1 Standard Details Ltd. Homer Road

2 Detail Ref/Page Rev Date Description Page Ground Works Specifications & Requirements Page 03 Fire Testing Page Fixing Specifications GTS GD 01 A 04/12/17 External Wall General Detail GTS GD 02 A 04/12/17 External Wall Detail: Additional Floor GTS GD 03 A 04/12/17 Party Wall Detail: 2 ply 89mm Timber Frame GTS GD 04 A 04/12/17 Party Wall/Floor Detail: 2 Ply 89mm Timber Frame GTS GD 05 A 04/12/17 Party Wall/Floor Detail in Different Height Buildings GTS GL 01 A 04/12/17 Foundation Detail: Brick Cladding GTS GL 02 A 04/12/17 Foundation Detail: Cladding GTS GL 03 A 04/12/17 Foundation Detail: Internal Wall GTS GL 04 A 04/12/17 Foundation Detail: DPC and DPM GTS GL 05 A 04/12/17 Soleplate / Packer Detail GTS GL 06 A 04/12/17 Garage Floor Setting Out Detail GTS WL 01 A 04/12/17 SIP to SIP Connection Detail GTS WL 02 A 04/12/17 SIP Connection Detail GTS WL 03 A 04/12/17 External Wall Detail: Various Cladding GTS WL 04 A 04/12/17 External Party Wall Plan Junction GTS WL 05 A 04/12/17 Plan Junction of Separating Wall Stagger GTS WL 06 A 04/12/17 Load-Bearing Wall to SIP Roof Detail GTS WL 07 A 04/12/17 Window Head & Cill Detail GTS WL 08 A 04/12/17 Window Jamb Detail GTS WL 09 A 04/12/17 Internal Door Lining Detail GTS WL 10 A 04/12/17 MVHR System GTS WL 11 A 04/12/17 Balanced Flue Boiler Installation GTS WL 12 A 04/12/17 Meter Box Installation GTS WL 13 A 04/12/17 Extractor Fan Installation GTS WL 14 A 04/12/17 External Chimney Detail GTS WL 15 A 04/12/17 Party Wall to Roof Truss Detail GTS WL 16 A 04/12/17 Isometric View of Typical Wall Construction GTS FL 01 A 04/12/17 Posi Joist Detail for Houses GTS FL 02 A 04/12/17 Posi Joist Detail for Flats GTS FL 03 A 04/12/17 Party Floor Posi Joist Detail GTS FL 04 A 04/12/17 Posi Joist with Parallel Non-Load Bearing Walls GTS FL 05 A 04/12/17 Posi Joist to Load Bearing Walls (1 noggin) GTS FL 06 A 04/12/17 Posi Joist to Load Bearing Walls (2 noggins) GTS FL 07 A 04/12/17 Typical Strongback Detail GTS FL 08 A 04/12/17 Strongback Change of Span Detail GTS FL 09 A 04/12/17 Stairway Opening Infill Panels GTS RF 01 A 04/12/17 Eaves Detail GTS RF 02 A 04/12/17 Ridge Detail GTS RF 03 A 04/12/17 Purlin Detail GTS RF 04 A 04/12/17 Equal Valley Detail GTS RF 05 A 04/12/17 Equal Valley Detail with Glulam Beam GTS RF 06 A 04/12/17 Dormer GTS RF 06A A 04/12/17 Isometric View of Dormer GTS RF 07 A 04/12/17 Overlaid Valley Detail GTS RF 08 A 04/12/17 Rooflight GTS RF 09 A 04/12/17 Parapet Detail GTS RF 10 A 04/12/17 SIP with Truss Roof Contents N/A 04/12/2017 M.B. N/A A

3 Detail Ref/Page Rev Date Description GTS RF 11 A 04/12/17 Flat Roof Detail GTS RF 12 A 04/12/17 SIPs Roof - Gable Detail GTS RF 13 A 04/12/17 Overhang Detail: Verge & Soffit to TF Gable Wall GTS RF 14 A 04/12/17 Overhang Detail: Clipped Verge to TF Gable Wall GTS RF 15 A 04/12/17 Overhang Detail: Verge & Soffit to SIPs Gable Wall GTS RF 16 A 04/12/17 Overhang Detail: Clipped Verge to SIPs Gable Wall GTS RF 17 A 04/12/17 Gable Wall-to-Truss Bracing GTS RF 18 A 04/12/17 SIPs Roof Infill Panel GTS RF 19 A 04/12/17 Roof Truss to SIP Wall Connection Detail GTS RF 20 A 04/12/17 Roof Truss Connection Details 1 GTS RF 21 A 04/12/17 Roof Truss Connection Details 2 GTS RF 22 A 04/12/17 Roof Truss to SIP Wall Connection Detail GTS RF 23 A 04/12/17 Truss Roof: Attic Dormer Roof Construction Detail GTS RF 24 A 04/12/17 Truss Roof: Raised Dormer Roof Construction Detail GTS RF 25 A 04/12/17 Truss Roof: Valley Frame Construction Detail GTS RF 26 A 04/12/17 Truss Roof: Web Longitudinal Slenderness Brace GTS RF 27 A 04/12/17 Truss Roof: Attic Truss Typical Decking Layout GTS RF 28 A 04/12/17 Isometric View of Typical SIPs Roof Construction GTS OF 01 A 04/12/17 Oak Post Detail GTS OF 02 A 04/12/17 Oak Corner Detail GTS OF 03 A 04/12/17 Oak Eaves Detail GTS OF 04 A 04/12/17 Oak Purlin Detail GTS SC 01 A 04/12/17 Typical Steel Baseplate Detail GTS SC 02 A 04/12/17 Brickwork Steel Support Detail GTS CB 01 A 04/12/17 Cavity Barriers for Party Houses GTS CB 02 A 04/12/17 Cavity Barriers for Flats GTS UV 01 A 04/12/17 Brick Cladding Detail: U-Value Options GTS UV 02 A 04/12/17 Timber/Render Cladding Detail: U-Value Options GTS UV 03 A 04/12/17 SIPs Roof Detail: U-Value Options Contents N/A 04/12/2017 M.B. N/A A

4 Kingspan Insulation Technical Advisory -EN Testing on Kingspan TEK TEK DOCUMENT NUMBER 001 JAN 2016 This Document covers the EN testing for the Kingspan TEK panel. TECHNICAL NOTE Kingspan Insulation Limited have moved All of the Fire resistance testing that we undertake to the EN methods to fit with the European norm. The EN test methods are considered to be slightly more severe than the BS methods/ BS 476 parts 20, 21 and 22. The build-up tested was a: 15mm fire resistant plasterboard fixed to a 25mm timber batten-onto the 142mm TEK panel. The construction achieved 77minutes insulation and integrity. Report number Exova have confirmed the following through Assessment: Internal Lining TEK Panel Fire resistance in minutes 9.5mm regular Plasterboard* 142 or 172mm 30 mins 1x 12.5mm Fire resistant PB 142 or 172mm 60 mins 1x 15mm Fire resistant PB 142 or 172mm 77 mins (test result) 2x 12.5mm Fire resistant PB 142 or 172mm 90 mins 1x 12.5mm Magnesium Oxide 142 or 172mm 120 mins minimum (product board or similar can be fitted to the outside should the fire resistant level be required in both directions) FURTHER DETAILS *Other internal finishes can be used please discuss with Kingspan Insulation Ltd We trust the foregoing technical note is of assistance. Please do not hesitate to contact us in the event of any further queries. Tel: +44 (0) Fax: +44 (0) techincal@kingspaninsulation.co.uk EN Testing on Kingspan N/A 04/12/2017 M.B. N/A A

