1 An Innovative Prefabricated Steel Structure System De Ming (Derry) Yu, Project Director, New World China Land Co. Ltd.
2 Table of Contents 1. Main Problems in Current Steel Structure Connections & Our Proposal 2. Origins of Tenon-mortise Joint & the Seismic Performance of Timber Structure 3. Proposal for a New Prefabricated Steel Structural System 4. Application Example for Temporary Structure-Hoarding 5. Conclusions 6. Issues to be further explored and studied
3 1. Main Problems in Current Steel Structure Connections & Our Proposal 1.1 Problems for High Strength Bolt Connection For high strength bolt connection, each joint may need to drill dozens or even hundreds of bolt holes on the members to be connected and the connecting plates in advance, it s very time-consuming and costly. Errors usually will occur for steel members during fabrication, and sometimes it will result in the difficult connection on site due to the accumulated errors from different components and fabrication processes. Manual fixing for bolts are required, For fixing each bolt, three working procedures may be needed: that is, temporary fixing, initial and final tightening, which will greatly increases on-site workingload and cost.
4 1.2 Problems for Welding Connection Onsite For welding connection onsite, usually pre-heating will be required prior to welding in case of thick plate or low environmental temperature, which will increases the onsite workingload and cost; Onsite welding also will be easily affected by welder s experience and proficiency, welding procedure and environment such as weather condition and welding position etc., it will lead to the difficulty for ensuring good quality for on-site welding. Extensive welding onsite will be very time consuming and risky.
5 1.3 Our Proposal Innovative Prefabricated Steel Structure System improved from tenon-mortise joint of timber structure; Possess sound structural safety & excellent seismic performance; Realize simplified & standardized modular fabrication for steel members & connections; Realize rapid No-bolt No-welding installation onsite; Significantly reduce construction time (20~30%) and cost;
6 2. Origins of Tenon-mortise Joint & the Seismic Performance of Timber Structure 2.1 Origins of Tenon-mortise Joint The Hemudu Site located in Yuyao City of eastern China belongs to Neolithic Age of more than 7,000 years ago, since the archaeological excavation from 1973, a lot of timber tenons and mortises had been found in the site, it means the Tenon-mortise joint had already been skillfully mastered and widely adopted to build dwellings at that time. Reference: GAO D.F., ZHAO H.T. & XUE J.Y. (2008). Study on Chinese Ancient Timber Structure and its Seismic Performance. (in Chinese) Beijing: China Science Press. Tenons and Mortises Found in the Hemudu Site
7 2.2 Seismic Performance of Existing Ancient Timber Structures in China The Yingxian Timber Tower constructed in 1056 is located in Shanxi Province of China. The 67.31m high tower is octagonal in plane with bottom diameter 30.27m, it is still intact after suffered many strong earthquakes including more than 10 earthquakes with Seismic Intensity over 5-degree. Yingxian Timber Tower - Shanxi The Hall of Supreme Harmony - Beijing The Hall of Supreme Harmony is located within the Forbidden City of Beijing, China. It was firstly completed in 1420 and then reconstructed after suffered several fires, the current one was constructed in It is 26.92m high, 64m long and 37m wide with total area 2377m 2. It had suffered 7 times of strong earthquakes with Seismic Intensity over 6-degree since No damage occurred even if under a 8-degree earthquake with epicenter only 45km away in 1679.
8 2.2 Seismic Performance of Existing Ancient Timber Structures in China Shoulder Tenon-Mortise Dovetail Tenon-Mortise These 2 existing acient timber structures had clearly proved the structural safety and excellent seismic performance of timber structures. One of the most important factors is the Tenon-mortise connection (see figures in the left) had been adopted as the joints, and furthermore due to the light weight, good ductility and strong energy dissipation capacity of timber material, plus the deformation and frictional sliding between tenons and mortises could balance, absorb and ultimately dissipate the seismic energy such that to secure the structural safety and integrity. Of course, based on the fundamental concepts of current seismic design theory, timber structures with Tenon-mortise joint need to be further improved, such as how to secure strong joint weak components when the tenon s nodes section is weakened compared with the corresponding component, and how to minimize floor vibration, control deformation etc.
