1 SCHOOL BOARD OF BREVARD COUNTY PURCHASING DEPARTMENT 2700 JUDGE FRAN JAMIESON WAY VIERA, FL BID #06-017/JO Acoustical Ceiling Tile, Non-Asbestos Maintenance 2005/06, 2006/07, 2007/08 VENDORS RECOMMENDED FOR RE-AWARD: Vendor Name Vendor #V Acousti Engineering Co. of Florida Vendor #V Dane Contracting Vendor #V Don Facciobene Inc. Vendor #V Space Coast Interiors, Inc. TOTAL Estimated Amount Awarded Item Nos. Primary: 3A2 & 3B2 (Armstrong), 8 (Armstrong) Secondary: 1A-D (Armstrong), 2A-B (Armstrong), 3A1 & 3B1, (Armstrong) 4A1-2 & 4B1-2 (Armstrong), 5 (Armstrong), 6 (Armstrong), 7 A-B (Armstrong), 9 (Armstrong) Secondary: All (Armstrong Only) Primary: 3A1-A2 & 3B1-B2 (USG), 4A1-2 & 4B1-2 (Armstrong & USG), 8 (USG), 9 (USG) Secondary: 1A-D (Armstrong & USG), 2A-B (Armstrong & USG), 3A1-2 & 3B1-2 (Armstrong), 5 (USG), 6 (USG), 7A&B (Armstrong & USG), 8 (Armstrong), 9 (Armstrong) Primary: 1A-D (Armstrong & USG), 2 A-B (Armstrong & USG), 3A1 & 3B1 (Armstrong), 4A1 (USG), 4B1 (USG), 5 (Armstrong & USG), 6 (Armstrong & USG), 7 A-B (Armstrong & USG), 9 (Armstrong) Secondary: 3A2 (Armstrong), 3B2 (Armstrong), 4B2 (Armstrong & USG), 8 (Armstrong) SOLICITATION SUMMARY Date Solicited: September 1, 2005 Number of Items/Groups: 20/9_ Date Opened: September 30, 2005 Present to Board: January 22, 2008 Original Award Date: October 25, 2005 CONTRACT TERM: (Option Year 2) One year from October 25, RECOMMENDATION: It is the recommendation of Mr. Walt Petters, Director of Maintenance and Staff to re-award to the low conforming bidder(s) as highlighted on the tabulation sheet for an indeterminate amount. ACTION BY BOARD Approved Recommendation(s) Above & Awarded Meeting Date: Other Lynda Jones, Director of Purchasing and Warehouse Services
2 RECOMMENDATION FOR IDENTICAL TIE BID Item 4A1 Tie: Don Facciobene Inc. and Space Coast Interiors (Armstrong) As per Florida Administrative Code 60A Identical Evaluations of Responses, a coin toss procedure was conducted by Maintenance & Purchasing Staff to determine the Primary award. Don Facciobene, Inc. was the winner of the coin-toss. Item 4B1 Tie: Don Facciobene Inc. and Space Coast Interiors (Armstrong) As per Florida Administrative Code 60A Identical Evaluations of Responses, a coin toss procedure was conducted by Maintenance & Purchasing Staff to determine the Primary award. Don Facciobene, Inc. was the winner of the coin-toss.
