API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

Size: px
Start display at page:

Download "API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS"

Transcription

1 API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17F Subsea Production Control Systems TASK GROUP STATUS JUNE 2017

2 1. INTRODUCTION API 17F Third Edition was published in May The latest edition was promoted for publication following the failure of ISO to publish an update. There were a number of issues that were not addressed in this edition that were identified during the publication phase of the current edition. A decision was made to tables those proposed changes until the next edition. In order to increase co-ordination, the plan is to have the work led by Christopher Curran (CJC Enterprises) in Houston, there is also a working group in Europe lead by Trond Bertman (Statoil). 2. STATUS API 17F Third Edition was published in May A SRRR form has been submitted to API to start work on the Fourth Edition immediately. A regular meeting pattern has been established in Europe and USA, collaboration is being achieved by use of web based technology. The draft for ballot was submitted by the working group to API in December The draft was balloted and the ballot closed on 7 th March The ballot was successful with only one Negative vote. On further discussion, this negative vote was changed to Affirmative. A total of 472 comments were received, each of these has been reviewed and addressed by the working group. On 1 st June 2017, the final version of the proposed API 17F, 4 th Edition, together with the comment matrix, was circulated for final approval. The deadline for responses is 15 th June MEMBERSHIP TABLE 3-1: API 17F TASK GROUP MEMBERS MEMBERSHIP Name Company USA EU Conf -1- June 2017

3 Name Company USA EU Conf OPERATORS Nancy Chafe Robert Law Anadarko BP X X Robert.law@bp.com X X George Ardoin Chevron George.Ardoin@chevron.com X X Lee Mitchell Chevron lmitchell@chevron.com X X Tim Goggans Cobalt tim.goggans@cobaltintl.com X X Joshua Oldham ExxonMobil Joshua.oldham@exxonmobil.com X X Cody Moller Hess cmoller@hess.com X X Steven Hammond Petronas steven.hammond@petronas.com X X Sohail Izhar Shell s.izhar@shell.com X X Bruce Gardner Trond Bertmand Shell Statoil bruce.p.gardner@shell.com X X trbert@statoil.com X X X Rory MacKenzie Total Rory.mackenzie@total.com X X X SUPPLIERS Jay Hursh Aker Solutions Jay.hursh@akersolutions.com X X Meir Greenfield Aker Solutions meir.greenfield@akersolutions.com X X Kimberly Shepard Dril-Quip Kimberly_shepard@dril-quip.com X X Jasson Shu FMC Jasson.Shu@fmcti.com X X Bjorn Haavengen FMC Bjorn.haavengen@fks.fmcti.com X X Ian Kent GE Ian.kent@ge.com X X -2- June 2017

4 Name Company USA EU Conf Stefan Knepper Eric Meunier Jake Hennig Kevin Glanville Richard Barratt Endre Brekke Michael Greene OneSubsea OneSubsea Stress Engineering Proserv Siemens Siemens Teledyne CONSULTANTS X X Emeunier2@OneSubsea.slb.com X X jake.hennig@stress.com X X Kevin.glanville@proserv.com X X richard.barratt@siemens.com X X endre.brekke@siemens.com X X michael.greene@teledyne.com X X John Allen AEC John.o.allen1@comcast.net X X Pete Fisher Atkins Peter.fisher@atkinsglobal.com X X David Bell Bechtel dmbell@bechtel.com X X Christopher Curran CJC Enterprises Chris@CJC-Enterprises.com X X Don Ogwude CSI datko@csilink.com X X Bruce Scott Halliburton bruce.scott@halliburton.com X X Jennifer Marshall Shea Writing Solutions jennifer.marshall@sheaws.com X X X 4. UPDATED TARGET DATES FOR DELIVERABLES TABLE 4-1: MILESTONE TARGET DATES -3- June 2017

5 Milestone Targets Completion Date Hold kick-off meeting. February 2015 Meeting schedule 22 February 2016 Houston 9 March Fornebu 13 April 2016 Webex 6 May - Houston 11 May 2016 Webex 13 June 2016 Den Haag 1 September 2016 Webex 19 September 2016 Houston 6 October 2016 Fornebu 25 October 2016 Webex 8 November 2016 Webex 5 December Sunbury First draft December Ballot closed 7 th March 2017 Circulated for final comment 1 st June MAJOR ISSUES No major issues. Ballot was received and all 472 comments were addressed. Waiting on results of final circulation deadline of 15 th June June 2017

