1 KERRAFRONT INSTRUCTION FOR INSTALLATIONS AND USE Cellular cladding kerrafront.com
2 - 2 - SUMMARY Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Horizontal installation - general rules - light colours 6 Horizontal installation - general rules - dark colours 7 Ventilation 8 Dilatation 9 Principles of positioning the screws in the fixing holes 10 Horizontal installation - general rules 11 Horizontal installation - CONNEX system 13 Horizontal installation on a timber frame wall 15 Horizontal installation on masonry 17 Installation on masonry wall with metal brackets 18
3 - 3 - INSTALLATION - GENERAL RULES 1. General rules 1.1. Storage Cellular cladding profiles should be stored inside, on a dry, flat and firm base, without direct contact with the ground. While still in its protective sleeving they should not be stored in places where they may be exposed to direct sunlight Transpo (on the pallet) The profiles should be transpo ed in a horizontal position If any visible flaws emerge or irregularities are detected, repo them immediately to the seller before installation Installation temperature The installation should be carried out at ambient temperatures of between 5 C a 30 C. Prior to installation the profiles should be allowed to adjust to atmospheric conditions at the installation site for approx. 24 hrs Dilatation Keep expansion gaps: the change in size due to significant changes in ambient temperature is a natural and inalienable feature of any item of almost any material, including cellular PVC. Therefore, during the installation always mind the necessity of maintaining ca 8- expansion gaps between panel ends and the inside pa s of finishing trims, as shown in the drawings. If the installation takes place in higher ambient temperatures (25-30 C) the clearance should be reduced to ca. 3-4 mm. Bear in mind that with every 10 C of temperature change, total profile length may expand/contract by approx. 0.7 mm per each meter of length Ventilation Keep ventilation gap behind the cladding panels as specified below. Light colours of cladding (white, creme, beige, claystone, light grey, light blue, sand) - ventilation gap of min. 20 mm. Dark colours (anthracite, olive, grey, qua z grey, blue, Wood Design colours) - ventilation gap of min. 40 mm Working with the profiles Cellular PVC profiles and accessory trims can be worked using conventional carpentry tools for cutting, drilling and shaping. Saws with fine-toothed blades should be used and power tools should be operated at the same or higher speeds to those normally used for timber work Do not modify the product by machining its su ace or coating it with a layer of another material Observe all the rules indicated in the instruction for installations and use. 2. Installation 2.1. Preparation of the suppo ing structure The suppo ing structure should be made of timber battens or studs, fastened to walls directly or with the use of metal brackets. IMPORTANT: all battens should be levelled to reduce any su ace irregularities; if necessary, use wedges to level out the irregularities. Timber battens requirements: - should be made of good quality timber, free of knots, the humidity of 15-18%, suitably treated with preservative - should be firmly and reliably fixed using screws / wall plugs or other fixings suitable for the type of substrate - the spacing between intermediate battens/studs directly behind the cladding should not exceed 40 cm centers (max 60 cm for light colours: white, cream, beige, claystone, light blue, light grey) - at the corners of a wall and under joint trims use double battening (or battens of double width) - battens/studs behind the facade cladding should always provide a proper ventilation gap behind the facade panels: a) min. 20 mm for light colours (white, cream, beige, claystone, light blue, light grey, sand) b) min. 40 mm for all other (darker) colours Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other) Installation of finishing trims Fix the ventilation trims and the sta er trims and at the bottom of the area to be clad. IMPORTANT: in order for the cladding to be installed properly in a level fashion, the sta er trims at the bottom of the walls MUST be level. Keep the ends of sta ing trims at least 5 mm apa to allow for expansion. Fix the inner pa s of perimeter trims over suppo ing battens; fix ve ical trims using specified fixings at recommended intervals of 30 cm. Do not fix outer pa s of the 2-pa trims before panels are installed. The outer pa s should be put aside and protected from damage until ready for use Installation of cladding boards Plan out the places of panel butt-joints on the area to be clad. If a center joint trim is to be used, it should be fixed on suppo ing batten at least of the same width (use 2 battens if necessary). If joint covers are to be used to butt-join adjacent panels, they should be staggered to