Project 3: Assembly, programming and commissioning of a production line with Handling station withelectrical drive and magazine and Turning station

Size: px
Start display at page:

Download "Project 3: Assembly, programming and commissioning of a production line with Handling station withelectrical drive and magazine and Turning station"

Transcription

1 Project 3: Assembly, programming and commissioning of a production line with Handling station withelectrical drive and magazine and Turning station Weighting (points out of total) 41/100 time max 360 min Szenario You are responsible for the delivery of a production line purchased by a customer in China to be used in the partial automation of its production process. Task Assemble, wire and tube the production line on the profile plate according to the documentation. Develop a program and commission the production line. Your task is complete when: 1. The production line has been mechanically assembled, correctly wired and connected and its correct operation is guaranteed (based on evaluation using the simulation box). 2. Correct execution of the program with PLC activation (based on evaluation/plc board) is guaranteed. 3. The system meets the specifications (in accordance with the 'Agreement on Professional Practice'). The system will be sent to China as soon as you are finished. You will have no opportunity to make improvements later. WorlSkills Germany Mechatronics Competition

2 Production line layout: Handling station 2 Turning station Initial position: No workpieces at the system Handling Staiton Magazine ejector retracted (Cylinder extended) Gripper unit over magazin, Gripper open, Gripper up Turning Station Conveyor off Stopper extended Gate open Gripper module at slide position and up Gripper open, Gripper is turned clockwise (regarding from the actuator side) turned clockwise WorldSkills Germany Mechatronics Competition

3 Details Turning station: 3 A WorldSkills Germany Mechatronics Competition

4 Conveyor (1), Sensor for checking the orientation (2), Stopper (3), Turning module (4), Slide small (5), Gate (6) Details: Opt.Sensor (2) Stopper (3) and Turning module (4) B Stopper (3) Gate (6) A WorldSkills Germany Mechatronics Competition

5 Turning module: turning unit Gripper Input terminal Output terminal / Valve terminal Swivel - linear cylinder WorldSkills Germany Mechatronics Competition

6 Adjust the stoppers behind the cover Position for sensors WorldSkills Germany Mechatronics Competition

7 Screws to adjust the stoppers (fine-tuning) Lock screws Angle of the orientation sensor WorldSkills Germany Mechatronics Competition

8 Swivel - linear cylinder One cylinder with 3 possibilities. Select the right one for the application swivel linear movement of 90 in a clockwise direction (Fig. 2) swivel linear movement of 90 in an anti clockwise direction (Fig. 3) linear movement (with CLR to CLR 63..., see Fig. 4). Fig. 2 Fig. 3 Fig. 4 F Guide bolt for motion control of the linear and swivel movements 1. Unscrew and remove the guide bolt. 2. The piston rod can then be turned freely to the desired groove. 3. Screw the guide bolt in again. WorldSkills Germany Mechatronics Competition

9 WorldSkills Germany Mechatronics Competition

10 According to the colour and the orieentation the workpiece will be transported to different positions. (A), (B), (C) Separating Turning Position A (Conveyor end) Position B (Slide at Turning module) Position C (Slide small) Red, silver X Red, silver X X black X black X X transparent X transparent X X Control panel Start lamp Start button Stop button Reset lamp Reset button Q1 Q2 Auto Man WorldSkills Germany Mechatronics Competition

11 Motor controller: A1 : move to right side / A2 : move to left side 1, 2 : Motor VCC: 24 V / GND: 0V A3 and I-OUT are not used WorldSkills Germany Mechatronics Competition

12 Wireing of the control panel Additional wireing for extra signals to - X7 (pin 5-8 Input; pin Output) Outputs of the control panel Input oft he control panels WorldSkills Germany Mechatronics Competition

13 Pin allocation for 15-pin Sub-D Valve Terminal PIN Core Colour Coil Output Function 1 White 0 5 Turn gripper anti- clockwise 2 Brown 1 6 Glose gripper Green 2 3 Move gripper unit up 4 Yellow 3 4 Move gripper unit down Brown green 0V 15 White - yellow 0V Pin allocation for 15-pin Sub-D Input Terminal Pin Core Colour M8 plug/ Pin Input Function White 0 / 4 5 Gripper unit is up 2 Brown 1 / 4 6 Gripper unit is down 3 Green 2 / 4 7 Gripper is turned anti-clockwise 4 Yellow 3 / 4 4-CP Gripper is turned clockwise 5 Grey 4 / 4 6-CP Gripper is open 6 Pink 5 / 4 7-CP Gripper is closed 7 Blue 6 / 4 Not used 8 Red 7 / 4 Not used White - green 0-7 / 1 24V DC 14 Brown green 0-7 / 3 0V 15 White - yellow 0-7 / 3 0V CP: Control Panel WorldSkills Germany Mechatronics Competition

14 Wireing of the I/O-Terminal in Turning Station Connector I/O Terminal (IN) Comment 1 signal if: Connector I/O Terminal (OUT) Commen 1 signal set DI 0 Part at belt input DO 0 Conveyor forwards DI 1 Part at optical sensor DO 1 Conveyor backwards DI 2 Part at belt end DO 2 Retract stopper DI 3 Orientation at optical sensor DO 3 Move gripper unit up DI 4 Part at stopper DO 4 Move gripper unit down DI 5 Gripper is up DO 5 Turn gripper anti clockwise DI 6 Gripper is down DO 6 Close gripper DI 7 Gripper is turned anticlockwise DO 7 Glose the gate Wiring of the control console X7 (see also circuit diagram) Anschluss E/A Terminal (IN) Kommentar 1 Signal angeben Anschlusse E/A Terminal (OUT) Kommentar 1 Signal geben DI 0 DO 0 DI 1 DO 1 DI 2 DO 2 DI 3 DO 3 DI 4 Gripper is turned clockwise DO 4 DI 5 DO 5 DI 6 Gripper is open DO 6 DI 7 Gripper is closed DO 7 No changes at the wireing of the Handling station WorldSkills Germany Mechatronics Competition