3 SCHOOL BOARD OF BREVARD COUNTY PURCHASING DEPT JUDGE FRAN JAMIESON WAY VIERA, FL October 4, 2005 TO: FROM: BIDDERS ON ACOUSTICAL CEILING TILE, NON ASBESTOS Joe O Connor, Purchasing Specialist RE: Bid #06-017/JO Acoustical Ceiling Tile, Non Asbestos Maintenance 2005/06, 2006/07, 207/08 TABULATION Listed below for your information is a Tabulation of bids received on the above captioned matter. This is Tabulation only, and Award of orders will be made at a later date. BIDDERS Acousti Engineering Dane Contracting Don Facciobene Don Facciobene Space Coast Interiors Space Coast Interiors Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid 1. Furnish and Install all Ceiling Tile & Mechanical Suspension Systems as indicated herein, per location, per job, as required during the bid period. Armstrong or USG Non-Asbestos only Less than 1,000 square feet - Price Per Square Foot A. Size 2x2 Acoustical $1.51 $3.10 $1.51 $1.51 $1.30 $1.30 Panels Armstrong #770 Armstrong #770 Armstrong #770 USG #2110 Armstrong #770 USG #2110 B. Size 2x4 Acoustical $1.45 $3.06 $1.41 $1.40 $1.20 $1.20 Panels Product(s) bid Armstrong #769 Armstrong #769 Armstrong #769 USG #2310 Armstrong #769 USG #2310 C. Size 2x2 Vinyl Cover Gypsum Panels $1.75 $4.63 NO BID $1.70 $1.60 $1.60 USG #3260 USG #3260 D. Size 2x4 Vinyl Cover Gypsum Panels Continued, $1.69 $4.55 NO BID $1.59 $1.55 $1.55 USG #3270 USG #3270
4 Bid #06-017/JO Price Sheet 10/4/05 Page 2 BIDDERS Acousti Dane Don Facciobene Don Facciobene Space Coast Space Coast Engineering Contracting Interiors Interiors Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid 2. Furnish and install all Ceiling Tile and Mechanical Suspension Systems as indicated herein, per location, per job, as required during the bid period. Armstrong or USG Non-Asbestos only 1,000 Square feet or more - Price Per Square Foot A. Size 2x2 Acoustical $1.51 $3.06 $1.38 $1.41 $1.25 $1.25 Panels Armstrong #756 Armstrong #770 Armstrong #770 USG #2110 Armstrong #770 USG #2110 B. Size 2x4 Acoustical $1.45 $3.00 $1.28 $1.30 $1.15 $1.15 Panels Armstrong #755 Armstrong #769 Armstrong #769 USG #2310 Armstrong #769 USG # Tile, Ceiling, Acoustical, Panels only, Armstrong or USG Non-Asbestos only, Size 2 x2 Supply Only, Not Installed 500 Square Feet or more Price Per Square Foot A. FISSURED 1) Class A Non- $0.41 $0.74 $0.41 $0.41 $0.38 NO BID Combustible Armstrong #756 Armstrong #756 Armstrong #756 USG # 560 Armstrong #756 2) Fire Rated $0.60 $1.06 $.61 $0.58 $0.65 NO BID Armstrong #896 Armstrong #824 Armstrong #824 USG #585 Armstrong #896 B. NON-FISSURED 1) Class A Non- $0.41 $0.74 $0.41 $0.41 $0.38 NO BID Combustible Armstrong #770 Armstrong #770 Armstrong #770 USG #2110 Armstrong # 770 2) Fire Rated $0.60 $1.06 $.61 $0.58 $0.65 NO BID Armstrong #824 Armstrong #824 Armstrong #824 USG #2115 Armstrong #824 Continued,
5 Bid #06-017/JO Price Sheet 10/4/05 Page 3 BIDDERS Acousti Dane Don Facciobene Don Facciobene Space Coast Space Coast Engineering Contracting Interiors Interiors Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid 4. Tile, Ceiling, Acoustical, Panels Only, Armstrong or USG Non-Asbestos only, Size 2x4 Supply Only, Not Installed 1,000 Square Feet or More - Price Per Square Foot A. FISSURED 1) Class A Non- $0.40 $0.72 $0.38 $0.40 $0.38 $0.38 Combustible Armstrong #755 Armstrong #755 Armstrong #755 USG #562 Armstrong #755 USG #562 2) Fire Rated $0.59 $1.26 $0.58 $0.57 $0.59 $0.59 Armstrong #895 Armstrong #895 Armstrong #895 USG #586 Armstrong #895 USG #586 B. NON-FISSURED 1) Class A Non- $0.40 $0.72 $0.38 $0.40 $0.38 $0.38 Combustible Armstrong #769 Armstrong #769 Armstrong #769 USG #2310 Armstrong #769 USG #2310 2) Fire Rated $0.59 $1.26 $0.58 $0.57 $0.59 $0.59 Armstrong #823 Armstrong #823 Armstrong #823 USG #2315 Armstrong #823 USG # Tile, Ceiling, Vinyl Cover Gypsum Panels, Size 2 x2 Armstrong or USG Non-Asbestos only Supply only, Not Installed 500 Square Feet or More Price Per Square Foot $0.58 $1.12 NO BID $0.60 $0.54 $0.54 USG #3260 USG # Tile, Ceiling, Vinyl Cover Gypsum Panels, Size 2 x4 Armstrong or USG Non-Asbestos only Supply only, Not installed 500 Square Feet or more Price per square foot $0.55 $1.10 NO BID $0.59 $0.52 $0.52 USG #3270 USG #3270 Continued,