make a regular pattern on a wall. Cut the panels to required lengths based on that planning. Mount the first cladding board on the sta er trim, ensuring that the back leg of the panel is engaged in the trim slot. Board fixing should commence at the center of its length to the batten through the nailing slot or groove at the top edge, then work progressively outwards. Fasteners should always be placed in the middle of the length of a slot. If a nail slot falls outside a suppo ing batten, use a batten offcut, fasten it to the substrate under the required slot and screw the panel to the timber offcut with a fastener. Always make sure that each end of a board is screwed/nailed to a batten. IMPORTANT: Never drive the head of the fastener tight into the panel su ace, as it may hinder any thermal movement. Keep a small clearance between the fastener heads and panel su ace so that each panel can be moved horizontally left/right after all its fasteners have been screwed to the battens. IMPORTANT: maintain expansion gaps between panel ends and the inside pa s of the finishing trims, as indicated above. The gaps will subsequently be concealed by the outer pa s of finishing trims. All joint covers and ve ical trims must be fixed on suppo ing battens. Joint covers should be installed tight to the panel ends as work proceeds - their spacing lugs will automatically provide proper clearance between adjacent panel lengths. Joint covers cannot be placed directly one over another. Joint covers forming a ve ical line should be separated from each other by at least 2 courses of cladding panels. Provide packing behind any panels cut along the top edge; panel off-cuts may be suitable for that purpose Inse the top pa s of all 2-pa trims to finish the installation. No fixings are required. 3. Information for usage During the use, possible colour changes caused by sunlight, in moderate climate, with air temperatures not exceeding 40 C, at a height of up to 1800 m above sea level, may have a homogeneous nature not exceeding the 3rd degree in the grey scale (EN A02). 4. Cleaning and maintenance Cellular cladding profiles are finished, practically maintenance-free products. In order to preserve the esthetics we recomend to clean it at least once a year depending on the degree of soiling. Clean the panels and trims using a domestic detergent solution with a temperature not exceeding 40 C. Do not use solvents or similar aggressive and caustic fluids. Wash the su ace with clean water after cleaning.
4 - 4 - CLADDING BOARDS - DETAILED DESCRIPTION FS-201 Single board Covering width: 180 mm. Installation: horizontal. FS-202 Double board Covering width: 332 mm. Installation: horizontal LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) DARK COLOURS: anthracite (AN), olive (OL), grey (GR), qua z grey (QG), Wood Design graphite (GP),Wood Design silvergrey (SG), Wood Design golden oak (GO), Blue (BL)
5 - 5 - TRIMS AND ACCESSORIES FS-211 Sta er trim FS-252 Top edge trim, 2-piece J-201 Joint cover for FS Installed between adjacent panels, always on a suppo ing batten, in order to butt-join FS-201 cladding boards Installed on the lower edge of a wall, on the ventilation trim. It is used to fix the first cladding panel; invisible after installation. Installed at the top or side edge of a wall, esp. suitable where panels have been cut to required height. 35 FS-222 Universal corner, 2-piece FS-262 Ventilation trim, 2-piece J-202 Joint cover for FS Installed between adjacent panels, always on a suppo ing batten, in order to butt-join FS-202 cladding boards. Installed in corners of walls, can be used as an internal or external corner detail. Installed at the top edge of the clad area in order to allow proper ventilation 35 FS-251 Universal trim FS-282 Center joint trim, 2-piece VOX INOX-UP3.5X35-TX15-A Fitting screw mm 21 8 Usage per 1 m²: single board: 15 pcs double board: 9 pcs Installed ve ically on a side edge or along a diagonal top edge of a wall, can be used as an alternative to FS-252 trim. Installed ve ically for continuous joints between cladding boards on a wall
6 - 6 - HORIZONTAL INSTALLATION - GENERAL RULES - LIGHT COLOURS Pic. 1. KERRAFRONT Single board, double board - installation scheme ROOF mm FITTING SCREW INOX ø 3,5x mm (max 600 mm) 39 mm J-201 / J mm = min. 20 mm 8 mm 3.5 mm 25 mm FITTING SCREW INOX ø 3,5x35 LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other).
7 - 7 - HORIZONTAL INSTALLATION - GENERAL RULES - DARK COLOURS Pic. 2. KERRAFRONT Single board, double board - installation scheme ROOF mm FITTING SCREW INOX ø 3,5x mm 39 mm J-201 / J mm = min. 40 mm 8 mm 3.5 mm 25 mm FITTING SCREW INOX ø 3,5x35 DARK COLOURS: anthracite (AN), olive (OL), grey (GR), qua z grey (QG), Wood Design graphite (GP),Wood Design silvergrey (SG), Wood Design golden oak (GO), Blue (BL) Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other).
