Kestrel Aluminium Systems Limited. Product Manual Section 11 Thermal Framing System - Fabrication. Manual Version
|
|
- Lynne Horn
- 6 years ago
- Views:
Transcription
1 Limited Product Manual Section 11 - Fabrication Manual Version
2 Section Fabrication sheet 1 General guidelines for cutting and bar preparation Section 11 Contents Section Fabrication sheet 1 Frame drill Jig KAS T105 Thermal break frame sections sheet 1 Hole setting out KAS721 and KAS sheet 2 Hole setting out KAS722 and KAS sheet 3 Hole setting out KAS sheet 4 Hole setting out KAS sheet 1 Screw port fixing Section Cill drainage preparation and fixing holes sheet 1 Cill drainage preparation in KAS sheet 1 Fixing holes Sheet
3 Fabrication - Guidelines for cutting and prepping General guidelines for cutting and bar preparation: For further reading on cutting, preparation and workmanship please refer to BS 8118: Part 2: Storage and transportation: Store aluminium in a dry place, clear of the ground. Avoid contact with other metals and with materials such as cement and damp timber. Protect aluminium extrusion surfaces with low tack removable tapes while danger of damage exists. Pack aluminium during transportation to avoid mechanical damage, abrasion and contact by agents liable to cause surface corrosion or staining. Fabrication tolerance: See corresponding sheets for each section type Marking out: Fine scribing lines must not be used on critically stressed ares of thin material. Where subsequent welding is involved paint, chalk, graphite or other marking materials likely to contaminate must not be used. Cutting: Cutting can be by circular saw or band saw and both must have a tooth form and pitch to suite the thickness of the material to be cut. Cut edges should be smooth, square and free from burrs, distortion and other irregularities. Care must be taken to avoid the use of tools contaminated by other metals, particulary copper or brass. Great care must be taken when working with mitred end cuts to avoid impact damage to ends (ideally bars should not be stored or transported vertically without corner protection). Drilling, punching and preparation: Holes can be made by either drilling, drilling and reaming or by punching. Drill holes should be smooth and free from burrs, distortion and other irregularities. Drainage slots must be of the correct diameter and length and positioned correctly. At all times prepared bars should be free from general debris and cutting/drilling swarf. Assembly: All joint surfaces should be free of dirt,grease and cutting/drilling debris. All joints shall be sealed against the entry of water by use of a high quality silicone sealant. NB Small gap joint sealant is NOT to be used on painted material - only anodised or mill finish profile. Be careful not to handle or transport frames in such a way as to disturb or open joints by excessive movement or bending of frames etc. See separate document for installation guidelines Sheet
4 Frame drill Jig KAS T05 Thermal break frame sections KAS721 Plate Middle drill hole handed for KAS 723 KAS T05 KAS721 TOP TOP KAS 721/727 Plate Plate Box KAS726 TOP TOP KAS 723/727 KAS723 KAS T Sheet
5 Fabrication - Hole setting out - KAS721, KAS KAS 723/727 3 x 5mmØ holes KAS x KAS KAS721 KAS 721/ x 5mmØ holes 4 x KAS Use off cut of KAS721 to keep 's parallel when drilling, fix top/bottom transoms in place to keep plates square prior to drilling intermediate transom positions Sheet
6 Fabrication - Hole setting out - KAS722, KAS724 KAS722 KAS x 5mmØ holes 2 x KAS KAS KAS x 5mmØ holes x KAS Use off cut of KAS721 to keep 's parallel when drilling, fix top/bottom transoms in place to keep plates square prior to drilling intermediate transom positions Sheet
7 Fabrication - Hole setting out - KAS717 Use internal screrw ports for securing fixing plates or cover trims KAS KAS x 5mmø holes 2 x KAS Use off cut of KAS721 to keep 's parallel when drilling, fix top/bottom transoms in place to keep plates square prior to drilling intermediate transom positions Sheet
8 Fabrication - Hole setting out - KAS718 KAS x 5mmØ holes 6 x KAS KAS Use off cut of KAS721 to keep 's parallel when drilling, fix top/bottom transoms in place to keep plates square prior to drilling intermediate transom positions Sheet
9 Fabrication - Screw port fixing Transom Mullion (Box) KAS721 Mullion (Plate) Transom Mullion Transom KAS723 Screw port fixing Sheet
