification is derived from a technology previously qualified by LR or other qualified assessment organization, the risk assessment to be undertaken may refer to the relevant parts of risk assessment resulting from the previous qualification and also include the differences in integration and/or in the application of its use. Risk Assessment is established to ensure any risks stemming from the technology are addressed, to ensure risks are eliminated wherever possible and risks which cannot be eliminated are mitigated Risk Assessment Team Risk assessment is not a substitute for good engineering judgment and expertise. In order for risk assessment to be effective the persons involved in the process must have the knowledge and experience in the technology area and/or target operating environment to provide a high quality, robust evaluation of the technology and systems being assessed. Independent third party expert(s) should be involved in the risk assessment process for high ranking hazards identified at the high-level hazard review, for example HAZID/HAZOP (see 4.3.3). The risk assessment team should include: a. Key Stakeholder (e.g. owner, operator/end-user, designer/ developer, third party assessor) b. Technical SMEs (pertaining to technology area and target operating environment) c. Regulators or the jurisdictional authorities, if deemed necessary d. A risk SME should chair the team during the risk assessment process Assessment Methods This document does not mandate any particular risk assessment method and does not offer acceptance criteria. It defines the principles and processes which LR requires to ensure that the risk assessment is performed to an acceptable standard. The methodology of risk assessment should meet the intent of international, national and industry standards acceptable to LR, such as LR risk assessment guidelines. The selection of methods and techniques should take into consideration the nature of the CTE, the system and equipment to be reviewed, safety and environmental factors, the risk profile, regulatory requirements and other pertinent variables. The selected risk assessment technique and risk management procedure should be approved by LR. Acceptable risk assessment approaches should be identified and dependent on engineering complexity, availability of data regarding sub-systems/components integrity and reliability. The selected method should consider complexity and maturity of the technology being assessed. Comprehensive descriptions of the risks should be provided. ISO/IEC provides guidance on selection and application of systematic techniques for risk assessment. ISO identifies some of the tools and techniques that can be used to identify hazards and risks in the offshore exploration and production industry and provides guidance on how they may be applied to particular activities. Risk assessments may be built on a foundation of applying the appropriate codes and standards where appropriate. Lloyd s Register 9