8 - 8 - The principle of ventilated cladding requires that the air path must not be obstructed both at the top and bottom of the clad area. 2 Bottom ventilation 3 Window joinery Door / window head 1C 3 3 1A 1B 3 MASKING BOARD 15 mm 2 1 Top ventilation 1A Ventilation under eaves 1B Ventilation under metalwork 1C Ventilation under soffit boards Windowsill mm mm 15 mm FS-262 FS-262
9 - 9 - DILATATION Proper allowance for expansion is made by: keeping sufficient expansion gaps at each board end screwing fasteners not too tight so that the boards can move freely positioning fasteners inside nail slots, at least 1 cm away from their extremes 1 Universal corner FS Universal corner FS ~ ~ ~ 4 ~ 2 Center joint trim FS Top edge trim FS Joint cover J-201 / J-202 Dilatation ~ ~ ~6 mm Dilatation Front Back
10 PRINCIPLES OF POSITIONING THE SCREWS IN THE FIXING HOLES min.
11 HORIZONTAL INSTALLATION - GENERAL RULES Pic. 3. Rules for joining the cladding profiles (FS-201/FS-202) with J-201/J-202 joint covers 400 mm (max 600 mm*) ROOF min. 400 mm mm J-201 / J-202 max 18 m * max. 600 mm for light colours
12 HORIZONTAL INSTALLATION - GENERAL RULES Pic. 4. Joining the cladding profiles (FS-201/FS-202) with FS-282 trim FS mm (max 600 mm*) ROOF mm FS-222 FS-282 <90 FS-282 FS-222 max 6 m * max 600 mm for ligt colours
13 HORIZONTAL INSTALLATION - SYSTEM CONNEX Pic. 5. Rules for joining the cladding profiles (FS-201) - system CONNEX 400 mm ROOF mm B2 C A B1 FS-222 INSTALLATION DIRECTION FS min. 1 cm ~10 cm 3 5 cm ~20 mm x - ventilation gap MIN 20 mm LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) MIN 40 mm DARK COLOURS: anthracite (AN), olive (OL), grey (GR), qua z grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL) x system CONNEX min. 1 cm
14 HORIZONTAL INSTALLATION - SYSTEM CONNEX Pic. 6. Rules for joining the cladding profiles (FS-201) - system CONNEX ROOF mm min. 400 mm FS-222 FS-282 <90 max 10 m
15 HORIZONTAL INSTALLATION ON A TIMBER FRAME WALL Pic. 7. KERRAFRONT Single board / double board on a timber frame wall - ve ical section Pic. 8. Ventilation gap required for LIGHT COLOURED cladding on a timber frame wall - horizontal section INNER WALL OSB PLANK Min. 20 mm VAPOUR MEMBRANE FS-201 / FS-202 TIMBER STUD 22x45 mm FITTING SCREW INOX ø 3,5x35 GAP 400 mm (max 600 mm) LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) TIMBER STUD 22x45 mm Pic. 9. Ventilation gap required for DARK COLOURED cladding on a timber frame wall - horizontal section OSB PLANK INNER WALL OSB PLANK Min. 40 mm VAPOUR MEMBRANE FS-211 TRIM VAPOUR MEMBRANE 2x TIMBER STUD 22x45 mm FITTING SCREW INOX ø 3,5x35 GAP 400 mm DARK COLOURS: anthracite (AN), olive (OL), grey (GR), qua z grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL)
16 INSTALLATION AROUND WINDOWS, TIMBER FRAME WALL Pic. 10. KERRAFRONT Joinery detail on a timber frame wall - ve ical section Pic. 11. KERRAFRONT Joinery corner detail on a timber frame wall - horizontal section TIMBER STUD 22x45 mm OSB PLANK VAPOUR MEMBRANE 15 mm FS-211 TRIM FS-222 TIMBER STUD 22x45 mm OSB PLANK VAPOUR MEMBRANE FS mm PACKING (offcut of a panel) TIMBER STUD 22x45 mm OSB PLANK 5 mm VAPOUR MEMBRANE
17 HORIZONTAL INSTALLATION ON MASONRY Pic. 12. KERRAFRONT Single board / double board, horizontal installation on masonry - ve ical section Pic. 13. Ventilation gap on masonry wall - horizontal section WALL Min. 40 mm TIMBER STUD 50x50 mm 400 mm FITTING SCREW INOX ø 3,5x35 TRIM TIMBER STUD 50x50 Pic. 14. Ventilation gap required on insulated masonry wall between studs - horizontal section WALL TIMBER STUD min 40 mm FS-211 FITTING SCREW INOX ø 3,5x35 TRIM 400 mm (max 600 mm - LIGHT COLOURS) TRIM LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) DARK COLOURS: anthracite (AN), olive (OL), grey (GR), qua z grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL)
18 INSTALLATION ON MASONRY WALL WITH METAL BRACKETS Pic. 15. KERRAFRONT Single board / double board on insulated masonry wall with brackets - ve ical section Pic. 16. Ventilation gap required on insulated masonry wall with brackets - ve ical section mm PACKING (offcut of a panel) BRACKET TIMBER STUD 50x50 mm WALL BRACKET Min. 40 mm FS-201 TIMBER STUD 50x50 mm FITTING SCREW INOX ø 3,5x35 TRIM 400 mm BRACKET FS-211 TRIM
19 INSTALLATION AROUND WINDOWS WITH METAL BRACKETS Pic. 17. KERRAFRONT Joinery detail on insulated masonry wall - ve ical section Pic. 18. KERRAFRONT Joinery corner detail on insulated masonry wall - horizontal section TIMBER STUD TIMBER STUD 50x50 BRACKET FS-201 / FS-202 FS-222 BRACKET FS-211 ALUMINUM PROFILE, VENTED TIMBER STUD FS mm BRACKET 5 mm TIMBER STUD 50x50
