MINUTES 21 st Joint Meeting API C2/SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment Houston, Texas February 7, 2007

Size: px
Start display at page:

Download "MINUTES 21 st Joint Meeting API C2/SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment Houston, Texas February 7, 2007"

Transcription

1 MINUTES 21 st Joint Meeting API C2/SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment Houston, Texas February 7, John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:30 AM and outlined various safety and housekeeping issues. 2. A roll call was completed and it was confirmed that there was not a quorum present for this meeting. (Attendee List provided in Attachment A) 3. The agenda was adopted (Attachment B) 4. The minutes from the 20 th Joint Meeting, held in Atlanta were reviewed by John McManus and tentatively approved by the attendees, no vote given as there was no quorum available. 5. The latest Work Program Listing (Attachment C) was presented and the Action items were reviewed and updated/added as appropriate (Attachment D) throughout the meeting. 6. Task Group Chair/Project Group Leader reports. a. ISO /API RP 17A---Subsea Production Systems--- See Task Group Chair report (Attachment E) i. Jonathan Jordan reported that the recent ballot resulted in 15-yes votes and 2-no votes. There were roughly 30 pages of comments from the US votes which will be reconciled by the ISO group following ISO balloting of the NWI. SC 17 recommended the US TAG vote yes to ISO. ii. The formal report from Per Ragnar Dahl was presented by Olav Indreberg. iii. DIS ballot for the Amendment may be sent to ISO CS March 2007 and start May-June. iv. Anthony Muff s proposal on System requirements for primary load bearing components/structures in subsea systems subjected to loads from drilling, completion, workover and well intervention operations was discussed. Olav Indreberg and Gary Hurta presented opposing views on the subject. John Bednar suggested that Jonathan Jordan out a ballot essentially asking for comments on the proposal. 1

2 b. ISO /API RP 17B, ISO /API 17J & ISO /API 17K Flexible Pipe and API RP 17L Ancillary Equipment for Flexible Pipe See Task Group Chair report (Attachment F) i. The formal report from Krassimir Doynov was presented by Jonathan Jordan. ii. The 2-month FDIS voting on ISO is expected to start around March/April Publication of standard is expected by the end of Summer iii. The Ancillary Equipment draft proposal of API Specification 17L1 and API RP 7L2 to be submitted in Spring 2007 and request to made for NWI from ISO. iv. The TG is preparing proposals for the next revision of ISO & -11 and API 17J/B 2207/2008 v. JIP is ongoing c. ISO (API 17C) ---TFL Systems---No formal report submitted i. Harold Reeves with BP is the new chairman. Harold reported that there is no new activity in TFL systems but intends to keep the group intact. There are still two TFL systems being used. d. ISO (API 17D) ---Subsea Wellheads and Trees--- See TG chair report (Attachment G) i. Ross Fraser and Brian Skeels submitted report. ii. The API DIS ballot closes the 2/14. ISO ballot closes 2/28. iii. (Well head) connectors (Annex L) draft released and comments received. Decision is for Annex L to be referred to 16A Drill Through equipment. However, it was reported that David Tannich did not think that 16A would be willing to take this on. It was again suggested that the new work group on flowline connectors may be a home for this. Note, was made that Annex L is still referenced in text of current DIS. 1. All tree connectors kept in D / drilling connectors to 16A. a. To wellhead / to flowline / etc. b. Functional requirements are fit for tree 2. Action item: TG to decide to possibly rework annex L considering only Subsea Tree Wellhead Connectors, excluding Drilling Connectors. If done, it would be for inclusion into the 17D document at a later date, possibly as an addendum. iv. Pad eyes general requirements are in /17A. 17D only addresses specific issues -- issues resolved and closed. v. Annex M has been proposed to be move to 17N. 17N TG and Brian Skeels /17D members are to get together to discuss further. 2

3 e. ISO (API 17E) --- Umbilicals---See Task Group Chair report (Attachment H) i. John McManus reported that the final merged API TG & DNV JIP document is still with the ISO representative within Shell Hague to undergo review to ensure ISO editorial correctness. Shell reported that the expected due date for submittal to the ISO Secretariat and the API TG is February 28, ii. DIS is expected to be issued June/July f. ISO (API 17F) --- Production Controls---No Report available. Olav Indreberg gave update. i. Better integration between production and work-over control systems will be proposed for the next revision. ii. Action is required that ISO and API TG communicate more often g. ISO (API 17 G) --- Completion/Workover Risers See Task Group Chair report (Attachment I) i. Brian Skeels submitted the report. ii. RP 16ST document on containment systems and testing (barrier systems) is still pending to be reviewed by TG. The TG can not move until this is transmitted and reviewed. Action for Jonathan Jordan to go to 16 head, David Tannich, and push for action from 16ST chair Alex Sas-Jaworski for testing & barrier philosophy. 1. note: the NORSOK D002 and D010 has been issued to TG for review iii. The TG is still open to possibly subdivide 17G into subsections: 17G1, 17G2, 17G3, etc., etc. iv. It is confirmed that IWOCS will remain in 17G v. Report on Interface proposal (see a iv above) -1, -4, & -7 given by Olaf Indreberg. Interface also with 16 (drilling) series. Current designs are based primarily on pressure. Fatigue is not taken into account. After drilling, sometimes the fatigue limit has already been achieved and thus no margin for safety. 1. Gary Hurta countered that everyone must read this carefully. This leads away from the minimum requirement philosophy which allows standard equipment to be manufactured. How do you monogram a SYSTEM? 2. John Bednar encouraged all to read and consider the impacts and need. This will be put out as a Technical Paper and solicit comments. will be sent to all SC-17 members. 3. A work session will be held the day before summer session for discussion to resume. 3

4 h. ISO &-9 (API 17 H&M)---ROV & ROT Systems--- See Task Group Chair report (Attachments J1 & J2) i. Charles White submitted the report. ii and are now officially retired and has been reinstated a iii. New document layout has begun and is in process both API & ISO iv. API 17R is the new assigned API designation. i. ISO/WD (API RP 2RD)---Dynamic Risers for Floating Production---See Task Group Chair report (Attachment K) i. Report presented by Paul Stanton. ii. Subgroup 2, Design Considerations, plans on having four levels of criteria: 1. Level 1: based on the current 2RD 2. Level 2: based on ISO Level 3: LRFD format based on DNV OS F Level 4: Essentially RP 1111 iii. Subgroup 3 on Riser Components, chaired by Gordon Craig, GrantPrideco, are reviewing the first draft of Section 9 prepared by Finn Kirkemo, Statoil. iv. Subgroup 4 on Materials has a new chairman (Howard Cook, BP), and met 18 Jan Jim Burk, BP is taking the lead. v. Subgroup 5 on Riser Integrity Management has completed a second draft and is making good progress. j. API 17N---Subsea Reliability and Technical Risk Management-- See Task Group Chair report (Attachment L) i. Report presented by Mark Sigmund. ii. First full draft released in April Re-draft released in October Workshop in KL in November iii. Reviewed with ISO In December 2006 with reference to the existing ISO document on reliability, ISO All areas of discrepancy were resolved. 2. Since the two are so close, it is important to ensure conflict is not reintroduced later iv. Funding by API of $50,000 was given. v. There will be a joint Deepstar/API 17N workshop in March a case study will be introduced vi. Chevron has agreed to fund a technical author. vii. Goal is to pass final version to API the end of the first quarter 2007 viii. Action item: John Allen writing request. Asking for additional $20,000 funding 4

5 ix. Request made to have Jonathan Jordan post current version on web so all can have access k. API 17O---HIPPS---No formal report available. No discussion l. API 17P---Templates and Manifolds---See Task Group Chair report (Attachment M) i. Report presented by Charles White. ii. Marc Hyndman of Chevron is new TG chair iii. Funds approved and work started iv. Annex L & clause 6 have been forwarded to for inclusion in The Manifold sections will eventually be moved into P. When P is complete, they will be removed from v. API 17P has been given the designation of ISO m. Flowline Connection Group i. Craig Redding has left Southwest Research and is now working with JP Kenny. Craig has confirmed he will continue to chair this work group n. Buoyancy and Insulation Aspects ---No report available. i. No update was available o. Other Business; a. John Bednar asked Jonathan Jordan to update the Sunset Committee rosters b. Andrew Wainright still needs to be on contacted with regards to his proposal for a NWI on standardized installation reels for coiled subsea products. c. HP/HT i. Brian Skeels is to continue to monitor the 6HP committees work and advise if there is to be any impact ton SC HP is dealing with HP/HT wait and see what can be brought over into 17 ii. Identify any specific factors in HP/HT that is below 6HP temperature levels. These may be better situated for F and below 6HP is dealing with 400F and above p. Funding a. Decisions for Funding for 2008 are made in June Need proposals for any new funding to be inplace April/May latest. q. OGP Int l workshop a. Workshop met Feb 7-8 in London b. Material selection is the issue. Olav will contact to make to ensure intent of their work. r. Work Group 6 now does not have a representative from SC 17. 5

6 a. Action for Leadership Team to have this representatives found and in place by June meeting. s. ECS has recommended that all winter meetings be held at same time and in the same location preferably in the Texas area. 16C disagrees and plan to keep its winter meeting separate. t. Next Meeting---Winter ; Summer June API Summer Conference in San Francisco. a. See the API Meeting Webpage for Registration and Hotel information. b. Meeting Wednesday morning and end lunch c. Will have working session meeting on the Tuesday before the Wed. group for entire day 6

