Installation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours

Size: px
Start display at page:

Download "Installation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours"

Transcription

1 TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours

2 TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours This installation guide applies to the installation of Maibec Resistech TM solid colour panels, shingle strips and trims only. Carefully read this entire guide to understand all of the necessary steps and requirements for ensuring proper installation. For assistance, please contact Maibec s technical service toll-free at , Monday to Friday from 8:30 a.m. to 4:30 p.m. (Eastern Time) For the installation requirements for Maibec Resistech TM lap siding and soffits, please consult the installation guides for these products. COMPLIANCE WITH MAIBEC S INSTALLATION, STORAGE AND MAINTENANCE REQUIREMENTS, AND WITH ALL APPLICABLE BUILDING CODES IS MANDATORY. PROBLEMS CAUSED BY FAILURE TO COMPLY WITH THESE REQUIREMENTS AND CODES MAY NOT BE COVERED Maibec Resistech TM engineered siding is for exterior use only. This installation guide has been created according to Maibec s requirements as well as to the requirements in the Louisiana-Pacific Corporation Installation Guide. Maibec s requirements prevail over those of Louisiana-Pacific. Drawings in this document are not to scale and are used solely to illustrate best practices. All dimensions in this document are given in inches. 1. BASIC PRINCIPLES FOR INSTALLING SIDING Exterior siding is essential for protecting a home against water infiltration, but is not watertight. Water accumulation behind the siding can cause it to warp or swell, mould to form and even lead to rot inside the wall. This will affect the siding s performance, durability and appearance. 1.1 MANAGING WATER The following requirements must be respected to properly manage water: Water must be able to drain away freely between the siding and water-resistive barrier. Install flashing over all openings, flat surfaces and wherever moisture drainage is needed. Flashings must have a slope outward at an angle of at least 6% for adequate water drainage. Use weather-seal tape/membrane around windows, doors and all other openings to ensure a tight seal with the water-resistive barrier. This will protect the wall from water infiltration. No horizontal furring strips or surfaces at the bottom of walls to prevent water accumulation. Install gutters and kick out flashings on roofs. ALLOW A MINIMUM CLEARANCE OF: FIGURE 1 OPEN ON TOP CONTINUOUS DRAINAGE OF INFILTRATED WATER OPEN AT BOTTOM FIGURE 2 FIGURE 3 FIGURE 4 6% SLOPE 8" 2" 2 8" from the ground - 2" from adjacent horizontal structures space between the siding and the COMPLIANCE WITH MAIBEC S INSTALLATION, (e.g. STORAGE decks, AND low MAINTENANCE walls, roof shingles) REQUIREMENTS, flashing AND over WITH all ALL openings APPLICABLE BUILDING - between siding and flashing

3 Maibec ResistechTM Panel, Shingle Strips and Trims Solid Colours 1.2 VENTILATING THE WALL Continuous wall ventilation will allow heat and moisture to escape from between the siding and the insulating material. Using furring strips, create ventilated spaces (called air gaps or rainscreens) and leave a minimum open space at the bottom and top of walls to allow air to enter and exit across the entire height and width of the wall. Wall ventilation is especially important when darkcoloured siding and/or foam insulation panels are used. Dark siding absorbs more heat and is more prone to thermal expansion. Foam insulation panels also tend to trap heat. Maibec ventilated strips* will allow proper water and heat management while preventing potential rodents and certain insects from getting in behind the siding. - Ventilated spacer: Used between furring strips at the top and bottom of panels; supports panels while ensuring adequate ventilation and drainage. - Ventilated universal "L" strip: Top of windows, top and bottom of walls, and other types of installation. The addition of spacers is required depending on where the ventilated strip is used. - Ventilated "J" strip: Bottom of windows and tops of walls. - Ventilated universal band: Can be folded and cut on-site to meet any installation requirement. *If non-maibec ventilated strips are used, they must have a minimum 50% opening to ensure adequate ventilation of the wall. FIGURE 5 MOISTURE CAUSED BY HEAT FROM THE SUN AND WATER VAPOUR EXPELLED FROM THE INTERIOR CAN ESCAPE AIR GAP BETWEEN TWO S AIR OUT OPENING AIR IN OPENING 1.3 PROTECTING THE INTEGRITY OF THE SIDING To protect the integrity of the product, always follow the instructions for touching up and nailing the siding. Apply touch-up paint to any bare wood to seal it. This will keep water from seeping into the strands, ensuring the optimal performance of the siding and paint while preventing degradation. [SECTION 5] Correct nailing will result in a stable, long-lasting installation. [SECTION 4] 2. STORAGE Keep the siding in a dry, unheated, well-ventilated area away from the elements and at least 6" from the ground. Never let it come into direct contact with the ground. Cover any unused siding with its original packaging at all times, even during installation. If the original packaging is no longer in good condition, cover the siding with a waterproof tarp. FIGURE 6 MINIMUM 6" FROM THE GROUND 3