10 Fabrication - Cill drainage preparation Mullion KAS Cill end plate Mullion Drain slot position for jamb mullions 55 Slot minimum 5mmØ 30 Cill end plate (fully sealed to KAS725) Mullion Drain slot position for all intermediate mullions Slot minimum 5mmØ Sheet
11 Fabrication - Fixing holes Always put deep glazing pocket inside Fixing length datum Clearance hole Fixing hole Clearance hole (to clear screw head) Fixing hole (8mmØ or 10mmØ typical) Note for fixing of frames Position frame within the opening plumb, level and diagonally square DO NOT TWIST OR BEND THE FRAME as this will damage frame joints. Use KAS729 as continuos filler around perimeter of frame Pack each fixing location with proprietary shims and fix using correct type and size of fixing for structural grounds. Fix from corners approximately 200mm in and then at approximately 500mm centres. Fix threshold to ensure no bowing or sagging. Ensure fixings do not clash with keep locations for flush or panic bolts etc. Check again that the frame is plumb, level and diagonally square Sheet
Side Light Frame Pack Assembly Instructions
Please read this complete set of assembly instructions before starting the installation and only when you understand the construction method start to follow the step by step guide. IDENTIFY THE PACK CONTENTS
More informationSide Light Frame Pack Assembly Instructions
Side Light Frame Pack Assembly Instructions Please read this complete set of assembly instructions before starting the installation and only when you understand the construction method start to follow
More informationVertical Slider Section Detail
Vertical Slider Section Detail PRODUCT GUIDE Main & Bead Profiles 128 42 69 VS01 - Outer frame 150 139 210 189 60 52 52 52 48 30 42 60 18 72 90 18 60 VS02 - Cill VS14 - Cill 18 VS03 - Top Sash VS04 - Standard
More informationStorefront Installation Guide
Storefront General Notes: 1. Check Contract Documents and Shop Drawings. Understand and clarify any Field Verify Notes and approvals of drawings and products to be familiar with the project. Installation
More informationKestrel Aluminium Systems Limited. Product Manual Section 13 60mm Polyamide Window System - Fabrication. Manual Version
Limited Product Manual Section 13 60mm - Fabrication Manual Version 24.0.1 Section 13.01 Fabrication Guidelines for cutting and prepping 13.01.01 sheet 1 General guidelines for cutting and bar preparation
More informationINSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass
INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass Deep pocket allows for direct anchor attachment to substrate without flat filler plate. 1/4 Ø perimeter anchor holes allows for direct anchor attachment
More informationInstallation - Sub Cills
Installation - Sub Cills Fitting of Subcill Drainage paths through the sub-cill can be seen on the illustration alongside so care must be taken to ensure they are not obstructed and that screw fixings
More informationLiniar Window. installation guide
Liniar Window installation guide This installation guide is designed to show you the best way to fit Liniar windows, and covers all styles of window made from Liniar s lead-free 70mm PVCu profile. Not
More informationSIG Awning / Casement / Fixed Lite 100
TYPICAL FRAME ASSEMBLY - AWNING WINDOW 07-01 85720-2 GASKET EXT FL JAMB 100 BS201 (3471) HEAD HINGED 100 86064 TRIM FIN A 83963 SCREW SQ 8G X 1.0 PAN PP SS #2 85737 GASKET EXT FL TRANSOM 85720-1 86065
More informationFlushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide
Flushglaze 4500 For Framed Openings and Horizontal Panels Window System Installation Guide January 2017 BENCHMRK Welcome to Kingspan, global leaders in the design and manufacture of insulated metal panels
More informationRevision Date: April 01, Paramount Enclosure
Paramount Enclosure www.urbanindustries.com 15 Urban Industries, Inc. 2008 Tools The following tools are recommended for the installation of the Paramount Aluminum Enclosure and roof. 1 2 Level 1 4 Level
More information14000 I/O Series Flush Glaze. Fabrication and Installation Instructions
14000 I/O Series Flush Glaze Fabrication and Installation Instructions Last saved on 12/18/2009 Table of Contents GENERAL CONSTRUCTION NOTES...3 EXTRUDED ALUMINUM PARTS...4 ACCESSORIES...5 OVERVIEW...6
More informationASS 70 FD folding / sliding door. Installation Guide
ASS 70 FD folding / sliding door Installation Guide IMPORTANT! These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the installation.