5 Application Fastener Type Spacing Fixing soleplate Panel straps to substructure/foundations Specifications should be in accordance with project structural engineers' recommendations based upon geography and project foundation substructure Specifications should be in accordance with project structural engineers' recommendations based upon geography and project foundation substructure Fixing soleplate or combined soleplate and bottomplate As per project structural engineers' recommendations Fixing bottomplates to soleplates 3.1mm x 90 mm galvanized ring-shank nails 200mm centres in two staggered rows Fixing 15mm x 100 OSB3 splines into Kingspan TEK Building System panels Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Fixing 100mm x 110 / 140mm insulated splines or timber posts into Kingspan TEK Building System panels Fixing 100mm x 150mm bevelled headplate to Kingspan TEK Building System panels Fixing Kingspan TEK Building System wall panels at corner joints Fixing Kingspan TEK Building System roof sections at wall/floor junctions, ridge beams, intermediate purlins and gable walls Fixing joist hangers to headplate or laminated beams (fixings may vary depending on specification of joist hanger - please refer to manufacturers' instructions floor systems) Fixing I-beams/joist to joist hanger (fasteners may vary depending on specification of joist hanger - please refer to manufacturers' instructions floor system) Fixing OSB3/P5 floor decking to joists/headplate or header joist 3.1mm x 63mm galvanized ring-shank nails 3.1mm x 63mm galvanized ring-shank nails 3.1mm x 63mm galvanized ring-shank nails 3.1mm x 63mm galvanized ring-shank nails Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment 3.75mm x 32mm square twist shank nails or Simpson N10 nails 3.75mm x 32mm square twist shank nails or Simpson N10 nails 3.1mm x 63mm galvanized ring-shank nails 50mm centres both sides of the panels 50mm centres both sides of the panels 50mm centres both sides of the panels 50mm centres both sides of the panels Typically at 400mm c/c, unless engineer specifies otherwise Typically at 200mm c/c, unless engineer specifies otherwise Into side and top of headplate locations marked out In pre-drilled holes for bottom flange Maximum 200mm centres Fixing rim board to headplate Skew nail 3.75mm x 75mm round wire nails 150mm Fixing OSB3/P5 floor decking to joists/rimboard 3.35mm x 65mm round wire nails 200mm Fixing brickwork cavity wall ties to Kingspan TEK Building System wall panels Fixing treated timber counter battens to Kingspan TEK Building System wall/roof panels for ventilation Simpson Strong Tie SWT50 wall ties fixed to SIP panels with stainless steel screws. ABC Spax 5mm x 60mm or EJOT M5 70mm stainless steel screws or equivalent (to penetrate through 15mm OSB/3 face) Where basic wind speed does not exceed 52m/s: 4.4 ties per m² If exceeds: 7 ties per m² Typically 300mm centres. For further guidance follow project structural engineers' recommendations Fixing Timber Frame to Soleplate 3.1mm x 63mm galvanized ring-shank nails 200mm centres in two staggered rows Fixing Timber Frame Panels to SIPs Rothoblaas TBS 8mm Ø SIP screws or similar Typically at 400mm c/c, unless engineer specifies otherwise Fixing Non-Load Bearing Timber Frame soleplates and headbinders to joist noggins Fixing Kingspan TEK Building System to oak timber framing Fixing Timber Frame Party Wall Panels to Glulam Header Beam 3.1mm x 90 mm galvanized ring-shank nails Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment into oak Rothoblaas TBS 8mm Ø x 160mm SIP screws or similar Skew fix 2no nails per noggin Typically at 400mm c/c, unless engineer specifies otherwise Typically at 600mm c/c, unless engineer specifies otherwise Fixing Specifications N/A 04/12/2017 M.B. N/A A

6 Plasterboard OSB Cover strip For Eaves Detail see drawing GTS RF 01 Proprietary cavity closer For Window Details, see drawing GTS WL 06 and GTS WL 07 Brick external leaf Minimum 100mm Mineral Fibre (10-33kg/m²) insulation to floor zone. Insulation not shown for clarity For Floor Details, see drawing GTS FL 01, GTS FL 02 and GTS FL 03 Proprietary cavity closer For Foundation Details, see drawings GTS GL 01 to GTS GL 05 Engineered posi floor system with 22mm thick weather resistant chipboard (minimum weight 15kg/m²) For Window Details, see drawing GTS WL 06 and GTS WL 07 SIPs 450mm wide 2000g PVCu DPC to underside of soleplate DPC Screed G.L 150 External Wall Detail Insulation DPM 1:20 04/12/2017 M.B. GTS GD 01 A

7 Plasterboard Wall Plate For Eaves Detail see drawing GTS RF 01 Proprietary cavity closer Minimum 100mm Mineral Fibre (10-33kg/m²) insulation to floor zone. Insulation not shown for clarity For Window Details, see drawing GTS WL 06 and GTS WL 07 Brick external leaf Minimum 100mm Mineral Fibre (10-33kg/m²) insulation to floor zone. Insulation not shown for clarity For Floor Details, see drawings GTS FL 01 and GTS FL 02 Proprietary cavity closer Engineered posi floor system with 22mm thick weather resistant chipboard (minimum weight 15kg/m²) For Window Details, see drawing GTS WL 06 and GTS WL 07 For Foundation Details, see drawings GTS GL 01 to GTS GL 05 DPC SIPs 450mm wide 2000g PVCu DPC to underside of soleplate Screed G.L 150 Insulation (by other) External Wall Detail: Additional Floor DPM 1:20 04/12/2017 M.B. GTS GD 02 A

8 9mm non-combustible board Roof battens and counter-battens SIPs Roof Party Wall Insulation required for acoustic performance For Floor Details, see drawings GTS FL 02 and GTS FL 03 Engineered posi floor system with 22mm thick weather resistant chipboard (minimum weight 15kg/m²) Fully filled with Rockwool Flexi (or similar approved) cavity insulation For Floor Details, see drawings GTS FL 02 and GTS FL 03 50mm min. cavity between sheathing Proprietary Party wall ties at 1200mm centres 89mm Timber frame with 9mm OSB sheathing (sheathing as required by Glosford engineer) 450mm wide 2000g PVCu DPC to underside of soleplate DPM 100mm 7N/mm² blocks 250 min. To Robust Details Layers of Plasterboard as per Robust Details ( For Foundation Details, see drawing GTS GL 03 Screed Insulation (by other) Party Wall Detail: 2 ply 89mm Timber Frame 1:20 04/12/2017 M.B. GTS GD 03 A

9 9mm non-combustible board Roof battens and counter-battens SIPs Roof Acoustic Floor System Engineered posi floor system with 18mm thick OSB3 sub-deck (by Glosford) Party Wall Insulation required for acoustic performance For Floor Details, see drawing GTS FL 03 To standard Robust Details ( 50mm min. cavity between sheathing 250 min. Resilient bar For Floor Details, see drawing GTS FL 03 89mm Timber frame with 9mm OSB sheathing (sheathing as required by Glosford engineer) Proprietary Party wall ties at 1200mm centres Fully filled with Rockwool Flexi (or similar approved) cavity insulation 450mm wide 2000g PVCu DPC to underside of soleplate 2 Layers of Plasterboard as per standard Robust Details ( Screed Insulation (by other) 100mm 7N/mm² block DPM For Foundation Details, see drawing GTS GL 03 Party Wall & Floor Detail: 2 ply 89mm Timber Frame 1:20 04/12/2017 M.B. GTS GD 04 A

10 Roof battens and counter-battens SIPs Roof SIPs External Wall Acoustic Floor System External Wall Finish Lead Flashing SIPs Roof 140mm Timber frame Engineered posi floor system with 18mm thick OSB3 sub-deck 89mm Timber Frame Party Wall Insulation required for acoustic performance To standard Robust Details ( 9mm OSB sheathing (sheathing as required by Glosford engineer) 450mm wide 2000g PVCu DPC to underside of soleplate 300 min. Resilient bar Fully filled with Rockwool Flexi (or similar approved) cavity insulation 2 Layers of Plasterboard as per standard Robust Details ( Foundation Block Screed Insulation (by other) Party Walls & Floors In Different Height Buildings 1:20 04/12/2017 M.B. GTS GD 05 A

11 Brick cladding with min. 50mm cavity (see Claddings detail: GTS WL 03). All cladding to be built after SIPs are erected Treated soleplate Breather membrane must overhang bottom of soleplate by 50mm min DPC Open perpends to ventilate and drain the cavity. Spaced at max. 1500mm centres G.L 150 Bottom rail 90mm ringshank nails 3.1 x 63mm nails DPM / DPC : See GTS FL 04 detail 450mm wide 2000g PVCu DPC to underside of soleplate Soleplate fixings as specified by Glosford engineer Screed Insulation Min. Cavity 50mm XX DPM/Radon barrier **Concrete block/shuttered upstand for support/connection of soleplate. Minimum width of SIPs panel **All masonry blocks below sole plates are to be a MINIMUM of 7N/mm² crushing strength concrete blocks to BS EN 771. Use of Aircrete Bricks and Blocks will not be accepted by Glosford. Use of Class A and Class B engineering bricks are not structurally acceptable. THE BELOW BRICK TYPES ARE NOT PERMITTED Application Fastener Type Spacing Fixing soleplate Specifications should be in accordance with project structural engineers' recommendations based upon geography and project foundation substructure Fixing soleplate or combined soleplate and bottomplate Panel Fixing straps bottomplates to substructure/foundations to soleplates Specifications 3.1mm x 90 mm should galvanized be in accordance ring-shank nails with project 200mm As per project centres structural in two staggered engineers' rows Fixing 15mm x 100 OSB3 splines into Kingspan TEK Building System panels Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels 3.1mm x 63mm galvanized ring-shank nails 3.1mm x 63mm galvanized ring-shank nails 50mm centres both sides of the panels 50mm centres both sides of the panels Fixing 100mm x 110 / 140mm insulated splines or 3.1mm x 63mm galvanized ring-shank nails 50mm centres both sides of the panels Foundation Detail: Brick Cladding 1:10 04/12/2017 M.B. GTS GL 01 A

