Select, wear adjust, use and maintain personal protective equipment

Size: px
Start display at page:

Download "Select, wear adjust, use and maintain personal protective equipment"

Transcription

1 ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and hazardous conditions Control Hazards Assemble, erect use and dismantle elevated platforms and scaffolds Perform lock out and tagging Select, operate and maintain tools and Perform housekeeping duties COMUNICATE Demonstrate effective interpersonal relations Receive and react to instructions Give instructions Read and interpret documents and/or job specifications Write job-related documents Practice personal hygiene READ, INTERPRET, AND MAINTAIN DRAWINGS AND SPECIFICATIONS Identify drawings and specifications interpret industry symbols and abbreviations select drawing Create drawings and sketches drawing approval process Maintain ANALYSE AND DESIGN Identify types of Perform jobrelated calculations requirements Identify and devices to be to be devices to be Layout and illustrate the piping (s) Submit design documents for approval(s)

2 ANALYSIS PROFILE PLAN AND PREPARE FOR THE PROJECT Prepare material and labour take off lists Complete all applications and tools and Expedite job Establish a job schedule Verify orders Store material, and tools LAYOUT AND INSTALL PIPE FITTINGS VALVES AND SUPPORTS Field check and verify site drawings select piping materials pipe fittings control valves joining methods pipe supports and Create a series of structural openings Fabricate all pipe supports, sleeves, guides and anchors Install pipe supports, fabricated components and Perform various cutting Join material Perform tube and pipe bending operations Prepare pipe and fittings Install and join pipe and fittings ASSEMBLE AND INSTALL PROCESS PIPING SYSTEM select the process piping s to be Verify pipe and fittings verify the location Install piping s Label and tag piping s Install fire stopping measures

3 ANALYSIS PROFILE INSTALL AND MAINTAIN INSTRUMENTATION CONTROL select piping requiring control types and function of piping instrumentation the control requirements select the control s to be Install, calibrate and maintain control (s) INSTALL EQUIPMENT to be to be Assemble the location of the Install the supports and hanger Install and connect the to various piping INSTALL DEVICES Install the devices device devices used for the Assemble the devices locations of the devices Install device supports and Install and connect the device to various and piping s TEST select the tests for s s the type, duration, pressures and set up requirements for test Perform and/or arrange destructive and non-destructive testing Perform visual inspection of various piping s Perform stress relieving on trade related materials Arrange for test or a testing schedule Perform piping testing Perform water treatment testing Receive and document test reports and results

4 ANALYSIS PROFILE COMISSION ACTIVATE piping s that require commissioning and/or activation and perform the tests for final inspections Flush and chemically treat s calibration and operation of and controls Instruct the end users Check that the s are commissioned/ activated PERFORM RIGGING AND HOISTING Read and interpret specifications and shop drawings Inspect the job site the Schedule the operation Inspect the Connect the rigging to the load Secure the area Perform the lift and moving operation Position and secure the load Disconnect the load Remove and store the rigging Communicate throughout the operation Operate power lifting and PERFORM PREVENTIVE MAINTENANCE Prepare the for inspection mechanical components which require scheduled Prepare service schedules for the client Liaise with the client Obtain approvals to proceed with schedule Perform the performed Recommission the after / full operational status of the Clean up the jobsite Submit relevant

5 ANALYSIS PROFILE TROUBLESHOOT AND REPAIR MECHANICAL Diagnose and assess problem(s) Prepare a service proposal Liaise with the client Arrange for Prepare the s for the approved repairs Perform the service Operate the after all repairs are completed calibration of the and/or components Re-commission the Clean up the job site Submit the relevant

NCCER Progress Blvd, Alachua, Florida Phone: (888)

NCCER Progress Blvd, Alachua, Florida Phone: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPEFITTING Competencies / Objectives Level One MODULE 08101-06 - ORIENTATION TO THE TRADE 1. Describe the

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014 National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL BOILERMAKER - MAINTENANCE V4 October 2014 Focus Statement A journey level industrial boilermaker in maintenance

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S BOILERMAKER PRESSURE VESSEL V2 BLMK34_02 October 2014 Focus Statement A journey level boilermaker is skilled in all aspects

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL PIPEFITTER V4 September 2013 Focus Statement An advanced pipefitter: Masters mathematical functions and knows

More information

Sheet Metal Worker Level 2

Sheet Metal Worker Level 2 Level 2 Unit: B1 Welding 2 (GMAW and SMAW) Level: Two Duration: 25 hours Theory: Practical: 5 hours 20 hours Overview: Upon completion of this unit of instruction the apprentice will demonstrate knowledge