20 kerrafront.com Profile VOX sp. z o.o. sp. k. ul. Gdynska Czerwonak Poland V:
KERRAFRONT INSTRUCTION FOR INSTALLATION AND USE. Cellular cladding. profile.vox.pl
KERRAFRONT INSTRUCTION FOR INSTALLATION AND USE Cellular cladding profile.vox.pl - 2 - SUMMARY Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Ventilation
More informationInstallation instructions
Installation instructions Cellular cladding www.kerrafront.com - 2 - Summary Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Horizontal installation - general
More informationInstallation instructions: Elements Vulcan+ Newport Hector Cladding
Technical Data Wood Species Thermally Modified Softwood (Pinus Radiata) Images Profile Newport Hector - Light Band Sawn face - Secret fix 5.4 6.0 8.5 3.0 25.0 3.0 111.0 3.0 12.0 R 3.0 7.0 7.0 123.0 15.0
More informationtechnical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit
Roofline Installation Details This is intended to provide you with a brief overview of the popular products in Kestrel s Roofline range, where they can be used and the main criteria for installation. Typical
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationtechnical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit
Roofline Installation Details This is intended to provide you with a brief overview of the popular products in Kestrel s Roofline range, where they can be used and the main criteria for installation. Typical
More informationShingle Installation Guidelines
Shingle Installation Guidelines General Guidelines Materials to be used Key definitions Cost of roofing Preparation of the roofing deck Materials used for roofing should conform to approved norms and regulations
More informationINSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd
Green esources Material Australia Pty Ltd Congratulations on the fine choice you have made in the selection of this product. outdoor wall panels will give you many years of carefree maintenance. When installed
More informationWPC DECKING TERRACE BOARDS
WPC DECKING TERRACE BOARDS INSTALATION AND MAINTENANCE INSTRUCTIONS MATERIALS SUBSTRATE PREPARATION DEVOREX WPC Decking system is produced from high quality materials containing selected wood flour and
More informationUlltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.
Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction
More informationInstallation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes
Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional
More informationOverlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework.
facade Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. Specification and installation guide Presentation of the system VMZ
More informationWall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK WA 1 - Ü 150 E
Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK 150-275 WA 1 - Ü 150 E 1 F Ü R D I E ZU K U N FT G E DAC HT. The alwitra waterproofing system alwitra wall flashing profiles are part of the practically
More informationINSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS
www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,
More informationKuraStone TM Installation Guide
Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18
More informationInstallation Instructions
Installation Instructions Roof edge trim profile Series TAG multi-piece aluminium profile Front face height: 250-1050 mm supplied with patented 4F brackets as standard height-adjustable, horizontally moveable,
More informationInstallation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. The Fastening Make shingle fastening simpler
More informationGeneral Installation Guidelines
g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working
More informationFeature T&G Timber Floor Installation and Finishing Recommendations
Feature T&G Timber Floor Installation and Finishing Recommendations DATA SHEET 3 RECOMMENDED INSTALLATION PRACTICES Version 1 October 2005 3.0 Introduction This data sheet outlines the recommended practices
More informationInstaller s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS
Uniclass L5:P7113 CI/SfB (4-) Hn7 Installer s Handbook Pocket Guide to Roofline & Cladding Installation BBA BRITISH BOARD OF AGRÉMENT CERTIFICATE NO.91/2620 CERTIFICATE NO.91/2622 BS 7619 Licence No. KM33730
More informationLUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February
LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally
More informationFibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.
Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm
More informationCembrit Patina. Cembrit Cover. Cembrit Solid. Cembrit Transparent
Rainscreen Cladding Your choice. In addition to the range of colours and shades, Cembrit cladding boards are available in four compositions, each with distinctive performance and characteristics. Cembrit
More informationResysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines
Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly
More informationFITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING
FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING SECTION 1 Installers Responsibility Pre-Installation SECTION 2 Glue Down (Solid & Engineered Flooring) SECTION 3 Secret Nailing (Solid & Engineered Flooring)
More informationSHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE
SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE SHIPLOCK CLADDING CN-04E / CN-04W / CN-W008 Prior to the installation of any form of Cladding, it is recommended
More informationDYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals
DYNEX SOFFIT SYSTEM BRANZ Appraisals Technical Assessments of products for building and construction. Dynex Extrusions Limited PO Box 19-133 Avondale Auckland Tel: 09 828 2800 Fax: 09 828 2801 Web: www.dynex.co.nz
More informationEaves Lining Installation Guide
Eaves Lining Installation Guide feb 13 Design Pine Eaves Lining - Installation Like most building products, Design Pine eaves lining has both advantages and limitations therefore a clear understanding
More informationExternal cladding technical instructions
External cladding technical instructions Contents External cladding technical instructions... 1 General... 2 Vertical cladding... 3 Horizontal cladding... 5 Lower end of the cladding and the plinth...
More informationSauna & Steam. Traditional Sauna Installation Instruction Manual
Traditional Sauna Installation Instruction Manual Oceanic Ltd, Pountney Street, Wolverhampton, WV2 4HX Phone: 01902 450 550 sales@oceanic-saunas.co.uk www.oceanic-saunas.co.uk Contents 1.Introduction................................................
More informationInstallation Guide - Evolution Series Wood Siding
Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration
More informationNewTech - CleverDeck Composite Decking Installation Guidelines
NewTech - CleverDeck Composite Decking Installation Guidelines Composite decking has unique characteristics and requires specific fixing requirements that differ from timber. We strongly recommend that
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationInstallation Guide. Deckorum. Composite Decking
Installation Guide Deckorum Composite Decking 1. Introduction Welcome to Deckorum Installation Guide Please fully read the installation guide before commencing any installation works. This will provide
More informationEgger Roofing Board Fast, Easy, Safe: With this board you can reach the top.
Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top. 1 2 Content Content 1 2 Roof Sheathing 4 Importance 4 EGGER Roofing Board 5 Benefits 5 Principles of the EGGER Roofing Board
More informationQuality you can feel. Exterior. Interior
Product guide Quality you can feel As a leading supplier of cutting-edge, intelligently-designed products, Deeplas is at the forefront of design and innovation. Exterior An aesthetically pleasing collection
More informationSiding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE
Siding Systems NOVIKSTONETM DS DRY STACK STONE GENERAL INFORMATION CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 17, 2017 the Roanoke 16'x32' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationAL13 v-line general installation guide
01 TM AL13 v-line general installation guide Vol 1 Version 1 pantented product TM AL13 architectural system www.al13.com CLAD THE WORLD TM How to Install v-line 01 TM AL13 architectural system SHEATHING
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationInstallation Manual 0318
Installation Manual 0318 DOUBLE 7 CEDAR SHINGLE INSTALLATION GUIDE General Information CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION / CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS
More informationInstallation guide. Step-by-step instructions
Installation guide Step-by-step instructions Contents Tools Required to Install p1 Screws & Fixings p2 Injection Moulded Solid Components p3 Components p4 Georgian Hips & Ancillaries p5 Fixing Eaves Beam
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationInstallation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours
TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours This installation guide applies to the installation of Maibec Resistech
More informationSiding Components. Installation Guide
Siding Components Installation Guide 2016 MID-AMERICA SIDING COMPONENTS INSTALLATION GUIDE This guide will show you the products of the Mid-America Siding Components family. It provides specific installation
More informationInstallation Instructions: Urbanline Euro Selekta Clad
Product description Ecology Technical data Urbanline Euro Selekta Clad (selekta façade profiles and heritageselekta façade profiles) are identical in terms of their core material and surface texture. However,
More informationAsh Brook Golf Course Scotch Plains, New Jersey
SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationTruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines
TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly
More informationBest Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016
Best Barns USA Assembly Book revised March 23, 2016 the Brookhaven 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More information40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)