9 3. Proposal for A New Prefabricated Steel Structural System Proposed Steel Structure System Mainly Includes: -Column ; Main-Secondary Beam Connection; Connection Between Steel Beam and Concrete Wall & Column; Energy Dissipation Type Rebar Brace; Non-structural Tie-column & Tie-beam Connection;
10 3.1 Beam-Column Horizontal Stiffener Fixing Plate Horizontal Stiffener Upper Steel Column Beam-Column Lower Steel Column Disassembled Components for a Beam-Column Joint Fixing Plate Vertical Stiffener Shear Key End Elevation Horizontal Stiffener Horizontal Stiffener Inner stiffeners inside Box-section Sleeve
11 3.1 Beam-Column Beam-Column Longitudinal Section A A B B Rebar Brace Fixing Plate with slot hole C-Section Sleeve Insert Fixing Plate with V-Shape Ends into the Notches of C-section Sleeve to lock the in position Section A-A Fixing Plate Fixing Key Elevation of the and Section B-B
12 3.1 Beam-Column (Video ) Beam-Column Step 1 Step 2 Step 3 Step 4 Lower Steel Column Upper Steel Column Fixing Plate Optional Measure Thickness<3mm Adopting steel cleat to fine-tune column position if necessary; Applying structural steel adhesive on the contact surfaces to enhance the seismic resistance & ductility of the connection; Installation Sequence of a Beam-Column Joint
13 3.2 Main-Secondary Beam Connection-Type A: Dovetail Type A Dovetail Tenon Connecting Plate Secondary Beam Main-Secondary Beam Disassembled Components for a Main- Secondary Beam Joint Using Dovetail Mortise Connecting Plate (Type A ) A 3D Perspective View Dovetail Groove with Leaning Angle on the connection plate to prevent slipping of the connecting Secondary Beam Secondary Beam Section A-A
14 3.2 Main-Secondary Beam Connection-Type A: Dovetail Type Secondary Beam A Plan Secondary Beam Main-Secondary Beam A Connection between & Secondary Beams Using Dovetail Mortise Connecting Plate (Type A) Main-Secondary Beam Secondary Beam Secondary Beam Vertical Stiffeners Main-Secondary Beam Vertical Stiffeners Section A-A Dovetail Tenon Connecting Plate (For same main & secondary beam depth ) Dovetail Groove Connecting Plate Dovetail Tenon Connecting Plate (For different main & secondary beam depth ) Dovetail Groove Connecting Plate
15 3.2 Main-Secondary Beam Connection-Type A: Dovetail Type Cantilever Edge Beam Positioning Steel End Plate Edge Beam Cantilever Beam Edge Beam A A Positioning Steel End Plate Main-Secondary Beam Edge Beam Cantilever Beam Cantilever Beam 3D Perspective View Main-Secondary Beam Plan Connection between Cantilever Beam & Secondary Beams Using Dovetail Mortise Connecting Plate (Type A) Section A-A Positioning Steel End Plate
16 3.2 Main-Secondary Beam Connection-Type A: Dovetail Type(Video ) Secondary Beam Secondary Beam Main-Secondary Beam Shear Studs Main-Secondary Beam Step 1 Step 2 Installation Sequence of Secondary Beam to Using Dovetail Mortise Connecting Plate (Type A)
17 3.2 Main-Secondary Beam Connection-Type B: Sleeve Type Secondary Beam Notches at Both Top & Bottom Flanges of the C-section Sleeve Secondary Beam Main-Secondary Beam Section A-A A A 3D Perspective View Secondary Beam Fixing Plate Main-Secondary Beam Secondary Beam Fixing Plate C-section Sleeve for Main Beam to connect with Secondary Beam Insert Fixing Plate with V-Shape Ends into the Notches of C-section Sleeve to Lock the Secondary Beam in Position Disassembled Components for a Main-Secondary Beam Joint Using C-section Sleeve (Type B)
18 3.2 Main-Secondary Beam Connection-Type B: Sleeve Type Main-Secondary Beam Secondary Beam A Plan Connection between & Secondary Beams Using C-section Sleeve (Type B) A Secondary Beam Secondary Beam Main-Secondary Beam Main-Secondary Beam Section A-A Vertical Stiffeners Vertical Stiffeners Secondary Beam (For same main & secondary beam depth ) Secondary Beam (For different main & secondary beam depth )
19 3.2 Main-Secondary Beam Connection-Type B: Sleeve Type Cantilever Cantilever Beam Plan Edge Beam Main-Secondary Beam A Positioning Steel End Plate A Edge Beam Edge Beam Positioning Steel End Plate Cantilever Beam Main-Secondary Beam 3D Perspective View Cantilever Beam Section A-A Positioning Steel End Plate Secondary Beam Fixing Plate Edge Beam Connection between Cantilever and Secondary Beams Using C-section Sleeve (Type B)
20 3.2 Main-Secondary Beam Connection-Type B: Sleeve Type(Video ) Secondary Beam Secondary Beam Fixing Plate Secondary Beam Main-Secondary Beam Installation Sequence of Secondary Beam to Using C-section Sleeve (Type B) Shear Studs Main-Secondary Beam Step 1 Step 2 Step 3
21 3.3 Connection between Steel Beam & RC Core Wall/Column For Composite Structure Type A Dovetail Type Connection 3D View Type B Sleeve Type Connection 3D View RC Wall/Column Anchor Bars Type A Connection Elevation Steel Embed Plate RC Wall/Column Steel Embed Plate Steel End Plate Steel Beam Steel Connection Sleeve Steel Beam Anchor Bars Fixing Key Type B Connection Elevation
22 3.4 Energy Dissipation Type Rebar Brace & Connection to the Beam-column Joint Energy Dissipation Coupler High Strength Rebar Brace Energy Dissipation Type Rebar Brace High Strength Rebar Brace Put the hooks of the 2 rebar rods into the slot hole of the rebar brace fixing plates which are pre-welded at the corners of beam-column connection sleeve in factory. The energy dissipation coupler could adopt either rod type viscous damper or low-yield high-ductility soft steel. Common high strength rebar (Grade HRB500 in Chinese) has ultimate tensile strength over 630MPA. For a single 50mm diameter rebar, the ultimate tensile resistance can be over 1230kN. The hot rolled steel bar Grade PSB1080 produced in China has ultimate tensile strength over 1230MPa. For a single 50mm diameter rebar, the ultimate tensile resistance can be over 12400kN. If necessary, numbers of high strength rebar can be bundled to form the brace.
