ASME BPV XI Interpretation Handout May 10, 2017

Size: px
Start display at page:

Download "ASME BPV XI Interpretation Handout May 10, 2017"

Transcription

1 ASME BPV XI Interpretation Handout May 10, 2017 Interpretation# and Code Change pg. 2-4 Interpretation# pg. 5 Interpretation# pg. 6 Interpretation# pg. 7 1 of 7

2 Revised Question for Question: Is it the intent that Appendix E be applied to nozzles in the reactor pressure vessel beltline region? Reply: No. 2 of 7

3 BPVC Section: SC-XI Record Number: Revision Number: 1.0 Based on Version: V IWB-3720 Unanticipated Operating Events (a) When an operating event causes an excursion outside the normal operating pressure and temperature limits defined in the plant Technical Specifications, an evaluation shall be performed to determine the effects of the out of limit condition on the structural integrity of the Reactor Coolant System. (b) Nonmandatory Appendix E provides procedures and criteria that may be used to evaluate the integrity of the reactor vessel beltline, excluding nozzles, for the out of limit condition. (c) The evaluation procedures shall be the responsibility of the Owner and shall be subject to acceptance by the regulatory authority having jurisdiction at the plant site. Date: 5/9/17 3 of 7 1 of 2

4 BPVC Section: SC-XI Record Number: Revision Number: 1.0 Based on Version: V Nonmandatory Appendix E Evaluation of Unanticipated Operating Events Article E-1000 Introduction E-1100 Scope This Nonmandatory Appendix provides acceptance criteria and guidance for performing an evaluation of the effects of an out of limit condition on the structural integrity of the reactor vessel beltline region, excluding nozzles. Showing compliance with the criteria in either E-1200 or E-1300 assures that the beltline region, excluding nozzles, has adequate structural integrity for the unit to return to service. Evaluations performed using this Nonmandatory Appendix shall meet all the requirements of the Appendix. E-1200 Acceptance Criteria 49,50 Adequate structural integrity of the reactor vessel beltline region, excluding nozzles, is assured if the following applicable criterion is satisfied throughout the event: (a) For isothermal pressure transients [i.e., ΔT c /Δt < 10 F/hr (5.5 C/hr)], the maximum pressure does not exceed the allowable values of Table E-1 at any value of T c RT NDT. Date: 5/9/17 4 of 7 2 of 2

5 Inquiry Passed WG PQSV&ET and SGNDE VII-4330(b) Level III personnel shall be recertified using the written Method, Specific, and Practical Examinations and the Demonstration Examination. Alternatively, Level III personnel may be recertified using only the written Method and Specific Examinations provided the following conditions are met: (1) The Level III candidate was previously certified or recertified using all the written examinations and the Demonstration Examination. Question: May a Level III candidate be recertified using only the written Method, and Specific Examinations, if the candidate was recertified with only method, specific, practical and demonstration examinations? Reply: Yes, provided the candidate s service was not interrupted in accordance with VII Applicability: 1995 Edition through 2017 Edition 5 of 7

6 Inquiry Record Subject: Pumps Flange Surface Examination, TABLE IWB , B-G-1, B6.190 Explanation: Inquirer Proposed Question: When the four Reactor Coolant Pumps of same design, size performing same function in system are disassembled, Is it permissible to examine only one pump flange surface (VT-1) during the interval? [applicable edition 2001 with 2003 addenda through the 2017 Edition] Inquirer Proposed Reply: <None Provided> Inquirer Background: IWB , B-G-1, NOTES: (3) Volumetric examination of bolting for heat exchangers, pumps, or valves may be conducted on one heat exchanger, one pump, or one valve among a group of heat exchanger, pumps, or valves that are similar in design, type, and function. In addition, when the component to be examined contains a group of bolted connections of similar design and size such as flanged connections, the examination may be conducted one bolted connection among the group. (4) Visual examination of bolting for heat exchangers, pumps, or valves is required only when the component is examined under Examination Category B-B, B-L-2, or B-M-2. Examination of a bolted connection is required only once during the interval. IWB , B-L-2, B12.20, Pump Internal Surface [Note 1] (1) Examinations are limited to at least one pump in each group of pumps performing similar functions in the system, e.g., recirculating coolant pumps. Inquirer: Mr. Won Park, ANSCO, 418, Munji-Dong, Yuseong-Gu, Daejeion, South Korea, wpark@ansco.kr Inquiry and response were reworded at SG WCS as follows: Is it a requirement of Table IWB , Examination Category B-G-1, that a visual VT-1 examination of the pump flange surface be performed on more than one pump performing a similar function in the system during each inspection interval? Response: No Motion for alternative intent inquiry passed WG-ISC Motion to change to intent inquiry passed SG WCS of 7