6 6. ANTICIPATED NEW WORK ITEMS The following work items are currently planned to be included, these expected to grow as the work develops: General update to focus on clearly defined requirements, less text book and general description of the various units comprising the system. Where applicable add and/or revise requirements to also suit emerging technologies including subsea factory. Include qualification requirements to topside equipment (Section 9 is for subsea equipment only) Improve clarity of test requirements (e.g. control valve qualification) Include rationale to requirements to clarify the intent. Align definitions and requirements with other relevant standards (e.g. API17D) Clarify test requirements to be applied after maintenance and modifications Revise environmental requirements to suit world wide applications (e.g. storage temperatures for arctic projects) Update according to latest revision of SIIS JIP Update according to SWiG JIP Note: feedback from API 17F working group is the that the document is too detailed and should look more like SIIS JIP input, as such will not be included in this revision of API 17F. Clarify safety requirements Improve communication descriptions and requirements to the communication links 7. PLANS FOR FUTURE MEETINGS Kick-off meeting to be held February Regular sequence of meetings has been scheduled for 2016 (see schedule above). A round of meetings was held to resolve all ballot issues. 8. RESOURCE NEEDS Technical writer to support the work effort has been requested and agreed. Special recognition to Trond Bertmand who is leading the European working group. -5- June 2017

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS JANUARY 2016 TABLE OF CONTENTS 1. INTRODUCTION... 1-1 2. PREVIOUS REPORTED STATUS...

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17Y Subsea chemical injection system - Recommended Practice for Design, Testing & Operations REVISION TASK GROUP STATUS JUNE 2017 1. INTRODUCTION

More information

John Bednar, Chairman

John Bednar, Chairman MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Summer Committee Meeting Grand Hyatt Hotel, Washington DC Wednesday, June 29 th 2016 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman

More information

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required). MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2017 Summer Committee Meeting Lloyd s Register Training Center, Houston, Texas Wednesday, June 14, 2017 Brian Skeels, (Co) Vice-Chairman Ross

More information

API Subcommittee MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API Subcommittee MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP... API Subcommittee 17 SUBCOMMITTEE ON SUBSEA PRODUCTION EQUIPMENT TASK/WORK GROUP STATUS REPORT API 17G - Standards for Subsea Well Intervention Systems 31 MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK...

More information

API 17G Update. API SC17 Summer Meeting 12 Jun API 17G Monthly Leadership Update 1

API 17G Update. API SC17 Summer Meeting 12 Jun API 17G Monthly Leadership Update 1 API 17G Update API SC17 Summer Meeting 12 Jun 2018 05/31/2018 API 17G Monthly Leadership Update 1 Agenda task group leadership how we re working where we are today results from ongoing reviews where we

More information

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016 MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman Ross Frazer,

More information

API Subcommittee JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API Subcommittee JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP... API Subcommittee 17 SUBCOMMITTEE ON SUBSEA PRODUCTION EQUIPMENT TASK/WORK GROUP STATUS REPORT API 17G - Standards for Subsea Well Intervention Systems 06 JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK...

More information

SC20 MEETING MINUTES January 29, E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana

SC20 MEETING MINUTES January 29, E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana Introduction of Attendees SC20 MEETING MINUTES January 29, 2015 2015 E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana API Subcommittee on Supply Chain Management (SC20)

More information

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015 MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS 11 JANUARY 2017 1. INTRODUCTION 2. STATUS The 17G2 document addresses subject

More information

21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX. February 7, 2007 Joint Meeting - 8:30 am

21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX. February 7, 2007 Joint Meeting - 8:30 am 21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building 11700 Old Katy Road Houston, TX February 7, 2007 Joint Meeting - 8:30 am 1. Opening of the meeting (Bednar/Inderberg) 2. Roll call/roster

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17E SPECIFICATION for SUBSEA UMBILICALS REVISION TASK GROUP STATUS JUNE 29, 2011 1. INTRODUCTION 2. STATUS The ISO 13628-5 Specification was

More information

Wells Expert Committee Bulletin

Wells Expert Committee Bulletin COMMITTEE UPDATE DECEMBER 2016 Issue no. 2 Wells Expert Committee Bulletin The Global Industry Response Group (GIRG) was created in July 2010 with a remit to identify, learn and apply the lessons of Macondo

More information

API 17G Update. API SC17 Winter Meeting 07 Feb API 17G Update SC17 Winter Meeting 1

API 17G Update. API SC17 Winter Meeting 07 Feb API 17G Update SC17 Winter Meeting 1 API 17G Update API SC17 Winter Meeting 07 Feb 2018 07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 1 Agenda new leadership how we re working November Workshop organization where we are today results

More information

19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA

19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA 19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA June 14, 2005 Joint Meeting - 8:00 am 1. Opening of the meeting (Bednar/Inderberg) 2.