15 Evaluation sheet Project 3: Assembly, programming and commissioning of a production line with Handling station withelectrical drive and magazine and Turning station Team: Verification of acceptance by experts (names, signatures): _ Time max.: 360 min. Time: Points max.: 41 Description Evaluation Maximum evaluation Function to be checked using simulation box in the Handling station if there is not full function with PLC Done Max points (Output 0 7: Signal 1 or 0) Preparation: Insert a workpiece into the magazine, connect the simulation box to the I/O terminal. (Output 0 7: signal 1 or 0) Open gripper (Out 3: 1) 0,2 Eject workpiece from magazine (Out 4: 1) 0,2 Gripper unit to position magazine (Out 1: 0; Out 0: 1) 0,2 Retract ejecting arm (Out 4: 0) 0,2 Gripper down (Out 2: 1) 0,2 Close gripper (Out 3: 0) 0,2 Gripper up (Out 2: 0) 0,2 Gripper unit to position next station/slide 2 (Out 1: 1; Out 0: 1) 0,2 SimuBox Handling station 1,6 WorldSkills Germany Mechatronics Competition

16 Description Evaluation Maximum evaluation Function to be checked using simulation box in the Turning station if there is not full function with PLC Done Max points (Output 0 7: Signal 1 or 0) Preparation: Put on the belt, connect the simulation box to the I/O terminal. Station in Initial position ((Out 6: 1); (Out 4: 0; Out 3: 1) Transport workpiece to the stopper (Out 0: 1) 0,5 Conveyor of (Out 0: 0) 0,5 Retract stopper (Out 2: 1) 0,5 Move turning module to pick up position (Out 4: 1; Out 3:0) 0,6 Glose gripper (Out 6: 0) 0,5 Move turning module to slide (Out 4: 0; Out 3:1) 0,6 Open Grippper (Out 6: 1) 0,5 Extend stopper (Out 2: 0) 0,5 Put a workpiece on stopper and close the gate (Out 7: 1) 0,6 Transport workpiece tot he small slide (Out 1: 1) 0,6 Open gate (Out 7: 1) 0,5 Conveyor OFF (Out 1: 0) 0,5 SimBox Turnning station 6,4 SimBox total 8,0 WorldSkills Germany Mechatronics Competition

17 Description Evaluation Maximum evaluation Function check with PLC Done Max. Points Preparation: Remove all workpieces from the stations, connect the PLC boards to the I/O terminals and the control panels, switch key to the position AUTO, start the PLCs, no programming cable / WLAN between PC and PLC, valve for air opened, Handling linear drive between sensors, Turning module Gripper at position belt. Function START Signal lamp RED ON ** 0,4 Turning station Lampe Reset AN (Turning Station) Switch key to the position MAN (Turning Station) then signal lamp YELLOW ON ** Press Reset button (Turning Station) then system moves to initial position Lamp Reset OFF if system is in the initial position Switch key to the position AUTO (Turning Station) then lamp START ON (Turning station) Handling station Lamp Reset ON (Handling Station) Switch key to the position MAN (Handling Station) Press Reset button (Handling Station) then system moves to initial position Lamp Reset OFF if system is in the initial position Switch key to the position AUTO (Handling Station) then lamp START ON (Handling station) And signal lampe GREEN flashing with 1 Hz** Put a number of pots (min 6) into the magazine of the Handling station* as instructed by the evaluation team Press the START button (Handling Station) then lamp START OFF (Handling Station) (no movements) Press the START button (Turning station) then Signal lamp GREEN ON ** and lamp START OFF (Turning station) A: Eject workpiece if pickup position empty Transfer pot to the next station 0,6 WorldSkills Germany Mechatronics Competition

18 Partial points 5,2 If workpiece red or silver with hole Done Max. Points If workpiece red or silver with Done Max. Points on top hole down Transport to conveyor end Workpiece stops at stopper If workpiece at conveyor end*** then flashing lamp Q2 with mit 2 Hz (Turning station) Take of the workpiece from the belt by hand, then Q2 OFF Continue automaticaly with A: if the belt is free until the Magazin is empty The turning module pick up the workpiece The turning module turns the workpiece 0,4 The turning module put the workpiece back on the belt The turning module moves to its initial position 0,4 Transport to conveyor end If workpiece at conveyor end*** then flashing lamp Q2 with mit 2 Hz (Turning station) Take of the workpiece from the belt by hand, then Q2 OFF Continue automaticaly with A: if the belt is free until the Magazin is empty 0,4 Partial points 1,3 Partial points 2,9 If workpiece black with hole on top Done Max. Points If workpiece black with hole down Done Max. Points Workpiece stops at stopper Workpiece stops at stopper Glose gate The turning module pick up the workpiece Transport workpiece onto the small slide Continue automaticaly with A: if the belt is free until the Magazin is empty The turning module turns the workpiece 0,4 The turning module put the workpiece back on the belt The turning module moves to its initial position 0,4 Glose gate Transport workpiece onto the small slide Continue automaticaly with A: if the belt is free until the Magazin is empty 0,4 Partial points 1,3 Partial points 2,6 WorldSkills Germany Mechatronics Competition

19 If workpiece transparent with hole Done Max. Points If workpiece transparent with Done Max. Points on top hole down Workpiece stops at stopper Workpiece stops at stopper The turning module pick up the workpiece The turning module put the workpiece onto the slide The turning module moves to its initial position Continue automaticaly with A: if the belt is free until the Magazin is empty The turning module pick up the workpiece 0,4 The turning module turns the workpiece The turning module put the workpiece back on the belt 0,4 The turning module moves to its initial position Continue automaticaly with A: if the belt is free until the Magazin is empty 0,4 0,4 Partial points 1,7 Partial points 2,0 If pot magazine empty Q1 ON (Lamp at Control panel) 0,2 Ejecting arm retraced Gripper stops at basic position if the previous job is finished Lamp Start ON (Handling station) Signal lamp YELLOW flashing with 2 Hz ** Put a pot into magazine n Press the START button (Handling Station) then lamp START OFF (Handling Station) And signal lamp GREEN ON ** And Lamp Q2 OFF 0,2 And Continue with A automatically 0,5 ** At any time only one lamp of the signal column is on Partial points 3,0 PLC board total 20 * Red, black, silver or transparent workpiece will be chosen by the evaluation team. *** Stop at conveyor end max 1 mm WorldSkills Germany Mechatronics Competition