23 3.4 Energy Dissipation Type Rebar Brace & Connection to the Beam-column Joint Rebar Brace Fixing Plate High Strength Rebar Brace Rebar Brace Fixing Plate Rebar Brace Fixing Plate High Strength Rebar Brace Rebar Brace Fixing Plate Rebar Brace Fixing Plate High Strength Rebar Brace Typical Rebar Brace Application Cases Rebar Brace Fixing Plate
24 3.5 Column Base Connection Pinned End Fixed End Traditional Column Base connection detail to be Adopted Column Base
25 3.6 Non-structural Tie Column Connection-H Section (Video ) Tie Column Fixing Keys Steel Beam H-section Tie Column Installation Sequence for H-section Tie Column (Type A) Step 1 Step 2
26 3.6 Non-structural Tie Column Connection-Channel Section (Video ) Tie Column Fixing Keys Steel Beam Channel-section Tie Column Insert Steel Cleat into the Gap between Tie Column Web & Fixing Key to Enhance the Fixing Step 1 Step 2 Installation Sequence for Channel-section Tie Column (Type B)
27 3.7 Non-structural Tie Beam Connection-H Section (Video ) H-section Tie Beam Tie Beam Fixing Keys Steel Column Installation Sequence for H-section Tie Beam (Type A) Step 1 Step 2
28 3.7 Non-structural Tie Beam Connection-T Section (Video ) T-section Tie Beam Tie Beam Fixing Keys Steel Column Installation Sequence for T-section Tie Beam (Type B)
29 3.8 Extended Application to RC Structures Cast-in Steel Strip for Fixing Shear Stud Cast-in Rebar Steel Embed Plate at the Top of Beam Tip Precast RC Beam Cast-in Rebar Fixing Key Welded on the Bottom of Steel Embed Cast-in Rebar Precast RC Beam Cast-in Steel Strip for Fixing Shear Stud Cast-in Rebar Beam Tip Top Plan Precast RC Beam 3D Perspective View Steel Embed Plate at the Bottom of Beam Tip Detail of a Precast RC Beam Tip Beam Tip Bottom Plan
30 3.8 Extended Application to RC Structures Precast RC Column Fixing Groove at the Surface of Steel Embed Plate to Enhance the interlocking Steel Embed Plate at the Column Tip Steel Embed Plate Cast-in Rebar Groove at the Surface of Steel Embed Plate Steel Embed Plate at Column Tip Cast-in Rebar Fixing Groove at the Surface of Steel Embed Plate 3D Perspective View Precast RC Column Tip Section Detail of a Precast RC Column Tip Precast RC Column Tip Elevation
31 3.9 Extended Application to Timer Structures Timber Beam Timber Beam 3D Perspective View Steel or Timber Shear Key Fixed by Flat Head Bolt / Steel Nail Flat Steel Bolt / Steel Nail Flat Head Bolt / Steel Nail Steel or Timber Shear Key Fixed by Flat Head Bolt / Steel Nail Steel or Timber Shear Key Fixed by Flat Head Bolt / Steel Nail Beam End Elevation Beam End Bottom Plan Timber Beam Detail of a Timber Beam Tip
32 4. Application Example for Temporary Structure-Hoarding (Video ) An attempt for practical application Traditional Hoarding CTBUH Comparison for Constructing a 400m Long Hoarding (Site Area 10,000m 2 ) Required Steel Tonnage Proposed Hoarding Equivalent Steel Cost Each Time Cost for Repeated Use 3 Times Required Time for Installation Saving Time Traditional Method 220 ton 0.55 ton/m USD418,000 USD1,900/ton Proposed Method 256 ton 0.64 ton/m (+16%) USD486,400 USD1,900/ton & Steel Cost 1 If the Hoarding could be repeatedly used for 3 Times, the cost for Each Time will be 39% of traditional one; 2 The installation time for a 3-span 7.2m length hoarding is 2.5 hours, saving 40~50% time compared with traditional one; N/A USD162,133 (=USD486,400/3) 150 Days 90Days 0-60 Days (-40%) USD255,867 (-61%)
33 5. Conclusions 1. To solve the problems in current steel structures connection, by adopting connection joints similar to but improved from Tenon-mortise joint of ancient timber structure with enhanced seismic performance, an innovative prefabricated steel structure system is proposed; 2. The most attractive feature of this system is: all of the structural members and connection joints could be easily fabricated in factory with secured good quality; simple & fast Nobolt No-welding Installation onsite could be realized efficiently; 3. Less fabrication process, shorter construction period could help to push energy conservation & emissions reduction, and expedite green construction and more sustainable building industry; 4. Through standard design, modularized fabrication and simplified installation, increasing labor shortage & soaring construction cost could be relieved, and eventually facilitate the industrialization & popularization for prefabricated structures;