More information

Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012

Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012 Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012 John Bednar, Chair Gary Hurta, (Co) Vice Chair Brian Skeels, (Co) Vice Chair Ross Frazer

More information

ISO/TC67/SC4 Work Group 4 Annual Report

ISO/TC67/SC4 Work Group 4 Annual Report ISO/TC67/SC4 Work Group 4 Annual Report 2007-2008 1. Convenor information. Mr. Bert Dijkhuis (Convenor) Van Bommellaan 16 2245 VN Wassenaar The Netherlands Tel. +31 (0)70 517 8976 E-mail edykhuis@wanadoo.nl

More information

IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase

IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase MCE Deepwater Development 2017 NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase Polina

More information

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:00 AM and outlined various safety and housekeeping issues.

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:00 AM and outlined various safety and housekeeping issues. MINUTES 84 th Exploration and Production Standards Conference on Oilfield Equipment and Materials 22 nd Joint Meeting API SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment San Francisco, California

More information

IADC NEW INITIATIVES

IADC NEW INITIATIVES IADC NEW INITIATIVES WellSharp WellSharp Well Control Training Features Role specific training and assessments Expanded emphasis on critical topics such as risk management, situational awareness, and barriers

More information

Presenter: John T. Gremp President and Chief Operating Officer. February 2011

Presenter: John T. Gremp President and Chief Operating Officer. February 2011 Presenter: John T. Gremp President and Chief Operating Officer February 2011 Director, Investor Relations Robert K. Cherry +1 281 591 4560 rob.cherry@fmcti.com These slides and the accompanying presentation

More information

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management Subsea Production Market and Industry Teaming Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management February 28, 2017 Worldwide Progression of Water Depth Capabilities

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO ,11,10 FLEXIBLE PIPE STANDARDS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO ,11,10 FLEXIBLE PIPE STANDARDS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO 13628-2,11,10 FLEXIBLE PIPE STANDARDS JOINT API-ISO FLEXIBLE PIPE TASK GROUP JANUARY 19, 2007 Prepared by: Krassy

More information

API Subcommittee JAN 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

API Subcommittee JAN 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP... API Subcommittee 17 SUBCOMMITTEE ON SUBSEA PRODUCTION EQUIPMENT TASK/WORK GROUP STATUS REPORT API 17G - Standards for Subsea Well Intervention Systems 31 JAN 2018 TABLE OF CONTENTS 1. SCOPE OF WORK...

More information

FMC Technologies Overview Third Quarter Supervisor, Investor Relations James Davis

FMC Technologies Overview Third Quarter Supervisor, Investor Relations James Davis FMC Technologies Overview Third Quarter 2015 Supervisor, Investor Relations James Davis +1 281.260.3665 james.davis@fmcti.com This presentation contains forward-looking statements intended to qualify for

More information

Operator s Wellbore Survey Group a sub-committee of the ISCWSA

Operator s Wellbore Survey Group a sub-committee of the ISCWSA Operator s Wellbore Survey Group a sub-committee of the ISCWSA Activity Report for ISCWSA #42 Houston 1 October 2015 Chair: Neil Bergstrom (Devon) Secretary: Son Pham (ConocoPhillips) Operator s Wellbore

More information

Annual Report to ISO TC67 / SC4 For 2005 Plenary Meeting May 12-13, 2004 Milan, Italy

Annual Report to ISO TC67 / SC4 For 2005 Plenary Meeting May 12-13, 2004 Milan, Italy ISO/TC 67/SC4/WG1 ISO/TC 67/SC 4 N 313 Materials, equipment and offshore structures for petroleum and natural gas industries: Drilling and Production Equipment Annual Report to ISO TC67 / SC4 For 2005

