1 Specifications for EA31002 U Tube Bundle for CDU 3 Tube Bundle Specificatio Tube Bundle for Heat Exchanger EA31002A/B/C/D Quantity required : One with Dummy shell Exchanger Type: BEU Horizontal No of U Tubes : 234 Tube Sizes: 32mm OD x 2.77 mm THK x 3750mmLG. 32mm OD x 2.50 mm THK x 3750mmLG Tube Material: SA210 Gr.A1 Seamless Stationary tube sheet material/dimension : SA 266 Gr.2 Tube to tube sheet joint :Heavy expansion Design Code: ASME SEC V111 DIV.1 (Latest) and TEMA R (Latest) Drawing Number: H-1250/FAD/2010- Sheet 1, 2 & 3 Inspection : Stage wise Inspection by Third Parties Like LRIS/EIL/BVIS/TOYO/DNV/TUV/IRS 1. Review of Quality Assurance Plan (QAP), approval by MRPL 2. Review of Test certificate for traceability of material meeting original specification as per the drawing. 3. If the material is sourced from vendor other than manufacturer, then selection of samples (min two samples from each heat/lot) for mechanical and chemical (product analysis) test. All mechanical test required as per applicable material specification shall be witnessed by TPI. 4. Witness of UT scanning. 5. Witness of Impact test of forgings carried out as per ASTM A-388 and acceptance criteria shall be as per of Section VIII Division II. 6. Review of ECT of tubes & Witness Hydrotest of tubes (100%). 7. Review of Mock up test for tube to tube sheet joint. 8. Stage wise inspection during fabrication. 9. Witness Tube sheet inspection after drilling and skeleton assembly before tube insertion. 10. Inspect percentage thinning, Length of Expansion etc. of Tube to tube sheet joint. 11. Review of Heat Treatment report of forged parts as per specification.

2 12. Witness pneumatic test of Tube to Tube sheet joints. 13. Witness of the hydrotesting of the tube bundle. 14. Review calibration reports of measuring instruments. 15. Inspection for dimensional conformance and marking. 16. Issue Product release note giving details of inspection carried out. Hydrostatic test and other tests 1. These tests shall be witnessed by MRPL / MRPL authrised inspectors or Third party inspectors at vendor s shop. Hydrostatic test shall be performed with indicating pressure gauge connected to the uppermost part of the equipment. Water used for these tests shall be salt free. Minimum metal temperature during hydrotest shall be 20º C. and the test pressure shall be maintained for a duration of minimum one hour period. 2. Final hydrotest shall be carried out to Kg/cm2g on the shell side. Required Dummy shell /Test Rings/Test Flanges/Test Covers shall be designed & Manufactured by the vendor for the purpose of Hydro testing of the Tube Bundle at the vendor s shop. Notes : Tubing Specification:(REF SPEC No.00-ES Rev-1) 1. All Tubing shall be seamless & cold drawn. 2. Tube gauge / thick specified is the required minimum wall thickness unless otherwise specified. 3. Tubing shall be in the fully heat treated conditions as received from the mill. Heat treatment shall be annealed for CS & SS tube. 4. Product analysis of tubes shall be carried out & reported. Material test certificate to be submitted along with the Tube Bundle. 1. Tubes and tube bundles a) The ratio of outer diameter to length of removable tube bundles shall be limited so that the bundle is sufficiently stiff for maintenance and hoisting. b) Rolled tubes shall project 3 ± 0.5 mm beyond the tube-side face of the tube sheet of horizontal exchangers. For vertical exchangers, the tubes shall flush with the tube-side face of the top tube sheet to allow complete drainage. c) Tube to tube sheet joint expanded with two grooves without welding d) Tube holes in the tubesheets shall be drilled as per TEMA-Special close fit. For metric tube of size 32mm OD, the nominal size of holes shall be 32.27mm with tolerance ± 0.07 mm. Holes in tubesheets shall be drilled and reamed to final size. Holes shall have no burrs or scoring marks and shall be circular with parallel sides and normal to the tubesheet surface. Edges of the hole shall be deburred.