34 6. Issues to be Further Explored and Studied 1. To conduct more theoretical studies & simulations for the connection joint and the overall structure system for further improving the details; 2. To conduct static & dynamic tests for the connection joints & different structural models, to verify the structural behaviors including deformation characteristics, failure process & seismic performance etc.; 3. To push both fabricators and steel-casting factories to adopt high-speed, high precision and intelligent Numerical Control machining technology and BIM technology, so as to upgrade fabrication efficiency & accuracy; 4. To develop low-cost, high temperature resistant structural steel adhesive, so as to avoid the thermal and oxidative decomposition of conventional steel adhesive under fire, and further enhance the overall energy dissipation capacity by applying it to the joints; 5. To develop efficient & stable 3D printing technology for steel, so as to further improve the prefabrication quality for connection sleeves and complex joints;
35 Granted Patents: Applied Patents: 1 Prefabricated Structural System PRC Patent No Granted on 2018/03/30 2 Prefabricated Steel Tie Column and Tie Beam Members for Steel Structure System PRC Patent No Granted on 2018/02/27 3 Prefabricated Brace for Steel Structure System PRC Patent No Granted on 2018/02/27 4 Prefabricated Structural System HK Patent No. HK Granted on 2018/08/24 Applicant: New World China Land Limited 9/F, New World Tower 1 18 Queen's Road Central Hong Kong, China 1 Prefabricated Structural System and Assembling Method Thereof PRC Application No Submitted on 2017/02/24 US Application No.15/ Submitted on 2018/02/23 EU Application No Submitted on 2018/02/22 Japan Application No Submitted on 2018/02/23 2 Prefabricated Steel Beam Connection with RC Wall or Column PRC Application No Submitted on 2018/03/26 Inventors: YU, De Ming Derry LU, Wenjie Michael KONG, Kam Ching Ivan derryyu@nwcl.com.hk michaellu@nwcl.com.hk ivankong@nwcl.com.hk
36 THANK YOU! 谢谢! Q & A
CONNECTIONS FOR CONTINUOUS FRAMING IN PRECAST CONCRETE STRUCTURES
CONNECTIONS FOR CONTINUOUS FRAMING IN PRECAST CONCRETE STRUCTURES G.Krummel PEIKKO GmbH, Waldeck, Germany Abstract Connections for continuous framing in precast concrete structures have been a problem
More informationFlanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND
Flanged Dowel Box INDUSTRIAL SLAB ON GROUND Designed for construction joints in Post Tension or large shrinkage specifications Large lateral movement and expansion capacity Eliminates the need to drill
More informationTECHNICAL MANUAL. TERADOWEL and ULTRADOWEL. Reliable Dowel System for Floor Joints
TECHNICAL MANUAL TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Version: PEIKKO GROUP 11/2018 TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Dowels manufactured from high
More informationModule 10 : Improvement of rock mass responses. Content
IMPROVEMENT OF ROCK MASS RESPONSES Content 10.1 INTRODUCTION 10.2 ROCK REINFORCEMENT Rock bolts, dowels and anchors 10.3 ROCK BOLTING MECHANICS Suspension theory Beam building theory Keying theory 10.4
More informationButt Two pieces of wood meeting with flat sides adjoining usually at right angles. Some type of connector is needed to prevent movement.
Wood Connections There are basically five different types of connectors: Interlocking (carpentry joints), Dowel, Metal Connectors, Special Formed Connectors and Adhesives. I Interlocking (Carpentry Joints)
More informationKeywords: Bracing bracket connection, local deformation, selective pallet racks, shear stiffness, spine bracings.
Send Orders for Reprints to reprints@benthamscience.ae The Open Construction and Building Technology Journal, 2015, 9, 1-6 1 Open Access Investigation of Shear Stiffness of Spine Bracing Systems in Selective
More informationBEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs
Working with Concrete Slabs When working with concrete slabs the barrier protection can be erected in three ways - with socket bases, adjustable slab edge brackets and multi slab clamps. Socket Bases 1
More informationMeva Guided Screens MGS Technical Instruction Manual
Meva Guided Screens MGS Technical Instruction Manual Product Characteristics: The MEVA Guided Screens (MGS) system encloses complete floors especially in high-rise construction independent of the height
More informationMoment Resisting Connections for Load Bearing Walls
PRECAST: MOMENT RESISTING CONNECTIONS Moment Resisting Connections for Load Bearing Walls Manish Khandelwal Sr. Structural Engineer, Building Structures, Sweco India Private Limited Design philosophy for
More informationNX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP
6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE
More informationDowel-type fasteners. Timber Connections. Academic resources. Introduction. Deferent types of dowel-type fasteners. Version 1
Academic resources Timber Connections Dowel-type fasteners Version 1 This unit covers the following topics: Deferent types of dowel-type fasteners Introduction There are four criteria designers should
More information1. Enumerate the most commonly used engineering materials and state some important properties and their engineering applications.
