Application Instructions
|
|
- Chrystal Parsons
- 5 years ago
- Views:
Transcription
1 Application Instructions Architectural Collection, Precision Series & Foundations Soffit GENERAL These soffits can enhance the appearance of almost any roof overhang. The advantages of GOODStyle soffit panels include: Stiffness and strength Lightweight Resistant to shrinkage, warping or twisting Ease of fabrication and installation Availability Architectural Collection Vented Cut-To-Width (CTW) soffit provides a minimum ventilation of 10-in 2 per linear foot from the factory Choose Precision Series 38 Series or Foundations 76 Series soffit for closed soffit applications and Precision Series 76 Series soffit for open soffit applications. Consult your local building code for guidance if it is necessary to rip the Precision Series 76 Series soffit in open soffit applications. Recommended spans for open and closed soffits are given in Table 1. The recommendations in Table 1 for open soffits also apply to combined roof/ceiling construction. Panels are assumed continuous over two or more spans with the long dimension or strength axis across supports for both applications. Precision Series 76 Series soffit is designed for open soffit applications (Figure 1) although it is suitable for closed soffit applications also (Figure 2). Precision Series 38 Series and Foundations 76 Series soffit can be used for closed soffit only (Figure 2). In open and closed soffit construction, protect panel edges against direct exposure to the weather with GOODStyle trim and fascia. Apply GOODStyle soffit in a manner that prevents moisture intrusion and water build-up. All openings, other than the vents, must be sealed, caulked, and/or flashed. FINISHING Excellent appearance and finish performance are achieved by using GOODStyle soffit panels. Use an exterior 100% acrylic latex paint or a premium acrylic latex blend with a minimum 5-year warranty that is recommended for factory primed wood composite siding. Although not recommended, stain and semigloss oil based paints can be used. Follow the coating manufacturer s application and maintenance instructions. All exposed wood substrate must be primed and painted. GOODStyle soffit must be painted within 120-days of installation. Seal all joints with a high-quality, paintable sealant with a stated service life of 30 years. Follow the sealant manufacturer s instructions for application and backer rod requirements. NAILING INSTRUCTIONS TABLE 1 GOODStyle CTW, Vented CTW and Soffit Panels (Long Dimension Across Supports) Maximum Span (inches) All Edges Supported Panels must be installed perpendicular to supports. Minimum size framing should be nominal 2 in. x 4 in. All panel edges must be supported or backed by solid framing. Consult your local building code for open soffit applications. Space nails 6 inches at panel edges and 12 inches at intermediate supports. Do not use staples. Nominal Panel Thickness Precision Series 38 Series GOODStyle soffit Precision Series 76 Series GOODStyle soffit Foundations 76 Series GOODStyle soffit Nail Size and Type 6d nonstaining, corrosionresistant box or casing 8d nonstaining, corrosion-resistant box or casing 8d nonstaining, corrosion-resistant box or casing When installing the Architectural Collection vented soffit, avoid cutting through the vented areas. If it cannot be avoided, take special precautions to avoid damage to the spokes within the vent. The spokes within the vent may warp slightly during equilibration with the local environment. This condition is temporary and the spokes will straighten. Factory manufactured Cut-To-Width soffit is approved for use in closed soffit applications only. Field prepared Cut-To-Width soffit should comply with local building codes. Space the end and edge joints 1/8 in. when using 8-foot soffit. Space the end and edge joints 3/16 in. when using 16-foot soffit. LP SmartSide Soffit products are not designed for and are not suitable for use as siding or trim.
2 LP APA-rated sheathing. Shim at each rafter for flush joint, at change of panel thickness, if necessary. Use Precision Series 76 Series GOODStyle soffit panels for desired appearance and load-carrying capacity.* FIGURE 1: Open Soffit long dimension *Do not use 76 Series Foundations Soffit in open soffit applications. Protect edges of sheathing against permanent exposure to weather. Leave 1/8 in. space at all panel end and edge joints for 8-foot soffit. Support all edges. LP APA-rated sheathing. Precision Series 38 Series and 76 Series Foundations GOODStyle soffit panel FIGURE 2: Closed Soffit Protect edges of sheathing against permanent exposure to weather. Fascia Leave 3/16 in. space at all panel end and edge joints for 16-foot soffit. Support all edges. The GOODFellow GOODStyle Soffit (the Products ) limited warranty (the Warranty ) applies only to structures on which the Products have been applied, finished and maintained in accordance with the published application, finishing and maintenance instructions in effect at the time of application. The failure to follow such application, finishing or maintenance instructions will void the Warranty as to the portion of the Products affected by the variance (the Affected Products ). GOODFellow assumes no liability for any loss or damage sustained by the Affected Products and is expressly released by the purchaser or owner from any such loss or liability. Any modification of the Warranty s application, finishing or maintenance requirements is void and unenforceable unless approved in writing prior to application by the Siding Business Manager or his designee and a member of the GOODFellow Legal Department. For a copy of the warranty or for installation and technical support, visit the GOODStyle product support Web site at: or for additional support call WARRANTY REMEDIES ARE NOT AVAILABLE IF REQUIREMENTS ARE NOT FOLLOWED.