3 2. Tube Expander & Expanding of Tubes. a) Tube expander used by the fabricator shall be electronically controlled type and shall be in good condition and shall have the inspector s approval. The tube expander shall have stops to prevent the rollers approaching nearer 3mm to the back of the tube plate. b) Tubes shall be expanded into the tubesheet by using the equipment and setting as previously agreed between the inspector and fabricator. Such settings may be required to be proved by procedural testing, or at the discretion of the inspector, fabrictor s established settings may be used. C) Tubes shall be expanded for the full thickness of the tube plates less the 3mm at the back-side-of face of the tube sheet. However, for tubesheet thickness more than 5 x Tube OD, expansion may be limited to 4 x Tube OD on the front side and 1x tube OD on the back side of the tubesheet. Care shall be taken to avoid any distortion of the tubesheet or gross deformation of the ligaments. It is suggested that tubes expanded systematically in small, diametrically opposite groups. 4. Pressure Testing a) After expansion of all tube joints in exchanger is completed, tube sheet face and the internal surfaces of the tubes to a length of about 15mm shall be thoroughly cleaned. Any grease or oil shall be suitably removed by the use of proper solvent or by steam jet. These joints shall then be subjected to pneumatic air-soap solution test of 1.25 Kg/cm 2 g. Leaking tubes shall be further expanded in the presence of inspector after reasons for the leakage have been ascertained and accepted by the inspector. If excessive thinning (>15%) is required to check the leakage, same shall be reported to MRPL before such expansion is carried out. b) Expansion joints shall also be subjected to hydrostatic leakage test at a test pressure indicated in the drawing. Leakage if any, shall be reported to MRPL. However leakage tubes leaking tubes if any may be further expanded keeping the guidelines given above in view. c) Water for hydrostatic testing, shall have appx. 25 (By volume) of an approved wetting agent in addition to 0.2% of sodium nitrate as corrosion inhibitor. Draining and drying requirements shall be as per spec. 4. Positive means of ensuring alignment and prevention of misassembly shall be provided for the following: Floating head cover, channel cover having grooved partitions, stationary tube sheet and shell flange. 5. No distortion whatsoever shall be permitted on the gasket seating surfaces, If distorted the same shall be machined. 6. Sliding strips shall be provided to facilitate pulling the removable tube bundles. Sliding strips shall be properly seated in the baffles, secured with a complete seal weld (both sides) and attached to the stationary tube sheet with a full penetration weld. The sliding strips shall protrude 2mm beyond the periphery of the baffles. Vertical exchangers shall be provided with four sliding strips evenly divided around the circumference of the bundle. When mechanical cleaning is required on shell side

4 (square-pitch patterns), the sliding strips shall not obstruct the tube lanes or pass partition. 7. Baffles shall be tied together with rods and spacers and provided when necessary with 90 top and bottom notches 10 mm wide for venting and draining. The drainage notches shall be increased to 25 mm width in case shell side fluid is exceptionally dirty or contains slurry. 8. The use of a 2-pass shell employing a continuous longitudinal baffle shall require buyer's approval. 9. If necessary, impingement protection shall be provided either by a square-plate or round- plate baffle, two rows of impingement rods and a distributing belt or by an enlarged inlet nozzle with an internal-distributor plate. 10. Impingement baffle shall be as per VS-42. If special baffle is specified, the following criteria shall be applied. 11. Plate baffles shall extend at least 25 mm beyond the projection of the nozzle bore. 12. The unrestricted bundle entrance flow area at the impingement plate baffle shall not be less than the flow area of the inlet nozzle. Materials 1. Materials shall conform to the specifications tabulated in the TEMA standards. All materials subjects to internal or external pressure shall also conform to the specification given in ASME, section VIII, division The material of internals such as baffles, tie rods, etc., Refer attached Material Specification sheet 3. Reinforcement pads shall be made of the same material as the shell, channel or head. Design codes with latest editions The latest design codes given below shall be used for design, manufacture, testing and acceptance of the equipment. i. ASME Boiler and Pressure Vessel code Sec. VIII div. I ii. TEMA, standard of tubular exchanger manufacturers association ( class as specified on the drawings / Data sheets) iii. ASTM specification iv. AWS -ASME specification for welding electrodes v. ANSI (American national standard institute ) B 16.5 steel pipe flanges and flanged fitting and B16.11 Forged fittings socket welding & threaded. vi. IBR (whenever applicable)- Indian Boiler Regulation