Code No: R05310305 Set No. 1 III B.Tech I Semester Regular Examinations, November 2008 DESIGN OF MACHINE MEMBERS-I ( Common to Mechanical Engineering and Production Engineering) Time: 3 hours Max Marks:
More informationHow to Use the Jahn Forming System
How to Use the Jahn Forming System 1. Preparation Gang drilling the plywood is the only preparation required. Holes need to be drilled 1/8" larger than the snap tie head. Normally, a 5/8" diameter drill
More information1. In the Y direction: to the vertical axis of the wall (middle of the wall)
Installation of TENLOC Panel Connectors Precast Factory Installation of the TENLOC The is placed into the reinforcement of the wall and attached to the mold with nails. The wall thickness must be minimum
More informationSWAY BRACE PIPE ATTACHMENT FIG. 010
Function: Designed for bracing pipe against sway and seismic disturbance. The pipe attachment component of a sway brace system used in conjunction with a PHD Manufacturing structural attachment fitting,
More informationProducts for fixing to Steelwork and Decking
Products 8.0 Beam Clamp - Single Support 8.1 Universal Joint for any variable Angle Adjustment 8.2 Beam Clamp TCS for Header Rails 8.3 Beam Clip for Cross Support/ Dimensioning of Bolts 8.4 Beam Clip for
More informationMX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP
6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE
More informationSimotec. 13.i
Products: Framo 80 13.0 Products: Framo 80 13.1 Products: Structural Elements 100/120 13.2 Products: Pipe Shoes 13.3 Framo 80: Beam Section and Screw 13.4 Framo 80: Cantilever Bracket and End Support STA
More informationA Shell construction
A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill
More informationBolt Material Types and Grades 1- Bolts made of carbon steel and alloy steel: 4.6, 4.8, 5.6, 5.8, 6.8, 8.8, 10.9 Nuts made of carbon steel and alloy
Bolt Material Types and Grades 1- Bolts made of carbon steel and alloy steel: 4.6, 4.8, 5.6, 5.8, 6.8, 8.8, 10.9 Nuts made of carbon steel and alloy steel: 4, 5, 6, 8, 10, 12 2- Bolts made of stainless
More informationNX7 SERIES 5-1/2 HANDRAIL
STORAGE & HANDLING The handrails are shipped unassembled. Upon receipt, immediately check all material for any damage that may have occurred in transit and verify that all of the items and quantities are
More informationDesign of structural connections for precast concrete buildings
BE2008 Encontro Nacional Betão Estrutural 2008 Guimarães 5, 6, 7 de Novembro de 2008 Design of structural connections for precast concrete buildings Björn Engström 1 ABSTRACT A proper design of structural
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH
ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH RAFTER PREPERATION RAFTER PREPARATION A FRAME PREPERATION AND ASSEMBLY A FRAME PREPARATION AND ASSEMBLY... Open boxes, remove
More informationCIC 200 PLASTIC SCREW ANCHOR ASSORTMENT WITH PHILLIPS BINDING HEAD METAL SCREWS. 6 x 3/4 P/N x 1 METAL SCREW P/N x 3/4 METAL SCREW
A21-1 1160 CIC 200 PLASTIC SCREW ANCHOR ASSORTMENT WITH PHILLIPS BINDING HEAD S For light duty applications in solid materials Color coded diameters for easy identifi cation Acid resistant NYLON FLANGED:
More informationPrecision Folding Technology
Precision Folding Technology Industrial Origami, Inc. Summary Nearly every manufacturing process has experienced dramatic improvements in accuracy and productivity as well as declining cost over the last
More informationPlate 60 ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND. Plate 60 AmourMate. Joint Edge Protection
Plate 60 AmourMate Plate 60 ArmourMate INDUSTRIAL SLAB ON GROUND Accommodates large concrete shrinkage Facilities thermal movement Prevents spalling on construction joints Extends the life-cycle of the
More informationTECHNICAL MANUAL. OPTIMAJOINT Free Movement Joint. Free Movement Joint System for Heavy Traffic
TECHNICAL MANUAL OPTIMAJOINT Free Movement Joint Free Movement Joint System for Heavy Traffic Version: PEIKKO GROUP 12/2018 OPTIMAJOINT Free Movement Joint Free Movement Joint System for heavy traffic
More information² TL Beton-StB 07 = German technical conditions for construction materials for concrete road pavements
Introduction A transverse joint frequently crossed by heavy goods traffic tends to form steps if it not perfectly doweled. This is associated with negative effects on ride comfort and driving safety as
More informationProduct Guide Specification
HALFEN USA Inc. March 2012 8521 FM 1976 P.O. Box 547 Converse, TX 78109 Toll Free 800-423-9140 Fax 888-277-1695 Website www.halfenusa.com E-mail info@halfenusa.com Product Guide Specification Specifier
More informationSection COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.
PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under
More informationOVERVIEW You are installing 2 Major components: SITE PREP Remove organics
OVERVIEW You are installing 2 Major components: Dimensionally stable exterior frame with pre-drilled thread-bar holes. High yield thread-bar in a predetermined grid pattern (slab) and a heavy concentration
More informationThe General Principles of Detailed Design at Ruukki Construction Ltd. Julia Piiroinen
The General Principles of Detailed Design at Ruukki Construction Ltd 1. The feasibilities of production at the workshops 2. Hot-rolled I-profile 2.1. Stiffeners 2.2. End plates 2.3. Lifting 3. Welded I-profile
More informationBuilding Constructed with Round Mortise and Tenon Joints from Salvage Materials and Small Diameter Timber
Building Constructed with Round Mortise and Tenon Joints from Salvage Materials and Small Diameter Timber by Carl A. Eckelnam Eva Haviarova Robert Leavitt Huseyin Akcey Department of Forestry and Natural
More informationCE2045-PREFABRICATED STRUCTURES QUESTION BANK
CE2045-PREFABRICATED STRUCTURES QUESTION BANK UNIT I - INTRODUCTION PART A 1. Define prefabrication 2. What are the types of prefabricates based on i. Plan area ii Based on weight 3. What are the types
More informationSection 914. JOINT AND WATERPROOFING MATERIALS
914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.
More informationNotes. Modifications and constructional corrections arising particularly from technological development excepted.
Notes Our service staff and application en gineers will be pleased to offer you their assistance to answer your questions or to work out in cooperation with you specific solutions with the aid of our own
More informationStrong, lightweight composite structural I -Beam.
Strong, lightweight composite structural I -Beam. This Installation Guide has been prepared as a source of information to provide general guidance to consultants and in no way replaces the services of
More informationPANEL CRIB PIERS AND TOWERS
CHAPTER 17 PANEL CRIB PIERS AND TOWERS Panel crib piers are made of trusses with panels set horizontally or vertically and are normally braced with transoms, sway bracing, rakers, bracing frames, and tie
More informationPRECAST CONCRETE STRUCTURES
PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and
More informationHyper ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND
Hyper ArmourMate INDUSTRIAL SLAB ON GROUND Full system edge protection Prevents concrete spalling at construction joints High FF and FL tolerances Extends the life-cycle of the floor and the asset Provides
More informationThread protection accessories are installed at the MODIX production factory and delivered with couplers.
Installation of MODIX Rebar Coupler Identification of the product The type of MODIX Rebar Coupler can be identified by the marking on the product. Size of the Coupler can be identified also according to
More informationInnovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz
Innovative composite dowel for steel concrete composite bridges Neil Westmacott, Wolfram Schwarz At a glance Cost effective alternative to prestressed bridge girders Introduction New to Australia although
More informationBolts and Set Screws Are they interchangeable?
1903191HA Bolts and Set Screws Are they interchangeable? Prof. Saman Fernando Centre for Sustainable Infrastructure SUT Introduction: This technical note discusses the definitions, standards and variations
More informationSystem 3000 specifications
System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be
More informationFixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i
Fixings & Fastenings Bright Zinc Plated, Galvanised & Stainless Steel Lockinex ea i, ea u i INTRODUCTION The Lockinex Range of Fixings & Fastenings are manufactured in Bright Zinc Plate, Hot dipped galvanised
More informationDTU Animal Cart Programme
DTU Animal Cart Programme TECHNICAL 25 LIGHT STEEL AND WOOD DONKEY CART RELEASE Development Technology Unit, Department of Engineering, University of Warwick, Coventry, CV4 7AL UK, tel: +44 (0)203 523523
More information3.1 General Provisions
WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationExperience the Hi-Lite Advantage
Experience the Hi-Lite Advantage 12K Aluminum Shoring System INTRODUCTION The 12K Shoring System is primarily a hand-set system. It can also be handled with a crane, and may also be used quite successfully
More informationPUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG
PUSH-PULL-PROPS and accessories MOUNTING TECHNOLOGY ROBUSTA-GAUKEL GMBH &CO.KG MOUNTING TECHNOLOGY PUSH-PULL-PROPS AND ACCESSORIES INDEX General information...................... 3 Push-pull-prop Type
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationSteel Strong-Wall Shearwall Installations
Steel Strong-Wall Shearwall Installations Connector Training for Contractors Series Name: (800) 999-5099 www.strongtie.com Industry Terms Steel Strong-Wall Every day we work hard to earn your business,
More informationKhathij Industrial Fasteners
Dear Sir/Madam, Khathij Industrial Fasteners This is Saqubar Sadique representing 'KHATHIJ INDUSTRIAL FASTENERS' from Chennai, India. We 'Khathij industrial fasteners' like to introduce us as a Stockist
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationPRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)
More informationJoshua Woodsman
CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you
More informationTwo basic types of single
Designing with Single Plate Connections M. Thomas Ferrell M. Thomas Ferrell is president of Ferrell Engineering, Inc., of Birmingham, AL. He is a member of the AISC Committee on Manuals and Textbooks,
More informationREVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION
INSTALLATION INSTRUCTIONS Service Doors, Counter Service Doors & Grilles REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION GENERAL NOTES: Instructions are intended for qualified door mechanics
More informationRIVETING Rivet types Solid rivets Solid rivets are used less and less. They have been replaced in many cases by welding or bonding.
