Jared Bower Robatel Technologies Roanoke, Virginia, USA
|
|
- Miranda Horn
- 5 years ago
- Views:
Transcription
1 Jared Bower Robatel Technologies Roanoke, Virginia, USA
2 What are Ion-? How is this waste typically managed? Can it be handled in a different way? How is Robatel s new method beneficial to cask users? How to ensure regulatory compliance? What tools are available to the user? Shipping Grossly Dewatered in the RT-100 2
3 Used to purify coolant water Extracts contaminates (sodium, silica, chloride, sulfates) from water circuits Form of intermediate or low level waste Average annual volume generated by commercial US nuclear power plants: 2,568 m³ (90,620 ft³) Source: USNRC, 2012 Gel-Type Anion Resin Source: Rohm and Haas Shipping Grossly Dewatered in the RT-100 3
4 Resin is transferred to a high integrity container (HIC) HIC is dewatered to less than 1% free-standing liquid HIC is loaded into a Type B cask and transported to disposal facility Designed to meet 10 CFR Part disposal requirements Dewatering Device Source: J. Mason Shipping Grossly Dewatered in the RT-100 4
5 10 CFR Part states the requirements for disposal In no case shall the liquid exceed 1% of the volume However, this requirement is for the disposal container Transportation container is limited by gas generation requirements Shipping Grossly Dewatered in the RT-100 5
6 Dewatering can take several days to complete If not shipped immediately, another attempt may be required Generator may take responsibility to ensure waste meets disposal requirements issue if moisture is higher than expected upon arrival Shipping Grossly Dewatered in the RT-100 6
7 Resin is transferred to a high integrity container (HIC) HIC is grossly dewatered to 20% freestanding liquid HIC is loaded into a RT-100 Type B transportation cask RT-100 is shipped to WCS (disposal facility) WCS processes resin to meet 1% freestanding liquid (disposal requirement) Shipping Grossly Dewatered in the RT-100 7
8 Generator takes on less risk (easier to justify 20% requirement) Generator may reduce exposure to site personnel Additional dewatering attempts may not be required May reduce transportation preparation time Dewatering process may be more simple Shipping Grossly Dewatered in the RT-100 8
9 Revision of the RT-100 Safety Analysis Report Contents include grossly dewatered resins Revision of containment analysis Ensure that H₂ gas does not exceed flammability limit New Certificate of Compliance issued in July 2015 Shipping Grossly Dewatered in the RT-100 9
10 H₂ gas accumulates in sealed containers Caused by radiolysis of hydrogenous material Volume fraction of Hydrogen in air should not exceed 5% Follow the guidance of NUREG/CR-6673 Shipping Grossly Dewatered in the RT
11 RT-100 Transportation Cask Polyethylene Liner Shoring Ionic Resin Ionic Resin submerged in free water Shipping Grossly Dewatered in the RT
12 Determine the G-values for the contents Establish volume ratios (fraction of decay heat absorbed by each content type) Establish free gas volume Calculate D H,max = ƒ( V waste ) Provide useful tools to cask users Shipping Grossly Dewatered in the RT
13 Easy tool for user to evaluate maximum allowable decay heat Can be used for most cask shipments Certain criteria must apply, including: Loading at max temperature of 38 C and standard atmospheric pressure Shipment time limited to 10 days Must use specified liner types Shipping Grossly Dewatered in the RT
14 Decay Heat (Watts) Waste Volume (ft³) Shipping Grossly Dewatered in the RT
15 In the form of an Excel Table User input variables: Loading Temperature and Pressure Volumes (secondary container, shoring, filters, ionic resin) Gamma/Alpha Decay Heat Distribution Either Decay Heat or Shipment Time Calculates Allowable Decay Heat or Maximum Shipment Time Shipping Grossly Dewatered in the RT
16 Shipping Grossly Dewatered in the RT
17 In this example, a known shipment time is used to calculate the maximum allowable decay heat. Shipping Grossly Dewatered in the RT
18 are typically dewatered prior to shipment Liner is certified as containing <1% free-standing liquid A new approach allows up to 20% liquid during transport Saves the generator time and reduces cost May reduce personnel exposure Reduces risk of CoC violations Shipping Grossly Dewatered in the RT
Conditioning of intermediate level waste resin by dewatering
Conditioning of intermediate level waste resin by dewatering ISOE European Symposium 2014 Bern, Switzerland 1 Intermediate Level Waste at Sizewell B Definition of ILW for the UK - >12 GBq/te (β/γ) or >4
More informationASME BPV XI Interpretation Handout May 10, 2017
ASME BPV XI Interpretation Handout May 10, 2017 Interpretation# 16-2355 and Code Change pg. 2-4 Interpretation# 16-2701 pg. 5 Interpretation# 16-2702 pg. 6 Interpretation# 17-765 pg. 7 1 of 7 Revised Question