More informationKestrel Aluminium Systems Limited. Product Manual Section 22 TB Commercial Door. Manual Version
Kestrel Aluminium Systems Limited Product Manual Section 22 TB Commercial Door Manual Version 23.0.1 PAS24: 2012 Section 22.01 Product Specification 22.01.01 sheet 1 Product specification 22.01.01 sheet
More informationInstallation and Glazing Guide
Installation and Glazing Guide Effective January 2013 Contents Before you start Door Set installation Fixing positions Fitting sidepanel into an installed frame Fixing decorative hardware 3D adjustable
More informationFolding Sliding door system
Folding Sliding door system Installation guide V1.1 Nov 2014 p2 This document is offered as guidance for WarmCore folding sliding door installations - for full survey and installation guidelines please
More informationHow to operate (folding)
How to operate (folding) LEFT HAND STACKING OUTWARD OPENING How to operate (folding) RIGHT HAND STACKING OUTWARD OPENING LOCK BOTH LEVER HANDLE AND FLAT HANDLE UTILISING THE D-HANDLE LOCATED ABOVE THE
More informationSMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE
SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE Please read guide before beginning any installation. Instructions/Guides Keys & Handle Screw Covers Interlock Covers Anti-Lift & Rubber Stops Anti-Lift for Slim
More information50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated
50948-RHN Putney 06 January 2018 This document includes: Code Section Revision Dated H72 Aluminium strip/ sheet coverings/ flashings 1 Table of Contents Title H72 Aluminium strip/ sheet coverings/ flashings
More informationYES 600 Thermal Clip Storefront System Installation Manual
Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii Frame Types............................................
More informationInstallation Guide. WarmCore. Folding Sliding door system. Glass Packing. Pre-Installation. Removing the Existing Door.
WarmCore Installation Guide Pre-Installation Glass Packing p5 Removing the Existing Door Glazing Sequence p6 Preparing the Opening Glass Packing Locations for Toe & Heel p6 Door Alignment Sill Options
More informationPicture Window and Welded Dead-Lite (Exterior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer) Fig.
Picture Window and Welded Dead-Lite (Exterior) Tools: (Not Provided by Manufacturer) Tape Measure Utility Knife Fig. 0-1 Drill Level Putty Knife Pry bar Square Foam Gun (Optional) Caulk Gun Hammer Safety
More informationVYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4
VYTEX PREMIUM SLIDING GLASS DOOR Table of Contents Precautions and Safety 2 Tools Required...3 Inspect and Prepare Door...4 Hardware and Parts Check List....4 Master Frame Assembly 5 Master Frame Installation..7
More informationASS 70 FD folding/sliding door installation guide
ASS 70 FD folding/sliding door installation guide 2 Preparation IMPORTANT These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the
More informationYES 45 TU Thermal Storefront System Installation Manual
Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii PARTS DESCRIPTION Framing
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation SL-450TB (2" x 4-1/2" with 1" Glazing) & SL-600TB (2" x 6" with 1" Glazing) IMPORTANT: Read all instructions before beginning installation.
More informationThermally Broken Framing and Door Installation
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 9/29/2017 Installation Guideline Disclaimer This document contains general installation
More informationFG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:
BuildingEnvelope R FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE: THE INSTALLATION DETAILS FOUND IN THIS PACKAGE ARE GENERIC AND ARE FOR REPRESENTATION ONLY WITH THE INTENT OF GIVING THE INSTALLATION
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 08/31/2018 Installation Guideline Disclaimer This document contains general installation
More informationINSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS
INSTALLATION INSTRUCTIONS SERIES 87 CENTER GLAZED WITH -/" TRIM OFFICE PARTITIONS Phone: (800) -6 Fax: (800) 58-7 crlaurence.com usalum.com crl-arch.com M056_Rev_D SERIES 87 OFFICE PARTITIONS CENTER GLAZED
More informationMetal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions
PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations
More informationASS 70.HI Lift/Sliding and Sliding Doors Installation Guide
ASS 70.HI Lift/Sliding and Sliding Doors Installation Guide 2 Schueco ASS 70.HI Lift/Sliding and Sliding Doors Installation Guide Installation guide IMPORTANT The ASS 70.HI door should be fitted by competent
More informationInstallation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2
Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details
More informationContents GROUP SECTION DESCRIPTION. Page. Rapier Star SCREW FIXING GUIDE. General. General cont... General cont... Casement Window: Reinforced
Contents GROUP SECTION DESCRIPTION Page 1 GENERAL 1.1 Main Profiles Main Profiles 1 1.2 Accessory Profiles Extensions & Coupling Profiles Cills & Glazing Beads 1 2 2 FABRICATION 2.1 Sections Double Door
More information14000 Series. Fabrication and Installation Instructions
14000 Series Fabrication and Installation Instructions 14000 Series Revision December 01, 2009 Table of Contents GENERAL CONSTRUCTION NOTES... 3 EXTRUDED ALUMINUM PARTS... 4 ACCESSORIES... 7 OVERVIEW...