7

8

9 21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX February 7, 2007 Joint Meeting - 8:30 am 1. Opening of the meeting (Bednar/Inderberg) 2. Roll call/roster Update (Jordan) 3. Adoption of the proposed agenda (Bednar/Inderberg) 4. Adoption of the minutes from 20 th joint meeting (Bednar/Inderberg) 5. Status and action plan update (See Attached Action Items) 6. Task Group/Project Group Reports (See Attached Work Program) A. Subsea Production Systems (Souza/Dahl) Update on activity WG for Flowline Connections New WG Leader needed B. Flexible Pipe (API TG1) (Doynov) Initiate Adopt-back for 17J/-2 Request to initiate simultaneous Adopt-back for 17B/-11 on FDIS release 17L - Flexible Pipe Ancillary Equipment JIP report on progress to date ISO /API Spec 17J & ISO /API RP 17B report on progress and status of JIP to update standards C. TFL Systems (API TG6) (Reeves) ISO /API RP 17C Update on activity D. Subsea Wellheads/Tree (API TG5) (Frazer/Skeels) ISO Spec Discussion/report on DIS ballots Document interface (annexes) with 17A/-1; 17G/-7; 17N; 16A E. Umbilicals (API TG4) (McManus) ISO /API Spec 17E - report on progress of revision F. Control Systems (API TG 2) (Neuenkirchen) ISO /API Spec 17F API 17F published Dec 2006 G. Completion/Workover Risers (Skeels) ISO /API RP 17G report on activity (17G published July 2006) H. ROV/ROT (API TG3) (White) ISO and 9/API RP 17H and RP 17M report on progress of NWI to combine documents into one standard I. Dynamic Risers (Stanton) ISO NWI (16389/API RP 2RD) report on status of revision J. Subsea Reliability RP (Allen) Update on RP17N activity K. HIPPS RP (Goggans) Update on RP17O activity L. Templates and Manifolds (Whipple) Update on 17P activity M. Subsea System Engineering (tbd) Update on 17Q activity N. Materials Study Group (tbd) Update on activity/api Chair 7. Summary of Discussions of Prior Meetings Document Interfaces Discussion (Inderberg) See SC17 Website (Meeting Material) for Document Report on Path Forward for Insulation and Buoyancy Spec and RP (Given) 8. Other Business 2006/2007/2008 Research Funding Proposals (Jordan/White/Allen) OGP International Standards Workshop (Feb 7-8) Discussion 9. Review of Action Items 10. Next meetings Summer 2007, June San Francisco, CA; Winter 2008, TBA

10 API SC17 (ISO TC67/SC4/WG6), SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS 2007 WORK PROGRAM Revised January 2007 BRIEF DESCRIPTION API ISO API Chair ISO Project Leader SC17 STATUS OF WORK/SCOPE Standard Standard Leadership Team Champion Design and operation of subsea systems RP 17A Luiz Souza, Petrobras America (TG7) Per Dahl, Norsk Hydro TBD (Wilkinson) Published (Jan 2006). Amendment ballot in progress. API closed Jan 26, ISO closes Feb 20. Flexible pipe RP 17B (was 10420) Krassimir Doynov, ExxonMobil (TG1) Krassimir Doynov, ExxonMobil TBD (Wilkinson) FDIS anticipated in 2-3 months. Simultaneous API adopt-back requested. TFL systems RP 17C Harold Reeves, BP (TG6) TBD Hurta No action needed at this time. Subsea wellhead and tree equipment Spec 17D Ross Frazer, ATP Vice Chair: Brian Skeels, FMC (TG5) Ross Frazer, ATP Vice Chair: Brian Skeels, FMC Hurta Work ongoing. DIS ballot in progress. API closes Feb 14, ISO Feb 28. Production control umbilicals Spec 17E John McManus, Gibson Tube (TG4) Subsea controls Spec 17F John Bodine, Chevron (TG2) Design & operation of completion/workover risers Ron Dee, Shell TBD Currently undergoing editorial checks, expect ISO DIS in 3 rd quarter 06. Jens Neuenkirken, Statoil RP 17G Brian Skeels, FMC Anthony Muff, FMC Bednar Published December 2006 (with errata). Possible revisions forwarded to ISO. Hurta Published July ROV interfaces RP 17H Charles White, DORIS, Inc (TG3) Eric Luzi, Statoil Hurta ISO /API 17H published. NWI passed to combine with to become Unbonded flexible pipe Spec 17J Krassimir Doynov, Exxon Mobil (TG1) Krassimir Doynov, Exxon Mobil TBD (Wilkinson) ISO -2 published July API adopt-back needed. Bonded flexible pipe Spec 17K Krassimir Doynov, ExxonMobil (TG1) Krassimir Doynov, Exxon Mobil TBD (Wilkinson) Second Ed Published Nov 2005.

11 BRIEF DESCRIPTION OF WORK/SCOPE API Standard ISO Standard API Chair ISO Project Leader SC17 Leadership Team Champion STATUS Flexible Pipe Ancillary Equipment (Spec) Spec 17L1 TBD Krassimir Doynov, ExxonMobil (TG1) Krassimir Doynov, Exxon Mobil TBD (Wilkinson) Incorporating comments in working draft. Flexible Pipe Ancillary Equipment (RP) RP 17L2 TBD Krassimir Doynov, ExxonMobil (TG1) Krassimir Doynov, Exxon Mobil TBD (Wilkinson) Incorporating comments in working draft. ROT Intervention System RP 17M Charley White, DORIS Inc. Eric Luszi, Statoil TBD NWI passed to combine with to become Dynamic Risers RP2RD Paul Stanton, Technip Paul Stanton, Technip Bednar Working draft being prepared. Subsea Reliability RP 17N TBD John Allen, Vetco- Grey Olav Inderberg, FMC TBD Working draft being prepared. API contract in progress. HIPPS 17O TBD Tim Goggans, FMC Tim Goggans, FMC Bednar Document ready for TG review. Templates and Manifolds 17P (proposed) Jeff Whipple, Intec Borge Brubaek, Statoil TBD (Wilkinson) Working draft being prepared. API contract in progress. Systems Engineering 17Q TBD (-TBD-) Olav Inderberg, FMC TBD (Wilkinson) Decision on continuing this project is pending discussion at next meeting. Materials Study Group n/a annexes to existing (-TBD-) Ragnar Mollan, Norsk Hydro Inderberg Generating annex materials for 17A (-1) and 17P

12 ISO SC4/WG6 / API SC17 Action Items February 7, 2007 Joint Meeting Standard/ Subject Flexible Pipe (17J), (17K), (17B) Action Item Last Update Current Status (items in bold are complete) 6/14/06 2/07/07 Craig Redding has Jonathan Jordan moved to JP Kenny in Houston will put out an e- and will continue to lead the work mail soliciting group. support. Craig Redding, SW Research, volunteered to lead the work group Working group for flowline connections/ connection systems proposed to make recommendation of what and where this should go Working group for metering system requirements and needs to be identified to ascertain who is working on metering systems and what should SC17 do with regards to metering systems Question as to whether 17A should continue its existence as a Recommended Practice or if it should be written as a specification D work group to compare wording on lifting that is currently in 17A and only provide additional information in 17D which is not adequately supplied in 17A Motion passed for SC17 to recommend that Clause 6 and Annex L go out for ballot to be included in 17A Work Group to be formed to come up with recommendations for one definition of pressure rating for general use : Olav Inderberg to prepare an ISO NWI based on the 17Ls work for consideration at the June meeting. 6/14/06 SC17 Leadership Team with assistance of John Allen to get working group started. 6/14/06 SC17 Leadership Team to give guidance. 2/07/07 -- Ongoing 2/07/07 Leadership Team agreed to keep as RP. Complete. Will be removed following next meeting. 6/14/06 Ongoing 2/7/2007 Complete. Will be removed following next meeting. 6/14/06 Ongoing 2/7/2007 Complete. Will be removed following next meeting. 6/14/06 Glen Cuiper with AKS volunteered to chair the WG. 6/29/05 Ongoing 9/30/05 Ongoing 3/03/06 Waiting on draft 6/14/06 Waiting on draft 2/07/07 Ongoing 2/07/07 Waiting on draft 17L1, 17L2 (Ancillary Equipment) February 7,

13 Standard/ Subject Action Item Last Update Current Status (items in bold are complete) 9/30/05 Ongoing 2/07/07 Waiting on draft : Krassimir Doynov to forward a draft of 17Ls (when draft is deemed ready for widespread release) to be used in the ISO new work item and this should include a proposed title and how it could also include umbilicals. 3/3/06 Incorporating comments into draft documents 3/03/06 Waiting on draft 6/14/06 Waiting on draft TFL Motion passed to initiate adopt back immediately for /17J in parallel with ISO when FDIS is completed. No outstanding action items 6/14/06 SC17 to initiate adopt back. 2/7/2007 Complete. Will be removed following next meeting (17C) Umbilicals SC leadership team to address the new Normative Annex L document Motion passed to delete Annex M as part of 17D and be given to 17N. No outstanding action items 6/14/06 Ongoing. 6/14/06 17D Chairman to transfer information to 17N. 2/7/2007 Complete. Will be removed following next meeting. 2/7/2007 Complete. Will be removed following next meeting (17E) Control Systems No outstanding action items (17F) Comp./Work -over Risers (17G) : Brian Skeels will prepare New Work Item to form a new API task group related IWOCS with ISO participation. This will then be submitted to Olav Inderberg to prepare an ISO New Work Item request before the June API meeting. 9/30/05 Ongoing 3/3/06 - Brian Skeels to propose an approach on what systems (including IWOCS?) the TG will address and how the documents will be structured by June 06 meeting 2/7/2007 Complete. Will be removed following next meeting. 6/14/06 Ongoing. February 7,

14 Standard/ Subject Action Item Last Update Current Status (items in bold are complete) : TG to provide a proposal with reference to barrier philosophy for well bore interventions systems. 3/3/06 - Brian Skeels to provide update on barrier discussion at June 06 meeting 2/07/07 Ongoing ROVs (17H) ROTs John McManus and Brian Skeels to propose how and where the IWOC umbilical goes API to assign API letter for the merged 17H and 17M.. 6/14/06 Ongoing. 6/14/06 Ongoing. 6/14/06 API to assign letter. 2/07/07 Complete. Will be removed following next meeting. 2/07/07 Complete. Will be removed following next meeting (17M) HIPPS Olav Inderberg will review the 17N document and the existing ISO document to make judgment if new ISO NWI should be raised Motion passed for 17N work group to present request for NWI to raise a number Motion passed that following the raising of the ISO NWI, the SC17 leadership committee to request ISO to issue the document as a working draft for comment. No outstanding action items 6/14/06 Ongoing. 6/14/06 17N WG to make request to ISO. 6/14/06 Ongoing. 2/07/07 Ongoing 2/07/07 Ongoing 2/07/07 Ongoing 17O (API RP 2RD) Dynamic Risers SC17 Leadership Team to ensure Annex L and 17P are not in conflict No outstanding action items 6/14/06 Ongoing. 2/07/07 Ongoing February 7,