19 Guidance Notes for, December 2014 Section Hazard Identification A prerequisite of risk assessment is hazard identification. A complete list of hazards related to a technology, subcomponent, equipment and system should be identified by means of a structured and systematic approach. HAZID and HAZOP are possible techniques for identification of all significant hazards. Each identified hazard is reviewed to determine whether it is significant and requires further evaluation by applying hazard evaluation techniques. It is important to record all identified hazards and the reasons for classifying some as not significant. This ensures traceability as the qualification progresses into later stages. Hazards to personnel, environment, and asset should be identified and potential associated risks should be evaluated. A formal hazards register should be prepared, detailing each hazard together with appropriate data such as potential cause, potential consequence, and actions for risk control measures. More information on HAZID should be referred to ISO Annex B and Annex D HAZOP - Hazard & Operability study The basis of HAZOP is a systematic examination of deviations from expected operational boundary conditions. It is performed by using a series of guidewords and parameters to identify if any of the combinations can occur, and if so the possible causes and consequences. In addition, existing measures to minimize causes and consequences are listed together with any recommendations to eliminate the deviation or improve upon the existing measures. IEC might be referenced to as a guide for HAZOP studies of systems, providing guidance on application of the technique and on the HAZOP study procedure, including definition, preparation, examination sessions, resulting documentation and follow-up SWIFT - Structured What-IF Technique SWIFT is similar to HAZOP as it is a structured brainstorming session; it uses a set of questions to stimulate discussion on consequences, safeguards and recommendations. Instead of using the guidewords and parameters in the HAZOP, standard what-if type phrases and a set of prompt words associated with the system are used to facilitate the discussion. The SWIFT technique is described in ISO FHA - Functional Hazard Assessment Functional Hazard Assessment is a top-down safety assessment technique defined in SAE ARP4761. FHA is a predictive technique that attempts to explore the effects of functional failures of parts of a system. FHA is first carried out for the whole system working from a description of system functions. Then, following allocation of functions to the systems, FHA is performed again for each subsystem Risk Identification Identification and assessment of the failure modes of the systems should be performed. The selected technique should be relevant and adequate for this purpose. FMECA, FTA and ETA are possible methods FMECA - Failure Modes, Effects and Criticality Analysis The function of each decomposed element of the system is analysed and for each element, consideration is given to the failures or incorrect performance that may occur. The associated cause of each failure and the corresponding effects of the failures are listed alongside each failure mode. Each failure mode identified is ranked according to its importance or criticality. There are several ways this may be conducted. Common methods include the measure of the probability that the mode being considered will result in failure of the system as a whole, level of risk by combining the consequences of a failure mode occurring with the probability of failure or a semi-quantitative measure of criticality obtained by multiplying numbers from rating scales (usually between 1 and 10) for consequence of failure, likelihood of failure and ability to detect the problem. IEC provides the procedure for the FMECA technique FTA - Fault Tree Analysis The FTA is used to qualitatively identify the potential causes and pathways to a failure. It can also be used quantitatively to calculate the probability of the failure given the probabilities of the causes. IEC describes the process of a Fault Tree Analysis and IEC gives guidelines on dependability management which is used to develop the fault tree of the system ETA - Event Tree Analysis The ETA is used to illustrate and quantify all possible outcomes from an initiating event by considering what can happen next. The tree is used to map the different ways the initiating event can escalate and the effectiveness of the control measures at each juncture. IEC gives guidance on carrying out the ETA technique Risk Evaluation and Reporting An LR-acceptable risk ranking methodology should be determined and carried out at each critical milestone/gate/phase for qualifying and managing the process of the whole lifecycle Risk Likelihood & Severity and Classification The selection of method (quantitative vs. qualitative) should take into consideration the complexity and maturity of the technology being assessed. Likelihood and severity ratings should be discussed and agreed upon at the beginning of the risk assessment workshop by all SMEs. An appropriate risk classification methodology should be agreed upon and established at the beginning of the risk assessment process by all SMEs to assess how new technology has been qualified and managed through the qualification process. A Risk Matrix is one possible method for classifying risks. 10 Lloyd s Register

TECHNOLOGY QUALIFICATION MANAGEMENT

TECHNOLOGY QUALIFICATION MANAGEMENT OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

DNVGL-RP-A203 Edition June 2017

DNVGL-RP-A203 Edition June 2017 RECOMMENDED PRACTICE DNVGL-RP-A203 Edition June 2017 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL

More information

Technology qualification management and verification

Technology qualification management and verification SERVICE SPECIFICATION DNVGL-SE-0160 Edition December 2015 Technology qualification management and verification The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

REVIEW AND APPROVAL OF NOVEL CONCEPTS

REVIEW AND APPROVAL OF NOVEL CONCEPTS Guidance Notes on Review and Approval of Novel Concepts GUIDANCE NOTES ON REVIEW AND APPROVAL OF NOVEL CONCEPTS APRIL 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of

More information

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN W.A.T. Alder and J. Perkins Binnie Black and Veatch, Redhill, UK In many of the high hazard industries the safety case and safety

More information

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE Summary Modifications made to IEC 61882 in the second edition have been

More information

TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS.

TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS. TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS. 1. Document objective This note presents a help guide for

More information

This document is a preview generated by EVS

This document is a preview generated by EVS IEC 61882 Edition 2.0 2016-03 REDLINE VERSION colour inside Hazard and operability studies (HAZOP studies) Application guide IEC 61882:2016-03 RLV(en) THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright

More information

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design June 2013 Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design Executive Summary A vendor pre-project design review of a new nuclear power plant provides an

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL REPORT IEC/TR 80002-1 Edition 1.0 2009-09 colour inside Medical device software Part 1: Guidance on the application of ISO 14971 to medical device software IEC/TR 80002-1:2009(E) THIS PUBLICATION

More information

This is a preview - click here to buy the full publication

This is a preview - click here to buy the full publication IEC/TR 80002-1 TECHNICAL REPORT Edition 1.0 2009-09 colour inside Medical device software Part 1: Guidance on the application of ISO 14971 to medical device software INTERNATIONAL ELECTROTECHNICAL COMMISSION

More information

Voluntary Carbon Standard

Voluntary Carbon Standard Voluntary Carbon Standard Voluntary Carbon Standard Program Guidelines 19 November 2007 VCS Secretariat 24 rue Merle-d Aubigné, 1207 Geneva, Switzerland secretariat@v-c-s.org 1 Voluntary Carbon Standard

More information

Applied Safety Science and Engineering Techniques (ASSET TM )

Applied Safety Science and Engineering Techniques (ASSET TM ) Applied Safety Science and Engineering Techniques (ASSET TM ) The Evolution of Hazard Based Safety Engineering into the Framework of a Safety Management Process Applied Safety Science and Engineering Techniques

More information

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR August 31, 2009 Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR-1000-1 Executive Summary A vendor pre-project design review of a new nuclear power plant provides an opportunity

More information

This is a preview - click here to buy the full publication

This is a preview - click here to buy the full publication TECHNICAL REPORT IEC/TR 62794 Edition 1.0 2012-11 colour inside Industrial-process measurement, control and automation Reference model for representation of production facilities (digital factory) INTERNATIONAL

More information

INTERNATIONAL. Medical device software Software life cycle processes

INTERNATIONAL. Medical device software Software life cycle processes INTERNATIONAL STANDARD IEC 62304 First edition 2006-05 Medical device software Software life cycle processes This English-language version is derived from the original bilingual publication by leaving

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

TYPE APPROVAL PROCEDURE

TYPE APPROVAL PROCEDURE Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated

More information

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 ANNEXURE A TECHNICAL SPECIFICATIONS ICASA 09/2018 1. Purpose of the Request

More information

Controlling Changes Lessons Learned from Waste Management Facilities 8

Controlling Changes Lessons Learned from Waste Management Facilities 8 Controlling Changes Lessons Learned from Waste Management Facilities 8 B. M. Johnson, A. S. Koplow, F. E. Stoll, and W. D. Waetje Idaho National Engineering Laboratory EG&G Idaho, Inc. Introduction This

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

How it works and Stakeholder Benefits

How it works and Stakeholder Benefits UNFC 2009 - Applications in Uranium and Thorium Resources: Focus on Comprehensive Extraction How it works and Stakeholder Benefits David MacDonald Santiago 9-12 July 2013 Stakeholders of our reported resources

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems INTERNATIONAL STANDARD ISO 10418 Second edition 2003-10-01 Petroleum and natural gas industries Offshore production installations Basic surface process safety systems Industries du pétrole et du gaz naturel

More information

OWA Floating LiDAR Roadmap Supplementary Guidance Note

OWA Floating LiDAR Roadmap Supplementary Guidance Note OWA Floating LiDAR Roadmap Supplementary Guidance Note List of abbreviations Abbreviation FLS IEA FL Recommended Practices KPI OEM OPDACA OSACA OWA OWA FL Roadmap Meaning Floating LiDAR System IEA Wind

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3B Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Segment

More information

TECHNICAL RISK ASSESSMENT: INCREASING THE VALUE OF TECHNOLOGY READINESS ASSESSMENT (TRA)