More informationWM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Dewatering Innovations Bill Boggia, ORNL-UCOR/ATL International
Dewatering Innovations 16381 Bill Boggia, ORNL-UCOR/ATL International ABSTRACT The Liquid and Gaseous Waste Operations (LGWO) project, located at the Oak Ridge National Laboratory, handles wastewater from
More informationT S 15KVA 1PH 240/480 Transformer
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 T2535173S 15KVA 1PH 240/480 Transformer Acme Electric Catalog Number Manufacturer Description Weight per unit Product
More informationEnvironmEntal health and safety
EnvironmEntal health and safety http://www.jjay.cuny.edu/ehs Universal Waste Instructional Manual Revised: 4 November 2015 Table of Contents Universal Waste Instructional Manual and Quiz Buildings Authorized
More informationS. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013)
S. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013) 1.0 GENERAL 1.1 This specification covers the electrical and mechanical
More informationNTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010
NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of
More informationDelineation and Regulatory Oversight of Processing Oil and Gas Midstream Facilities
Delineation and Regulatory Oversight of Processing Oil and Gas Midstream Facilities Presented by Subcommittee on Midstream Facility Safety PHMSA Gas & Liquids Technical Advisory Committees August 2015
More informationProcess Validation to Improve Food Safety Meat and Poultry. James S Dickson Inter-Departmental Program in Microbiology Department of Animal Science
Process Validation to Improve Food Safety Meat and Poultry James S Dickson Inter-Departmental Program in Microbiology Department of Animal Science Validation vs. Verification Those activities, other than
More informationWM 00 Conference, February 27 March 2, 2000, Tucson, AZ EVALUATION OF GLASS MELTER OPERATION IN TOKAI VITRIFICATION FACILITY
EVALUATION OF GLASS MELTER OPERATION IN TOKAI VITRIFICATION FACILITY Masahiro Yoshioka and Noboru Endo Japan Nuclear Cycle Development Institute Tokai-Works 4-33 Muramatsu, Tokai-mura Ibaraki 319-1194
More informationSAFETY ASSESSMENT METHODOLOGIES AND THEIR APPLICATION IN DEVELOPMENT OF NEAR SURFACE WASTE DISPOSAL FACILITIES ASAM PROJECT
SAFETY ASSESSMENT METHODOLOGIES AND THEIR APPLICATION IN DEVELOPMENT OF NEAR SURFACE WASTE DISPOSAL FACILITIES ASAM PROJECT B. Batandjieva, P. Metcalf (a) International Atomic Energy Agency Wagrammer Strasse
More informationSpray Painting Policy
Spray Painting Policy Form: Revision: MFG-20 C Revision Date: 1-8-2018 Spray Painting Policy Granite Falls, MN New Ulm, MN Watertown, SD Prentice, WI a.) Configuring, testing and maintaining the paint
More informationModel: PR-55. High Voltage Oscilloscope Probe 10 kv, 40 MHz USER MANUAL
Model: PR-55 High Voltage Oscilloscope Probe 10 kv, 40 MHz USER MANUAL 1 2017 All rights reserved. B&K Precision products are covered by US and foreign patents, issued and pending. Information is this
More informationWM 04 Conference, February 29-March 4, 2004, Tucson, AZ
MOSAIK 20 YEARS OF EXPERIENCE WITH A CASK SYSTEM FOR TRANSPORTATION, CONDITIONING AND STORAGE OF RADIOACTIVE WASTE G. Gestermann GNS Gesellschaft für Nuklear-Service mbh Hollestraße 7 A, Germany 45127
More informationGlass Recycling Update
Glass Recycling Update STRATEGIC MATERIALS FOOTPRINT Seattle Cornwall Owatonna St. Paul Withee East Troy Collingwood Guelph Toronto Brampton Franklin S. Windsor Sacramento Muscatine Chicago (3) Ashley
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation
More informationSF 6 Characteristics and Re-use Concept
DILO. Sustainably tight. SF 6 Characteristics and Re-use Concept www.dilo-gmbh.com Peter Jannick / Solvay Fluor Overview What is sulphur hexafluoride? Decomposition products SF 6 gas specifications IEC
More informationIntegration of MGDS Design into the Licensing Process' This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design
ntegration of MGDS Design into the Licensing Process' ntroduction This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the
More informationBasic Principles and Operation of Transformer
Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core
More informationIndaver Impex, your partner in sludge dewatering
Indaver Impex, your partner in sludge dewatering About us Indaver Impex is the sludge dewatering expert within the European waste management group Indaver. Indaver Impex has been offering excellent service
More informationWell Control Contingency Plan Guidance Note (version 2) 02 December 2015
Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...
More informationMATERIAL SPECIFICATION FOR PACKAGED SILICA FUME DRY GROUT MIXTURE FOR POST TENSIONING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1304 NOVEMBER 2005 MATERIAL SPECIFICATION FOR PACKAGED SILICA FUME DRY GROUT MIXTURE FOR POST TENSIONING TABLE OF CONTENTS 1304.01 SCOPE 1304.02 REFERENCES
More informationFirestar f201 laser & Flyer 3D System Quick Start Guide
Important Note: See the Flyer 3D Marking Head and Firestar f201 Laser Operators Manual for complete installation details and instructions. A PDF version is available Online at: http://www.synrad.com/manuals/manuals_laser.htm.
More informationGENERAL PURPOSE DRY-TYPE DISTRIBUTION TRANSFORMERS
GENERAL PURPOSE DRY-TYPE DISTRIBUTION TRANSFORMERS Acme offers a large selection of Dry-Type Distribution Transformers. Ranging from 600 Volt and below, in both Single and Three Phase, you re sure to find
More informationNEWMONT MINING CORPORATION ENVIRONMENTAL DEPARTMENT
Page: 1 of 6 Version: 1.1 NEWMONT MINING CORPORATION ENVIRONMENTAL DEPARTMENT Subject: Environmental Policies for Contractors and Vendors Effective Date: May 2006 I. PURPOSE These guidelines establish
More informationBest Products to Use in a Healthcare Facility Repaint Project
Best Products to Use in a Healthcare Facility Repaint Project Introduction 03 Types of Products to Consider in Healthcare Painting Projects 04 Paints, Oil-based Paints, Water-based Paints 05 Paint Finishes,
More informationInstructors Guide. Composites Fabricators Association. September, 1998
Controlled Spraying Training Instructors Guide September, 1998 Composites Fabricators Association Composites Fabricators Association 1655 N. Ft. Myer Dr., Arlington, VA 22209 (703)-525-0511 CFA 1998 CFA
More informationPAPER AND CARD PACKAGING DESIGN TIPS FOR RECYCLING
PAPER AND CARD PACKAGING DESIGN TIPS FOR RECYCLING INTRODUCTION 2 Most paper sent for recycling is used in manufacturing processes as an alternative to virgin material such as wood pulp. This means the
More informationDimensions: [mm] Dimensions: [mm] Electrical Properties: Schematic: General Properties: WE-VD Disk Varistor ORDER CODE
Dimensions: [mm] 16,5 max. 6,7 max. 20,0 max. 25,0 min. Dimensions: [mm] 1,3 7,5 O 0,9 Scale - 3:1 Electrical Properties: Properties Test conditions Value Unit Tol. AC Operating Voltage V RMS 275 V DC
More informationOperator s Manual. PP016 Passive Probe
Operator s Manual PP016 Passive Probe 2017 Teledyne LeCroy, Inc. All rights reserved. Unauthorized duplication of Teledyne LeCroy documentation materials is strictly prohibited. Customers are permitted
More informationCOMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationD C 01/2019 3
D-0117968-C 01/2019 3 4 D-0117968-C 01/2019 Screw Driver Screw Driver Unplug both the Red & Blue connectors. (see above) Place a small flat head screw driver on the small orange tabs and push down while
More informationFORM Q-120 PROCEDURE SPECIFICATION FOR CLASS II VESSELS (Revision C 2017) Part I Fabrication
FORM Q-120 Part I Fabrication PROCEDURE SPECIFICATION NUMBER: NOTE: Procedure Specification Form Q-120 for Class II vessels consists of three parts. Part I, Fabrication, shall be completed for each separately
More informationPharmaceutical Manufacturing and Engineering Catalog Excerpt
Pharmaceutical Manufacturing and Engineering Catalog Excerpt PME 530 Introduction to Pharmaceutical Manufacturing Pharmaceutical manufacturing is vital to the success of the technical operations of a pharmaceutical
More informationFACILITY RATINGS METHOD TABLE OF CONTENTS
FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5
More informationNZQA Expiring unit standard version 3 Page 1 of 8. Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing
Page 1 of 8 Title Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing Level 3 Credits 10 Purpose This unit standard is for people working in the pavement surfacing industry.
More informationASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications. Prague, CR July 7 8, 2014
ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications Prague, CR July 7 8, 2014 ASME NQA-1 Due to the expansion of the global supply chain and advances in technology, many codes and
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 8502-4 Second edition 2017-01 Preparation of steel substrates before application of paints and related products Tests for the assessment of surface cleanliness Part 4: Guidance
More informationMATERIALS DIVISION MEMORANDUM
MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete and Concrete Pipe Quality Control/Quality Assurance Programs SPECIFIC SUBJECT: Sections 204.22(c), 204.26(d) and Minimum Acceptance Sampling
More informationStormwater & Water Quality Training Programs for Colorado
Altitude Training Associates, LLC www.altitudeta.com Stormwater & Water Quality Training Programs for Colorado WINTER/SPRING 2018 Contact: Scott Olson scott@altitudeta.com (307) 630-8110 Altitude Training
More informationThe Safety Case and the Risk-Informed Performance-Based Approach for Management of US Commercial Low-Level Waste (Paper #190)
The Safety Case and the Risk-Informed Performance-Based Approach for Management of US Commercial Low-Level Waste (Paper #190) Rateb (Boby) Abu-Eid, David Esh, and Christopher Grossman Division of Decommissioning,
More information(AMMA) American Maritime Modernization Association
(AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT
More informationEncana Corporation Expression of Interest (EOI)
Encana Corporation Expression of Interest (EOI) HARSH ENVIRONMENT JACK-UP, MOBILE OFFSHORE DRILLING UNIT (MODU) BIDS Category: 0420 Reference: EOI DC01 Issue Date: May 18, 2017 Closing Date: June 8, 2017
More informationAir Monitoring Directive Chapter 9: Reporting
Air Monitoring Directive Chapter 9: Reporting Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 9: Reporting Number: Program
More informationGW5BTF27K00. Light Emitting Diode Module. Spec No. DG A. Product Type. Model No.
Spec No. Issue DG-099008A 16-Apr-10 Product Type Light Emitting Diode Module Model No. GW5BTF27K00 These specifications contain 14 pages including the cover and appendix. If you have any objections, please
More informationJanuary 7, 1997 COATED PRINTING PAPER, GS-10 1 GS-10 SECOND EDITION JANUARY 7, This standard has been superseded by Edition 2.
January 7, 1997 COATED PRINTING PAPER, GS-10 1 GS-10 GREEN SEAL STANDARD FOR COATED PRINTING PAPER SECOND EDITION JANUARY 7, 1997 This standard has been superseded by Edition 2.1, July 12, 2013 Green Seal,
More informationRegulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame
Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual
More informationTOPS Speaker Bios
TOPS 2019 - Speaker Bios A Bad Day Why ILTA Started TOPS George Edwards is the Health & Safety Director for the Pipelines & Terminals group at Flint Hills Resources. He has 20 years of experience in process
More informationINTRINSIC SAFETY BASIC PRINCIPLES
INTRINSIC SAFETY BASIC PRINCIPLES IGNITION TRIANGLE Ignition Energy In many industrial processes, the presence of flammable materials (gases, vapours, liquids, dusts, fibres and flyings) requires the adoption
More informationEnvironmental Story + Standards
Environmental Story + Standards Spinneybeck is committed to working with the highest quality of sustainable and biodegradable materials. Our approach to sustainable design considers all of the parts and
More informationINDUSTRY INFRASTRUCTURE MARINE
As a core IHI Group member in the field of rotating machinery, IHI Rotating Machinery Engineering Co., Ltd. is a general engineering company that capitalizes on its technological capabilities and worldwide
More informationWAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)
WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) 1 PART 1: GENERAL This section describes materials and installation requirements for low voltage
More informationTechnical Standard Order
Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, D.C. TSO-C23f Effective Date: 09/21/2012 Technical Standard Order Subject: Personnel Parachute Assemblies
More informationBeamsplitter Product Specification
1.0 Description This specification defines the product requirements for the 45 degree beamsplitters (50T-50R, 60T-40R, and 70T-30R) produced in MAC. These beamsplitters are designed to include a 45 degree
More informationNorth Carolina No-Rise Guidance Document
North Carolina No-Rise Guidance Document June 4, 2015 Atlanta, GA Dan Brubaker, PE, CFM NFIP Engineer (919) 825-2300 Dan.Brubaker@ncdps.gov Purpose Provide guidance for No-Rise preparation Engineers Provide
More informationSPECIFICATION SS-140/9. 0.6/1 (1.2) kv CONTROL AND POWER UNDERGROUND CABLES WITH PVC OR XLPE INSULATION AND PVC JACKET
INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION December 2016 SPECIFICATION 0.6/1 (1.2) kv CONTROL AND POWER UNDERGROUND CABLES WITH PVC OR XLPE INSULATION
More informationETP ELECTRON MULTIPLIERS
ETP ELECTRON MULTIPLIERS Care and Handling A division of Maintenance, Storage, and Handling of ETP Electron Multipliers ETP Electron Multipliers from SGE are incorporated as original equipment in all areas
More informationPASARGAD OIL COMPANY. gas and power THE BIGGEST PRODUCER OF BITUMEN IN IRAN MISSION AND VALUES
PASARGAD OIL CO. gas and power PASARGAD OIL COMPANY THE BIGGEST PRODUCER OF BITUMEN IN IRAN Pasargad Oil Company (POC) which is established in 2003 as an Iranian manufacturer is playing a major role as
More informationINTERNATIONAL TRANSFORMERS. Acme Electric s broad selection of CSA energy efficient transformers
INTERNATIONAL TRANSFORMERS Acme Electric s broad selection of CSA energy efficient transformers International Transformers What is CSA C802.2 Compliant? On January 1, 2005, the Canadian Energy Efficiency
More informationChapter 02. Casing and Tubing
Chapter 02 Casing and Tubing Table of Contents Introduction 2-4 Topic Areas 2-4 Learning Objectives 2-4 Unit A: Casing and Tubing Uses 2-4 Unit A Quiz 2-5 Unit B: Typical Casing Strings 2-5 Conductor
More informationETP ELECTRON MULTIPLIERS
ETP ELECTRON MULTIPLIERS ] Care and Handling Electron Multipliers division of Maintenance, Storage, and Handling of ETP Electron Multipliers ETP Electron Multipliers from SGE are being used in a growing
More informationOil and Gas UK Well Integrity Guidelines
Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and
More informationFirestar f201 laser & Flyer 3D System Quick Start Guide
Important Note: See the Flyer 3D Marking Head and Firestar f201 Laser Operators Manual for complete installation details and instructions. A PDF version is available Online at: http://www.synrad.com/manuals/manuals_laser.htm.
More informationSIMpull THHN, it slips and slides - all with NoLube.
SOUTHWIRE S SIMpull THHN Southwire maintains its goal of revolutionizing the wire industry by providing its consumers with a product that is not only SIMpull but also requires NoLube. SIMpull THHN is a
More informationM P E B WB. (unit : mm) Absolute Maximum Ratings (Ta=25ºC) Tstg(ºC) SML-P12VT(R) SML-P12UT(R)
PICOLED TM Datasheet Features Outline Ultra compact, thin size 1.0 0.6mm Original device technology enables high brightness and high reliability Lead Free/RoHS Compliant. Size 1006 1006 (0402) (0402) 1.0
More informationNuclear Regulatory Needs and Activities Related to Liquefaction Assessment
National Research Council of the National Academies Committee on Geological and Geotechnical Engineering Board on Earth Sciences & Resources Dr. Annie Kammerer Office of Nuclear Regulatory Research December
More informationDisplay Rules & Regulations
2018 Great American Outdoor Show Display Rules & Regulations Rules & Regulations are based on the 2007 International Association of Exhibitions and Events (IAEE) Guidelines Linear Booth Linear Booths have
More informationYolande Akl, Director, Canadian Nuclear Safety Commission Ottawa, Canada. Abstract
OVERVIEW OF SOME CHALLENGES IN PSA REVIEWS FOR EXISTING AND NEW NUCLEAR POWER PLANTS IN CANADA 1 Guna Renganathan and Raducu Gheorghe Canadian Nuclear Safety Commission Ottawa, Canada Yolande Akl, Director,
More informationYour Presenters. > Thomas Patzner Product Manager, Low Voltage Transformers. > Marquette University Electrical Engineering. > Apprentice Electrician
Your Presenters > Thomas Patzner Product Manager, Low Voltage Transformers > Marquette University Electrical Engineering > Apprentice Electrician > Low Voltage Transformers - Co-op (Square D Company) (lab
More informationIndex. Linear Booth, Corner Booth and Perimeter Booth 2. End-cap Booth and Peninsula Booth 3. Split Island Booth and Island Booth 4
Index Linear Booth, Corner Booth and Perimeter Booth 2 End-cap Booth and Peninsula Booth 3 Split Island Booth and Island Booth 4 Other Important Considerations 5 Issues Common To All Booth Types 6-7 The
More informationSML-D1 series EXCELED TM
EXCELED TM Datasheet Features Outline EXCELED TM series Original device technology enables high brightness and high reliability Size 6 68 (42) (63). mm.6 mm (t=.2mm) (t=.55mm) Color Type V U D Y M P Dimensions
More informationAmerican Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM
American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1051 - REVISED: 2009 Individual and Branch Type Air Admittance Valves MANUFACTURER: CONTACT PERSON: E-MAIL: ADDRESS:
More informationCPL LOG Updated February 3, 2017
CPL NUMBER 06-03 (CPL 02) 10-02 (CPL 02) CPL 01-00-003 Old CPL 1-0.3 CPL 02-00-002 Old CPL 2.2 CPL 02-00-009 Old CPL 2.9 CPL 02-00-025 Old CPL 2.25I CPL 02-00-042 Old CPL 2.42 CPL 02-00-042 Old CPL 2.42
More informationEE223D: Distribution Power Transformer
EE223D: Distribution Power Transformer Aug 07-09, 2018 / Dubai EE223 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This intensive course is designed to provide participants with the skills
More information3M Dual Lock Reclosable Fastener
1-800-773-0062 www.marianinc.com 3 Dual Lock Reclosable Fasteners SJ3550CF (Type 250) SJ3551CF(Type 400) SJ3552CF(Type 170) Dual Lock Reclosable Fastener Black with a clear acrylic adhesive Product Information
More informationAirworthiness Directive
Airworthiness Directive Federal Register Information Header Information DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [61 FR 29271 NO. 112 06/10/96] [Docket No. 93-ANE-48;
More informationPiloting for Evaluation of Innovative Residuals Dewatering Technologies. Presented By: Jay Surti, PE, Northeast Residuals Practice Lead
Piloting for Evaluation of Innovative Residuals Dewatering Technologies Presented By: Jay Surti, PE, Northeast Residuals Practice Lead Agenda Operational overview Existing process Dewatering technologies
More informationApplication for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID
Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified
More informationAlternate Visible Emissions Methods
Alternate Visible Emissions Methods Presented by: Jody Monk Eastern Technical Associates, Inc. Raleigh, NC (919) 878-3188 jody@smokeschool.com Topics 40 CFR part 60 Subpart OOO Standards of Performance
More informationEnglish
English Specifications Type Power Source Vibration Frequency Maximum Output Power Consumption Water Pressure Lighting NE134 AC120V 50/60Hz AC230V 50/60Hz 28~32kHz 8W Max. 42VA 0.1~0.5MPa (1~5kgf/cm
More informationSubstation Preventive Maintenance
Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS
More informationAmerican Nuclear Society
American Nuclear Society 1 Unraveling the Mystery of Consensus Standards Presented by: The American Nuclear Society Standards Committee January 31, 2017 Copyright 2017 by American Nuclear Society Purpose
More informationREVISED DISPLAY RULES & REGULATIONS
REVISED DISPLAY RULES & REGULATIONS DIVERSIFIED COMMUNICATIONS 121 Free Street P.O. Box 7437 Portland, ME 04112-7437 In an effort to allow exhibitors to enhance their displays, we have increased the height
More informationInstallation guide 873 SmartRadar Control Unit & Antenna Unit
Installation guide 873 SmartRadar Control Unit & Antenna Unit Rev. 7 January 2006 Part no. 4416.569 Enraf BV PO Box 812 2600 AV Delft Netherlands Tel. : +31 15 2701 100 Fax : +31 15 2701 111 E-mail : info@enraf.nl
More informationExhibit Space & Booth Layout Guidelines
Exhibit Space & Booth Layout Guidelines Exhibit Space & Booth Display Rules The following display rules have been designed using the IAEE (International Association of Exhibitions and Events) guidelines
More informationMetal Casting Dr. D. B. Karunakar Department of Mechanical and Industrial Engineering Indian Institute of Technology, Roorkee
Metal Casting Dr. D. B. Karunakar Department of Mechanical and Industrial Engineering Indian Institute of Technology, Roorkee Module - 02 Sand Casting Process Lecture 03 Moulding Sands and Design-II Welcome
More informationGuidelines for Display Rules and Regulations
Guidelines for Display Rules and Regulations The following Guidelines for Display Rules and Regulations have been established by the International Association of Exhibitions and Events (IAEE) Guidelines
More informationDNVGL-CP-0212 Edition March 2016
CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD
More informationStandard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection
Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:
More informationTechnically Unavoidable Particles Profile (TUPPs) Guide
Technically Unavoidable Particles Profile (TUPPs) Guide Priscilla Zawislak Global Regulatory Affairs Manager Ashland Inc. Chair Elect, IPEC-Americas pszawislak@ashland.com www.ipecamericas.org 1 Agenda
More informationPOWER FLATTENING FOR SODIUM COOLED METALLIC FUEL CANDLE REACTOR BY ADDING THORIUM IN INNER CORE
, on CD-ROM, American Nuclear Society, LaGrange Park, IL (21) POWER FLATTENING FOR SODIUM COOLED METALLIC FUEL CANDLE REACTOR BY ADDING THORIUM IN INNER CORE Hiroshi SEKIMOTO, Sinsuke NAKAYAMA, Hiroshi
More informationGS-7 GREEN SEAL STANDARD FOR EDITION 6.1 JULY 12, 2013
GS-7 GREEN SEAL STANDARD FOR PRINTING AND WRITING PAPER EDITION 6.1 JULY 12, 2013 Green Seal, Inc. 1001 Connecticut Ave. NW, Ste 827 Washington, DC USA 20036-5525 (202) 872-6400 FAX (202) 872-4324 www.greenseal.org
More informationEXHIBITOR MANUAL North Carolina State Fairgrounds
EXHIBITOR MANUAL North Carolina State Fairgrounds September 22-24th, 2017 This Exhibitor Manual has been compiled to help you and your staff with complete details about all phases of the exhibition process
More informationREGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE
No. 9197 REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers oard, 2008. All rights reserved. No part of this publication may be reproduced by any means
More informationTurning the wheels of your success
INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 15156-3 Third edition 2015-09-01 Petroleum and natural gas industries Materials for use in H2Scontaining environments in oil and gas production Part 3: Cracking-resistant CRAs
More informationDEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name
GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com
More informationSolexy USA, LLC International Blvd Cincinnati, Ohio Phone: Fax:
OVERVIEW The Solexy RX series explosion proof and intrinsically safe antenna coupler is an integrated protection device that facilitates non-ex certified radio antenna installation in hazardous areas.
More informationREMOVAL OF URANIUM BY SODIUM ALGINATE-BASED DIPHOSIL BEAD
ABSTRACT REMOVAL OF URANIUM BY SODIUM ALGINATE-BASED DIPHOSIL BEAD K. J. Kim, I. S. Kang, S. P. Yim, J. S. Shon, K. P. Hong, H. S. Park Korea Atomic Energy Research Institute 150 Dukjin-dong, Yuseong-ku,
More informationROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT
ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT Page 1 of 8 The document describes the current methodology used for developing facility ratings
More information