5 vii. EJMA (Expansion joint manufacturers association standard. Design and Drawings approvals 1. The drawing & Material of Construction Sheet issued with this enquiry is for estimation purpose only. 2. The manufacturer shall prepare detailed fabrication drawings and material of construction and it shall be submitted for approval. Procurement of materials, fabrications etc shall start only after such approval. Guarantee. The manufacturer shall be responsible for any defects due to any inferior materials or workmanship developed under operating conditions within 12months from the date of the commissioning or 18months from the date of receipt of the equipment at the site whichever is earlier. and the manufacture shall attend his own cost & make necessary repairs and /or replacements without delay.

Technical specification for Purchase requisition number:

Technical specification for Purchase requisition number: Technical specification for Purchase requisition number: 3000012238 Fabrication, Testing and Supply of the Heat Exchanger & Tube Bundle 1. Scope of Supply: Fabrication, Testing and Supply of one (01) nos

More information

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,

More information

INSPECTION AND TEST PLAN

INSPECTION AND TEST PLAN BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,

More information

Inspection and Test Plan for Water Tube Boiler

Inspection and Test Plan for Water Tube Boiler www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

Module 4 Design for Assembly IIT BOMBAY

Module 4 Design for Assembly IIT BOMBAY Module 4 Design for Assembly Lecture 8 Case Studies - IV Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles

More information

ISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers

ISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers INTERNATIONAL STANDARD ISO 16812 Second edition 2007-02-15 Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers Industries du pétrole, de la pétrochimie et du gaz naturel

More information

Calculations per ABS Code along with ASME Sec. VIII Div.1 XXXX

Calculations per ABS Code along with ASME Sec. VIII Div.1 XXXX Calculations per ABS Code along with ASME Sec. VIII Div.1 XXXX Grouping of Boilers and Pressure Vessels: PART 4 CHAPTER 4 SECTOIN 1 Table #2 and #3 >> Group II PART 4 CHAPTER 4 SECTOIN 1 Appendix 1 Rules

More information

for industry.com

for industry.com Inspection and Test Plan for Shell and Tube Heat Exchanger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Manuf. TPI Client Remark 1 Pre Inspection Meeting

More information

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 Page of FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 1. Manufactured and certified by: 2. Manufactured for:

More information

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC) PIOEER I HEAT TRASFER TECHOLOGY DOLPHI SHELL & TUBE MARIE CODESERS (DSTMC) Dolphin Shell & Tube Marine Condenser (DSTMC) General Information Dolphin carries out Thermal Design, Mechanical Design & detailed

More information

Fluid Sealing Association

Fluid Sealing Association Fluid Sealing Association STANDARD FSA-MG-501-02 STANDARD TEST METHOD FOR INWARD BUCKLING OF SPIRAL-WOUND GASKETS 994 Old Eagle School Road, Suite 1019 Wayne, Pennsylvania 19087-1866 Phone: (610) 971-4850

More information

IN-LINE INTER- AFTERCONDENSER

IN-LINE INTER- AFTERCONDENSER IOM-INTER/AFTER-0209 IN-LINE INTER- AFTERCONDENSER Installation, Operation, Maintenance and Manual Graham Corporation 20 Florence Avenue Batavia, New York 14020 Email: equipment@graham-mfg.com www.graham.mfg.com