12 Cladding: polymer render or timber, fixed on timber battens (sized by architect's project) at 400c/c. See Claddings detail: GTS WL 03 Bottom rail 90mm ringshank nails Treated soleplate Insect Mesh 25mm min space for air circulation Breather membrane must overhang bottom of soleplate by 50mm min 3.1 x 63mm nails DPM / DPC : See GTS FL 04 detail 450mm wide 2000g PVCu DPC to underside of soleplate Plinth to be built after SIPs have been erected 150 G.L DPM/Radon Barrier A clear cavity may not be required here. Please confirm this with your building warranty provider XX Soleplate fixings as specified by Glosford engineer **Concrete block/shuttered upstand for support/connection of soleplate. See Ground Requirements **All masonry blocks below sole plates are to be a MINIMUM of 7N/mm² crushing strength concrete blocks to BS EN 771. Use of Aircrete Bricks and Blocks will not be accepted by Glosford. Use of Class A and Class B engineering bricks are not structurally acceptable. THE BELOW BRICK TYPES ARE NOT PERMITTED Application Fastener Type Spacing Fixing soleplate Specifications should be in accordance with project structural engineers' recommendations based upon geography and project foundation substructure Fixing soleplate or combined soleplate and bottomplate Panel Fixing straps bottomplates to substructure/foundations to soleplates Specifications 3.1mm x 90 mm should galvanized be in accordance ring-shank nails with project 200mm As per project centres structural in two staggered engineers' rows Fixing 15mm x 100 OSB3 splines into Kingspan TEK Building System panels Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels 3.1mm x 63mm galvanized ring-shank nails 3.1mm x 63mm galvanized ring-shank nails 50mm centres both sides of the panels 50mm centres both sides of the panels Fixing 100mm x 110 / 140mm insulated splines or 3.1mm x 63mm galvanized ring-shank nails 50mm centres both sides of the panels Foundation Detail: Cladding 1:10 04/12/2017 M.B. GTS GL 02 A

13 Timber frame 450mm wide 2000g PVCu DPC to underside of soleplate (to be lapped with DPM - by others) 3.1mm x 63mm nails Treated soleplate Non shrink grout by client Screed Insulation Holding down fixings to engineers requirements Timber Frame 100mm block for 89mm Timber Walls 140mm block for 140mm Timber Walls 7N/mm² minimum grade Breather membrane must overhang bottom of soleplate by 50mm min 450mm wide 2000g PVCu DPC to underside of soleplate (to be lapped with DPM - by others) 3.1 x 90mm ringshank nails 3.1 x 63mm nails Silicone Bead Treated Soleplate Screed Insulation Non shrinkable grout Holding down fixings to engineers requirements SIPs Concrete block/shuttered upstand for support/connection of soleplate. 7N/mm² minimum grade. The use of aircrete bricks and blocks and Class A and Class B engineering bricks is not accepted Application Fastener Type Spacing Fixing soleplate Specifications should be in accordance with project structural engineers' recommendations based upon geography and project foundation substructure Fixing soleplate or combined soleplate and bottomplate Panel Fixing straps bottomplates to substructure/foundations to soleplates Specifications 3.1mm x 90 mm should galvanized be in accordance ring-shank nails with project 200mm As per project centres structural in two staggered engineers' rows Fixing 15mm x 100 OSB3 splines into Kingspan TEK Building System panels Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels 3.1mm x 63mm galvanized ring-shank nails 3.1mm x 63mm galvanized ring-shank nails 50mm centres both sides of the panels 50mm centres both sides of the panels Fixing 100mm Timber Frame x 110 / Panels 140mm to insulated SIPs splines or Rothoblaas 3.1mm x 63mm TBS galvanized 8mm Ø SIP ring-shank screws or similar nails 50mm Typically centres at 400mm both c/c, sides unless of the engineer panels specifies otherwise Fixing Non-Load Bearing Timber Frame 3.1mm x 90 mm galvanized ring-shank nails Skew fix 2no nails per noggin Foundation Detail: Internal Wall 1:10 04/12/2017 M.B. GTS GL 03 A

14 Amplified area TRADA Detail SIPs Fix SIP to Edge Timber with 3.1mm x 63mm 50mm c/c Glosford DPC and others DPM left overlong on internal face and sealed by others with appropriate sealant Soleplate Minimum 5mm shim to allow for injection of non-shrinkable grout DPM/Radon Barrier 450mm wide 2000g PVCu DPC to underside of soleplate Block/concrete upstand Foundation Detail: DPC and DPM 1:2 04/12/2017 M.B. GTS GL 04 A

15 silicone bead shown thus Breather membrane must overhang bottom of soleplate by 50mm min Treated soleplate Fix edge timber to soleplate using 3.1 x 90mm ringshank centres. Fix SIP to edge timber with 3.1 x 63mm 50mm c/c Minimum 5mm shim to allow for injection of non shrinkable grout 450mm Wide 2000g PVCu DPC to underside of soleplate Shim (if necessary) Soleplate fixings as specified by Glosford Engineering Notes: 1). Substructure to be ±5 mm in level, ±10 mm in line. 2). Soleplates must be level, square and straight. Soleplates to be levelled on PVCu packers. Continual structural grout is to be carried out by main contractor / client to provide the longterm load transfer of the soleplate to the foundation. 3). Structural grout to be installed prior to the cladding of the building being commenced. 4). Soleplate may require packing level, which will be by Glosford to a maximum of 20mm with non load bearing shims. 5). Soleplates to be fixed down to foundation with proprietary fixings at centres agreed by Glosford engineer. 6). Soleplates must be fully supported and not overhang or set back from slab by more than 20 mm (NHBC 6.2-S2). 7). SIP soleplate should be a minimum of 150mm above external ground level. Application Fastener Type Spacing Fixing soleplate Specifications should be in accordance with project structural engineers' recommendations based upon geography and project foundation substructure Fixing soleplate or combined soleplate and bottomplate Fixing bottomplates to soleplates 3.1mm x 90 mm galvanized ring-shank nails 200mm centres in two staggered rows Fixing 15mm x 100 OSB3 splines into Kingspan TEK Building System panels Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels 3.1mm x 63mm galvanized ring-shank nails 3.1mm x 63mm galvanized ring-shank nails Soleplate/Packer Detail 50mm centres both sides of the panels 50mm centres both sides of the panels 1:5 04/12/2017 M.B. GTS GL 05 A

16 Garage Notes: Garage finished floor level to be 150mm minimum below house finished floor level. Sole Plate to be at one level throughout. Two layers of 12.5mm plasterboard to garage walls and a minimum of 30mm plasterboard to ceilings. Sole Plates at Same Level FFL FINISHED GARAGE FLOOR 150 Garage Soleplate Setting Out 1:5 04/12/2017 M.B. GTS GL 06 A

17 Breather membrane 3.1 x 63mm nails Expanding urethane sealant in joints 142mm SIPs 100 x 110mm insulated spline (100 x 110mm timber post if necessary) Breather membrane 3.1 x 63mm nails Expanding urethane sealant in joints 172mm SIPs 100 x 140mm insulated spline (100 x 140mm timber post if necessary) Application Fastener Type Spacing Fixing 100mm x 110 / 140mm insulated splines or timber posts into Kingspan TEK Building System panels 3.1mm x 63mm galvanized ring-shank nails 50mm centres both sides of the panels SIP-to-SIP Connection Detail 1:5 04/12/2017 M.B. GTS WL 01 A