15 Standard/ Subject General/ Admin. Action Item Last Update Current Status (items in bold are complete) : Leadership team to explore 3/3/06 Verify 2/07/07 Ongoing ways to get information out to industry in a document status more timely manner. sheet on API website and/or develop dedicated page. Review System Poster in Atlanta Permanent Discussion Items New Work The current SC17 Sunset Team listing is outdated. List needs to be updated with current member s names : John Bednar, Gary Hurta, and Olav Inderberg are to look at the direction that SC17 should be pursuing relative to the composite suite of API 17 Series general and specific documents that address the broad spectrum of subsea hardware : Brian Skeels to develop a plan for dealing with HPHT issues for subsea production system standards, addressing: - what areas should be covered in terms of equipment and procedures; - how this would best be integrated into the SC17 documents e.g. stand alone document versus HPHT Annexes in each existing document; - what else is going on in the industry in this regard e.g. API sponsorship of testing of effects of HT on material properties : Dave Wilkinson, John Bednar, and Andy Radford to determine path forward for Insulation and Buoyancy standards prior to the June meeting. 6/14/06 Jonathan Jordan to see if existing poster or new flyer recommendation can be made to the leadership team. 6/14/06 Jonathan Jordan to update the list. 3/3/06 To be discussed at Atlanta meeting during -1 and -7 sessions. 3/3/06: Maintain continued SC17 awareness of issue and provide input relevant to SC17 6/14/06 Ongoing. 3/3/06 Mike Given to provide update/recommen dation at June 06 Meeting. 2/07/07 Ongoing 6/14/06 Ongoing. 2/07/07 Closed. This Is being handled by 6HP Task Group. Brian Skeels will still keep an eye on issues/conclusions for future recommendations to SC17. Complete. Will be removed following next meeting. 2/07/07 Leadership Team to follow up with Mike Given. 6/14/06 Dave Wilkinson to follow up with Mike Given to determine way forward. February 7,

16 Standard/ Subject Action Item Last Update Current Status (items in bold are complete) 3/3/06 Ongoing 2/07/07 Leadership Team to follow up with Andrew Wainright : David Wilkinson to contact Andrew Wainright regarding his proposal for NWI on standardized installation reels for coiled subsea products 6/14/06 Ongoing. February 7,

17 ISO/TC67/SC4/WG6 N... ISO/TC67/SC4/WG6 Subsea production systems ISO Design and operation of subsea production systems Part 1: General recommendations and requirements Task Group status report January Membership of task group ISO Project leaders; Part 1 project leader: Per Ragnar Dahl, Hydro, Norway Other ISO project leaders: Krassimir Doynov - ExxonMobil Ross Frazer - ATP Ron Dee - Shell Jens Henrik Neuenkirchen - Statoil Antony Muff FMC Paul Stanton Technip Eric Luzi Statoil Other task group members; Olav Inderberg FMC David Wilkinson ExxonMobil John Bednar BP Bruce Crager ABB Brian Skeels FMC Gary L. Hurta Dril Quip Rolf Nordaunet ABB Steve Dean / Giorgio Pastore Agip Alain Creatine Total Mauricio Werneck Petrobras Eric Wehner - Cameron John MacManus Gibson Tube

18 2. Status of work item ISO , second edition was published It has been adopted as EN ISO , November 2005 without any changes. It has also been adopted as API RP 17A, fourth edition, January 2006 (identical). The joint API SC17 and ISO TC67/SC4/WG6 meeting agreed to create a Materials task group to develop the material requirements in the ISO13628 suite of standards. This work has progressed well and a draft for an official Amendment to ISO Clause 6, Materials and corrosion protection is now available together with a proposal for a new Annex L "Materials and welding of subsea manifolds". Launching this as a NWIP was however overseen until late fall The NWIP ballot is closing Thereafter follows the DIS and FDIS (if not 100% approved at DIS stage). 3. Updated target dates for deliverables DIS ballot for the Amendment may be sent ISO CS March 2007 and start May-June. 4. Major issues No major issues remains to be solved at this moment. 5. Anticipated new work /new work items Part 1 is the main subsea production systems standard and it needs to be regularly maintained. During the last revision process some comments were left for later considerations. These comments were suffixed with noted in the commentary report. The following list present by keywords noted issues from the commentary report and some issues that have been defined after the commentary report was closed. - Separate doc for Annex A to be considered - Define drilling loads (work has started by DNV for Standards Norway) - Include separate paragraph to consider physical interface to subsea processing equipment such as pumps, metering equipment etc. - Template and manifold (section 5.12 and Annex G) is proposed merged and pulled out into a separate ISO part 15 to be co-ordinated with the API 17P work. - Commentaries report Ref NO Landing speed suggested moved to part 9. - Ref NO 054. Include running clearances - NO 055.Consider suction systems. - Ref US 049. Definition of dropped object protection and trawl resistant structure. - US 067. Consider special tests for handling systems etc. - US 068. Consider reversibility and repeatability tests - US 076. How does one commission a subsea processing system?

19 - US 077. Additional information for annex F - US 079. Active actuators considerations - US 099 Ref This section discusses acid-gas related chemical corrosion on an "agreed-upon model" basis, while direction is given to correlations for corrosion for oxygen. In section , this is related to flow phenomena. This should probably refer to individual standards, rather than these specifics. - Subsea processing issues - Terminology and definitions to be consistent with the N172 document. - Revisit the system engineering guidelines - Flanges design etc. The initiative to revise the material clause 6 needs to be amalgamated with next revision of the standard and further developed as necessary. Future work should also typically include more focus on systems engineering, and examine the need for describing interfaces to subsea processing equipment such as separators, sand management systems, pumps etc. In addition, maintenance of Part 1 can also be triggered by changes in the other corresponding parts or by activity on upcoming new work items as e.g. the template and manifolds, system engineering, HIPPs and other initiatives. 6. Plans for future meetings None. However, in view of comments above, it was suggested at the joint API/SC17 and ISO... WG6 meeting at the API Summer Conference that the issues mentioned above be discussed at a task group meeting, late fall/early winter Interested parties were requested to contact the undersigned at Per.Ragnar.Dahl@hydro.com or No response have been received to date. Suggest this request be brought up again at the next joint API/SC17 and ISO... WG6 meeting at the API Summer Conference Resource needs (money and/or people) Population of TG1 is necessary to start soon for planned revision work. Also, identification of a new Project Leader for API 17A would facilitate coordination. Per Ragnar Dahl, Hydro January 2007

20 API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO ,11,10 FLEXIBLE PIPE STANDARDS JOINT API-ISO FLEXIBLE PIPE TASK GROUP JANUARY 19, 2007 Prepared by: Krassy Doynov Flexible Pipe Task Group Chair Ph.D., Subsea / Riser Systems ExxonMobil Development Company Greenspoint Dr., Houston, TX Tel.: ; FAX: krassimir.doynov@exxonmobil.com

21 API 17 B,J,K,L & ISO ,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT 1. INTRODUCTION The joint API-ISO Flexible Pipe Task Group (FPTG) is an international group of Subject Matter Experts (SME) representing the flexible pipe community worldwide, whose tasks are to address all technical comments arising from revisions and updates of the flexible pipe standards, and to provide smooth transition between: ISO : Flexible pipe systems for subsea and marine applications, and API RP 17B, Recommended practice for flexible pipe, Third edition, March 2002 ISO : Unbonded flexible pipe systems for subsea and marine applications, and API 17J, Specification for Unbonded Flexible Pipe, Second edition, November 1999 ISO : Bonded flexible pipe, and API 17K, Specification for Bonded Flexible Pipe, First edition, March 2002 by maintaining the technical content Identical. This report contains comments on the completion of the scope of work, as well as presents the status of the: a) Ancillary Equipment JIP aimed at the creation of draft for API 17L1 and L2 standards, b) Flexible Pipe Technology JIP whose purpose is the next revision of the ISO /-11 and API 17 J/B standards, intended for the 2008/2009 timeframe. 2. CURRENT STATUS The flexible pipe ISO standards are based on, and improve the API standard revisions mentioned above, by virtue of addressing a number of comments received in that process. The flexible pipe community desire is to back adopt the improvements made in the ISO standards into next API standard revisions, to facilitate the use of flexibles worldwide. The ISO was published on October-1, 2005, while the identical API 17K was published on November-1, The ISO was published on July-12, This process included a 2-month FDIS voting. In principle, only comments of editorial nature are allowed after FDIS voting, while technical comments are not allowed. After the FDIS voting, the FPTG was involved in resolving one issue finding a substitute for a reference to an old ASTM -1-

22 API 17 B,J,K,L & ISO ,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT D671 standard that was discontinued in 2002 without replacement. While this issue was identified as editorial, it was probably of a mixed editorial/technical nature since it was resolved practically with the help of the FPTG. This example highlights the need of a transparent documentation of all changes made to the standard after FDIS voting, to facilitate the back adoption into API 17J standard. Identical API 17J standard is yet to be published. The preparation of the ISO/FDIS document was delayed practically for 6-7 months due to delays in editing all Figures (see Lessons Learned section for details). The ISO/FDIS document was accepted by ISO Central Secretariat for FDIS processing on January-12, As advised by Alain Samne of the ISO Central Secretariat, it takes 2.5 to 3-months to launch the 2-month FDIS ballot, or 5.5 to 6 months to Publication, meaning that the ISO standard is expected to be published around July The Ancillary Equipment JIP is completed. The JIP manager MCS is expected to the draft proposals for API Specification 17L1, and API Recommended Practice 17L2 standards by the end of February, The Flexible Pipe Technology JIP, whose purpose is the next revision of the ISO /-11 and API 17 J/B standards within the 2008/2009 timeframe, has 19 participants manufacturers, operators, service companies, regulators and standardization bodies a very broad Industry representation worldwide. The JIP was kicked off in January 2005 and is about to be completed in The JIP main task is to work on resolving the most challenging issues associate mostly with deepwater applications, which cannot be resolved by simple correspondence. The final deliverables of the FPT JIP is draft proposals for the next revision of the API and ISO standards mentioned above. 3. MEMBERSHIP The list of the subject matter experts volunteering their time to support the Flexible Pipe Task Group (FPTG) activities is provided in the table shown below. This list is being updated only when the FPTG Chair receives a request for that from a Subject Matter Expert (SME), Company, or Country with a stake in the development of the ISO /-10/-11 standards. Most of the requests are usually for the replacement of one SME with another SME from the same institution. This list is a reflection of all companies with -2-