4 3. BEFORE YOU BEGIN INSTALLATION 3.1 CHECK YOUR ORDER Make sure the product(s) delivered matches your order (colour, model, dimensions, quantity, nails, accessories, etc.). Sealant. Have touch-up paint on hand. Inspect each piece prior to installing it. Never install a product that appears to be or that you think may be defective. Installed defective products are not covered by the warranty. Contact Maibec at NOTE: Maibec sells sealant for stock program products but not for custom colour products. Be sure to have a sufficient amount of ASTM C920-approved, minimum Class 25 sealant on hand for sealing butt joints, gaps between siding and trim and all other gaps as needed. Maibec does not recommend customizable sealant. For a list of ASTM-compliant sealant, go to maibec.com. 3.2 CONSULT THE BUILDING CODES Make sure you are familiar with the specific requirements of all applicable federal and provincial building codes and municipal by-laws for your region with respect to installing siding, water-resistive barrier, sealant, etc. For the water-resistive barrier and the sealant, follow the manufacturers instructions. For more information, see the National Model Construction Codes on the Government of Canada s website at nationalcodes.nrcc.gc.ca 4. INSTALLATION SYSTEM Maibec Resistech TM siding is installed with Maibec hot dipped galvanized steel ring shank corrosion resistant nails with textured head as described below. These nails must be ordered at the same time as your siding. DO NOT USE STAPLES. 4.1 NAIL SPECIFICATIONS The nails specified below ensure the required minimum real penetration of 1 into solid wood. These nails are available only from Maibec. 8d (2 ) hot dipped galvanized steel ring shank Maibec coil nails with: A minimum.095" shank A minimum.219" head diameter Rings starting at from the head FIGURE 7 2 If Maibec Resistech TM siding is installed in Coastal regions*, unstained stainless steel grade 316 ring shank nails must be used for installing siding and trims. These nails must have the same features (shank, head, length and ring pattern) as that of galvanized steel ring shank nails described above. Failure to comply with this requirement will void the warranties. CORRECT INCORRECT * APPLICABLE COASTAL REGIONS INCLUDE THOSE LOCATED LESS THAN 600 M (2,000 FT) FROM THE COASTLINE IN THE ATLANTIC PROVINCES (NEW BRUNSWICK, PRINCE EDWARD ISLAND, NOVA SCOTIA, NEWFOUNDLAND AND LABRADOR), IN SAINT-PIERRE-ET-MIQUELON, AND IN THE U.S. EAST COAST STATES. For information on installing Resistech products in high wind speed areas, refer to ICC-ES Report ESR-1301 or APA PR-N124. 4

5 Maibec ResistechTM Panel, Shingle Strips and Trims Solid Colours 4.2 NAILING Ensure nails have a minimum real penetration of 1 in a solid substrate (wood, plywood or OSB). Nails must also penetrate into the structure. This penetration is obtained by using two nails to secure the board at the required locations. Do not overdrive nails. Nail head should seat firmly to face of siding but not be overdriven to distort the siding surface. All exposed face nails must be properly sealed in a manner that prevents moisture intrusion and water buildup. FIGURE 8 CONDITION CORRECTION : INVISIBLE NAILS VISIBLE NAILS SNUG FLUSH VISIBLE FIBER COUNTERSUNK 1/16" - 1/8" COUNTERSUNK MORE THAN 1/8" OK OK PAINT APPLY APPLY. RE-NAIL PAINT PAINT PAINT APPLY AND PAINT. APPLY AND PAINT. RE-NAIL 5. TOUCH-UPS To ensure the optimal performance of the siding and paint, all cut panels, batten, shingle strip edges and trims must be resealed to prevent water from seeping into the strands and causing degradation over time. Apply touch-up paint to all cut or planed surfaces and to all exposed substrate, even if it will not be visible after the siding is installed. Always touch up boards BEFORE installing them. FIGURE 9 FIGURE 10 RESEAL ALL CUT BOARDS APPLY PRECISELY DO NOT SPILLOVER OR OVERBRUSH Apply touch-up paint to all visible nail heads (and some invisible nail heads - FIGURE 8). Most of these nails can be found on panels, battens, shingle strip edges installed above doors, above and under windows, along the starter course, on corner trims, as well as around doors, windows and other openings on the wall. Use a polyester, nylon or any synthetic applicator with firm bristles approved for water-based coatings. Touch-up paint is included with your order. If you need more, you can purchase a Maibec-approved paint from your retailer. See the list of Maibec-approved paints in the Painting Guide at maibec.com. NEVER APPLY TOUCH-UP PAINT OVER NON-DAMAGED OR UNCUT FACTORY COATED MATERIAL. IMPROPER APPLICATION OF THE TOUCH-UP PAINT CAN RESULT IN DIFFERENCES IN COLOUR THAT WILL NOT NECESSARILY APPEAR IMMEDIATELY, BUT WHICH MAY BECOME MORE NOTICEABLE OVER TIME AFTER PROLONGED EXPOSURE TO ULTRAVIOLET RAYS. For more information, consult the touch-up guide that accompanies the touch-up paint or go to maibec.com. 5