18 SIPs Panel Timber Frame Stud Wall Breather membrane 8 x 200mm screw for 142mm SIPs 8 x 220mm screw for 172mm 400mm centres silicone bead shown thus 8 x 200mm screw for 142mm SIPs 8 x 220mm screw for 172mm 400mm centres Breather membrane SIPs 3.1 x 63mm nails Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Fixing Kingspan TEK Building System wall panels at corner joints 3.1mm x 63mm galvanized ring-shank nails Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment SIP Connection Details 50mm centres both sides of the panels Typically at 400mm c/c, unless engineer specifies otherwise 1:5 04/12/2017 M.B. GTS WL 02 A

19 Timber cladding Polymer Render cladding Plasterboard Cement Particle Board Plasterboard Minimum 25 x 50mm vertical timber 400c/c SIPs Minimum 25 x 50mm vertical timber battens SIPs Breather membrane Breather membrane Timber (Horizontal) Render All cavities to be vented and drained Brick cladding 50mm cavity Plasterboard Horizontal timber battens Plasterboard Stainless steel cavity wall tie SIPs Vertical timber battens Vertical timber cladding SIPs Breather membrane Breather membrane Brick Timber (Vertical) External Wall Detail: Various Cladding 1:10 04/12/2017 M.B. GTS WL 03 A

20 silicone bead shown thus Plasterboard lining. Min 22kg/m² to Robust Details 9.5mm OSB sheathing to party walls as required by timber frame engineer Insulation for acoustic purposes Rockwool Flexi (or similar approved) to full fill cavity 25 x 38mm vertical timber battens 8mm SIP Screw SIPs 50 Breather membrane with vertical laps of 150mm min Stainless steel wall ties fixed with stainless steel screws 65mm polythene wrapped mineral wool cavity barrier Application Fastener Type Spacing Fixing Timber Frame Panels to SIPs Rothoblaas Specifications TBS should 8mm be Ø SIP in accordance screws similar with project Fixing Typically soleplate 400mm or combined c/c, unless soleplate engineer specifies otherwise Fixing Non-Load Bearing Timber Frame 3.1mm x 90 mm galvanized ring-shank nails Skew fix 2no nails per noggin External Party Wall Plan Junction 1:5 04/12/2017 M.B. GTS WL 04 A

21 silicone bead shown thus 9.5mm OSB sheathing to party walls to be agreed by timber frame engineer Rockwool Flexi (or similar approved) to full fill cavity Insulation for acoustic purposes 8mm SIP Screw 65mm polythene wrapped mineral wool cavity barrier SIPs Plasterboard lining. Min 22kg/m² to Robust Details - on battens if service void required Breather membrane with vertical laps of 150 mm min SIPs Cavity Brickwork Application Fastener Type Spacing Fixing Timber Frame Panels to SIPs Rothoblaas Specifications TBS should 8mm be Ø SIP in accordance screws similar with project Fixing Typically soleplate 400mm or combined c/c, unless soleplate engineer specifies otherwise Plan Junction of Separating Wall Stagger Fixing Non-Load Bearing Timber Frame 3.1mm x 90 mm galvanized ring-shank nails Skew fix 2no nails per noggin 1:5 04/12/2017 M.B. GTS WL 05 A

22 25 x 50mm slate/tile battens 8 x 140mm screw 8 x 200mm screw for 142 SIPs 8 x 220mm screw for mm centres 2no 100mm wide strips of overlapping Rothoblaas Flexi Band tape (or similar) to ridge OSB Cover strips 25 x 50mm counter 400 c/c max. Fixed as noted below Breather membrane SIPs Headbinder (site adjusted/fitted) Glulam ridge beam in pocket in wall Load-bearing wall (sheathed with 9mm OSB if required by Glosford engineer - shown by dashed line) silicone bead shown thus Application Fastener Type Spacing Fixing Kingspan TEK Building System roof sections at wall/floor junctions, ridge beams, intermediate purlins and gable walls Rothoblaas Specifications TBS should 8mm be Ø SIP in accordance screws similar, with project 50mm embedment Fixing Typically soleplate 200mm or combined c/c, unless soleplate engineer specifies otherwise Fixing treated joist hangers timber to counter headplate battens or laminated to 3.75mm ABC Spax x 5mm 32mm x square 60mm twist or EJOT shank M5 nails 70mm or Simpson stainless steel N10 Into Typically side and 300mm top centres. of headplate For further locations Kingspan TEK Building System wall/roof panels screws or equivalent (to penetrate through 15mm OSB/3 guidance follow project structural for ventilation face) engineers' recommendations Fixing Timber Frame to Soleplate 3.1mm x 63mm galvanized ring-shank nails 200mm centres in two staggered rows Load-Bearing Wall to SIP Roof Detail 1:5 04/12/2017 M.B. GTS WL 06 A

23 Joinery Head Stainless steel wall tie Timber Headbinder DPC dressed over lintel and tucked under breather paper Lintel Brick support lintel Open Perpends to ventilate and drain cavity SIPs Sealant Edge Timber Joinery Cill Compressible sealant DPC dressed into groove and staple fixed to pinch batten Breather membrane 47 x 47 timber cavity fire barrier or proprietary cavity closer SIPs Window Head & Cill Detail 1:5 04/12/2017 M.B. GTS WL 07 A

24 Plasterboard lining - on battens if service void required SIPs Breather membrane 47 x 47mm timber cavity fire barrier or proprietary cavity closer DPC staple fixed to pinch batten and into window frame groove Window Jamb Detail 1:4 04/12/2017 M.B. GTS WL 08 A

25 Pack between lining & jamb studs at fixing positions 3 tol. Threshold may be omitted Leaf Size 32 6 tol. Door leaf 1981/ tol structural opening for 1981 door leaf 2100 structural opening for 2040 door leaf Glosford SIPs Standard Door Openings Imperial doors (1981 high) Leaf Structural opening x x x x x x x x x2040 Pair x2040 Pair x2040 Pair x2040 Pair x2040 Pair x2040 Pair x2040 Pair x2040 Pair x2040 Metric Doors (2040 high) Leaf Structural opening x x x x x x2100 Pair x2100 Pair x2100 Pair x2100 Pair x2100 Pack between lining & jamb studs at fixing positions NOTE: Internal door sizes to be used by Glosford if no internal door schedule is supplied. Internal Door Lining Detail 1:2.5 04/12/2017 M.B. GTS WL 09 A

26 Wall Tie Weephole over air brick Internal grille 25 min External grille 25 min Fully filled with mineral wool Cavity barrier Breather membrane SIPs MVHR System 1:4 04/12/2017 M.B. GTS WL 10 A

27 SIPs DPC tray above opening Plasterboard lining - on battens if service void required Fully filled with mineral wool 25 min FLUE 25 min 65 mm polythene wrapped mineral wool cavity barrier BOILER Additional layer of plasterboard behind boiler Openings for flues to be a minimum of 500mm from the top of the panel and 300mm from the side of the panel Balanced Flue Boiler Installation 1:5 04/12/2017 M.B. GTS WL 11 A

28 DPC tray above opening to extend 150 mm either side SIPs 65 mm polythene wrapped mineral wool cavity barrier Plasterboard lining - on battens if service void required 15mm min gap between back of meter box and breather membrane 1000mm max. 500 mm min. Ground Level Meter Box Installation 1:5 04/12/2017 M.B. GTS WL 12 A

29 Plasterboard lining - on battens if service void required DPC tray above opening Fully filled with mineral wool 25 min 25 min 47 x 47 timber cavity fire barrier or proprietary cavity closer SIPs Breather membrane Extract Fan Installation 1:5 04/12/2017 M.B. GTS WL 13 A

30 Chimney above Ground Floor SIPs Chimney at Ground Floor 100 min Brickwork over 50 min 200 min Mineral wool cavity barrier SIPs External Chimney Detail 1:10 04/12/2017 M.B. GTS WL 14 A

31 Roofing Underlay Continuous 333 x 50mm Fireus Fireshield fire and cavity barrier 600 Roof truss 100mm (min) mineral wool insulation between ceiling joists - 10kg/m³ min Plasterboard ceiling Insulation for acoustic purposes - not needed above ceiling 2 layers of plasterboard to Robust Details - Rockwool Flexi (or similar approved) to full fill cavity Party Wall to Roof Truss Detail 1:10 04/12/2017 M.B. GTS WL 15 A