23 API 17 B,J,K,L & ISO ,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT a stake Table 2 and notable presence Table 1 in the International flexible pipe user community. List of Subject Matter Experts actively participating in the FPTG activities No. Name Company address 1. Krassimir Doynov ExxonMobil Development Co. krassimir.doynov@exxonmobil.com 2. Kent Caveny ExxonMobil Development Co. kent.p.caveny@exxonmobil.com 3. Phil Abrams ExxonMobil Development Co. kent.p.caveny@exxonmobil.com 4. Antoine Felix Henry Technip - Flexi France afelixhenry@technip.com 5. Jean Rigaud Technip - Flexi France jrigaud@technip.com 6. Zhimin Tan Wellstream Inc. zhimin.tan@wellstream.com 7. Paul Lewicki Wellstream Inc. paul.lewicki@wellstream.com 8. Terry Sheldrake Wellstream Ltd. terry.sheldrake@wellstream.com 9. Niels Rishoj NKT Flexibles niels.rishoj@nktflexibles.com 10. Mike Bryant DeepFlex Inc. mike.bryant@deepflex.com 11. Tibor Nagy Phoenix Rubber (Industrial) Ltd. nagy.tibor@phoenix-rubber.hu 12. Michael Werth Atofina michael.werth@atofina.com 13. Thierry Roland Total thierry-roland.delahaye@total.com Delahaye 14. Denis Melot Total denis.melot@total.com 15. Trond Stokka Meling Statoil tsmeling@statoil.com 16. Knut-Aril Farnes Statoil kafa@statoil.com 17. Einar Oeren Statoil eoer@statoil.no 18. Harald Thon Norsk Hydro harald.thon@hydro.com 19. Jon Olav Bondevik SeaFlex jon.olav.bondevik@seaflex.no 20. Rune Haakonsen SeaFlex Riser Technology Inc. rune.haakonsen@seaflex.com 21. Chris Mungall KBR chris.mungall@halliburton.com 22. Kam Zandiyeh Dunlop Oil Kam.Zandiyeh@dunoil.com TABLE 1 LIST OF ACTIVE API ISO FPTG MEMBERS List of Subject Matter Experts invited to participate in the 2/-11 FPTG activities No. Name Company address 23. Jemei Chang Shell Oil Company jemei.chang@shell.com 24. Ali Anaturk Shell Oil Company ali.anaturk@shell.com 25. Neil Reeve Shell Global Solutions neil.reeve@shell.com 26. Alan Bliault Shell International E&P alan.a.bliault@shell.com 27. Dick Percy BP Exploration percyrj@bp.com 28. Stephen Groves BP Exploration grovess2@bp.com 29. Carlos Lemos PetroBras caolemos@petrobras.com.br -3-

24 API 17 B,J,K,L & ISO ,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT 30. Marcos Carpigiani PetroBras 31. Renato Da Silva PetroBras 32. Luiz Lobianco PetroBras 33. George Gu ConocoPhillips 34. Richard Thompson ChevronTexaco 35. Paul Hays ChevronTexaco 36. John Lawson ChevronTexaco 37. Todd Jones ChevronTexaco Products 38. Chris Lawlor Woodside 39. Tore Narum Woodside 40. Don Johnson ASME 41. Meyrick Hadfield HSE 42. Nicola Feroleto Agip 43. Rick Hill Kvaerner Oilfield Products Inc. 44. Sijm Last Materials Engineering Consultancy 45. Bob Rothberg JP Kenny Inc. 46. Barry Thomson Materials Engineering Research Laboratory 47. Jean Philippe Roques SAIPEM 48. Olivier Moutet Singlebuoy 49. Graeme Reid CNR International Ltd 50. Frank Grealish MCS International 51. Kieran Kavanaugh MCS International 52. Patrick O Brien MCS International patrickobrien@mcs.com 53. Michael O'Sullivan MCS International michaelosullivan@mcs.com 54. Craig Redding Southwest Research Institute credding@swri.com 55. George Wolfe Southwest Research Institute gwolfe@swri.org TABLE 2 LIST OF INVITED SME COPIED WITH FPTG CORRESPONDENCE This FPTG list is subject to further modification based on the availability of the volunteering SMEs. 4. UPDATED TARGET DATES FOR DELIVERABLES The target dates for the milestones described in Section 2 are: a) The 2-month FDIS voting on ISO is expected to start around March-April Publishing of ISO standard is expected in the Summer of

25 API 17 B,J,K,L & ISO ,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT b) Submitting Ancillary Equipment standard draft proposals of API Specification 17L1 and API Recommended Practice 7L2, and requesting ISO New Work Items for these standards Spring, 2007 c) Preparing Flexible Pipe Technology proposals for the next revision of ISO /- 11 and API 17J/B 2007/ LESSONS LEARNED The previous experience with the revision of the ISO and API 17K standards has demonstrated the success of the formula of clearly defined and separated responsibilities of a technical leadership (FPTG Chair), and editorial leadership (API). The preparation of the ISO/FDIS document was delayed practically for 6-7 months due to delays in editing of all Figures. The DIS document was assembled by more than one API editor due to job changes and/or rotations. The figure editing was subcontracted by the International Association of Oil and Gas Producers (OGP) to a contractor (Galbraith Consulting Ltd.) who consequently merged with another contractor - Poseidon International Ltd. The ISO/FDIS document is being edited by the ISO Central Secretariat. The lesson is that such 6-7 month delays can be perhaps avoided by : a) assigning a clearly defined editorial leadership, b) outlining a matrix and schedule of agreed upon responsibilities spread out among all organizations (like API, OGP, ISO) supporting the editorial work. ISO FDIS voting process lasts two months. In principle, only comments of editorial nature are allowed after FDIS voting, while technical comments are not allowed. After the FDIS voting, the FPTG was involved in resolving one issue finding a substitute for a reference to an old ASTM D671 standard that was discontinued in 2002 without replacement. While this issue was identified as editorial, it was probably of a mixed editorial/technical nature since it was resolved practically with the help of the FPTG. -5-

26 API 17 B,J,K,L & ISO ,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT It is documented in item 7, b), iii) of the MOM from Atlanta 2006 ISO-API meeting, that Motion was made and seconded that SC17 initiate adopt back immediately for (perhaps a typo should have been added too) in parallel with ISO when FDIS is completed. This is contingent that no changes are made without the approval of the respective API and ISO Committees. The apparent condition for back adoption of API 17J is a transparent documentation of all changes made to the standard after FDIS voting. The imposing of this condition is supported by the example of the old ASTM D671 reference explained in the previous paragraph. This second lesson highlights the need of a transparent documentation of all changes made to the standard after FDIS voting, to facilitate the back adoption into API standards. 6. ANTICIPATED NEW WORK ITEMS Two draft proposals for API 17L1 Ancillary Equipment Specification and API 17L2 Recommended Practice standards are expected in Spring, Since these standards are about to compliment API 17 J/B/K ISO /11/10 to provide the business framework for complete flexible pipe/ancillary equipment system, I expect the need of two NWI for corresponding ISO standards in the Summer of PLANS FOR FUTURE MEETINGS None at this time. 8. RESOURCE NEEDS The FPT JIP is currently experimenting with an Internet Forum type discussion on the JIP manager s web site. The three distinctive advantages of using the Internet Forum that surfaced up are: - ability to continuously exchange opinions, and giving SMEs the chance to get familiar with and discuss competing points of view on controversial topics, -6-

27 API 17 B,J,K,L & ISO ,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT - the potential impact of shortening lengthy discussions during face-to-face meeting with a large group of SMEs seeking opportunity to share different lessons learned and offer unique perspective on a variety of controversial topics, - providing transparency (and documentation) of arriving at a logic for making a final decision on technical comments. These advantages are seen as a vehicle to accelerate the work of API-ISO FPTG, and perhaps decrease the need for interpretation of technical clauses accepted in the flexible pipe standards already published. Thus, I request the establishment of an Internet Forum on the API SC17 website, and/or on the ISO TC67 SC4 WG6 website, for facilitating API-ISO FPTG future activities. Alternatively, I expect to request some funding for using MCS Internet Forum, for the same FPTG purposes, in Summer,

28 API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17D/ISO Subsea Wellheads and Christmas Trees JOINT TASK GROUP STATUS 07 FEB 2007

29 SPECIFICATION API 17D/ISO SUBSE WELLHEADS AND TREES STATUS REPORT TABLE OF CONTENTS 1. INTRODUCTION STATUS MEMBERSHIP TARGET DATES FOR DELIVERABLES MAJOR ISSUES ANTICIPATED NEW WORK ITEMS PLANS FOR FUTURE MEETINGS RESOURCE NEEDS February 2007

30 SPECIFICATION API 17D/ISO SUBSE WELLHEADS AND TREES STATUS REPORT 1. INTRODUCTION The API 17D task group s scope was to develop a second edition of the specification, combining ISO and API 17D into a second edition of Once that ISO document is fully balloted & accepted, it is planned that it will be adopted by API as the second edition of 17-D. Items considered in the new edition of the specification include: 2. STATUS Revised information on gaskets and flanges Addressed GLL and HXTs Revised mudline equipment definitions Updated pressure testing and acceptance criteria Added annexes on flange bolting, material compatibility testing, and lifting devices Pressure ranges (limit to 15k equipment) Updated PSL, material class and temperature class Clarified wellhead annular monitoring requirements In June it was reported that the last outstanding issues had been resolved to the point that members were ready to release the document as a DIS. This occurred on 28 September API balloting closes 25 Jan 2007 and ISO balloting closes 28 Feb Once ballots and comments are received, the task group will begin working on comment resolution As per agreement at the last joint meeting, 17D/ leadership (Ross Frazer & Brian Skeels) forwarded Annex L, Performance verification (qualification) of wellhead connectors, to the 16A subcommittee in early January and asked that group to consider including it in their specification February 2007