6 6. Use a ASTM C920-approved, minimum Class 25 sealant for sealing butt joints, gaps between siding and trim, and all other gaps as needed. 7. GENERAL STRUCTURE OF THE WALL Siding and trims must be installed over: A standard maximum 16" stud built wall. Nailing base consisting of furring strips and OSB (oriented strand board) or plywood, or foam insulation panels combined with OSB or plywood. For siding panels only: Ventilated spacer between furring strips at the top and bottom of panels. Approved water-resistive barrier (Tyvek, Typar, etc.). Flashing installed over all openings, flat surfaces and wherever moisture drainage is needed. Weather-seal tape/membrane around windows, doors and all other openings to ensure a tight seal with the water-resistive barrier. This will protect the wall from water infiltration. Ventilated barriers preventing rodents and certain insect from infiltrating behind the siding. Check the structural integrity of the wall prior to installation. It must be solid and straight, with an adequate nailing base to hold the siding securely in place. Maibec cannot be held responsible for any damage to the siding caused by the movement of a structure that has not been built on a frost-protected foundation. FIGURE 11 WATER-RESISTIVE BARRIER "L" FOUNDATION (PANELS ONLY) Verify that the wall s watertightness is ensured by a properly installed water-resistive barrier and appropriate flashing. If you are using insulating concrete forms (ICF), please contact Maibec for technical assistance. 8. MAIBEC RESISTECH TM PANEL AND SHINGLE S INSTALLATION MAIBEC RESISTECH TM PANEL CAN ONLY BE INSTALLED VERTICALLY. MAIBEC RESISTECH TM SHINGLE S CAN ONLY BE INSTALLED HORIZONTALLY. 8.1 MANDATORY VERTICAL S Vertical furring strips create a ventilated space (called an air gap or rainscreen) between the siding and the waterresistive barrier. This space allows any water that may infiltrate behind the siding due to driving rain, wind or morning dew to escape rather than accumulating behind the siding. It also allows water vapour from inside the building released by the water-resistive barrier to escape without damaging the wall. MANDATORY SPECIFICATIONS 1" x 3" furring strips (1" x 4" or 2" x 3" is acceptable) must be used. This requirement applies especially when foam insulation panels less than 1 thick are used. Furring strips must be kiln-dried with a moisture content below 19%. They must be new, straight and undamaged. If the siding is being installed as part of a renovation project, replace all existing furring strips with new compliant strips. 6

7 Maibec ResistechTM Panel, Shingle Strips and Trims Solid Colours 8.1 Mandatory vertical furring strips (cont d) INSTALLING S Install furring strips vertically and secure them firmly to the structure using one staggered nail or angle screw every 6" maximum. Nails/screws must have a maximum penetration of 1 in the structure. [FIGURE 12] Furring strips should have a maximum spacing of 16" on centre. Maibec prohibits a spacing of 24" between furring strips. Furring strips must extend beyond the concrete foundation line by 1" minimum to ensure the overlap of the siding and the foundation. FIGURE 12 STRUCTURE 6" MAXIMUM BETWEEN NAILS/ SCREWS 16" BETWEN S FOUNDATION S MUST EXTEND BEYOND THE FOUNDATION 1" MINIMUM FIGURE 13 NEVER INSTALL S DIAGONALLY, WHICH WILL IMPEDE VENTILATION OF THE WALL AND PREVENT WATER FROM DRAINING FREELY. NEVER INSTALL S HORIZONTALLY AT THE BOTTOM OF WALLS OR AROUND DOORS AND WINDOWS. [FIGURE 13] FORBIDDEN IMPORTANT - If foam insulation panels exceeding 1" in thickness are used or if the siding is installed in a high wind speed area, 1" x 4" or 2" x 3" vertical furring strips must be installed over the insulation to hold it in place. It is the installer s responsibility to ensure the furring strips are firmly nailed/screwed to the structure and spaced a maximum of 16" on centre with a minimum nail/screw penetration depth of 1. Nails/screws cannot be spaced further apart than the width of the siding. Maibec and Louisiana-Pacific will assume no responsibility for any damage or condition arising from the use of foam insulation panels. 8.2 PREPARING THE BOTTOM OF WALLS AND THE STARTER COURSE FIGURE 14 BOTTOM OF WALLS Install siding at least 8" from the ground to avoid exposing it to splashing rain and soil moisture. [FIGURE 14] Siding should never come into direct contact with the ground. Cut the surface of the siding such that the rotation of the blade cuts downward on the prefinished surface. 8" FROM THE GROUND 1" "L" 7

8 8.2 Preparing the bottom of walls and the starter course (cont d) STARTER COURSE WITH MAIBEC S Use one of the following ventilated strips* for the starter course: - Ventilated universal "L" strip: The ventilated universal "L" strip ensures proper ventilation and drainage behind panels and shingle strips. A shim must be installed along the bottom of the ventilated strip to create the correct angle for the shingle strip. The shim consists of 1 high by thick piece of siding and must run the entire perimeter of the building. Touch-up stain should be applied to the entire shim. [FIGURE 15] - Ventilated universal band: Use the universal band if furring strips exceed 3/4" in thickness or if insulation panels are used. The ventilated band will cover the furring or insulation panels, preventing potential rodents and certain insects from getting behind the siding. The addition of a spacer is required for shingle strip. *If non-maibec ventilated strips are used, they must have a minimum 50% opening to ensure adequate ventilation of the wall. Install the ventilated strip with a precision (laser) level or other type of level directly over the furring strips. The bottom of the furring strips should reach to the bottom of the ventilated strip. Secure with 2 nails horizontally every 16". - Ventilated spacer: Used between furring strips at the top and bottom of panels; supports panels while ensuring adequate ventilation and drainage. FIGURE 15 "L" 16" 8.3 NAIL PLACEMENT ON SIDING MAIBEC RESISTECH PANELS (VISIBLE NAIL SIDING) Install panels over furring strips with a maximum spacing of 16" on center. The edges of panels with overlap grooves must fall directly in the centre of the furring strip. Space nails 6" on center along the vertical edges of the panel. Nails spaced 6" on center along the bottom groove will be covered by the overlap flange. Nails spaced 6" on center on the overflap flange should be 1" from the edge of the panel. Use 2 nails at the top and bottom of panels between furring strips centered at 5. Nail panel on intermediate furring strips at 12" on center vertically. [FIGURE 26] Nails will be exposed on the overlap flange, along the horizontal edges at the top and bottom of panels and below window sills. Apply touch-up paint to all visible nails. It is recommended to use a fine-tooth carbide blade to ensure as smooth a cut as possible and to maintain the lifespan of the blade. Cut the surface of the siding so that the rotation of the blade cuts downward on the prefinished surface. 8