More information

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does

More information

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL. METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)

More information

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing

More information

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow PIPING COMPONENTS Piping components are mechanical elements suitable for joining or assembly into pressure-tight fluid containing piping systems. Components include pipe, tubing, fittings, flanges, gaskets,

More information

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove WARNING Read and understand all instructions before attempting to install any Victaulic piping products. These products must be used only on pipe that is prepared to Victaulic Advanced Groove System (AGS)

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3501 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Instrument Air Design Conditions 150 PSIG @ 180 F Operating Conditions 125

More information

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings. 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)

More information

ANSI ORIFICE FLANGES METAL-KOREA

ANSI ORIFICE FLANGES METAL-KOREA METAL-KOREA ANSI ORIFICE FLANGES ORIFICE FLANGES are widely used in conjunction with orifice meters for measuring the rate of flow of liquids and gases. They are basically the same as standard welding

More information

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements.

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements. SPEC-3017 1/8 1.0 PURPOSE This specification describes the minimum requirements for the installation of breathing air distribution systems (indoor and outdoor) up to the connection to the breathing air

More information

Installation and Specification Manual December 2012

Installation and Specification Manual December 2012 Installation and Specification Manual December 2012 APOLLOXPRESS TM fittings are a heat-free method for joining copper tube and provide a clean, easy to use joining method designed to save time and money

More information

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.

More information

Requirement for Holes - Holes for Hanging

Requirement for Holes - Holes for Hanging Requirement for Holes - Holes for Hanging In order for items to progress through the series of pretreatment and galvanizing baths at our facility, they must be suspended in a suitable manner to ensure

More information

Sprinkler wet pipe and dry pipe. For FM approval of the dry pipe model "I" shall be used. SBF 120: 7 applies to model "E".

Sprinkler wet pipe and dry pipe. For FM approval of the dry pipe model I shall be used. SBF 120: 7 applies to model E. Product Name Nordic Flow FM Thin Wall Pipes Application Sprinkler wet pipe and dry pipe. For FM approval of the dry pipe model "I" shall be used. SBF 120: 7 applies to model "E". Manufacturing Standard

More information

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification. Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector zinc plated bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc

More information

IOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance

IOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance IOM 004 Effective 3/29/04 Rev A MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance Contents Batten Arrangements...3 Slip-On Battens...4 Ceiling Opening...5 Installation...5 Hanger Bracket

More information

Assembly instructions

Assembly instructions Assembly instructions Important notes on VOSS assembly instructions In order to ensure maximum performance and functional reliability of VOSS products, the respective assembly instructions, operating conditions

More information

Visual Testing of Pipe Threads

Visual Testing of Pipe Threads From NDT Technician, Vol. 10, No. 1, pp: 1 5. Copyright 2011 The American Society for Nondestructive Testing, Inc. The American Society for Nondestructive Testing www.asnt.org FOCUS AAs an oil well is

More information

QUALITY ASSURANCE SPECIFICATION

QUALITY ASSURANCE SPECIFICATION Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM Technical Specification of Back Clamp for LT Cross Arm (MS) Back clamp for LT Cross Arm made out of 50 x 6mm MS Flat suitable for 8m X 300 Kg PSC poles. After fabrication the cross arm shall be painted

More information

Chapter VI Vessel Supports

Chapter VI Vessel Supports Chapter VI Vessel Supports 1 2 Vessel Supports Vessel support is to a. Support the weight of the container b. Fix the container position c. Keep the container in operation. Classified by the type of vessels:

More information

Repair Manual 12 PL PILOT

Repair Manual 12 PL PILOT Repair Manual 12 PL PILOT 12 PL PILOT REPAIR MANUAL INDEX Introduction... 1 Elastomer Materials... 2 Disassembly... 3 Assembly... 7 Testing... 11 NOTE: We reserve the right to modify or change, without

