VISITOR AND EVENT CENTRE - DESIGN; DOCUMENT AND CONSTRUCT

Size: px
Start display at page:

Download "VISITOR AND EVENT CENTRE - DESIGN; DOCUMENT AND CONSTRUCT"

Transcription

1 DRAWING SHEDULE NTG drawing No. Sheet No. Sheet Name B A0 OVER SHEET B8-068 A0 LEGEND AND GENERAL NOTES B8-068 A0 LOALITY PLAN B8-068 A0 EXISTING ONDITIONS AND DEMOLITION SITE PLAN B8-068 A05 SITE PLAN B A06 GROUND FLOOR PLAN B A07 PLANT ROOM FLOOR PLAN B A08 GROUND FLOOR REFERENE & SET OUT PLAN B A09 GROUND FLOOR & PLANT REFLETED EILING PLAN B ROOF PLAN B ELEVATIONS - SHEET B8-069 ELEVATIONS - SHEET B8-069 SETIONS - SHEET B8-069 SETIONS - SHEET B SETIONS - SHEET B SETIONS - SHEET DRAWING SHEDULE NTG drawing No. Sheet No. Sheet Name B SETIONS - SHEET 5 B ONSUTION S - SHEET B ONSUTION S - SHEET B A0 ONSUTION S - SHEET B A ONSUTION S - SHEET B8-070 A ONSUTION S - SHEET 5 B8-070 A ONSUTION S - SHEET 6 B8-070 A STAIR & BALUSADE S B8-070 A5 RAMP S B A6 DOOR SHEDULE B A7 WINDOW SHEDULE B A8 SERVIES YARD B A9 EXTERNAL ELEMENTS - SHEET B A0 EXTERNAL ELEMENTS - SHEET B8-070 A WET AREA ELEVATIONS B8-07 A INTERNAL ELEVATIONS - SHEET I!V!M!MZ!!!!!M!J!W!F!S!J!T OVER SHEET PWD DATE - A0 OF B

2 GENERAL NOTES VERIFY ALL DIMENSIONS PRIOR TO ORDERING & FABRIATION OF MATERIALS. DO NOT SALE THE DRAWINGS UNLESS OTHERWISE NOTED ALL NEW MATERIALS & ONSUTION METHODS ARE TO BE IN AORDANE WITH THE URRENT N.T. DEEMED TO OMPLY, BUILDING ODE OF AUSALIA, SAA STANDARDS & THE MANUFATURER'S DIRETION/SPEIFIATIONS. NEW FINISHES AND MATERIALS TO OMPLY WITH BA FIRE HAZARD INDIES SPEIFIATION.0 EXIT DOORS & DOORS IN THE PATH OF AVEL TO AN EXIT SHALL BE OPENABLE FROM WITHIN, WITHOUT A KEY WITH A 'D' LEVER HANDLE LOATED AT 000 AFL IN AORDANE WITH BA LAUSE D.. INSTALL FIRE EXTINGUISHERS TO THE REQUIREMENTS OF NT FIRE SERVIES & IN AORDANE WITH BA LAUSE E.8 & AS. STEELWORK EATMENT NOTE: ALL EXTERNAL STEELWORK TO BE HOT DIPPED GALVANISED. ARHITET TO BE ONTATED PRIOR TO EATMENT TO VERIFY VENTILATION HOLES. ALL SITE WELDS TO BE GROUND BAK SMOOTH AND EATED WITH 'JOTUN GALVANITE' PAINT FINISH APPLIED IN SIT AORDANE WITH MANUFATURERS SPEIFIATIONS. GENERAL LEGEND D W00 D00 DP FHR TGI xa : 0B : (E) DRY HEMIAL FIRE EXTINGUISHER WINDOW No. AS SHOWN ON FLOOR PLANS DOOR No. AS SHOWN ON FLOOR PLANS 50 DIA HS GALVANISED DOWNPIPE 50 DIA S.STEEL DOWNPIPE OLUMN, REFER FIRE HOSE REEL TATILE INDIATORS SHALL OMPLY WITH AS/NZS 8.. & 8.. GENERAL RAMP / STAIR NOTES ONSUT RAMP, STAIRS, HANDRAILS AND BALUSADES IN AORDANE WITH AS HANDRAILS, BOLTS, KERB RAIL, STEEL RODS ET. TO BE HOT DIPPED GALVANISED FINISH. INSTALL TATILE INDIATORS IN AORDANE WITH AS GENERAL NOTES FOR AESSIBLE FAILITIES. AESSIBLE UBILE & AMBULANT UBILE TO OMPLY WITH AS 8. ALL DIMENSIONS SHOWN ARE LEAR INTERNAL, BUILDER TO ENSURE ALLOWANES FOR ALL LININGS & FINISHES.. ALL AMBULANT AESSIBLE UBILES TO BE mm WIDE LEAR & 900mm MIN LEAR FROM FRONT FAE OF TOILET PAN.. FLOOR GRADIENTS IN AESSIBLE PERSONS TOILET TO BE BETWEEN in 60 & in 80 FOR SHOWERS AND BETWEEN in 80 & in 00 FOR GENERAL AREAS.. SET-OUT DIMENSIONS OF ALL FIXTURES & FITTINGS TO BE FROM FINISHED FLOOR AND WALL SURFAES AND MUST OMPLY WITH AS 8. ALLOW FOR THESE FINISHES WHEN SETTING OUT FROM BASE ( UNFINISHED ) WALLS & FLOORS. 5. DISABLED TOILETS SHALL BE IDENTIFIED WITH BRAILLE & TATILE SIGNAGE OMPLYING WITH BOA D.6. ENSURE INTERNATIONAL SYMBOLS FOR AESS OMPLYING WITH AS/NZS 8. ARE PROVIDED ON THE LATH SIDE OF DOORS & MOUNTED BETWEEN 50-50mm ALF SWITH & POWER POINTS IN DISABLED TOILETS TO BE MOUNTED 000 AFL AND NOT LESS THAN 500 FROM INTERNAL ORNERS. 7. DOOR TO AESSIBLE FAILITIES TO HAVE AN IN USE INDIATOR. 8. DOOR TO AESSIBLE FAILITIES TO BE REMOVABLE FROM OUTSIDE. 9. PROVIDE AT LEAST 0% MIN LUMINANE ONAST (BETWEEN DOOR LEAF v. DOOR FRAME or DOOR LEAF v. ADJAENT WALL) AT ALL DOORWAYS WHERE DISABLED AESSIBILITY IS REQUIRED IN AORDANE WITH AS TATILE INDIATORS SHALL OMPLY WITH AS/NZS 8.. & 8. NOTE: WET AREA MEMBRANE TO AS 0-00 PROVIDE WET AREA MEMBRANE TO FLOORS AND WALLS (800H) TO ALL SHOWER AREAS PROVIDE WET AREA MEMBRANE TO FLOORS AND 00mm HIGH TO WALLS IN MALE / FEMALE TOILETS, U.A.T ROOMS AND LEANERS ROOMS GENERAL ROOF NOTES ALL TO BE GALVANISED AS SPEIFIED AND SHEDULED. ALL APPINGS, FLASHINGS AND FASIAS TO BE GALVANISED AS SPEIFIED AND SHEDULED. TO BE GENERALLY GALVANISED IMDEK. ALL ROOF FASTENERS TO BE LASS FINISH. TURN UP VALLEYS AT RIDGE & INSTALL PROFILED BITUMEN IMPREGNATED FOAM SEALING SIP UNDER FLASHING. PROPRIETARY EAVES GUTTERS GENERALLY HDG STEEL WITH HDG STEEL BRAKET SUPPORTS AS ED. EAVES GUTTERS TO HAVE A TOWARDS OUTLET OF :500 MIN. ALL STEELWORK TO GUTTER & DOWNPIPE BRAKETS TO BE HDG. FINISH GENERALLY PROVIDE FOIL INSULATION TO ENTIRE ROOF (EXLUDE ROOF OVERHANGS). PROVIDE FIBREGLASS THERMAL INSULATION OVER ALL ENLOSED AREAS. U.N.O. TO SOUTH DARWIN FAILITIES. DOWNPIPES TO DISHARGE INTO UNDERGROUND SYSTEM. REFER TO IVIL DRWGS. FLASHING NOTES FLASHINGS INDIATE ARHITETURAL INTENT ONLY AND DO NOT NEESSARILY IDENTIFY THE FULL EXTENT OR SHAPE OF FLASHINGS REQUIRED. NEATLY SRIBE FLASHING TO SUIT ROOF PROFILES PROVIDE "DEKTITE" ROOF FLASHINGS OF MATHING DIAMETER TO ALL PLUMBING ROOF PENEATIONS SELETED OLOUR TO MATH. INSTALL IN SIT AORDANE WITH THE MANUFATURERS SPEIFIATIONS. FLASHINGS AND APPINGS SHALL BE RATIONALISED WHERE PRATIAL ROOF FLASHINGS GENERALLY TO BE GALVANISED TO MATH THE. UNLESS NOTED ALL FLASHINGS & APPINGS TO BE GALVANISED. FLASHINGS GENERALLY TO BE OMPATIBLE WITH THE ROOF & WALL SHEETING. HEK ON SITE FOR PROFILES & DIMENSIONS OF APPING & FLASHINGS PRIOR TO MANUFATURE ENSURE ALL FLASHINGS/APPINGS OVERLAP DEK BY MIN 00mm WHERE POSSIBLE MINIMUM OVER: RIDGE APPING 50mm BARGE APPING 00mm VAPOUR BARRIER / INSULATION NOTES... MATERIALS AND INSTALLATION SAFETY MESH : 00mm x 50mm GRID OF mm DIAMETER GALVANISED WIRE. INSTALL SAFETY MESH TO U/S OF ROOF INSULATION / VAPOUR BARRIER IN AORDANE WITH AS/NZS89 AND RELEVANT WORK HEALTH & SAFETY REGULATIONS. GLASSWOOL ROOF INSULATION: INSULATION BLANKET WITH BONDED PERFORATED REFLETED FOIL LAMINATE FAING - PROPRIETARY ITEM: BRADFORD ANTION BLANKET WITH BONDED PERFORATED FAING OR EQUAL ALTERNATIVE. FLETHER PERMASTOP WITH BONDED REFLETIVE FOIL. LAY GLASSWOOL INSULATION BLANKET, BONDED FAE DOWN, ONTINUOUSLY OVER THE TOP OF THE PURLINS AND THE SAFETY MESH. NOTE KINGSPAN AIRELL INSULINER INSULATION TO SOUTH DARWIN FAILITY ROOF. VAPOUR BARRIER - PROPRIETARY ITEM: BRADFORD THERMOFOIL 75 HEAVY DUTY & HIGH LASSIFIATION OR EQUAL ALTERNATIVE. LAY VAPOUR BARRIER PARALLEL TO ROOF PURLINS AND FULLY SEAL LAPS WITH APPROVED TAPE AND ELASTOMEI SEALANT, BRING VAPOUR BARRIER TO EXTERNAL WALLS (HOT SIDE) AND FASTEN. IN FRAMED WALL ONSUTION ENSURE THE FOIL OF THE ROOF VAPOUR BARRIER IS LAPPED AND SEALED OVER THE WALL VAPOUR BARRIER / INSULATION, LAP AND SEAL JOINTS IN WALL VAPOUR BARRIER PER ROOF VAPOUR BARRIER SARKING REFLETIVE FOIL LAMINATE (TYPIAL): LAY SARKING OVER EAVES, VERANDAHS AND NON AIR-ONDITIONED INTERNAL SPAES. LAP SARKING WITH VAPOUR BARRIER AND FULLY SEAL, TERMINATE OTHER END TO ROOF OVERHANG. VAPOUR BARRIER PENEATIONS: ALL PENEATIONS THROUGH THE VAPOUR BARRIER TO BE FULLY SEALED AND MEHANIALLY FIXED. VAPOUR BARRIER TERMINATIONS: ALL VAPOUR BARRIER TERMINATIONS TO WALLS TO BE ON THE (HOT SIDE) OF THE SUTURE - BRING THE HOT SIDE OF WALL AND FASTEN (FOR BOTH EXTERNAL OR INTERNAL NON AIR-ONDITIONED SPAES) TERMINATIONS TO BE FULLY SEALED AND MEHANIALLY FIXED EILING LEGEND FPB 700 EILING MATERIAL EILING HEIGHT ABOVE ON. SLAB LEVEL MATERIAL: R OLORBOND INSULATED OOL ROOM PANEL F OMPRESSED FIBRE EMENT SHEET FPB FLUSH PLASTERBOARD, PAINT FINISH PLY AOUSTI PLYWOOD EILING WITH F EILING ABOVE FIXED TO U/SIDE OF ROOF PURLINS U UNDERSIDE OF ONRETE SLAB, LEAR SEAL UR UNDERSIDE OF WPB WATER PROOF FLUSH PLASTERBOARD, PAINT FINISH GENERAL: BH BULKHEAD R RAKING AP AESS PANEL NOTE ELEIAL AND MEHANIAL FIXTURES AND FITTINGS ARE SHOWN FOR OORDINATION PURPOSES ONLY AND ARE NOT SHOWING THE FULL EXTENT. REFER TO ELEIAL AND MEHANIAL DRAWINGS FOR FULL EXTENT OF SOPE OF WORKS. EILING NOTES. DO NOT SALE OFF THE DRAWINGS.. THE ONATOR SHALL ARRY OUT A IAL SET-OUT OF ALL EILING GRIDS.. GENERALLY SET-OUT ROOMS AS INDIATED ON DRAWINGS WHERE NO SET-OUT SHOWN ASSUME ENAL SET-OUT.. "equal" RELATES ONLY TO OPPOSING DIMENSION IN THAT DIMENSION LINE. 5. HEK ALL DIMENSIONS ON SITE WITH-IN ROOMS PRIOR TO INSTALLATION OF FITTINGS. NOTIFY SUPERINTENDENT OF ANY DISREPANIES PRIOR TO PROEEDING. 6. EILING HEIGHTS SHOWN ARE TAKEN FROM THE TOP OF THE INTERNAL ON. FLOOR SLAB. 7. FOR MEHANIAL AND ELEIAL LAYOUTS REFER TO ENGINEERS DRAWINGS 8. SET-OUT OF ALL ELEIAL AND MEHANIAL FIXTURES AND FITTINGS TO BE ONFIRMED ON SITE WITH THE SUPERINTENDENT PRIOR TO FRAMING, UTTING ET. OF THE EILING LINING. FLOOR FINISHES LEGEND PLANT RM.0 ON. SEALED ONRETE ROYAL PALM AVENUE G.0. ON OLOURED ONRETE REFER TO LANDSAPE DRWGS ENTY FOREOURT G.0. ON OLOURED ONRETE REFER TO LANDSAPE DRWGS AMPHITHEAE G.0. ON OLOURED ONRETE REFER TO LANDSAPE DRWGS DEK G.0 HW DARWIN SINGY BARK DEKING INTERP/VISITOR ENE G.05 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE MULTI MEDIA ROOM G.06 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE RETAIL G.07 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE EVENT SPAE G.08 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE FOOD PREP G.09 SV SHEET VINYL WITH OVED SKIRTING R G.0 P INSULATED FLOOR PREFINISHED STORE G. SV SHEET VINYL STAIR G. ON. SEALED ONRETE MALE G. M. ON OLOURED MONO ONRETE FEMALE G. M. ON OLOURED MONO ONRETE U.A.T. G.5 M. ON OLOURED MONO ONRETE SERVIES YARD G.6 ONRETE SPONGE FINISH WALL FINISHES LEGEND AP T RP AOUSTI PLYWOOD ERAMI WALL TILES RENDER AND PAINT FINISH STAK BOND BLOKWORK, PAINT FINISH DOOR NOTES. DIMENSIONS ARE NOMINAL ONLY, ALL MEASUREMENTS SHOULD BE TAKEN FROM SITE BEFORE ANY FABRIATIONS.. REFER TO FLOOR PLANS TO DETERMINE DIRETION OF DOOR SWING.. ALL ALUMINIUM FRAMES SELETED ANODISED FINISH.. HW DOOR FRAMES AND DOORS SELETED LEAR FINISH. 5. EXIT DOOR AND DOORS IN THE PATH OF AVEL TO AN EXIT ARE REQUIRED TO BE OPENABLE FROM WITHIN, WITHOUT A KEY, ON A HANDLE LEVER LOATED BETWEEN 900 & 00 ABOVE FLOOR LEVEL. 6. UNLESS NOTED OTHERWISE HW DOOR FRAMES ARE RETO FITTED AS WORK PROEEDS. 7. ALL GLASS WITHIN 000mm OF FFL SHALL BE GRADE 'A' SAFETY GLASS IN AORDANE WITH AS ALL GLASS DOORS, SIDELIGHTS OR ANY GLASS APABLE OF BEING MISTAKEN AS AN UNIMPEDED PATH OF AVEL MUST BE MARKED WITH SOLID AND NON-ANSPARENT VISUAL INDIATOR (MIN 75mm WIDE BOTTOM EDGE AFL) THAT PROVIDES MIN 0% LUMINANE ONAST AGAINST THE FLOOR SURFAE OR SURFAES WITHIN M OF THE GLAZING ON OPPOSITE SIDE IN AORDANE WITH AS8. 9. ALL EXTERNAL DOORS TO HAVE THRESHOLD SEALS AGAINST WEATHER AND VERMIN AND OMPLY WITH AS8 FOR AESSIBILITY. 0. ALL DOORS WHERE DISABLED AESS IS REQUIRED TO HAVE MINIMUM 850mm WIDE LEAR FRAME OPENING AS PER AS8.. LEGEND T - ORETEN PANEL AS NOTED VP - FIXED GLASS VISION PANEL FG - FIXED GLASS PANEL WINDOW NOTES. GLAZING SYSTEM GLAZING ONATOR SHALL BE RESPONSIBLE FOR PROVIDING A SETION 0 DESIGN ERTIFIATE ( ISSUED BY A NT REGISTERED SUTURAL ENGINEER ) AND DESIGN DRAWINGS AND UPON OMPLETION OF WORKS ISSUE AN INSTALLATION ERTIFIATE.. DESIGN WIND PRESSURES REFER TO SUTURAL DRAWINGS THE PROJET SUTURAL ENGINEERS DOUMENTATION INDIATE THE DESIGN RITERIA FOR THE WINDOW DESIGN. THE BUILDER IS TO ONFIRM ALL PRESSURES WITH THE PROJET ENGINEER PRIOR TO ORDERING AND FABRIATION.. DIMENSIONS SHOWN ARE NOMINAL SUTURAL OPENING S ONLY. ALL MEASUREMENTS SHOULD BE TAKEN FROM SITE BEFORE ANY FABRIATION.. ALL WINDOW & SLIDING DOOR FRAMES, GLAZING, FIXING & INSTALLATION TO BE ERTIFIED BY THE MANUFATURER AS OMPLYING WITH; AS88 - GLASS IN BUILDINGS - SELETION AND INSTALLATION AS70 PART - WIND LOADS AS07 - WINDO IN BUILDINGS - SELETION & INSTALLATION 5. ALL ALUMINIUM FRAMES TO BE SELETED ANODISED FINISH. 6. ALL DOORS WHERE DISABLED AESS IS REQUIRED TO HAVE MINIMUM 800mm WIDE LEAR FRAME OPENING AS PER AS8. 7. ALL EXTERNAL WINDO ARE VIEWED FROM OUTSIDE AND ALL INTERNAL WINDO ARE VIEWED FROM OUTSIDE OF ROOM. 8. ALL GLASS WITHIN 000mm OF FFL SHALL BE GRADE 'A' SAFETY GLASS IN AORDANE WITH AS GLASS APABLE OF BEING MISTAKEN AS AN UNIMPEDED PATH OF AVEL MUST BE MARKED WITH SOLID AND NON-ANSPARENT VISUAL INDIATOR (MIN 75mm WIDE AND BOTTOM EDGE AFL) THAT PROVIDES MIN 0% LUMINANE ONAST AGAINST THE FLOOR SURFAE OR SURFAES WITHIN M OF THE GLAZING ON OPPOSITE SIDE IN AORDANE WITH AS8. SAFE ROOF AESS SAFETY HARNESS SYSTEM INSTALL A OMPLETE SAFE ROOF AESS AND SAFETY HARNESS SYSTEM TO ASSIST IN THE SAFE AESS AND MAINTENANE OF THE WHOLE OF THE ROOF AREAS OF THE BUILDING AT THE ROOF LEVEL INLUDING ALL BOX AND EAVES GUTTERS. THE SYSTEM IS TO OMPLY TO AS/NZS 89. AND. QUALITY ASSURANE a) ALL PRODUTS PROPOSED WILL BE PROPRIETARY ITEMS MANUFATURED AND SUPPLIED BY A SPEIALIST MANUFATURER AND INSTALLED BY ERTIFIED ONATORS. b) PROVIDE ERTIFIATES BY RELEVANT AUTHORITIES STATING OMPLIANE WITH ALL OUPATIONAL HEALTH AND SAFETY REQUIREMENTS LAIMED BY THE MANUFATURER (NT WORKSAFE). c) PROVIDE WRITTEN PROPOSAL OMPLETE WITH ALL REQUIRED SHOP ING, PERFORMANE HARATERISTIS AND WORK HEALTH AUTHORITY ONURRENE FOR USE ON THIS BUILDING INLUDING AINING PROGRAM AND AREDITATION PROESS (WHERE REQUIRED). d) LIAISE WITH THE BUILDING SUTURAL ENGINEER INORPORATION OF ALL BUILDING SUTURAL OMPONENTS AS SUBSATES FOR THE ONNETION OF ANY ARREST AND AVEL RESAINTS SYSTEMS. ERTIFIATION OF THE APPROVED SYSTEM IS TO ENOMPASS THE ADEQUAY OF THE SUBSATE TO WHIH THE SYSTEM IS ATTAHED. PROVIDE OMPLIANE ERTIFIATION OF THE INSTALLED SYSTEM UPON OMPLETION OF THE WORKS, ERTIFIATION IS TO INLUDE ONFIRMATION THAT THE APPROPRIATE AINING PROGRAM HAS BEEN PROVIDED TO THE NOMINATED PERSONS AND OMPLETED AND AREDITATION VALIDATED. LEGEND AND GENERAL NOTES PWD DATE - A0 OF B