20 Description Evaluation Maximum evaluation Professional practice List of Professional Practice will be checked in samples PP item no. Not fullfiled * -1,0 * -1,0 * -1,0 * -1,0 * -1,0 Professional Practice total 5,0 * Each deviation will result in 1 points being deducted Description Evaluation Maximum evaluation Time evaluation (only if the maximum number of points is achieved for PLC board and simulation box function and at least 6 points for professional practice) Points for time = (max. time actual time) x max. points /(max. time min. time) = ( ) x 8 Points / ( ) 8 Total evaluation Project 3: Description Evaluation Maximum evaluation Points for operation based on simulation box 8 Points for operation based on PLC board 20 Points for professional practice 5 Points for time evaluation 8 Total points 41 WorldSkills Germany Mechatronics Competition

Table of Contents. Lucas Nülle GmbH Page 1/75

Table of Contents. Lucas Nülle GmbH Page 1/75 Table of Contents Table of Contents Automation Technology CIM Computer Integrated Manufacturing CIM 1-2 Individual components used in machining CIM 1 Lathe machine CIM 2 Milling machine CIM 11-23 Examples

More information

APES HD-7700 Version Operator s Training Manual

APES HD-7700 Version Operator s Training Manual APES-14-77 HD-7700 Version Operator s Training Manual Issue A1 09/03 P/N 900599 Performance Design Inc. 2350 East Braniff St. Boise Idaho 83716 This manual contains very important safety information and

More information

Sorting Line with Detection 9V

Sorting Line with Detection 9V 536628 Sorting Line with Detection 9V I2 O8 I1 I3 C1 I5 I6 I4 Not in the picture: O5, O6, O7, O8 Circuit layout for Sorting Line with Detection Terminal no. Function Input/Output 1 color sensor I1 2 phototransistor

More information

Conveyor station. Ruggeveldlaan Deurne tel

Conveyor station. Ruggeveldlaan Deurne tel Conveyor station Introduction and didactic background In the age of knowledge, automation technology is gaining increasing importance as a key division of engineering sciences. As a technical/scientific

More information

Operators Manual (Manual A)

Operators Manual (Manual A) CD201 SINGLE COLUMN CARD DISPENSER Operators Manual (Manual A) Contents A1 Scope... 1 A2 Specifications... 1 A3 Installation... 2 3.1 Unpacking and inspection... 2 3.2 Opening and closing the door... 2

More information

Instruction. Actuator ICAD 600 / ICAD 900 / ICAD 1200 ICAD 600 ICAD 900 ICAD 1200 ICAD 600 ICAD 900. ICAD 1200 Fig. 2. Fig. 4

Instruction. Actuator ICAD 600 / ICAD 900 / ICAD 1200 ICAD 600 ICAD 900 ICAD 1200 ICAD 600 ICAD 900. ICAD 1200 Fig. 2. Fig. 4 Instruction 027R9796 027R9796 Actuator ICAD 600 / ICAD 900 / ICAD 1200 ICAD 600 ICAD 900 ICAD 1200 ICAD 600 ICAD 900 ICAD 1200 Fig. 1 Fig. 2 Note: When mounting the ICAD make sure to push ICAD down to

More information

Operating Manual. for CUTTING, PERFORATING, BENDING SLB120

Operating Manual. for CUTTING, PERFORATING, BENDING SLB120 Operating Manual for CUTTING, PERFORATING, BENDING SLB120 31040\B06eng 0896 0 Contents 1. Scope of delivery... 1 2. Technical specifications... 1 3. Applications... 1 4. Commissioning... 2 5. Cutting...

More information

Screwfeeder Troubleshooting Guide

Screwfeeder Troubleshooting Guide Symptom General Cause Specific Cause Solution Illustration No Screws are being fed to the screwdriver Screw jam in screw delivery tubing Insufficient Screw Blast to deliver screw Adjust Screw Blast Inline

More information

Modular transfer system. PDF- Catalog Modular Transfer System

Modular transfer system. PDF- Catalog Modular Transfer System Modular transfer system PDF- Catalog Modular Transfer System 1 Modular Transfer System TLM 1000 156, route de Lyon 38300 DOMARIN FRANCE Phone (33) 4 37 03 33 55 Fax (33) 4 37 03 33 59 September 2001 edition

More information

linear/swivel clamp CLR Operating instructions e [ ]

linear/swivel clamp CLR Operating instructions e [ ] linear/swivel clamp CLR en Operating instructions 8072624 2017-05e [8072626] Translation of the original instructions CLR-EN Identification of hazards and instructions on how to prevent them: Danger Immediate

More information

A Brief Description of the Testing Station in Festo Modular Production System (MPS)

A Brief Description of the Testing Station in Festo Modular Production System (MPS) A Brief Description of the Testing Station in Festo Modular Production System (MPS) Figure 1 Distribution station (left) and testing station (right) 1 Introduction The purpose of this document is to describe

More information

CHC-400 Capacitive Torch Height Controller

CHC-400 Capacitive Torch Height Controller CHC-400 Capacitive Torch Height Controller www.pure lo gic.ru Contacts: Moscow +7 (495) 505 63 74 Voronezh +7 (473) 204 51 56 149 Office 160, Leninsky avenue Voronezh, Russia, 394033 Monday - Thursday:

More information

WHEN A PLC IS TOO MUCH, AND SPACE FOR

WHEN A PLC IS TOO MUCH, AND SPACE FOR WHEN A PLC IS TOO MUCH, AND SPACE FOR A RELAY SEQUENCE CIRCUIT IS TOO LITTLE Pattern Selector 59 2.33 66 2.6 70 2.75 No programming required Select from among 15 preset patterns Wiring far simpler than

More information

M PREMIUM. Additional Instructions. Neat seam beginning (NSB)

M PREMIUM. Additional Instructions. Neat seam beginning (NSB) 867 867-M PREMIUM Additional Instructions Neat seam beginning (NSB) IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE All rights reserved. Property of Dürkopp Adler AG and protected by copyright.