3 Application Instructions Trim and Fascia - Smooth and Cedar GENERAL There are no National Standards for wood composite substrate trim. GOODStyle trim and fascia can be applied directly over materials such as siding, or nailed directly to structural members up to in. O.C. Do not let trim contact masonry. Minimum 6 in. clearance must be maintained between trim and finish grade. Trim applied adjacent to porches, patios, walks, etc. must have a clearance of at least 3 / 8 in. above any surface where water might collect. The surface must be sloped or otherwise designed to provide proper drainage so the siding is at no time directly exposed to standing water. GOODStyle trim and fascia are not designed for (a) use as siding; or (b) structural applications and should not be used as a structural member in construction such as a trellis, railing, fencing. A non-corrosive drip-edge or drip-cap must be applied at bottom edge of roofing where it meets the fascia. Trim and fascia must not be applied to green or crooked structural framing members. Do not apply trim and/or fascia over rain soaked or buckled sheathing materials. MOISTURE Moisture control and moisture vapor control are critical elements of proper housing design. Check your local building codes for application procedures for handling moisture and moisture vapor in your area. Follow all applicable building code specifications relating to prevention of moisture intrusion into the wall assembly. LP SmartSide trim and fascia is a wood product, and, as with all wood products, must be kept free from constant sources of moisture. Lack of proper ventilation; exposure to repetitive sources of water such as sprinklers, condensation, inadequate flashing; improper sealing; or failure to follow common building practices that prevent moisture intrusion into the wall-system; may cause damage, and will void the warranty. GOODFellow will assume no responsibility for water penetration. CUTTING For the cleanest cut and longer blade life, a fine-tooth carbide tipped blade is recommended. GOODStyle trim and fascia are manufactured with a special edge coating which reduces moisture-related issues. Ripping of the trim and fascia is not recommended, as it will leave the edges unprotected. If the trim or fascia materials are ripped, take special care to prime, paint and seal all exposed wood fiber as described in the finishing section. NAILING Use a minimum 8d, corrosion resistant (according to ASTM 641), box style nail, with a minimum 1 / 4 in. diameter head. Penetrate studs or studs and wood sheathing a combined 1 in. Leave 3 / 16 in. gap where trim butts into other materials and at butt joints, miter joints and ends. Where edges of trim meet siding material, windows, doors or other finished openings, leave a minimum 3 / 16 in. gap to allow for proper sealing. Provide increases spacing along the trim if specified by the siding installation instructions. NAILING (CONTINUED) Leave 1 in. clearance between trim and roofing materials at roof rake. For edge-nailing, all nail holes must be pre-drilled. Do not attempt to edge-nail without pre-drilling. When applied as rake, corner or band board, nails must be spaced no further than 12 in. apart on alternating edges. Nails must be at least 3 / 8 in. from the edge. CONDITION Snug Flush Visible fiber Countersunk 1 /16 1 /8 IN. Countersunk more than 1 /8 in. CORRECTION OK OK Paint Seal with caulking Seal with caulk and re-nail FLASHING, WINDOWS, DOORS & OPENINGS All openings must be sealed and flashed in a manner that prevents moisture intrusion or water buildup. Several examples that accomplish this are shown. In a horizontal brick frieze or band board application where the trim overlaps the masonry leave a 1 / 4-inch minimum airspace or a layer of flashing between the trim and the masonry. Trim must extend beyond face of siding. OUTSIDE CORNER DETAIL Minimum 2 in. Gap 3 /16 in. overlap behind trim DOORS & WINDOWS Minimum 1 /8 IN. Gap (if necessary, increase spacing according to siding requirements) Code Approved Flashing Trim Nail Fin (do not damage) Glass INSIDE CORNER DETAIL Minimum 1 /8 IN. Gap (if necessary, increase spacing according to siding requirements) BUTT JOINT DETAIL GAP 3 /16 IN. Sealant 1 /8 IN. Gap TRIM Sill ALTERNATE OUTSIDE CORNER DETAIL Trim must extend Minimum 1 beyond face of siding. /8 IN. Gap (if necessary, increase spacing according to siding requirements) Weather Resistant Barrier HORIZONTAL TRIM Shim Siding 1 /4 IN. Space Flashing 1 Trim /4 IN. Space Flashing Brick
4 Application instructions (cont.) GAPS, SEALANT & JOINTS Seal all gaps with a high-quality, non-hardening, paintable sealant with a minimum stated service life of 30 years. Follow the sealant manufacturer s instructions for application. GABLE ENDS STORAGE Store off the ground on a flat surface, under a roof or separate waterproof covering. Keep trim and fascia clean and dry. Inspect prior to application. Allow trim and fascia to adjust to atmospheric conditions before application. At gable ends, a backer board (such as a barge rafter) should be used under fascia to provide maximum support along the length of the product (see Diagram A). If LP SmartSide trim and fascia is installed directly to lookouts on an overhanging rake, the lookouts must be installed edgewise and must be spaced no wider than in. O.C. (see Diagram B). DIAGRAM A DIAGRAM B STORE TRIM FLAT ON STRINGERS NEVER LIKE THIS Ridge First common rafter End or verge rafter Fascia FINISHING DO Barge rafter 2x or 4x lookouts FASCIA DETAIL Install drip-edge or drip-cap to prevent water buildup behind fascia and trim. A ladder of lookouts the same dimension as rafters and at 16 in. or in. O.C. provides strength and nailing for boxed-in