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL MAINTENANCE MECHANIC V4 MEMT32_04 Released June 2013 Focus Statement A journey-level Industrial Maintenance Mechanic

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

COMPETENCY ANALYSIS PROFILE Tool and Die Maker 430A (All unshaded skill sets must be demonstrated/completed)

COMPETENCY ANALYSIS PROFILE Tool and Die Maker 430A (All unshaded skill sets must be demonstrated/completed) COMPETENCY ANALYSIS PROFILE Tool and Die Maker 430A (All unshaded skill sets must be demonstrated/completed) SKILL SETS SKILLS PROTECT SELF AND OTHERS Identify health and safety hazards. Wear, adjust,

More information

Certified Precision Sheet Metal Operator Level I

Certified Precision Sheet Metal Operator Level I Certified Precision Sheet Metal Operator Level I 13 Sections Total of 136 tasks/skills/knowledge areas Section B. Metals, Metallurgy, and Metal Working Processes Section C. Paperwork and Documentation

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

Pipefitting. or fuel. that are. ICE Level 2. as; to meet specification. Support the. n pipework. positioning. Page 1 of 5

Pipefitting. or fuel. that are. ICE Level 2. as; to meet specification. Support the. n pipework. positioning. Page 1 of 5 Pipefitting Level 2 - International Competen nce: Engineering Construction (Red Card) OCCUPATION PROFILE PIPEFITTER The occupation of Pipefitter consists of the positioning, assembly, fabrication, maintenance

More information

PLACE LOGO HERE. Final Project Report 10/02/2014. Chemical Clean & Oil Flush of Company 1 Lube Oil & Control Oil Systems.

PLACE LOGO HERE. Final Project Report 10/02/2014. Chemical Clean & Oil Flush of Company 1 Lube Oil & Control Oil Systems. PLACE LOGO HERE Final Project Report 10/02/2014 Chemical Clean & Oil Flush of Company 1 Lube Oil & Control Oil Systems Company 1 Prepared For: Company 1 Prepared By: CAN-AK Date: 10/03/14 CONTENTS 1.0

More information

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher Model # 100 Standard Model #100-U Heavy Duty CAUTION: Read and Understand

More information

Industrial Mechanic (Millwright) On-the-Job Training Guide

Industrial Mechanic (Millwright) On-the-Job Training Guide Industrial Mechanic (Millwright) On-the-Job Training Guide Industrial Mechanics (Millwright) install, maintain and repair machinery in factories, mines and production facilities. Training Requirements:

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Plumber Level 1 Rev. May 2011

Plumber Level 1 Rev. May 2011 Plumber Level 1 Plumber Unit: A1 Introduction To Your Apprenticeship Level: One Duration: 7 hours Theory: Practical: 7 hours 0 hours Overview: Jobsite learning and teaching have long been fundamental to

More information

Plating. Level 3 - International Competence: Engineering-Construction (Blue Card)

Plating. Level 3 - International Competence: Engineering-Construction (Blue Card) Plating Level 3 - International Competence: Engineering-Construction (Blue Card) OCCUPATION PROFILE PLATER Platers within the engineering construction industry prepare steel and/or other metal plates and

More information

Sheet Metal Worker A Guide to Course Content

Sheet Metal Worker A Guide to Course Content Sheet Metal Worker A Guide to Course Content Sheet Metal Workers use metal of 10 gauge or lighter to make and repair products and buildings. Training Requirements: To graduate from each level of the apprenticeship

More information

GE018: Interpretation of Engineering Drawings

GE018: Interpretation of Engineering Drawings GE018: Interpretation of Engineering Drawings GE018 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This course, developed out of best practice recommendations and extensive industry experience,

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures

More information

SELF APPRAISAL OF SKILLS - STANDARD FOR ALL DISCIPLINES

SELF APPRAISAL OF SKILLS - STANDARD FOR ALL DISCIPLINES Applicant Name: Position(s) Applied For: Date: Application Reg. No: To The Applicant: The following questionnaire is designed to indicate the range of skills you will bring to the company. The company

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Visual Pipe Stress Analysis for AutoCAD Plant 3D

Visual Pipe Stress Analysis for AutoCAD Plant 3D Page 1 of 7 Visual Pipe Stress Analysis for AutoCAD Plant 3D AutoCAD Plant 3D 2015 and checkstress It is common practice for piping designers to consider space constraints, process and flow constraints