9 Maibec ResistechTM Panel, Shingle Strips and Trims Solid Colours 8.3 Nail placement on siding (cont d) BATTENS To install battens, use 2 nails at each end, with additional nails spaced a maximum of 12" apart vertically on alternating edges along the length of the batten. [FIGURE 17] FIGURE 17 FIGURE 16 PANEL 1" BATTEN TIP Space battens symmetrically on the wall. Battens should cover the nails at panel joints. [FIGURE 16] 1/8" 1/8" PANEL WITH 1" X 2" BATTENS SHINGLE S (VISIBLE NAILS) Start by nailing a 1 high by thick shim to the ventilated strip. [FIGURE 18] FIGURE 18 Staggered shingle strip: When installing the staggered strip over another material, the starter strip should be installed with the right side facing down. Continue installation according to the instructions in the next point. Working from left to right, install the first row of siding so that the random edge does not extend more than below the shim. Cut the left edge so that the siding butts snugly against the corner board, with a gap of 3/16. Make sure the other edge of the strip falls against a stud so that it can be nailed in place. 1 3/4" OVERLAP 10" EXPOSURE 3/4" Straight shingle strip: Working from right to left, install the first row of siding so that the straight edge does not extend more than below the shim. Cut the right edge so that the siding butts snugly against the corner board, with a gap of 3/16". Make sure the other edge of the strip falls against a stud so that it can be nailed in place. 1" Use the "alignment groove" in the edge of the shingle strip as an automatic guide for overlapping each row of shingles. At least 1 3/4" of the lower part of the groove should be covered. Nail 3/4" from the bottom edge to penetrate both layers of siding. All siding joints should fall on studs. Double nail at the edges of shingle strips. [FIGURES 19, 20 AND 21] "L" 8" FROM THE GROUND 9

10 8.3 Nail placement on siding (cont d) FIGURE 19 FIGURE 20 FIGURE 21 16" 16" 3/4" STAGGERED SHINGLE STRAIGHT SHINGLE 1 1/4" 8.4 END JOINTS 3/4" ALIGNMENT NOTCH 1" 1 1/4" PANEL-TO-PANEL AND PANEL-TO-TRIM Joints must occur over a furring strip and the bottom panel must be centred. Nail at least from the top and 1" from the edge of the panel. [FIGURE 22] Where the siding butts against trim, door frames, masonry, etc., leave a 3/16" to 1/4" gap and apply sealant. [FIGURE 25] PANEL, SHINGLE S AND TRIM CAN VARY BY UP TO 1/16" (+/ ) IN THICKNESS. AS A RESULT, SOME BOARDS MAY NOT ALIGN PERFECTLY. THIS IS NORMAL AND TO BE EXPECTED. PANEL-TO-PANEL FIGURE 22 FIGURE 23 1" FIGURE 24 1/8" 1" 1/8" 1/8" NAILING ALONG LOWER SURFACE NAILING GROOVED PANEL SURFACE NAILING NON-GROOVED PANEL PANEL-TO-TRIM FIGURE 25 SPACING BETWEEN 3/16" TO 1/4" USE ONLY WHERE NEEDED. IMPROPER USE OF MAY PREVENT WATER DRAINAGE. APPLY 10

11 Maibec ResistechTM Panel, Shingle Strips and Trims Solid Colours 8.5 SUBSEQUENT COURSES PANEL Do not force siding during installation. Joints must fall in the center of furring strips. [FIGURE 26] Verify course alignment with a level at every panel and adjust as needed. A maximum gap of 1/16" between panels is considered normal. If you are installing one panel above another, leave a gap between flashing and the upper panel. [FIGURE 27] Make sure there is a ventilated spacer running along the top and bottom of each panel to properly support it and to provide adequate ventilation and drainage. 12" 5 6" FIGURE /8" AT THE BOTTOM AND TOP OF THE PANELS 1" BATTENS If using battens, make sure they are not longer than the height of one storey. [FIGURE 28] SHINGLE S Depending on whether you re following the random or straight strips installation method, begin installing the subsequent rows in the same way, but cut each length so that joints are staggered. For best results, shorten the first piece of the second row by 16" and the first piece of the third row by 32". Repeat this sequence every three rows. [FIGURE 19] FIGURE 27 FIGURE 28 "L" PANEL PANEL PANEL BATTEN 9. TRIMS AND CORNERS Trims should be thick enough so the siding does not extend beyond the face of the trim. 9.1 CUTTING TRIMS For the cleanest cut and longer blade life, a fine-tooth carbide tipped blade is recommended. Cut the surface of the trim such that the rotation of the blade cuts downward on the prefinished surface. 11