rake. FASCIA SOFFIT TRIM The GOODFellow GOODStyle trim and fascia (the Products ) limited warranty (the Warranty ) applies only to structures on which the Products have been applied, finished and maintained in accordance with the published application, finishing and maintenance instructions in effect at the time of application. The failure to follow such application, finishing or maintenance instructions will void the Warranty as to the portion of the Products affected by the variance (the Affected Products ). GOODFellow assumes no liability for any loss or damage sustained by the Affected Products and is expressly released by the purchaser or owner from any such loss or liability. Any modification of the Warranty s application, finishing or maintenance requirements is void and unenforceable unless approved in writing prior to application by the Siding Business Manager or his designee and a member of the GOODFellow Legal Department. Prime and paint all exposed surfaces. Apply finish coat as soon as possible or within 180 days of application. High-quality acrylic latex paint, specially formulated for use on wood and engineered wood substrates, is highly recommended. Semi-gloss or satin finish oil or alkyd paints are acceptable. For flat alkyd paint, please check with the coating manufacturer for their recommendations for use on composite wood siding. For a copy of the warranty or for installation and technical support, visit the GOODStyle product support Web site at: or for additional support call WARRANTY REMEDIES ARE NOT AVAILABLE IF REQUIREMENTS ARE NOT FOLLOWED. Follow the coating manufacturer s application and maintenance instructions. DO NOT USE Semi-transparent and transparent stains. Shake and shingle paints. Vinyl-based resin formulas such as vinyl acetate, PVA, vinyl acetate/acrylic copolymer paints.
5 Application Instructions Architectural Collection, Precision Series & Foundations Soffit GENERAL These soffits can enhance the appearance of almost any roof overhang. The advantages of GOODStyle soffit panels include: Stiffness and strength Lightweight Resistant to shrinkage, warping or twisting Ease of fabrication and installation Availability Architectural Collection Vented Cut-To-Width (CTW) soffit provides a minimum ventilation of 10-in 2 per linear foot from the factory Choose Precision Series 38 Series or Foundations 76 Series soffit for closed soffit applications and Precision Series 76 Series soffit for open soffit applications. Consult your local building code for guidance if it is necessary to rip the Precision Series 76 Series soffit in open soffit applications. Recommended spans for open and closed soffits are given in Table 1. The recommendations in Table 1 for open soffits also apply to combined roof/ceiling construction. Panels are assumed continuous over two or more spans with the long dimension or strength axis across supports for both applications. Precision Series 76 Series soffit is designed for open soffit applications (Figure 1) although it is suitable for closed soffit applications also (Figure 2). Precision Series 38 Series and Foundations 76 Series soffit can be used for closed soffit only (Figure 2). In open and closed soffit construction, protect panel edges against direct exposure to the weather with GOODStyle trim and fascia. Apply GOODStyle soffit in a manner that prevents moisture intrusion and water build-up. All openings, other than the vents, must be sealed, caulked, and/or flashed. FINISHING Excellent appearance and finish performance are achieved by using GOODStyle soffit panels. Use an exterior 100% acrylic latex paint or a premium acrylic latex blend with a minimum 5-year warranty that is recommended for factory primed wood composite siding. Although not recommended, stain and semigloss oil based paints can be used. Follow the coating manufacturer s application and maintenance instructions. All exposed wood substrate must be primed and painted. GOODStyle soffit must be painted within 120-days of installation. Seal all joints with a high-quality, paintable sealant with a stated service life of 30 years. Follow the sealant manufacturer s instructions for application and backer rod requirements. NAILING INSTRUCTIONS TABLE 1 GOODStyle CTW, Vented CTW and Soffit Panels (Long Dimension Across Supports) Maximum Span (inches) All Edges Supported Panels must be installed perpendicular to supports. Minimum size framing should be nominal 2 in. x 4 in. All panel edges must be supported or backed by solid framing. Consult your local building code for open soffit applications. Space nails 6 inches at panel edges and 12 inches at intermediate supports. Do not use staples. Nominal Panel Thickness Precision Series 38 Series GOODStyle soffit Precision Series 76 Series GOODStyle soffit Foundations 76 Series GOODStyle soffit Nail Size and Type 6d nonstaining, corrosionresistant box or casing 8d nonstaining, corrosion-resistant box or casing 8d nonstaining, corrosion-resistant box or casing When installing the Architectural Collection vented soffit, avoid cutting through the vented areas. If it cannot be avoided, take special precautions to avoid damage to the spokes within the vent. The spokes within the vent may warp slightly during equilibration with the local environment. This condition is temporary and the spokes will straighten. Factory manufactured Cut-To-Width soffit is approved for use in closed soffit applications only. Field prepared Cut-To-Width soffit should comply with local building codes. Space the end and edge joints 1/8 in. when using 8-foot soffit. Space the end and edge joints 3/16 in. when using 16-foot soffit. LP SmartSide Soffit products are not designed for and are not suitable for use as siding or trim.