More information

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: FABRICATION TECHNOLOGY-II (Code: 3345505) Diploma Programme in which this course is offered Semester in which offered

More information

Basket & Screen Data. Cylindrical baskets for simplex and duplex strainers up to 8" size

Basket & Screen Data. Cylindrical baskets for simplex and duplex strainers up to 8 size Basket & Screen Data Cylindrical baskets for simplex and duplex strainers up to 8" size Slant top baskets for Model 510 simplex and Model 570 duplex strainers sizes 8" to 36" Basket and Screen Design The

More information

PRODUCT CATALOGUE. Major Features: Arc Bends Manufactured to: Pipestar now offering full-line of flanged Arcbends

PRODUCT CATALOGUE. Major Features: Arc Bends Manufactured to: Pipestar now offering full-line of flanged Arcbends PRODUCT CATALOGUE Pipestar now offering full-line of flanged Arcbends Pipestar offers a range of seamless long radius Arc HDPE sweep bends made to the highest quality standards. Pipestar offers a range

More information

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INTRODUCTION During manufacture and assembly of equipment great care is taken to ensure accuracy in mating the sealing faces on frame and doors, especially

More information

Grooved Products. Installation Instructions. Trusted above all.

Grooved Products. Installation Instructions. Trusted above all. Grooved Products Installation Instructions Trusted above all. Grooved products installation instructions Introduction Introduction to grooved products installation Viking is renowned for the development,

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

JIS G3465 Seamless Steel Tubes for Drilling

JIS G3465 Seamless Steel Tubes for Drilling JIS G3465 Seamless Steel Tubes for Drilling 1. Scope This Japanese Industrial Standard specifies the seamless steel tubes, hereinafter referred to as the "tubes", used for casing tube, core tube and drill

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping

More information

SERRATING / GROOVING TOOL - ST SERIES. Features : 1/8 x3/8 x1/8

SERRATING / GROOVING TOOL - ST SERIES. Features : 1/8 x3/8 x1/8 3 1 8 2-2 SERRATING / GROOVING TOOL - ST SERIES FOR GROOVING IN TUBE SHEETS Tool 1/8 x 3/8 x 1/8 Spacing Spare Tool Bits 1/8 x 1/4 x 1/8 Spacing Special Spacing 9.53 3/8 ST-375-970 ST-3703 ST-3703-S ST-3703-SPEC

More information

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures. SECTION 22 05 16 LOOPS FOR PLUMBING PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Compressors, Chillers & Condensers

Compressors, Chillers & Condensers MARINE CONDENSER ACME MHX MARINE CONDENSER ACME Type MHX condensers are manufactured with the latest technology marine condenser tubing to provide compact size and cost effective use. STANDARD DESIGNS

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

DEUTSCH Instructional Manual for HDP-400 Power Crimper (TE CONNECTIVITY PN )

DEUTSCH Instructional Manual for HDP-400 Power Crimper (TE CONNECTIVITY PN ) ORIGINAL INSTRUCTIONS DEUTSCH Instructional Manual for HDP-400 Power Crimper (TE CONNECTIVITY PN 1606312-1) Instruction Sheet 0425-034-0000 15 JAN 18 Rev H NOTE All numerical values are in metric units

More information

5.1 MUELLER CORPORATION VALVES. MUELLER 300 Ball Type Corporation Valves

5.1 MUELLER CORPORATION VALVES. MUELLER 300 Ball Type Corporation Valves MUELLER CORPORATION VALVES 5.1 Shaded area indicates changes Rev. 4-14 Machine inserted corporation stops were developed by Hieronymus Mueller in conjunction with his development of the drilling and tapping