3 P P P P M W PP PP PP PP P PP P PP PP PP PP P P P P P P PP PP PP PP PP PP PP P DARWIN HIGH SHOOL MINDIL BEAH PROPOSED VISITOR & EVENT ENE UP D GARDENS OVAL NO. ARPARK 7 NO. ARS + DIS. EVAS AFE D D X PROPOSED LOATION OF FOUNTAIN PUMP BUILDING - STAGE B D X BUS PARKING ARPARK 8 NO. ARS + DIS. ENY ARPARK NO. ARS + DIS. AMPHITHEAE GARDENS OVAL NO. SKYITY LOALITY PLAN : NORTH DATE - DATE LOALITY PLAN NTG PROJET No. NTG ASSET No. SHEET No. NTG DRAWING No. AMENDMENT SHEET PWD0 OF 0089 SEPT 08 A0 B

4 ONATOR TO PROVIDE TEMPORARY ONSUTION FENE BARRIERS AND PROTET ALL EXISTING EES TO BE RETAINED - () INLUDING THE ROOT SYSTEM, FOR THE DURATION OF THE WORKS FOR A MIN. OF M DIA AROUND THE EE BASE OR AS DIRETED ON SITE TF TF TF PORTION OF EXISTING GARDEN BED TO BE DEMOLISHED BY GBDBG EXISTING UBAN WINE PALM SEWERAGE EASEMENT TF EXISTING BOAB SITE AESS VIA SALONIKA ST EXISTING ROAD PAVEMENT TO BE REPAVED WITH EVEN AROSS ROAD FROM TOP OF KERB TO TOP OF KERB EXISTING ONDITIONS AND SITE DEMOLITION : TF EE PROTETION GENERAL WARNING SIGN: DISPLAY A SIGN IN A PROMINENT POSITION AT EAH ENANE TO THE SITE, WARNING THAT EES AND PLANTINGS ARE TO BE PROTETED DURING THE ONAT. REMOVE ON OMPLETION. PROTETION MEASURES PROGRAM: BEFORE OMMENEMENT OF DEMOLITION AND EARTHWORKS. EE PROTETION AS ED AND IN AORDANE WITH: EE PROTETION ZONE: AS SHOWN ON DRAWINGS WORK NEAR EES HARMFUL MATERIALS: KEEP THE AREA WITHIN THE DRIPLINE FREE OF SHEDS AND PATHS, ONSUTION MATERIAL AND DEBRIS. DO NOT PLAE BULK MATERIALS AND HARMFUL MATERIALS UNDER OR NEAR EES. DO NOT PLAE SPOIL FROM EXAVATIONS AGAINST EE UNKS. PREVENT WIND-BLOWN MATERIALS SUH AS EMENT FROM HARMING EES AND PLANTS. DAMAGE: PREVENT DAMAGE TO EE BARK. DO NOT ATTAH STAYS, GUYS AND THE LIKE TO EES. WORK UNDER EES: DO NOT REMOVE TOPSOIL FROM, OR ADD TOPSOIL TO, THE AREA WITHIN THE DRIPLINE OF THE EES. EXAVATION: IF EXAVATION IS REQUIRED NEAR EES TO BE RETAINED, GIVE NOTIE AND OBTAIN INSUTIONS. OPEN UP EXAVATIONS UNDER EE ANOPIES FOR AS SHORT A PERIOD AS POSSIBLE. HAND METHODS: USE HAND METHODS TO LOATE, EXPOSE AND LEANLY REMOVE THE ROOTS ON THE LINE OF EXAVATION. IF IT IS NEESSARY TO EXAVATE WITHIN THE DRIP LINE, USE HAND METHODS SUH THAT ROOT SYSTEMS ARE PRESERVED INTAT AND UNDAMAGED. ROOTS: DO NOT UT EE ROOTS EXEEDING 50 MM DIAMETER. WHERE IT IS NEESSARY TO UT EE ROOTS, USE MEANS SUH THAT THE UTTING DOES NOT UNDULY DISTURB THE REMAINING ROOT SYSTEM. IMMEDIATELY AFTER UTTING, WATER THE EE AND APPLY A LIQUID ROOTING HORMONE TO STIMULATE THE GROWTH OF NEW ROOTS. BAKFILLING: BAKFILL TO EXAVATIONS AROUND EE ROOTS. PLAE THE BAKFILL IN LAYERS OF 00 MM MAXIMUM DEPTH AND OMPATED TO A DRY DENSITY SIMILAR TO THAT OF THE ORIGINAL OR SURROUNDING SOIL. BAKFILL MATERIAL: - MIX PROPORTIONS (TOPSOIL: WELL ROTTED OMPOSTS) BY VOLUME: :. - NEUAL PH VALUE. - FREE FROM WEED GROWTH AND HARMFUL MATERIALS. OMPATION PROTETION: PROTET AREAS ADJAENT THE EE DRIPLINE. SUBMIT PROPOSALS FOR AN ELEVATED PLATFORM TO SUIT THE PROPOSED EARTHWORKS MAHINERY. WATERING: WATER EES AS NEESSARY, INLUDING WHERE ROOTS ARE EXPOSED AT AMBIENT TEMPERATURE MORE THAN 5. TD TD SITE AESS GATES TD TD SAWUT EXISTING BITUMEN & ONRETE KERB. EXAVATE TO FULL DEPTH OF ROAD PAVEMENT, MINIMUM 900mm READY FOR LANDSAPE - STAGE B TD SEWERAGE EASEMENT EES TO BE REMOVED DESIGNATION EXTENT: AS SHOWN ON DEMOLITION PLAN MARKING: LEARLY MARK EES AND SHRUBS TO BE REMOVED WITH PERMANENT PAINT, 000 MM ABOVE GROUND LEVEL. EES TO BE ANSPLANTED ALL PLANTS ARE TO BE PREPARED FOR ANSPLANTING BY A QUALIFIED ARBORIST. WORKS TO INLUDE HAND UTTING A ENH 00MM DEEP MINIMUM AROUND THE FULL PERIMETER OF THE PLANT. ALL ENOUNTERED ROOTS TO BE UT NEATLY WITH SHARP HAND TOOLS. AT THE SAME TIME UT BAK THE EE ANOPY AS IDENTIFIED. ANSPLANT EE WEEKS AFTER THE ABOVE OPERATION AND RELOATE INTO FINAL LOATION AS SHOWN ON PLANS, OR POT UP AS SHEDULED FOR FUTURE USE. REMOVAL OF FINAL ROOT BALL TO BE UNDERTAKEN BY UTTING UNDER THE ROOTBALL WITH A STEEL ABLE OR PLATE, ENSURING ROOTBALL REMAINS INTAT. SITE AESS GATES TF TD TD EXISTING GARDEN BED TO BE DEMOLISHED BY GBDBG TD TD TD TD TD ANSPLANT x LIVISTONA NOTE: LIMITED WEIGHT ARRYING APAITY ON THE BRIDGE LESS THAN 8 TONNE. TO BE DETERMINED ON SITE PORTION OF EXISTING PATH TO BE DEMOLISHED - STAGE B TD EXISTING GARDEN BED EXISTING GARDEN BED TO BE DEMOLISHED BY ONATOR TD TD POND EXISTING PAVING TO BE DEMOLISHED IN STAGE B REMOVE EXISTING PUMP BUILDING AND ALLOW FOR RELOATION TO NEW LOATION AS IDENTIFIED ON THE LOALITY PLAN - STAGE B EXISTING ARPARK POND SITE AESS VIA GARDENS ROAD SITE LEGEND TF // // // TEMPORARY ONSUTION FENE ONATORS AESS ROUTE TO SITE - EES TO BE RETAINED & PROTETED DURING ONSUTION TD - EES TO BE DEMOLISHED & REMOVED BY GBDBG GENERAL SITE NOTES AESS TO SITE VIA GARDENS ROAD MAY BE LIMITED WEIGHT ARRYING APAITY ON THE BRIDGE LESS THAN 8 TONNE. TO BE DETERMINED ON SITE AESS TO SITE VIA SALONIKA SEET BE LIMITED TO LESS THAN 0 TONNES ONROAD SHOULDER. 0kph SPEED LIMIT TO BE ADHERED TO ON ALL INTERNAL ROADS. THE ONATOR SHALL PREPARE A PHOTOGRAPHI OR VIDEO AND WRITTEN DILAPIDATION REORD BEFORE OMMENEMENT OF DEMOLITION WORKS OF THE ONDITION OF THE PORTION OF THE EXISTING BUILDING TO BE RETAINED, ADJAENT BUILDINGS AND ALL OTHER RELEVANT SUTURES AND FAILITIES. THE ONATOR SHALL PREPARE A PHOTOGRAPHI OR VIDEO AND WRITTEN DILAPIDATION REORD BEFORE OMMENEMENT OF DEMOLITION WORKS OF ALL AESS ROUTES, ROADS, ARPARKS AND LAYDOWN AREAS USED BY THE ONATOR DURING THE ONAT. DATE - DATE EXISTING ONDITIONS AND DEMOLITION SITE PLAN NTG PROJET No. NTG ASSET No. SHEET No. NTG DRAWING No. AMENDMENT SHEET PWD0 OF 0089 SEPT 08 A0 B