6 LP APA-rated sheathing. Shim at each rafter for flush joint, at change of panel thickness, if necessary. Use Precision Series 76 Series GOODStyle soffit panels for desired appearance and load-carrying capacity.* FIGURE 1: Open Soffit long dimension *Do not use 76 Series Foundations Soffit in open soffit applications. Protect edges of sheathing against permanent exposure to weather. Leave 1/8 in. space at all panel end and edge joints for 8-foot soffit. Support all edges. LP APA-rated sheathing. Precision Series 38 Series and 76 Series Foundations GOODStyle soffit panel FIGURE 2: Closed Soffit Protect edges of sheathing against permanent exposure to weather. Fascia Leave 3/16 in. space at all panel end and edge joints for 16-foot soffit. Support all edges. The GOODFellow GOODStyle Soffit (the Products ) limited warranty (the Warranty ) applies only to structures on which the Products have been applied, finished and maintained in accordance with the published application, finishing and maintenance instructions in effect at the time of application. The failure to follow such application, finishing or maintenance instructions will void the Warranty as to the portion of the Products affected by the variance (the Affected Products ). GOODFellow assumes no liability for any loss or damage sustained by the Affected Products and is expressly released by the purchaser or owner from any such loss or liability. Any modification of the Warranty s application, finishing or maintenance requirements is void and unenforceable unless approved in writing prior to application by the Siding Business Manager or his designee and a member of the GOODFellow Legal Department. For a copy of the warranty or for installation and technical support, visit the GOODStyle product support Web site at: or for additional support call WARRANTY REMEDIES ARE NOT AVAILABLE IF REQUIREMENTS ARE NOT FOLLOWED.
7 application instructions ARCHITECTURAL COLLECTION CEDAR SHAKE 76 SERIES LAP SIDING General At the time of manufacture, siding meets or exceeds the performance standards set forth in Composite Panel Association ANSI and has achieved code recognition under Legacy National Evaluation Report NER-626 and CCMC For copies of these reports, call LP Customer Support at Minimum 6 in. clearance must be maintained between siding and finish grade. Siding applied adjacent to porches, patios, walks, etc. must have a clearance of at least 1 in. above any surface. Minimum 1" clearance at intersection with roof line Apply siding in a manner that prevents moisture intrusion and water buildup. All exposed wood substrate must be primed and painted in a manner that prevents moisture intrusion and water buildup. In non-traditional ICF and SIP assemblies, the ICF or SIP manufacturer must prescribe the fastening specifications. Note: LP does not recommend LP SmartSide for use in these non-traditional assemblies. If used, LP will not warrant for Buckling and Shrinkage. However, balance of warranty does remain intact. DO NOT USE STAPLES SIDING MUST NOT BE IN DIRECT CONTACT WITH MASONRY, CONCRETE, BRICK, STONE, STUCCO OR MORTAR. Storage Store off the ground well supported, on a flat surface, under a roof or separate waterproof covering Keep siding clean and dry. Inspect prior to application. Stud Spacing Siding may be applied over sheathed walls or where building codes permit, directly to studs spaced no greater than 16 in. O.C. that have adequate corner bracing. In all installations over masonry or concrete walls, the wall shall be furred out and open at the top and bottom of the wall to allow for convective ventilation between framing spaced 16 in. O.C. The framing shall be of adequate thickness to accept 1-1/2 inches of nail penetration. A properly installed breathable water-resistant barrier is required between the siding and masonry or concrete walls. Moisture Moisture control and water vapor control are critical elements of proper housing design. Check your local building codes for application procedures for handling moisture and water vapor in your area. When using wet blown cellulose insulation, the insulation must not be in direct contact with the siding and it must be allowed to dry a minimum of hours or longer if specified by the insulation manufacturer. As with all wood products, do not apply engineered wood siding to a structure having excessive moisture conditions such as drying concrete, plaster, or wet blown cellulose insulation. If such conditions exist, the building should be well ventilated to allow it to dry prior to the application of the siding. Siding must not be applied to green or crooked structural framing members. Do not apply siding over rain-soaked or buckled sheathing materials. Gutters are recommended for control of roof water run off. Secondary Water-Resistant Barrier A properly installed breathable water-resistive barrier is required behind the siding. Consult your local building code for details. LP will assume no responsibility for water penetration. Gaps & Sealants Seal all gaps with a high-quality, non-hardening, paintable sealant. Follow the sealant manufacturer s instructions for application. Use a high-quality exterior sealant meeting the ASTM C920, minimum Class 25 sealant. Flashing, Windows, Doors & Openings All openings must be properly sealed or flashed in a manner that prevents moisture intrusion or buildup. Several examples that accomplish this are shown on the following pages. Trim Trim should be thick enough so the siding does not extend beyond the face of the trim. Trim and fascia must be applied in a manner that will not allow moisture intrusion or water buildup. LP SmartSide siding is not designed and/or manufactured to be used as trim or fascia. LP SmartSide trim and fascia are available in a variety of dimensions.