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

SEMPEO Unit H4R3 04 Using and communicating technical information

SEMPEO Unit H4R3 04 Using and communicating technical information Overview This standard identifies a range of basic competences that you need to make use of text, numerical and graphical information, by interpreting and using technical information extracted from a range

More information

SEMPEO SQA Unit Code FR0V 04 Using and communicating technical information

SEMPEO SQA Unit Code FR0V 04 Using and communicating technical information Overview This standard identifies a broad range of basic competences that you need to make full use of text, numeric and graphical information, by interpreting and using technical information extracted

More information

ENTRY-LEVEL INDUSTRIAL MECHANIC

ENTRY-LEVEL INDUSTRIAL MECHANIC ENTRY-LEVEL INDUSTRIAL MECHANIC Definition: An entry-level industrial mechanics technician fabricates/repairs machinery, troubleshoots, installs, inspects, and maintains industrial equipment using mechanical,

More information

Subject Description Form

Subject Description Form Subject Description Form Subject Code Subject Title Credit Value BRE222 Workshop Practices and Draftsmanship 3 Academic Credits Level 2 Pre-requisite/ Co-requisite/ Exclusion Objectives Nil 1) Provide

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

Air Tractor, Inc. Repairs Page 5-i AT-802/802A July 30, 2008

Air Tractor, Inc. Repairs Page 5-i AT-802/802A July 30, 2008 Repairs Page 5-i TABLE OF CONTENTS SECTION 5- REPAIRS No. Page FUSELAGE FRAME REPAIRS... 5-1 FORWARD CLAMP BLOCK BOLT FAILURE..5-1 STANDARD STRUCTURAL REPAIR DRAWINGS...5-1 Repairs Page 5-1 April 12, 2010

More information

1. Competency A Analyze the Design Competency B Prepare for Dress making operations Competency C Develop pattern...

1. Competency A Analyze the Design Competency B Prepare for Dress making operations Competency C Develop pattern... 1 2 Table of contents 1. Competency A Analyze the Design.04 2. Competency B Prepare for Dress making operations.....06 3. Competency C Develop pattern..........10 4. Competency D Perform fabric cutting.....14

More information

Machinist NOA (2010) Subtask to Unit Comparison

Machinist NOA (2010) Subtask to Unit Comparison Machinist NOA (2010) Subtask to Unit Comparison NOA Subtask Task 1 Organizes work. 1.01 Interprets documentation. A16 Job Planning 1.02 Plans sequence of operations. A16 Job Planning 1.03 Maintains safe

More information

Industrial Mechanic (Millwright) Level 4

Industrial Mechanic (Millwright) Level 4 Level 4 Rev. September 2005 Unit: A3 Pre-Interprovincial Review 50 hours Theory: Practical: 50 hours 0 hours This unit offers apprentices a systematic review of skills and knowledge required to pass the

More information

CHAPTER 75 STEELWORKER (SW)

CHAPTER 75 STEELWORKER (SW) CHAPTER 75 STEELWORKER (SW) NAVPERS 18068-75E CH-65 Updated: January 2016 Enclosure (1) TABLE OF CONTENTS STEELWORKER (SW) SCOPE OF RATING GENERAL INFORMATION STEELWORKER ARC WELDING AND CUTTING CONSTRUCTION

More information

WORLDSKILLS STANDARD SPECIFICATION

WORLDSKILLS STANDARD SPECIFICATION WORLDSKILLS STANDARD SPECIFICATION Skill 04 Mechatronics WSC2015_WSSS04 THE WORLDSKILLS STANDARDS SPECIFICATION (WSSS) GENERAL NOTES ON THE WSSS The WSSS specifies the knowledge, understanding and specific

More information

QPEO2/003N Credit Value: 4 QCF Level: 2 GLH: 29 Using and communicating technical information

QPEO2/003N Credit Value: 4 QCF Level: 2 GLH: 29 Using and communicating technical information Performing Engineering Operations QPEO2/003N Credit Value: 4 QCF Level: 2 GLH: 29 Using and communicating technical information Learner Name: EAL Assessment Route Summary This EAL assessment route covers

More information

Multi-Bowl Applications

Multi-Bowl Applications Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

Duties and Standards. for. Screw Machining--Level III

Duties and Standards. for. Screw Machining--Level III Duties and Standards for Screw Machining--Level III Single-and Multiple-Spindle Automatic Bar and Chucking Machines Approved by The National Institute for Metalworking Skills, Inc. October 1996 Prepared