5 FUTURE ADMINISATION BUILDING W M FRANGIPANI HILL Landing AMPHITHEAE SEATING IN STAGE B WORKS REFER TO LANDSAPE DRWGS SEWERAGE EASEMENT LOTUS/LILY POND REFER TO LANDSAPE DRWGS - STAGE B EX. AESSIBLE ELEVATED WALKWAY REFER TO LANDSAPE DRAWINGS AND DRWG A0 TO DETERMINE LOATION AND EXTENT OF EXISTING EES TO BE REMOVED, THOSE TO REMAIN AND NEW EES PAVING - STAGE B STORE AMPHITHEAE EVENT SPAE STAIR RETAIL INTERP/VISITOR ENE MULTI MEDIA ROOM EXISTING UBAN WINE PALM EX. BOAB EE EXISTING GARDEN BED NEW SERVIES YARD IN STAGE B WORKS SERVIES YARD G.6 RAMP UP FEMALE MALE RL 6.50 PIT FOOD PREP. DEK G.0 RL 6.50 SEWERAGE EASEMENT PAVING - STAGE B RAMP UP ENY FOREOURT G.0 Seat Seat PAVING - STAGE B LINE OF PORTION OF EXISTING PATH TO BE DEMOLISHED - STAGE B EX BILLABONG EXISTING PAVING TO BE DEMOLISHED - STAGE B FOUNTAIN OURT 7.5 X.5M LOADING ZONE PIT ROYAL PALM AVENUE G.0 EX. EE DENOTES SEATS REMOVED DEK - STAGE B DENOTES EES REMOVED DEMOLISH EXISTING PIT, RELOATE & RE DIVERT SERVIES TO NEW PIT LOATIONS EXISTING ONRETE KERB LINE SHOWN DASHED FOR INFORMATION FB EX FOUNTAIN NEW PAVING OVER EXISTING ROYAL PALM AVENUE IN STAGE B WORKS ROYAL PALM AVENUE G.0 NORTH SITE PLAN : ARPARK SITE PLAN PWD DATE - A05 OF B

6 FLOOR FINISHES LEGEND PLANT RM.0 ON. SEALED ONRETE ROYAL PALM AVENUE G.0. ON OLOURED ONRETE REFER TO LANDSAPE DRWGS ENTY FOREOURT G.0. ON OLOURED ONRETE REFER TO LANDSAPE DRWGS AMPHITHEAE G.0. ON OLOURED ONRETE REFER TO LANDSAPE DRWGS DEK G.0 HW DARWIN SINGY BARK DEKING INTERP/VISITOR ENE G.05 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE MULTI MEDIA ROOM G.06 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE RETAIL G.07 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE EVENT SPAE G.08 T&G DARWIN SINGY BARK T& G FLOORING OVER F BASE FOOD PREP G.09 SV SHEET VINYL WITH OVED SKIRTING R G.0 P INSULATED FLOOR PREFINISHED STORE G. SV SHEET VINYL STAIR G. ON. SEALED ONRETE MALE G. M. ON OLOURED MONO ONRETE FEMALE G. M. ON OLOURED MONO ONRETE U.A.T. G.5 M. ON OLOURED MONO ONRETE SERVIES YARD G.6 ONRETE SPONGE FINISH NEW EE NEW EE H 6 EX. EE LEGEND & SW SS DOWNPIPE AS NOTED STORMWATER FLOW PATH (INDIATIVE) SUBSOIL DRAIN UT-OFF DRAIN SWALE GRATED ENH DRAIN GIP NOTE: IVIL WORKS SHOWN ARE INDIATIVE ONLY DAYLIGHT TO SHEETFLOW EX. EE SERVIE YARD G X.5M LOADING ZONE EX. EE EX. EE PAVING G 6 SS EX. EE F 5 SS PLANTING SW RAMP UP : EX. EE MALE G. M. ON PLANTING PAVING U.A.T. G.5 M. ON SW FEMALE G. M. ON F 5 NEW EE SW E 5 SS PLANTING RL 6.50 SW STORE G. SV NEW ONRETE PIT R G.0 P GIP DP DB AV DATA clnr FOOD PREP G.09 SV NEW EE E 5 PAVING FHR GTD D AMPHITHEAE G.0. ON EVENT SPAE G.08 T&G RL 6.50 SW EX. PALMS SS EXISTING ONRETE KERB LINE SHOWN DASHED FOR INFORMATION VENDING MAHINES + ROLLER SHUTTER STAIR TO PLANT OVER G 6 D PLANTINGDP FHR PLANTING SW DB SS H 6 RETAIL G.07 T&G PLANTING DRINKING FOUNTAIN SW DEK G.0 HW SW RL 6.50 STORMWATER (APPROX). IL~7.5m~ PLINTH SEWERAGE EASEMENT LOTUS/LILY POND REFER TO LANDSAPE DRWGS - STAGE B PLANTING B INTERP/VISITOR ENE G.05 T&G RL 6.50 B PAVING SS EX. PALM MULTI MEDIA ROOM G.06 T&G PLANTING A RAMP UP :0 A SW INSTALL STEEL EE GRATES TO ALL EXISTING ESS IN NEW PAVEMENT AREA IN STAGE B WORKS SEWERAGE EASEMENT DP 8.8 ENY FOREOURT G.0. ON PAVING Unable to open PERFORATED METAL SREEN EX. EE J 7 SHALLOW 00 WIDE ON. BOX ULVERT PLANTING DAYLIGHT TO SHEETFLOW EXISTING BOAB NEW EE 6.78 NEW UNDERGROUND ONRETE PIT ROYAL PALM AVENUE G.0. ON DISHARGE TO ONRETE SWALE (APPROX). IL~6.8m ~ GROUND FLOOR PLAN PWD DATE - A06 OF B

7 PITH 600x5 S.STEEL BOX GUTTER SHOWN HATHED TO AMPHITHEAE ROOF BELOW 5 6 D H DASHED LINE INDIATES PLANT ROOM ROOF LINE OVER 600x5 S.STEEL BOX GUTTER SHOWN HATHED TO MEDIA ROOF BELOW B A E 5 GALVANISED IMDEK ROOF SHEETING - TYPIAL F 5 GALVANISED IMDEK ROOF SHEETING - TYPIAL PITH DP AESS GATES PITH SEWERAGE EASEMENT LINE BELOW DP G F E DASHED LINE INDIATES WALL LINE UNDER DP PLANT RM.0 ON. PITH J 7 PITH M PV D PITH B A G 6 GUTTER HIGH POINT 600Ø HALFROUND ZINALUME GUTTER PITH SEWERAGE EASEMENT LINE BELOW GUTTER HIGH POINT GALVANISED IMDEK ROOF SHEETING - TYPIAL GUTTER HIGH POINT PLANT ROOM PLAN : PLANT ROOM FLOOR PLAN PWD DATE - A07 OF B

8 B A L L A MALE G. M. ON D0 90 L U.A.T. G.5 M. ON D0 A FEMALE G. M. ON 80 D R G.0 P STORE G. SV L L DP FOOD PREP G.09 SV 90 L D0 000 D0 50 D0 000 SD AMPHITHEAE G.0. ON SD P P 000 SD EVENT SPAE G.08 T&G OVER HI-LEVEL WINDOW D0 FHR 7 7 OVER HI-LEVEL WINDOW SD G 695 F 67 OVER HI-LEVEL WINDOW D STAIR G. SD L 0 L D05 FHR SD RETAIL G.07 T&G W7 65 P E L 0 W DEK G.0 HW W6 W A0 W W 50 SD M M 50 INTERP/VISITOR ENE G.05 T&G MULTI MEDIA ROOM G.06 T&G M OVER 050 OVER HI-LEVEL WINDOW HI-LEVEL WINDOW M W W W 6 W M W M W 00 DP GROUND FLOOR REFERENE & SET OUT PLAN PWD DATE - A08 OF B

9 B A ML DL REFER BELOW FOR RP ONTINUATION ML ML M ML DL ML RP LED 5 U 600 LED 5 UR R DL DL LED 5 RP DL M LED 5 DL GROUND FLOOR REFLETED EILING PLAN : B A ML RP LED 5 DL DL ML DL GROUND FLOOR RP - ONTINUATION : ML ML ML PLY R DL FPB 700 DL NY ML ML DL DL ML DL RP LED 5 ML NY DL DL FPB 700 RP DL DL NY DL LED 5 DL LED DL 5 DL LED LED DL DL EILING LEGEND FPB 700 F 6 DL LED LED F LED DL PLY R DL PLY DL 7 LED DL LED F F LED MATERIAL: R OLORBOND INSULATED OOL ROOM PANEL F OMPRESSED FIBRE EMENT SHEET FPB FLUSH PLASTERBOARD, PAINT FINISH PLY AOUSTI PLYWOOD EILING WITH F EILING ABOVE FIXED TO U/SIDE OF ROOF PURLINS U UNDERSIDE OF ONRETE SLAB, LEAR SEAL UR UNDERSIDE OF WPB WATER PROOF FLUSH PLASTERBOARD, PAINT FINISH GENERAL: BH BULKHEAD R RAKING AP AESS PANEL EILING MATERIAL EILING HEIGHT ABOVE ON. SLAB LEVEL LED NOTE ELEIAL AND MEHANIAL FIXTURES AND FITTINGS ARE SHOWN FOR OORDINATION PURPOSES ONLY AND ARE NOT SHOWING THE FULL EXTENT. REFER TO ELEIAL AND MEHANIAL DRAWINGS FOR FULL EXTENT OF SOPE OF WORKS. DL DL DL DL 8 LED DL DL DL F DL F PL LED G F LED PLY R DL PL DL DL PL LED DL DL DL PL F 9 DL RI NY LED DL PLY LED RP M RI LED LED NY M 0 PLY 500 F F M M M M F R PLANT ROOM REFLETED EILING PLAN : DL F DL 0 M LED DL F DL F F DL DL DL M DL PLY R DL LED LED PLY LED DL PLY R PLY R PLY R ML ML LED ML ML ML LED DL DL ML LIGHTING LEGEND LED LED LED LED 5 F F DL DL M NY PL DL ML DL DL LED DL ML LED DL 'BILTON' DIMMABLE REESSED LED LIGHTING AK IP RATED INLINE REESSED LED AK AND SPOTS REFER TO ELEIAL DRW GS REESSED LED LIGHTING IN JOINERY AT EAH SHELF 'MASON' LED AK AND SPOTS 'BILTON' PROFILE RT0 FIXED TO U/SIDE OF PURLINS 'HUNZA' REESSED OPPER DOWNLIGHT GIMBEL IP RATED 'BILTON' ORNER PROFILE YT0 DOW NLIGHT 'HUNZA' EILING MOUNTED DOWNLIGHT SOLID OPPER 'HUNZA' WALL SPOT LED SOLID OPPER 'LOUIS POULSEN' NY HAVEN LED OPPER 'HUNZA; PILLAR LIGHT LED SOLID OPPER RP 'RIPPLE IRON.OM' PLEATED SHADE 50 DIA RIL RI ML S.STEEL HANGING POINTS REFER TO ROOM DATA SHEETS AND SHEDULES 'RIPPLE IRON' SHELL WALL SONE RIL5 'HUNZA MOUSE' LIGHT SQUARE BRONZE MOUNTED TO RAMP RAIL 'HAIKU' 500 DIA BRONZE FINISH 'BIGASS FAN' ESSENE.m DIA SILVER G F E D GROUND FLOOR & PLANT REFLETED EILING PLAN PWD DATE - A09 OF B

10 PITH DASHED LINE INDIATES PLANT ROOM ROOF LINE OVER 600x5 S.STEEL BOX GUTTER SHOWN HATHED TO MEDIA ROOF BELOW 600x5 S.STEEL BOX GUTTER SHOWN HATHED TO AMPHITHEAE ROOF BELOW GALVANISED IMDEK ROOF SHEETING - TYPIAL G DASHED LINE INDIATES WALL LINE UNDER GALVANISED IMDEK ROOF SHEETING - TYPIAL DP PITH STEP LADDER AESS TO PLANT RM ROOF SOAKER VALLEY GUTTER DP 800W x 000H (000 SILL) SLATTED TIMBER GATES ON HDG SHS FULLY WELDED STEEL FRAME. EQUIPMENT AESS TO PLANT ROOM PLANT RM.0 PITH PITH SEWERAGE EASEMENT LINE BELOW DP F E PITH D PITH B A REFER BELOW FOR ROOF PLAN ONTINUATION GUTTER HIGH POINT 600Ø HALFROUND ZINALUME GUTTER PITH SEWERAGE EASEMENT LINE BELOW G GUTTER HIGH POINT GALVANISED IMDEK ROOF SHEETING - TYPIAL GUTTER HIGH POINT ROOF PLAN : REFER BELOW FOR ROOF PLAN ONTINUATION F AESS ROOF POINT VIA EWP ONLY. REFER TO SAFE ROOF AESS NOTES AND THE SPEIFIATION. PROVIDE SUITABLE PROPRIETARY ALUMINIUM ATWALK SYSTEM 'JURALO' OR EQUAL AT THE EWP AESS POINT IN FULL OMPLIANE TO AS657 ANS AS/NZS 89.. ENSURE EPDM SPAERS AND SEAL WASHERS ARE PROVIDED BETWEEN WALKWAY FRAMES AND /FLASHINGS AT ALL LOATIONS. B A ROOF PLAN - ONTINUATION : 9 PLANT ROOM ROOF PLAN : PITH 0 LEGEND EXTENT OF VAPOUR BARRIER, PROVIDE TO FULL EXTENT OF ROOF AND TURN DOWN AND EXTEND DOWN AND SEAL TO WALLS BELOW. INLUDING SEALING AROUND ALL PURLINS AND PENEATIONS. E LOSED END FULL HEIGHT UPSTAND 50Ø GALVANISED DOWNPIPE DP 50Ø S.STEEL DOWNPIPE EJ EXPANSION JOINT OE OPEN END 50mm UPSTAND ROOF PLAN PWD DATE - 0 OF B

11 RONSTAN WIRE FERRULE SYSTEM ON H.D.G BATTENS EF EF EF(H) EF EF EF EF EF6 EF EF EF EF(H) EF(H) EF EF EF EF5 EF7 EF5 EF7 EF5 EF6 EF6 EAST ELEVATION INTERP/VISITOR ENE : RONSTAN WIRE FERRULE SYSTEM ON H.D.G BATTENS EF EF EF(H) EF(H) EF6 EF EF(H) EF7 EF EF EF EF EF EF EF EF EF EF5 EF5 EAST ELEVATION : EF6 EF6 EXTERNAL FINISHES ODE FINISH EF VERTIAL OPPER MINI ORB EF ORTEN STEEL EF VERTIAL GALVANISED USTOM ORB EF(H) HORIZONTAL GALVANISED USTOM ORB EF HARDWOOD TIMBER SLATS EF5 STAKBONDED BLOKWORK LEAR SEAL FINISH EF6 OPPER PERFORATED MINI ORB EF7 STAINLESS STEEL PERFORATED MINI ORB EF EF EF EF6 EF EF EF EF(H) EF EF EF EF EF SOUTH ELEVATION : ELEVATIONS - SHEET PWD DATE - OF B

12 EF(H) EF EF EF5 EF EF EF6 EF6 EF WEST ELEVATION INTERP/VISITOR ENE : 75X75 SINGY BARK TIMBER POSTS. 5x5 HW. TIMBER SLATS ON H.D.G SHS GIRTS. EF(H) EF EF EF EF EF EF6 EF6 EF EF WEST ELEVATION : EXTERNAL FINISHES ODE FINISH EF VERTIAL OPPER MINI ORB EF ORTEN STEEL EF VERTIAL GALVANISED USTOM ORB EF(H) HORIZONTAL GALVANISED USTOM ORB EF HARDWOOD TIMBER SLATS EF5 STAKBONDED BLOKWORK LEAR SEAL FINISH EF6 OPPER PERFORATED MINI ORB EF7 STAINLESS STEEL PERFORATED MINI ORB EF7 EF EF EF EF5 EF NORTH ELEVATION : NATURAL ANODISED HI-LIGHT LOUVRES ELEVATIONS - SHEET PWD DATE - OF B