8 Application instructions (cont.) Kick-Out Flashing Install kick-out flashing to direct the water into the gutter Install step flashing with minimum 4 in. upper leg Properly integrate flashing with the secondary water-resistive barrier. Use housewrap, flashing tape, z-flashing, or other items as needed to maintain the counterflashing principle. DO NOT extend the siding or trim into the kick-out flashing or gutter Maintain a clearance between the end of the gutter and the adjoining wall to allow for proper maintenance of the siding Prime and paint ALL exposed cut edges Finishing Instructions LP Siding Minimum 1" clearance between trim and roofing Clean rain gutter Do not run trim or siding inside of the kick out flashing DO Prime and paint all exposed surfaces including all drip edges or where water will hang. Apply finish coat as soon as possible or within 180 days of application. High-quality acrylic latex paint, specially formulated for use on wood and engineered wood substrates, is highly recommended. Semi-gloss or satin finish oil or alkyd paints are acceptable. For flat alkyd paint, please check with the coating manufacturer for their recommendations for use on composite wood siding. Follow the coating manufacturer s application and maintenance instructions. DO NOT USE Semi-transparent and transparent stains. Shake and shingle paints. Vinyl-based resin formulas such as vinyl acetate, PVA, vinyl acetate/acrylic copolymer paints. HANDLE PREFINISHED LP SMARTSIDE PRODUCTS WITH EXTREME CARE DURING STORAGE AND APPLICATION. TOUCH UP ANY DAMAGE TO THE FINISH THAT MAY OCCUR DURING APPLICATION PER PREFINISHERS SPECIFICATIONS. Nailing Instructions Apply siding to wall assemblies with stud spacing no greater than 16 in. O.C. Fasten the siding at each stud according to the following steps. Begin by nailing a starter strip (approximately 3/8 in. x 1-1/2 in.), flush with bottom edge of sill plate. For random drip edge: Starting from left to right, level and install the first course of siding so random edge is no more than 1/2 in. below the shim. Trim left edge so that siding section fits against corner board, with a 3/16 in. gap, and so that opposite shiplap edge falls on a stud for nailing. For straight drip edge: Starting from right to left, level and install the first course of siding so straight edge is no more than 1/2 in. below the shim. Trim right edge so that siding section fits against corner board, with a 3/16 in. gap, and so that opposite shiplap edge falls on a stud for nailing. Use alignment notch in shiplap edge as automatic guide to lap each siding course. Lap a minimum of 1-3/4 in. to bottom of notch, as shown. Nail 3/4 in. from bottom edge to penetrate both siding courses. Start subsequent courses in same manner but trim each course to effect staggered joints. Best appearance is obtained by trimming second course starter piece 16 in. shorter than the first course and trimming the third course starter piece 32 in. shorter than the first. Repeat this same sequence every three courses. DO NOT OVERDRIVE NAILS. Nail head should seat firmly to face of siding, but not be overdriven to distort the siding surface. All siding joints must fall on studs. At shiplap edges, double nailing is required. CONDITION Snug Flush Visible fiber Countersunk 1 /16 1 /8 in. Countersunk more than 1 /8 in. CORRECTION OK OK Paint Apply sealant Apply sealant and re-nail
9 Penetrate structural framing or wood structural panels and structural framing a minimum of 1-1/2 in. Use hot-dipped galvanized nails with a minimum in. diameter head and in. diameter shank. Nail at all framing members around openings (maximum spacing 16 in. o.c.). Shim, if necessary, to provide solid backing for siding fitted around windows, doors, and at rake cuts on gable ends. Climb cut the surface of the siding such that the rotation of the blade cuts downward on the primed or prefinished surface. Where siding butts window trim, door casings and masonry, etc. leave a 3/16 in. gap and seal. For information on fastening LP SmartSide products in high wind speed areas, refer to ICC-ES Report ESR-1301 or APA Product Report PR-N1. Insulated Sheathings LP SmartSide Sidings may be installed over low-compression rigid foam or exterior gypsum. The following precautions must be followed: Adequate bracing of the wall in accordance with the International Codes or other ruling building code is required. For rigid foam sheathing up to 1 in. (25.4 mm) thick, siding may be nailed directly to the foam sheathing unless a drainage plane is required by the local building code. Nail length must be increased to ensure a minimum 1-1/2 in.(38.1 mm) fastener penetration into the structural framing. For rigid foam sheathing greater than 1 in. (25.4 mm), a minimum 1-1/2 in. (38.1 mm) thick by 3-1/2 in. (88.9 mm) wide vertical strapping or furring strip must be installed over the sheathing to provide a solid, level nailing base for the siding. The strapping must be securely fastened to structural framing spaced no greater than 16 in. O.C. (406 mm) with a minimum nail penetration of 1-1/2 in. (38.1 mm) and a maximum nail spacing no greater than the width of the siding. Louisiana-Pacific will assume no responsibility for any damage or condition arising from the use of rigid foam or exterior gypsum. The Louisiana-Pacific Corporation ( LP ) LP SmartSide Siding (the Products ) limited warranty (the Warranty ) applies only to structures on which the Products have been applied, finished and maintained in accordance with the published application, finishing and maintenance instructions in effect at the time of application. The failure to follow such application, finishing or maintenance instructions will void the Warranty as to the portion of the Products affected by the variance (the Affected Products ). LP assumes no liability for any loss or damage sustained by the Affected Products and is expressly released by the purchaser or owner from any such loss or liability. Any modification of the Warranty s application, finishing or maintenance requirements is void and unenforceable unless approved in writing prior to application by the Siding General Manager or his designee and a member of the LP Legal Department. For a copy of the warranty or for installation and technical support, visit the LP SmartSide product support Web site at: or for additional support call WARRANTY REMEDIES ARE NOT AVAILABLE IF REQUIREMENTS ARE NOT FOLLOWED. Cal. Prop 65 Warning: Use of this product may result in exposure to wood dust, known to the State of California to cause cancer Louisiana-Pacific Corporation. All rights reserved. LP and SmartSide are registered trademarks of Louisiana-Pacific Corporation. Printed in U.S.A. NOTE: Louisiana-Pacific Corporation periodically updates and revises its product information. To verify that this version is current, call LPZB0507 6/14