TECHNICAL RISK ASSESSMENT: INCREASING THE VALUE OF TECHNOLOGY READINESS ASSESSMENT (TRA) TECHNICAL RISK ASSESSMENT: INCREASING THE VALUE OF TECHNOLOGY READINESS ASSESSMENT (TRA) Rebecca Addis Systems Engineering Tank Automotive Research, Development, and Engineering Center (TARDEC) Warren,

More information

GENERAL DESCRIPTION OF THE CMC SERVICES

GENERAL DESCRIPTION OF THE CMC SERVICES STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Bonnie S. Blair bblair@thompsoncoburn.com 202.585.6905 Margaret E. McNaul mmcnaul@thompsoncoburn.com 202.585.6940 Cities of Anaheim, Azusa,

More information

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011 LESSONS LEARNED IN PERFORMING TECHNOLOGY READINESS ASSESSMENT (TRA) FOR THE MILESTONE (MS) B REVIEW OF AN ACQUISITION CATEGORY (ACAT)1D VEHICLE PROGRAM Jerome Tzau TARDEC System Engineering Group UNCLASSIFIED:

More information

UNIT-III LIFE-CYCLE PHASES

UNIT-III LIFE-CYCLE PHASES INTRODUCTION: UNIT-III LIFE-CYCLE PHASES - If there is a well defined separation between research and development activities and production activities then the software is said to be in successful development

More information

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

Type Approval JANUARY The electronic pdf version of this document found through  is the officially binding version STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service

More information

DNVGL-CP-0338 Edition October 2015

DNVGL-CP-0338 Edition October 2015 CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class

More information

ISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Privacy framework

ISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Privacy framework INTERNATIONAL STANDARD ISO/IEC 29100 First edition 2011-12-15 Information technology Security techniques Privacy framework Technologies de l'information Techniques de sécurité Cadre privé Reference number

More information

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

Background T

Background T Background» At the 2013 ISSC, the SAE International G-48 System Safety Committee accepted an action to investigate the utility of the Safety Case approach vis-à-vis ANSI/GEIA-STD- 0010-2009.» The Safety

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3C (DDVP) Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space

More information

8th Floor, 125 London Wall, London EC2Y 5AS Tel: +44 (0) Fax: +44 (0)

8th Floor, 125 London Wall, London EC2Y 5AS Tel: +44 (0) Fax: +44 (0) Ms Kristy Robinson Technical Principal IFRS Foundation 30 Cannon Street London EC4M 6XH 27 January 2016 Dear Kristy This letter sets out the comments of the UK Financial Reporting Council (FRC) on the

More information

IEEE STD AND NEI 96-07, APPENDIX D STRANGE BEDFELLOWS?

IEEE STD AND NEI 96-07, APPENDIX D STRANGE BEDFELLOWS? IEEE STD. 1012 AND NEI 96-07, APPENDIX D STRANGE BEDFELLOWS? David Hooten Altran US Corp 543 Pylon Drive, Raleigh, NC 27606 david.hooten@altran.com ABSTRACT The final draft of a revision to IEEE Std. 1012-2012,

More information

Development of a Manufacturability Assessment Methodology and Metric

Development of a Manufacturability Assessment Methodology and Metric Development of a Assessment Methodology and Metric Assessment Knowledge-Based Evaluation MAKE Tonya G. McCall, Emily Salmon and Larry Dalton Intro and Background Methodology Case Study Overview Benefits

More information

RESOLUTION MEPC.290(71) (adopted on 7 July 2017) THE EXPERIENCE-BUILDING PHASE ASSOCIATED WITH THE BWM CONVENTION

RESOLUTION MEPC.290(71) (adopted on 7 July 2017) THE EXPERIENCE-BUILDING PHASE ASSOCIATED WITH THE BWM CONVENTION RESOLUTION MEPC.290(71) (adopted on 7 July 2017) RESOLUTION MEPC.290(71) (adopted on 7 July 2017) ANNEX 12 RESOLUTION MEPC.290(71) (adopted on 7 July 2017) MEPC 71/17/Add.1 Annex 12, page 1 THE MARINE