6 Bid #06-017/JO Price Sheet 10/4/05 Page 4 BIDDERS Acousti Dane Don Facciobene Don Facciobene Space Coast Space Coast Engineering Contracting Interiors Interiors Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid Amount Bid 7. Ceiling Tile --- De-Install and remove from premises and dispose of old tile in accordance with local code and state law regarding disposal of material. Provide and install new. Grid system is not to be replaced, but is to be utilized. This will be a total turnkey job; vendor is to supply all materials and labor. Orders will be on an as needed basis Price per square foot A. 2x2 Acoustical Panels $1.17 $1.85 $1.16 $1.16 $0.75 $0.75 Armstrong #770 Armstrong #770 Armstrong #770 USG #2110 Armstrong #770 USG #2110 B. 2x4 Acoustical Panels $1.11 $1.80 $1.13 $1.12 $0.72 $0.72 Armstrong #769 Armstrong #769 Armstrong #769 USG #2310 Armstrong #769 USG # Tile, Ceiling, Panels only, Lay-in, Fiberglass, Average C Factor (AT 75 F) is.38, R factor is 2.6, vinyl film facing insulation back loading 5/8 thickness, 24 x 48, minimum back loading R19, flame spread 0-25, ASTM-E84, Class A Fed SS-S-118B, Armstrong Colortones or equal. NON- ASBESTOS Supply Only, Not installed Price per square foot $0.55 $1.30 $0.64 $0.63 $0.69 NO BID Notes: Armstrong #2905, 2907, 2910, 2911 White Only Armstrong #2905, 2907, 2910, 2911 Armstrong #2907 USG #7053G Armstrong # s 2905, Ceiling Tile --- De-Install and remove from premises and dispose of old tile in accordance with local code and state law regarding disposal of material. Provide and install new 2 x 2 moisture resistant, fire guard, fire retardant-resistant, non-asbestos, STC 40-44, Armstrong #R.H. 90 fissured or equal. Grid system is not to be replaced, but is to be utilized. This will be a total turnkey job; vendor is to supply all materials and labor. Orders will be on an as needed basis Price per square foot $1.61 $1.88 $1.64 $1.65 $0.90 NO BID Armstrong #1810 Armstrong #1811 Armstrong #1811 USG #2211 Armstrong #1811
7 Bid #06-017/JO Price Sheet 10/4/05 Page 5 Contract Instructions The Primary/Secondary Threshold of this contract is $5, It is the intent of the contract that ALL projects be competitively bid however the School Board may alter this procedure for projects which are estimated to be less than $5, The Primary contractor (lowest bidder per applicable line item, as indicated by highlighting and bolding), may be requested to perform the work at the rates bid and awarded. For projects estimated to be over $5, all contractors awarded as a secondary shall be asked to competitively quote; care should be taken to request quotes only from the contractors bidding the required product (see notes). In the event there was only one bidder for a particular line item; no Secondary is awarded and the Primary will be asked to perform the work at the rates awarded regardless of the size of the project (see notes). Notes: Acousti Engineering & Dane Contracting bid Armstrong product only Do not use for USG quoting. Don Facciobene did not bid Line Items 1C&D (Armstrong), 5 (Armstrong), 6 (Armstrong). All three remaining contractors may be utilized for Armstrong quotes (mandatory for projects estimated to be over $5,000.00). Space Coast Interiors did not bid Line Items 3A1-2 & 3B1-2 (USG), 8 (USG), 9 (USG) Don Facciobene only bidder for these items.