More information

INSTALLATION MANUAL FOR STAINLESS STEEL, GROOVE-END, FLEXIBLE COUPLINGS

INSTALLATION MANUAL FOR STAINLESS STEEL, GROOVE-END, FLEXIBLE COUPLINGS PIEDMONT PACIFIC CORPORATION INSTALLATION MANUAL FOR STAINLESS STEEL, GROOVE-END, FLEXIBLE COUPLINGS 4703 Tidewater Ave., Suite G Oakland. CA, 94601, USA Ph: +1 510 434 0990 / Fax: +1 510 436 0990 www.piedmontpacific.com

More information

No September, Char-Lynn. Power Steering. Repair Information. 20 Series Steering Control Unit 001

No September, Char-Lynn. Power Steering. Repair Information. 20 Series Steering Control Unit 001 Char-Lynn Power Steering No. 7-313 September, 1997 Repair Information 20 Series Steering Control Unit 001 Bearing Race Retaining Ring Needle Thrust Bearing Bearing Race Seal Ring Backup Washer Seal (3

More information

COMPLETE REVISION October Process Industry Practices Piping. PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details

COMPLETE REVISION October Process Industry Practices Piping. PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details COMPLETE REVISION October 2007 Process Industry Practices Piping PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize

More information

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable

More information

General Information. Ball Curb Valve

General Information. Ball Curb Valve General Information 1. All Jones Curb Valves are manufactured in accordance with the AWWA Standard C-800-latest revision. 1. Copper Alloy CDA No. C83600 (85-5-5-5) 2. Copper Alloy CDA No. 89520 (Low Lead)

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

SECTION THERAPEUTIC POOL ACCESSORIES

SECTION THERAPEUTIC POOL ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 13 17 23.11 THERAPEUTIC POOL ACCESSORIES SPEC WRITER NOTES: Delete between // // if not applicable to project. Also, delete any other item or paragraph not applicable

More information

REPUTE tube fittings are manufactured to stringent quality control program and internal standards which

REPUTE tube fittings are manufactured to stringent quality control program and internal standards which Introduction: REPUTE tube fittings are manufactured to stringent quality control program and internal standards which assure the highest quality available in the industry. Two ferrule tube fittings are

More information

Joint Preparation prior to Tensioning: General:

Joint Preparation prior to Tensioning: General: `Hydraulic Tensioner Procedure for 50% tensioning: Document: PWL-HTS-101 Joint Preparation prior to Tensioning: General: Clean Flanges and check for scars on the flange surface area Check studs and nuts

More information

HBS-AP ASSEMBLING INSTRUCTIONS

HBS-AP ASSEMBLING INSTRUCTIONS ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK 97 HBS-AP ASSEMBLING INSTRUCTIONS 1. INTRODUCTION 1.1. This manual is very easy to consult and we recommend reading it before starting work,

More information

Operating instructions OI/FPD350-EN Rev. H. FPD350 Torbar Averaging pitot tubes

Operating instructions OI/FPD350-EN Rev. H. FPD350 Torbar Averaging pitot tubes Operating instructions OI/FPD350-EN Rev. H FPD350 Torbar The Company We are an established world force in the design and manufacture of measurement products for industrial process control, flow measurement,

More information

Section 914. JOINT AND WATERPROOFING MATERIALS

Section 914. JOINT AND WATERPROOFING MATERIALS 914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

Rodney Hunt. A GA Industries Company Glydaseal Gates

Rodney Hunt. A GA Industries Company Glydaseal Gates Rodney Hunt A GA Industries Company Glydaseal Gates GUIDE BRONZE GUIDE BAR FRAME NUT POCKET SEAT FACING RESILIENT INVERT SEAT DISC GUIDE BAR ADJUSTMENT BOLT WITH LOCK NUT GUIDE BAR ATTACHING BOLT The Glydaseal

More information

CV Control Valves Installation and Operation Manual

CV Control Valves Installation and Operation Manual CV00 - Control Valves Installation and Operation Manual Overview Warning: This bulletin should be used by experienced personnel as a guide to the installation of the Armstrong CV00 Control Valve. Selection