31 SPECIFICATION API 17D/ISO SUBSE WELLHEADS AND TREES STATUS REPORT 3. MEMBERSHIP The current membership is listed below. The task group leadership is in the process of updating this. API 17D TASK GROUP MEMBERS (January 2007) Name Company Address Ross Frazer ATP Oil & Gas Brian Skeels FMC Technologies Tom Ames BP Don Wells ConocoPhillips Gary Hurta Dril-Quip Tim Dean Kerr-McGee Sterling Lewis ExxonMobil David Lacaze Shell Sean Thomas Vetco Gray Loren Kowalchuk Master Flo Mike Larkin Cameron Russell Hoshman MMS Tony Ratcliffe Chevron James Waithman KBR Karl Winter Mariner Energy Erik Opoien Hydro Alain Cretenet Total Tor Geir Wernø Statoil Bhailal Parmer Chevron Finn Kirkemo Statoil Ed Knerr Technip Alternates Chris Bartlett FMC Technologies David Morgan Cameron Dave Garnham Cameron Mike Conner MMS Bobby Voss Vetco Gray Frank Gallander Chevron February 2007

32 SPECIFICATION API 17D/ISO SUBSE WELLHEADS AND TREES STATUS REPORT 4. TARGET DATES FOR DELIVERABLES The ISO balloting closes 28 Feb A date for resolution of comments will be issued by the task group leadership after a high-level review of the number and content of those. 5. MAJOR ISSUES None at this time. 6. ANTICIPATED NEW WORK ITEMS None at this time. 7. PLANS FOR FUTURE MEETINGS None at this time. The task group will wait on direction from ISO TAG regarding steps after the review mentioned in item four. 8. RESOURCE NEEDS None at this time February 2007

33 API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17E SPECIFICATION for SUBSEA UMBILICALS REVISION TASK GROUP STATUS FEBRUARY 7, 2007

34 API 17E/ISO SUBSEA UMBILICALS WINTER MEETING STATUS REPORT 1. INTRODUCTION On June 18, 2003 the NWI was formally sanctioned by SC17 for the API task group to work on a revision to the recently passed joint API/ISO document. The API 17E task group would begin the revision process by correcting or supplementing areas of the document which were deemed weak or incorrect. In June 2004 a JIP was formed by DNV. The JIP began work on selected items and worked in parallel to the API TG. In October/November 2004, a NWI was formally submitted by Olav Inderberg to the ISO Committee. 2. STATUS A final merged, API TG & DNV JIP, document has been submitted to ISO representatives within Shell Hague to undergo review to ensure ISO editorial correctness. 3. MEMBERSHIP Task Group The working task group is made up of the following personnel: TABLE 1-1: API 17P TASK GROUP MEMBERS Name Company John McManus RathGibson jmcmanus@skylin .com Katrina Paton Clausing Shell International Exploration & Productionkmmpaton@shell.com Peter Worman Chevron pjwo@chevrontexaco.com Teguh Inarsoyo BP Teguh.Inarsoyo@bp.com Dave Madden DUCO Inc. DMadden@DucoInc.com Fraser Thomson Oceaneering Multiflex fthomson@oceaneering.com Alternate to Katrina Tom Williams Shell International Exploration & Productionvtwilliams@shell.com Note: Teguh Inarsoyo has recently joined the TG and will support DIS & FDIS clarifications and the next revision effort. -1- February 7, 2007

35 API 17E/ISO SUBSEA UMBILICALS WINTER MEETING STATUS REPORT Reader/Comment Group The reader/comment group is made up of the following personnel: 1. Mark Stevenson Chevron 2. Virginia Nelson Chevron 3. Jason Ellis Chevron 4. Dave Wilkinson ExxonMobil 5. Paul Donavan ExxonMobil 6. David Micheletti ExxonMobil 7. John Respess Marathon Oil 8. Lisbeth Holst Norsk Hydro 9. Sigmund Lunde Norsk Hydro 10. Godfried Dekeyser Pioneer Energy 11. Paul Shaw Alpha Petroleum 12. Knut Ivar Ekeberg Nexans Norway AS 13. Kjell Garvik Aker Kvaerner Subsea AS 14. Tim Wooters Cabett Parker Subsea 15. John Brown DUCO Ltd. 16. Peter Fellows DUCO Ltd. 17. John Tokaruk Sandvik Steel 18. Dave O Donnell RathGibson 19. Kurt Jones Tenaris 20. Ken Bertram Webco 21. Philippe Roelants Intec Engineering 22. Jim Morrison Pegasus International 23. Steve Mansfield J P Kenny 24. Fraser Gourlay Consultant 25. Vincent Ledoux Technip 26. Jean François Saint Marcoux Paragon Engineering 27. Darrel Evans Stolt Offshore 28. Norb Gorman Oceaneering International 29. David Gray Consultant 30. Jeremy Woulds Cal Dive International 31. Jim Macklin Cal Dive International 32. Sandy Fraser Subsea 7-2- February 7, 2007

36 API 17E/ISO SUBSEA UMBILICALS WINTER MEETING STATUS REPORT 4. UPDATED TARGET DATES FOR DELIVERABLES Table 4-1 shows the new proposed milestone targets: TABLE 4-1: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date ISO review for editorial correctness / Shell Hague Send updated DIS proposal to SC 4 Send to ISO secretariat in Geneva to issue as DIS February 2007 March 2007 (1 month) April 2007 (2 months) Publication of ISO DIS June/July MAJOR ISSUES None at this time 6. ANTICAPTED NEW WORK ITEMS Following publication as FDIS, a NWI will be prepared to begin the next revision process. 7. PLANS FOR FUTURE MEETINGS The TG will meet as required to reconcile comments to DIS. 8. RESOURCE NEEDS None at this time -3- February 7, 2007

37 API SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17G Subsea Completion Risers TASK GROUP STATUS FEBRUARY, 2007

38 API 17G RISERS STATUS REPORT TABLE OF CONTENTS 1. INTRODUCTION PREVIOUS REPORTED STATUS CURRENT REPORTED STATUS MEMBERSHIP UPDATED TARGET DATES FOR DELIVERABLES MAJOR ISSUES ANTICIPATED NEW WORK ITEMS PLANS FOR FUTURE MEETINGS RESOURCE NEEDS /7/2007

39 API 17G RISERS STATUS REPORT 1. INTRODUCTION The have been no 17G task group meetings in At the last task group meeting, the group decided they would meet again to review the 16ST document drafted by Alex Sas-Jaworski. The draft has not been issued. At the February SC 17 meeting, it was decided that task group 17G would continue to contain IWOCS controls and create several sub documents to cover various well intervention techniques. No further action has been taken since then. 2. PREVIOUS REPORTED STATUS During previous meetings, it has been agreed that: 1. IWOCS controls will stay in ISO / RP 17G. 2. Alex Sas-Jaworski s task group will release their document on containment systems and testing (RP 16ST) by mid-march The task group agreed to use this document to update testing and operating procedures within 17G, once the group has time to review and comment on the 16ST document no progress. 3. The task group at the February 2006 SC 17 meeting agreed to re-form to address other well intervention schemes and possibly subdivide RP 17G into sub documents (17G1, 17G2, 17G3, etc.) to specifically address these systems. This effort will follow the operations/testing work, and will work closely with the task group. 3. CURRENT REPORTED STATUS No new business. 4. MEMBERSHIP Table 1 shows the current volunteer membership for the API RP 17G task group: TABLE 1: API 17G TASK GROUP MEMBERS Name Company Address Tony Muff (Norway) (ISO Chair) FMC Technologies Anthony.Muff@fmcti.com Brian Skeels (API 17G Chair) FMC Technologies brian.skeels@fmcti.com Tom Ames BP amest@bp.com Ginny Stover BP stoverg1@bp.com Sterling Lewis ExxonMobil Sterling.f.lewis@exxonmobil.com David Lacaze Shell David.lacaze@shell.com Mike Hess Shell Michael.hess@shell.com Bill Parks DTC International Bill.parks@dtc-houston.com Alex Sas-Jaworsky SAS Industries sasindinc@cs.com Russell Hoshman MMS Russell.Hoshman@mms.gov -1-2/7/2007

40 API 17G RISERS STATUS REPORT Bobby Voss has been removed from the roster since he has been transferred to Aberdeen. Mike Hess has been added to the 17G roster as of January. 5. UPDATED TARGET DATES FOR DELIVERABLES Table 2 shows the current proposed milestone targets: TABLE 2: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date Review RP 16ST 4/07 17G Task Group Meeting to discuss well operational requirements for completion/ workover risers, and other subsea well intervention techniques. 6/07 6. MAJOR ISSUES None. 7. ANTICIPATED NEW WORK ITEMS No new progress. o Look at where well control testing and operational procedures belong in RP 17G. o Plan future scope of RP 17G, retaining IWOCS and expanding the overall scope to include other subsea intervention techniques based on a common LRP interface. Outside technical writing assistance will be sought. 8. PLANS FOR FUTURE MEETINGS Tentatively the task group will meet in June 2007 to discuss the path forward. 9. RESOURCE NEEDS No new progress. All task group members and SC 17 members and their member companies are still urged to spread the word of companies and/or subject matter experts who would volunteer their time and expertise by participating in the expanded task group over the next few years. Controls systems experts, companies working on light well intervention, and additional operator company participation especially -2-2/7/2007

41 API 17G RISERS STATUS REPORT those who are actively looking at light well intervention operations are being sought to join the 17G task group. Several task group members have also asked for technical writing assistance. However, this will be contingent on the scope of what the task group wants to do. -3-2/7/2007

42 API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H & 17 M / ISO & ISO ROV/ROT INTERFACE TASK GROUP STATUS FEBRUARY 2007

43 API 17P TEMPLATES AND MANIFOLDS STATUS REPORT TABLE OF CONTENTS 1. INTRODUCTION PREVIOUS REPORTED STATUS MEMBERSHIP UPDATED TARGET DATES FOR DELIVERABLES MAJOR ISSUES ANTICIPATED NEW WORK ITEMS PLANS FOR FUTURE MEETINGS RESOURCE NEEDS Dec-06

44 API 17P TEMPLATES AND MANIFOLDS STATUS REPORT 1. INTRODUCTION The API 17H and API 17M were adopted in 2004 from ISO and ISO respectively. A new work item has been identified to combine the two standards into one new standard titled ISO Comments to the previous release of the standards will need to be incorporated into the next revision. The API 17H task group, working with an equivalent ISO team, has the scope of work to update and combine the existing API-17H / ISO and API-17M / ISO into a single concise specification. 2. PREVIOUS REPORTED STATUS Statoil has setup a FTP web site to allow universal access to all team members. The strawman document and other supporting documents have been posted to the site. An ISO work group and an API task group have been assembled, member names and contacts are listed in section 3. Several meetings between Erich Luzi and Charles White have been held and a table of contents have been developed. Using the table of contents a strawman document has been created for use by both teams. Responsibility for chapters of the strawman have been distributed to each team for comment. The ISO work group has commented on the table of contents and has held their first meeting in January, the API task group is scheduled to have the first meeting by the end of February Dec-06