More information

Safety of programmable machinery and the EC directive

Safety of programmable machinery and the EC directive Automation and Robotics in Construction Xl D.A. Chamberlain (Editor) 1994 Elsevier Science By. 1 Safety of programmable machinery and the EC directive S.P.Gaskill Health and Safety Executive Technology

More information

Logic Solver for Tank Overfill Protection

Logic Solver for Tank Overfill Protection Introduction A growing level of attention has recently been given to the automated control of potentially hazardous processes such as the overpressure or containment of dangerous substances. Several independent

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Australian Standard. Design review AS IEC IEC 61160, Ed.2 (2005) AS IEC

Australian Standard. Design review AS IEC IEC 61160, Ed.2 (2005) AS IEC AS IEC 61160 2008 IEC 61160, Ed.2 (2005) AS IEC 61160 2008 Australian Standard Design review This Australian Standard was prepared by Committee QR-005, Dependability. It was approved on behalf of the Council

More information

EFRAG s Draft letter to the European Commission regarding endorsement of Definition of Material (Amendments to IAS 1 and IAS 8)

EFRAG s Draft letter to the European Commission regarding endorsement of Definition of Material (Amendments to IAS 1 and IAS 8) EFRAG s Draft letter to the European Commission regarding endorsement of Olivier Guersent Director General, Financial Stability, Financial Services and Capital Markets Union European Commission 1049 Brussels

More information

Impact on audit quality. 1 November 2018

Impact on audit quality. 1 November 2018 1221 Avenue of Americas New York, NY 10020 United States of America www.deloitte.com Dan Montgomery Interim Technical Director International Auditing and Assurance Standards Board International Federation

More information

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes.

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes. Joint ILAC CIPM Communication regarding the Accreditation of Calibration and Measurement Services of National Metrology Institutes 7 March 2012 Authorship This document was prepared by the International

More information

Getting the evidence: Using research in policy making

Getting the evidence: Using research in policy making Getting the evidence: Using research in policy making REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 586-I Session 2002-2003: 16 April 2003 LONDON: The Stationery Office 14.00 Two volumes not to be sold

More information

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods The Preliminary Risk Approach: Merging Space and Aeronautics Methods J. Faure, A. Cabarbaye & R. Laulheret CNES, Toulouse,France ABSTRACT: Based on space industry but also on aeronautics methods, we will

More information

SHTG primary submission process

SHTG primary submission process Meeting date: 24 April 2014 Agenda item: 8 Paper number: SHTG 14-16 Title: Purpose: SHTG primary submission process FOR INFORMATION Background The purpose of this paper is to update SHTG members on developments

More information

LAW ON TECHNOLOGY TRANSFER 1998

LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER May 7, 1998 Ulaanbaatar city CHAPTER ONE COMMON PROVISIONS Article 1. Purpose of the law The purpose of this law is to regulate relationships

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY D8-19 7-2005 FOREWORD This Part of SASO s Technical Directives is Adopted

More information

White paper The Quality of Design Documents in Denmark

White paper The Quality of Design Documents in Denmark White paper The Quality of Design Documents in Denmark Vers. 2 May 2018 MT Højgaard A/S Knud Højgaards Vej 7 2860 Søborg Denmark +45 7012 2400 mth.com Reg. no. 12562233 Page 2/13 The Quality of Design

More information

Essential requirements for a spectrum monitoring system for developing countries

Essential requirements for a spectrum monitoring system for developing countries Recommendation ITU-R SM.1392-2 (02/2011) Essential requirements for a spectrum monitoring system for developing countries SM Series Spectrum management ii Rec. ITU-R SM.1392-2 Foreword The role of the

More information

Latin-American non-state actor dialogue on Article 6 of the Paris Agreement

Latin-American non-state actor dialogue on Article 6 of the Paris Agreement Latin-American non-state actor dialogue on Article 6 of the Paris Agreement Summary Report Organized by: Regional Collaboration Centre (RCC), Bogota 14 July 2016 Supported by: Background The Latin-American