More information

FLEXRISE2 VERSION. 2 LEG / 2 MOTOR ELECTRIC TABLE BASE (36 to 72 ) **PATENT PENDING**

FLEXRISE2 VERSION. 2 LEG / 2 MOTOR ELECTRIC TABLE BASE (36 to 72 ) **PATENT PENDING** FLEXRISE2 2 LEG / 2 MOTOR ELECTRIC TABLE BASE (36 to 72 ) VERSION A INSTRUCTION MANUAL CONTENTS: FLEX-MU-2L3S-C3672-K4# FEET-ADJ-UNV-2430# **PATENT PENDING** MAX Load 265 lbs (120 KG) Equally Divided MAX

More information

SUNRISE UPGRADE KIT for LAI "SkillTester"

SUNRISE UPGRADE KIT for LAI SkillTester SUNRISE UPGRADE KIT for LAI "SkillTester" This upgrade is designed to suit the early model LAI Skill Tester machines. These machines have a Move Forward and a Move Right button, and no sound effects. The

More information

Sole Fitness E95 Elliptical Trainer TurnKey Delivery and Setup Training

Sole Fitness E95 Elliptical Trainer TurnKey Delivery and Setup Training Sole Fitness E95 Elliptical Trainer TurnKey Delivery and Setup Training Delivery Requirements Ground delivery Inside delivery to customer-specified location Unpack and assemble machine, and remove packing

More information

Actuator ICAD 600A / ICAD 600A-TS / ICAD 1200A

Actuator ICAD 600A / ICAD 600A-TS / ICAD 1200A Installation Guide Actuator ICAD 600A / ICAD 600A-TS / ICAD 1200A 027R9966 ICAD 600A ICAD 600A-TS ICAD 1200A 027R9966 ICAD 600A / ICAD 600A-TS ICAD 1200A Fig. 1 Fig. 2 Note: When mounting the ICAD make

More information

FBX-PA-2AC. Third edition : April No

FBX-PA-2AC. Third edition : April No FBX-PA-2AC Third edition : April 2006 No. 060058 INTRODUCTION Thank you very much for purchasing Kansai Special FBX series. Read and study this Instruction Manual carefully before you start any of the

More information

PARTS LIST: Air Control Assembly (1632 Sander)

PARTS LIST: Air Control Assembly (1632 Sander) PARTS LIST: Air Control Assembly (1632 Sander) 1 6293482 Filter... 1 2 6293483 Solenoid Valve... 1 3 6293484 Brake Cylinder... 1 4 6293485 Multi-Hole Connector... 1 5 6293486 Air Valve... 1 6 6293487 Air

More information

Handling station. Ruggeveldlaan Deurne tel

Handling station. Ruggeveldlaan Deurne tel Handling station Introduction and didactic background In the age of knowledge, automation technology is gaining increasing importance as a key division of engineering sciences. As a technical/scientific

More information

USi Product Presentation. Mayser Ultrasonic Industrial Sensor USi

USi Product Presentation. Mayser Ultrasonic Industrial Sensor USi USi Product Presentation Mayser Ultrasonic Industrial Sensor USi Page 1 Contents Ultrasonic Technology - General technology - Mayser Ultrasonic Technology Ultrasonic Industrial Sensor - Intended use -

More information

Tooling Approving Report

Tooling Approving Report Project Name: Part Name: Tool Name: Tool source: Tool Steel: Resin: Project Number: Part Number: Tool Number: Customer: No of Cavities: Machine Size: CAVITY What is the customer required core hardness?

More information

Torque Sensor Series 3000 and Series 4000

Torque Sensor Series 3000 and Series 4000 Properties Sensorshaft with integrated torque and angle measurement Non-contact measurement system, high robustness Plug & Play solution, no additional electronics required Performance Measurement range

More information

Wing Gate Instructions. Applicable Models: FB1000 / FB3000 FB1200 / FB3200 Version: 1.0 Date: Jun. 2016

Wing Gate Instructions. Applicable Models: FB1000 / FB3000 FB1200 / FB3200 Version: 1.0 Date: Jun. 2016 Wing Gate Instructions Applicable Models: FB1000 / FB3000 FB1200 / FB3200 Version: 1.0 Date: Jun. 2016 Contents Chapter 1 Overview... 2 1.1 Product Model and Appearance... 2 1.2 Features... 3 1.3 Technical

More information

Installers guide Deadbolt 02.

Installers guide Deadbolt 02. Installers guide Deadbolt 02. version 0.7.1 Specifications Model igloohome Smart Deadbolt 02 Material Zinc Alloy Current Rating (Standby) ~30uA Current Rating (Active) ~200mA Batteries 4 x AA Alkaline

More information

SPRINT 5000 BOOKLETMAKER OPERATION MANUAL

SPRINT 5000 BOOKLETMAKER OPERATION MANUAL SPRINT 5000 BOOKLETMAKER OPERATION MANUAL Sprint5000HCS-USA.doc3.doc Page 1 01/05/2002 CONTENTS 1. Introduction. 2 2. Specification. 2 3. Initial setting up. 3 4. Operation. 4 4.1 Loading staples. 5 4.2

More information

Overview of types. Technical data

Overview of types. Technical data echnical data sheet SHA-.. Multifunctional linear actuators for adjusting air dampers and slide valves in ventilation and air-conditioning systems for building services installations For air control dampers

More information

IST-KIT-UR-G Page 1 of 9 KIT-UR-G REVISIONS

IST-KIT-UR-G Page 1 of 9 KIT-UR-G REVISIONS Page 1 of 9 MOUNTING INSTRUCTIONS AND OPERATING MANUAL KIT-UR-G REVISIONS DATE REVISION MAIN CHANGES 2017/10/17 Edition A First release 2017/11/23 Edition B Replaced jaws screws (old VITE-016, new VITE-031)

More information

Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15

Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 ASSIGNMENT 3 CIRCUIT DESIGN TARGET SUBMISSION DATE: NAME: I agree to the assessment as contained in

More information

FIRST Robotics Control System

FIRST Robotics Control System 2018/2019 FIRST Robotics Control System Team 236 1 (click on a component to go to its slide) 2 The Robot Powered solely by 12V battery RoboRIO- is the computer on the robot Controlled by Java code on the