32 Window lintel support post to Glosfords engineers specification Timber Lintel to Glosfords engineers specification 50 x 108mm window head timber (142 SIPs) 40 x 138mm window head timber (172 SIPs) 15mm thick OSB cover strip SIP to window head Timber Lintel to Glosfords engineers specification 50 x 108mm door head timber (142 SIPs) 40 x 138mm door head timber (172 SIPs) Door lintel support post to Glosfords engineers specification 50 x 108mm head plate (142 SIPs) 40 x 138mm head plate (172 SIPs) 100 x 110mm insulated spline (142 SIPs) (100 x 110mm timber post if necessary) 80 x 140mm insulated spline (172 SIPs) (80 x 140mm timber post if necessary) Expanding urethane foam to be applied to rout in panel before inserting splines/timbers to seal joints 50 x 108mm window bottom timber (142 SIPs) 40 x 138mm window bottom timber (172 SIPs) SIP bottom plate - to be cut out of doorway after erection Soleplate - to be cut out of doorway after erection TEK panels stitched to framing elements with 3.1 x 63mm ringshank 50mm centres both sides of the panels SIP consists of a fibre-free rigid urethane insulation core between 2no 15mm OSB3 boards 50 x 108mm bottom plate (142 SIPs) 40 x 138mm bottom plate (172 SIPs) 38 x 140mm soleplate (142 SIPs) 44 x 172mm soleplate (172 SIPs) Silicone sealant between soleplate and bottom plate 50 x 108mm end timber (142 SIPs) 40 x 138mm end timber (172 SIPs) Isometric View of Typical Wall Construction N.T.S. 04/12/2017 M.B. GTS WL 16 A

33 47 x 72mm Intermediate joists packer Breather membrane Bottom Plate 90mm ringshank nails 3.1 x 63mm nails 47 x 72mm Continuous packer SIPs Minimum 100mm Mineral Fibre (10-33kg/m²) insulation to floor zone Engineered posi floor system with 22mm thick weather resistant chipboard (minimum weight 15kg/m²) Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 50mm soleplate centres both or combined sides of the soleplate panels Fixing 100mm bottomplates x 110 / to 140mm soleplates insulated splines or 3.1mm x 63mm 90 galvanized ring-shank nails 50mm 200mm centres both in two sides staggered of the panels rows Fixing joist 15mm hangers x 100 OSB3 to headplate splines into or laminated Kingspan 3.1mm 3.75mm x x 63mm 32mm galvanized square twist ring-shank nails nails or Simpson N10 Into 50mm side centres and top both of headplate sides of the locations panels beams (fixings may vary depending on specification of joist hanger - please refer to manufacturers' instructions floor systems) nails marked out Fixing I-beams/joist to joist hanger (fasteners 3.75mm x 32mm square twist shank nails or Simpson N10 In pre-drilled holes for bottom flange Posi Joist Detail for Houses 1:10 04/12/2017 M.B. GTS FL 01 A

34 47mm x 72mm Intermediate joists packer Breather membrane Bottom Plate 47 x 72mm Continuous packer SIPs 90mm ringshank nails Acoustic Floor System (by others if required) 65 mm polythene wrapped mineral wool cavity barrier Glulam Beam for Acoustic Performance Resilient bar Engineered posi floor system with 18mm thick OSB3 sub-deck Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 50mm soleplate centres both or combined sides of the soleplate panels Fixing 100mm bottomplates x 110 / to 140mm soleplates insulated splines or 3.1mm x 63mm 90 galvanized ring-shank nails 50mm 200mm centres both in two sides staggered of the panels rows Fixing joist 15mm hangers x 100 OSB3 to headplate splines into or laminated Kingspan 3.1mm 3.75mm x x 63mm 32mm galvanized square twist ring-shank nails nails or Simpson N10 Into 50mm side centres and top both of headplate sides of the locations panels beams (fixings may vary depending on specification of joist hanger - please refer to manufacturers' instructions floor systems) nails marked out Fixing I-beams/joist to joist hanger (fasteners 3.75mm x 32mm square twist shank nails or Simpson N10 In pre-drilled holes for bottom flange Posi Joist Detail for Flats 1:10 04/12/2017 M.B. GTS FL 02 A

35 Cavity full filled with Rockwool Flexi (or similar approved) 9mm OSB sheathing (sheathing as required by Glosford engineer) 90mm ringshank nails Insulation required for acoustic performance 3.1 x 63mm nails Acoustic Floor System (by others if required) Timber blocking Resilient Bar 8 x 160mm TBS screws 2 Layers of Plasterboard Engineered posi floor system with 18mm thick OSB3 sub-deck 2 Layers of plasterboard as per Robust Details min. Typical party floor / party wall posi joist detail. Alternative acoustic floor systems available. Acoustic floor build up and resilient bar by other. Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 50mm soleplate centres both or combined sides of the soleplate panels Fixing 100mm bottomplates x 110 / to 140mm soleplates insulated splines or 3.1mm x 63mm 90 galvanized ring-shank nails 50mm 200mm centres both in two sides staggered of the panels rows Fixing joist 15mm hangers x 100 OSB3 to headplate splines into or laminated Kingspan beams (fixings may vary depending on specification of joist hanger - please refer to manufacturers' instructions floor systems) 3.75mm 3.1mm x x 63mm 32mm galvanized square twist ring-shank nails nails or Simpson N10 nails Into 50mm side centres and top both of headplate sides of the locations panels marked out Fixing I-beams/joist to joist hanger (fasteners 3.75mm x 32mm square twist shank nails or Simpson N10 In pre-drilled holes for bottom flange Party Floor Posi Joist Detail 1:10 04/12/2017 M.B. GTS FL 03 A

36 Panel Skew Nailed through onto Noggin with a Min. of 2 No. Ø3.35 Galvanized Wire Nails Key: Floor 600mm Centres Ceiling 600mm Centres Both Floor & Ceiling Noggins Simpson ZS47N Clips 47 x 97mm Floor Partition 600mm c/c max. 22mm T&G chipboard decking Posi Depth Varies 47 Plasterboard 47 Inverted Simpson ZS47N Clips 47 x 97mm Ceiling 600mm c/c max. Application Fastener Type Spacing Fixing Timber Frame to Soleplate Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 200mm soleplate centres or in two combined staggered soleplate rows Fixing Timber Non-Load Frame Bearing Panels Timber to SIPs Frame soleplates and headbinders to joist noggins 3.1mm x 90 mm galvanized ring-shank nails Posi Joist with Parallel Non-Load Bearing Walls Skew Typically fix 2no at 400mm nails per c/c, noggin unless engineer Fixing Kingspan TEK Building System to oak SIP screws or similar, 50mm Typically at 400mm c/c, unless engineer 1:20 04/12/2017 M.B. GTS FL 04 A

37 Typical 22mm T&G decking Intermediate 47 x 97mm noggins between posi joists Continuous header beam. Load bearing wall fixed to header beam with 8 x 160mm TBS 600mm max. centres (unless otherwise stated) Engineered posi floor system with 22mm thick weather resistant chipboard (minimum weight 15kg/m²) Timber frame load bearing wall with 9mm OSB sheathing to Glosfords engineers specification. Head binder to be site fitted Application Fastener Type Spacing Fixing Timber Frame to Soleplate Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 200mm soleplate centres or in combined two staggered soleplate rows Fixing Timber Frame Panels to SIPs Top Hung Posi Joist on Load Bearing Walls - 1 Noggin Typically at 400mm c/c, unless engineer 1:20 04/12/2017 M.B. GTS FL 05 A

38 Typical 22mm T&G decking Intermediate 47 x 72mm noggins between posi joists Continuous header beam. Load bearing wall fixed to header beam with 8 x 160mm TBS 600mm max. centres (unless otherwise stated) Engineered posi floor system with 22mm thick weather resistant chipboard (minimum weight 15kg/m²) Timber frame load bearing wall with 9mm OSB sheathing to Glosfords engineers specification. Head binder to be site fitted Posi joists of different widths Intermediate 47 x 72mm noggins between posi joists Application Fastener Type Spacing Fixing Timber Frame to Soleplate Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 200mm soleplate centres or in combined two staggered soleplate rows Fixing Timber Frame Panels to SIPs Top Hung Posi Joist on Load Bearing Walls - 2 Noggins Typically at 400mm c/c, unless engineer 1:20 04/12/2017 M.B. GTS FL 06 A