45 API 17P TEMPLATES AND MANIFOLDS STATUS REPORT 3. MEMBERSHIP Membership to the task group has grown with several new members participating. Table 3-1, Table 3-2, and Table 3-3 show the changes in the current volunteer membership for the API 17P RP: TABLE 3-1: API 17P TASK GROUP MEMBERS Name Company Charles White DORIS George Siappas Chevron Lynn Dates Shell Doug Hernandez BP Don Ross Pegasus Engineering TABLE 3-2: ISO WORK GROUP MEMBERS Name Company Eurich Luzi Statoil Kjersti Kannei Vetco Jon Thoresen Statoil Alain Cretenet Total Diddier Renard Technip Finn Haugen FMC Harald Arnt Friisk Norsk Hydro Harald Wahl Breivik Shell TABLE 3-3: RESERVE API 17P TASK GROUP MEMBERS Name Company Reserve members are not able to participate directly due to combination of project workload and temporary relocation to support projects, but are interested in the success of the task group. 4. UPDATED TARGET DATES FOR DELIVERABLES Now that the team have been formed, a milestone schedule will need to be created: TABLE 4-1: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date Dec-06

46 API 17P TEMPLATES AND MANIFOLDS STATUS REPORT Working Draft agreed by TG to proceed to Subcommittee (SC) (ISO Stage 20.99) Draft approved by SC for formal ballot (ISO Stage 30.99) Publication of Standard (ISO Stage 60.60) TBD TBD TBD 5. MAJOR ISSUES No major technical issues at this time. 6. ANTICIPATED NEW WORK ITEMS None at this time. 7. PLANS FOR FUTURE MEETINGS ISO Work Group and API Task Group are scheduled to meet quarterly. A milestone schedule need to be developed. 8. RESOURCE NEEDS Operators are asked to submit any standard subsea manifold specifications that may be useful to this team Dec-06

47 ISO/TC67/SC4/WG6 N... ISO/TC67/SC4/WG6 Subsea production systems ISO Remotely Operated Tools and Interfaces on Subsea Production Systems Task Group status report January Membership of task group ISO Project leaders; Part 13 project leader: Erich Luzi, Statoil, Norway co-operation with API work group headed by Charles White Task group members; Alain Cretenet Didier Renard Finn Haugen Harald Arnt Friisk Harald Wahl Breivik Kenneth Jakobsen Kjersti Kanne Timothy Marsh Alf Kristian Aadland Total Technip FMC Norsk Hydro Shell Statoil Vetco Shell Oceaneering

48 2. Status of work item ISO , is a merged standard from the previous and standards. At present a new document layout and work split between API and ISO workgroup has been prepared as a working document. Initial telephone meeting in the ISO workgroup has been held early January 2007, with a follow up work meeting scheduled for march 20 th Updated target dates for deliverables CD planned ready for review November Major issues No major issues remains to be solved at this moment. 5. Anticipated new work /new work items The main focus for the new standard will be to implement experiences with existing standard and introduce new requirements and additions as found appropriate. A close coordination with the revision of is foreseen. 6. Plans for future meetings New work meeting within ISO group planned for march 20 th In addition co-ordination meetings with API work group will be planned for. 7. Resource needs (money and/or people) No specific needs identified at this stage Erich Luzi, Statoil January 2007

49 ISO TC 67/SC 4/WG 6 API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API RP 2RD REVISION / ISO/WD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS TASK GROUP STATUS February 7, 2007

50 API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT TABLE OF CONTENTS 1. INTRODUCTION 2. STATUS 3. MEMBERSHIP 4. TARGET DATES FOR DELIVERABLES 5. MAJOR ISSUES 6. ANTICIPATED NEW WORK ITEMS 7. PLANS FOR FUTURE MEETINGS 8. RESOURCE NEEDS -i- 16-Jun-04

51 1. INTRODUCTION 2. STATUS API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT The ISO /API RP 2RD Task Group s scope of work is to revise API RP 2RD and to submit the revision to ISO. The new document will cover top-tensioned risers, catenary risers, hybrid risers and offloading risers. The new name of the document will be Dynamic Risers for Floating Production Installations. The TG has met four times since the 14 June 2006 report. The focus has continued to been on the work of Subgroup 2, Design Considerations. The current plan is to have four levels of criteria: Level 1: based on the current 2RD Level 2: based on ISO Level 3: LRFD format based on DNV OS F201 Level 4: Essentially RP 1111 Subgroup 5 on Riser Integrity Management has completed a second draft and is making good progress. Subgroup 4 on Materials has a new chairman (Howard cook, BP), and met 18 Jan Jim Burk, BP is taking the lead. Subgroup 3 on Riser Components, chaired by Gordon Craig, GrantPrideco, met last week to discuss a first draft of Section 9 prepared by Finn Kirkemo, Statoil. The other subgroups should be able to progress soon Jun-06

52 API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT 3. MEMBERSHIP Table 1 shows the current volunteer membership for the API RP 2RD TG: TABLE 1: API RP 2RD TASK GROUP MEMBERS Name Company Stanton Paul N. Technip USA, Inc pstanton@technip.com Aggarwal, Rajiv KBR rajiv.aggarwal@kbr.com Baxter, Carl RTI cbaxter@rtienergy.com Bhat, Shankar KBR Shankar.Bhat@kbr.com Burk, Jim BP James.Burk@BP.com Cerkovnik, Mark 2H Offshore cerkovnm@2hoffshoreinc.com Chezhian, Muthu DnV muthu.chezhian@dnv.com Colby, Craig DNV Tech. Services craig.colby@dnv.com Cook, Howard bp howard.cook2@bp.com Craig, Gordon Grant Prideco gordon.craig@grantprideco.com Denison, Early R. Shell early.denison@shell.com Dutta, Amit KBR amit.dutta@halliburton.com Garrett, David Stress Engineering david-garrett@stress.com Jin, Joe ExxonMobil joe.jin@exxonmobil.com Karayaka, Metin Chevron karayaka@chevron.com Kavanagh, Kieran MCS kierankavanagh@mcs.com Kim, WanJun Shell Wanjun.Kim@Shell.Com Kopp, Frans Shell Frans.Kopp@shell.com Kirkemo, Finn Statoil fkir@statoil.com Massaglia, Jacky Vallourec & Mannesmann jacky.massaglia@vmtubes.fr Mekka, Basim Enterprise Field Services bmekha@eprod.com Meling, Trond Stokka Statoil tsmeling@statoil.com Mork, Kim DNV kim.mork@dnv.com Moros, Thanos BP morosa@bp.com Rao, Vidish Shell vidish.rao@shell.com, Song, Ruxin Technip USA, Inc rsong@technip.com Yiu, Flora Technip USA, Inc fyiu@technip.com Yu, Alan Technip USA, Inc ayu@technip.com API & ISO/TC67 Inderberg, Olav FMC Olav.Inderberg@fks.fmcti.com Jeanjean, Philippe bp Philippe.Jeanjean@bp.com Johansen, Alf Reidar Norsk Hydro Alf.Reidar.Johansen@hydro.com Komiskey, Elizabeth MMS elizabeth.komiskey@mms.gov Radford, Andy API radforda@api.org O'Connor, Patrick BP oconnpe@bp.com Stark, Cheryl BP starkcl@bp.com Felix-Henry, Antoine Flexi France afelixhenry@technip.com 2 14-Jun-06

53 API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT TABLE 2: API RP 2RD Sub Task Group Members Section Content STG# Members 1 Scope STG#1 Stanton, Yiu 2 Normative references 3 Definitions and Nomenclature (Refer to Annex A) 4 General 5 Description of Riser Systems and Components 6 General Design Considerations STG#2 Garrett, Song, Kirkemo, Mork, Denison 7 Design Loads and Conditions 8 Design Criteria for Riser Pipes 9 Connectors and Riser Components STG#3 Craig, Stanton, Massaglia, Kirkemo, Baxter, Yu, Garrett 10 Materials STG#4 Cook, Baxter, Massaglia, Jin, Burk 11 Fabrication and Installation 12 Riser Integrity Management STG#5 Kavanagh, Chezhian, Kim Annex A (Normative) Definitions and Nomenclature STG#1 Stanton, Yiu Annex B (Informative) Design Basis STG#6 Song Annex C (Informative) Analytical Considerations STG#7 Garrett, Kavanagh, Kim Annex D (Informative) Load Case Examples STG#2 Garrett, Song, Kirkemo, Mork Annex E (Informative) Example TTR Design STG#1 Yu Annex F (Informative) Example SCR Design STG#8 Song Annex G (Informative) Example Hybrid Riser Design STG#9 Cerkovnik, Song Annex H (Informative) Bibliography STG#1 Stanton, Yiu Un-assigned Aggarwal, Bhat, Colby, Dutta, Karayaka Meling, Rao, Kopp, Moros, Shu 3 14-Jun-06

54 API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT 4. TARGET DATES FOR DELIVERABLES Table 3 shows the proposed milestone targets: TABLE 3: MILESTONE TARGET DATES Milestone Targets Revised Draft agreed by TG to proceed to Subcommittee (SC) Proposed Completion Date 9/07 Draft approved by SC for formal ISO ballot 1/08 Publication of Standard MAJOR ISSUES Available resources. 6. ANTICIPATED NEW WORK ITEMS None at this time. 7. PLANS FOR FUTURE MEETINGS Next full TG meeting currently scheduled for mid March, We are trying to meet about every six weeks. 8. RESOURCE NEEDS Still need volunteer to lead Fabrication and Installation Section Jun-06

55 Introduction to API RP 17N API Recommended Practice RP17N Subsea Production System Reliability& Technical Risk Management API 17N Presentation to API/ISO meeting February 07

21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX. February 7, 2007 Joint Meeting - 8:30 am

21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX. February 7, 2007 Joint Meeting - 8:30 am 21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building 11700 Old Katy Road Houston, TX February 7, 2007 Joint Meeting - 8:30 am 1. Opening of the meeting (Bednar/Inderberg) 2. Roll call/roster

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO ,11,10 FLEXIBLE PIPE STANDARDS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO ,11,10 FLEXIBLE PIPE STANDARDS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO 13628-2,11,10 FLEXIBLE PIPE STANDARDS JOINT API-ISO FLEXIBLE PIPE TASK GROUP JANUARY 19, 2007 Prepared by: Krassy

More information

19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA

19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA 19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA June 14, 2005 Joint Meeting - 8:00 am 1. Opening of the meeting (Bednar/Inderberg) 2.