More information

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair

More information

Revision to Base Stock Slate Definition Ballot #4. Summary

Revision to Base Stock Slate Definition Ballot #4. Summary Revision to Base Stock Slate Definition Ballot #4 Summary Base Stock Slate Definition - Ballot 4 Ballot Item 1: AMEND BASE STOCK SLATE DEFINITION TO INCLUDE A NEW SECOND SENTENCE: E.1.2.2 A base stock

More information

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer FMC Overview Fourth Quarter 2016 Director, Investor Relations Matt Seinsheimer +1 281.260.3665 matthew.seinsheimer@fmcti.com This presentation contains forward-looking statements intended to qualify for

More information

API SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17TR8 HPHT Guideline TASK GROUP STATUS

API SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17TR8 HPHT Guideline TASK GROUP STATUS API SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17TR8 HPHT Guideline TASK GROUP STATUS 29 JUNE 2016 TABLE OF CONTENTS 1. STATUS... 1 2. MEMBERSHIP... 1 3. WORK IN PROGRESS... 4 i 1. STATUS The

More information

RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD

RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD ISO/TC 67 / SC 4 N 327 A Title of TC or SC concerned Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries Drilling

More information

National Fire Protection Association M E M O R A N D U M. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems

National Fire Protection Association M E M O R A N D U M. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Initiating Devices

More information

Facilitate. Collaborate. Innovate.

Facilitate. Collaborate. Innovate. Cost Effective Subsea Processing Theme: Standardized Low Cost Separation System - Functional Specification and Market Study CALL FOR PROPOSALS SEPTEMBER 2014 Aim Facilitate. Collaborate. Innovate. Cost

More information

2016 Australian Subsea Business Awards. SUBSEA ENERGY AUSTRALIA Awards Presentation Evening Linton & Kay Galleries Friday 14 October

2016 Australian Subsea Business Awards. SUBSEA ENERGY AUSTRALIA Awards Presentation Evening Linton & Kay Galleries Friday 14 October 2016 Australian Subsea Business Awards SUBSEA ENERGY AUSTRALIA Awards Presentation Evening Linton & Kay Galleries Friday 14 October A MESSAGE FROM OUR CHAIRMAN When the business awards were launched in

More information

Koso kentintrol Overview :

Koso kentintrol Overview : Koso kentintrol Overview : OUR COMPANY What About KOSO: What About KOSO: What About KOSO: What About KOSO: Introduction to kentintrol History 1967 Introl Limited company formed 1969, Acquired by the George

More information

Site Investigations and Survey Guidelines. GEMS Group.

Site Investigations and Survey Guidelines. GEMS Group. Site Investigations and Survey Guidelines GEMS Group www.gems-group.com London 24 th March 2010 AIMS Guidelines for Site Investigations and surveys Historical overview Currently used In Progress Future

More information

ISO/TC145-IEC/SC3C JWG 11 N 64

ISO/TC145-IEC/SC3C JWG 11 N 64 ISO/TC145-IEC/SC3C JWG 11 N 64 ISO ORGANISATION INTERNATIONALE DE NORMALISATION INTERNATIONAL ORGANIZATION FOR STANDARDIZATION IEC COMMISSION ÉLECTROTECHNIQUE INTERNATIONALE INTERNATIONAL ELECTROTECHNICAL

More information

Module B contains eleven modules. This is Module B8. International Standards Development

Module B contains eleven modules. This is Module B8. International Standards Development 0 Module B contains eleven modules. This is Module B8. International Standards Development 1 At the end of this module you will know What makes a Standard International The process by which ASME Standards

More information

Lessons Learned. Industry Led Multi- Jurisdictional, Multi-Agency Exercise - Gino Zaza- Crisis Management and Emergency Response Coordinator

Lessons Learned. Industry Led Multi- Jurisdictional, Multi-Agency Exercise - Gino Zaza- Crisis Management and Emergency Response Coordinator Industry Led Multi- Jurisdictional, Multi-Agency Exercise - Lessons Learned Learnings and experiences from the ConocoPhillips Subsea Challenge Exercise, Indonesia 2014 Gino Zaza- Crisis Management and

More information

API COPM CPMA Chapter 20.X

API COPM CPMA Chapter 20.X API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February

More information

DNB's 9th Annual Oil, Offshore & Shipping Conference Kristian Siem Chairman Subsea 7

DNB's 9th Annual Oil, Offshore & Shipping Conference Kristian Siem Chairman Subsea 7 DNB's 9th Annual Oil, Offshore & Shipping Conference Kristian Siem Chairman Subsea 7 1 Forward-looking statements Certain statements made in this announcement may include forward-looking statements. These