More information

0.20. Record Page 1 of 19

0.20. Record Page 1 of 19 Page 1 of 19 Page 2 of 19 Page 3 of 19 Page 4 of 19 Page 5 of 19 ASME BPVC.III.1.ND-2015 Page 6 of 19 ð15þ Figure ND-3325-1 Some Acceptable Types of Unstayed Flat Heads and Covers GENERAL NOTE: The illustrations

More information

Practical Bolting and Gasketing for the Non Standard-Flanged Joint

Practical Bolting and Gasketing for the Non Standard-Flanged Joint Practical Bolting and Gasketing for the Non Standard-Flanged Joint Points of Discussion Introduction Joint Analysis Existing Flange Data Machining Procedure Bolting Radial Shear Available Gasket Styles

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Thickness tolerances of steel plates and wide flats

Thickness tolerances of steel plates and wide flats (1981) (Rev.1 1989) (Rev.2 1992) (Rev.3 1995) (Rev.4 Oct 2009) (Rev.5 Feb 2012) Thickness tolerances of steel plates and wide flats.1 Scope.1.1 These requirements apply to the tolerance on thickness of

More information

The Redi-Flange Method. How It Works. Services. Engineering & Costing Assistance

The Redi-Flange Method. How It Works. Services. Engineering & Costing Assistance ... g n ldi ng... e i W No hread ing! T oov o N Gr o N The Redi-Flange Method Redi-Flange is a method of joining valves, fi ttings and equipment with integral fl anged ends to plain-ended pipe, with all

More information

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

Important Notices. Manway Lockout Point

Important Notices. Manway Lockout Point 2 Drawing CM-1B Important Notices 1. We palletize all manways to avoid damage during shipment and subsequent handling at the jobsite. We suggest that the manway remain on the pallet until installation.

More information

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2 operating Instructions manual MUELLER GAS TAble of contents PAGE DH-5 Drilling Machine For use on 1 1 /2 & 2 Line Stopper Fittings General Information 2 Installing and Stopping-off 1 1 /2 and 2 Line Stopper

More information

MILITARY SPECIFICATION

MILITARY SPECIFICATION MIL-R-47196A(MI) 6 September 1977 SUPERSEDING MIL-R-46196(MI) 12 July 1974 MILITARY SPECIFICATION RIVETS, BUCK TYPE, PREPARATION FOR AND INSTALLATION OF This specification is approved for use by US Army

More information

Fuel - Defuel Valve. Model Maintenance & Repair Manual. SM61499 Issued: February 1996 Applicable additional manuals: NONE

Fuel - Defuel Valve. Model Maintenance & Repair Manual. SM61499 Issued: February 1996 Applicable additional manuals: NONE Aerospace Group Conveyance Systems Divison Carter Brand Ground Fueling Equipment SM61499 Issued: February 1996 Applicable additional manuals: NONE Maintenance & Repair Manual Fuel - Defuel Valve Model

More information

One Revolution Tube Cutter

One Revolution Tube Cutter One Revolution Tube Cutter Series 9060 Tube & Pipe Cleaners Tube Testers Tube Plugs Tube Removal Tube Installation Operating and Maintenance Instructions www.elliott-tool.com Table Of Contents Introduction...