39 Strongback brace tight to underside of top chord (depth to suit - see below) Strongback bracing required to clear spans over approx. 4000mm Strongback twice nailed to vertical Strongback Minimum Requirements Below: 47 x 97mm* TR26 timber for 225 & 253mm deep Joists 47 x 147mm* TR26 timber for 304 & 373mm deep Joists Typical Strongback Detail 1:15 04/12/2017 M.B. GTS FL 07 A

40 38 x 89mm Timber Blocks fixed using 2No. Ø3.1 x 90mm Nails to Top and Bottom Chords View on Posi Type 1 View on Posi Type 2 Strongback Nailed to Change of Span Noggin using 2No. Ø3.1 x 90mm Nails Posi Type 1 Posi Type 2 Strongback Change of Span Detail 1:20 04/12/2017 M.B. GTS FL 08 A

41 7.5 Tolerance 7.5 Tolerance Trimmer Joist Direction 2No. 38 x 89 mm C16 Ledger Timbers fixed to Trimmer / External Wall Splines the full length of floor opening. Fix with TBS 8 x 140mm screws to trimmers and TBS 8 x 200/220mm to SIPs (from outside) at 400mm max. centres and at either end of ledger - Minimum end distance for first TBS screw to be 100mm, Maximum end distance for first TBS screw to be 150mm. TBS screws fixed centrally in depth of 89mm ledger 7.5 Tolerance 7.5 Tolerance Trimmer Joist Direction 45mm x Joist Depth PERMANENTLY fixed with TBS 8 x 100mm screws centrally in 47mm depth of chords at MAX 600mm centres, (avoid metal webs) Clear spans up to 3.6 m wide: Joists 38x140mm at 400mm centres Stairway Opening Infill Panels 1:10 04/12/2017 M.B. GTS FL 09 A

42 25 x 50mm 400 c/c max. fixed as noted below Breather membrane 25 x 50mm slate/tile battens Roof SIPs Breather membrane Tilting fillet 8 x 200mm screw for 142mm SIPs 8 x 220mm screw for 172mm SIPs 15mm OSB cover strip Proprietary fascia board Timber Wall Plate 3.1 x 63mm nails Plumb and seatcut for fascia & soffit. Site tolerance 10mm for position and alignment to be packed silicone bead shown thus Wall SIPs Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Fixing Kingspan TEK Building System roof sections at wall/floor junctions, ridge beams, intermediate purlins and gable walls Fixing treated timber counter battens to Kingspan TEK Building System wall/roof panels for ventilation 3.1mm x 63mm galvanized ring-shank nails Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment ABC Spax 5mm x 60mm or EJOT M5 70mm stainless steel screws or equivalent (to penetrate through 15mm OSB/3 face) Eaves Detail 50mm centres both sides of the panels Typically at 200mm c/c, unless engineer specifies otherwise Typically 300mm centres. For further guidance follow project structural engineers' recommendations 1:5 04/12/2017 M.B. GTS RF 01 A

43 silicone bead shown thus 8 x 140mm screw Breathable membrane (with 150mm overlap at ridge) Breather membrane 25 x 50mm slate/tile battens 2no 100mm wide strips of overlapping Rothoblaas Flexi Band tape (or similar) to ridge OSB Cover strips 25 x 50mm counter 400 c/c max. Fixed as noted below SIPs Glulam ridge beam 8 x 200mm screw for 142mm SIPs 8 x 220mm screw for 172mm SIPs Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 50mm soleplate centres both or combined sides of the soleplate panels Fixing 100mm Kingspan x 110 TEK / Building 140mm insulated System roof splines or Rothoblaas 3.1mm x 63mm TBS galvanized 8mm Ø SIP ring-shank screws or similar, nails 50mm 50mm Typically centres at 200mm both c/c, sides unless of the engineer panels sections at wall/floor junctions, ridge beams, embedment specifies otherwise intermediate purlins and gable walls Fixing treated joist hangers timber to counter headplate battens or laminated to 3.75mm ABC Spax x 5mm 32mm x square 60mm twist or EJOT shank M5 nails 70mm or Simpson stainless steel N10 Into Typically side and 300mm top centres. of headplate For further locations Kingspan TEK Building System wall/roof panels screws or equivalent (to penetrate through 15mm OSB/3 guidance follow project structural for ventilation face) engineers' recommendations Fixing Timber Frame to Soleplate 3.1mm x 63mm galvanized ring-shank nails 200mm centres in two staggered rows Ridge Detail 1:5 04/12/2017 M.B. GTS RF 02 A

44 25 x 50mm counter 400 c/c max. Fixed as noted below 25 x 50mm slate/tile battens Breather membrane 8 x 200mm screw for 142mm SIPs 8 x 220mm screw for 172mm SIPs Breather membrane SIPs Glulam purlin (size varies) Application Fastener Type Spacing Fixing Kingspan TEK Building System roof sections at wall/floor junctions, ridge beams, intermediate purlins and gable walls Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment Purlin Detail Typically at 200mm c/c, unless engineer specifies otherwise 1:4 04/12/2017 M.B. GTS RF 03 A

45 silicone bead shown thus 2no 100mm wide strips of overlapping Rothoblaas Flexi Band tape (or similar) to valley Fix SIP to fillet 3.1 x 63mm 50mm c/c OSB Cover Strip 8 x 140mm 400c/c. Minimum embedment 50mm into opposing timber Fillets (to engineers specification) Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Fixing Kingspan TEK Building System roof sections at wall/floor junctions, ridge beams, intermediate purlins and gable walls 3.1mm x 63mm galvanized ring-shank nails Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment 50mm centres both sides of the panels Typically at 200mm c/c, unless engineer specifies otherwise Equal Valley Detail 1:4 04/12/2017 M.B. GTS RF 04 A

46 silicone bead shown thus Fix SIP to fillet with 3.1 x 63mm 50mm c/c Fillets (to engineers specification) Breather membrane OSB Cover Strip 8 x 140mm 400c/c. Minimum embedment 50mm into glulam beam Glulam valley beam Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 50mm soleplate centres both or combined sides of the soleplate panels Fixing Kingspan 100mm x 110 TEK / Building 140mm insulated System roof splines or Rothoblaas 3.1mm x 63mm TBS galvanized 8mm Ø SIP ring-shank screws or similar, nails 50mm 50mm Typically centres at 200mm both c/c, sides unless of the engineer panels sections at wall/floor junctions, ridge beams, embedment specifies otherwise intermediate purlins and gable walls Fixing joist hangers to headplate or laminated 3.75mm x 32mm square twist shank nails or Simpson N10 Into side and top of headplate locations Equal Valley Detail - with Glulam 1:4 04/12/2017 M.B. GTS RF 05 A

47 SIP See Overlaid detail: GTS RF 07 8 x 140mm SIP 200mm staggered centres OSB cover strip 3.1 x 63mm nails Breather membrane SIP SIP 8 x 200mm screw for 142mm SIPs 8 x 220mm screw for 172mm SIPs OSB cover strip Timber Fillet silicone bead shown thus Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Specifications 3.1mm x 63mm should galvanized be in accordance ring-shank nails with project Fixing 50mm soleplate centres both or combined sides of the soleplate panels Fixing Kingspan 100mm x 110 TEK / Building 140mm insulated System roof splines or Rothoblaas 3.1mm x 63mm TBS galvanized 8mm Ø SIP ring-shank screws or similar, nails 50mm 50mm Typically centres at 200mm both c/c, sides unless of the engineer panels sections at wall/floor junctions, ridge beams, embedment specifies otherwise intermediate purlins and gable walls Fixing joist hangers to headplate or laminated 3.75mm x 32mm square twist shank nails or Simpson N10 Into side and top of headplate locations Dormer 1:20 04/12/2017 M.B. GTS RF 06 A

48 8 x 140mm SIP 200mm staggered centres 3.1 x 63mm nails OSB cover strip Timber Fillets End Timbers Dormer Roof SIP Main Roof 3.1 x 63mm 50mm centres both sides of SIP Dormer Cheek SIP OSB cover strip 8 x 200mm screw for 142 SIPs 8 x 220mm screw for mm centres Isometric View of Dormer N.T.S. 04/12/2017 M.B. GTS RF 06A A