More informationC-Series & S-Series Classic Frame with Transom (Single or Pair)
1. TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Safety Glasses Screw gun #2 Screwdriver tip #3 Screwdriver tip Philips Head screwdriver (Used to move frame on wall using oval slots on
More informationCasement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer)
Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Tape Measure Utility Knife Fig. 0-1 Drill Level Putty Knife Pry bar Square Caulk Gun Hammer Safety Glasses
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationInstallation Instructions
Installation Instructions 200 Series Curtainwall 3056 WALKER RIDGE DR. NW, SUITE G WALKER, MI 49544 800-866-2227 dependable@tubeliteinc.com Revised April 2014 dependable@tubeliteinc.com Page 1 TABLE OF
More informationYES 40 FS/FI Storefront System Installation Manual
Installation Manual 2014 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes... Page ii PARTS DESCRIPTION YES 40 FS Framing Members... Page 1 YES 40
More informationExtrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.
Extrusions Updated: N/A Scale: N.T.S REV: - Dwg Dwg Revision Rev No Description Description Date GB-3-IN01 Index Page - - - - - GB-3-001 Extrusions - - - - - GB-3-002 Extrusions - - - - - GB-3-003 Extrusions
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationINSTALLATION INSTRUCTIONS
400T SERIES CURTAIN WALL INSTALLATION INSTRUCTIONS 3056 Walker Ridge Dr. NW, Suite G Walker, MI 49544 800-866-2227 October 2017 www.tubeliteinc.com Page 1 BLANK Page 2 www.tubeliteinc.com October 2017
More informationSteel Reinforced Joining Guide (Horizontal / Vertical)
(Horizontal / Vertical) for Andersen Patio Door and/or Elliptical Top Window Combinations Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation
More information4500 Series. Fabrication and Installation Instructions
4500 Series Fabrication and Installation Instructions E4500 Series July, 2017 Table of Contents GENERAL CONSTRUCTION NOTES... 3 EXTRUDED ALUMINUM PARTS... 5 ACCESSORIES... 7 OVERVIEW... 8 FRAME FABRICATION...
More informationProducing platework components and assemblies. Outcome one
006 UNIT 023 Producing platework components and assemblies Learning outcomes 1 2 Know how to produce platework components and assemblies Performance evidence must be the main form of evidence gathered.
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationYES 45 XT High Performance Thermal Storefront System
Dual Thermal Barrier ThermaBond Plus Pour & Debridge Technology Installation Manual 2015 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes... Page
More informationSeries Sloped glazed Curtain wall. Installation Instructions
Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationYCW 750 IG Inside Glazed Curtain Wall System Installation Manual
Installation Manual 2014 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes... Page ii PARTS DESCRIPTION YCW 750 IG Framing Members... Page 1 to 3
More informationSLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE
Set A Set B PFD30 Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST
More informationTHERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)
THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) fig.3 Casement, Awning, Fixed Casement, Direct-Set, Double-Hung, Single-Hung & Horizontal Slider Windows Materials
More informationFrameless Inline Door With Return QCI5263
INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges
More informationINSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE
INSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE Phone: (800) 421-6144 Fax: (800) 582-7501 crlaurence.com usalum.com crl-arch.com 11M0230 HANDLING, STORAGE, AND PROTECTION
More informationINSTALLATION INSTRUCTIONS TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T
INSTALLATION TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T INSTRUCTIONS LITHO IN U.S.A. JANUARY KAWNEER COMPANY, INC., 2004 451-VG-970.01.04a PART NO. 451-VG-970 1 INSTALLATION
More informationProducing platework components and assemblies
Unit 823 Producing platework components and assemblies UAN: R/600/5880 Level: Level 2 Credit value: 14 GLH: 64 Relationship to NOS: Endorsement by a sector or regulatory body: Aim: This unit has been derived
More informationALLORA SWING PANEL INSTALLATION INSTRUCTIONS
ALLORA SWING PANEL INSTALLATION INSTRUCTIONS Before Installation Please check that your Allora Swing Panel is undamaged SEQUENCE OF INSTALLATION These instructions are also available from the Athena website:
More informationINSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.
INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS. Installer: DO NOT DISCARD Please leave the Installation Guide with the owner. Please read
More informationFRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274
FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION
More informationFrameless Inline Door QCI5254
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied
More informationIMPORTANT READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
SAPPHIRE ALCOVE SHOWER INSTALLATION GUIDE IMPORTANT READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION SHOWER WALL TOP RAIL DOOR RETAINER DOOR RETAINER DOOR ASSEMBLY DOOR SILL SHOWER TRAY
More informationHeavy Wall Applied Stop Tube Frame and Door Installation
INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS TOOLS REQUIRED Rechargeable, variable speed drill 3/8 diameter drill bit 3 Robertson bits #0, #1 and #2 Slot screwdriver Non marring hammer with 1 head Level Caulk or sealant
More informationDURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL
DURACRYL WALL FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL INSTALLATION GUIDE INDEX PAGES Introduction 1 Tools and materials 1-2 Construction requirements - timber
More informationConfigurable, Insulated Electrical Housing System for Lighting Installation Guide
Configurable, Insulated Electrical Housing System for Lighting Installation Guide Version 1 Feb 2014 1 PLEASE READ THESE NOTES BEFORE INSTALLATION AND PASS TO THE HOMEOWNER FOR FUTURE REFERENCE Dear Customer,
More informationMethod of Build 1. General
Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed
More informationInstallation Instructions
Installation Instructions Roof edge trim profile Series TAG multi-piece aluminium profile Front face height: 250-1050 mm supplied with patented 4F brackets as standard height-adjustable, horizontally moveable,
More informationInstallation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows
for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationA-935 RODA WALL MOUNT HINGES
INSTALLATION INSTRUCTIONS A-935 RODA WALL MOUNT HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time FRAMELESS DOOR / PANEL CELESTA QCI0274 REV.
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More informationSeries Advanced and alternate. Installation Instructions
Series 5500 Advanced and alternate Installation Instructions Part NO. Y557 February 2013 TABLE OF CONTENTS SECTION S-5500 ADVANCED INSTALLATION INSTUCTIONS PAGE I. General Notes and Guidelines...... 3-4
More informationIMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray. Usage:
More informationELEPHANT DOOR SYSTEMS SERIES E1200
INSTALLATION INSTRUCTIONS ELEPHANT DOOR SYSTEMS SERIES E1200 Phone: (800) 262-5151 Fax: (866) 262-3299 crlaurence.com usalum.com crl-arch.com AVDB3096 03.13 TABLE OF CONTENTS SUBJECT PAGE GENERAL INSTALLATION
More informationYCW 752 Outside Glazed Curtain Wall System Installation Manual
YCW 752 Outside Glazed Curtain Wall System Installation Manual 2007 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................
More informationHow to Build a Recessed Medicine Cabinet
How to Build a Recessed Medicine Cabinet See post for install info http://www.hertoolbelt.com/recessed-medicine-cabinet/ Materials 6 Inset Cabinet Door Hinges 3 Latches 1 sheet Beadboard or 1/4 plywood
More informationInstallation Instructions for Vista Air Vertically Folding Walls
Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.