More information

Computer Technology. Broad-based Courses

Computer Technology. Broad-based Courses Computer Technology Broad-based Courses TEJ3E Computer Technology, Grade 11, Workplace Preparation Name: This job may allow employees to develop the knowledge and skills related to computer hardware, networks,

More information

Risk Management Department. Control of Hazardous Energy

Risk Management Department. Control of Hazardous Energy Risk Management Department Control of 1 Introduction Power tools, machinery and devices make our lives easier and our jobs more productive. However, the tools, machines and systems we use every day can

More information

Dropped Objects Who s Responsible. Presented by Bob Thompson, Chevron Indonesia

Dropped Objects Who s Responsible. Presented by Bob Thompson, Chevron Indonesia Dropped Objects Who s Responsible Presented by Bob Thompson, Chevron Indonesia Design - Bolt fell from URA to Drillfloor - 1.6kg x 25m A bolt attaching the gripper head to the upper racking arm came loose

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

QCF Unit and Assessment Specification

QCF Unit and Assessment Specification QCF Unit and Assessment Specification Unit title Ofqual Unit code Using and Communicating Technical Information M/600/5790 SQA Unit code FT2V 60 SSC Ref Unit 80 History of changes Publication date: March

More information

SECTION COMMON WORK RESULTS FOR HVAC

SECTION COMMON WORK RESULTS FOR HVAC SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

SEMAER2_02 Using and interpreting engineering data and documents

SEMAER2_02 Using and interpreting engineering data and documents Using and interpreting engineering data and documents Overview This unit identifies the competences you need to make effective use of text, numeric and graphical information by interpreting and using technical

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.

More information

Guidance for producing centre devised tasks for 2660

Guidance for producing centre devised tasks for 2660 Qualification title: Level 3 Diploma in Engineering Construction Qualification number: 2660 Guidance relating to all centre devised units for this qualification The following guidance applies to all of

More information

Apprenticeship Training Standard. Schedule of Training. Draftsperson Mechanical. Trade Code: 614A

Apprenticeship Training Standard. Schedule of Training. Draftsperson Mechanical. Trade Code: 614A Apprenticeship Training Standard Schedule of Training Draftsperson Mechanical Trade Code: 614A Development Date: March 2000 NOTICE OF COLLECTION OF PERSONAL INFORMATION 1. At any time during your apprenticeship

More information

Machinist NOA (1998) Subtask to Unit Comparison

Machinist NOA (1998) Subtask to Unit Comparison Machinist NOA (1998) Subtask to Unit Comparison NOA Subtask Task 1 Demonstrates safe working practices. 1.01 Recognizes potential health and safety hazards. A1 Safety in the Machine Shop 1.02 Recognizes

More information

Machinist Level 4 Rev. December 12, 2012

Machinist Level 4 Rev. December 12, 2012 Machinist Level 4 Machinist Unit: A14 Reconditioning Level: Four Duration: 12 hours Theory: Practical: 12 hours 0 hours Overview: This unit of instruction is designed to introduce knowledge of the procedures

More information

COMPETENCY ANALYSIS PROFILE MOULD MAKER 431A (All unshaded skill sets must be demonstrated/completed)

COMPETENCY ANALYSIS PROFILE MOULD MAKER 431A (All unshaded skill sets must be demonstrated/completed) COMPETENCY ANALYSIS PROFILE MOULD MAKER 431A (All unshaded skill sets must be demonstrated/completed) SKILL SETS SKILLS PROTECT SELF AND OTHERS Identify health and safety hazards in the workplace. Wear,

More information

Carpentry. Full Time

Carpentry. Full Time Full Time Cabinet Maker Manufacturing Job Number: 3643 Shop Production Worker Installer Millwork Hours/Days: Monday-Friday Salary: $16.00/hr. Requirements: Los Angeles, CA Skills Requirements: Minimum

More information

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INTRODUCTION During manufacture and assembly of equipment great care is taken to ensure accuracy in mating the sealing faces on frame and doors, especially

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

COMPETENCY ANALYSIS PROFILE GENERAL MACHINIST 429A. (All unshaded skill sets must be demonstrated/completed)

COMPETENCY ANALYSIS PROFILE GENERAL MACHINIST 429A. (All unshaded skill sets must be demonstrated/completed) COMPETENCY ANALYSIS PROFILE GENERAL MACHINIST 429A (All unshaded skill sets must be demonstrated/completed) SKILL SETS SKILLS PROTECT SELF AND OTHERS Identify health and safety hazards. Wear, adjust, and

