State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE ACKNOWLEDGED ON THE BID FORM IN THE APPROPRIATE LOCATION OF ITS RECEIPT. The following should be recognized as Addendum No# 1 to Project No# 7-17-2-11 & 3-17-2-12 Description: SCF Venice Campus: All necessary work for the installation of new 300 ton chiller, refurbishment of (1) one 80 ton air-cooled chiller and the refurbishment of (2) two existing cooling towers that are 150 ton and 225 tons as per construction documents issued on December 4, 2017, and due January 5, 2018 @ 10:00 am. PLEASE NOTE THE FOLLOWING: The following changes, additions, modifications, deletions and clarifications to the D r a w i n g s / P l a n s dated as shown (dated December 4, 2017 ) are herewith issued and shall be made under this Addendum Number 1 as a part of the Proposal due January 5, 2018 and acknowledged on the Proposal form. INSTRUCTIONS A. All work covered in this addendum is subject to the General and Special Conditions. B. This Addendum shall be acknowledged on the bid form and the cost of the work herein specified shall be included in the Base Bid. PART 1 REFER TO SPECIFICATIONS: PART 2 REFER TO DRAWINGS: Drawing M-101, Mechanical Floor Plan 1. Revise general note #6 to remove requirement to provide 400 tons of temporary campus cooling capacity. 2. Add keyed note #12 for bid alternate to replace all exterior condenser water piping and accessories (including CT equalizer line) in kind with new steel piping. Drawing M-300, Mechanical Schedules Revise Bid Alternate Summary Table to include the following: a. Bid Alternate #4: Replace all existing equipment isolation valves (chillers, boiler, pumps and cooling towers) b. Bid Alternate #5: Replace all exterior condenser water piping and accessories (including CT equalizer line) in kind with steel piping. PART 3 CLARIFICATIONS: *Addition of page 26 to bid documents to include new Alternate #4 and Alternate #5 page. This concludes Addendum #1. All other terms and conditions remain the same. Page 1 ********** END OF ADDENDUM No# 1 *********
STATE COLLEGE OF FLORIDA VENICE CAMPUS CENTRAL ENERGY PLANT M/E/P ADDENDUM NO. 1 DECEMBER 4, 2017 MATRIX PROJECT NO. 16-0700 PREPARED BY: Engineering Matrix, Inc. 2860 Scherer Drive Suite 640 St. Petersburg, Florida 33716 The following Addendum is made and hereby becomes a part of the contract documents for the subject project. INSTRUCTIONS A. This Addendum to the Specifications is issued prior to the receipt of bids. B. All work covered in this Addendum is subject to the General and Special Conditions. C. This Addendum shall be acknowledged on the Bid Form and the cost of the work herein specified shall be included in the Base Bid and/or Alternate lump sum amounts. D. If this Addendum lists additional acceptable manufacturers, manufacturers listed remain responsible for meeting the design and performance criteria of specifications and drawings, as shown. CHANGES TO DRAWINGS Item 1. Drawing M-101, Mechanical Floor Plan. REVISE General Note 6 to remove requirement to provide 400 tons of temporary campus cooling capacity. ADD Keyed Note #12 for Bid Alternate to replace all exterior condenser water piping and accessories (including CT equalizer line) in kind with new steel piping.
STATE COLLEGE OF FLORIDA; VENICE CAMPUS CENTRAL ENERGY PLANT DECEMBER 4, 2017 M/E/P ADDENDUM NO. 1 PAGE 2 Item 2. Drawing M-300, Mechanical Schedules. REVISE Bid Alternate Summary Table to include the following: Bid Alternate #4: Replace all existing equipment isolation valves (chillers, boiler, pumps, cooling towers). Bid Alternate #5: Replace all exterior condenser water piping and accessories (including CT equalizer line) in kind with new steel piping. Attachments: Drawings M-101 and M-300 ***END OF ADDENDUM NO. 1***
12/1/2017 5:27:57 PM M:\_2016\16-0700 HJA SCF Venice Campus CEP Improvements\Mechanical\16-0700_M-101_New Floor Plan.dwg 101 TRANSFORMER VAULT 100 EQUIPMENT RM. SEAL: DRAWING PHASE: 100% CONSTRUCTION DOCUMENTS ISSUE DATE: 11-02-17 EMI JOB NO. 16-0700 DRAWING REVISIONS: DRAWN BY: DRAWING TITLE: SCALE: NORTH: DRAWING NUMBER: STATE COLLEGE OF FLORIDA VENICE CAMPUS CENTRAL ENERGY PLANT UPGRADES 8000 S. TAMIAMI TR., VENICE, FL 34293 2017 Engineering Matrix, Inc. Addendum #1 12/4/17 CHECKED BY: DMK
11/2/2017 5:23:08 PM M:\_2016\16-0700 HJA SCF Venice Campus CEP Improvements\Mechanical\16-0700_M-300_Schedules.dwg SEAL: DRAWING PHASE: 100% CONSTRUCTION DOCUMENTS ISSUE DATE: 11-02-17 EMI JOB NO. 16-0700 DRAWING REVISIONS: DRAWN BY: DRAWING TITLE: SCALE: NORTH: DRAWING NUMBER: STATE COLLEGE OF FLORIDA VENICE CAMPUS CENTRAL ENERGY PLANT UPGRADES 8000 S. TAMIAMI TR., VENICE, FL 34293 2017 Engineering Matrix, Inc. Addendum #1 12/4/17 CHECKED BY: DMK