http://www.sundancesupply.com 40mm Thermoclick Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial) U-Profile 12' Lengths $39 Out System offers a complete set of extrusions and accessories
More informationInstallation Guide. deckorum Composite Decking
Installation Guide deckorum Composite Decking 1. Introduction Welcome to Deckorum installation Guide Please fully read the installation guide before commencing any installation works. This will provide
More informationWARNING. Not suitable for children under 36 months Contents
For domestic and family use only Children of any age should not be left to play unsupervised Retain Instructions for future reference WARNING. Not suitable for children under 36 months Contents Length
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x32' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationInspire Aledora Slate Application Guidelines
July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,
More informationThe better way to build TM. Installation Manual ROOF SIPs
The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................
More informationSECTION CARPENTRY
SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x20' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x24' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x28' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More information4256HM JAMES HARDIE MONOLITHIC CLADDING
4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James
More informationVYTEC ARCHITECTURAL SPECIFICATIONS
SCOPE OF WORK SECTION 07464 SIMULATED WOOD SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A) Vytec Solid Vinyl Siding. B) Vytec Vinyl Accessories and Trim. C) Vytec Vinyl Soffits. 1.2 RELATED SECTIONS A) Section
More informationmultipanel Installation (panels) CONTENTS
multipanel Installation (panels) The following is an installation guide for fitting multipanel to walls, tiles, plaster, chipboard or concrete. A separate guide is available for fitting multipanel shower
More informationFORMWALL Ceiling Plank / Board Installation Guide
FORMWALL Ceiling Plank / Board Installation Guide Nuplex Ceiling Plank Installation Guide This fitting guide is for guidance only. Refer to the installing contractor and/or builder for the exact job process.
More informationJoshua Woodsman
CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you
More informationTriple Wheelie Bin Chest Instructions
Triple Wheelie Bin Chest Instructions Please read the instructions carefully before assembling this product and check pieces and fixings using the list below. Parts list: 1 x Left Panel 3 x Back Panel
More informationINSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes
INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes 1) General The panels must be rotated on both short and long edges to fit into one another. This can be performed by inserting either the tongue into
More informationPVC Roofline & Window Trims. The Complete Guide. Sales Material Important Information Installation Guides Range & Prices
20 Extended Guarantee PVC Roofline & Window Trims The Complete Guide Sales Material Important Information Installation Guides Range & Prices Prices Effective 4th June, 2012 - Issue 2 Fax Order Line: 01827
More informationInstallation Instructions
TEL: 09 579-8895 FAX: 09 579-2933 EMAIL: sales@nzfiredoors.co.nz NZ Fire Doors Ltd, 89 Gavin Street, Ellerslie, PO Box 12709, Penrose 1642, Auckland, New Zealand. www.nzfiredoors.co.nz Installation Instructions
More informationInstallation instructions for co-extruded louver-board profiles
Installation instructions for co-extruded louver-board profiles www.silvadec.com / info@silvadec.com / tel.:+33 (0)2.97.45.09.00 TO BE READ CAREFULLY BEFORE INSTALLATION Before starting installation on
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More informationXenon 05 Installation Instructions & Parts List
Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably
More informationInstallation Guide 2016
Installation Guide 2016 BUILDERS EDGE INSTALLATION GUIDE This guide will show you the products of the Builders Edge family. It provides specific installation steps and application details. Our main goal
More informationInstallation Instructions
edium + Heavy duty READ BEFORE INSTALLING UNIT Preliminary instructions: 1. Check window opening size: the mounting parts furnished with this air conditioner are made to install in a wooden sill double-hung
More informationREAD BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION
edium + Heavy duty READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Pay attention to danger and safety notices. be exposed: Carefully
More informationSTEEL FRAMING WEATHERBOARD SYSTEM
T A R A NAK IPINE STEEL FRAMING WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz T A R ANAKIPINE
More informationInstallation Instructions
For Medium (15-18.5K) + Heavy duty (-8.5K) Air Conditioner READ BEFORE INSTALLING UNIT To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges
More informationINSTALLATION MANUAL STORAGE
IMVersion 1.1 INSTALLATION MANUAL GENERAL GUIDE: The information in this IM is intended to serve as a general guide to proper installation with no warranties intended or implied. Prime Panels assumes no
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationLinda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE
Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE Ruler Pencil Masking tape Measuring tape Silicone sealant & silicone gun Power drill & screwdriver High-grab adhesive Jig
More informationCladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable.
Cladding Quick Installation Guide HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable. Installation instructions This document is a step by step guide
More informationAPPLICATION INSTRUCTIONS FOR DINGEWOOD SIDING
APPLICATION INSTRUCTIONS FOR DINGEWOOD SIDING SQUARE FOOTAGE Customers should plan on ordering 10-20% more wood because wood is, by nature, imperfect. Prefinished wood will come pre-stained, but wood planks
More informationE-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'
E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20' BUILD You can construct your own E-Z frame shed with the help of this step by step guide. North American softwood dimensional lumber sizes: Nominal Actual in
More informationTORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS
ENGLISH INSTRUCTIONS TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS Dear Customer, You have chosen a high quality TORLYS Leather floor, well suited for all residential application except bathrooms and
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationInstallation Instructions for Panel Siding and Soffit
Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808
More informationGARDEN SHED BRIGHTOLN
ASSEMBLY INSTRUCTIONS GARDEN SHED BRIGHTOLN Dimensions: 10x10 (1 1/8") IMPORTANT Before beginning the assembly of your garden shed, please read the instructions carefully and follow them closely. By doing
More informationSystem for 2+ Level Buildings
Issued Sept 205 Contact Info@symonite.co.nz System for 2+ Level Buildings Typical Details Issued: September 205 TYPICAL DETAILS CONTENTS.0 TYPICAL VERTICAL JOINTS 2.0 EXT. CORNER / TYPICAL HORIZONTAL JOINT
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More informationSAGIREV Installation Manual
SAGIPER North America Inc 13179 156 Street Edmonton, AB Canada T5V 1V2 T: (780) 482-3445 F: 1 (888) 870-7069 www.sagipernorthamerica.com SAGIREV Installation Manual NOTE: This guide has been prepared and
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More information6 1/2 x 6 1/2 Flat Top Pergola
6 / x 6 / Flat Top Pergola A S S E M B L Y G U I D E Models: Portland, Liberty O P T I O N A L A C C E S S O R Y Bolt Down Bracket Kit V.-0506 Ta b l e o f Co n t e n t s PAGE The Introduction & Overview......................................................
More informationCeiling Installation
Ceiling Installation Sounds Impressive Used with or without optional rockwool insulation panels, all four different millings of Echolinear panelling deliver highly effective sound absorption across a broad
More informationBest Barns USA Assembly Book Revised November 3, 2016
Best Barns USA Assembly Book Revised November 3, 2016 the Aspen II 12' x 8' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive, Greenville, PA 16125 This manual is copyrighted. Under the
More informationInstallation Instructions
For Medium (15-18.5K) + Heavy duty (22-28.5K) Air Conditioner READ BEFORE INSTALLING UNIT To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp
More informationINSTALLATION INSTRUCTIONS
CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16
More informationFaçade CUT-TO-SIZE FAÇADE STRIPS APPLICATION IN OVERLAP ON WOODEN SUPPORTING STRUCTURE APPLICATION INSTRUCTIONS 1 1. GENERAL
Façade CUT-TO-SIZE FAÇADE STRIPS APPLICATION IN OVERLAP ON WOODEN SUPPORTING STRUCTURE APPLICATION INSTRUCTIONS 1 1. GENERAL These application instructions are specifically intended for the fastening of
More informationIOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance
IOM 004 Effective 3/29/04 Rev A MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance Contents Batten Arrangements...3 Slip-On Battens...4 Ceiling Opening...5 Installation...5 Hanger Bracket
More informationINTERNAL LININGS INSTALLATION GUIDE
Your partner in building solutions INTERNAL LININGS INSTALLATION GUIDE General remarks on This installation guide is to be used in conjunction with: specifications Architects specific details Pacific Build
More information