10.1 Rivet types 10.1.1 Solid rivets Solid rivets are used less and less. They have been replaced in many cases by welding or bonding. Because of the large countersinking angle of 140 flat countersunk
More informationSegmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring
Building Manual for F P McCann `Smoothbore Shaft Linings with EPDM Gaskets (rev 04) (To be read in conjunction with the Segmental Shaft and Tunnel Safety Data Sheet) Segmental ring types provided by F
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationBracket guide. LK Pipe Pole. LK Radiator fixture Uni
Bracket guide LK Radiator fixture Uni LK Radiator fixture Uni c/c 40 (Article no. 481 43 92) LK Radiator fixture Uni c/c 50 (Article no. 481 44 03) LK Pipe Pole (Article no. 481 43 91, 481 43 90) Used
More informationRlGIDITY AND STRENGTH OF WALL FRAMES BRACED WlTH METAL STRAPPING
RlGIDITY AND STRENGTH OF WALL FRAMES BRACED WlTH METAL STRAPPING information Reviewed and Reaffirmed March 1955 No. R1603 UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE FOREST PRODUCTS LABORATORY
More informationPlease do not open this exam until you are told to do so.
Seat # Name a General examination rules: 1) Do not put your completed work anywhere that it can be seen. If any part of your work can be seen by others it will be confiscated and you will not be permitted
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationHeat-Mechanics Interaction Behavior of Laminated Rubber Bearings under Large and Cyclic Lateral Deformation
October 2-7, 28, Beijing, China Heat-Mechanics Interaction Behavior of Laminated Rubber Bearings under Large and Cyclic Lateral Deformation E. Takaoka, Y. Takenaka 2, A. Kondo 3, M. Hikita 4 H. Kitamura
More informationKOLO SHELTER Installation Instructions Parts List
Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14
More informationCURTAIN WALL OPTIONS UNITIZED CURTAIN WALL
CURTAIN WALL OPTIONS UNITIZED CURTAIN WALL Is a type of frame-supporting curtain wall consisting of framing components and panel materials. Such framing components and panel materials are assembled into
More informationSTEEL PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports
More informationALUMINUM PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy
More informationGared Pro-S Portable Backstop
Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION
More informationConnections in CLT Assemblies
Creating forest sector solutions www.fpinnovations.ca Connections in CLT Assemblies Cross Laminated Timber Symposium Vancouver, BC February 8-9, 2011 M. Mohammad Building Systems Wood Products Division
More informationEquilibrium. Conference Table. Installation Instruction. Revision B 11/07/16
Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete
More informationJVI Vector Connector
The JVI Vector Connector User Guidelines 1 of 11 INTRODUCTION JVI designed the Vector Connector for use as shear and alignment connections between precast concrete elements such as double-tee flanges,
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationCOLUMN 11/2013 LINEAR STRUCTURAL ELEMENT
11/2013 LINEAR STRUCTURAL ELEMENT OÜ TMB Element produces linear structural elements with the product name column in conformity with the standard EVS-EN 13225 Precast concrete products. Linear structural
More informationMECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA
MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA 7/16 PETRARCH ARCHITECTURAL WALL PANELS APPLIED OVER A STUDWALL BY MEANS OF A FIELD ASSEMBLED BACK FASTENED SYSTEM DESIGN CONCEPT 7/16 panels may be installed
More information1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"
More informationSTRUCTURAL PERFORMANCE OF DOU-GONG BRACKETS OF YINGXIAN WOOD PAGODA UNDER VERTICAL LOADING
STRUTURAL PERFORMANE OF DOU-GONG BRAKETS OF YINGXIAN WOOD PAGODA UNDER VERTIAL LOADING Enchun Zhu 1, Zhiyong hen 2, Jinglong Pan 3, Frank Lam 4 ABSTRAT: Yingxian Wood Pagoda, built in 1056, is located
More informationALUMIDI. Concealed beam hanger with and without holes Aluminum alloy tridimensional perforated plate ALUMIDI - 01 CERTIFIED STEEL-ALUMINUM
ALUMIDI Concealed beam hanger with and without holes Aluminum alloy tridimensional perforated plate CERTIFIED Available with and without holes. The 2200 mm model is also certified FIELD OF USE Timber-to-Timber
More informationDevelopment of Wooden Portal Frame Structures with Improved Columns
Development of Wooden Portal Frame Structures with Improved Columns by Dr. Masahiro Noguchi Post Doctoral Fellow Tokyo Institute of Technology, Yokohama, Kanagawa, Japan Prof. dr. Kohei Komatsu Professor
More information1. Show the following information with additional information necessary to indicate shop compliance with the requirements of this section.