More information

Draft performance standards for shipborne "BeiDou" BDS receiver equipment

Draft performance standards for shipborne BeiDou BDS receiver equipment IMO NAV 59 Summary Report Introduction The 59th session of the IMO Sub-Committee on Safety of Navigation (NAV 59) was held from 2nd to 6th September 2013, at the IMO headquarters in London. This briefing

More information

Office for Nuclear Regulation

Office for Nuclear Regulation Office for Nuclear Regulation ASSESSMENT REPORT Civil Nuclear Reactors Programme NNB Genco: Hinkley Point C Pre-Construction Safety Report 2012 Assessment Report for Work Stream B14, Radiation Protection

More information

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048 GN This document contains one or more pages which contain colour. Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2013 Rail Safety and Standards Board Limited GE/GN8648 Issue

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued)

Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued) Life Cycle Management of Station Equipment & Apparatus Interest Group (LCMSEA) Getting Started with an Asset Management Program (Continued) Projects sorted and classified as: 1. Overarching AM Program

More information

NZFSA Policy on Food Safety Equivalence:

NZFSA Policy on Food Safety Equivalence: NZFSA Policy on Food Safety Equivalence: A Background Paper June 2010 ISBN 978-0-478-33725-9 (Online) IMPORTANT DISCLAIMER Every effort has been made to ensure the information in this report is accurate.

More information

IET Standards Committee. Governance. IET Standards Committee Remit. IET Standards Committee Constitution

IET Standards Committee. Governance. IET Standards Committee Remit. IET Standards Committee Constitution IET Standards Committee Governance The IET is governed by a Board of Trustees, to which report five committees and Council. In addition, two main boards Knowledge Management Board and Membership and Professional

More information

Initial draft of the technology framework. Contents. Informal document by the Chair

Initial draft of the technology framework. Contents. Informal document by the Chair Subsidiary Body for Scientific and Technological Advice Forty-eighth session Bonn, 30 April to 10 May 2018 15 March 2018 Initial draft of the technology framework Informal document by the Chair Contents

More information

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT M. VISSER, N.D. VAN DER LINDEN Licensing and compliance department, PALLAS Comeniusstraat 8, 1018 MS Alkmaar, The Netherlands 1. Abstract

More information

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION IEC TS 61400-14 First edition 2005-03 Wind turbines Part 14: Declaration of apparent sound power level and tonality values Reference number IEC/TS 61400-14:2005(E) Publication numbering

More information

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015.

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015. Atoms for Peace and Development Information Circular INFCIRC/57 72/Rev.6 Date: 19 January 2018 General Distribution Original: English Guidelines regarding Convention National Reports under the on Nuclear

More information

Health Based Exposure Limits (HBEL) and Q&As

Health Based Exposure Limits (HBEL) and Q&As Health Based Exposure Limits (HBEL) and Q&As The EMA guideline (EMA/CHMP/ CVMP/ SWP/169430/2012) & EMA/CHMP/CVMP/SWP/463311/2016 Graeme McKilligan, UK, MHRA. Content Intent of HBEL Post Implementation

More information

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology INTERNATIONAL STANDARD ISO 12100-1 First edition 2003-11-01 Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology Sécurité des machines Notions fondamentales,

More information

IAASB Main Agenda (March, 2015) Auditing Disclosures Issues and Task Force Recommendations

IAASB Main Agenda (March, 2015) Auditing Disclosures Issues and Task Force Recommendations IAASB Main Agenda (March, 2015) Agenda Item 2-A Auditing Disclosures Issues and Task Force Recommendations Draft Minutes from the January 2015 IAASB Teleconference 1 Disclosures Issues and Revised Proposed