More information

Mould Precision Co., Ltd

Mould Precision Co., Ltd Program Name: Part Name: Tool Name: Tool Source: Tool Steel: Resin: NL9502 314501 MP1425 Mould Precision Co., Ltd Finished Mould Checklist H13 HRC 48-52 ABS HF380(LG Chem) Program No.: Part No.: Tool No.:

More information

DICTATOR RTS Tube Door Closer

DICTATOR RTS Tube Door Closer Tube Door Closer RTS v long DICTATOR RTS Tube Door Closer The "Invisible" Door Closer The DICTATOR RTS tube door closer is built into the door and therefore is as good as invisible. The joint can only

More information

KTM-16/20 TECHNICAL DATA

KTM-16/20 TECHNICAL DATA TECHNICAL DATA Table Diameter : 1,600mm Max. Turning Diameter : 2,000mm Max. Turning Height : 1,750mm Table Indexing Degree : 0.001mm CNC Controller : FANUC 18i-TB ** Bed The bed has symmetrical structure

More information

SICLOCK DCFRS Industrial Version with TTY Interface 2XV9450-1AR21

SICLOCK DCFRS Industrial Version with TTY Interface 2XV9450-1AR21 SICLOCK DCFRS Industrial Version with TTY Interface 2XV9450-1AR21 User Manual Version 1.2 Revision: May 2014 Order No. 2XV9450-1AR48 Contact Person: Orders: local SIEMENS branch local SIEMENS branch Published

More information

MODEL T10815 GRINDING ATTACHMENTS INSTRUCTIONS

MODEL T10815 GRINDING ATTACHMENTS INSTRUCTIONS MODEL T10815 GRINDING ATTACHMENTS INSTRUCTIONS For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Introduction Designed to work exclusively with the

More information

QR12. Output. A = Line Driver B = Line Driver ABZ/ Open Collector UVW C = Sin/Cos/ Line Driver UVW D = Sin/Cos/Open Collector UVW

QR12. Output. A = Line Driver B = Line Driver ABZ/ Open Collector UVW C = Sin/Cos/ Line Driver UVW D = Sin/Cos/Open Collector UVW QR12 DESIGN FEATURES Low profile assembled height of 0.99" Bearing design simplifies encoder attachment Resolutions up to 20,000 lines per revolution SIN/COS outputs available up to 1250 LC 4, 6 or 8 pole

More information

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY. SARGENT Installation Instructions for LP8600 x LR8600 & 12-LP8600 x 12-LR8600 Series Low Profile Panic and Fire Exit Devices on Double Egress & Double Doors or LS8600 & 12-LS8600 Low Profile Exit Device

More information

INMOTION Controls Series INSTALLATION & OPERATION MANUAL. INMOTION Series - INMOTION INMOTION-260. Page: 1/15

INMOTION Controls Series INSTALLATION & OPERATION MANUAL. INMOTION Series - INMOTION INMOTION-260. Page: 1/15 INSTALLATION & OPERATION MANUAL INMOTION Series - INMOTION-220 - INMOTION-260 Page: 1/15 PREFACE This installation & operation manual is intended as an instruction manual for trained persons who are in

More information

JARVIS. Model25CL-4,5,6 Hock Cutter and Loin Dropper. 25CL--5 Front Legs and Horns. 25CL--4 Hind Legs and Horns. 25CL--6 Loins

JARVIS. Model25CL-4,5,6 Hock Cutter and Loin Dropper. 25CL--5 Front Legs and Horns. 25CL--4 Hind Legs and Horns. 25CL--6 Loins Model25CL-4,5,6 Hock Cutter and Loin Dropper 25CL--4 Hind Legs and Horns 25CL--5 Front Legs and Horns 25CL--6 Loins EQUIPMENT SELECTION... Ordering No. TABLE OF CONTENTS... Page 25CL--4... 4025007 25CL--5...

More information

2-JAW SELF-CENTERING RADIAL PNEUMATIC GRIPPER (SERIES PS)

2-JAW SELF-CENTERING RADIAL PNEUMATIC GRIPPER (SERIES PS) PS 2-JAW SELF-CENTERING RADIAL PNEUMATIC GRIPPER (SERIES PS) Double-acting radial motion. The gripping force is constant throughout the entire stroke (from 0 to 90, both opening and closing). Lightweight:

More information

Mould Precision Co., Ltd

Mould Precision Co., Ltd Mould Precision Co., Ltd Program Name: Part Name: Tool Name: Tool source: Tool Steel: Resin: Finished Mould Checklist Program No.: MP15016 NL00326-2G rev04 Part No.: MP15016 Tool No.: MP15016 Customer:

More information

Assembly Instructions Beta Prusa Standard & Deluxe

Assembly Instructions Beta Prusa Standard & Deluxe Assembly Instructions Beta Prusa Standard & Deluxe 3D Printer Version 2.6 Date Page 1 / 67 General data about the assembly instructions for an incomplete machine according to appendix VI of the EG machinery

More information

Arducopter 3DR-B Hardware

Arducopter 3DR-B Hardware Arducopter 3DR-B Thank you for purchasing an Arducopter 3DR kit. The Arducopter 3DR is a stable and supported quadrotor frame in the ongoing development of the Arducopter code on DIYDrones. It features

More information

MICROWAVE MOISTURE SENSOR WITH WIRELESS DATA TRANSMISSION FL-WAPP

MICROWAVE MOISTURE SENSOR WITH WIRELESS DATA TRANSMISSION FL-WAPP - 1 MICROWAVE MOISTURE SENSOR WITH WIRELESS DATA TRANSMISSION FL-WAPP INDEX General Function Description P. 2 Technical Data P. 2 1. Software Installation P. 3 2. System Integration P. 3 2.1 Sensor as

More information

Standard specifications MG15HL*E58

Standard specifications MG15HL*E58 Standard specifications MG15HL*E58 1st Edition : 2nd Edition : January 15, 2018 January 18, 2019 KAWASAKI HEAVY INDUSTRIES, LTD. ROBOT DIVISION Specification : (Arm): * F,G,R,S (Controller): Materials

More information

ABM International, Inc. Navigator Assembly Manual

ABM International, Inc. Navigator Assembly Manual ABM International, Inc. 1 1.0: Parts List Tablet (Qty. 1) Tablet mount (Qty. 1) NOTE: Mount may appear and operate different then image below Control Box (Qty. 1) Motor Power Supply (Qty. 1) 2 X-axis motor