More information

INSTALLATION OF SERRATED METAL CORE WITHOUT FULL DISASSEMBLY OF A HEAT EXCHANGER

INSTALLATION OF SERRATED METAL CORE WITHOUT FULL DISASSEMBLY OF A HEAT EXCHANGER PVP2010 25685 INSTALLATION OF SERRATED METAL CORE WITHOUT FULL DISASSEMBLY OF A HEAT EXCHANGER Abstract Problem Russ Currie R Davis Flexitallic Limited Scandinavia Mill Cleckheaton West Yorkshire UK Rcurrie@flexitallic.eu

More information

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL 1 Foreword These instructions are provided to familiarize the user with the seal and its designated use. The instructions must be read and applied whenever work is done on the seal, and must be kept available

More information

STEEL PIPE GUIDERAIL 01/01/

STEEL PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports

More information

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks Mounting Instructions For DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks WARNING: Because of the possible danger to person(s) or property from accidents which may result from the

More information

Durapipe ABS Jointing Guide

Durapipe ABS Jointing Guide Durapipe ABS Jointing Guide Solvent cement welding offers a simple and quick means of constructing high integrity, leak-free joints. The solvent cement operates by chemically softening the joint surfaces.

More information

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward. Figure 1 Miniature Quick Change Applicators, of the end feed type, are designed to crimp end feed strip terminals to prestripped wires. Each applicator is set up to accept the strip form of certain specific

More information

ALUMINUM PIPE GUIDERAIL 01/01/

ALUMINUM PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy

More information

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe INFORMATION The Stargrip Mechanical Joint Restraint System is a unique product with a proven design that provides an exceptional

More information

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL 1 Foreword These instructions are provided to familiarize the user with the seal and its designated use. The instructions must be read and applied whenever work is done on the seal, and must be kept available

More information

Repair of Rotac Actuators

Repair of Rotac Actuators Repair of Rotac Actuators MP Model OVERHAUL INSTRUCTIONS Also Includes older styles RN CG XL HN Read the entire contents of these instructions before installing the actuator and before making any connections

More information

WIRELINE RODS CARE AND HANDLING

WIRELINE RODS CARE AND HANDLING WIRELINE RODS CARE AND HANDLING Drilling companies constantly need to achieve greater depths, while machines are increasingly more powerful and faster. Heat treatment applied to rod ends, enhances their

More information

BRAZING PROCEDURE SPECIFICATION NO

BRAZING PROCEDURE SPECIFICATION NO NATIONAL CERTIFIED PIPE WELDING BUREAU BRAZING PROCEDURE SPECIFICATION NO. 107-1 FOR TORCH BRAZING OF ALLOYS 102, 120, 122, 142, 192 OF TUBE, VALVES, FITTING AND FLANGES USING BcuP-3 THROUGH-7 FILLER METALS

More information

ACF Maintenance Bulletin. TC-200 Revision B. ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement

ACF Maintenance Bulletin. TC-200 Revision B. ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement ACF Maintenance Bulletin TC-200 Revision B ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement May 16, 2016 SHEET: 1 of 13 FOREWORD: This ACF Maintenance Bulletin TC-200 details the inspection

More information

THERMOWELLS CONSTRUCTION FROM BARSTOCK OR FABRICATED

THERMOWELLS CONSTRUCTION FROM BARSTOCK OR FABRICATED age 1 of 5 THERMOWELLS CONSTRUCTION FROM BARSTOCK OR FABRICATED A thermowell is a thermally conductive socket recommended to: rotect the delicate instrument sensing elements against corrosive effects.

More information

PURESTREAM SYSTEM - ASSEMBLY GUIDE

PURESTREAM SYSTEM - ASSEMBLY GUIDE PURESTREAM SYSTEM - ASSEMBLY GUIDE VISIT OUR WEBSITE : www.cagpurification.com our installment procedure videos in the PURESTREAM Piping section. NECESSARY TOOLS FOR INSTALLATION We suggest the use of

More information

Installation and Maintenance Instructions

Installation and Maintenance Instructions Installation and Maintenance Instructions Bradley Barrier-Free HN-300 In-Wall Shower Table of Contents Pre-Installation Information................2 Warranty...............................2 Components

More information

NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION

NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION Prepared by Liftech Consultants Inc. Quality Assurance Review for Liftech Consultants Inc. Author: Kenton Lee Structural Engineer Editor: Erik Soderberg

More information

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information