49 silicone bead shown thus Dormer SIPs Panel Main roof fillet sits under dormer roof fillet 3.1 x 63mm nails 15mm OSB Cover strips TBS 8 x 140mm 200mm c/c max Roof SIPs Panel Application Fastener Type Spacing Fixing bottomplates, headplates, end timbers and edge timbers into Kingspan TEK Building System panels Fixing Kingspan TEK Building System roof sections at wall/floor junctions, ridge beams, intermediate purlins and gable walls 3.1mm x 63mm galvanized ring-shank nails Rothoblaas TBS 8mm Ø SIP screws or similar, 50mm embedment Overlaid Valley Detail 50mm centres both sides of the panels Typically at 200mm c/c, unless engineer specifies otherwise 1:4 04/12/2017 M.B. GTS RF 07 A

50 Roof light and fixings SIPs Counter batten XXX* Roof light and fixings Roof cladding XXX* XXX*: STRUCTURAL OPENING Size to be confirmed by the client, including any insulated collars that sit in the roof depth. SIPs Rooflight 1:10 04/12/2017 M.B. GTS RF 08 A

51 Head Binder 89mm Time Frame Parapet with 10mm OSB each side Second layer site fixed 47 x 72mm Intermediate joists packer Breather membrane Tapered Insulation Sole Plate 47 x 72mm Continuous packer SIPs Engineered posi floor system with 18mm thick Service Class 3 Plywood sub deck only. Fixing straps etc. all by other. Plasterboard Parapet Detail 1:10 04/12/2017 M.B. GTS RF 09 A

52 Roofing Underlay Slate/tiles and battens Ventilation Cavity (25mm) Trusses by Glosford. Centres and timber sizes TBC in engineering 25 Over Fascia Ventilator Insulation Head Binder Soffit Lintel, as required by engineer SIPs panel Proprietary cavity closer SIP with Truss Roof 1:10 04/12/2017 M.B. GTS RF 10 A

ISSUE Erection Manual

ISSUE Erection Manual Erection Manual The details and information in this book are for guidance of the erection of panels and flooring only. They are not site specific. Refer to the relevant panel drawings for the site, which

More information

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Guide A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Details A B C D F E A Masonry Wall Connection Details Blockwork

More information

STRUCTURAL INSULATED PANEL SYSTEMS STANDARD CONSTRUCTION DETAILS

STRUCTURAL INSULATED PANEL SYSTEMS STANDARD CONSTRUCTION DETAILS STRUCTURAL INSULATED PANEL SYSTEMS STANDARD CONSTRUCTION DETAILS General arrangement: GA01 Through section SIPFIT BUILDING SYSTEM STANDARD DETAILS Foundations: F01 details to be added Wall details: W01

More information

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials... 30a Renewable Chase Bibra Lake WA 6163 Tel: (08) 9494 2211 Fax: (08) 9494 2202 Email: info@sipsindustries.com.au Web: www.sipsindustries.com.au Installation Guide Please read before installing SIPs Kit.

More information

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs. Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm

More information

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter SuperFOIL Insulation Solutions Guide Pitched Roof - Under Rafter SF19+ Pitched Roof Under Rafter Solutions CONSTRUCTION THICKNESS R -VALUE EXTERNAL SURFACE - 0.040 TILES / SLATES 10mm - BATTEN CAVITY 25mm

More information

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800

More information

TRISO-SUPER 10 Installation Guidelines

TRISO-SUPER 10 Installation Guidelines V 2007 ACTIS THIN MULTIFOIL INSULATION Installation Guidelines ROOFS ATTICS 2 Contents Technical characteristics 2 Essential rules of installation 3 Over rafter installation 4 Under rafter installation

More information

Acceptable Standards of Domestic Construction

Acceptable Standards of Domestic Construction Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be

More information

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 the unique loft conversion & flooring system INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 Unit 6, Devizes Trade Centre, Hopton Park, Devizes, Wiltshire, SN10 2EH t 01380 739000 e info@telebeam.co.uk

More information

Sections & Details VOCABULARY

Sections & Details VOCABULARY 1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING

More information

How-To-build guide Garden shed

How-To-build guide Garden shed How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV

More information

The better way to build TM. Installation Manual ROOF SIPs

The better way to build TM. Installation Manual ROOF SIPs The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................

More information

Installation Guide - Evolution Series Wood Siding

Installation Guide - Evolution Series Wood Siding Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

Material List for Log Complete Packages

Material List for Log Complete Packages Material List for Log Complete Packages DAYLIGHT BASEMENT EXTERIOR WALLS ( If Applicable ) 2X6 Pressure Treated Sills With 6" Foam Sill Sealer 2X6 K.D. Spruce Plates And Studs 2X10 K.D. Spruce Headers

More information

Pitched roofs rafter level

Pitched roofs rafter level Pitched Roofs - Rafter Level Pitched roofs rafter level Insulation at rafter level design Rafter level insulation Insulation between the rafters can be designed in two ways: Breathing roof with Low Resistance

More information

GLOSSARY OF TERMS SECTION 8

GLOSSARY OF TERMS SECTION 8 GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

8x8 Shed Plans and Building Guide

8x8 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

June Residential Refurbishment Pitched roofs - rafter level

June Residential Refurbishment Pitched roofs - rafter level June 2010 Residential Refurbishment 3.2.2 Pitched roofs - rafter level Residential refurbishment 3.0 Residential Refurbishment Pitched Roof - Rafter Level Contents Introduction find online page Solution

More information

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose

More information

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,

More information

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing. A useful collection of definitions for commonly used terms in tile roofing. Abutment Where the roof tiles meet a structure rising above the roof. Accessory A concrete or terracotta product used to finish

More information

8 x 10 Timber-frame Garden Shed

8 x 10 Timber-frame Garden Shed 8 x 10 Timber-frame Garden Shed Includes: Step-By-Step Instructions, Complete Details & Materials Lists Timber-framing is a traditional building method that uses a simple framework of heavy timber posts

More information

Installation guide for 20/20

Installation guide for 20/20 Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British

More information

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions REDLAND DRY VALLEY Installation Instructions for Redland Dry Valley Version: 6 Date: May 2013 Author: Department: Redland Technical Solutions Redland Technical Solutions 1 Introduction 1.1 TECHNICAL DATA

More information

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016 Best Barns USA Assembly Book revised March 23, 2016 the Brookhaven 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Cl/SfB (23.9) VALUE OPEN WEB FLOOR SOLUTION. ALPINE. Advancing timber fabrications through design : components : manufacture

Cl/SfB (23.9) VALUE OPEN WEB FLOOR SOLUTION.   ALPINE. Advancing timber fabrications through design : components : manufacture Cl/SfB (.9) VALUE OPEN WEB FLOOR SOLUTION www.itwalpine.co.uk MCL T-SJ 00 SpaceJoist TM Technical Manual ALPINE Advancing timber fabrications through design : components : manufacture ITW Alpine is a member

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 12, 2017 the Arlington Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL

STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL INTERNAL LINING TIMBER LINTEL AS PER NZS 3604 FLEXIBLE FLASHING TAPE INSTALLED OVER AT AIRSEAL ON CORNERS PEF ROD GAP 7.5-8mm APPROX 35 RENDER 20mm DRAINED & VENTED CAVITY - BATTENS AT 300-600mm MAX.CTRS.

More information

Guardian warm roof conversion system. Installation Guide

Guardian warm roof conversion system. Installation Guide Guardian warm roof conversion system Installation Guide 2 www.guardianroof.co.uk Conservatory walls consist largely of glazed elements including windows and doors that may include structural mullions or

More information

System for 2+ Level Buildings

System for 2+ Level Buildings Issued Sept 205 Contact Info@symonite.co.nz System for 2+ Level Buildings Typical Details Issued: September 205 TYPICAL DETAILS CONTENTS.0 TYPICAL VERTICAL JOINTS 2.0 EXT. CORNER / TYPICAL HORIZONTAL JOINT

More information

June Non - Residential Refurbishment Pitched roofs - rafter level

June Non - Residential Refurbishment Pitched roofs - rafter level June 2010 Non - Residential Refurbishment 5.2.3 Pitched roofs - rafter level Non-residential refurbishment 5.0 Non-residential Refurbishment Pitched Roof - Rafter Level Contents Introduction find online

More information

Garage Design Guide. October 2018

Garage Design Guide. October 2018 Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief

More information

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a

More information

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24" C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24 C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4 GABLE FLASHING FASTENER @ 24" C/C MAX. ROOF PURLIN BUTYL SEALANT TAPE FLASH AB-1, AB-2, AB-3, OR AB-4 FASTENER @ EVERY MAJOR RIB OR 12" C/C MAX. F-J TRIM FABRAL ALUMINUM SOFFIT FASTENER 24" C/C MAX. BUTYL