More information

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:00 AM and outlined various safety and housekeeping issues.

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:00 AM and outlined various safety and housekeeping issues. MINUTES 84 th Exploration and Production Standards Conference on Oilfield Equipment and Materials 22 nd Joint Meeting API SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment San Francisco, California

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17E SPECIFICATION for SUBSEA UMBILICALS REVISION TASK GROUP STATUS JUNE 29, 2011 1. INTRODUCTION 2. STATUS The ISO 13628-5 Specification was

More information

John Bednar, Chairman

John Bednar, Chairman MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Summer Committee Meeting Grand Hyatt Hotel, Washington DC Wednesday, June 29 th 2016 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman

More information

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required). MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2017 Summer Committee Meeting Lloyd s Register Training Center, Houston, Texas Wednesday, June 14, 2017 Brian Skeels, (Co) Vice-Chairman Ross

More information

Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012

Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012 Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012 John Bednar, Chair Gary Hurta, (Co) Vice Chair Brian Skeels, (Co) Vice Chair Ross Frazer

More information

API 17G Update. API SC17 Summer Meeting 12 Jun API 17G Monthly Leadership Update 1

API 17G Update. API SC17 Summer Meeting 12 Jun API 17G Monthly Leadership Update 1 API 17G Update API SC17 Summer Meeting 12 Jun 2018 05/31/2018 API 17G Monthly Leadership Update 1 Agenda task group leadership how we re working where we are today results from ongoing reviews where we

More information

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016 MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman Ross Frazer,

More information

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes. Minutes of Meeting 2009 Exploration & Production Standards Conference on Oilfield Equipment and Materials Meeting Tuesday, June 23, 2009 Drilling Well Control Equipment SC16 8:30 am 12:00 pm Chair: Mel

More information

ISO/TC 67/SC 4 N 267 ISO/TC 67 N

ISO/TC 67/SC 4 N 267 ISO/TC 67 N Secretariat: ISO/TC 67/SC 4 Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries - Drilling and production equipment American Petroleum Institute, 1220 L

More information

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015 MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman

More information

SC20 MEETING MINUTES January 29, E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana

SC20 MEETING MINUTES January 29, E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana Introduction of Attendees SC20 MEETING MINUTES January 29, 2015 2015 E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana API Subcommittee on Supply Chain Management (SC20)

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 13628-8 First edition 2002-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 8: Remotely Operated Vehicle (ROV) interfaces on

More information

RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD

RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD ISO/TC 67 / SC 4 N 327 A Title of TC or SC concerned Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries Drilling

More information

Recommended Practice for Flexible Pipe

Recommended Practice for Flexible Pipe Recommended Practice for Flexible Pipe ANSI/API RECOMMENDED PRACTICE 17B FOURTH EDITION, JULY 2008 Document includes Technical Corrigendum 1, dated June 2008 ISO 13628-11:2007 (Identical), Petroleum and

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS JANUARY 2016 TABLE OF CONTENTS 1. INTRODUCTION... 1-1 2. PREVIOUS REPORTED STATUS...

More information

Specification for Subsea Umbilicals

Specification for Subsea Umbilicals Specification for Subsea Umbilicals Upstream Segment ANSI/API SPECIFICATION 17E FOURTH EDITION, OCTOBER 2010 EFFECTIVE DATE: APRIL 1, 2011 ISO 13628-5:2009 (Identical), Petroleum and natural gas industries

More information

OBSERVATORY SERVICING AND MAINTENANCE

OBSERVATORY SERVICING AND MAINTENANCE OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS 11 JANUARY 2017 1. INTRODUCTION 2. STATUS The 17G2 document addresses subject

More information

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management Subsea Production Market and Industry Teaming Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management February 28, 2017 Worldwide Progression of Water Depth Capabilities

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

Annual Report to ISO TC67 / SC4 For 2005 Plenary Meeting May 12-13, 2004 Milan, Italy

Annual Report to ISO TC67 / SC4 For 2005 Plenary Meeting May 12-13, 2004 Milan, Italy ISO/TC 67/SC4/WG1 ISO/TC 67/SC 4 N 313 Materials, equipment and offshore structures for petroleum and natural gas industries: Drilling and Production Equipment Annual Report to ISO TC67 / SC4 For 2005

More information

Wells Expert Committee Bulletin

Wells Expert Committee Bulletin COMMITTEE UPDATE DECEMBER 2016 Issue no. 2 Wells Expert Committee Bulletin The Global Industry Response Group (GIRG) was created in July 2010 with a remit to identify, learn and apply the lessons of Macondo

More information

AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999.

AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999. AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999. 1.0 WELCOME AND APOLOGIES The members were welcomed to the meeting. There were nine attendees

More information

API 17G Update. API SC17 Winter Meeting 07 Feb API 17G Update SC17 Winter Meeting 1

API 17G Update. API SC17 Winter Meeting 07 Feb API 17G Update SC17 Winter Meeting 1 API 17G Update API SC17 Winter Meeting 07 Feb 2018 07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 1 Agenda new leadership how we re working November Workshop organization where we are today results

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals INTERNATIONAL STANDARD ISO 13628-5 Second edition 2009-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals Industries du pétrole et du

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17F Subsea Production Control Systems TASK GROUP STATUS JUNE 2017 1. INTRODUCTION API 17F Third Edition was published in May 2014. The latest

More information

David Galbraith Convenor ISO TC 67/SC 7/WG 3 Project Leader ISO & ISO Fixed Steel Offshore Structures / Topsides Structures

David Galbraith Convenor ISO TC 67/SC 7/WG 3 Project Leader ISO & ISO Fixed Steel Offshore Structures / Topsides Structures International Standards and the status of the offshore structures codes David Galbraith Convenor ISO TC 67/SC 7/WG 3 Project Leader ISO 19902 & ISO 19901-3 Fixed Steel Offshore Structures / Topsides Structures

More information

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Defining the New Normal for Offshore Drilling Copenhagen 16 June 2011 Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Montara & Macondo Investigations Report of the Montara Commission

More information

Module B contains eleven modules. This is Module B8. International Standards Development

Module B contains eleven modules. This is Module B8. International Standards Development 0 Module B contains eleven modules. This is Module B8. International Standards Development 1 At the end of this module you will know What makes a Standard International The process by which ASME Standards

More information

2015 Exploration & Production Winter Standards Meeting Subcommittee 10. January 27-29, 2015 Intercontinental Hotel New Orleans, LA

2015 Exploration & Production Winter Standards Meeting Subcommittee 10. January 27-29, 2015 Intercontinental Hotel New Orleans, LA 2015 Exploration & Production Winter Standards Meeting Subcommittee 10 January 27-29, 2015 Intercontinental Hotel New Orleans, LA Subcommittee on Well Cements (SC10) Agenda Tuesday, January 27 th, 2015

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17Y Subsea chemical injection system - Recommended Practice for Design, Testing & Operations REVISION TASK GROUP STATUS JUNE 2017 1. INTRODUCTION

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems INTERNATIONAL STANDARD ISO 10418 Second edition 2003-10-01 Petroleum and natural gas industries Offshore production installations Basic surface process safety systems Industries du pétrole et du gaz naturel

More information

Enhancing international subsea well incident intervention

Enhancing international subsea well incident intervention Enhancing international subsea well incident intervention Y C 23 M 2 Y 0 K 63 K While we hope intervention equipment will never be needed, it is critical for the industry to be prepared Archie Smith, Chief

More information

API Subcommittee MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API Subcommittee MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP... API Subcommittee 17 SUBCOMMITTEE ON SUBSEA PRODUCTION EQUIPMENT TASK/WORK GROUP STATUS REPORT API 17G - Standards for Subsea Well Intervention Systems 31 MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK...

More information

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee Roald Sirevaag IOGP Subsea committee chair About IOGP Wherever you are Wherever you go... Whatever you

More information

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Kevin Taylor September 26, 2011 Eleventh U.S.-China Oil and Gas Industry Forum Chevron is a Major Operator in Subsea and

More information

API Standards Overview

API Standards Overview 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 API Standards Overview Roland Goodman Upstream Standards Manager American Petroleum Institute This presentation is the property of

More information

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair

More information

DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS

DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS Trond Sundby Petroleum Safety Authority, Norway

More information

2014 Exploration & Production Standards Conference Subcommittee 10. January InterContinental Dallas Addison, Texas

2014 Exploration & Production Standards Conference Subcommittee 10. January InterContinental Dallas Addison, Texas 2014 Exploration & Production Standards Conference Subcommittee 10 January 21-23 2014 InterContinental Dallas Addison, Texas Subcommittee on Well Cements (SC10) Agenda Tuesday, January 21, 2014 8:00 8:15

More information

Subsea Structural Engineering Services. Capability & Experience

Subsea Structural Engineering Services. Capability & Experience Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation

More information

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Special Notes API publications necessarily address problems

More information

API COPM CPMA Chapter 20.X

API COPM CPMA Chapter 20.X API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February

More information

Greta Lydecker opened the meeting, welcomed everyone and thanked them for their attendance.