12 9.1 Cutting trims(cont d) Do not rip and/or rout the trim, as FIGURE 29 it will leave the edges unprotected. All cut trims must be resealed to prevent water from seeping into the strands. Apply touch-up paint to all cut surfaces and/or to all exposed substrate, even if it will not be visible after the siding is installed. TOUCH-UP NO 45 DEGREE NEVER NAIL DO NOT MITER DO NOT MITER Always touch up boards BEFORE PAINT DIAGONAL INTO EDGES EDGES CUT THE installing them. CUTS CORNER JOINT Do not miter trim ends or edges. 45 degree diagonal cuts of trim ends around door and window opening are not permitted, as well as joining. 9.2 NAILING TRIMS AND END JOINTS For trims under 7" wide, fasten with 2 nails at both ends, with additional fasteners spaced a maximum of 12" along alternating edges the length of the trim. [FIGURE 30] Nails must have a penetration of 1 1/8" in solid wood. Apply nails to meet specifications in Section 4. Nail quantity: - For trims under 7" wide use a minimum of 2 nails per width. - For trims 7" to 12" wide use a minimum of 3 nails per width. A 3/16" to 1/4" gap is required at trim joints and where edges of trim meet siding material, windows, doors or other finished openings to allow for proper sealing. FIGURE 30 FIGURE 31 FIGURE 32 2 NAILS AT TOP AND BOTTOM OF TRIM MAXIMUM 12" BETWEEN NAILS MAXIMUM 6" BETWEEN NAILS 3 NAILS AT TOP AND BOTTOM OF TRIM 2 NAIL SEALED END JOINT 3/16" TO 1/4" GAP AND SEAL TRIM UNDER 7" WIDE AND BATTEN 1" x 2" AND 1" x 3" 7" TO 12" TRIM 9.3 CORNERS Maibec recommends finishing corners with Resistech TM trims or Maibec metal corners. FIGURE 33 3/16" TO 1/4" GAP 3/16" TO 1/4" GAP TRIM MUST EXTEND BEYOND FACE OF SIDING TRIM MUST EXTEND BEYOND FACE OF SIDING 12

13 Maibec ResistechTM Panel, Shingle Strips and Trims Solid Colours 10. JUNCTIONS 10.1 SIDING-DECK JUNCTION Siding must never come into direct contact with a balcony or deck. At all times, the installation should allow rainwater to drain freely and prevent pooling water from ice dams from penetrating behind the siding. Leave a 2" space between adjacent horizontal structures and a space between the siding and the flashing. [FIGURE 34] Install the ventilated starter strip directly to the furring at the bottom of the wall. "L" AND FIGURE 34 DECK DRAINAGE AND AIRFLOW 2" BETWEEN STRUCTURES 10.2 DORMER-ROOF JUNCTIONS Leave a 2" space between the siding and the surface of the roof to allow water to drain freely. [FIGURE 35] Install the ventilated "L" strip or the universal band at the bottom of the dormer. 2" FIGURE 35 2" ROOF CLADDING "L" 2" 10.3 OTHER JUNCTIONS Always install flashing and a ventilated strip to ensure ventilation when there is on the same wall: SIDING AND OTHER MATERIAL FIGURE /2 OR MORE STORIES OF PANEL 2 1/2 OR MORE STORIES OF PANEL AND BATTEN TOP "L" AND FIGURE 37 "L" AND FIGURE 38 "L" AND TRIM BOTTOM OTHER MATERIAL PANEL "L" AND "L" AND PANEL BATTEN 13

14 11. WINDOW AND DOOR FINISHING DETAILS The siding s installation must allow for continuous ventilation and adequate drainage above and below all openings. Maibec offers a full range of ventilated trims to ensure this. If you plan to install Maibec Resistech TM trims, you must properly set the window or door depth according to the thickness of the furring strips, the siding being installed and the trim. The trim must not extend too far past the window or door frame in areas where water can accumulate (header and sill). If the siding butts to the frame, the frame must be as deep as the thickness of the wall plus the thickness of the siding. Always install trims before installing the siding ABOVE WINDOWS Flashings over openings must: Have a slope outward at an angle of at least 6%. Minimum spacing between flashing and the siding to allow for adequate drainage and air flow. Cover the building element below it vertically by at least. Projection of at least 1/4" beyond the outer face of the building element below it. A shim must be added to the row of shingle strips installed at the tops of windows. See section 8.3 for more details. The ventilated spacer is required between furring strips at the bottom of the panel. [FIGURE 11] WITH MAIBEC RESISTECH TM TRIM FIGURE 39 BETWEEN TWO S "L" TRIM 6% 1/4" WITHOUT MAIBEC RESISTECH TM TRIM FIGURE 40 BETWEEN TWO S "L" 6% 1/4" 14

15 Maibec ResistechTM Panel, Shingle Strips and Trims Solid Colours 11.2 BELOW WINDOWS All flat horizontal surfaces (such as window sills) are prone to water or snow accumulation. To avoid such accumulation, one of the following options is mandatory: Flashing with a minimum 6% slope Sealant Ventilated spacer (panel only) To minimize movements in the boards, ventilation at the bottom of windows is required when the window has a width of more than 4 ft and is located more than 4 ft from the first course. WITH MAIBEC RESISTECH TM TRIM FIGURE 41 FIGURE 42 TRIM INCORRECT WITHOUT MAIBEC RESISTECH TM TRIM BETWEEN TWO S 3/4" "J" TOUCH UP NAIL HEAD FIGURE 43 BETWEEN TWO S FIGURE 44 3/4" "J" TOUCH UP NAIL HEAD TIP For a neat finish, make a cut in the board of siding and insert underneath the ventilated "J" strip. 12. TOP OF WALLS FINISHING DETAILS Several ventilated strips can be used to allow air to circulate and for heat to escape at the top of the wall. WITHOUT MAIBEC RESISTECH TM TRIM - "J" FIGURE 45 3/4" BETWEEN TWO S WITHOUT MAIBEC RESISTECH TM TRIM - "L" FIGURE 46 BETWEEN TWO S "J" "L" TOUCH UP NAIL HEAD *WHEN ROOF OVERHANG EXCEEDS 2" 15