8 BIDDERS NOTES Bid #06-017/JO Acoustical Ceiling Tile, Non-Asbestos Maintenance 2005/06, 2006/07, 2007/08 Time Required For Delivery Bids Valid Until V Acousti Engineering Co. 426 Gus Hipp Blvd. Rockledge, FL Order Contact Person: Dana Durden Ph. # Fx. # Rep: Dana Durden 10 Business Days 1 Year From Date Of Award V Dane Contracting, Inc. P.O. Box Indialantic, FL Order Contact Person: Pete Sorenson Ph. # Fx. # Rep: Pete Sorenson Per Request 1 Year From Date of Award, 2 Option Years V Don Facciobene, Inc Babcock St. NE #7 Palm Bay, FL Order Contact Person: Don Facciobene Ph. # Fx. # Rep: Don Facciobene V Space Coast Interiors, Inc. PO Box Satellite Beach, FL Order Contact Person: Tim Burns Ph. # Fx. # Rep: Tim Burns 3 Days 1 Year From Date Of Award 3-5 Days 1 Year From Date Of Award
SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL
SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL 32940-6601 ITB #11-009/BM Portable Classroom and Mobile Trailer Relocation Plant Operations and Maintenance
More informationSCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL
SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 7 JUDGE FRAN JAMIESON WAY VIERA, FL -661 ITB 1-B-7-DR - Purchase of VENDOR RECOMMENDED FOR AWARD: VENDOR NAME ESTIMATED ANNUAL AMOUNT AWARDED
More informationSCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL Estimated
SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL 32940-6601 BID #10-021/JJ Paper Warehouse Services VENDORS RECOMMENDED FOR AWARD: Vendor Name Estimated
More informationSUBMITTAL SHEET. Project Submittals by
Galvanized Tie Wire and Hanger Wire Submittal of Product Performance SUBMITTAL SHEET Project Submittals by GRABBER CONSTRUCTION PRODUCTS, INC. Submittal Date: Contract Number: Project Name: Section Number:
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationBID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT
February 04, 2016 BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT The Bid Documents that are included as part of the above bid package include the following: 1). Instructions to bidders
More informationAcoustical Infill Panels
Acoustical Infill Panels Assembly and Installation Instructions 1. GENERAL These installation instructions will explain and show the recommended installation methods for acoustical infill panels with-in
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More information(Y Roadway Production Division
PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, FL 33416-1229 (561) 684-4000 FAX: (561) 684-4050 www.pbcgov.com Palm Beach
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationNOTICE OF INTENT TO AWARD. The Right to File an Intent to Protest Expires: 1:51 p.m. on Thursday, January 17, 2019
NOTICE OF INTENT TO AWARD DATE/TIME OF INITIAL POSTING DATE/TIME POSTING REMOVED Monday, January 14, 2019 @ 1:51 p.m. The Right to File an Intent to Protest Expires: 1:51 p.m. on Thursday, January 17,
More informationDOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410
DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original
More informationWood Squares Installation Guide
Wood Squares Installation Guide World Commerce Center 2000 Ring Way Road, St. Augustine, FL 32092 Phone: 800-227-8566 or 904-584-1400 www.rulonco.com Rulon Wood Squares Ceiling Installation Guide Receipt
More informationRESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017
RESIDENTIAL ADDENDUM NUMBER ONE August 28, 2017 The following additions to, deletions from, and clarifications of the Contract Documents govern insofar as they apply and shall take precedence over those
More informationCHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO. 18-04 ADDENDUM NO. ONE DATE: September 07, 27 CLIENT / PROJECT: Chabot-Las Positas CCD Campus Master
More informationPALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT. January 8, 2018
Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, FL 33416-1229 (561) 684-4000 FAX: (561) 684-4050 www.pbcgov.com DATE: TO: FROM: PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT
More informationTechnical Data VARIABLES
Overview SYSTEM Rulon Linear Open wood ceilings are designed with wood boards suspended parallel to the floor and reveals separating each wood board. The system utilizes the Rulon Cliprail H system eliminating
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationFAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014
FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders
More informationAddress: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:
Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL
More informationSecond Revision No. 1-NFPA [ Section No ]
Page 1 of 8 Second Revision No. 1-NFPA 701-2014 [ Section No. 1.1.1 ] 1.1.1* Test Method 1. 1.1.1.1 Test Method 1 shall apply to materials with an areal density less than or equal to 700 g/m 2 (21 oz/yd
More informationSECTION INTERIOR SIGNAGE
SECTION 10 14 02 INTERIOR SIGNAGE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationREQUEST FOR QUOTATION INVITATION
REQUEST FOR QUOTATION INVITATION DATE: July 15, 2010 DPS: REQUIREMENT: SUBJECT: Patricia Farina DPS Contract Administrator Email: Patricia.Farina@cityofchicago.org Telephone: 312-744-7660 Silver Halide
More informationDesign Documents for Wayfinding
Design Documents for Wayfinding 11-11-08 FOR FHWA SUBMITTAL 1 2 3 4 5 6 7 8 9 1st AVENUE WEST 3rd AVENUE WEST A B C D E F G H I 15th STREET WEST 14th STREET WEST Historic 2nd AVENUE WEST BARCARROTA BOULEVARD
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationUFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 55 80.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE
More informationTechnical Data VARIABLES
Overview SYSTEM Rulon Panel Grilles are manufactured with aligned and spaced wood strips suspended vertically or horizontally, giving a ladder-like appearance. Panel Grilles provide a modern or traditional
More informationAddendum #1 - Bid Package #
Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationIFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1
IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are
More informationProduct Guide Specification
Extrutech Plastics, Inc. September 2012 5902 West Custer Street Manitowoc, Wisconsin 54220 Toll Free 888-818-0118 Phone 920-684-9650 Fax 920-684-4344 Website www.epiplastics.com E-mail info@epiplastics.com
More informationB. The designated coverage areas shall include both indoor and outdoor coverage.
Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet
More informationPALM COAST WASTEWATER TREATMENT PLANT NO. 2
ITB-CD-CME--0 ADDENDUM NO. PALM COAST WASTEWATER TREATMENT PLANT NO. ISSUE DATE: December 0, 0 BID DATE: January 0, 0 SUBJECT: Statements, Questions and Answers INTENT: This addendum is issued prior to
More informationImproving the Wind Resistance of Roof Systems: Asphalt Shingle Roofs
Improving the Wind Resistance of Roof Systems: Asphalt Shingle Roofs Relatively few homes receive severe structural damage from hurricane and other severe winds. Those few which are severely structurally
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.
More informationINDICATIVE PRICE BID FOR FURNISHING WORKS AT UZHAMALAKKAL BRANCH (NEW PREMISES) (FOR INFORMATION ONLY - NEED NOT BE FILLED UP)
INDICATIVE PRICE BID FOR FURNISHING WORKS AT UZHAMALAKKAL BRANCH (NEW PREMISES) (FOR INFORMATION ONLY - NEED NOT BE FILLED UP) S.No Description Qty Unit Rate Amount 1 SINGLE WINDOW SYSTEM: 12 Rmt Providing
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationQUOTATION FOR THE INTERIOR FURNISHING WORK OF BANK OF INDIA, BALARAMAPURAM BRANCH.
QUOTATION FOR THE INTERIOR FURNISHING WORK OF BANK OF INDIA, BALARAMAPURAM BRANCH. Date:- Si.No. Description of work Qty Units Rate Amount I DOORS & PARTITIONS :- 1 FULLY GLAZED FULL HEIGHT PARTITION WITH
More informationC. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors.
12300 - MANUFACTURED CASEWORK PART 1 - GENERAL 1.01 STIPULATIONS A. The specifications sections General Conditions, Special Requirements, and General Requirements form a part of this section by this reference
More informationCity Council Report 915 I Street, 1 st Floor Sacramento, CA
City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-00196 March 20, 2018 Consent Item 14 Title: Contract: Fort Natomas Shade Structure Location: District
More informationProposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846
PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y Proposal P.O. Box 846 Baker, MT 59313 P R E C A S T R E I N F O R C E D C O N C R E T E B O X C U L V E R T F O R W E S T M O
More informationTELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationLarge Scale CalArc Pavers for Sand-Set Pedestrian Use Installations
The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION
PART 1 GENERAL 1.01 SUMMARY Section 16195 A. This Section includes electrical identification for the following: 1. Nameplates and labels 2. Wire and cable markers 3. Conduit markers 4. Cable tray markers
More informationMETALWORKS Mesh. intertwine your design
M E T A L W O R KS Me sh intertwine your design The industry s broadest portfolio of standard Mesh ceilings allows you to weave, weld, and expand. Should your imagination exceed the norm, bend the rules
More informationFinish 1 Year 1 Year Lifetime 9200 Inswing Warranty Painted Plated PVD Vinyl Swinging Door List Price White Chrome S.Nickel H.Duty
Finish 1 Year 1 Year Lifetime 9200 Inswing Warranty Painted Plated PVD Vinyl Swinging Door List Price White Chrome S.Nickel H.Duty Euro White Tan or Earthtone Black A.Brass Brass Argon 270 366 Rolling
More informationSEALED BID FORMAT FOR INTERIOR FURNISHING WORKS AT THE NEW PREMISES OF SBI MANIPUZHA BRANCH
SEALED BID FORMAT FOR INTERIOR FURNISHING WORKS AT THE NEW PREMISES OF SBI MANIPUZHA BRANCH Sl No Description Qty Unit Rate Amount 1 SINGLE WINDOW SYSTEM: 8 Rmt Providing and fixing of Single window system
More informationKNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION
KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION PROPERTY ADDRESS: DISTRICT: Fourth and Gill H-1 906 Luttrell St 37917 FILE NO.: 11-I-13-HZ MEETING DATE: 11/21/2013
More informationSt. Monica Food Pantry
St. Monica Food Pantry 26 5113-1 ELECTRICAL WORK DIVISION 26 SECTION 265113 INTERIOR LIGHTING FIXTURES PART 1. GENERAL 1.1 WORK INCLUDES A. Extent, location, and details of interior lighting fixture work
More informationSECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -
More informationLEBANON BOARD OF EDUCATION, LEBANON, CONNECTICUT REQUEST FOR PROPOSALS FOR LYMAN MEMORIAL HIGH SCHOOL BOYS LOCKER ROOM 2/24/2017
LEBANON BOARD OF EDUCATION, LEBANON, CONNECTICUT REQUEST FOR PROPOSALS FOR LYMAN MEMORIAL HIGH SCHOOL BOYS LOCKER ROOM 2/24/2017 The Lebanon Board of Education invites sealed proposals for replacement