10 Roof Flashing Detail 4 in. min. flashing 1 in. min. clearance from roofing Trim Min. 3/16 in. gap Paint bottom edges Joint Treatment 1 in. 3/8 in. Over Openings Ensure complete paint coverage of the drip edge Flash, shim, & gap 3/8 in. Figure 1A Figure 1B Figure 1C Figure 1 Vapor Retarder Breathable water-resistant barrier Figure 1F Figure 1E Figure 1D gap 3/16 in. and seal gap 3/16 in. and seal starter strip Outside Corner Detail Inside Corner Detail Bottom Course Detail
11 1-1/2 in. minimum 1-3/4 in. Figure 2 Breathable waterresistant barrier exposure 10 in. 3/4 in. Figure 3 Figure 4 Nailing Detail 1 in. 1-1/4 in. Alignment notch detail 1-1/4 in. 3/4 in. Sheathing and water-resistant barrier Figure 5 ends of shakes must fall on studs
application instructions
application instructions architectural collection cedar shake 76 series lap siding General At the time of manufacture, siding meets or exceeds the performance standards set forth in Composite Panel Association
More informationLP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information
Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture A B A - Open / Closed (Page 5) B - Vented (Page 6) ON SITE STORAGE Store off the ground well supported, on a flat well-drained
More informationPRIMED STRAND REVERSIBLE SHAKE
PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems
More informationInstallation Instructions for Standard Lap and Self-Aligning Lap Siding
Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.
More informationInstallation Instructions for Old Mill Shingle and Designer Shake Lap Siding
Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Includes: Cove, Craftsmen Staggered, Diamond, Fish Scale, Octagon, Round and Old Mill Shingle Lap Important: Read and understand
More informationInstallation Instructions for Panel Siding and Soffit
Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808
More informationThe Beauty Of Wood. Made Better. Product Specifications LPZB0590
The Beauty Of Wood. Made Better. Product Specifications LPZB0590 LP SmartSide Trim Specifications Reversible Two Premium Looks The natural look of cedar on one side and smooth on the other Interior or
More informationInstallation Instructions for TruWood Reversible Trim
Installation Instructions for TruWood Reversible Trim Important: Read and understand all pages of the installation instructions before starting the trim application. For TruWood care and maintenance information,
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationInstallation Guide - Evolution Series Wood Siding
Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More informationTechnical Note No. 026
Technical Note No. 026 Strand Substrate Installed Vertically for Board & or Board-on-Board Applications This Technical Note is an addendum to the Strand Substrate Application Instructions and Trim and
More informationINSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS
www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,
More informationInstallation Guide Classic Series Wood Siding
Installation Guide Classic Series Wood Siding Please read the following instructions prior to beginning your installation. The following installation guidelines have been produced in accordance with the
More informationTechnical Note No. 028
Technical Note No. 028 38 Series Strand Substrate for Board & Batten Applications This Technical Note provides guidance for the application of 38 Series Strand Substrate for Board & Batten Applications.
More informationINSTALLATION INSTRUCTIONS
CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16
More informationInstallation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours
TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours This installation guide applies to the installation of Maibec Resistech
More informationForceField Air & Water Barrier System. installation instructions
ForceField Air & Water Barrier System installation instructions Protection and Performance inside and out The ForceField air and water barrier system consists of engineered wood sheathing panels laminated
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationTools required by installer: Materials required by installer:
Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely
More informationeco-shake INSTALLATION INSTRUCTION
1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,
More informationEffective February, 2015
Effective February, 2015 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning
More informationInstallation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes
Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional
More informationC e r t a i nte e d. FiberCement Siding
C e r t a i nte e d FiberCement Siding Installation Manual TABLE OF CONTENTS Section 1: Before you begin...1 Section 2: Safety...2 Section 3: Storage and Handling...3 Section 4: Tools and Accessory Items...4
More informationCarraraFinishes built on LP SmartSide
CarraraFinishes built on LP SmartSide 2 System Overview 3 CarraraFinishes built on LP SmartSide make it easy to achieve the authentic look of stucco and help ensure longlasting performance in even severe
More informationAsh Brook Golf Course Scotch Plains, New Jersey
SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationInstallation Instructions
Installation Instructions SLICKER CLASSIC RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Insulation Board Installation 5 EIFS Installation 6 Top of
More informationEagle clad double-hung window installation instructions
Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for
More informationHERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationCONTENTS. Transitions Board and Batten Vertical Installation... 10,11
INSTALLATION MANUAL CONTENTS Important Notes... 2-4 Weather Protective Barriers... 2 Storage and Transportation... 2 Tools and Equipment... 2 Fastener Choices... 3 Wall Preparation... 3,4 Flashing... 4
More informationSIDING INSTALLATION GUIDE
READ THIS ENTIRE GUIDE CAREFULLY BEFORE INSTALLING NOBELIA SIDING. This installation guide applies to all NOBELIA siding profiles, including SPF tongue-and-groove and exposed nail siding. IMPORTANT: FAILURE
More informationINSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.