13 G F E D MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS ORETEN STEEL ABOVE WINDOW HEAD LINE R.L.. VERTIAL OPPER PERFORATED MINI ORB SREEN URVED PLYWOOD EILING HI-LEVEL FIXED GLASS WINDOW GALVANISED IMDEK VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED IMDEK 600 dia HDG GUTTER Top of Wall R.L VERTIAL GALVANISED USTOM ORB LADDING BELOW WINDOW HEAD LINE 00 PLYWOOD EILING MULTI MEDIA ROOM G S.STEEL BOX GUTTER INTERP/VISITOR ENE G.05 SINGY BARK TIMBER ON F FLOORING RAKING PLYWOOD SOFFIT LINING FIXED GLASS WINDO SINGY BARK TIMBER FLOORING HDG UB VERANDAH OLUMN HDG DOWNPIPE + ONE HEAD 600 R.L EASEMENT G F E D VERTIAL OPPER PERFORATED MINI ORB SREEN URVED PLYWOOD EILING GALVANISED IMDEK 8 VERTIAL GALVANISED USTOM ORB WALL LADDING Top of Wall R.L ORETEN STEEL VERTIAL OPPER MINI ORB WALL LADDING A S.STEEL BOX GUTTER HI-LEVEL FIXED GLASS WINDOW INTERP/VISITOR ENE G.05 SINGY BARK TIMBER ON F FLOORING A RAKING PLYWOOD VERTIAL GALVANISED SOFFIT LINING PERFORATED MINI ORB SREEN VERANDAH FIXED GLASS WINDO SINGY BARK TIMBER FLOORING 600 dia HDG GUTTER 8 HDG UB VERANDAH OLUMN HDG DOWNPIPE + ONE HEAD 600 R.L EASEMENT A A06 SETION : 50 GAP FOR INSPETION OPENING FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM GRAVEL BED LOSE OFF UNDERSIDE WITH ORETEN HI-LIGHT SREENS B A06 SETION : 50 LEAR FOR INSPETION OPENING FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM GRAVEL BED LOSE OFF UNDERSIDE WITH ORETEN HI-LIGHT SREENS SETIONS - SHEET PWD DATE - OF B

14 9 G F E D RAKING PLYWOOD SOFFIT LINING 9 GALVANISED IMDEK 9 RONSTAN WIRE FERRULE SYSTEM ON H.D.G BATTENS RAKING OLUMN HDG FINISH TIMBER SLATTED WALL PLANT RM.0 PLYWOOD SOFFIT R SLAB TO TIMBER SLATTED WALL GALVANISED IMDEK 600 dia HDG GUTTER Plant Rm Wall R.L PLA NT ROOM R.L ORETEN FINS & HOOD ORETEN FINS & HOOD RAKING PLYWOOD SOFFIT LINING HDG UB VERANDAH OLUMN 00 SINGY BARK TIMBER FLOORING SINGY BARK TIMBER FLOORING HDG DOWNPIPE + ONE HEAD R.L EASEMENT 50 LEAR FOR INSPETION OPENING A06 SETION : FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM GRAVEL BED LOSE OFF UNDERSIDE WITH ORETEN HI-LIGHT SREENS B A A GALVANISED IMDEK 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS A0 600X5 S.STEEL BOX GUTTER SLOPING WALL AND GLAZING A0 VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED IMDEK Top of Wall R.L TERRAE SEATING WALL REFER LANDSAPE DRWGS RAKING PLYWOOD SOFFIT LINING SINGY BARK TIMBER ON F FLOORING EVENT SPAE G.08 URVED PLYWOOD TIMBER EILING WITH LED LIGHTING VERTIAL OPPER MINI ORB WALL LADDING SINGY BARK TIMBER FLOORING RAKING PLYWOOD SOFFIT LINING 600 dia HDG GUTTER HDG UB VERANDAH BEAM HDG DOWNPIPE + ONE HEAD 600 R.L EASEMENT 50 D A06 SETION : 50 LEAR FOR INSPETION OPENING FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM GRAVEL BED LOSE OFF UNDERSIDE WITH ORETEN HI-LIGHT SREENS SETIONS - SHEET PWD DATE - OF B

15 B A A0 VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED IMDEK GALVANISED IMDEK VERTIAL OPPER MINI ORB WALL LADDING Top of Wall R.L STAK BONDED R BLOKWORK WALL TO STORE G. 700 PLASTERBOARD EILING, PAINT FINISH FOOD PREP G.09 SINGY BARK TIMBER FLOORING R.L EASEMENT E A06 SETION : FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM WATERPROOF MORTAR BELOW SLAB & OURSES ABOVE, LEAR MORTAR (NOT OLOURED) GRAVEL BED ONRETE PROTETION SIP FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM LOSE OFF UNDERSIDE WITH ORETEN HI-LIGHT SREENS B A VERTIAL S.STEEL PERFORATED MINIORB A GALVANISED IMDEK A SEAL OFF U.A.T WITH VERTIAL S.STEEL PERFORATED MINIORB A R.L dia HDG GUTTER STAK BONDED R BLOKWORK WALL TO MALE G. U.A.T. G.5 SINGY BARK TIMBER FLOORING 5x5 HW. TIMBER SLATS ON H.D.G SHS GIRTS HDG DOWNPIPE + ONE HEAD 50X50 SINGY BARK TIMBER POSTS R.L WATER STOP FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM F A06 SETION : WATERPROOF MORTAR BELOW SLAB & OURSES ABOVE, LEAR MORTAR (NOT OLOURED) ONRETE PROTETION SIP FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM GRAVEL BED LOSE OFF UNDERSIDE WITH ORETEN HI-LIGHT SREENS SETIONS - SHEET PWD DATE - 5 OF B

16 A GALVANISED IMDEK SEAL OFF U.A.T WITH VERTIAL S.STEEL PERFORATED MINIORB 5 A 6 A GALVANISED IMDEK VERTIAL S.STEEL PERFORATED MINIORB STAK BONDED R BLOKWORK WALL TO OPPER VERTIAL PERFORATED MINIORB NATURAL ANODISED HI-LIGHT LOUVRES ON. PROTETION SIP MALE G. FEMALE G. OURT ON. PROTETION SIP PLANTER R G.0 FOOD PREP G.09 EVENT SPAE G.08 SINGY BARK TIMBER ON F FLOORING R.L G A06 SETION : WATERPROOF MORTAR BELOW SLAB & OURSES ABOVE, LEAR MORTAR (NOT OLOURED) WATERPROOF MORTAR BELOW SLAB & OURSES ABOVE, LEAR MORTAR (NOT OLOURED) G 500 F 5 A0 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS GALVANISED IMDEK RAKING PLYWOOD SOFFIT LINING TIMBER SLATTED WALL Plant Rm Wall R.L..050 RAKING OLUMN HDG FINISH ORETEN STEEL LAD NIBS & HOOD TO MANUFATURERS SPEIFIATION 000 PLANT RM.0 R SLAB TO TIMBER SLATTED WALL GALVANISED IMDEK 600 PLA NT ROOM R.L dia HDG GUTTER 6 A0 SINGY BARK TIMBER ON F FLOORING RETAIL G.07 VERTIAL OPPER MINI ORB WALL LADDING 500 BRONZE STEEL LAD BULKHEAD VERANDAH SINGY BARK TIMBER FLOORING RAKING PLYWOOD SOFFIT HDG UB VERANDAH OLUMN 00 R.L H A06 SETION : SETIONS - SHEET PWD DATE - 6 OF B

17 A 9 0 GALVANISED IMDEK GALVANISED IMDEK TIMBER SLATTED WALL A PLANT RM.0 A TIMBER SLATTED WALL GALVANISED IMDEK A A URVED PLYWOOD, SLATTED TIMBER EILING WITH LED LIGHTING EVENT SPAE G.08 PLYWOOD BULKHEAD SINGY BARK TIMBER ON F FLOORING PLYWOOD EILING RETAIL G.07 SINGY BARK TIMBER ON F FLOORING PLYWOOD SOFFIT SINGY BARK TIMBER FLOORING PLYWOOD BULKHEAD SINGY BARK TIMBER ON F FLOORING URVED PLYWOOD, SLATTED TIMBER EILING WITH LED LIGHTING INTERP/VISITOR ENE G.05 PLA NT ROOM R.L VERTIAL GALVANISED USTOM ORB WALL LADDING ORETEN STEEL LAD NIBS & HOOD TO MANUFATURERS SPEIFIATION HORIZONTAL GALVANISED USTOM ORB WALL LADDING R.L J A06 SETION : LOSE OFF UNDERSIDE WITH ORETEN HI-LIGHT SREENS SETIONS - SHEET 5 PWD DATE - 7 OF B

18 00 L GALVANISED IMDEK 775 E 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS ONTINUOUS VAPOUR BARRIER, TAPE SEAL ALL JOINTS & AROUND PENEATIONS. LAP & FULLY SEAL TO WALL VAPOUR BARRIER, MINIMUM R.0 INSULATION ON GALV. WIRE MESH TAPER ROOF BEAM BAK TO WALL LINE GALVANISED 'U' IM D L 00 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS 75 TAPER ROOF BEAM BAK TO OLUMN LINE SHS & PLATE GUSSET PURLINS TO, H.D.G FINISH VERTIAL OPPER USTOM ORB WALL LADDING VERTIAL SHS RAILS WELDED TO GUSSETS TO ENGINEERS, H.D.G FINISH VERTIAL GALVANISED PERFORATED MINI ORB LADDING ON SHS BATTENS TO MANUFATURERS S PLATE GUSSET FIXED TO WALL FRAMING TO ENGINEERS, H.D.G FINISH 00 L GALVANISED GUTTER FLASHING A.F.L 50x5 SPOTTED GUM TIMBER ORNIE ALL ROUND, LEAR FINISH GALVANISED FLASHING FULLY SEAL UP BEHIND WALL LADDING ALUMINIUM FRAMED WINDOW AS SHEDULED SPOTTED GUM TIMBER WINDOW IMMING, LEAR FINISH GALVANISED PRESSED METAL FLASHING, FULLY SEAL TO U/S OF WINDOW SUBSILL SISALATION VAPOUR BARRIER, TAPE SEAL ALL JOINTS ROOF FRAMING TO, H.D.G FINISH URVED PLYWOOD EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS WITH LEAR FINISH Top of Wall R.L x5 SPOTTED GUM TIMBER ORNIE ALL ROUND, LEAR FINISH WALL FRAMING TO R.5 INSULATION SISALATION VAPOUR BARRIER, TAPE SEAL ALL JOINTS : GALVANISED 'U' IM VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED PRESSED METAL FLASHING, SRIBE & FULLY SEAL TO WALL LADDING GALVANISED IMDEK ROOF SHEETING ROOF FRAMING TO, H.D.G FINISH PLYWOOD SOFFIT ON BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES : SHS OLUMN TO ENGINEERS 7 R.5 INSULATION.00 A.F.L SPOTTED GUM TIMBER IMMING, LEAR FINISH E 600x5 S.STEEL BOX GUTTER ON STEEL SUPPORTS TO, S AS INDIATED ON ROOF PLAN : AOUSTI PLYWOOD WALL LINING ON PLASTERBOARD BAKING, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH WALL FRAMING TO PLATE GUSSET FIXED TO WALL FRAMING TO TO ENGINEERS, H.D.G FINISH GALVANISED GUTTER FLASHING SPOTTED GUM TIMBER WINDOW IMMING, LEAR FINISH GALVANISED PRESSED METAL FLASHING, FULLY SEAL TO U/S OF WINDOW SUBSILL GALVANISED IMDEK ROOF SHEETING L GUTTER FLASHING, GALVANISED FINISH L ORETEN FASIA TO MANUFATURERS S HALF ROUND.0mm H.D.G GUTTER TO BE SMOOTH ROUNDED NOT FAETED TO S AS INDIATED ON ROOF PLAN SISALATION VAPOUR BARRIER, TAPE SEAL ALL JOINTS 0 0 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS.00 A.F.L 600x5 S.STEEL BOX GUTTER ON STEEL SUPPORTS TO, S AS INDIATED ON ROOF PLAN S.STEEL ONEHEAD SHOWN DASHED BEYOND 50 DIA. S.STEEL DOWNPIPE SHOWN DASHED BEYOND 5 : R.5 INSULATION WALL FRAMING TO PLYWOOD SOFFIT ON BATTEN SYSTEM TO ENGINEERS DWGS, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES PLYWOOD FASIA WITH EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. : OLUMN TO. H.D.G FINISH RHS OUIGGER TO ENGINEERS DWGS, TAPER BAK TO OLUMN LINE. H.D.G FINISH HALF ROUND GUTTER BRAKET - 50x5 MS HDG PLATE. FW TO GUTTER SUPPORTS AT MAX 500 S AND LAYED TO. 00dia BASE PLATE WITH xm GALV. BOLTS TO RHS PURLIN. HDG FINISH AT EXPOSED LOATIONS 50Ø HDG DOWNPIPE REFER DRWG A9 FOR BOTTOM SUPPORT BRAKET ONSUTION S - SHEET PWD DATE - 8 OF B

19 F GALVANISED IMDEK ROOF SHEETING 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS ROOF FRAMING TO ENGINEERS ONTINUOUS VAPOUR BARRIER, TAPE SEAL ALL JOINTS & AROUND PENEATIONS. LAP & FULLY SEAL TO WALL VAPOUR BARRIER, MINIMUM R.0 INSULATION ON GALV. WIRE MESH 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS PLYWOOD SOFFIT ON BATTEN SYSTEM TO ENGINEERS DWGS, EXPRESSED SREW FIXINGS & BUTT JOINTS. EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES OPPER APS TO TIMBER SLATS GALVANISED IMDEK ROOF SHEETING D L 00 Plant Rm Wall R.L..050 OPPER APS TO TIMBER SLATS RAKING OLUMN TO ENGINEERS RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH ROOF FRAMING TO ENGINEERS : 75x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH 00 GALVANISED IMDEK ROOF SHEETING L 650 OVERHANG ROOF FRAMING TO ENGINEERS G 75x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT TAPER ROOF BEAM BAK TO RAKING OLUMN LINE 0 PLYWOOD FASIA WITH EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. RAKING OLUMN TO ENGINEERS PLYWOOD SOFFIT ON BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES 600 RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH 00 SERIES R BLOKWORK WALL TO AEGIS MSP RENDER FINISH TO EXTERNAL FAE OF BLOKWORK WALL : RAKING OLUMN TO ENGINEERS 75x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT DAMP PROOF MEMBRANE TO ENTIRE PLANT ROOM FLOOR PLA NT ROOM R.L PLA NT ROOM R.L GALVANISED PRESSED METAL FLASHING, SAW UT & FULLY SEAL TO BLOKWORK GALVANISED IMDEK ROOF SHEETING OPPER APS TO TIMBER SLATS R SLAB TO LEAR SEAL FINISH TO UNDERSIDE BRONZE STEEL LAD FASIA LADDING TO MANUFATURERS S.500 A.F.L R SLAB TO LEAR SEAL FINISH TO UNDERSIDE BRONZE STEEL LAD FASIA LADDING TO MANUFATURERS S ROOF FRAMING TO, H.D.G FINISH PLYWOOD SOFFIT ON BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES 0 0 : PLYWOOD SOFFIT ON BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES : ONSUTION S - SHEET PWD DATE - 9 OF B