More informationWoodWORKS Channeled Plank
CEILING&WALL SYSTEMS Between us, ideas become reality WoodWORKS Channeled Plank Assembly and Installation Instructions 1. General 1.1 Product Description WoodWorks Channeled acoustical ceiling and wall
More informationSKC. Technical & Wood Works COMPANY PROFILE.
SKC Technical & Wood Works COMPANY PROFILE ABOUT US Established in 1989, Based in Al Jadaf, Dubai, one of the UAE's finest Fit-out and Joinery Contractor. SKC provides a huge range of expert installation,
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.
More informationTechnical Data VARIABLES
Overview SYSTEM Rulon Linear Closed wood ceilings are designed with wood boards suspended parallel to the floor with lap joints and produces a 1/4 overlap between boards. The closed style gives an all-wood
More informationSPECIFICATIONS FOR TENDER # SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH
SPECIFICATIONS FOR TENDER # 0171-0838 SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH CLOSING DATE: 21 March 2008 CLOSING TIME: 11:00 AM (Newfoundland Time) Invitation to
More informationDESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776)
DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) AGENCY Department of Management Services TITLE Mutual Aid Communication Microwave Short description of the commodity or service desired: Microwave
More informationtamko.com PREMIUM LAMINATED ASPHALT SHINGLES Beauty that Performs.
tamko.com PREMIUM LAMINATED ASPHALT SHINGLES Beauty that Performs. TAMKO COMPLETE CUT COLOR COVERAGE Nothing distinguishes the look of a home quite like an architecturally shingled roof. But more than
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2 PROJECT: June Jordan School for Equity DATE: April 17, 2017 Security Cameras & Science Classrooms Improvements Project
More informationSCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL , 10, 11, & 69 6, 40, 46, 47, & 65
SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL 32940-6601 BID #09-028/JJ Classroom & Art Supplies Warehouse Services VENDORS RECOMMENDED FOR AWARD:
More informationDR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479
AREA MAP DR. FAKHOURI SKIN CARE SPECIALISTS 750 WEST GRAND PARKWAY SOUTH SUITE 20 SUGAR LAND, TX 7779 DRAWING LIST G00 G002 G00 G00 G005 G00 G007 G008 A0 A02 A0 00 0 02 0 0 05 Cover Sheet General Conditions
More informationStrands & Standards CARPENTRY 2
Strands & Standards CARPENTRY 2 COURSE DESCRIPTION This is the second in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden structures and fixtures
More informationCSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated
DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing
More informationPAREFEU PANEL Environmentally Sustainable Product with High Fire Rating
PAREFEU PANEL Environmentally Sustainable Product with High Fire Rating WHY PAREFEU PANEL Parefeu Panels is made from special fire rated minerals that have been reinforced with palm fibres and glass fibres
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationINDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:
INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK
More informationWatertown City Council
City of Watertown Agenda Item: Watertown City Council November 27 th, 2018 Capital Project Pagers and Portable Radios Request for Action Request for Action: Adopt Resolution #2018-149, Authorizing Acquisition
More information2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo
2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationNOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY
NOTICE TO BIDDERS Sealed bids will be received by the City of Midwest City at its City Clerk' s office located in the Municipal Building, 100 N. Midwest Blvd., Midwest City, Oklahoma until 2: 00 p. m.,
More informationSECTION MECHANICAL IDENTIFICATION
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:
More informationSECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section
More informationCOVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS
TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL
More informationFastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side
ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,
More informationDistrict School Board of Pasco County Bid Recommendation
District School Board of Pasco County Bid Recommendation Bid Title Musical Instruments- Secondary As-Needed PART II Number of Vendors Notified Bid Number Number of Bids Distributed Date Solicited February
More informationBOQ FOR INTERIOR & FURNISHING WORKS FOR STATE BANK OF INDIA BRANCH 74, JANPATH
BOQ FOR INTERIOR & FURNISHING WORKS FOR STATE BANK OF INDIA BRANCH S.NO DESCRIPTION FLOORING / WALL TILES WORKS 74, JANPATH 1 Vitrified tile flooring SQM 10 Providing and replace broken Vitrified Tiles
More informationSECTION MECHANICAL IDENTIFICATION
Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationSECTION IDENTIFYING DEVICES
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 10441 IDENTIFYING DEVICES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section,
More informationHardwood and Laminate Installer Assessment Worksheet
Contact customer to schedule assessment within two business days and return this form within one day of assessment completion. Assessment Date: Installers: Please fax all completed forms with barcode page
More informationCore Curriculum Carpentry 1 Carpentry 2 Carpentry 3
A Correlation of Core Curriculum Carpentry 1 Carpentry 3 To the Carpentry II Course Standards and Objectives to the Content Standards Resource Title: Core Curriculum: Introductory Craft Skills, Fifth Edition
More informationYour NAMI State Organization
Your NAMI State Organization State: State Organization: Florida NAMI Florida NAMI Florida PO Box 961 Tallahassee, FL 32302 Phone: (850) 671-4445 Fax: (850) 671-5272 Email Additional Contact Info: info@namiflorida.org
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationB. Samples: For each exposed product and for each color and texture specified.
SECTION 095113 -ACOUSTICAL PANEL CEILINGS PART 1- GENERAL 1.1 SUMMARY Section includes acoustical panels and exposed suspension systems for ceilings. Work is limited to modification of existing acoustical
More informationPART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,
More informationCITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationROOF-CEILING CONSTRUCTION
CHAPTER 8 ROOF-CEILING CONSTRUCTION SECTION R801 GENERAL R801.1 Application. The provisions of this chapter shall control the design and construction of the roof-ceiling system for all buildings. R801.2
More informationUSER MANUAL Table of Contents
USER MANUAL Table of Contents Safety Information 3 Specifications 4 Main Power Connection 5 DMX-512 Connection 5 Fixture Level 6 Set Up 6 Operation Options 7 Connection 8 Rigging the Fixture 9 Cleaning
More informationCITY OF TACOMA Transmission & Distribution
CITY OF TACOMA Transmission & Distribution ADDENDUM NO. 1 DATE: May 3, 2017 REVISIONS TO: Request for Bids Specification No. PT17-0124N Solid Insulation Distribution Transformer NOTICE TO ALL: RESPONDENTS:
More informationGUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON MILLENNIUM DECORATIVE METAL COLUMN COVERS DIVISION 05 7500 or DIVISION 09 2000 Note To Specifier: Column Covers are a finished, decorative product and should be installed
More informationDIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS
DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication
More informationCI/SfB. October RockLink Integra. Installation system
CI/SfB (35) Xh2 October 2008 RockLink Integra Installation system RockLink Integra 1 6 Rockfon tiles with the E15 straight edge detail are suitable for installation using this system. 6 2 6 The following
More informationMcKenzie County Healthcare Systems
McKenzie County Healthcare Systems Hospital Replacement and Long-Term Care Replacement Watford City, North Dakota Request for Proposal (RFP) for Distributed Antenna System Table of Contents Introducti
More informationCYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL
T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated
More informationMerrick Pet Care New Distribution Center Hereford, Texas
Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,
More informationJames W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.
ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings