1 CONNECTIONS FOR CONTINUOUS FRAMING IN PRECAST CONCRETE STRUCTURES G.Krummel PEIKKO GmbH, Waldeck, Germany Abstract Connections for continuous framing in precast concrete structures have been a problem almost impossible to solve. A frame system is more economical in comparison with to the standard system for precast concrete elements, consisting of a rigid column to foundation connection and a jointed beam to column connection. But the rigid beam to column connection was difficult and expensive to realise. Therefore an easy and economical bolt system has been developed. This system allows a fast assembling of the column to the foundation and a fast assembling of the beam to the column, independent of weather conditions. The roots of this system are in Scandinavia / Finland. 1. Introduction The economical aspect and the details of precast concrete frames have been researched and tested in the ELECON [1] project. The most common ways of rigid column to foundation and column to beam connections in Europe have been compared with a bolt system to screw the precast concrete elements together. Two bolted rigid frame systems were studied to clarify how big material savings can be obtained. Finally the assembling time of the different frame types was compared. The static calculations have been proceeded according to ENV 1992, the anchoring of the headed bolts is calculated according to concrete capacity (cc-designing). 1233
2 2. Bolt based frame system 2.1 Column-foundation connection Details The common ways for rigid column anchorage have been socket bases and grout sleeve bases. Figure 1: Socket foundation Figure 2: Grout sleeve base These systems are expensive and costly. The socket requires a deep foundation. The column is fixed by wedges during assembling time and might need a support (tall columns). The grout- sleeve base carries the loads by overlapping in the foundation and has to be supported during assembling time until the grouting is hardened. The bolted connection consists of the following parts: 1. Anchor bolts (base bolts), which are placed to right position before casting. 2. Column shoes, which transmit forces from the column to the anchor bolts. There can be 4 shoes in every corner and shoes in the middle, too. The shoes are placed entirely inside the column thus the formwork can be done easily. 3. After the column has been erected and the anchor bolts are tightened, the gap between column and foundation is grouted with non shrinkage mortar. 1234
3 Figure 3: Bolted column foundation connection The connection is also suitable for column to column joints Load transfer The column shoes transmit the loads normally by overlapping with the longitudinal reinforcement of the column. The load transfer after grouting can be calculated according to ENV The compression force is taken by the mortar and the bolts, the tensile force from the bending moment is taken by the bolts. The stiffness of the joint depends on the size of the cross section and the diameter of the bolts. The shear force can be taken by the bolts, the concrete section or an extra shear dowel. During assembling time all loads can be taken by the bolts. The anchoring of the bolts depends on the dimensions of the foundation. Anchor bolts with headed studs can be calculated according the German approval (HPM/L, PPM/L anchor bolts) or a truss and tie model. Other anchorings like overlapping etc. according ENV 1992 are also possible (HPM/P, PPM/P anchor bolts). A special software to calculate the load transfer and the anchoring is available. Figure 4: Column shoe Figure 5: HPM/L anchor bolt 1235
4 2.1.3 Assembling A levelling plate is adjusted in the right level on the foundation. The lower nuts are screwed under the right level, the column is screwed with the upper nuts in the right direction. After that the lower nuts are tightened to the base plate of the column shoe. It is a rigid connection already during assembling state and no extra support for the column is needed. Finally the gap between the foundation and the column is grouted with an non shrinkage mortar. 2.2 Beam to Column connection Details The connection between column and beam was basically realised by welding joints or grout sleeves. Both systems are difficult during assembling time and can be very expensive. The bolted joint consists of the following parts 1. Anchor bolts with or without muffs cast in the column 2. Beam shoes cast in the beam (similar like column shoes) 3. Corbel for shear force- if required 4. Niches on the columns face and the end of the beam for shearforces 5. After the beam has been erected and the anchor bolts are tightened, the gap between column and beam is grouted with non shrinkage mortar. Figure 6: Bolted connection Three different connections are mainly used: 1236
5 Connection between a column and a precast beam: Figure 7: The beam is screwed to the column, the beam shoes can have a long hole. The top connection is realised by bolts with muffs or couplers. Connection between a column and a half precast beam: Figure 8: The beam is screwed to the column, the upper connection is realised by couplers and are casted in situ, depending on the floor system (f.e. filigran floor system). 1237
6 Connection between column and precast top beam Figure 9: The top beam is assembled in the same way as the column to column or column to foundation connection. The bars of the column shoes can be bent according to the structure of the top beam Load transfer The beam shoes carrying the normal forces by overlapping with the longitudinal beam reinforcement. The bolts are screwed with the beam shoes and transfer the loads inside the column. The shear forces are normally taken by corbels, depending on loads. Niches in the column and in the beam are also possible to take shear forces after grouting with non shrinkage mortar. The anchoring is mainly calculated to ENV 1992 (f.e. overlapping, anchor plate). The usage of headed studs for anchoring the tensile forces has been tested. Mainly it can be calculated according to cc- method and the tie and truss model Assembling A levelling plate is adjusted in the right level on the corbel. The beam is seated on the levelling plate, the nuts are tightened. The gap and the niches are casted with non shrinkage mortar. 3. Economical aspects When the elements have been screwed together, the connection is rigid and need not to be braced. The assembling is independent of weather conditions. The hardening time of the grout is not critical. The erection time of two one storey high frames (bolted system and socket foundation) has been compared [1], 35% savings of assembling time are possible to reach with a bolted column foundation connection in comparison with a socket foundation. 1238
7 The assembling time for the bolted system to fix a beam rigidly to a column is much shorter than the welding joints or the grouted sleeves. The erection is independent of weather conditions, the system is rigid during assembly time. The material savings for a frame system have been tested and researched [1]. The amounts of concrete and steel can be reduced by up to 30% with a rigid frame system in comparison with the common system with hinged beam to column connections. The material saving starts with the foundation. The quantity of topsoil which has to be removed is smaller in comparison with to the socket foundation, the length of the column can be shorter. The rigid beam to column connection reduces the bending moment for the column foundation connection in comparison with the hinged joint. 4. Conclusion Bolted rigid frame systems for precast concrete elements offer an economical and fast are more than an alternative to the common connections for precast concrete elements. These systems allow an easy and economical assembling for rigid column to foundation and rigid column to beam connections. The assembling advantages for steel constructions are translated to precast reinforced concrete constructions. 5. References 1. ELECON project: Research project for bolted connections (Bolt based connection for precast frames) 1996, Tampere University of Technology 2. Deutsches Institut für Bautechnik (DIBt), Berlin 1997: Bemessungsverfahren für Teräspeikko Ankerbolzen HPM/L 3. Technical data PEIKKO GmbH 1239
Look Our New Technology
1. PRECAST WALL CONNECTORS Tunel Pey Khazar PSK Wall Nail are precast wall connectors designed for tension splicing. The structural connection between precast wall and other concrete element is achieved
More informationMoment Resisting Connections for Load Bearing Walls
PRECAST: MOMENT RESISTING CONNECTIONS Moment Resisting Connections for Load Bearing Walls Manish Khandelwal Sr. Structural Engineer, Building Structures, Sweco India Private Limited Design philosophy for
More informationIJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online): 2321-0613 Comparative Study between Precast and Cast In-Situ Structure Under Combination of Dynamic
More informationThread protection accessories are installed at the MODIX production factory and delivered with couplers.
Installation of MODIX Rebar Coupler Identification of the product The type of MODIX Rebar Coupler can be identified by the marking on the product. Size of the Coupler can be identified also according to
More informationErstantie 2, FIN Villähde Tel , Fax
www.anstar.eu 2 www.anstar.eu 3 CONTENTS Page 1 PRODUCT DESCRIPTION...4 2 MATERIALS AND STRUCTURE...4 2.1 PRODUCT RANGE...4 2.2 MATERIALS...4 2.3 MANUFACTURING...4 2.4 MANUFACTURING TOLERANCES...4 2.5
More information1. In the Y direction: to the vertical axis of the wall (middle of the wall)
Installation of TENLOC Panel Connectors Precast Factory Installation of the TENLOC The is placed into the reinforcement of the wall and attached to the mold with nails. The wall thickness must be minimum
More informationTECHNICAL MANUAL. HPM Rebar Anchor Bolt Easy and Fast Bolted Connections
TECHNICAL MANUAL HPM Rebar Anchor Bolt Easy and Fast Bolted Connections Version: PEIKKO GROUP 01/2015 HPM Anchor Bolt For bolted connections System benefits Standardized and approved rebar anchor bolt
More informationDesign of structural connections for precast concrete buildings
BE2008 Encontro Nacional Betão Estrutural 2008 Guimarães 5, 6, 7 de Novembro de 2008 Design of structural connections for precast concrete buildings Björn Engström 1 ABSTRACT A proper design of structural
More informationCOLUMN 11/2013 LINEAR STRUCTURAL ELEMENT
11/2013 LINEAR STRUCTURAL ELEMENT OÜ TMB Element produces linear structural elements with the product name column in conformity with the standard EVS-EN 13225 Precast concrete products. Linear structural
More informationModule 10 : Improvement of rock mass responses. Content
IMPROVEMENT OF ROCK MASS RESPONSES Content 10.1 INTRODUCTION 10.2 ROCK REINFORCEMENT Rock bolts, dowels and anchors 10.3 ROCK BOLTING MECHANICS Suspension theory Beam building theory Keying theory 10.4
More informationTECHNICAL MANUAL. TERADOWEL and ULTRADOWEL. Reliable Dowel System for Floor Joints
TECHNICAL MANUAL TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Version: PEIKKO GROUP 11/2018 TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Dowels manufactured from high
More informationALP-C Anchor Bolts User Manual 2
2 ALP-C Anchor Bolts Revision 12/2017 3 TABLE OF CONTENTS 1 ALP-C ANCHOR BOLTS... 4 2 BOLT APPLICATIONS... 4 2.1 Heavy-duty concrete element frames of industrial buildings... 4 2.2 Composite column and
More informationTECHNICAL MANUAL. OPTIMAJOINT Free Movement Joint. Free Movement Joint System for Heavy Traffic
TECHNICAL MANUAL OPTIMAJOINT Free Movement Joint Free Movement Joint System for Heavy Traffic Version: PEIKKO GROUP 12/2018 OPTIMAJOINT Free Movement Joint Free Movement Joint System for heavy traffic
More informationA Shell construction
A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill
More informationInstallation Instructions
Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationHALFEN COLUMN SHOE HCC 09-E CONCRETE
HALFEN COLUMN SHOE HCC 09-E CONCRETE HALFEN COLUMN SHOE SYSTEM Introduction The better solution for connecting precast columns HALFEN HCC column shoe combined with HALFEN HAB Anchor bolts HCC Column shoe
More informationPRECAST CONCRETE STRUCTURES
PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and
More information1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"
More informationconcrete Apolo MEA Befestigungssysteme GmbH Industriestraße Aichach DEUTSCHLAND Apolo MEA Befestigungssysteme GmbH, Plant2 Germany
European Technical Assessment ETA-09/0373 of 1 June 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationPUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG
PUSH-PULL-PROPS and accessories MOUNTING TECHNOLOGY ROBUSTA-GAUKEL GMBH &CO.KG MOUNTING TECHNOLOGY PUSH-PULL-PROPS AND ACCESSORIES INDEX General information...................... 3 Push-pull-prop Type
More informationAn Innovative Prefabricated Steel Structure System. De Ming (Derry) Yu, Project Director, New World China Land Co. Ltd.
An Innovative Prefabricated Steel Structure System De Ming (Derry) Yu, Project Director, New World China Land Co. Ltd. Table of Contents 1. Main Problems in Current Steel Structure Connections & Our Proposal
More informationCI/SfB (29) Et6. October Lockable Dowels For Temporary Movement Joints
CI/SfB (29) Et6 October 2011 Lockable Dowels For Temporary Movement Joints Ancon Lockable Dowels Contents Advantages and Applications 2-3 Range of Lockable Dowels 4-5 Performance Data 6 Edge Distance and
More informationStandard 25 Wide Structure
Standard 25 Wide Structure Truss Arch Style 2 piece 12ft c/c typical Arch Depth 12 Webbing Diameter 1/2 1 run straight 2 runs straight Wind Brace - up to 120 8 Wind Brace - up to 192 12 Wind Brace - over
More informationInternational Version CI/SfB (29) Et6. June MBT Mechanically- Bolted Couplers for the Construction Industry
International Version CI/SfB (29) Et6 June 2015 MBT Mechanically- Bolted Couplers for the Construction Industry Reinforcing Bar Couplers Simplify the design and construction of concrete Lapped joints are
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationSimotec. 13.i
Products: Framo 80 13.0 Products: Framo 80 13.1 Products: Structural Elements 100/120 13.2 Products: Pipe Shoes 13.3 Framo 80: Beam Section and Screw 13.4 Framo 80: Cantilever Bracket and End Support STA
More informationEuropean Technical ETA-17/0513 Assessment of 27 October 2017 General Part
European Technical Assessment ETA-17/0513 of 27 October 2017 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationHALFEN Anchor channel HTA / Special screw HS
DECLARATION OF PERFORMANCE HALFEN Anchor channel HTA / Special screw HS CONF-DOP_HTA 02/16-E No. H01-09/0339 1. 2. 3. 4. 5. 6. 7. 8. Unique identification code of the HALFEN Anchor channel HTA / HALFEN
More informationCast-in Ferrule Connections Load/Displacement Characteristics in Shear
Cast-in Ferrule Connections Load/Displacement Characteristics in Shear Ian Ferrier 1 and Andrew Barraclough 2 1 Product Manager - Connections, ITW Construction Systems ANZ. 2 Research and Development Manager,
More informationANCHORING TECHNOLOGY CAST-IN CHANNELS PEC-TA
ANCHORING TECHNOLOGY CAST-IN CHANNELS PEC-TA European Technical Assessment ETA-16/0929 European Technical Assessment ETA-16/0929 of 9 August 2018 - Original version in German language General Part Technical
More informationKlaus-Fischer-Straße Waldachtal DEUTSCHLAND EAD This version replaces ETA-15/0352 issued on 12 April 2016
European Technical Assessment ETA-15/0352 of 30 October 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationProducts for fixing to Steelwork and Decking
Products 8.0 Beam Clamp - Single Support 8.1 Universal Joint for any variable Angle Adjustment 8.2 Beam Clamp TCS for Header Rails 8.3 Beam Clip for Cross Support/ Dimensioning of Bolts 8.4 Beam Clip for
More informationHow to Use the Jahn Forming System
How to Use the Jahn Forming System 1. Preparation Gang drilling the plywood is the only preparation required. Holes need to be drilled 1/8" larger than the snap tie head. Normally, a 5/8" diameter drill
More informationUtility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles
Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationEuropean Technical Assessment. ETA-18/0045 of 22 February English translation prepared by DIBt - Original version in German language
European Technical Assessment ETA-18/0045 of 22 February 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Deutsches Institut
More informationSchöck dowel Type SLD plus
Schöck dowel Type plus Schöck dowel type plus Contents Page Design joints 10 Connection options 11 Dimensions 12-13 Installation information/notes 14-15 Design/On-site reinforcement 16-29 Punching shear
More informationSECTION MASONRY ANCHORAGE AND REINFORCEMENT. Display hidden notes to specifier. (Don't know how? Click Here)
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 04080 MASONRY ANCHORAGE AND REINFORCEMENT Display hidden notes to specifier. (Don't know how? Click Here) A. Post installed masonry anchors. B. Miscellaneous
More informationMeva Guided Screens MGS Technical Instruction Manual
Meva Guided Screens MGS Technical Instruction Manual Product Characteristics: The MEVA Guided Screens (MGS) system encloses complete floors especially in high-rise construction independent of the height
More informationmetal anchors fixed on the profile back in combination with special nib bolts Product size covered
DECLARATION OF PERFORMANCE HALFEN Anchor channel HTA 40/22P and HTA 50/30P CONF-DOP_HTA-P 01/17-E No. H01-16/0453 1. 2. 3. 4. 5. 6. Unique identification code of the HALFEN Anchor channel HTA 40/22P and
More informationHPD Aerated concrete anchor. Approvals / certificates. Basic loading data (for a single anchor)
HPD Anchor version HPD Benefits - anchor for autoclaved aerated concrete - maximum use of base material capacity - setting without drilling Autoclaved aerated concrete Fire resistance Sprinkler approved
More informationEuropean Technical Assessment. ETA-18/0861 of 12 November English translation prepared by DIBt - Original version in German language
European Technical Assessment ETA-18/0861 of 12 November 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationBEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs
Working with Concrete Slabs When working with concrete slabs the barrier protection can be erected in three ways - with socket bases, adjustable slab edge brackets and multi slab clamps. Socket Bases 1
More informationHOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero
Setbacks WALL 36" WALL 42" STREET 36" 59" STREET Installation Instructions Tape Measure Marker or Pencil Masonry Drill Bit Drill (Hammer drill recommended) Hammer Wrench 9/16 Level RECOMMENDED BASE MATERIAL
More informationEuropean Technical Assessment ETA-04/0038 English translation prepared by DIBt. Page 2 of July 2016
European Technical Assessment ETA-04/0038 Page 2 of 15 29 July 2016 The European Technical Assessment is issued by the Technical Assessment Body in its official language. Translations of this European
More informationGlulam Connection Details
T E C H N I C A L N O T E Glulam Connection Details Note: This version is superseded by a more current edition. Check the current edition for updated design and application recommendations. ENGINEERED
More informationPERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE
MAGNETIC PRODUCTS FOR PRECASTING PERFORM WITH PRECISION CONCRETE CONSTRUCTION SOLUTIONS BROCHURE Form Magnets ON/OFF MAGNETS Strong adhesion and shear capacity -650# to 2500# adhesion Easy to turn on or
More informationGeneral Layout. Eng. Maha Moddather
General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension
More informationHALFEN HSC STUD CONNECTOR HUC 10-US CONCRETE
HALFEN HSC STUD CONNECTOR HUC 10-US CONCRETE H A L F E N H U C U N I V E R S A L CO N N E C T I O N System description HALFEN Universal Connection System The HALFEN HUC Universal Connection System is a
More informationA. Extent of structural precast concrete work is shown on drawings and in schedules.
SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification
More informationCIVIL TECHNOLOGY. 9. For the purpose of this paper, the size of a brick should be taken as 220 mm 110 mm 75 mm.
NATIONAL SENIOR CERTIFICATE EXAMINATION NOVEMBER 2014 CIVIL TECHNOLOGY Time: 3 hours 200 marks PLEASE READ THE FOLLOWING INSTRUCTIONS CAREFULLY 1. This question paper consists of 12 pages, a Formula Sheet
More informationState-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )
State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA -01-1911) Vince Campbell Former president of Bayshore Concrete Products Corporation, VA This presentation is developed
More informationThe General Principles of Detailed Design at Ruukki Construction Ltd. Julia Piiroinen
The General Principles of Detailed Design at Ruukki Construction Ltd 1. The feasibilities of production at the workshops 2. Hot-rolled I-profile 2.1. Stiffeners 2.2. End plates 2.3. Lifting 3. Welded I-profile
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationWELDA FASTENING PLATES
FASTENING PLATES Author: Markus Junes, M. Sc. Civ. Eng. R&D Manager, Peikko Group 1. INTRODUCTION Peikko Group has launched a new family of Fastening Plate products with resistances calculated on the basis
More informationALUMINUM PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy
More informationEuropean Technical Assessment. ETA-09/0338 of 18 June English translation prepared by DIBt - Original version in German language.
European Technical Assessment ETA-09/0338 of 18 June 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationEuropean Technical ETA-17/0130 Assessment of 4 December 2017 General Part
European Technical Assessment ETA-17/0130 of 4 December 2017 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationFRANK. Technologies for the construction industry. Egcodorn Shear force dowel for expansion joints
FRANK Technologies for the construction industry Egcodorn Shear force dowel for expansion joints Contents Max Frank GmbH & Co. KG Mitterweg 1 94339 Leiblfi ng Germany Phone +49 9427 189-0 Fax +49 9427
More informationSTEEL PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports
More informationHUS 6 Screw anchor, Redundant fastening
HUS 6 Screw anchor, Anchor version HUS-A 6 Carbon steel Concrete Screw with hex head HUS-H 6 Carbon steel Concrete Screw with hex head HUS-I 6 Carbon steel Concrete Screw with hex head Benefits - Quick
More informationD. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC
STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,
More informationButt Two pieces of wood meeting with flat sides adjoining usually at right angles. Some type of connector is needed to prevent movement.
Wood Connections There are basically five different types of connectors: Interlocking (carpentry joints), Dowel, Metal Connectors, Special Formed Connectors and Adhesives. I Interlocking (Carpentry Joints)
More informationSteel Strong-Wall Shearwall Installations
Steel Strong-Wall Shearwall Installations Connector Training for Contractors Series Name: (800) 999-5099 www.strongtie.com Industry Terms Steel Strong-Wall Every day we work hard to earn your business,
More informationEuropean Technical Assessment. ETA-16/0929 of 3 July English translation prepared by DIBt - Original version in German language.
European Technical Assessment ETA-16/0929 of 3 July 2017 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationFosroc International Limited Drayton Manor Business Park Coles Road TAMWORTH STAFFORDSHIRE; B78 3XN GROSSBRITANNIEN EAD
European Technical Assessment ETA-18/0586 of 12 July 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationLok Fast Column Clamp General Information
Lok Fast Column Clamp General Information Gates Lok-Fast Column Clamp Has These Advantages: Can Be Job Built Gang Formed No Loose Pieces Designed For Rapid Placement of Concrete Rapid Locking Action 3
More informationSturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models
Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models Project Number ME086-05 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com January
More informationCHAPTER I INTRODUCTION
CHAPTER I INTRODUCTION 1.1 Introduction Precast concrete construction have been getting popular and being widely applied in construction sector today. The rapid growth of the building industry together
More informationc. Pins, bolts, and retaining rings b. Washers, locking nuts, and rivets
62 20 HW 8: Fasteners / Force, Pressure, Density Mechanical Systems DUE Mon, 11/21/16 Start of class Check link on website for helpful fastener information Please use a scantron. Material is based primarily
More informationLockable Dowels. for Temporary Movement Joints in Post-Tensioned Concrete. A cleaner, safer, faster alternative to Pour Strip s.
A cleaner, safer, faster alternative to Pour Strip s CI/SfB (29) Et6 April 2017 Lockable Dowels for Temporary Movement Joints in Post-Tensioned Concrete Ancon Lockable Dowels Contents Advantages and Applications
More information6.1. PUSH-PULL-PROPS and accessories
6 6.1. PUSH-PULL-PROPS and accessories MOUNTING TECHNOLOGY 6 GENERAL INFORMATION PUSH-PULL-PROPS AND ACCESSORIES INDEX General information....................... 3 Push-pull-props Type R.....................
More informationNORMAL WEIGHT CONCRETE TOTAL-LEWIS-DECK GYPSUM BOARD 2 OR 3-PLY COMPOSITE TOTALJOIST TOP CHORD CONNECTION
GENERAL DETAILS 100 TYPICAL FLOOR CONSTRUCTION NORMAL WEIGHT CONCRETE WELDED WIRE MESH FIBERGLASS BATT INSULATION (OPTIONAL) 18 GAUGE TIE WIRE 7/8" RESILIENT CHANNEL NOTE: CEILING MAY ALSO BE SUSPENDED
More informationCROS S L A MINAT ED TIMBER S TRUCTURES
M a d e f o r b u i l d i n g b u i l t f o r l i v i n g COMP onent CATA LO GUE FOR CROS S L A MINAT ED TIMBER S TRUCTURES I M P R I N T KLH Massivholz GmbH Publisher and responsible for the content:
More informationAssembly Instructions
18' W x 10' H or 12' H Peak Style Frame Assembly Assembly Instructions Before you start: 2+ individuals recommended for assembly, approximate time 3 hours. Recommended tools: Power Drill, Safety Glasses,
More informationBear-Resistant Trash Can Caddy: Enclosed Design Designed by Eagle Scout Michael Mezich
Bear-Resistant Trash Can Caddy: Enclosed Design Designed by Eagle Scout Michael Mezich The Florida Fish and Wildlife Conservation Commission offers the following design for areas with frequent bear visits.
More informationAssembly instructions for: ATTACHED PAVILION - DEL NORTE ROOF STYLE- WITH METAL PLAQUES
866.332.2403 (Toll Free); 8am-5pm Pacific Time, Monday-Friday Assembly instructions for: ATTACHED PAVILION - DEL NORTE ROOF STYLE- WITH METAL PLAQUES CONTENT OF BOXES QUANTITY DESCRIPTION DRAWING 2 Posts
More informationTrade of Metal Fabrication. Module 4: Structural Steel Fabrication Unit 4: Roof Trusses Phase 2
Trade of Metal Fabrication Module 4: Structural Steel Fabrication Unit 4: Roof Trusses Phase 2 Table of Contents List of Figures... 5 List of Tables... 6 Document Release History... 7 Module 4 Structural
More informationTECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts
TECHNICAL CORRECTION October 2006 Process Industry Practices Structural PIP STF05121 Fabrication and Installation of Anchor Bolts PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize
More informationPryda Timber Connectors
Pryda Timber Connectors Pryda Lintel Guide Engineered Steel Wall Lintels March 2014 ESSENTIAL NOTES PRYDA PRODUCT GUIDES INTRODUCTION The information in this Product Guide is provided for use in Australia
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS LAMINATED P LASTIC TOILET PArTITIONS 1540 ClassicSeries with Options IMPORTANT: Storage and Handling Information on last page. For faster, easier installation, please review these
More informationNote: Conditions where bending loads are imposed on the bolt e.g. non-parallel bolting surfaces, should be avoided.
Bolted Joint Design Introduction A most important factor is machine design, and structural design is the rigid fastening together of different components. This should include the following considerations..
More informationShearwall System Installation Guide
Shearwall System Installation Guide Complete HFX product listing with dimensions, weights, connectors, typical installations and accessories. Also includes Hardy Frame Moment Frame information. Easy as
More informationAssembly Instructions
V4-10.15 Assembly Instructions (W x D x H) 1.89m x 1.62m x 1.80m Product Name: Miami Swing Pressure Treated products should not be treated with any other products for the first month. PLEASE KEEP THIS
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationLockable Dowels For Temporary Movement Joints in Post-Tensioned Concrete. A cleaner, safer, faster alternative to Pour Strip s CI/SfB (29) Et6
A cleaner, safer, faster alternative to Pour Strip s CI/SfB (29) Et6 November 2013 Lockable Dowels For Temporary Movement Joints in Post-Tensioned Concrete Ancon Lockable Dowels Contents Advantages and
More informationApplied Precast Concrete Detailing
Applied Precast Concrete Detailing Tekla Structures 11.0 August 30, 2005 Copyright 2005 Tekla Corporation Copyright 2005 Tekla Corporation Applied Precast Concrete Detailing i Copyright 2005 Tekla Corporation
More informationAllow 60 from door face
Setbacks Allow 60 from door face TOOLS NEEDED Tape Measure Marker or Pencil Masonry Drill Bit 3/8 Hammer Drill Hammer Socket Wrenches and Wrench: 9/16, 1/2, 7/16, 1/4 drive socket wrench and 1/2 socket
More informationMODEL 36 Di-Acro Hand Shear
OPERATOR S MANUAL & INSTRUCTIONS MODEL 36 Di-Acro Hand Shear Di-Acro, Incorporated PO Box 9700 Canton, Ohio 44711 3713 Progress Street N.E. Canton, Ohio 44705 330-455-1942 330-455-0220 (fax) Revised 01/02
More informationSwerve Rack CUSTOM RACKS AVAILABLE
CUSTOM RACKS AVAILABLE Swerve Rack The design of the Swerve mirrors the bike frame, thus providing superior bike support while making it easy to secure both the bike frame and wheel with a standard u-lock.
More informationWAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence
MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised
More informationH O O P RAC K. Simple Security
H O O P RAC K Simple Security The Hoop Rack is a proven design that provides high security and easy bike parking. The Hoop Rack uses thick pipe construction and the full radius of the bend makes the Hoop
More informationOptimast Installation Method Statement. F108.
Optimast Installation Method Statement. F108. Contents Page 1) Product Description. 2) Durability....... 3) Profile & Baseplate..... 4) Anchor Cradle and Foundation Stud Set Detail Drawings 4a) 127...
More informationTHE GATE COACHAll Rights Reserved 28, Jia Sarai N.Delhi ,-9998
1 P a g e 1 DESIGN AGAINST STATIC AND FLUCTUATING LOADS 2 SHAFT, KEYS AND COUPLINGS CONTENTS Introduction 6 Factor of safety 6 Stress concentration 7 Stress concentration factors 8 Reduction of stress
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationSECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationInstallation Manual for Gate Guard
Installation Manual for Gate Guard Fast Opening Barrier Gate for Emergencies and Contra Flow Innovative safety technology from SGGT of Germany TABLE OF CONTENTS Page Number Preface 3 Introduction 3 System
More informationPlate 60 ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND. Plate 60 AmourMate. Joint Edge Protection
Plate 60 AmourMate Plate 60 ArmourMate INDUSTRIAL SLAB ON GROUND Accommodates large concrete shrinkage Facilities thermal movement Prevents spalling on construction joints Extends the life-cycle of the
More informationMAURER DB Joints Manufacturing and Installation Instructions
Head Office P.O. Box 440145, D-80750 München Frankfurter Ring 193, D-80807 München phone (089) 3 23 94-0 fax (089) 3 23 94-329 Main Branch Office P.O. Box 63 40, D-44520 Lünen 1 / 10 Zum Holzplatz 2, D-44536