20 00 TAPER ROOF BEAM BAK TO WALL LINE L 775 OVERHANG GALVANISED 'U' IM ROOF FRAMING TO, H.D.G FINISH R.5 INSULATION 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS ONTINUOUS VAPOUR BARRIER, TAPE SEAL ALL JOINTS & AROUND PENEATIONS. LAP & FULLY SEAL TO WALL VAPOUR BARRIER, MINIMUM R.0 INSULATION ON GALV. WIRE MESH GALVANISED IMDEK ROOF SHEETING A L 00 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED FLASHING FULLY SEAL UP BEHIND WALL LADDING 00 PLYWOOD PELMET BUILT OUT AS REQUIRED FOR MOTORIZED BLOKOUT BLINDS Top of Wall R.L VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED PRESSED METAL FLASHING, FULLY SEAL UP BEHIND WALL LADDING GALVANISED IMDEK ROOF SHEETING ROOF FRAMING TO ENGINEERS GALVANISED IMDEK ROOF SHEETING HI LIGHT LOUVRES 'S0/60' OR EQUIVALENT. POWDEROAT FINISH PURPOSE FOLDED ALUM SILL SETION TO ASSIST IN SILL DRAINAGE GALVANISED PRESSED METAL FLASHING, FULLY SEAL TO U/S OF WINDOW SUBSILL 00 URVED AOUSTI SPOTTED GUM VENEER PLYWOOD EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED LOUVRE WINDO AS SHEDULED RAKING OLUMN TO AOUSTI PLYWOOD WALL LINING ON PLASTERBOARD BAKING, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH : VERTIAL OPPER MINI ORB WALL LADDING ROOF FRAMING TO ENGINEERS PLYWOOD SOFFIT ON BATTEN SYSTEM TO ENGINEERS DWGS, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT : OPPER APS TO TIMBER SLATS 6MM F EILING ON METAL BATTENS TO U/SIDE OF ROOF PURLINS RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH GALVANISED IMDEK ROOF FRAMING TO, H.D.G FINISH 600x5 S.STEEL BOX GUTTER ON STEEL SUPPORTS TO, S AS INDIATED ON ROOF PLAN S.STEEL ONEHEAD SHOWN DASHED BEYOND 50 DIA. S.STEEL DOWNPIPE SHOWN DASHED BEYOND : VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED PRESSED METAL FLASHING, FULLY SEAL TO U/S OF WALL LADDING GALVANISED GUTTER FLASHING PLYWOOD SOFFIT ON BATTEN SYSTEM TO ENGINEERS DWGS, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES (.O.S) WALL FRAMING TO 00 L TAPER ROOF BEAM BAK TO WALL LINE 5 : SISALATION VAPOUR BARRIER, TAPE SEAL ALL JOINTS R.5 INSULATION AOUSTI PLYWOOD WALL LINING ON PLASTERBOARD BAKING, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH.00 A.F.L DOOR AS SHEDULED FRAME OUT & ALLOW FOR SLIDING DOOR HEAD AK LEARANE PLYWOOD PELMET BUILT OUT AS REQUIRED FOR MOTORIZED BLOKOUT BLINDS 00 OVERHANG EVENT SPAE G.08 ADDITIONAL PURLIN AS REQUIRED FOR FLASHING & INSULATION SUPPORT GALVANISED PRESSED METAL FLASHING, FULLY WATERPROOF SEAL TO BLOKWORK WALL, FRAME OUT AS REQUIRED STAK BONDED R BLOKWORK WALL TO L TAPER ROOF BEAM BAK : GALVANISED IMDEK ROOF FRAMING TO, H.D.G FINISH, H.D.G FINISH PLYWOOD FASIA WITH EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. PLYWOOD SOFFIT ON BATTEN SYSTEM TO ENGINEERS DWGS, EXPRESSED SREW FIXINGS PLA & BUTT NT ROOM JOINTS EXTERIOR GRADE WITH LEAR FINISH. R.L. BRASS 9.50 HANNEL IM ALL ROUND TO PLY EDGES ORETEN STEEL LADDING ON STEEL STUD FRAME ONTINUOUS VAPOUR BARRIER, TAPE SEAL ALL FIXED IN FULL OMPLIANE WITH MANUFATURERS JOINTS & AROUND PENEATIONS. LAP & SPEIFIATIONS, FULLY SIKAFLEX SEAL AT ALL JOINTS FULLY SEAL TO WALL VAPOUR BARRIER, MINIMUM R.0 INSULATION ON GALV. WIRE MESH EXTEND VAPOUR BARRIER TO WALL. PROVIDE ONTINUOUS MEHANIAL FIXING TO FULL LENGTH OF ONTAT WITH WALL GALVANISED IMDEK ROOF SHEETING ORETEN STEEL LADDING TO NIBS & HOOD. FRAME OUT TO. FULLY SIKAFLEX SEAL AT ALL JOINTS ROLLER SHUTTER AS SHEDULED 6 6 : ROOF FRAMING TO ENGINEERS A.F.L.00 A.F.L 75x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT OPPER APS TO TIMBER SLATS 0mm 000 VENDING MAHINES PAINTED F SOFFIT PAINTED 9mm F LINING FIXED TO STEEL STUD FRAME AS PER MANUFATURERS REOMMENDATIONS G 75 RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH R SLAB TO AOUSTI PLYWOOD SPOTTED GUM VENEER EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED 50x5 SPOTTED GUM ORNIE, LEAR FINISH SISALATION VAPOUR BARRIER, TAPE SEAL ALL JOINTS R.5 INSULATION WALL FRAMING TO RETAIL G.07 AOUSTI PLYWOOD WALL LINING ON PLASTERBOARD BAKING, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH ONSUTION S - SHEET PWD DATE - A0 OF B

21 00 L 00 OVERHANG TAPER ROOF BEAM BAK TO WALL LINE GALVANISED IMDEK ROOF SHEETING ROOF FRAMING TO, H.D.G FINISH GALVANISED IMDEK ROOF SHEETING PLYWOOD FASIA WITH EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. ROOF FRAMING TO ENGINEERS 50 GALVANISED GUTTER FLASHING L 650 L 00 ORETEN FASIA TO MANUFATURERS S HALF ROUND.0mm HDG GUTTER TO BE SMOOTH ROUNDED NOT FAETED TO S AS INDIATED ON ROOF PLAN 5 R SLAB TO ENGINEERS DWGS, LEAR SEAL FINISH : VERTIAL S.STEEL PERFORATED MINI ORB LADDING ON SHS BATTENS TO MANUFATURERS S RHS STUB OLUMNS TO 'E' BLOK TO STAK BONDED R BLOKWORK WALL TO 5 : SHS STUB OLUMNS TO VERTIAL S.STEEL PERFORATED MINI ORB LADDING ON SHS BATTENS TO MANUFATURERS S STAK BONDED R BLOKWORK WALL TO, LEAR SEAL FINISH PLYWOOD SOFFIT ON BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES 5 EDGE OF VERANDAH LINE ENELINE OF OLUMN : 0 TAPER BEAM BAK TO OLUMN LINE SINGYBARK VERTIAL TIMBER SLATS ON HORIZONTAL SHS RAILS AS ED GALVANISED PRESSED METAL FLASHING, FULLY SRIBE & SEAL TO WALL LADDING HALF ROUND GUTTER BRAKET - 50x5 MS HDG PLATE. FW TO GUTTER SUPPORTS AT MAX 500 S AND LAYED TO. 00dia BASE PLATE WITH xm GALV. BOLTS TO RHS PURLIN. HDG FINISH AT EXPOSED LOATIONS ONE RAINHEAD, HDG FINISH 50Ø HDG DOWNPIPE REFER DRWG A9 FOR BOTTOM SUPPORT BRAKET ONTINUOUS VAPOUR BARRIER, TAPE SEAL ALL JOINTS & AROUND PENEATIONS. LAP & FULLY SEAL TO WALL VAPOUR BARRIER, MINIMUM R.0 INSULATION ON GALV. WIRE MESH GALVANISED IMDEK ROOF SHEETING END APS H.D.G FINISH 50 GALVANISED PRESSED METAL FLASHING, FULLY SRIBE & SEAL TO WALL LADDING GALVANISED IMDEK PAK OUT AS REQUIRED GALVANISED IMDEK ROOF SHEETING SHS OUIGGER PURLIN TO. H.D.G FINISH ONTINUOUS VAPOUR BARRIER, TAPE SEAL ALL JOINTS & AROUND PENEATIONS. LAP & FULLY SEAL TO WALL VAPOUR BARRIER, MINIMUM R.0 INSULATION ON GALV. WIRE MESH PLATE GUSSET FIXED TO OUIGGER PURLIN TO ENGINEERS, H.D.G FINISH VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED PRESSED METAL FLASHING, FULLY SEAL UP BEHIND WALL LADDING ROOF FRAMING TO ENGINEERS END APS H.D.G FINISH 50 SHS OUIGGER PURLIN TO. H.D.G FINISH PLATE GUSSET FIXED TO OUIGGER PURLIN TO ENGINEERS, H.D.G FINISH ROOF FRAMING TO ENGINEERS RHS STUB OLUMNS TO GALVANISED PRESSED METAL FLASHING, FULLY WATERPROOF SEAL TO BLOKWORK WALL ROOF FRAMING TO ENGINEERS EXTEND VAPOUR BARRIER TO WALL. PROVIDE ONTINUOUS MEHANIAL FIXING TO FULL LENGTH OF ONTAT WITH WALL ROOF FRAMING TO ENGINEERS EXTEND VAPOUR BARRIER TO WALL. PROVIDE ONTINUOUS MEHANIAL FIXING TO FULL LENGTH OF ONTAT WITH WALL URVED AOUSTI SPOTTED GUM VENEER PLYWOOD EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED 50x5 SPOTTED GUM TIMBER ORNIE ALL ROUND, LEAR FINISH S.STEEL GALVANISED PERFORATED MINI ORB LADDING ON SHS BATTENS TO MANUFATURERS S STAK BONDED R BLOKWORK WALL TO, LEAR SEAL FINISH 6 : A.F.L STAK BONDED R BLOKWORK WALL TO, LEAR SEAL FINISH 5 6 : OOL ROOM 6 6 : A.F.L mm FLUSH JOINTED PLASTERBOARD ON 'RONDO' SUSPENDED SYSTEM. 'RONDO' P50 SHADOWLINE ORNIE STAK BONDED R BLOKWORK WALL TO, LEAR SEAL FINISH ONSUTION S - SHEET PWD DATE - A OF B

22 75x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT GALVANISED PRESSED METAL FLASHING, FULLY SEAL UP BEHIND WALL LADDING 9 RHS OLUMN TO RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH GALVANISED IMDEK ROOF SHEETING END APS H.D.G FINISH URVED AOUSTI SPOTTED GUM VENEER PLYWOOD EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED ROOF FRAMING TO, H.D.G FINISH EXTEND VAPOUR BARRIER TO WALL. PROVIDE ONTINUOUS MEHANIAL FIXING TO FULL LENGTH OF ONTAT WITH WALL R BLOKWORK WALL TO REFER TO MEHANIAL DWGS FOR EXTENT OF DUTWORK SHS OUIGGER PURLIN TO. H.D.G FINISH 7 : PLATE GUSSET FIXED TO OUIGGER PURLIN TO ENGINEERS, H.D.G FINISH OPPER APS TO TIMBER SLATS 75x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT ROOF FRAMING TO ENGINEERS RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH RHS OLUMN TO 50x5 SPOTTED GUM ORNIE, LEAR FINISH 600 R SLAB TO AOUSTI PLYWOOD LAD BULKHEAD, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH 7 : 50x5 SPOTTED GUM ORNIE, LEAR FINISH.00 A.F.L PLA NT ROOM R.L RHS OLUMN TO 75x50 HW. TIMBER SLATS ON RHS GIRTS TO, ONEALED FIXINGS TO SUIT EVENT SPAE G.08 AOUSTI PLYWOOD WALL LINING ON PLASTERBOARD BAKING, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH AOUSTI PLYWOOD WALL LINING, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH.700 AOUSTI PLYWOOD SPOTTED GUM VENEER EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED 50x5 SPOTTED GUM ORNIE, LEAR FINISH WALL FRAMING TO RETAIL G.07 REFER TO MEHANIAL DWGS FOR EXTENT OF DUTWORK RHS GIRTS TO ENGINEERS DWGS. H.D.G FINISH R BLOKWORK WALL TO GALVANISED PRESSED METAL FLASHING, FULLY SEAL UP BEHIND TIMBER SLATS ROOF FRAMING TO, H.D.G FINISH EXTEND VAPOUR BARRIER TO WALL. PROVIDE ONTINUOUS MEHANIAL FIXING TO FULL LENGTH OF ONTAT WITH WALL PLA NT ROOM R.L R SLAB TO DAMP PROOF MEMBRANE TO ENTIRE PLANT ROOM FLOOR 0 DAMP PROOF MEMBRANE TO ENTIRE PLANT ROOM FLOOR PLA NT ROOM R.L R SLAB TO URVED AOUSTI SPOTTED GUM VENEER PLYWOOD EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED 50x5 SPOTTED GUM ORNIE, LEAR FINISH 600 AOUSTI PLYWOOD SPOTTED GUM VENEER EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED RETAIL G.07 AOUSTI SPOTTED GUM VENEER PLYWOOD WALL LINING ON STEEL STUD FRAMING WITH EXPRESSED SREW FIXINGS AS SHEDULED SPOTTED GUM TIMBER WINDOW IMMING, LEAR FINISH WINDOW AS SHEDULED.700 A.F.L A.F.L VERTIAL OPPER MINI ORB LADDING ON STEEL BATTENS TO MANUFATURERS S FLASHING FULLY SEAL UP BEHIND WALL LADDING, FINISH TO MATH WALL LADDING.500 A.F.L PLYWOOD SOFFIT ON BATTEN SYSTEM TO ENGINEERS DWGS, EXPRESSED SREW FIXINGS & BUTT JOINTS EXTERIOR GRADE WITH LEAR FINISH. BRASS HANNEL IM ALL ROUND TO PLY EDGES ORETEN STEEL LADDING TO NIBS & HOOD. FRAME OUT TO. FULLY SIKAFLEX SEAL AT ALL JOINTS FULL SIKAFLEX SEAL.00 A.F.L 50x5 SPOTTED GUM ORNIE, LEAR FINISH WINDOW AS SHEDULED AOUSTI PLYWOOD LAD BULKHEAD, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH 7 : 7 : ONSUTION S - SHEET 5 PWD DATE - A OF B

23 ONTINUOUS VAPOUR BARRIER, TAPE SEAL ALL JOINTS & AROUND PENEATIONS. LAP & FULLY SEAL TO WALL VAPOUR BARRIER, MINIMUM R.0 INSULATION ON GALV. WIRE MESH GALVANISED IMDEK GALVANISED PRESSED METAL FLASHING, FULLY SRIBE & SEAL TO WALL LADDING ROOF FRAMING TO ENGINEERS PLATE GUSSET FIXED TO OUIGGER PURLIN TO ENGINEERS, H.D.G FINISH VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED PRESSED METAL FLASHING, FULLY SEAL UP BEHIND WALL LADDING END APS H.D.G FINISH SHS OUIGGER PURLIN TO. H.D.G FINISH END APS H.D.G FINISH URVED AOUSTI SPOTTED GUM VENEER PLYWOOD EILING ON SUSPENDED BATTEN SYSTEM TO, EXPRESSED SREW FIXINGS & BUTT JOINTS AS SHEDULED ROOF FRAMING TO ENGINEERS PLATE GUSSET FIXED TO OUIGGER PURLIN TO ENGINEERS, H.D.G FINISH SHS OUIGGER PURLIN TO. H.D.G FINISH 50x5 SPOTTED GUM ORNIE, LEAR FINISH SISALATION VAPOUR BARRIER, TAPE SEAL ALL JOINTS R.5 INSULATION E SPOTTED GUM TIMBER IMMING, LEAR FINISH WALL FRAMING TO.00 A.F.L AOUSTI PLYWOOD WALL LINING ON PLASTERBOARD BAKING, SPOTTED GUM TIMBER EDGING ALL ROUND, LEAR FINISH 7 : VERTIAL GALVANISED USTOM ORB WALL LADDING GALVANISED TOE MOULD, FULLY SEAL UP BEHIND WALL LADDING 00 0mm GALVANISED 'U' IM HORIZONTAL GALVANISED USTOM ORB WALL LADDING ORETEN STEEL LADDING TO NIBS & HOOD. FRAME OUT TO. FULLY SIKAFLEX SEAL AT ALL JOINTS 00 ONRETE OR ONRETE BLOKWORK RETAINING WALL, RENDER AND PAINT WHERE EXPOSED. WATERPROOF MEMBRANE, WITH PROTETION BOARD AND SUBSOIL DRAINAGE WHERE IN ONTAT WITH NATURAL GROUND. SUBSOIL DRAINAGE TO IVIL ENGINEERS DESIGN SINGY BARK SKIRTING AS SHEDULED R.L SINGY BARK DEKING. ADHERED TO SUTURAL F WORKING PLATFORM ON FRAMING TO ENGINEERS. NOTE: FULLY PAINT UNDERSIDE OF SHEET FOR VAPOUR BARRIER ALLOW FOR EXPANSION JOINTS FLOOR FRAMING TO ENGINEER STEEL WORK TO BE OATED WITH 'EPIREZ 5' OR EQUIVALENT APPROVED FROM 00 BELOW TOP OF ONRETE TO 00 ABOVE SURFAE. TYPIAL R.L D 0X0 SINGY BARK EDGING/HEADER BOARD 90X5 SINGY BARK DEKING WITH OUNTERSUNK FIXINGS WITH BLAK SIKA FILL, SAND THEN FINISH FLOOR FRAMING TO ENGINEER STEEL WORK TO BE OATED WITH 'EPIREZ 5' OR EQUIVALENT APPROVED FROM 00 BELOW TOP OF ONRETE TO 00 ABOVE SURFAE. TYPIAL : FREE DRAINING ROK WITH AG DRAIN WRAPPED IN FILTER LOTH, ONNET TO SUBSOIL DRAINAGE SYSTEM ONRETE FOOTING TO, SLOPE TOP TO SHED WATER. : ONRETE FOOTING TO, SLOPE TOP TO SHED WATER. ONSUTION S - SHEET 6 PWD DATE - A OF B