SECTION 12360 LIBRARY SHELVING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 06100 - Carpentry. 2. 09200 - Metal Studs, Lath, Suspension Ceiling, Plaster and Stucco. 3. 09660 - Resilient Tile Flooring.
More informationAUXILIARY FRAMING AND ACCESSORIES
CUSTOM CABINETS & RACKS STRUT AND ACCESSO- RIES JUNCTION KITS ANGLE AND BRACE KITS SPLICE KITS BRACE KITS INSTALLATION KITS WALL ANGLE KITS RUBBER END CAPS SUPPORT INSTALLATION AND SUPPORT KITS STANCHION
More informationOpen shipping crate and separate all of the different parts. Over The Top Shelters LLC
ASSEMBLY INSTRUCTIONS FOR MODEL SH122110GN and SH122110GY Open shipping crate and separate all of the different parts. Count each part and match up with parts list. Shortages or damaged parts should be
More informationItem # Thanks for shopping with Improvements!
Thanks for shopping with Improvements! Hampshire -Door Cabinet Item #5505 To order, call -800-64- West Chester, OH 45069 Made in China PR-6 If you have questions regarding this product, call -800-64- Mon.-Fri.
More informationMount to the Wall INSTALLATION MANUAL
Mount to the Wall 15 Locate the Wooden Studs This step applies to wooden stud wall installation only. Determine and mark the exact locations of two stud centers on the wall. Wooden studs should be spaced
More informationInstallation Instructions
Installation Instructions For Models: Model Number / Description File Name 1540 Classic Series P-Lam Toilet Partitions 1540.pdf 1 INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET PARTITIONS 1540 Classic
More informationSTAKS. Crossover Casegoods ASSEMBLY INSTRUCTIONS
STAKS Crossover Casegoods ASSEMBLY INSTRUCTIONS Installation Sequence 1. Wall Panels a. Connector Kit Part Identification 3 b. T - 3 Panel Connection Preparation 4 c. X Panel Connection Preparation 5 d.
More informationAnswer Power Beam and Boundary Screen
Answer Power Beam and Boundary Screen 5/16 MAGNETIC 3/8 If you have a problem, question, or request, call your local dealer, or Steelcase Line 1 at 888.STEELCASE (888.783.3522) for immediate action by
More informationAeon AcousticPro UHD Series
Aeon AcousticPro UHD Series EDGE FREE Fixed Frame Sound Transparent Projection Screen User s Guide Product Description: The Aeon AcousticPro UHD Series is a fixed frame projection screen that uses Elite
More informationBaby Grande or Grande Crank Shade with Cables and Housing Installation Instructions
Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit Screwdriver (Flat & Phillips) Measuring Tape Pencil 4 Level Plumb Line ¼ Masonry
More informationInternational Journal of Advanced Engineering and Management Research Vol. 2 Issue 2, 2017
International Journal of Advanced Engineering and Management Research Vol. 2 Issue 2, 2017 www.ijaemr.com ISSN: 2456-3676 VERTICAL SUPPORT DESIGN AND STRENGTH ANALYSIS OF LARGE DIAMETER HIGH PRESSURE VESSEL
More informationBC-SERIES Screw-Jack Pedestal for Creative Design. Specifications text. Menu. Page 1/7
Specifications text BC Series Screwjack Pedestal 3rd Generation Menu Introduction of the BC series 1 Pedestal 1.1 Head 1.2 Base 2 Sleeve 3 Tabs 4 Lock 5 Slope corrector PH5 6 Slope corrector BC-PH5 7 Reverse
More informationPERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE
MAGNETIC PRODUCTS FOR PRECASTING PERFORM WITH PRECISION CONCRETE CONSTRUCTION SOLUTIONS BROCHURE Form Magnets ON/OFF MAGNETS Strong adhesion and shear capacity -650# to 2500# adhesion Easy to turn on or
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More information(50 FT FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" 8-0" 6-0" Truss Depth. 3" sheets 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.
Column truss connection (See details sheets 3 & 4 of 10) \ Span (Odd number of panels) \ Span (Even number of panels) Back truss chord Top truss chord \ Truss Chord splice Truss depth (See details \ Left
More informationfischer NEW The installation-friendly nylon toggle plug for high loads in gypsum plasterboard.
fischer DUOtec NEW The installation-friendly nylon toggle plug for high loads in gypsum plasterboard. fischer DUOTEC. The intelligent combination for high loads in gypsum plasterboard. Due to its unique
More informationCAM SYSTEM. Eccentric self-locking clamping devices. Set. CAM SYSTEM t. CAM SYSTEM t. Set. CAM SYSTEM s pag CAM SYSTEM s pag.
Eccentric self-locking CAM SYSEM Set CAM SYSEM t pag. 12 CAM SYSEM t pag. 126 Set CAM SYSEM s pag. 127 CAM SYSEM s pag. 128 EDGE CLAMP pag. 130 123 CAM-SYSEM eccentric self-locking he CAM SYSEM has been