More information

Planned Obsolescence, MidLife Updates & Next generation. Subsea Controls Down Under, Perth, WA- Oct 2018, John S Løvås

Planned Obsolescence, MidLife Updates & Next generation. Subsea Controls Down Under, Perth, WA- Oct 2018, John S Løvås Planned Obsolescence, MidLife Updates & Next generation Subsea Controls Down Under, Perth, WA- Oct 2018, John S Løvås October 2018 Perth Contents Planned Obsolescence, MidLife upgrades & Next generation

More information

TOTAL Subsea Technical Specifications - alignment with SPS Contractors. P.A. NILSEN Head of Subsea Technology Department

TOTAL Subsea Technical Specifications - alignment with SPS Contractors. P.A. NILSEN Head of Subsea Technology Department TOTAL Subsea Technical Specifications - alignment with SPS Contractors P.A. NILSEN Head of Subsea Technology Department SCENE SETTING We see a continuing and significant cost increase in the subsea market

More information

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee Roald Sirevaag IOGP Subsea committee chair About IOGP Wherever you are Wherever you go... Whatever you

More information

Enhancing international subsea well incident intervention

Enhancing international subsea well incident intervention Enhancing international subsea well incident intervention Y C 23 M 2 Y 0 K 63 K While we hope intervention equipment will never be needed, it is critical for the industry to be prepared Archie Smith, Chief

More information

WellMaster RMS User Group Meeting. Nov 15 th, 2018

WellMaster RMS User Group Meeting. Nov 15 th, 2018 WellMaster RMS User Group Meeting Nov 15 th, 2018 2 Agenda 1. Introduction and welcome 2. Round the table short presentations who we are, positions, roles 3. Short on current status of WellMaster RMS 4.

More information

Capability Presentation. Enhanced Production optimisation and asset monitoring SUT 2018 November. Kevin Glanville Design & Development Manager

Capability Presentation. Enhanced Production optimisation and asset monitoring SUT 2018 November. Kevin Glanville Design & Development Manager Capability Presentation Enhanced Production optimisation and asset monitoring SUT 2018 November Kevin Glanville Design & Development Manager Subsea Communications & Integrated Sensors 1 Agenda 1. Opportunity

More information

Upstream Engineering Centre

Upstream Engineering Centre Upstream Engineering Centre BP s Subsea Reliability Strategy 10 years on David Saul BP Advisor, Subsea System Reliability MCE Deepwater Development April 2014 With acknowledgements to D Brookes, K Williams

More information

ISO INTERNATIONAL STANDARD. Technical drawings General principles of presentation Part 23: Lines on construction drawings

ISO INTERNATIONAL STANDARD. Technical drawings General principles of presentation Part 23: Lines on construction drawings INTERNATIONAL STANDARD ISO 128-23 First edition 1999-06-15 Technical drawings General principles of presentation Part 23: Lines on construction drawings Dessins techniques Principes généraux de représentation

More information

Definition of Bulk Electric System Phase 2

Definition of Bulk Electric System Phase 2 Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

Subsea Electric Power Grid

Subsea Electric Power Grid Subsea Electric Power Grid Transatlantic Science Week November 14, 2012 Anngjerd Pleym Siemens - Oil & Gas Division Integrated System Solutions Technology & Innovation Subsea power distribution is the

More information

1 st MEETING OF THE IHO COUNCIL

1 st MEETING OF THE IHO COUNCIL C1-3.1 1 st MEETING OF THE IHO COUNCIL Monaco, 17-19 October 2017 REPORT OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE C1-3.1 - P a g e 3 REPORT OF THE HYDROGRAPHIC STANDARDS AND SERVICES COMMITTEE

More information

Newsletter: Standardisation Efforts on Industrial and Service Robots

Newsletter: Standardisation Efforts on Industrial and Service Robots Newsletter: Standardisation Efforts on Industrial and Service Robots Industrial robots have been part of industrial automation for a long time and are thus covered by several international standards such

More information

ISO/IEC JTC1/WG11 (IT aspects of) Smart Cities

ISO/IEC JTC1/WG11 (IT aspects of) Smart Cities Location Powers; Our Urban Environment ISO/IEC JTC1/WG11 (IT aspects of) Smart Cities Name: Title: Organisation: Email: Peter Parslow Principal Data Architect / Open Standards Lead Ordnance Survey peter.parslow@os.uk