More information

Installing Your Electronic Deadbolt

Installing Your Electronic Deadbolt Ultra Security Plus Electronic Deadbolt Installation Instructions http://www.hberger.com/video-gallery/electronic-deadbolt New Installation Lock Location Preparation (Skip this section if you door has

More information

Diesel Pile Hammer D30-32 Part # 66508

Diesel Pile Hammer D30-32 Part # 66508 Diesel Pile Hammer D30-32 Part # 66508 2 Diesel Pile Hammer D30-32 Part # 66508 Pos Order No Pg Description Qty 66508 Diesel Pile Hammer D30-32 cmpl 1 1 108742 4 Cylinder Lower Part cmpl 1 2 60151 Inner

More information

RADIO ANTI TWO-BLOCK SYSTEM

RADIO ANTI TWO-BLOCK SYSTEM BB-550 TM RADIO ANTI TWO-BLOCK SYSTEM INSTALLATION MANUAL GREER Company 1918 East Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX (714) 259-7626 BB-550 TM Radio Anti Two-Block System PN W250000

More information

In order to do this project you should review the following concepts:

In order to do this project you should review the following concepts: Catapult In order to do this project you should review the following concepts: Catapult 18 Rope Lego Band Rubber Band Catapult: Arm Catapult: Arm Catapult: Arm Leave the other end of the rubber band loose

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Sheet 1 of 5 General: Upon receipt of fixture thoroughly inspect for any freight damage, which should be brought to the attention of the delivery carrier. Compare the catalog description listed on the

More information

J. Base 1 pc. 1 pc. P. Shelf 2 pcs. Gate Leg. 1 pc. Head Cap Bolt 13 pcs. (+1 extra) Cam Lock Screw. Cam Lock. 20 pcs. (+1 extra)

J. Base 1 pc. 1 pc. P. Shelf 2 pcs. Gate Leg. 1 pc. Head Cap Bolt 13 pcs. (+1 extra) Cam Lock Screw. Cam Lock. 20 pcs. (+1 extra) 88 5023 95C Kitchen Island with Breakfast Bar IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or other damages occuring to the

More information

TA2. series. Industrial Motion. Product Segments

TA2. series. Industrial Motion. Product Segments Product Segments Industrial Motion TiMOTION s TA2 linear actuator is compact, robust and fully sealed. This linear actuator is perfect for use in small spaces where force or capability cannot be sacrificed.

More information

KKS Circular Sawing Machines

KKS Circular Sawing Machines If Steel is Your Deal! KKS Circular Sawing www.kaltenbach.com 1 The complete KALTENBACH program for metal processing 2 www.kaltenbach.com 3 The Economical One Applications: locksmith s shop, metal construction,

More information

MBM Sprint 3000 Booklet Maker

MBM Sprint 3000 Booklet Maker MBM Sprint 3000 Booklet Maker Instruction Manual Provided By http://www.mybinding.com http://www.mybindingblog.com SPRINT 3000 BOOKLETMAKER OPERATION MANUAL IMP oper3500.doc Page 1 23/01/2004 CONTENTS

More information

Technical data. Your advantages

Technical data. Your advantages Technical data Nominal torque: 50 Nm to 2.000 Nm, bidirectional Rotational speed: 10.000 rpm Accuracy: ±0,2 % Temperature range: -40 C to +85 C Protection class: IP50, IP65 Output signals: 0-10 V/4-20

More information

DP-8 H. H. MØRCH. Instructions. Contents of the packing. Spatial requirements. Mounting the bush

DP-8 H. H. MØRCH. Instructions. Contents of the packing. Spatial requirements. Mounting the bush DP-8 Instructions H. H. MØRCH Contents of the packing In the packing of the tonearm you will find the arm base in which the bearings are encapsulated in a heavy body. This is the link between the moveable

More information

Vinyl Cutter Instruction Manual

Vinyl Cutter Instruction Manual Vinyl Cutter Instruction Manual 1 Product Inventory Inventory Here is a list of items you will receive with your vinyl cutter: Product components (Fig.1-4): 1x Cutter head unit complete with motor, plastic

More information

Operating Instructions and Parts Manual. 10 x 16 Horizontal Band Saw Models J-7020, J-7040

Operating Instructions and Parts Manual. 10 x 16 Horizontal Band Saw Models J-7020, J-7040 Operating Instructions and Parts Manual 10 x 16 Horizontal Band Saw Models J-7020, J-7040 JET 427 New Sanford Road LaVergne, Tennessee 37086 Part No. M-414472 Ph.: 800-274-6848 Revision C2 03/2014 www.jettools.com

More information

ICM/ICAD Motorized Valve. Quick Start Guide. Installation, Programming, and Trouble-shooting REFRIGERATION & AIR-CONDITIONING

ICM/ICAD Motorized Valve. Quick Start Guide. Installation, Programming, and Trouble-shooting REFRIGERATION & AIR-CONDITIONING Installation, Programming, and Trouble-shooting REFRIGERATION & AIR-CONDITIONING Quick Start Guide Contents Page Installation...............................................................................................3

More information

Standard PS-P61 Punch Stapler

Standard PS-P61 Punch Stapler Standard PS-P61 Punch Stapler Instruction Manual Provided By http://www.mybinding.com http://www.mybindingblog.com PUNCH STAPLE PS-P61 Important Information - This manual is designed to help you to install,

More information

White Quail Auto Trap

White Quail Auto Trap White Quail Auto Trap WARNING SAFETY, STORAGE & USE IF THE MAIN SPRING IS ATTACHED AND THE TRAP ARM IS IN THE 6 O CLOCK POSITION, THE TRAP IS ARMED AND EXTREME CAUTION IS REQUIRED. TO DISARM, TURN THE

More information

Closet Wall Drawer Unit

Closet Wall Drawer Unit 88 5531 751 Closet Wall Drawer Unit A. B. C. Shelf D. E. F. For assembly see instructions in carton 88 5531 752. 88 5531 752 Closet Wall Drawer Unit G. H. I. Plinth M. Bottom L. N. 2 pc. J. K. O. Drawer