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment Section Nine /Platform Environment /Platform Environment The rig site are broken into basic work areas. These are: Substructure /Platform Environment The rig site are broken into basic work areas. These

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

SHEET METAL STUDENT GRADE RECORD Career & Technical Education

SHEET METAL STUDENT GRADE RECORD Career & Technical Education STUDENT GRADE RECORD Career & Technical Education Course Outline Modules Industry Module Test Industry Module Performance Module Competency Rating WINDHAM SCHOOL DISTRICT CORE 0. CTE Orientation 1. Basic

More information

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete

More information

Inspection of aerial platforms in Poland

Inspection of aerial platforms in Poland Inspection of aerial platforms in Poland Europlatform conference Warsaw, 14 September. 2017 Michał Dębski Specialist Office of Technical Inspection Overview UDT introduction & law basics Kinds of technical

More information

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines. STANDARD PHRASEOLOGY SECTION G 1. This section of standard phraseology is for general use in piping disciplines. Hydrostatically test, using at PSIG for a minimum of minutes. Allowable leakage: None. G1

More information

DACUM Workshop Report Composite Repair Technician

DACUM Workshop Report Composite Repair Technician Center of Excellence, Marine Manufacturing & Technology Skagit Valley College South Seattle Community College National STEM Consortium DACUM Workshop Report Composite Repair Technician South Seattle Community

More information

CHAPTER 75 STEELWORKER (SW) NAVPERS F CH-77

CHAPTER 75 STEELWORKER (SW) NAVPERS F CH-77 CHAPTER 75 STEELWORKER (SW) NAVPERS 18068-75F CH-77 TABLE OF CONTENTS STEELWORKER (SW) SCOPE OF RATING GENERAL INFORMATION STEELWORKER ARC WELDING AND CUTTING CONSTRUCTION MANAGEMENT OXYFUEL GAS CUTTING

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

CHAPTER 29 ELECTRICIAN S MATE (EM) NAVPERS G CH-76

CHAPTER 29 ELECTRICIAN S MATE (EM) NAVPERS G CH-76 CHAPTER 29 ELECTRICIAN S MATE (EM) NAVPERS 18068-29G CH-76 ELECTRICIAN S MATE (EM) TABLE OF CONTENTS SCOPE OF RATING GENERAL INFORMATION ELECTRICAL SYSTEMS MAINTAINER AUXILIARY ELECTRICAL EQUIPMENT ELECTRICAL

More information

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2 Trade of Metal Fabrication Module 5: Pipe Fabrication Unit 3: Flanges Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 5 Pipe Fabrication... 7 Unit

More information

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set # Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #1002493 JET 427 New Sanford Road LaVergne, Tennessee 37086 Part No. M-708482 Ph.: 800-274-6848 Revision C3 02/2014 www.jettools.com

More information

CHAPTER 53 MACHINERY REPAIRMAN (MR) NAVPERS E CH-65

CHAPTER 53 MACHINERY REPAIRMAN (MR) NAVPERS E CH-65 CHAPTER 53 MACHINERY REPAIRMAN (MR) NAVPERS 18068-53E CH-65 Updated: January 2016 SCOPE OF RATING GENERAL INFORMATION MACHINERY REPAIR APPRENTICE FABRICATIONS AND MANUFACTURING MACHINE OPERATIONS PRE-MANUFACTURING

More information

ELECTRONICS AND INSTRUMENTATION (For the State of Haryana)

ELECTRONICS AND INSTRUMENTATION (For the State of Haryana) 1 ELECTRONICS AND INSTRUMENTATION (For the State of Haryana) 1. SALIENT FEATURES OF THE PROGRAMME 1) Name of the Programme : Diploma Programme in Electronics and Instrumentation 2) Duration of the Programme

More information

ClearSpan PolyMax Windbreak Wall

ClearSpan PolyMax Windbreak Wall ClearSpan PolyMax Windbreak Wall Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: February 2007ldg STK# DIMENSIONS

More information

Model Curriculum. Irrigation Service Technician

Model Curriculum. Irrigation Service Technician Model Curriculum Irrigation Service Technician TABLE OF CONTENTS 1. Curriculum 04 2. Trainer Prerequisites 09 3. Annexure: Assessment Criteria 10 Irrigation Service Technician CURRICULUM / SYLLABUS This

More information

NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD

NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD for the Occupation of Instrumentation and Control Technician New Blocks 1, 2, 3 and 4 in September 2014 See Page 11 for NS Program Structure Based on the