24 G F 500 AA A 50 (HDG) FLOOR PLATE EADS REFER TO TYPE A'M' STANHION mm UP RETAIL G.07 AA A PF SINGERS TO TYPE 'AM' STANHION PLATE STAIR EAD REFER TO SUTURAL DRWGS 'D' 0 KIKPLATE (TYP) 'D' VARIES REFER TO STD-5 GROUND FLOOR - STAIR PLAN : TYPIAL STAIR & HANDRAIL SETION SALE :0 STAIR WIDTH PLATFORM - 'P' WELDED - 'W' D 'a' = ANGLE OF STAIR STANHION & ANGLE LOSURE BEND PREFERRED ANGLE 'a' = 7 ANGLE MOUNTED - 'AM' J NOTES. THIS DRAWING TO BE READ IN ONJUNTION WITH GENERAL SUTURAL NOTES DRAWING. AA A G F PLA NT ROOM R.L UP TYPE A'M' STANHION mm (HDG) FLOOR PLATE EADS REFER TO FIRST FLOOR - STAIR PLAN : SETION : TYPE 'AM' STANHION HANDRAILS TO OMPLY WITH AS MAX. ENES PLANT RM.0 ON. 5mm (HDG) FLOOR PLATE EADS PF SINGERS TO PLANT RM.0 RETAIL G mm R.L NOTE: HANDRAILS TO BE REMOVABLE. PROVIDE PIPE SLEEVE WELDED TO TOP OF BEARER/JOIST WITH SOKET DRIVE GRUB SREW FIXING TO HANDRAIL REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. SINGY BARK TIMBER DEKING ON RHS FLOOR JOISTS R.L FLOOR FRAMING TO ENGINEERS HI LIGHT ORETEN LOUVRES OR EQUIVALENT TO MANUFATURERS S SHS SUTS FROM JOISTS FOR ORETEN LOUVRE FIXING. H.D.G FINISH SHS STUB OLUMN & FOOTING TO, H.D.G FINISH 600 TGSI 000 TYPIAL ENY STAIR : 00 0 SHS SINGERS WELDED TO BEARER/JOIST TO ENGINEERS DWGS. H.D.G FINISH RUSHED GRAVEL 5 FOOTING TO 'FLOORSAFE' R0 FRANKLIN PROPRIETARY ALUMINIUM NOSING STEP INLAY SIP OR EQUAL WITH 0% LUMINANE ONAST TO THE BAKGROUND OMPLYING WITH.(f) OF AS MIN. GOING NOM. 0mm THIK SINGY BARK TIMBER RISER WITH ONEALED FIXING FROM BEHIND NOM. x0x0 SINGY BARK TIMBER EADS WITH ONEALED FIXING FROM BELOW 80 MAX. RISER NATURAL BRASS 50Ø HANDRAILS TO OMPLY WITH AS8.. DIE ORED INTO LOWER ONRETE SLAB & PINNED TO VERANDAH OLUMNS WITH MATHING 5Ø BRASS PINS & 0Ø WASHER EPOXY SET. HANDRAIL MUST BE TO ENELINE OF A FULL BOARD EAD WIDTH ORETEN STEEL RISER WITH ONEALED FIXING FROM BEHIND H.D.G FULLY WELDED PLATES TO SINGERS TGSI STEEL WORK TO BE OATED WITH 'EPIREZ 5' OR EQUIVALENT APPROVED FROM 00 BELOW TOP OF ONRETE TO 00 ABOVE SURFAE. TYPIAL 000. THE S SHOWN ON THIS DRAWING ARE BASED ON REQUIREMENTS OUTLINED IN A.S.657 (S.A.A. ODE FOR FIXED PLATFORMS,WALKWAYS,STAIRWAYS AND LADDERS) AND ARE MINIMUM AEPTABLE.. THE TYPE AND EXTENT OF HANDRAILS IS SHOWN ON THE DESIGN DRAWINGS.. ONTAT SURFAES OF HANDRAILS SHALL BE SMOOTH AND FREE FROM BURRS AND SHARP ORNERS. 5. ALL HANDRAILS ON THIS DRAWING ARE MONOWILLS HANDRAILING. 6. ALL HANDRAIL STANHIONS AND RAILING TO BE HOT DIPPED GALVANISED U.O.N.. 7. TYPE 'P' STANHIONS ARE NOT REOMMENDED WHERE UT-OUTS IN THE FLOORING ARE REQUIRED FOR STANHION INSTALLATION. 8. IF BENT PIPE IS NOT ONTINUOUS THROUGH STANHION BALL, USE SPLIE ( P) OR FULLY WELD PIPE TO STANHION. NOTE: HANDRAILS TO BE REMOVABLE. PROVIDE PIPE SLEVE DIE ORED INTO ONRETE THIKENING WITH SOKET DRIVE GRUB SREW FIXING TO HANDRAIL REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. ONRETE PAVEMENT STAIR & BALUSADE S PWD DATE - A OF B

25 B 500 NATURAL BRASS 50Ø HANDRAILS & BALUSADES TO OMPLY WITH AS8. TGSI 000 A0 SINGY BARK TIMBER FLOORING AA A5 A REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. D BB A TGSI 9570 (EXTENT OF RAMP DEKING) RAMP UP : (EXTENT OF ONRETE RAMP) UP TGSI 50 BB A5 REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. AA A5 TGSI UP R SLAB & FOOTING TO (EXTENT OF ONRETE RAMP) RAMP UP : 700 (EXTENT OF RAMP DEKING) REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. GROUND FLOOR - RAMP PLAN : SINGY BARK TIMBER FLOORING NATURAL BRASS 50Ø HANDRAILS & BALUSADES TO OMPLY WITH AS8. NATURAL BRASS 50Ø PIPE HANDRAIL NATURAL BRASS 0mm ROD WELDED TO HANDRAIL & AP PLATE NATURAL BRASS 00 MAX S, mm BRASS PLATE AP R SLAB & FOOTING TO A.F.L. ONTINUE HANDRAIL DOWN & WELD TO TOP OF BEARER/JOIST REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. R.L GROUND FLOOR - RAMP PLAN : TGSI 000 SINGY BARK TIMBER FLOORING NATURAL BRASS 50Ø HANDRAILS & BALUSADES TO OMPLY WITH AS8. R SLAB & FOOTING TO TGSI 000 ONTINUE HANDRAIL DOWN & DIE ORE INTO ONRETE PAVEMENT REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. SINGY BARK KERB RAIL, FIXED TO BALUSTER THRU ONEALED PLATE AS PER AS , FIGURE 9(b) ALIGN WITH INSIDE FAE OF BALUSTER BALUSTER FIXED TO TOP OF BEARER/JOIST MIN. TYPIAL RAMP HANDRAIL SETION : AA A5 RAMP SETION : 700 (EXTENT OF DEKING TO RAMP) 9000 RAMP UP : 800 (EXTENT OF ONRETE RAMP) ONTINUE HANDRAIL DOWN & WELD TO TOP OF BEARER/JOIST SINGY BARK TIMBER FLOORING NATURAL BRASS 50Ø HANDRAILS & BALUSADES TO OMPLY WITH AS8. REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. R.L TGSI R SLAB & FOOTING TO TGSI 000 ONTINUE HANDRAIL DOWN & DIE ORE INTO ONRETE PAVEMENT REESSED BLAKENED STEEL TGSI TATILE INDIATORS IN FULL OMPLIANE WITH AS8. BB A5 RAMP SETION : (EXTENT OF DEKING TO RAMP) 500 RAMP UP : (EXTENT OF ONRETE RAMP) DATE - DATE RAMP S NTG PROJET No. NTG ASSET No. SHEET No. NTG DRAWING No. AMENDMENT SHEET PWD0 OF 0089 SEPT 08 A5 B

26 DOOR HEAD FLOOR LEVEL T VP FG FG FG FG FG DOOR No. LOATION LEAF TYPE FRAME OTHER D0 TOILETS / U.A.T 00 x 90 TYPE G D0 TYPE A D0 TYPE F SPOTTED GUM FRAME SPOTTED GUM, LEAR FINISH T - ORETEN PANEL. SELETED LASER UT GRAPHIS TO MALE AND FEMALE TOILET DOORS. SOLID ORETEN PANEL TO U.A.T. DOOR ONEALED DOOR LOSER FOOD PREP 00 x 90 LAMINATE FAED SOLID ORE, SPOTTED GUM EDGE IMS SPOTTED GUM, LEAR FINISH - ALUMINIUM THRESHOLD PROPRIETARY WEATHER SEALS ALL ROUND DOOR TO EXTERNAL DOOR 00mm S.STEEL KIK PLATE TO INSIDE FAE OF EXTERNAL DOOR AND TO BOTH SIDES OF INTERNAL DOOR ONEALED DOOR LOSER GENERALLY HW SPOTTED GUM DOOR FRAME: 00mm WIDE BTM RAIL, 00mm WIDE STILES AND TOP RAIL STORE x 00 x 960 SPOTTED GUM FRAME WITH VERTIAL SPOTTED GUM SLATTS SPOTTED GUM, LEAR FINISH - ONEALED DOOR LOSER D0 FHR UPBD TYPE A 00 x 80 LAMINATE FAED SOLID ORE, SPOTTED GUM EDGE IMS SPOTTED GUM, LEAR FINISH - PROPRIETARY SIGNAGE D05 USTOM DOOR FHR UPBD - VENDING MAHINE ALOVE 00 x 80 ORETEN FAED SOLID ORE, ORETEN EDGE IMS SHS HDG ONEALED DOOR FRAME - PROPRIETARY SIGNAGE D06 PLANT ROOM AESS 00 x SHS HDG FRAMED DOOR WITH HW SLATTS TO MATH ADJAENT WALL ONEALED HDG FRAME - STEEL FRAMED DOOR ESAPE FUNTION ONEALED DOOR LOSER P TYPE E DORMA BTS TOP P TYPE E SD TYPE SD TYPE & BOTTOM PIVOT EVENT SPAE AS SHOWN PIVOT DOOR SPOTTED GUM FRAME SPOTTED GUM, LEAR FINISH DORMA BTS TOP & BTM PIVOT TO MANUFATURERS S REBATED SPOTTED GUM THRESHOLD REESSED INTO FLOOR AS REQUIRED LEAR GLASS SAFETY DEALS PROPRIETARY WEATHER SEALS ALL ROUND DOOR APPLIED FILM TO GLASS WITH SELETED GRAPHI DESIGN RETAIL AS SHOWN PIVOT DOOR SPOTTED GUM FRAME INTEGRATE INTO ALUMINUM WINDOW FRAME DORMA BTS TOP & BTM PIVOT TO MANUFATURERS S REBATED SPOTTED GUM THRESHOLD REESSED INTO FLOOR AS REQUIRED LEAR GLASS SAFETY DEALS PROPRIETARY WEATHER SEALS ALL ROUND DOOR EVENT SPAE AS SHOWN SLIDING GLASS DOOR ASSEMBLY SPOTTED GUM FRAME SPOTTED GUM, LEAR FINISH HEAVY DUTY SLIDING DOOR AK REBATED SPOTTED GUM THRESHOLD REESSED INTO FLOOR AS REQUIRED LEAR GLASS SAFETY DEALS PROPRIETARY WEATHER SEALS ALL ROUND DOOR APPLIED FILM TO GLASS WITH SELETED GRAPHI DESIGN EVENT SPAE AS SHOWN SLIDING GLASS DOOR ASSEMBLY SPOTTED GUM FRAME SPOTTED GUM, LEAR FINISH HEAVY DUTY SLIDING DOOR AK REBATED SPOTTED GUM THRESHOLD REESSED INTO FLOOR AS REQUIRED LEAR GLASS SAFETY DEALS PROPRIETARY WEATHER SEALS ALL ROUND DOOR APPLIED FILM TO GLASS WITH SELETED GRAPHI DESIGN DOOR HEAD DOOR HEAD FLOOR LEVEL FG FG FG DOOR No. LOATION LEAF TYPE FRAME OTHER DOOR SHEDULE : SD EVENT SPAE TYPE SAFETY DEALS SD TYPE SD TYPE B RD TYPE D AS SHOWN SLIDING GLASS DOOR ASSEMBLY SPOTTED GUM FRAME SPOTTED GUM, LEAR FINISH HEAVY DUTY SLIDING DOOR AK REBATED SPOTTED GUM THRESHOLD REESSED INTO FLOOR AS REQUIRED LEAR GLASS SAFETY DEALS PROPRIETARY WEATHER SEALS ALL ROUND DOOR APPLIED FILM TO GLASS WITH SELETED GRAPHI DESIGN GENERALLY HW SPOTTED GUM DOOR FRAME: 00mm WIDE BTM RAIL, 00mm WIDE STILES AND TOP RAIL EVENT SPAE AS SHOWN SLIDING GLASS DOOR ASSEMBLY SPOTTED GUM FRAME SPOTTED GUM, LEAR FINISH HEAVY DUTY SLIDING DOOR AK REBATED SPOTTED GUM THRESHOLD REESSED INTO FLOOR AS REQUIRED LEAR GLASS SAFETY DEALS PROPRIETARY WEATHER SEALS ALL ROUND DOOR APPLIED FILM TO GLASS WITH SELETED GRAPHI DESIGN INTERP/VISITOR ENE AUTOMATI SLIDING DOOR ASSEMBLY AUTOMATI SLIDING SPOTTED GUM HW DOOR INTEGRATE INTO ANODISED ALUMUNIUM WINDOW FRAME AUTOMATI SLIDING DOOR AK REBATED SPOTTED GUM THRESHOLD REESSED INTO FLOOR AS REQUIRED LEAR GLASS SAFETY DEALS PROPRIETARY WEATHER SEALS ALL ROUND DOOR GLARE REDUTION FILM TO GLASS VENDING MAHINE ENLOSURE 00x00 PROPRIETARY ROLLER DOOR GALVANISED PANEL AND WINDLOK GUIDES TO BE FOR YLONI ONDITIONS AND TO BE ERTIFIED BY A PRATIING SUTURAL ENGINEER. SETION 0 ERTIFIATION REQUIRED. DOOR NOTES. DIMENSIONS ARE NOMINAL ONLY, ALL MEASUREMENTS SHOULD BE TAKEN FROM SITE BEFORE ANY FABRIATIONS.. REFER TO FLOOR PLANS TO DETERMINE DIRETION OF DOOR SWING.. ALL ALUMINIUM FRAMES SELETED ANODISED FINISH.. HW DOOR FRAMES AND DOORS SELETED LEAR FINISH. 5. EXIT DOOR AND DOORS IN THE PATH OF AVEL TO AN EXIT ARE REQUIRED TO BE OPENABLE FROM WITHIN, WITHOUT A KEY, ON A HANDLE LEVER LOATED BETWEEN 900 & 00 ABOVE FLOOR LEVEL. 6. UNLESS NOTED OTHERWISE HW DOOR FRAMES ARE RETO FITTED AS WORK PROEEDS. 7. ALL GLASS WITHIN 000mm OF FFL SHALL BE GRADE 'A' SAFETY GLASS IN AORDANE WITH AS ALL GLASS DOORS, SIDELIGHTS OR ANY GLASS APABLE OF BEING MISTAKEN AS AN UNIMPEDED PATH OF AVEL MUST BE MARKED WITH SOLID AND NON-ANSPARENT VISUAL INDIATOR (MIN 75mm WIDE BOTTOM EDGE AFL) THAT PROVIDES MIN 0% LUMINANE ONAST AGAINST THE FLOOR SURFAE OR SURFAES WITHIN M OF THE GLAZING ON OPPOSITE SIDE IN AORDANE WITH AS8. 9. ALL EXTERNAL DOORS TO HAVE THRESHOLD SEALS AGAINST WEATHER AND VERMIN AND OMPLY WITH AS8 FOR AESSIBILITY. 0. ALL DOORS WHERE DISABLED AESS IS REQUIRED TO HAVE MINIMUM 850mm WIDE LEAR FRAME OPENING AS PER AS8.. LEGEND T - ORETEN PANEL AS NOTED VP - FIXED GLASS VISION PANEL FG - FIXED GLASS PANEL DOOR SHEDULE PWD DATE - A6 OF B

27 EQ BAYS 00 LEG 90 deg SILIONE BUTT JOINT AUTOMATI DOOR ASSEMBLY deg SILIONE BUTT JOINT 500 DOOR HEAD 00 FLOOR LEVEL FG FG FG FG 00 PERFORATED ALUM SREEN IN FRONT OF WINDOW FRAME FG FG SJ SD SJ SJ P FG FG FG FG FG FG 00 FG WINDOW No. W W W W W W5 W5 W6 LEG W6 LEG FRAME SUB FRAME GLAZING OMMENTS APRAL NOM. 50 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL FIXED LEAR GLASS PERFORATED ALUMINIUM SREEN FIXED TO FRONT OF GLAZING FRAME GLARE REDUTION FILM TO GLASS APRAL NOM. 00 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL FIXED LEAR GLASS GLARE REDUTION FILM TO GLASS NOM. 50 X 50 GLAZING ADAPTOR PURPOSE FOLDED ALUMINIUM SUBHEAD AND SUBSILL FIXED LEAR GLASS 'L' SHAPED WINDOW WITH 00 LEG EAH SIDE. GLARE REDUTION FILM TO GLASS APRAL NOM. 00 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL FIXED LEAR GLASS SD AUTOMATI SLIDING DOOR INTEGRATED INTO WINDOW FRAME GLARE REDUTION FILM TO GLASS INLUDING DOOR SAFETY DEALS APRAL NOM. 00 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL FIXED LEAR GLASS P PIVOT DOOR INTEGRATED INTO WINDOW FRAME SAFETY DEALS APRAL NOM. 00 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL FIXED LEAR GLASS 'L' SHAPED WINDOW WITH UNEQUAL LEGS EAH SIDE FG FG FG DOOR HEAD FG FLOOR LEVEL WINDOW No. FRAME SUB FRAME GLAZING OMMENTS 900 W7 APRAL NOM. 00 X 50 NARROWLINE SERIES SUBHEAD AND NO SILL SETION FIXED LEAR GLASS WINDOW SHEDULE : ALUMINIUM FRAMED HINGED SASH SITS ON TOP OF OUNTER (NO SILL SETION TO WINDOW FRAME) FRAMED ALUMINIUM GLAZED HINGED SASH ON PROPRIETARY GAS SUTS INTERP/VISITOR ENE G.05 EVENT SPAE G.08 EVENT SPAE G.08 APRAL NOM. 00 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL FIXED LEAR GLASS HI LEVEL WINDOW GLARE REDUTION FILM TO GLASS APRAL NOM. 50 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL + ALTAIR POWER LOUVRE SYSTEM FIXED LEAR GLASS LOUVRE BLADES HI LEVEL SLOPED WINDOW WITH POWER OPERATED GLASS LOUVRES BLAK OUT BLINDS TO INTERNAL FAE OF WINDOW FRAME MULLIONS APRAL NOM. 50 X 50 NARROWLINE SERIES SUBHEAD AND SUBSILL + ALTAIR POWER LOUVRE SYSTEM FIXED LEAR GLASS LOUVRE BLADES HI LEVEL SLOPED WINDOW WITH POWER OPERATED GLASS LOUVRES BLAK OUT BLINDS TO INTERNAL FAE OF WINDOW FRAME MULLIONS WINDOW NOTES. GLAZING SYSTEM GLAZING ONATOR SHALL BE RESPONSIBLE FOR PROVIDING A SETION 0 DESIGN ERTIFIATE ( ISSUED BY A NT REGISTERED SUTURAL ENGINEER ) AND DESIGN DRAWINGS AND UPON OMPLETION OF WORKS ISSUE AN INSTALLATION ERTIFIATE.. DESIGN WIND PRESSURES REFER TO SUTURAL DRAWINGS THE PROJET SUTURAL ENGINEERS DOUMENTATION INDIATE THE DESIGN RITERIA FOR THE WINDOW DESIGN. THE BUILDER IS TO ONFIRM ALL PRESSURES WITH THE PROJET ENGINEER PRIOR TO ORDERING AND FABRIATION.. DIMENSIONS SHOWN ARE NOMINAL SUTURAL OPENING S ONLY. ALL MEASUREMENTS SHOULD BE TAKEN FROM SITE BEFORE ANY FABRIATION.. ALL WINDOW & SLIDING DOOR FRAMES, GLAZING, FIXING & INSTALLATION TO BE ERTIFIED BY THE MANUFATURER AS OMPLYING WITH; AS88 - GLASS IN BUILDINGS - SELETION AND INSTALLATION AS70 PART - WIND LOADS AS07 - WINDO IN BUILDINGS - SELETION & INSTALLATION 5. ALL ALUMINIUM FRAMES TO BE SELETED ANODISED FINISH. 6. ALL DOORS WHERE DISABLED AESS IS REQUIRED TO HAVE MINIMUM 800mm WIDE LEAR FRAME OPENING AS PER AS8. 7. ALL EXTERNAL WINDO ARE VIEWED FROM OUTSIDE AND ALL INTERNAL WINDO ARE VIEWED FROM OUTSIDE OF ROOM. 8. ALL GLASS WITHIN 000mm OF FFL SHALL BE GRADE 'A' SAFETY GLASS IN AORDANE WITH AS GLASS APABLE OF BEING MISTAKEN AS AN UNIMPEDED PATH OF AVEL MUST BE MARKED WITH SOLID AND NON-ANSPARENT VISUAL INDIATOR (MIN 75mm WIDE AND BOTTOM EDGE AFL) THAT PROVIDES MIN 0% LUMINANE ONAST AGAINST THE FLOOR SURFAE OR SURFAES WITHIN M OF THE GLAZING ON OPPOSITE SIDE IN AORDANE WITH AS8. WINDOW SHEDULE PWD DATE - A7 OF B

28 D View - SERVIE D View - SERVIE EX. EE 00 IRULAR HDG FRAME VINE ARBOUR AA HDG STEEL FRAMED ARBOR OVER URVED ONRETE BLOKWORK RETAINNG WALL. HEIGHT AND EXTENT TO SUIT NATURAL GROUND LEVELS IRULAR ONRETE BLOKWORK RETAINING WALL, AEGIS MSP FINISH WHERE EXPOSED. WATERPROOF MEMBRANE, WITH PROTETION BOARD AND SUBSOIL DRAINAGE WHERE IN ONTAT WITH NATURAL GROUND. FINISH TOP OF WALL APPROX. 00mm ABOVE NATURAL GROUND ALL ROUND SERVIES YARD x 5 HW. VERTIAL TIMBER SLATS WITH OPPER APS TO TOP ON URVED SHS HDG GIRTS TO, ONEALED FIXINGS TO SUIT R.L x 5 HW. VERTIAL TIMBER SLATS WITH OPPER APS TO TOP ON URVED SHS HDG GIRTS TO, ONEALED FIXINGS TO SUIT AA SETION - : 50 PLANTER ONRETE SLAB TO RADIUS TO 5 BLOKWORK RETAINING WALL SERVIE YARD G.6 GATE 70 x 5 HW. VERTIAL TIMBER SLATS WITH OPPER APS TO TOP ON URVED SHS HDG HINGED LOKABLE DOUBLE GATE FRAME TO, ONEALED FIXINGS TO SUIT. PROVIDE HEAVY DUTY BALL BEARING GATE HINGES, DROPBOLTS LATHES AND LOKS TO OMPLETE THE INSTALLATION GATE PAVING EX. EE AA SERVIE YARD FLOOR PLAN : SERVIE YARD ELEVATION : SERVIES YARD PWD DATE - A8 OF B

A001 RUE JEANNE-MANCE RUE OLMSTEAD AVENUE MCARTHUR SITE PLAN A002 1:500 NEW TWO STOREY ELEMENTARY SCHOOL

A001 RUE JEANNE-MANCE RUE OLMSTEAD AVENUE MCARTHUR SITE PLAN A002 1:500 NEW TWO STOREY ELEMENTARY SCHOOL RUE JEANNE-MANE RUE OLMSTEAD NEW TWO STOREY ELEMENTARY SHOOL NOUVELLE ÉOLE ÉLÉMENTAIRE À DEUX ÉTAGES ÉLÉVATION DU REZ-DE-HAUSSÉE : 64,91 m EXISTING SHOOL TO BE RENOVATED EXISTING GYMNASIUM EXISTING TRAINING

More information

TIMBER SLIDING LOFT LADDER

TIMBER SLIDING LOFT LADDER POWER ARM SPRING HOUSING ANCHOR & LOCATION STOP ROLLER AR TWIST CATCH TIMER SLIDING LOFT LADDER A1 A2 A6 Installation and Operating Instrutions Read Carefully efore Installation Please hek you have all

More information

PETSPRING, LLC MEADOWLAKE RICHMOND AVENUE, HOUSTON, TEXAS 77057

PETSPRING, LLC MEADOWLAKE RICHMOND AVENUE, HOUSTON, TEXAS 77057 PETSPRING, LL SLATTERY TAKETT ARHITETS, LLP PETSPRING, LL REG D I STERED DA V I J. SL ARH A T T E RY I TET S T A T E 1 2 1 6 4 O F T E X A S DIGITALLY SIGNED: 06/11/2018 ARHITET SLATTERY TAKETT ARHITETS,

More information

Installation Data for Access Stairs and Handrails. PD 63 rev C 01/12/14

Installation Data for Access Stairs and Handrails. PD 63 rev C 01/12/14 Installation Data for Aess Stairs and Handrails 01/12/14 Page 1 of 8 ACCESS STAIRS For road, rail and utilities for aess to maintenane works via an embankment. 1. Sope This doument gives basi guidane on

More information

Customer Helpline No. (01773)

Customer Helpline No. (01773) Maintenane The ladder and all other wooden parts an be varnished to protet and extend its life. Lubriate all moving metal parts annually. Srews and nuts should be heked from time to time and tightened

More information

Contents 04LEAN0804-V1. Side Panels. Fixing Kit. Nail Bag & Ironmongery. For Assistance Please Contact Customer Care on

Contents 04LEAN0804-V1. Side Panels. Fixing Kit. Nail Bag & Ironmongery. For Assistance Please Contact Customer Care on 04LAN0804-V1 Contents Please retain Instrutions and label (attahed to your building for future referene See bak of instrutions for Combi greenhouse assembly Side Panels 1 2 3 Before ommening assembly make

More information

nineteen wood construction and design Timber Construction Timber Construction Timber Construction

nineteen wood construction and design Timber Construction Timber Construction Timber Construction APPLIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS FALL 2017 leture nineteen wood onstrution and design Timber Constrution all-wood framing systems studs, beams, floor diaphragms,

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800

More information

FAAST DEMONSTRATION UNIT CONSTRUCTION MANUAL. designs supplied by. re:creation

FAAST DEMONSTRATION UNIT CONSTRUCTION MANUAL. designs supplied by. re:creation FAAST DEMONSTRATION UNIT CONSTRUCTION MANUAL designs supplied by CONTENTS FAAST DEMO UNIT #1 - GLASS SHOWCASE 2 FAAST DEMO UNIT #1 - UNIT CONSTRUCTION 3 CENTRAL GRAPHIC FRAMEWORK CONSTRUCTION 4 SMOKE RESISTOR

More information

How-To-build guide Garden shed

How-To-build guide Garden shed How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to

More information

INSTALLATION GUIDE. Perfect PANELLING c

INSTALLATION GUIDE. Perfect PANELLING c INSTALLATION GUIDE 01522 123456 Perfet PERFECT The sole supplier of Perfet Panelling wall panels, shower panels and wet-room boards, we supply a omplete bathroom and wet-room solution to low maintenane

More information

LOCATION: GROVELAND BEACH PARK PARCEL No: SECTION S24, T24E, RANGE 4E LAT: N LONG: W

LOCATION: GROVELAND BEACH PARK PARCEL No: SECTION S24, T24E, RANGE 4E LAT: N LONG: W Exhibit A EXISTING ONDITIONS LAT: 47.570656 N LONG:.069 W VERTIAL: NGVD 988 VALUES DERIVED USING RTK-GPS WATER BODY: LAKE WASHINGTON AND THE WASHINGTON STATE REFERENE NETWORK. DATE: /07/07 EXISTING ONDITIONS

More information

The better way to build TM. Installation Manual ROOF SIPs

The better way to build TM. Installation Manual ROOF SIPs The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................

More information

STEEL CANTILEVER TYPE E MICHIGAN DEPARTMENT OF TRANSPORTATION NOTE: EDGE OF SIGN VARIABLE 12" (MAX) 5'-0" COLUMN CAP 9'-5" (MAX) (TYP) DETAIL C

STEEL CANTILEVER TYPE E MICHIGAN DEPARTMENT OF TRANSPORTATION NOTE: EDGE OF SIGN VARIABLE 12 (MAX) 5'-0 COLUMN CAP 9'-5 (MAX) (TYP) DETAIL C EDGE OF SIGN VARIABLE 12" (MAX) 25'-0" OLUMN AP 9'-5" (MAX) DETAIL END AP 1'-6" 4'-0" ARMS OPTIONAL SPLIE SIGN SIGN AND ARMS JP 1'-3" (MIN) 5'-0" 0.4 x L (MAX) OPTIONAL SPLIE VAIRES (25'-0" MAX) SEE ONTRAT

More information

Acceptable Standards of Domestic Construction

Acceptable Standards of Domestic Construction Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be

More information

CROSSBAR RAFTER ISOMETRIC

CROSSBAR RAFTER ISOMETRIC Super Sky Products' typical glazing system consists of glass panels or "lites" which are attached to the main framing members using extruded aluminum "retainers" or "pressure plates". These retainers are

More information

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip Tolerance Detail (recommended) Verge Closure Verge Channel Verge Clip Verge Flashing VERGE CHANNEL RIVETTED TO EUROSEAM AT APPROX 400MM CENTRES USING 4.8 X 12MM RIVETS. NB: DO NOT RIVET AT HALTER POSITION

More information

BUILDERS RESPONSIBILITY

BUILDERS RESPONSIBILITY BUILDERS RESPONSIBILITY August 2015 Key Builder Responsibilities Before roof tiles can be loaded onto the roof frame, the following must be completed unless otherwise specified in the roof contract: 1.

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

SpeedDeck. Fixing and Handling Guide

SpeedDeck. Fixing and Handling Guide SpeedDeck Section 1 Delivery/Storing On Site/Handling l SpeedDeck is factory or on-site manufactured. l Straight SpeedDeck bundles are a maximum 1 tonne, sheets nestled and banded with polypropylene or

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs. Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm

More information

System for 2+ Level Buildings

System for 2+ Level Buildings Issued Sept 205 Contact Info@symonite.co.nz System for 2+ Level Buildings Typical Details Issued: September 205 TYPICAL DETAILS CONTENTS.0 TYPICAL VERTICAL JOINTS 2.0 EXT. CORNER / TYPICAL HORIZONTAL JOINT

More information

INITIAL X. Industrial Development Ray & Carol Wittenbaker Lot 803 #1124, Abernethy Road, High Wycombe

INITIAL X. Industrial Development Ray & Carol Wittenbaker Lot 803 #1124, Abernethy Road, High Wycombe Industrial Development Lot 83 #1124, Abernethy Road, High N DEVELOPMENT SUMMARY W E ZONING SHIRE : SHIRE O KALAMUNDA PROPOSED USAGE : SPEIAL USE - SU6 TOTAL GLA : 1936m² SITE AREA : 28m² PLOT RATIO AHIEVED

More information

8 x 10 Timber-frame Garden Shed

8 x 10 Timber-frame Garden Shed 8 x 10 Timber-frame Garden Shed Includes: Step-By-Step Instructions, Complete Details & Materials Lists Timber-framing is a traditional building method that uses a simple framework of heavy timber posts

More information

SITE LOCATION (SCALE 1:1250) SITE LOCATION (SCALE 1:25000) LOCATION PHOTOGRAPH THESE DRAWINGS COMPLY WITH STANDARD ICNIRP DESIGN GUIDELINES.