More informationSERIES 900 TERRACE DOOR WITH TRANSOM AND SIDELITES
INSTALLATION INSTRUCTIONS SERIES 900 TERRACE DOOR WITH TRANSOM AND SIDELITES Phone: (800) 262-5151 Fax: (866) 262-3299 crlaurence.com usalum.com crl-arch.com 11M0172_REV_A HANDLING, STORAGE, AND PROTECTION
More informationYES 45 FS/FI Storefront System Installation Manual
Installation Manual 2014 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes... Page ii PARTS DESCRIPTION YES 45 FS Framing Members... Page 1 YES 45
More informationSPW500 Thermal Framing SPW500. Product Assembly Manual 2012 Thermal Framing
SPW500 Thermal Framing SPW500 Product Assembly Manual 2012 Thermal Framing SPW.500.ii 01.12 SPW500 Thermal Framing Introduction The Company Senior Architectural Systems Ltd are a group of companies based
More informationSLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE
Set A Set B P7001 Standard Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST
More informationSeries 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)
Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Things to Know Before You Start Things to Know Before You Start Removal of Old Fenestration Products Ensure any old fenestration
More informationTraditional Undermount: S Method (Undermount):
TOOLS REQUIRED 15.1 TOOLS REQUIRED The installation of Corian shape product must be a precise and exacting process to ensure that a good fit is always created. Using the correct tools is essential. In
More informationDesign Guide for Hot Dip Galvanizing best practice for venting and draining
Design Guide for Hot Dip Galvanizing best practice for venting and draining Contents Introduction 3 Handrails/ 25 Balustrades Importance 4 of Venting and Draining Purpose Safety Quality Aesthetics General
More informationDHS-500 IMPACT SYSTEM INSTALLATION MANUAL
DHS-500 IMPACT SYSTEM INSTALLATION MANUAL TABLE OF CONTENTS SECTION PAGE GENERAL NOTES 3 EXTRUSION & PARTS IDENTIFICATION 4-5 DETERMINE FRAME SIZE 6 FABRICATE VERTICAL MULLIONS & FILLERS 7-8 FABRICATE
More information9/16" (14mm) 1/2" (12mm)
Deluxe Header Kit Deluxe Header Kit Cat. No. SDH660-66" (1676mm) Length Cat. No. SDH980-98" (2489mm) Length Cat. No. SDH144-144" (3657mm) Length Each Deluxe Header Kit Contains: 66" (1676mm), 98" (2489mm)
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationSEMPEO2-23 (SQA Unit Code - FP2Y 04) Producing platework components and assemblies
Overview This standard covers a broad range of basic heavy platework (above 3 mm) competences that will prepare you for entry into the engineering or manufacturing sectors, creating a progression between
More informationRhinoArt Decor Polystyrene Mouldings
C Art 12/8/08 2:31 PM Page 2 RhinoArt Decor Polystyrene Mouldings CORNICES Made of high density POLYSTYRENE for a perfectly smooth surface. RhinoArt Decor adhesive covers 8-10 linear metres per kg. 62
More informationFITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H
FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H 01603 424434 Please refer to your order or detailed sectional drawing (if requested) to assist you with the configuration of the system supplied
More informationB A T H R O O M G L A S S
mistley B A T H R O O M G L A S S vaug16 Page 2 Thank you for purchasing this Trinity shower screen. Please study these instructions carefully before assembly and installation and check all supplied parts
More informationSECTION B INDEX STOREFRONT FRAMING SYSTEMS
SECTION B INDEX STOREFRONT FRAMING SYSTEMS B PAGE DESCRIPTION 01 STOREFRONT FRAMING SPECIFICATIONS 02 175 SERIES 1 3/4" (44.5) X 4 1/2" (114.3) FLUSH GLAZE FRAMING FOR SINGLE GLAZING. 06 200 SERIES 2"
More informationSKIN SYSTEM ORDER FORM NOTES AND REQUIREMENTS
SKIN SYSTEM ORDER FORM NOTES AND REQUIREMENTS STRUCTURAL SUPPORTS It is recommended that all rafter centers be no greater than 24 and mullions required every 4ft down the slope. Slope Distances - Maximum
More informationwindow installation TECHNICAL GUIDE Everbrite House, Greenway, Harlow Business Park, Harlow, Essex CM19 5QJ
TECHNICAL GUIDE window installation Everbrite House, Greenway, Harlow Business Park, Harlow, Essex CM19 5QJ T: 0845 4567668 F: 01279 629924 E: info@everbritedirect.com PART OF THE EVERBRITE GROUP CMS 1065*
More informationPlease read and understand all instructions before beginning. These instructions cover the non-impact aluminum French Door 101.
The performance and proper operation of a door is only as good as the installation. By following these instructions, the probability of a good installation greatly increases. Please read and understand
More informationmultipanel Installation (panels) CONTENTS
multipanel Installation (panels) The following is an installation guide for fitting multipanel to walls, tiles, plaster, chipboard or concrete. A separate guide is available for fitting multipanel shower
More informationALUMINUM PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy
More informationSeries 526 Thermal impact storefront. Installation Instructions
Series 526 Thermal impact storefront Installation Instructions Part NO. Y021 February 2013 TABLE OF CONTENTS SECTION PAGE I. General Notes and Guidelines. 3 II. Parts Identification Chart.......4-8 III.
More information