More information

Requirements Analysis aka Requirements Engineering. Requirements Elicitation Process

Requirements Analysis aka Requirements Engineering. Requirements Elicitation Process C870, Advanced Software Engineering, Requirements Analysis aka Requirements Engineering Defining the WHAT Requirements Elicitation Process Client Us System SRS 1 C870, Advanced Software Engineering, Requirements

More information

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario August 7, 2001 See Distribution List RE: Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario Dear Sir/Madam: The Electrical Safety

More information

Part 2: Medical device software. Validation of software for medical device quality systems

Part 2: Medical device software. Validation of software for medical device quality systems Provläsningsexemplar / Preview TECHNICAL REPORT ISO/TR 80002-2 First edition 2017-06 Medical device software Part 2: Validation of software for medical device quality systems Logiciels de dispositifs médicaux

More information

Australian/New Zealand Standard

Australian/New Zealand Standard Australian/New Zealand Standard Quality management and quality assurance Vocabulary This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee QR/7, Quality Terminology. It was

More information

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Special Notes API publications necessarily address problems

More information

DNV GL Marine Renewables

DNV GL Marine Renewables ENERGY DNV GL Marine Renewables De-Risking Technologies, Insurance and Certification: The Certification Role Claudio Bittencourt Business Development Director Wave & Tidal Renewables Certification International

More information

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate)

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) API Manual of Petroleum Measurement Standards TR 2570 EI Hydrocarbon Management HM 56 Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) First Edition, October 2010

More information

Guidelines for the avoidance of vibration induced fatigue failure in process pipework

Guidelines for the avoidance of vibration induced fatigue failure in process pipework ERRATA for Guidelines for the avoidance of vibration induced fatigue failure in process pipework Errata 1: Pg 61: Feed in from Flowchart T2-5 should be Errata 2: Pg 68: The peak force calculation in Flowchart

More information

Systems. Professor Vaughan Pomeroy. The LRET Research Collegium Southampton, 11 July 2 September 2011

Systems. Professor Vaughan Pomeroy. The LRET Research Collegium Southampton, 11 July 2 September 2011 Systems by Professor Vaughan Pomeroy The LRET Research Collegium Southampton, 11 July 2 September 2011 1 Systems Professor Vaughan Pomeroy December 2010 Icebreaker Think of a system that you are familiar

More information

Risk Based Classification of Offshore Production Systems Matthew D. Tremblay, ABS; Jorge E. Ballesio, ABS; Bret C. Montaruli, ABS

Risk Based Classification of Offshore Production Systems Matthew D. Tremblay, ABS; Jorge E. Ballesio, ABS; Bret C. Montaruli, ABS OTC 18776-PP Risk Based Classification of Offshore Production Systems Matthew D. Tremblay, ABS; Jorge E. Ballesio, ABS; Bret C. Montaruli, ABS Copyright 2007, Offshore Technology Conference This paper

More information

Fact Sheet IP specificities in research for the benefit of SMEs

Fact Sheet IP specificities in research for the benefit of SMEs European IPR Helpdesk Fact Sheet IP specificities in research for the benefit of SMEs June 2015 1 Introduction... 1 1. Actions for the benefit of SMEs... 2 1.1 Research for SMEs... 2 1.2 Research for SME-Associations...

More information

ETSI EN V1.1.2 ( ) Harmonized European Standard

ETSI EN V1.1.2 ( ) Harmonized European Standard EN 302 729-2 V1.1.2 (2011-05) Harmonized European Standard Electromagnetic compatibility and Radio spectrum Matters (ERM); Short Range Devices (SRD); Level Probing Radar (LPR) equipment operating in the

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk

More information

Scotian Basin Exploration Drilling Project: Timeline

Scotian Basin Exploration Drilling Project: Timeline Scotian Basin Exploration Drilling Project: Timeline When it comes to exploratory drilling programs that an operator proposes to conduct, the Canada- Nova Scotia Offshore Petroleum Board (CNSOPB) goes