More information

FMC CUSTOMER SUPPORT. Ingmar Westervik Operations Manager Operations Norway

FMC CUSTOMER SUPPORT. Ingmar Westervik Operations Manager Operations Norway FMC CUSTOMER SUPPORT Ingmar Westervik Operations Manager Operations Norway FMC Technologies Named World's Most Admired Oil and Gas Equipment, Services Company, 2010 FMC has been named the 2010 World's

More information

AOG 2O15 PREVIEW SHELL WOODSIDE CHEVRON SHELL WOODSIDE C & 2014 SHOW REPORT OLUTIONS TECHNIP SUBSEA 7 SAIPEM FMC TECHNOLOGIES CAM

AOG 2O15 PREVIEW SHELL WOODSIDE CHEVRON SHELL WOODSIDE C & 2014 SHOW REPORT OLUTIONS TECHNIP SUBSEA 7 SAIPEM FMC TECHNOLOGIES CAM L WOODSIDE CHEVRON SHELL WOODSIDE CHEVR OLUTIONS TECHNIP SUBSEA 7 SAIPEM FMC TECHNOLOGIES CAM SHELL WOODSIDE CHEVRON SHELL WOODSIDE C FMC TECHNOLOGIES CAMERON AKER SOLUTIONS TECHNIP SUB L WOODSIDE CHEVRON

More information

Transportation. Growth Management Policy Board April 4, 2019

Transportation. Growth Management Policy Board April 4, 2019 Transportation Growth Management Policy Board April 4, 2019 Overview Transportation in VISION 2040 Changes since the adoption of VISION 2040 Feedback to date Potential updates to the Transportation chapter

More information

Recommended Practice for Flexible Pipe

Recommended Practice for Flexible Pipe Recommended Practice for Flexible Pipe ANSI/API RECOMMENDED PRACTICE 17B FOURTH EDITION, JULY 2008 Document includes Technical Corrigendum 1, dated June 2008 ISO 13628-11:2007 (Identical), Petroleum and

More information

ISO/TC145-IEC/SC3C JWG 11 N 16E

ISO/TC145-IEC/SC3C JWG 11 N 16E ISO/TC145-IEC/SC3C JWG 11 N 16E ISO ORGANISATION INTERNATIONALE DE NORMALISATION INTERNATIONAL ORGANIZATION FOR STANDARDIZATION IEC COMMISSION ÉLECTROTECHNIQUE INTERNATIONALE INTERNATIONAL ELECTROTECHNICAL

More information

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes. Minutes of Meeting 2009 Exploration & Production Standards Conference on Oilfield Equipment and Materials Meeting Tuesday, June 23, 2009 Drilling Well Control Equipment SC16 8:30 am 12:00 pm Chair: Mel

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. GOMR OCS Subsea Pipelines Regulatory Perspectives Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. Gobert Overview Governing Regulations & Guidance Documents GOMR Pipeline

More information

API Standards Overview

API Standards Overview 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 API Standards Overview Roland Goodman Upstream Standards Manager American Petroleum Institute This presentation is the property of

More information

The Inside Track on the Subsea Oil &

The Inside Track on the Subsea Oil & The Inside Track on the Subsea Oil & Gas Industry Neil Douglas Managing Director, Viper Subsea My Background Graduated from Bristol in 1984 in Electrical & Electronic Engineering Joined Marconi Avionics

More information

Overview and Update of API Standards

Overview and Update of API Standards Overview and Update of API Standards IADC South East Asia Chapter Meeting Kuala Lumpur, Malaysia March 21, 2017 Eric Ho American Petroleum Institute Singapore Scope of Presentation API Background API Standards

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

Produced Water Club Meeting. Thistle Aberdeen Airport Hotel Aberdeen

Produced Water Club Meeting. Thistle Aberdeen Airport Hotel Aberdeen Produced Water Club Meeting 10 December 2014 Thistle Aberdeen Airport Hotel Aberdeen Club Objectives Provide a central place for information Keep abreast of the legislative and technology developments

More information

M E M O R A N D U M. NFPA Technical Committee on Assembly Occupancies and Membrane Structures. NFPA 101 ROP Letter Ballot Circulation