More information

Automatic Fastener Feeding Systems

Automatic Fastener Feeding Systems Automatic Fastener Feeding Systems Automatic Fastener Feeding Systems The Improvement of productivity and quality has been the driving force in the development of the CP Desoutter range of fastener feeding

More information

OPERATION AND MAINTENANCE HANDBOOK D407270XA

OPERATION AND MAINTENANCE HANDBOOK D407270XA OPERATION AND MAINTENANCE HANDBOOK D407270XA vers. 1.0 Thank you for choosing one of Silca s high quality key cutting machines. This machine has been designed, tested and produced in our factory using

More information

Exercise 10. Linear Slides EXERCISE OBJECTIVE

Exercise 10. Linear Slides EXERCISE OBJECTIVE Exercise 10 Linear Slides EXERCISE OBJECTIVE In this exercise, you will learn to use a linear slide. You will learn how to use the Linear Slide, Model 5209, to extend the work envelope of the Servo Robot.

More information

Capacitive Torch Height Controller. CHC-200E Instruction

Capacitive Torch Height Controller. CHC-200E Instruction HYD CNC Technology CO.,LTD Tel:+86 755 26625800 Fax:+86 755 26729960 www.hydcnc.com Capacitive Torch Height Controller CHC-200E Instruction (Revision 2011) SAFETY: Please read this manual fully before

More information

AutoSeal FD 2006IL / FE 2006IL

AutoSeal FD 2006IL / FE 2006IL AutoSeal FD 2006IL / FE 2006IL FI / FJ Series 06/2018 OPERATOR MANUAL First Edition TABLE OF CONTENTS DESCRIPTION 1 SPECIFICATIONS 1 UNPACKING 1 SETUP 2 Sealer Alignment Base Setup 2 Sealer Setup 2-4

More information

FD 2002IL AutoSeal System

FD 2002IL AutoSeal System FD 2002IL AutoSeal System 4/2017 OPERATOR MANUAL FIRST EDITION TABLE OF CONTENTS DESCRIPTION 1 SPECIFICATIONS 1 UNPACKING 1 SETUP 2 Sealer Alignment Base Setup 2 Sealer Setup 2-4 Printer Alignment Base

More information

Hydraulic Clamping Systems

Hydraulic Clamping Systems Hydraulic Clamping Systems Hydraulic Swivel clamps, double action Operating pressure max. 250 bar Hydraulic swivel clamps are particularly designed for applications which require high clamping forces and

More information

Servo Robot Training Systems

Servo Robot Training Systems Servo Robot Training Systems LabVolt Series Datasheet Festo Didactic en 220 V - 50 Hz 07/2018 Table of Contents General Description 2 Robot Controller Module 3 Servo Robot Software 3 Location Pins 4 Included

More information

Electrical data Nominal voltage AC/DC 24 V Nominal voltage frequency

Electrical data Nominal voltage AC/DC 24 V Nominal voltage frequency echnical data sheet LH24A-00 Communicative linear actuator adjusting dampers and slide valves in technical building installations Air damper size up to approx. m² Actuating force 50 N Nominal voltage AC/DC

More information

AutoSeal FD 1506 Plus / FE 1506 Plus

AutoSeal FD 1506 Plus / FE 1506 Plus AutoSeal FD 1506 Plus / FE 1506 Plus FK / FL SERIES 06/2018 OPERATOR MANUAL FIRST EDITION TABLE OF CONTENTS DESCRIPTION 1 UNPACKING AND SET-UP 2 CONTROL PANEL 3 OPERATION 3 FOLD PLATE ADJUSTMENT 4 SETTING

More information

Disc Gap Control DGC-2. Technical Manual

Disc Gap Control DGC-2. Technical Manual GB Disc Gap Control DGC-2 Technical Manual Contents Introduction Electronic unit... 1 Tracer valve... 1 Technical data... 2 Component layout... 4 Functions, electronic unit Stepper motor operation...

More information

Parts. Backplate. Battery Cover. Backup Key. Touchscreen Assembly. Inside Assembly. Thumbturn. Strike. Reinforcement Plate. Bolt.

Parts. Backplate. Battery Cover. Backup Key. Touchscreen Assembly. Inside Assembly. Thumbturn. Strike. Reinforcement Plate. Bolt. Quick Start Guide Backplate Backup Key Battery Cover Touchscreen Assembly Parts Strike Bolt Inside Assembly Thumbturn Reinforcement Plate Set Screw Reinforcement Screws Inside Assembly Screw Backplate

More information

ALFRA PRESS. Made in Germany by ALFRA

ALFRA PRESS. Made in Germany by ALFRA 52 ALFRA PRESS Made in Germany by ALFRA 53 ALFRA PRESS Overview ALFRA PRESS AP 250 ALFRA PRESS AP 400 Page 56 Page 58 Control cabinet housing, control cabinet doors, mounting plates Control cabinet housing,

More information

NEWS Part. N /0 MINITEC NEWS

NEWS Part. N /0 MINITEC NEWS NEWS 2009 Part. N 95.0423/0 MINITEC NEWS 2009 1 TABLE OF CONTENT INTRODUCTION CONTENTS 3 END CAP Z WITH HAMMER TAPS 3 END CAP 45X45 VA 4 ANGLE 25 GD-Z 4 ANGLE 45X90 GD-Z 5 ANGLE 90 GD-Z 5 HINGE 19 S 6

More information

meped v2 Assembly Manual

meped v2 Assembly Manual meped v Assembly Manual The meped is an open source quadruped robot designed by Scott Pierce of Spierce Technologies, LLC. This design is released under the Creative Commons, By Attribution, Share Alike

More information

M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL. West Springfield, MA Phone: (866) FAX: (413)

M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL.   West Springfield, MA Phone: (866) FAX: (413) M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL Troy Industries, Inc. WWW.TROYIND.COM West Springfield, MA 01089 Phone: (866) 788-6412 FAX: (413) 383-0339 Thank You M14/M1A MODULAR CHASSIS SYSTEM

More information

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual Legacy Woodworking Machinery a division of Phantom Engineering The Legacy CNC Assembly Manual New Orientation of the Legacy Step one: Re-orientation of the machine Remove the X-axis screw and supports.