16 12. Top of walls finishing details (cont d) WITH MAIBEC RESISTECH TM TRIM - "L" OR BAND* FIGURE 47 BAND BETWEEN TWO S FLAT ROOF BAND FIGURE 48 ROOF BETWEEN BAND TWO S 3/4" TOUCH UP NAIL HEAD 2" TRIM SIDING *WHEN ROOF OVERHANG EXCEEDS FINISHING GABLES AND BOTTOM SIDES OF DORMERS The ventilated "J" strip allows for proper ventilation of the wall. Extra pieces of furring strips must be added at the top of the wall. These pieces must be 3 long to allow siding to be properly nailed in place without blocking airflow. Do not add furring diagonally as this will block airflow. FIGURE 49 SHINGLE S VENTLATED "J" INSTALLED ON AN ANGLE FIGURE 50 VENTLATED "J" TRANSITION 3/4" PANEL TOUCH UP NAIL HEAD Refer to section 8.5 and 10.3 for siding junctions. 14. MAINTENANCE As with all exterior products, siding is prone to organic or inorganic substances accumulating on its surface over time. This is a natural phenomena and is to be expected. To ensure the performance and longevity of your siding, check its appearance on a regular basis. See the maintenance guide at maibec.com for more details. 16 IMPORTANT: COMPLIANCE WITH MAIBEC S INSTALLATION, STORAGE AND MAINTENANCE REQUIREMENTS, AND WITH ALL APPLICABLE BUILDING CODES IS MANDATORY. PROBLEMS CAUSED BY FAILURE TO COMPLY WITH THESE REQUIREMENTS AND CODES MAY NOT BE COVERED BY THE APPLICABLE maibec.com CODES IS MANDATORY. PROBLEMS CAUSED BY FAILURE TO COMPLY WITH THESE REQUIREMENTS AND CODES MAY 202 NOT 1984, BE COVERED 5 e Rue, Lévis QC REGISTERED TRADE-MARK PROPERTY OF MAIBEC INC. COPYRIGHT - MAIBEC INC PRINTED BY THE IN CANADA APPLICABLE MAY 2018 WARRANTIES. A A N G6W 5M6 Canada

SIDING INSTALLATION GUIDE

SIDING INSTALLATION GUIDE READ THIS ENTIRE GUIDE CAREFULLY BEFORE INSTALLING NOBELIA SIDING. This installation guide applies to all NOBELIA siding profiles, including SPF tongue-and-groove and exposed nail siding. IMPORTANT: FAILURE

More information

PRIMED STRAND REVERSIBLE SHAKE

PRIMED STRAND REVERSIBLE SHAKE PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems

More information

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. The Fastening Make shingle fastening simpler

More information

application instructions

application instructions application instructions architectural collection cedar shake 76 series lap siding General At the time of manufacture, siding meets or exceeds the performance standards set forth in Composite Panel Association

More information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.

More information

Installation Guide - Evolution Series Wood Siding

Installation Guide - Evolution Series Wood Siding Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration

More information

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,

More information

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Includes: Cove, Craftsmen Staggered, Diamond, Fish Scale, Octagon, Round and Old Mill Shingle Lap Important: Read and understand

More information

Installation Instructions for Panel Siding and Soffit

Installation Instructions for Panel Siding and Soffit Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808

More information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture A B A - Open / Closed (Page 5) B - Vented (Page 6) ON SITE STORAGE Store off the ground well supported, on a flat well-drained

More information

Shapes Siding. Perfection Shingles. Chalk Line

Shapes Siding. Perfection Shingles. Chalk Line Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

Individual Shingles Installation Guide

Individual Shingles Installation Guide Individual Shingles Installation Guide Read this entire guide before installing Maibec individual shingles. For proper installation, you must understand and follow all requirements and steps correctly.

More information

Application Instructions

Application Instructions Application Instructions Architectural Collection, Precision Series & Foundations Soffit GENERAL These soffits can enhance the appearance of almost any roof overhang. The advantages of GOODStyle soffit

More information

Installation Guide Classic Series Wood Siding

Installation Guide Classic Series Wood Siding Installation Guide Classic Series Wood Siding Please read the following instructions prior to beginning your installation. The following installation guidelines have been produced in accordance with the

More information

Ash Brook Golf Course Scotch Plains, New Jersey

Ash Brook Golf Course Scotch Plains, New Jersey SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

Installation Instructions for TruWood Reversible Trim

Installation Instructions for TruWood Reversible Trim Installation Instructions for TruWood Reversible Trim Important: Read and understand all pages of the installation instructions before starting the trim application. For TruWood care and maintenance information,

More information

eco-shake INSTALLATION INSTRUCTION

eco-shake INSTALLATION INSTRUCTION 1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,

More information

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS This product can be used for interior and exterior installations. Much of this guide refers to exterior installation, however, many of the construction

More information

KuraStone TM Installation Guide

KuraStone TM Installation Guide Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18

More information

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES F-WAVE REVIA SYNTHETIC ROOFING SHINGLES Installation Manual for Steep-Slope Residential Installations For support with all other Steep-Slope Installations, please call F-Wave Technical Support at 888-GO-FWAVE.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16

More information

Technical Note No. 028

Technical Note No. 028 Technical Note No. 028 38 Series Strand Substrate for Board & Batten Applications This Technical Note provides guidance for the application of 38 Series Strand Substrate for Board & Batten Applications.