M E M O R A N D U M. NFPA Technical Committee on Assembly Occupancies and Membrane Structures. NFPA 101 ROP Letter Ballot Circulation M E M O R A N D U M TO: FROM: NFPA Technical Committee on Assembly Occupancies and Membrane Structures Linda MacKay DATE: January 12, 2010 SUBJECT: NFPA 101 ROP Letter Ballot Circulation The January 11

More information

CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign'

CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign' CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign' Proposed Project Teams: It is proposed that the following PTs be installed. The exact PT teams and the work they will

More information

Provläsningsexemplar / Preview

Provläsningsexemplar / Preview Provläsningsexemplar / Preview SS-ISO 2575:2010 (E) Contents Page Foreword...iv 1 Scope...1 2 Normative references...1 3 Terms and definitions...1 4 General...2 5 Colour...3 6 Summary table of all symbols...3

More information

Wave & Tidal Safety & Construction Guidelines

Wave & Tidal Safety & Construction Guidelines Wave & Tidal Safety & Construction Guidelines Malcolm Bowie Ltd All-Energy, Aberdeen, 24 th May 2012 Principal Challenges - Energetic environment with very unique construction risks. - Many new / radical

More information

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Integrity Monitoring? New thinking in the approach to Subsea IMMR Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Disclaimer and important notice This presentation contains forward looking statements

More information

NPSTC, Radio PCR Working Group Presentation to TIA TR8 Committee

NPSTC, Radio PCR Working Group Presentation to TIA TR8 Committee NPSTC, Radio PCR Working Group Presentation to TIA TR8 Committee Dan Robinson, Radio PCR Working Group Chair Thursday, February 2, 2017 The member organizations of the National Public Safety Telecommunications

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 13628-8 First edition 2002-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 8: Remotely Operated Vehicle (ROV) interfaces on

More information

HPHT Case Study: Kristin Field, North Sea

HPHT Case Study: Kristin Field, North Sea HPHT Case Study: Kristin Field, North Sea Craig Newman Senior Engineer, Subsea Systems NOV Texas Oil Tools 1 Personal info 2010 BSME Texas Tech University Joined TOT as Mechanical Engineer Worked with

More information

Sustainability Through the Supply Chain. Jennifer M. Bell

Sustainability Through the Supply Chain. Jennifer M. Bell Sustainability Through the Supply Chain Jennifer M. Bell Purpose Define Sustainability Discuss What a Socially Responsible Investment Looks Like Corporate Sustainability Leaders Stages of Sustainability

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS Strengthening Systems for Promoting Science, Technology, and Innovation (KSTA MON 51123) TERMS OF REFERENCE FOR CONSULTANTS 1. The Asian Development Bank (ADB) will engage 77 person-months of consulting

More information

The Standards Development Process. Substations Committee Erin Spiewak IEEE SA May 20, 2012

The Standards Development Process. Substations Committee Erin Spiewak IEEE SA May 20, 2012 The Standards Development Process Substations Committee Erin Spiewak IEEE SA May 20, 2012 The Standards Development Lifecycle Agenda 2 What is the Standards process? There are 6 steps to the IEEE Standards

More information

Planned Obsolescence and Mid Life Updates -

Planned Obsolescence and Mid Life Updates - Planned Obsolescence and Mid Life Updates - Life of field is more than just existence Kevin Glanville, Design & Development Manager, Proserv [UK]; Presenting Paul Hunter, Subsea controls / Systems technical

More information

Personal Medical Services (PMS) Contract Review Update

Personal Medical Services (PMS) Contract Review Update Personal Medical Services (PMS) Contract Review Update 1. Introduction NHS England commenced the Personal Medical Services (PMS) Review process across the North West London (NWL) Collaboration of CCGs

More information

Extending life of brownfields and enabling new standards

Extending life of brownfields and enabling new standards Extending life of brownfields and enabling new standards Tore Erntsen (presenter) Vice President Technology, Proserv Overview Why upgrade existing brownfield systems? Brownfield subsea fields are an important

More information

ISO INTERNATIONAL STANDARD. Ergonomic design for the safety of machinery Part 3: Anthropometric data

ISO INTERNATIONAL STANDARD. Ergonomic design for the safety of machinery Part 3: Anthropometric data INTERNATIONAL STANDARD ISO 15534-3 First edition 2000-02-15 Ergonomic design for the safety of machinery Part 3: Anthropometric data Conception ergonomique pour la sécurité des machines Partie 3: Données