7 Inquiry Original Question 1: Regarding Appendix G to the Section XI of ASME Code, no upper limit is specified in Section G-2110 while Fig. G shows fracture toughness up to 220 ksi?in. Does 220 ksi?in mean an upper limit value for KIc? Revised Question 1: Is it a requirement of ASME Code Section XI, Appendix G that an upper limit of 220 ksiin^0.5 be applied to KIC? Reply: No Original Question 2: If it doesn't mean upper limit value, is it permissible to evaluate the RCS Pressure- Temperature Limits Curve up to the system design pressure without placing the upper limit of the fracture toughness (KIc)? Revised Question 2: If the reply to Question 1 is no, is it permissible to evaluate the RCS Pressure- Temperature Limits Curve up to the system design pressure without placing the upper limit of the fracture toughness (KIc)? Reply: Consulting (Yes) 7 of 7

Rules for Inservice Inspection of Nuclear Power Plant Components

Rules for Inservice Inspection of Nuclear Power Plant Components 2013 ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE XI Rules for Inservice Inspection of Nuclear Power Plant Components 29. 2013 ASME FINAL Covers_XI Rules Nuc MECH 5.9.indd 1 5/15/13 5:09

More information

ASME BPVC Sec I PG-99.2 The metal temperature shall not exceed 120 F (50 C) during the close visual examination

ASME BPVC Sec I PG-99.2 The metal temperature shall not exceed 120 F (50 C) during the close visual examination Code Comparison of ASME Boiler and Vessel Codes, Piping and API Standard Practices: Compiled by Goutham Rathinam, AweldI, CWSIP 3.1 (TWI,UK) Maximum Permissible Test Minimum Test ASME BPVC Sec I PG-99.1

More information

ASME B31.3 INTERPRETATIONS NO. 13

ASME B31.3 INTERPRETATIONS NO. 13 /. '.... _,' ASME B31.3 INTERPRETATIONS NO. 13 1 Replies to Technical Inquiries April 1, 1994, Through March 31, 1995 General Information It has been agreed to publish interpretations issued by the B31

More information

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process

Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process ASME B73.1-2012 [Revision and Consolidation of ASME B73.1-2001 (R2007) and ASME B73.5M-1995 (R2007)] Specification for Horizontal End Suction Centrifugal Pumps for Chemical Process AN AMERICAN NATIONAL

More information

ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications. Prague, CR July 7 8, 2014

ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications. Prague, CR July 7 8, 2014 ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications Prague, CR July 7 8, 2014 ASME NQA-1 Due to the expansion of the global supply chain and advances in technology, many codes and

More information

Wrought Copper and Wrought Copper Alloy Solder-Joint Drainage Fittings DWV

Wrought Copper and Wrought Copper Alloy Solder-Joint Drainage Fittings DWV ASME B16.29-2017 (Revision of ASME B16.29-2012) Wrought Copper and Wrought Copper Alloy Solder-Joint Drainage Fittings DWV AN AMERICAN NATIONAL STANDARD ASME B16.29-2017 (Revision of ASME B16.29-2012)

More information

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 Page of FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 1. Manufactured and certified by: 2. Manufactured for:

More information

Cast Copper Alloy Solder Joint Drainage Fittings: DWV

Cast Copper Alloy Solder Joint Drainage Fittings: DWV ASME B16.23-2011 [Revision of ASME B16.23-2002 (R2006)] Cast Copper Alloy Solder Joint Drainage Fittings: DWV AN AMERICAN NATIONAL STANDARD ASME B16.23-2011 [Revision of ASME B16.23-2002 (R2006)] Cast

More information

Socket Wrenches, Handles, and Attachments

Socket Wrenches, Handles, and Attachments ASME B107.110-2012 (Redesignation and Consolidation of ASME B107.1, B107.2, B107.5M, B107.10, B107.12, B107.33M, and B107.34) Socket Wrenches, Handles, and Attachments AN AMERICAN NATIONAL STANDARD ASME

More information

ASME B31.3 INTERPRETATIONS NO.9,

ASME B31.3 INTERPRETATIONS NO.9, ASME B31.3 INTERPRETATIONS NO.9,, t, Replies to Technical Inquiries June 1, 1990, Through March 31, 1991 General Information It has been agreed to publish interpretations issued by the B31 Committee concerning

More information

Meeting of October 21, 2014 Columbus, Ohio

Meeting of October 21, 2014 Columbus, Ohio Date Distributed: November 13, 2014 SUBCOMMITTEE REPAIR AND ALTERATION Meeting of October 21, 2014 Columbus, Ohio MINUTES These minutes are subject to approval and are for Committee use only. They are

More information

(AMMA) American Maritime Modernization Association

(AMMA) American Maritime Modernization Association (AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT

More information

Module B contains eleven modules. This is Module B8. International Standards Development

Module B contains eleven modules. This is Module B8. International Standards Development 0 Module B contains eleven modules. This is Module B8. International Standards Development 1 At the end of this module you will know What makes a Standard International The process by which ASME Standards