Greta Lydecker opened the meeting, welcomed everyone and thanked them for their attendance. MER UK Forum Steering Group Meeting 18 th April 2018 Meeting Attendees: Andy Samuel, Co-Chair, MER UK Steering Group, Greta Lydecker, Co-Chair, MER UK Steering Group Deirdre Michie, Chief Executive, Oil

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

ISO/TR TECHNICAL REPORT

ISO/TR TECHNICAL REPORT TECHNICAL REPORT ISO/TR 13624-2 First edition 2009-12-01 Petroleum and natural gas industries Drilling and production equipment Part 2: Deepwater drilling riser methodologies, operations, and integrity

More information

Overview and Update of API Standards

Overview and Update of API Standards Overview and Update of API Standards IADC South East Asia Chapter Meeting Kuala Lumpur, Malaysia March 21, 2017 Eric Ho American Petroleum Institute Singapore Scope of Presentation API Background API Standards

More information

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer FMC Overview Fourth Quarter 2016 Director, Investor Relations Matt Seinsheimer +1 281.260.3665 matthew.seinsheimer@fmcti.com This presentation contains forward-looking statements intended to qualify for

More information

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Special Notes API publications necessarily address problems of a general nature. With respect

More information

Guidelines for the avoidance of vibration induced fatigue failure in process pipework

Guidelines for the avoidance of vibration induced fatigue failure in process pipework ERRATA for Guidelines for the avoidance of vibration induced fatigue failure in process pipework Errata 1: Pg 61: Feed in from Flowchart T2-5 should be Errata 2: Pg 68: The peak force calculation in Flowchart

More information

Reversing the trend Collaboration, Robustness and Standardization

Reversing the trend Collaboration, Robustness and Standardization Reversing the trend Collaboration, Robustness and Standardization 2017 BSEE Standards Workshop, Houston May 5th 2017 By Dr.ing Geir Loeland. Head of Structural Integrity Section Petroleum Safety Authority

More information

API Subcommittee JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API Subcommittee JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP... API Subcommittee 17 SUBCOMMITTEE ON SUBSEA PRODUCTION EQUIPMENT TASK/WORK GROUP STATUS REPORT API 17G - Standards for Subsea Well Intervention Systems 06 JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK...

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

IWCF Well Control Level 5. Celle Drilling Conference 2017

IWCF Well Control Level 5. Celle Drilling Conference 2017 IWCF Well Control Level 5 Celle Drilling Conference 2017 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions Why? Level 5 background

More information

RECOMMENDATIONS FOR RADIO COMMUNICATION EQUIPMENT AND ITS INSTALLATION IN PETROLEUM ROAD TANKERS. Second Edition November 2004

RECOMMENDATIONS FOR RADIO COMMUNICATION EQUIPMENT AND ITS INSTALLATION IN PETROLEUM ROAD TANKERS. Second Edition November 2004 RECOMMENDATIONS FOR RADIO COMMUNICATION EQUIPMENT AND ITS INSTALLATION IN PETROLEUM ROAD TANKERS Second Edition November 2004 RECOMMENDATIONS FOR RADIO COMMUNICATION EQUIPMENT AND ITS INSTALLATION IN

More information

ISO/TC67/SC4 Work Group 4 Annual Report

ISO/TC67/SC4 Work Group 4 Annual Report ISO/TC67/SC4 Work Group 4 Annual Report 2007-2008 1. Convenor information. Mr. Bert Dijkhuis (Convenor) Van Bommellaan 16 2245 VN Wassenaar The Netherlands Tel. +31 (0)70 517 8976 E-mail edykhuis@wanadoo.nl

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

ISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers

ISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers INTERNATIONAL STANDARD ISO 16812 Second edition 2007-02-15 Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers Industries du pétrole, de la pétrochimie et du gaz naturel

More information

CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign'

CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign' CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign' Proposed Project Teams: It is proposed that the following PTs be installed. The exact PT teams and the work they will

More information

Matrix Composites & Engineering Ltd

Matrix Composites & Engineering Ltd Matrix Composites & Engineering Ltd Euroz 2015 Industrials Tour 10 June 2015 Overview Introduction to Matrix Business Operations and Outlook Plant Tour 2 Introduction to Matrix WHO WE ARE AND WHAT WE DO

More information

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise Deepsea technologies INTEGRATED INTERVENTION SYSTEMS Lowering Costs and Risks with Customized Tools and Application Expertise Specialized Intervention Services for Specific Field Needs AFGlobal and Deepsea

More information

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World 1 Overview About Subsea UK Facts and figures UK industry evolution Centre of Excellence Technology and Innovation

More information

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise

More information

1 st MEETING OF THE IHO COUNCIL

1 st MEETING OF THE IHO COUNCIL C1-3.1 1 st MEETING OF THE IHO COUNCIL Monaco, 17-19 October 2017 REPORT OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE C1-3.1 - P a g e 3 REPORT OF THE HYDROGRAPHIC STANDARDS AND SERVICES COMMITTEE

More information

Presenter: John T. Gremp President and Chief Operating Officer. February 2011

Presenter: John T. Gremp President and Chief Operating Officer. February 2011 Presenter: John T. Gremp President and Chief Operating Officer February 2011 Director, Investor Relations Robert K. Cherry +1 281 591 4560 rob.cherry@fmcti.com These slides and the accompanying presentation

More information

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Special Notes API publications necessarily address problems

More information

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa 1 SAFER, SMARTER, GREENER Content Going Deeper Scale/Size of Deepwater Mega

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,

More information

Site Investigations and Survey Guidelines. GEMS Group.

Site Investigations and Survey Guidelines. GEMS Group. Site Investigations and Survey Guidelines GEMS Group www.gems-group.com London 24 th March 2010 AIMS Guidelines for Site Investigations and surveys Historical overview Currently used In Progress Future

More information

Subsea Developments Status and Trends. Tore Halvorsen Senior Vice President

Subsea Developments Status and Trends. Tore Halvorsen Senior Vice President Subsea Developments Status and Trends Tore Halvorsen Senior Vice President FMC Technologies at a Glance 2005 Revenue: $3.2 Billion Subsea Trees Surface Wellheads Manifolds Control Systems Floating Production

More information

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario August 7, 2001 See Distribution List RE: Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario Dear Sir/Madam: The Electrical Safety

More information

Marvin J. Migura Sr. Vice President & CFO Oceaneering International, Inc.

Marvin J. Migura Sr. Vice President & CFO Oceaneering International, Inc. 2009 Energy, Utilities & Power Conference May 27, 2009 Marvin J. Migura Sr. Vice President & CFO Oceaneering International, Inc. Safe Harbor Statement Statements we make in this presentation that express

More information

HPHT Case Study: Kristin Field, North Sea

HPHT Case Study: Kristin Field, North Sea HPHT Case Study: Kristin Field, North Sea Craig Newman Senior Engineer, Subsea Systems NOV Texas Oil Tools 1 Personal info 2010 BSME Texas Tech University Joined TOT as Mechanical Engineer Worked with

More information

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

Emergency Pipeline Repair Systems; A Global Overview of Best Practice Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James

More information

Reliability of Deepwater Technologies

Reliability of Deepwater Technologies Reliability of Deepwater Technologies Technical Risk Management during R&D Alex Imperial, MD - Deepwater Technology Centre SMI Workshop - 3 April 2012 Reliability and Technical Risk Management Why New

More information

Workshop on Offshore Wind Energy Standards and Guidelines: Metocean Sensitive Aspects of Design and Operations in the United States July 17, 2014

Workshop on Offshore Wind Energy Standards and Guidelines: Metocean Sensitive Aspects of Design and Operations in the United States July 17, 2014 BOEM Update Workshop on Offshore Wind Energy Standards and Guidelines: Metocean Sensitive Aspects of Design and Operations in the United States July 17, 2014 Sid Falk U. S. Dept. of Interior Bureau of

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 28781 First edition 2010-08-15 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment Industries du pétrole et

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 16530-2 December 2015 ICS 75.180.10 English Version integrity - Part 2: integrity for the operational phase (ISO/TS 16530-2:2014)

More information

(3r d session of the GRE Informal Group. Visibility, Glare and Levelling (VGL), July, 2016)

(3r d session of the GRE Informal Group. Visibility, Glare and Levelling (VGL), July, 2016) GRE-VGL-03-01 Rev.1 (3r d session of the GRE Informal Group Visibility, Glare and Levelling (VGL), 18-19 July, 2016) Draft updated Terms of Reference and Rules of Procedure for the "Informal Working Group

More information

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing The Evolution & Future of API Coiled Tubing Standards Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing API Overview Presentation Outline Resource Group on Coiled Tubing

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

Single / Dual Barrier HP Drilling Risers

Single / Dual Barrier HP Drilling Risers Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction

More information

Opportunities and Challenges in Deepwater West Africa Projects

Opportunities and Challenges in Deepwater West Africa Projects Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and

More information

This document is a preview generated by EVS

This document is a preview generated by EVS IEC 61882 Edition 2.0 2016-03 REDLINE VERSION colour inside Hazard and operability studies (HAZOP studies) Application guide IEC 61882:2016-03 RLV(en) THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright

More information

Update on API and ISO Gas-Lift Standards and Recommended Practices

Update on API and ISO Gas-Lift Standards and Recommended Practices 31 st Gas-Lift Workshop Houston, Texas February 4-8, 2008 Update on API and ISO Gas-Lift Standards and Recommended Practices Jim Hall, Shell International EP Wayne Mabry, Schlumberger Cleon Dunham, Oilfield

More information

Dennis Marlow has begun work on the first two topics. The others will be addressed in new business.

Dennis Marlow has begun work on the first two topics. The others will be addressed in new business. 9.7 Insulation Life Subcommittee - D.W. Platts The Insulation Life Subcommittee met at 8:00 AM Wednesday, October 17, 2001 in Orlando.. Attendance was 37 members and 72 guests. The minutes of the April

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

EI Research report. A framework for monitoring the management of ageing effects on safety critical elements

EI Research report. A framework for monitoring the management of ageing effects on safety critical elements EI Research report A framework for monitoring the management of ageing effects on safety critical elements RESEARCH REPORT A FRAMEWORK FOR MONITORING THE MANAGEMENT OF AGEING EFFECTS ON SAFETY CRITICAL

More information

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY PEMEX-INTSOK Deepwater Technology Seminar, May 9-10, 2013 UNITECH is QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY Global Reach UNITECH equipment and people support some of the world s most challenging

More information

Advisory Committee for the Ocean Energy Safety Institute

Advisory Committee for the Ocean Energy Safety Institute Advisory Committee for the Ocean Energy Safety Institute 16 May 2017 1 Facility Information 2 Safety Moment 3 Tropical Cyclone 101 Development May - Nov Jun - Nov Apr - Dec All Year Oct - May Formation

More information

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND CONTAINMENT TASK FORCE, and JOINT INDUSTRY OIL SPILL PREPAREDNESS

More information

Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016

Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016 Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016 2016 Oceaneering International, Inc. All rights reserved. About Oceaneering

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

Riser Installation in Deep & Ultra Deep Water

Riser Installation in Deep & Ultra Deep Water Riser Installation in Deep & Ultra Deep Water Frank Lim 38 th Annual Offshore Pipeline Technology Conference Amsterdam, February 2015 Outline Introduction Overview of current deepwater riser systems and

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information