More information

Committee E44 on Solar, Geothermal and Other Alternative Energy Sources

Committee E44 on Solar, Geothermal and Other Alternative Energy Sources Committee E44 on Solar, Geothermal and Other Alternative Energy Sources Formed in 1978 Meets once a year during November Committee Week Current membership of approximately 70 Jurisdiction over 49 standards

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 10424-2 First edition 2007-11-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Threading and gauging of rotary shouldered thread connections Industries

More information

Pee Dee Area Council, Florence, SC. Conditional Charter Agreement

Pee Dee Area Council, Florence, SC. Conditional Charter Agreement Pee Dee Area Council, Florence, SC Conditional Charter Agreement The National Council, Boy Scouts of America hereby issues a Conditional Charter to the Pee Dee Area Council, BSA. This charter is given

More information

David Galbraith Convenor ISO TC 67/SC 7/WG 3 Project Leader ISO & ISO Fixed Steel Offshore Structures / Topsides Structures

David Galbraith Convenor ISO TC 67/SC 7/WG 3 Project Leader ISO & ISO Fixed Steel Offshore Structures / Topsides Structures International Standards and the status of the offshore structures codes David Galbraith Convenor ISO TC 67/SC 7/WG 3 Project Leader ISO 19902 & ISO 19901-3 Fixed Steel Offshore Structures / Topsides Structures

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

ISO/TC 67/SC 4 N 267 ISO/TC 67 N

ISO/TC 67/SC 4 N 267 ISO/TC 67 N Secretariat: ISO/TC 67/SC 4 Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries - Drilling and production equipment American Petroleum Institute, 1220 L

More information

API Ballot Summary Sheet 10/12/2004

API Ballot Summary Sheet 10/12/2004 Vote Results Voter Comments Affirmative Negative Abstain Did t Vote 134629 Nelson Acosta HMT Inspection Yes 131617 Joel Andreani Equity Engineering Group, Inc., The 38921 Robert Annett Alyeska Pipeline

More information

R&D - Technology Development November Conference RJ, 3-4 November by Innovation Norway

R&D - Technology Development November Conference RJ, 3-4 November by Innovation Norway R&D - Technology Development November Conference RJ, 3-4 November by Innovation Norway Mika Tienhaara 04.11.2014 RJ GENERAL ASPECTS 2 R&D CENTERS IN WINTERTHUR (DOWNSTREAM) & ARNHEM (UPSTREAM) 3 SINCE

More information

National Petroleum Council. Arctic Potential

National Petroleum Council. Arctic Potential National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015 National Petroleum Council 1 Introduction In October 2013, the Secretary of Energy

More information

National Petroleum Council

National Petroleum Council National Petroleum Council 125th Meeting March 27, 2015 National Petroleum Council 1 National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015

More information

API Ballot Summary Sheet 10/25/2011

API Ballot Summary Sheet 10/25/2011 Vote Results Voter Interest Category Company Comments Affirmative Negative Abstain Did t Vote Nelson Acosta Gregory Alvarado Joel Andreani Shane Ardoin Ronald Bailey Mark Baker Chris Bashor Doug Bayles

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO/IEC 24730-2 Second edition 2012-06-01 Information technology Real time locating systems (RTLS) Part 2: Direct Sequence Spread Spectrum (DSSS) 2,4 GHz air interface protocol Technologies

More information

EI Research report. A framework for monitoring the management of ageing effects on safety critical elements

EI Research report. A framework for monitoring the management of ageing effects on safety critical elements EI Research report A framework for monitoring the management of ageing effects on safety critical elements RESEARCH REPORT A FRAMEWORK FOR MONITORING THE MANAGEMENT OF AGEING EFFECTS ON SAFETY CRITICAL

More information

FINAL Draft March 21, 2016 Planning Board Minutes, approved 4/18/16 pg. 1

FINAL Draft March 21, 2016 Planning Board Minutes, approved 4/18/16 pg. 1 FINAL Draft March 21, 2016 Planning Board Minutes, approved 4/18/16 pg. 1 Town of Charlton Planning Board Minutes 758 Charlton Road Charlton, New York 12019 Minutes of the Planning Board Meeting March

More information

Frequently Asked Questions

Frequently Asked Questions Table of Contents Who should an Investigator contact to submit an ERP proposal? What type of information is needed for Medtronic to review? Is a protocol required? Why is so much information necessary?

More information