SITE LOCATION (SCALE 1:1250) SITE LOCATION (SCALE 1:25000) LOCATION PHOTOGRAPH THESE DRAWINGS COMPLY WITH STANDARD ICNIRP DESIGN GUIDELINES. THESE DRAWINGS OMPLY WITH STANDARD INIRP DESIGN GUIDELINES. 0 50m 100m 150m 0 500m 1000m 1500m 2000m 2500m SALE 1:1250 SITE LOATION SALE 1:25000 SITE LOATION SITE LOATION (SALE 1:1250) SITE LOATION (SALE

More information

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter SuperFOIL Insulation Solutions Guide Pitched Roof - Under Rafter SF19+ Pitched Roof Under Rafter Solutions CONSTRUCTION THICKNESS R -VALUE EXTERNAL SURFACE - 0.040 TILES / SLATES 10mm - BATTEN CAVITY 25mm

More information

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED INSTALLATION GUIDE Flat Roof Homesheds TM Onto Concrete BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed.

More information

Joshua Woodsman

Joshua Woodsman CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you

More information

UPPER POINT COOK STAGE 28

UPPER POINT COOK STAGE 28 UPPER POINT OOK GENERAL NOTES: 1. ALL LEVELS ARE TO AUSTRALIAN EIGT DATUM AND ALL OORDINATES ARE TO MAP GRID OF AUSTRALIA (MGA) ZONE 55. 2. ALL S SOWN ON TE ENGINEERING DRAWINGS AVE BEEN INTERPOLATED FROM

More information

900 SERIES WALL PANELS

900 SERIES WALL PANELS CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900

More information

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! TABLE OF ONTENTS General Information... p.2 Frame Fabrication...

More information

Installation guide. Step-by-step instructions

Installation guide. Step-by-step instructions Installation guide Step-by-step instructions Contents Tools Required to Install p1 Screws & Fixings p2 Injection Moulded Solid Components p3 Components p4 Georgian Hips & Ancillaries p5 Fixing Eaves Beam

More information

A Shell construction

A Shell construction A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill

More information

To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call

To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call Data Sheet for Fitting Superquilt Under or over Rafters to Roofs To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call 0844 9919949 From outside the UK Call 0044 1143230474

More information

Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for Pitched roof insulation Fully certificated Thermally tested in accordance with EN12667 High thermal resistance of 2.71m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective

More information

The Complete Guide to Building With Winter Panels

The Complete Guide to Building With Winter Panels The Complete Guide to Building With Winter Panels 1 This publiation was prepared for: Winter Panel 74 Glen Orne Drive Brattleboro, VT 05301 (802) 254-3435 http://www.winterpanel.om by: 3-D Building Solutions,

More information

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE INSTALLATION GUIDE Stratco Sanctuary Verandahs, Patios and Carports BEFORE YOU START It is important to check with your Local Government Authority prior to the installation of your new Stratco Sanctuary

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

Guardian warm roof conversion system. Installation Guide

Guardian warm roof conversion system. Installation Guide Guardian warm roof conversion system Installation Guide 2 www.guardianroof.co.uk Conservatory walls consist largely of glazed elements including windows and doors that may include structural mullions or

More information

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening. Installation Openings: 1. Fit a support (noggins) around the opening. 2. Apply Isola Sealant to the support and then fit Pro Super. 3. Install an Isola Opening Fitting for round or square openings. (Remember

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

HOW TO Fix Onduline Corrugated Bitumen Sheets

HOW TO Fix Onduline Corrugated Bitumen Sheets HOW TO Fix Onduline Corrugated Bitumen Sheets BBA BRITISH BOARD OF AGREMENT CERTIFICATE NO. 87 / 1823 W ROOFING PLAN IT Roofing components: Ridge Roof decking Apex Verge Barge board Purlins / battens Rafters

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D. With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)

FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed) FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed) Thank you for choosing to purchase a ROOF Maker Fixed Flat Rooflight. Assembly Procedure Guidance Please take precaution when moving

More information

Multi-layer Insulation Blanket for Roofs, Walls & Floors The Highest Performing Certificated MultiFoil on the Market

Multi-layer Insulation Blanket for Roofs, Walls & Floors The Highest Performing Certificated MultiFoil on the Market Multilayer Insulation Blanket for Roofs, Walls & Floors e The Highest Performing Certificated MultiFoil on the Market MultifoilInsulation.com UK and European Distributors Specialising in Multifoil Insulation

More information

Chapter 12 - Windows and Doors

Chapter 12 - Windows and Doors Chapter 12 - Windows and Doors Contents Chapter 12 - Windows and Doors... 12-1 Timing & Prerequisites... 12-2 Verifying Windows and Doors Orders... 12-3 Windows... 12-4 Prepare the Window Openings... 12-4

More information

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions 14000 I/O Series Flush Glaze Fabrication and Installation Instructions Last saved on 12/18/2009 Table of Contents GENERAL CONSTRUCTION NOTES...3 EXTRUDED ALUMINUM PARTS...4 ACCESSORIES...5 OVERVIEW...6

More information

MULTI-STORY FIRE STOPPING ASSEMBLY FRAMED OPENING JAMB (LOW CELL) INDEX SHEET

MULTI-STORY FIRE STOPPING ASSEMBLY FRAMED OPENING JAMB (LOW CELL) INDEX SHEET KPH-DS-01-MTLV KPH-PP-01-MTLV KPH-PP-02-MTLV KPH-PJ-01-MTLV KPH-PJ-02-MTLV KPH-PJ-03-MTLV KPH-PJ-04-MTLV KPH-PJ-05-MTLV KPH-FS-01-MTLV KPH-FS-02-MTLV KPH-FS-03-MTLV KPH-BS-01-MTLV KPH-BS-02-MTLV KPH-BS-03-MTLV

More information

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction

More information

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES 1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 9/29/2017 Installation Guideline Disclaimer This document contains general installation

More information

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES 1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 08/31/2018 Installation Guideline Disclaimer This document contains general installation

More information

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated 50948-RHN Putney 06 January 2018 This document includes: Code Section Revision Dated H72 Aluminium strip/ sheet coverings/ flashings 1 Table of Contents Title H72 Aluminium strip/ sheet coverings/ flashings

More information

Typical Drawings for Schools

Typical Drawings for Schools 0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)

More information

HOW TO BUILD A 12X8 SHED

HOW TO BUILD A 12X8 SHED HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,

More information

COLORBOND steel clad. Details for bushfire-prone AS BAL-FZ sites

COLORBOND steel clad. Details for bushfire-prone AS BAL-FZ sites FACT SHEET Version April 20 COLORBOND steel clad Details for bushfire-prone AS3959-2009 BAL-FZ sites This Fact Sheet describes a range of new steel clad roofing systems that have been designed for areas

More information

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a

More information

DW HORIZONTAL INSTALLATION

DW HORIZONTAL INSTALLATION AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S

More information

Installation guide for 20/20

Installation guide for 20/20 Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British

More information

4600 INSTALLATION INSTRUCTION W/ 2190

4600 INSTALLATION INSTRUCTION W/ 2190 1 STILE PREPARATION DOOR VERTIAL L STRIKE PREPARATION ALUMINUM FRAME.218 1.594 5/32" OFFSET (SEE STEP-8) 1 1/4" RIVNUT INSTALLATION FOR SINGLE OR DUAL LEVERS ON ALUMINUM STILE 5/32" OFFSET (SEE STEP-9)

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 1 October 2012 Ver. 1.2 Window Association of New Zealand Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening

More information

Multi-layer Insulation Blanket for use in Roofs

Multi-layer Insulation Blanket for use in Roofs Multi-layer Insulation Blanket for use in Roofs Massive Thermal Insulation in a Thin, Flexible, Multi-layer Membrane HIGHEST PERFORMING MULTI-FOIL ON FULLY INDEPENDENTLY THE MARKET TESTED KEEPS YOUR FULLY

More information

Curtain Wall Installation Guide

Curtain Wall Installation Guide Curtain Wall Installation Guide Curtain Wall Installation Guide 1 IMPORTANT NOTICES! Important Notices & Information Manufacturer s Notes: The building envelope must be correctly prepared with weather

More information

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME

More information

SUPREME WALL GARDEN ASSEMBLY INSTRUCTIONS 24/08/16 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. SAFETY WARNING 1. Always wear protective glasses, shoes, gloves

More information

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.

More information

Material List for Log Complete Packages

Material List for Log Complete Packages Material List for Log Complete Packages DAYLIGHT BASEMENT EXTERIOR WALLS ( If Applicable ) 2X6 Pressure Treated Sills With 6" Foam Sill Sealer 2X6 K.D. Spruce Plates And Studs 2X10 K.D. Spruce Headers

More information

Trapezoidal Roof KS1000 RW Installation Guide

Trapezoidal Roof KS1000 RW Installation Guide Insulated Roof & Wall Panels UK & Republic of Ireland Trapezoidal Roof KS1000 RW Installation Guide Multiple Panels Eaves to Ridge 150mm End Lap September 2018 Trapezoidal Roof KS1000 RW Components Trapezoidal

More information

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched roof insulation

More information

Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK WA 1 - Ü 150 E

Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK WA 1 - Ü 150 E Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK 150-275 WA 1 - Ü 150 E 1 F Ü R D I E ZU K U N FT G E DAC HT. The alwitra waterproofing system alwitra wall flashing profiles are part of the practically

More information

SmartVent Eave Edge Installation Instructions

SmartVent Eave Edge Installation Instructions SmartVent Eave Edge Installation Instructions STEP 1: Cut a slit 1 wide (or a series of 1 ¾ holes at 3 on center) into the roof decking 6 to 7 up from the drip edge. SmartVent is rated 9NFA. Ensure drip

More information

SHED PACK Step 1: Choose your shed type.

SHED PACK Step 1: Choose your shed type. SHED PACK Step 1: Choose your shed type. Industrial Shed Open FarmShed Shed Pack / Types of Sheds Drawing # S0104.A001 Hanger Shed =DISCLAIMER= Please read and agree to Purlin Brackets Terms and Conditions

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for Data Sheet for Fitting Superquilt Under or over Rafters to Roofs To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call 0844 9919949 From outside the UK Call 0044 1143230474

More information

TOTAL NUMBER OF 150 WATT HPS CONVENTIONAL CUTOFF TYPE 3 LUMINAIRES MOUNTED ON ALUMINUM POLES

TOTAL NUMBER OF 150 WATT HPS CONVENTIONAL CUTOFF TYPE 3 LUMINAIRES MOUNTED ON ALUMINUM POLES FEDERAL PROJET LEGEND OF SYMBOLS PROPOSED FOUNDATION AND METER ABINET, TYPE 2M-M PROPOSED 18"X36" JUNTION BOX GENERAL NOTES PROPOSED JUNTION BOX FOUNDATION TOTAL NUMBER OF LIGHTING UNITS ON THE PROJET

More information

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood

More information

Installation Guide - Evolution Series Wood Siding

Installation Guide - Evolution Series Wood Siding Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration

More information

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR 900 SERIES PANEL CI-DS-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-EL-01-900 CI-EL-02-900 CI-EL-03-900 CI-EL-04-900 CI-EL-05-900 CI-EL-06-900 CI-EL-07-900 CI-EL-08-900 CI-RD-01-900 CI-RD-02-900 CI-RD-03-900 CI-EV-01-900

More information

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25 Installation Manual Pitchglaze Roof Window Contents Contents and introduction 2 Delivery 3 Pre Installation 4 Installation 8 Stage 1. Preparation of the aperture 9 Stage 2. Fitting the Pitchglaze 11 Stage

More information

SHED PACK. Sheds are commonly constructed using portal frames.

SHED PACK. Sheds are commonly constructed using portal frames. SHED PACK Sheds are commonly constructed using portal frames. This pack relates to purchasing portal frame purlin bracket sets. Ruest our free generic engineered and certified shed plans. SHED PACK Step

More information

Plasterboard Ceiling Systems

Plasterboard Ceiling Systems Plasterboard Ceiling Systems 400C Issue 1 2 Plasterboard Ceiling Systems Contents Standard Ceilings Design...3-7 Introduction... 3 Fire Ratings... 3 Systems Mass... 3 Decoration... 3 General Construction

More information

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS ADGV_001_FASTPOS Panel Timber Frame 12mm from top edge 600mm MAX CTRS TIMBER STUDS 200 mm MAX CTRS 50mm from corner Fastener Positioning Scale 1:20 No. ADGV_001 ADGV_003_SHTEDGEPOS Centre line of Timber

More information

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd. Extrusions Updated: N/A Scale: N.T.S REV: - Dwg Dwg Revision Rev No Description Description Date GB-3-IN01 Index Page - - - - - GB-3-001 Extrusions - - - - - GB-3-002 Extrusions - - - - - GB-3-003 Extrusions

More information

Five Star Panel Installation Instructions

Five Star Panel Installation Instructions Five Star Panel Installation Instructions How to Store Five Star Panels You will need to store FIVE STAR PANELS in dry place to prevent staining, deterioration and possibly void all warranties. Stand the

More information

PROJECT INSTRUCTIONS Roofing

PROJECT INSTRUCTIONS Roofing PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015 6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015 Thank you for purchasing a 6x6 Maximizer Storage Shed. Please take the time to identify all the parts prior to assembly. Please Note-

More information

L:\Document Control\DR Drafting\Records\Royce\Facades\Plank\US BenchmarkTM By Kingspan 40% RGB Gold 2013.jpg FACADES - BRICK INDEX SHEET

L:\Document Control\DR Drafting\Records\Royce\Facades\Plank\US BenchmarkTM By Kingspan 40% RGB Gold 2013.jpg FACADES - BRICK INDEX SHEET KPV-DS-01-BRH KPV-PJ-01-BRH KPV-PJ-02-BRH KPV-PJ-03-BRH KPV-BS-01-BRH KPV-BS-02-BRH KPV-BS-03-BRH KPV-OC-01-BRH KPV-IC-01-BRH KPV-FO-01-BRH KPV-FO-02-BRH KPV-FO-03-BRH KPV-SJ-01-BRH KPV-PR-01-BRH KPV-LE-01-BRH

More information

Dear Contractor, I am glad that you are interested in our window rebate program.

Dear Contractor, I am glad that you are interested in our window rebate program. Dear Contractor, I am glad that you are interested in our window rebate program. I have included three documents with this letter. One is our form to indicate your intention to participate in the program.

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

How To Install Windows: Nail-Fin Application

How To Install Windows: Nail-Fin Application How To Install Windows: Nail-Fin Application Required Tools & Materials: Materials: 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into framing For mulled and/or DP50 or above units:

More information

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS CORE WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS Proper Window & Door Flashing Although all possible measures have been taken to insure the accuracy of the material presented,

More information

Finesse Profiles. Nailstrip

Finesse Profiles. Nailstrip Installation Details Profile and Lap Detail 265/465 38mm NAILSTRIP *other widths available CD GRADE PLYWOOD 19mm STRUCTURE SILICONE * MIN 20mm VENTILATION GAP * WHEN ROOF PITCH IS UNDER 7.5 OR TOTAL COMBINED

More information

Chapter 12 - Windows and Doors

Chapter 12 - Windows and Doors Chapter 12 - Windows and Doors Contents Chapter 12 - Windows and Doors... 12-1 Timing & Prerequisites... 12-2 Verifying Windows and Doors Order... 12-3 Windows... 12-4 Prepare the Window Openings... 12-4