More information

Value Paper. Are you PAT and QbD Ready? Get up to speed

Value Paper. Are you PAT and QbD Ready? Get up to speed Value Paper Are you PAT and QbD Ready? Get up to speed PAT and Quality-by-Design As PAT and Quality -by-design (QbD) become an integral part of the regulatory framework, automation group ABB argues more

More information

1 SERVICE DESCRIPTION

1 SERVICE DESCRIPTION DNV GL management system ICP Product Certification ICP 4-6-3-5-CR Document number: ICP 4-6-3-5-CR Valid for: All in DNV GL Revision: 2 Date: 2017-05-05 Resp. unit/author: Torgny Segerstedt Reviewed by:

More information

ANSI/IEC American National Standard for Environmentally Conscious Design for Electrical and Electronic Products

ANSI/IEC American National Standard for Environmentally Conscious Design for Electrical and Electronic Products ANSI/IEC 62430-2010 American National Standard for Environmentally Conscious Design for Electrical and Electronic Products Approved as an American National Standard ANSI Approval Date: October 19, 2010

More information

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Resolution II/4 on Emerging policy issues A Introduction Recognizing the

More information

Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction

Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction Prepared for: National Defense Industrial Association (NDIA) 26 October 2011 Peter Lierni & Amar Zabarah

More information

Principles and structure of the technology framework and scope and modalities for the periodic assessment of the Technology Mechanism

Principles and structure of the technology framework and scope and modalities for the periodic assessment of the Technology Mechanism SUBMISSION BY GUATEMALA ON BEHALF OF THE AILAC GROUP OF COUNTRIES COMPOSED BY CHILE, COLOMBIA, COSTA RICA, HONDURAS, GUATEMALA, PANAMA, PARAGUAY AND PERU Subject: Principles and structure of the technology

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit) Incentive Guidelines Aid for Research and Development Projects (Tax Credit) Issue Date: 8 th June 2017 Version: 1 http://support.maltaenterprise.com 2 Contents 1. Introduction 2 Definitions 3. Incentive

More information

Guidelines: Review and evaluation of high-end infrastructure proposals and award of funding allocations

Guidelines: Review and evaluation of high-end infrastructure proposals and award of funding allocations SUB-PROGRAMME: BASIC SCIENCES AND INFRASTRUCTURE Guidelines: Review and evaluation of high-end infrastructure proposals and award of funding allocations 1. Introduction The Department of Science and Technology

More information

Engineering Recommendation M30 Issue Standard Electricity Network Operator Electricity Smart Meter Configurations

Engineering Recommendation M30 Issue Standard Electricity Network Operator Electricity Smart Meter Configurations PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation M30 Standard Electricity Network Operator Electricity Smart Meter s www.energynetworks.org PUBLISHING AND

More information

Technology Needs Assessments under GEF Enabling Activities Top Ups

Technology Needs Assessments under GEF Enabling Activities Top Ups National Communications Support Programme United Nations Development Programme Global Environment Facility Technology Needs Assessments under GEF Enabling Activities Top Ups UNFCCC/UNDP Expert Meeting

More information

A NEW METHODOLOGY FOR SOFTWARE RELIABILITY AND SAFETY ASSURANCE IN ATM SYSTEMS

A NEW METHODOLOGY FOR SOFTWARE RELIABILITY AND SAFETY ASSURANCE IN ATM SYSTEMS 27 TH INTERNATIONAL CONGRESS OF THE AERONAUTICAL SCIENCES A NEW METHODOLOGY FOR SOFTWARE RELIABILITY AND SAFETY ASSURANCE IN ATM SYSTEMS Daniela Dell Amura, Francesca Matarese SESM Sistemi Evoluti per

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 17894 First edition 2005-03-15 Ships and marine technology Computer applications General principles for the development and use of programmable electronic systems in marine applications

More information