More information

Technical Note No. 026

Technical Note No. 026 Technical Note No. 026 Strand Substrate Installed Vertically for Board & or Board-on-Board Applications This Technical Note is an addendum to the Strand Substrate Application Instructions and Trim and

More information

Installation Instructions

Installation Instructions Installation Instructions SLICKER CLASSIC RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Insulation Board Installation 5 EIFS Installation 6 Top of

More information

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11 INSTALLATION MANUAL CONTENTS Important Notes... 2-4 Weather Protective Barriers... 2 Storage and Transportation... 2 Tools and Equipment... 2 Fastener Choices... 3 Wall Preparation... 3,4 Flashing... 4

More information

RED DIAMOND SHINGLES Roof Installation Introduction:

RED DIAMOND SHINGLES Roof Installation Introduction: RED DIAMOND SHINGLES Roof Installation Introduction: The guidelines set forth in this manual are intended for use with the application of Red Diamond shingles. Wallaba specie (Eperua Falcata) shingles

More information

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TABLE OF CONTENTS This installation guide provides detailed step-by-step instructions for do-it-yourself projects. We invite you to read it carefully and

More information

ForceField Air & Water Barrier System. installation instructions

ForceField Air & Water Barrier System. installation instructions ForceField Air & Water Barrier System installation instructions Protection and Performance inside and out The ForceField air and water barrier system consists of engineered wood sheathing panels laminated

More information

Tapersawn Shake Installation Instructions

Tapersawn Shake Installation Instructions Smart-Shingle TM System Tapersawn Shake Installation Instructions INSTALLATION GUIDE MARKS Shake-Strip 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

More information

Effective February, 2015

Effective February, 2015 Effective February, 2015 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

The Beauty Of Wood. Made Better. Product Specifications LPZB0590

The Beauty Of Wood. Made Better. Product Specifications LPZB0590 The Beauty Of Wood. Made Better. Product Specifications LPZB0590 LP SmartSide Trim Specifications Reversible Two Premium Looks The natural look of cedar on one side and smooth on the other Interior or

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

Inspire Aledora Slate Application Guidelines

Inspire Aledora Slate Application Guidelines July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,

More information

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional

More information

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Inspire Slate Starter Piece Hip and Ridge. 13 1/2 Height: 13 ½ Width: 12 Squares/ Pallet. Bundles/ Square December 2017 Classic Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,

More information

Installation Guidelines

Installation Guidelines Installation Guidelines Tando Building Products provides these instructions as general guidelines only. Tando Building Products neither installs exterior cladding nor has any control over any installation.

More information

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally

More information

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Sun Windows General Information New Construction Sliding Door Installation Instructions H F A G B D C H F H E H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape

More information

All Window Installation Instruction

All Window Installation Instruction 1 All Window Installation Instruction Hurd Window Installation Instructions for Nail Fin & Wood Brick Mould Units Nail Fin Windows See Pages 2-11 Wood Brick Mould Windows See Pages 2-6, 8 & 12BM - 14BM

More information

STEEL FRAMING WEATHERBOARD SYSTEM

STEEL FRAMING WEATHERBOARD SYSTEM T A R A NAK IPINE STEEL FRAMING WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz T A R ANAKIPINE

More information

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply

More information

PROJECT INSTRUCTIONS Roofing

PROJECT INSTRUCTIONS Roofing PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not

More information

BARDOLINE INSTALLATION INSTRUCTIONS

BARDOLINE INSTALLATION INSTRUCTIONS BARDOLINE INSTALLATION INSTRUCTIONS www.onduline.com CONTENTS General conditions Material requirements Terms Estimating shingle requirements Roof preparation Shingle application 9 GENERAL CONDITIONS ONDULINE

More information

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation. Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

Installation Manual SOLID CORE SIDING

Installation Manual SOLID CORE SIDING Installation Manual SOLID CORE SIDING SOLID CORE SIDING Installation Information contained in this manual can be viewed in video form at: www.youtube.com/epbc CONTENTS Important Notes...2-4 Weather Protective

More information

Effective April 1, 2013

Effective April 1, 2013 Effective April 1, 2013 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning

More information

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 1 Directions For Applying Malarkey 3-Tab Shingles GENERAL INSTRUCTIONS Install Malarkey 3-tab shingles according to building code and local amendments.

More information

Installation Instructions

Installation Instructions Installation Instructions SLICKER MAX RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Top of Wall Detail 5 Bottom of Wall Detail 6 Wall Corner Detail

More information

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations

More information

Shingle Installation Guidelines

Shingle Installation Guidelines Shingle Installation Guidelines General Guidelines Materials to be used Key definitions Cost of roofing Preparation of the roofing deck Materials used for roofing should conform to approved norms and regulations

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

Tools required by installer: Materials required by installer:

Tools required by installer: Materials required by installer: Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely

More information

Sun Windows General Information New Construction Hinged Door Installation Instructions

Sun Windows General Information New Construction Hinged Door Installation Instructions A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1790 Reissued September 1, 2012 This report is subject to renewal September 1, 2013. A Subsidiary of the International Code Council

More information

Window Frame Installation Instructions For Nail-on and Block Frames

Window Frame Installation Instructions For Nail-on and Block Frames General The key to any window or door installation is preparation. This extends from storage of the product to the final installation and to all points in between. Careful planning and attention to detail