More information

Model No: TC10. Parts Information: Tyre Changer - Automatic

Model No: TC10. Parts Information: Tyre Changer - Automatic Page 1 of 11 1 TC10.01 BODY 2 TC10.02 COLUMN 3 TC10.03 HORIZONTAL ARM ASS'Y 4 TC10.04 WASHER 5 TC10.05 RUBBER FOOT 6 TC10.06 COVER 7 TC10.07 SCREW M14x42 8 TC10.08 PRESS COVER 9 TC10.09 STOP-UP 10 TC10.10

More information

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase v1.0 ASSEMBLY GUIDE Mia Wide Bookcase Components Upon unpacking your bookcase from it s delivery box, you should have the pieces shown. Follow the steps on the next pages to assemble your new bookcase.

More information

Series 7000 Torque Sensor for PTO-shafts

Series 7000 Torque Sensor for PTO-shafts Properties PTO (Power Take-Off) shaft with integrated torque and angle measurement Non-contact measurement system, high robustness Special for PTO shafts 1 ¾ und 1 3/8 Plug & Play solution, no additional

More information

M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL. West Springfield, MA Phone: (866) FAX: (413)

M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL.  West Springfield, MA Phone: (866) FAX: (413) M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL Troy Industries, Inc. WWW.TROYIND.COM West Springfield, MA 01089 Phone: (866) 788-6412 FAX: (413) 383-0339 Thank You M14/M1A MODULAR CHASSIS SYSTEM

More information

FBX1104P FBX1104 FBX1106P FBX1106

FBX1104P FBX1104 FBX1106P FBX1106 FBX1104P FBX1104 FBX1106P FBX1106 Second edition : September 2004 No. 040037 INTRODUCTION Thank you for your purchasing Kansai Special's FBX Series. Read and study this instruction manual carefully before

More information

25 TONNE HYDRAULIC PRESS MODEL NO: AHP 26

25 TONNE HYDRAULIC PRESS MODEL NO: AHP 26 WARNING: Read these instructions before using the machine 25 TONNE HYDRAULIC PRESS MODEL NO: AHP 26 PART NO: 7615115 OPERATION & MAINTENANCE INSTRUCTIONS LS1211 INTRODUCTION Thank you for purchasing this

More information

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems FABA Conductor Bar System Installation Instructions Publication #FABA-03 3/1/04 Part Number: 005-1062 Copyright 2004 Electromotive Systems 1S 100 Z Installation Instructions Contents: Basic Diagram - -

More information

TRC EV DR TRC EV DR TRC EV

TRC EV DR TRC EV DR TRC EV DR-TRC103-EV Evaluation Kit User s Guide DR TRC103 868 EV DR TRC103 915 EV DR TRC103 950 EV DR-TRC103-EV User s Guide (2015/04/17) Page 1 of 11 www.murata.com Introduction The DR TRC103 series evaluation

More information

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil 4 Level Phillips

More information

Single Channel Loop Detector

Single Channel Loop Detector Single Channel Loop Detector Model LD120T Series The LD120T is a series of single channel inductive loop detectors. The use of microprocessor and surface mount technology enables a large number of functions

More information

R-EVO MANUAL. English

R-EVO MANUAL. English R-EVO MANUAL English 1 ENGLISH VERSION Adjusting the holster for your revolver With versatility, refined design, high quality, elegance and resistance - R-EVO, the new GR Holster for revolvers, supplies

More information

Actuator LA12 PRODUCT DATA SHEET

Actuator LA12 PRODUCT DATA SHEET PRODUCT DATA SHEET Actuator LA12 Thanks to its small size and outstanding performance, the actuator LA12 provides a practical and cost-effective alternative to small-scale traditional hydraulic and pneumatic

More information

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C) Follow the instructions below to replace the reciprocator in the SWF Compact series machines. The tools required can be found in the tool kit that came with the machine. Preparation 1. First, place the

More information

Top spin Nr /

Top spin Nr / Top spin Nr. 1840 0000 / 1840 1000 Bedienungsanleitung 21-6680 28052014 / A Made in Germany Ideas for dental technology Top spin Nr. 1840 0000 / 1840 1000 Contents 1. Introduction...2 1.1 Symbols...2 2.

More information

5-Axis Machine Tools from SMW-AUTOBLOK

5-Axis Machine Tools from SMW-AUTOBLOK 5-Axis Machine Tools from SMW-AUTOBLOK 5-Axis Machine Tools ensures the following advantages: Ideal suitable for OP 10 use ST5-2G also suitable for OP 20 use Jaws with SinterGrip clamping inserts for clamping

More information

AutoSeal FD 2002/FD 2032 FE 2002/FE 2032 OPERATOR MANUAL FIRST EDITION

AutoSeal FD 2002/FD 2032 FE 2002/FE 2032 OPERATOR MANUAL FIRST EDITION AutoSeal FD 2002/FD 2032 FE 2002/FE 2032 10/2012 OPERATOR MANUAL FIRST EDITION TABLE OF CONTENTS SUBJECT PAGE DESCRIPTION 1 SPECIFICATIONS 1 UNPACKING 2 2000/2032 Components 2 Optional Conveyor Components

More information

Assembly Guide for Printrbot - Simple Maker s Edition 1405

Assembly Guide for Printrbot - Simple Maker s Edition 1405 Assembly Guide for Printrbot - Simple Maker s Edition 1405 Last update: March 2016 Please Note: be careful on the steps that are underlined 1 Contents Tools Needed:... 3 First step: Check components and

More information

CNC Punching Machine Holecut 40-9 Professional

CNC Punching Machine Holecut 40-9 Professional CNC Punching Machine Holecut 40-9 Professional CNC Punching Machine Holecut 40-9 Professional All EHRT punching machines in the Holecut Professional Line feature three CNC controlled axes. They are designed

More information

Pressure Vessel Assembly Instructions

Pressure Vessel Assembly Instructions Pressure Vessel Assembly Instructions 1) Measure aluminum tube outer diameter 2) Machine both end caps and only drill pilot holes for all hoes shown 3) Weld both end caps onto the aluminum tube and be

More information