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 17, 2017 the Roanoke 16'x32' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

12x12 Shed Plans and Building Guide

12x12 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 13, 2017 the North Dakota with pocket doors 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 19, 2015 the Arlington-R Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This

More information

10x10 Shed Plans and Building Guide

10x10 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x32' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x20' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 12, 2017 the Arlington Building Size 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x24' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x28' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

RIDGE-JOIST CONNECTION 12/12 maximum slope

RIDGE-JOIST CONNECTION 12/12 maximum slope R1 RIDGE-JOIST CONNECTION Beveled bearing stiffener each side (see detail R8) 2 3 8" min. end nailing distance, typical United Steel Products LSTA24 or Simpson Strong-Tie LSTA24 strap with 7-10d x 1 1

More information

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR 900 SERIES PANEL CI-DS-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-EL-01-900 CI-EL-02-900 CI-EL-03-900 CI-EL-04-900 CI-EL-05-900 CI-EL-06-900 CI-EL-07-900 CI-EL-08-900 CI-RD-01-900 CI-RD-02-900 CI-RD-03-900 CI-EV-01-900

More information

HOW TO BUILD A 12X8 SHED

HOW TO BUILD A 12X8 SHED HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised July 27, 2012 the North Dakota with pocket doors 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This

More information

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D. With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

Multi-layer Insulation Blanket for use in Roofs

Multi-layer Insulation Blanket for use in Roofs Multi-layer Insulation Blanket for use in Roofs Massive Thermal Insulation in a Thin, Flexible, Multi-layer Membrane HIGHEST PERFORMING MULTI-FOIL ON FULLY INDEPENDENTLY THE MARKET TESTED KEEPS YOUR FULLY

More information

Shingle Installation Guide

Shingle Installation Guide Installation Guide Roof Framing Information Installation Installation Accessory Installation Estimating Data General Information Roof Framing Information It is the responsibility or roofers, building contractors

More information

POST FRAME CONSTRUCTION MANUAL

POST FRAME CONSTRUCTION MANUAL POST FRAME CONSTRUCTION MANUAL www.pole-barn.info www.apbbuildings.com TABLE OF CONTENTS 3. Jobsite Preparation 4. Setting Foundation Posts 5. Setting Corner Posts 6. Sidewall & Endwall Posts 7. Grade

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised March 6, 2017 the Arlington Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.

More information

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans 12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed

More information

Chapter 22. Shed Construction

Chapter 22. Shed Construction Chapter 22. Shed Construction 22.1 BUILDING SHED FLOOR 22.2 BUILDING SHED WALLS 22.3 BUILDING SHED ROOF 22.4 ASSEMBLING SHED Tools needed by volunteers: Hammer Nail apron Tape measure Square Utility knife

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

General Installation Guidelines

General Installation Guidelines g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 19, 2015 the Arlington-R Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This

More information

3.1 General Provisions

3.1 General Provisions WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope

More information

15 YEAR GUARANTEE. Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

15 YEAR GUARANTEE. Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS INSTALLATION GUIDE AVAILABLE IN A RANGE OF COLOURS 15 YEAR GUARANTEE Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix Coroline corrugated bitumen sheet is a tough lightweight

More information

Roofs SECTION. Contents for this section: Components and Elements of Roofs

Roofs SECTION. Contents for this section: Components and Elements of Roofs SECTION Contents for this section: MODULE 1 Types of MODULE 2 Components and Elements of MODULE 3 MODULE 4 Roof Structures Trussed Rafter MODULE 5 Flat Roof Construction MODULE 6 Types of Roof Decking

More information

August 2008: Issue 1. Non - Residential New Build Pitched Roofs - Rafter Level

August 2008: Issue 1. Non - Residential New Build Pitched Roofs - Rafter Level Non - Residential New Build 4.2.3 Pitched Roofs - Rafter Level August 2008: Issue 1 Non-residential new build 4.0 Non-residential New Build Pitched Roof - Rafter Level Contents Introduction find online

More information

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

technical bulletin Roofline Installation Details  No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit Roofline Installation Details This is intended to provide you with a brief overview of the popular products in Kestrel s Roofline range, where they can be used and the main criteria for installation. Typical

More information

BBS Rusticated & Splaycut Cavity System

BBS Rusticated & Splaycut Cavity System BBS Rusticated & Splaycut Cavity System 2018 www.bbstimbers.co.nz www.cedarcorp.co.nz BBS Rusticated & Splaycut Weatherboard Cavity Wrap System Installation Specifications 1.0 General Information Introduction

More information

Assembly Book. the Brandon Building Size 12' x 20' Revised September 13, 2017

Assembly Book. the Brandon Building Size 12' x 20' Revised September 13, 2017 Assembly Book Revised September 13, 2017 the Brandon Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under the

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 13, 2017 the Belmont Building Size 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 1 October 2012 Ver. 1.2 Window Association of New Zealand Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening

More information

900 SERIES WALL PANELS

900 SERIES WALL PANELS CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900

More information

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017 Best Barns USA Assembly Book revised February 15, 2017 Regency Deluxe 8' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive, Greenville, PA 16125 This manual is copyrighted. Under

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 13, 2017 the North Dakota with pocket doors Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 Building Size 12'x12'

More information

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Belmont with pocket doors. Building Size 12'x16' or 12'x20' Revised January 10, 2012

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Belmont with pocket doors. Building Size 12'x16' or 12'x20' Revised January 10, 2012 Best Barns USA Assembly Book Revised January 10, 2012 SAMPLE INSTRUCTIONS the Belmont with pocket doors Building Size 12'x16' or 12'x20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive

More information

6x6 Shed Plans and Building Guide

6x6 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

Installation of Fiberglass Windows

Installation of Fiberglass Windows Installation of Fiberglass Windows Before you begin please read and understand these installation instructions. The following installation instructions are recommended by Norwood and failure to follow

More information

The Complete Guide to Building with Green Mountain Panels

The Complete Guide to Building with Green Mountain Panels The Complete Guide to Building with s The Complete Guide to Building with s 74 Glen Orne Drive Brattleboro, VT 05301 (800) 882-9490 (802) 254-3435 GreenMountainPanel.com Copyright 2014 All rights reserved.

More information

Roll-Fix Kit The complete dry hip kit RFIG

Roll-Fix Kit The complete dry hip kit RFIG H I P Roll-Fix Kit The complete dry hip kit RFIG.045-0906-1 Roll-Fix is a quick and simple dry-fix roofing kit for hips. l Quick and easy to install no special tools required l Universal application fits

More information

DW HORIZONTAL INSTALLATION

DW HORIZONTAL INSTALLATION AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S

More information

ALPINE TRAY. To get the best from this product please follow these recommendations.

ALPINE TRAY. To get the best from this product please follow these recommendations. F I X I N G D E TA I L S ALPINE TRAY The standing seam roofing profile is designed to withstand some of New Zealand s harshest weather in our toughest environments. To get the best from this product please

More information

Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top.

Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top. Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top. 1 2 Content Content 1 2 Roof Sheathing 4 Importance 4 EGGER Roofing Board 5 Benefits 5 Principles of the EGGER Roofing Board

More information

UL Construction No. 254

UL Construction No. 254 UL Construction No. Wind-Uplift - Class 90 (See Item No. ) / Fire Not Investigated Metal Roof Deck Panels* Snap-Clad No. MSG or No. MSG min. thickness coated steel panels. Panels in. wide max., 0 in. wide

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 12, 2017 the Easton 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under

More information

A. Rough carpentry includes but is not limited to the following:

A. Rough carpentry includes but is not limited to the following: SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,

More information

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April Best Barns USA Assembly Book Revised April 28 2015 the Greenbriar 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

FASTENERS BUILDING DEPARTMENT

FASTENERS BUILDING DEPARTMENT FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and

More information

JOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener

More information

BRACING BRACING SECTION 7 SECTION 7

BRACING BRACING SECTION 7 SECTION 7 If we are to learn from the past, it is clear that there is generally a lack of understanding of the purpose of roof bracing and who should be responsible for it. This has led to disputes, claims and,

More information

A Shell construction

A Shell construction A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised June 14, 2017 the Belmont-R Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.

More information

Construction Manual. 1. Delivery Day

Construction Manual. 1. Delivery Day 1. Delivery Day By now you should have the construction site for your new log home prepared for delivery. Your logs will be coming on a large flatbed semi trailer truck that will require you to plan ahead

More information