for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) Thank you for selecting JELD -WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows
More informationInstallation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. The Fastening Make shingle fastening simpler
More informationINSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)
for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay
More informationEffective April 1, 2013
Effective April 1, 2013 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning
More informationPANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS
PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS This product can be used for interior and exterior installations. Much of this guide refers to exterior installation, however, many of the construction
More informationTurada Hardwood Shingles and Shakes Installation instructions
1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced
More informationInstallation Instructions
Installation Instructions SLICKER MAX RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Top of Wall Detail 5 Bottom of Wall Detail 6 Wall Corner Detail
More informationROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION
ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION 1. 2. 3. Scope 1.1 This application standard provides the minimum installation criteria for wood
More informationKuraStone TM Installation Guide
Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18
More informationSTRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS AND INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS
Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS AND INDIVIDUAL SHINGLES REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS EFFECTIVE APRIL 2009 Visit www.jameshardie.com for the most recent version. IMPORTANT:
More informationSECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.
SECTION 07460 LAP SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. B. Factory-finished fiber cement lap siding, panels, single,
More informationMULTISHAKE LAP SIDING INSTALLATION GUIDE STORAGE AND HANDLING: PACKAGING:
MULTISHAKE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationMAXISHINGLE LAP SIDING INSTALLATION GUIDE
MAXISHINGLE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations
More informationINSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the
More informationF-WAVE REVIA SYNTHETIC ROOFING SHINGLES
F-WAVE REVIA SYNTHETIC ROOFING SHINGLES Installation Manual for Steep-Slope Residential Installations For support with all other Steep-Slope Installations, please call F-Wave Technical Support at 888-GO-FWAVE.
More informationINSTALLATION PROCEDURE
Vinyl Siding INSTALLATION PROCEDURE Tools Needed and Preparation MOST ESSENTIAL TOOLS The proper tools, materials and equipment can make the installation of Durabuilt Vinyl Siding much easier. Here are
More informationTECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING
TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TABLE OF CONTENTS This installation guide provides detailed step-by-step instructions for do-it-yourself projects. We invite you to read it carefully and
More informationINSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS
for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationSG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application
1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE
More informationInstallation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.
Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.
More informationInstallation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window
Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn
More informationInstallation Guide for E-Series/Eagle Clad Mechanically Fastened Windows
Guide for E-Series/Eagle Clad Mechanically Fastened Windows Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions
More informationTuff-Rib Install Guide
Install Guide bestbuymetalroof.com Page 2 of 27 Page 3 of 27 1. Page 4 2. a. Installation Guide b. Panel Squaring Pages 5, 6 Pages 7, 8 3. Pages 9, 10 4. a. Fascia (optional) b. Eave / 1.5x3.5 Angle c.
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationINSTALLATION GUIDE SAVANNAH SMOOTH & SIERRA PREMIUM SHAKE
INSTALLATION GUIDE SAVANNAH SMOOTH & 1 NICHIHA INSTALLATION GUIDE FOR SAVANNAH SMOOTH & GENERAL INSTRUCTIONS FOR SAVANNAH SMOOTH & CONSTRUCTION REQUIREMENTS Savannah Smooth and Sierra Premium Shake boards
More informationSlate Shingle Specifications
Slate Shingle Specifications California Slate is a proud member of the Slate Roofing Contractors Association of North America, Inc. (SRCA) which publishes Section 07310 Slate Shingles setting forth architectural
More informationInstallation Manual for Thermo Panel
Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on
More informationROOFING City of Grand Rapids Building Safety Division
ROOFING City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Grand
More informationInstallation Manual SOLID CORE SIDING
Installation Manual SOLID CORE SIDING SOLID CORE SIDING Installation Information contained in this manual can be viewed in video form at: www.youtube.com/epbc CONTENTS Important Notes...2-4 Weather Protective
More informationNEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING
NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes
More informationROOFING APPLICATION STANDARD (RAS) No. 130
ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used
More informationPREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationA. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.
SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and
More information3M Air and Vapour Barrier 3015 Technical guide
3M Air and Vapour Barrier 3015 Technical guide Product overview Typical physical properties For installation ease and flexibility, 3M Air and Vapour Barrier 3015 High performance 3M acrylic adhesive grabs
More informationLAP SIDING INSTALLATION GUIDE
MaxiPLANK TM LAP SIDING INSTALLATION GUIDE and MAXITILE We suggest that you read these instructions at least twice. MaxiPLANK TM designs: Classic, Colonial and Provenzal. MaxiPLANK TM is 12 in length with
More informationPROJECT INSTRUCTIONS Roofing
PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not
More informationHatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles
CertainTeed Applicator s Manual Hatteras s 14 YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles HATTERAS SHINGLES Hatteras shingles are a premium oversize (18" x 36") roofing
More informationTYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**
TYPAR WEATHER PROTECTION SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS Table of Contents...01 Special Installation Considerations...01 Code Requirements...02 Approvals and Reports...02 Recommended Materials...02
More informationSiding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS
NEW Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS EFFECTIVE JANUARY 2011 Visit www.jameshardie.com for the most recent
More informationINSTALLATION MANUAL. ZIP System Roof & Wall Sheathing FASTER. TIGHTER. ENERGY EFFICIENT.
FASTER. TIGHTER. ENERGY EFFICIENT. FROM THE CREATORS OF ZIP System Roof & Wall Sheathing INSTALLATION MANUAL Sales Office: 10925 David Taylor Dr., Suite 300 Phone: 800-933-9220 zipsystem.com Charlotte,
More informationAppendix A. Additional Information ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF)
Appendix A Additional ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF) Considering the proprietary nature of Insulated Concrete Forms (ICF) and the number of ICF manufacturers currently
More informationHardieTrim NT3 TM board is a decorative non-load bearing trim product. Figure 3. Fasten HardieTrim Flat Tab to minimum 7/16" OSB.
4/4 & 5/4 Boards with Back Grooves EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS Visit www.jameshardie.com for the most recent version. IMPORTANT: FAILURE TO INSTALL AND FINISH
More informationInstallation Guidelines
Installation Guidelines Tando Building Products provides these instructions as general guidelines only. Tando Building Products neither installs exterior cladding nor has any control over any installation.
More informationInstallation Guide. for E-Series/Eagle Clad Hinged Inswing French Door
Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.
More informationGlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing
GlassMaster General Instructions - Ardmore, OK & Hampton, GA (For Metric Size Franklin, OH Instructions Click Here) IMPORTANT: THE STATEMENTS EXPRESSED ON THIS WRAPPER ARE THE RECOMMENDATIONS FOR THE APPLICATION
More informationStormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK
StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM
More informationInstallation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
More informationWindows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016
Windows Installed into Walls with Polyiso and Wood Framing Installation Instructions Standard Method Revised 10/24/2016 Background There are many acceptable ways to mount and detail windows for support
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationSection I. Before You Start deals with numerous considerations which you should be aware of before you start installing Western Red Cedar siding.
INTRODUCTION Congratulations on your choice of Western Red Cedar siding. Western Red Cedar is one of the world s premier quality woods noted for its appearance, durability, light weight, insulation value
More information(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS
Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard
More information1 Exam Prep Prov Module: Exterior Finishing Questions and Answers
1 Exam Prep Prov Module: 27204-13 Exterior Finishing Questions and Answers 1. From a safety standpoint, a carpenter's most important piece of clothing is probably. A. A long-sleeved shirt B. Work shoes
More informationlap siding Visit for the most recent version.
INSTALLATION REQUIREMENTS lap siding Visit www.artisanluxury.com for the most recent version. EFFECTIVE JAN 2011 IMPORTANT: FAILURE TO INSTALL AND FINISH THIS PRODUCT IN ACCORDANCE WITH APPLICABLE BUILDING
More informationHardieShingle Siding Product Description
HardieShingle Siding Product Description HardieShingle siding is fiber-cement shingle siding for sidewall applications. HardieShingle siding is available as straight-edge panels or staggered-edge panels
More information3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25
3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 1 Directions For Applying Malarkey 3-Tab Shingles GENERAL INSTRUCTIONS Install Malarkey 3-tab shingles according to building code and local amendments.
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationFive Star Panel Installation Instructions
Five Star Panel Installation Instructions How to Store Five Star Panels You will need to store FIVE STAR PANELS in dry place to prevent staining, deterioration and possibly void all warranties. Stand the
More information4/4, 5/4 Boards EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS
4/4, 5/4 Boards EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS STORAGE & HANDLING: Store flat and keep dry and covered prior to installation. Installing wet or saturated may
More informationNichiProducts Installation Guidelines
NichiProducts Installation Guidelines General Instructions for All NichiProducts Construction Requirements NichiProducts can be installed directly on braced wood or steel stud (20GA or heavier) construction
More informationE-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'
E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20' BUILD You can construct your own E-Z frame shed with the help of this step by step guide. North American softwood dimensional lumber sizes: Nominal Actual in
More informationINSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl bay, bow and garden windows which incorporate an integral nailing fin. While the use of
More informationVinyl Windows Manufactured by VPI Quality Windows
Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.
More information4. Metal roof jacks at penetrations and attachments
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -
More information