More information

apprenticeship curriculum standard NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD SHEET METAL WORKER

apprenticeship curriculum standard NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD SHEET METAL WORKER apprenticeship curriculum standard NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD SHEET METAL WORKER 2018 2015 Based on the CCDA for the Harmonization Occupation of Recommendations and the Interprovincial

More information

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. 1/5 1.0 PURPOSE This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. It outlines the expectations for requesting Vendor

More information

NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD

NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD for the Red Seal Occupation of Based on the Interprovincial Program Guide Levels 3 & 4 in September 2018 (pg. 12 for Program Structure) Construction Electrician

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

INDUSTRIAL MECHANIC (MILLWRIGHT)

INDUSTRIAL MECHANIC (MILLWRIGHT) Interim Logbook Department of Advanced Education and Skills Apprenticeship and Trades Certification Division INDUSTRIAL MECHANIC (MILLWRIGHT) Note to Apprenticeship Applicants This form can only be used

More information

Carpentry. Full Time Job Title: Cabinet Installer Job Number: 3547 Hours/Days: Monday-Friday Salary: $15+DOE Location:

Carpentry. Full Time Job Title: Cabinet Installer Job Number: 3547 Hours/Days: Monday-Friday Salary: $15+DOE Location: Full Time Job Title: Cabinet Installer Job Number: 3547 Hours/Days: Monday-Friday Salary: $15+DOE Greater Los Angeles, CA Requirements: Skills Requirements: Experienced with finish carpentry and/or experience

More information

Construction Trades Foundation

Construction Trades Foundation PRECISION EXAMS Construction Trades Foundation EXAM INFORMATION Items 65 Points 82 Prerequisites NONE Grade Level 10-12 Course Length ONE YEAR DESCRIPTION This course will focus on the foundation of construction

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

AMTEC Modules. AMT 102: General PM and Predictive Maintenance AMT 1021: Basic PM AMT 1022: Advanced Technologies

AMTEC Modules. AMT 102: General PM and Predictive Maintenance AMT 1021: Basic PM AMT 1022: Advanced Technologies AMT 100: Computer Literacy AMT 1001: Orientation to Computer Systems AMT 1002: Operating Systems AMT 1003: Computer Applications AMT 1004: Internet/Intranet AMT 101: Fluid Power and Electrohydraulics/Pneumatics

More information

Full Time Positions Available: Plant Site Superintendent. Industrial Maintenance Mechanic. Pipefitter. Welder

Full Time Positions Available: Plant Site Superintendent. Industrial Maintenance Mechanic. Pipefitter. Welder Full Time Positions Available: Plant Site Superintendent Industrial Maintenance Mechanic Pipefitter Welder ~Please see the detailed postings below.~ Full Time Position: Plant Site Superintendent Job duties

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

Construction III Curriculum Maps

Construction III Curriculum Maps Curriculum Maps Unit 1: Shop Safety Unit 2: Shop Equipment and Tool Review Unit 3: Project I Unit 4: Building Plans and Materials Unit 5: Footings and Foundations Unit 6: Floor Framing Unit 7: Wall Framing

More information

Industrial Maintenance Mechanics

Industrial Maintenance Mechanics Measuring What Matters in Job Ready Assessment Blueprint Industrial Maintenance Mechanics Test Code: 2074 / Version: 01 Copyright 2007 General Assessment Information Industrial Maintenance Mechanics Blueprint

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130 PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified

More information

APPLICANT GUIDE ENGINEERING OCCUPATIONS

APPLICANT GUIDE ENGINEERING OCCUPATIONS ENGINEERING OCCUPATIONS OCCUPATION: Fitter - General (ANZSCO 323211) QUALIFICATION: MEM30205 - Certificate III in Engineering Mechanical Trade SKILLS ASSESSMENT - Occupational Requirements A person who

More information

1. ASME A Scheme for the Identification of Piping Systems.

1. ASME A Scheme for the Identification of Piping Systems. SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:

More information

HIRING COMPANY: Dynomax Inc. INDUSTRY: Aerospace and Defense POSITION: CNC Programmers, Machinists, Operators

HIRING COMPANY: Dynomax Inc. INDUSTRY: Aerospace and Defense POSITION: CNC Programmers, Machinists, Operators CNC Programmers, Machinists, Operators Dynomax is looking for operators, machinists and programmers available for basic setup through complete processing of advanced components for CNC turning/cnc milling

More information

Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013

Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013 Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013 Instrumentation and Control Technicians maintain, diagnose, calibrate and repair measurement