More information

INSTALLATION PROCEDURE

INSTALLATION PROCEDURE Vinyl Siding INSTALLATION PROCEDURE Tools Needed and Preparation MOST ESSENTIAL TOOLS The proper tools, materials and equipment can make the installation of Durabuilt Vinyl Siding much easier. Here are

More information

Five Star Panel Installation Instructions

Five Star Panel Installation Instructions Five Star Panel Installation Instructions How to Store Five Star Panels You will need to store FIVE STAR PANELS in dry place to prevent staining, deterioration and possibly void all warranties. Stand the

More information

Eagle clad double-hung window installation instructions

Eagle clad double-hung window installation instructions Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for

More information

Installation Guidelines

Installation Guidelines Installation Guidelines Exteria Building Products provides these instructions as general guidelines only. Exteria Building Products neither installs siding nor has any control over any installation. The

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME

More information

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM

More information

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application 1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE

More information

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding** TYPAR WEATHER PROTECTION SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS Table of Contents...01 Special Installation Considerations...01 Code Requirements...02 Approvals and Reports...02 Recommended Materials...02

More information

C e r t a i nte e d. FiberCement Siding

C e r t a i nte e d. FiberCement Siding C e r t a i nte e d FiberCement Siding Installation Manual TABLE OF CONTENTS Section 1: Before you begin...1 Section 2: Safety...2 Section 3: Storage and Handling...3 Section 4: Tools and Accessory Items...4

More information

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.

More information

Appendix A. Additional Information ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF)

Appendix A. Additional Information ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF) Appendix A Additional ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF) Considering the proprietary nature of Insulated Concrete Forms (ICF) and the number of ICF manufacturers currently

More information

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. SECTION 07460 LAP SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. B. Factory-finished fiber cement lap siding, panels, single,

More information

Installation Instructions for Siding

Installation Instructions for Siding Smart-Shingle TM System "The new smart way to install cedar shingles." - This Old House Installation Instructions for Siding V3.2 INSTALLATION GUIDE MARKS Shingle-Strip 0 1 2 3 4 5 6 7 8 9 10 11 12 13

More information

Slate Shingle Specifications

Slate Shingle Specifications Slate Shingle Specifications California Slate is a proud member of the Slate Roofing Contractors Association of North America, Inc. (SRCA) which publishes Section 07310 Slate Shingles setting forth architectural

More information

Polytegola N. Bitumen Roof shingles. Application guide

Polytegola N. Bitumen Roof shingles. Application guide Polytegola N Bitumen Roof shingles Application guide Application manual POLYTEGOLA N CONTENT 1. Foreword - General conditions 3 2. POLYTEGOLA N designs 4 3. Roof pitches 5 4. Storage 5 5. Roof decking

More information

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No. Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 PART 1 GENERAL 1.1 SCOPE OF WORK.1 Total roof area approximately 1,312 m 2. The Work includes, but is not limited to:.1 Removal and disposal

More information

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

MAXISHINGLE LAP SIDING INSTALLATION GUIDE

MAXISHINGLE LAP SIDING INSTALLATION GUIDE MAXISHINGLE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations

More information

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Adorn Mortarless Stone Veneer Installation Natural Concrete Products Adorn Mortarless Stone Veneer Installation Adorn Mortarless Stone Veneer can be used on new or existing construction. Adorn is nailed or screwed onto the wall; therefore no brick ledge is required. Adorn

More information

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles CertainTeed Applicator s Manual Hatteras s 14 YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles HATTERAS SHINGLES Hatteras shingles are a premium oversize (18" x 36") roofing

More information

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

Aluminum Siding System

Aluminum Siding System Aluminum Siding System Do It Yourself Installation Guide For New Construction and Remodeling The Sell-Even Aluminum Siding System is manufactured to professional tolerences, yet it s designed to be fast

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the

More information

Installation Manual for Thermo Panel

Installation Manual for Thermo Panel Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on

More information

Tuff-Rib Install Guide

Tuff-Rib Install Guide Install Guide bestbuymetalroof.com Page 2 of 27 Page 3 of 27 1. Page 4 2. a. Installation Guide b. Panel Squaring Pages 5, 6 Pages 7, 8 3. Pages 9, 10 4. a. Fascia (optional) b. Eave / 1.5x3.5 Angle c.

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the PART 1 GENERAL 1) DESCRIPTION a) CertainTeed Symphony TM composite slate is an innovative roofing product that simulates the appearance, texture, and contours of traditional natural slate. It is a carefully

More information

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn

More information

HERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL

HERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL Application Instructions for THESE ARE THE APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. SHALL NOT BE RESPONSIBLE FOR LEAKS OR OTHER ROOFING PROBLEMS RESULTING

More information

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard

More information

Turada Hardwood Shingles and Shakes Installation instructions

Turada Hardwood Shingles and Shakes Installation instructions 1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced

More information

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

Section I. Before You Start deals with numerous considerations which you should be aware of before you start installing Western Red Cedar siding.

Section I. Before You Start deals with numerous considerations which you should be aware of before you start installing Western Red Cedar siding. INTRODUCTION Congratulations on your choice of Western Red Cedar siding. Western Red Cedar is one of the world s premier quality woods noted for its appearance, durability, light weight, insulation value

More information

A P P L I C A T I O N I N S T R U C T I O N S

A P P L I C A T I O N I N S T R U C T I O N S 1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE

More information

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS General This Installation Instruction document for Owens Corning Berkshire roofing shingles is to be read in conjunction with the Installation information printed on each packet of shingles along with

More information