More information

Jared Bower Robatel Technologies Roanoke, Virginia, USA

Jared Bower Robatel Technologies Roanoke, Virginia, USA www.robateltech.com Jared Bower Robatel Technologies Roanoke, Virginia, USA What are Ion-? How is this waste typically managed? Can it be handled in a different way? How is Robatel s new method beneficial

More information

STP-NU CODE COMPARISON REPORT

STP-NU CODE COMPARISON REPORT CODE COMPARISON REPORT for Class 1 Nuclear Power Plant Components CODE COMPARISON REPORT for Class 1 Nuclear Power Plant Components Prepared for: Multinational Design Evaluation Programme Codes and Standards

More information

Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report

Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report 1. Introduction By S. S Dua PNC Working Group/Task Group Chair Atomic Energy of Canada Ltd. Canada This

More information

Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1 -

Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1 - Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1-1 Preliminary remark... 1 2 Fundamentals... 2 2.1 Terms / criteria... 2 2.2 Scope / limitations...

More information

Machine Screws, Tapping Screws, and Metallic Drive Screws (Inch Series)

Machine Screws, Tapping Screws, and Metallic Drive Screws (Inch Series) ASME B18.6.3-2010 [Revision and Consolidation of ASME B18.6.3-2003 (R2008) and B18.6.4-2009] Machine Screws, Tapping Screws, and Metallic Drive Screws (Inch Series) A N A M E R I C A N N A T I O N A L

More information

HSB Global Standards ASME Code Changes and Discussions

HSB Global Standards ASME Code Changes and Discussions HSB Global Standards ASME Code Changes and Discussions Presented by: David M. Allore Field Services Manager September 12, 2012 AGENDA Guidelines for AI Review of Design Calculations Frequent Mistakes on

More information

ASME B31.3 INTERPRETATIONS NO. 11

ASME B31.3 INTERPRETATIONS NO. 11 ,..,.- r, ASME B31.3 INTERPRETATIONS NO. 11 Replies to Technical Inquiries April 1,1992, Through March 31,1993 'I General Information,It has been agreed to publish interpretations issued by the B31 Committee

More information

American Nuclear Society

American Nuclear Society American Nuclear Society 1 Unraveling the Mystery of Consensus Standards Presented by: The American Nuclear Society Standards Committee January 31, 2017 Copyright 2017 by American Nuclear Society Purpose

More information

MDEP Codes and Standards Working Group. CSWG s Initiative to Harmonize Nuclear Pressure-Boundary Codes and Standards

MDEP Codes and Standards Working Group. CSWG s Initiative to Harmonize Nuclear Pressure-Boundary Codes and Standards MDEP Codes and Standards Working Group CSWG s Initiative to Harmonize Nuclear Pressure-Boundary Codes and Standards MDEP Codes and Standards Working Group s (CSWG s) Goal Achieve harmonization of code

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

CECIMO position on the applicability of the. Pressure Equipment Directive (97/23/EC) to machine tools

CECIMO position on the applicability of the. Pressure Equipment Directive (97/23/EC) to machine tools CECIMO position on the applicability of the Pressure Equipment Directive (97/23/EC) to machine tools Summary: The Pressure Equipment Directive (97/23/EC) was enforced in a mandatory way on 29 May 2002.

More information

Machine Screws, Tapping Screws, and Metallic Drive Screws (Inch Series)

Machine Screws, Tapping Screws, and Metallic Drive Screws (Inch Series) ASME B18.6.3-2013 (Revision of ASME B18.6.3-2010) Machine Screws, Tapping Screws, and Metallic Drive Screws (Inch Series) AN AMERICAN NATIONAL STANDARD ASME B18.6.3-2013 (Revision of ASME B18.6.3-2010)

More information

Process Validation to Improve Food Safety Meat and Poultry. James S Dickson Inter-Departmental Program in Microbiology Department of Animal Science

Process Validation to Improve Food Safety Meat and Poultry. James S Dickson Inter-Departmental Program in Microbiology Department of Animal Science Process Validation to Improve Food Safety Meat and Poultry James S Dickson Inter-Departmental Program in Microbiology Department of Animal Science Validation vs. Verification Those activities, other than

More information

SECTION IX. ASME Boiler and Pressure Vessel Code An International Code ASME B PVC.I X-2017

SECTION IX. ASME Boiler and Pressure Vessel Code An International Code ASME B PVC.I X-2017 ASME B PVC.I X-2017 SECTION IX We l d i n g, Br a zi n g, a n d Fu sin g Qu alific ations 2017 ASME Boiler and Pressure Vessel Code An International Code Qual i fi cat i on St and ard for We l d i ng,

More information

Pressure Vessels Asme Code Simplified

Pressure Vessels Asme Code Simplified We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with pressure vessels asme

More information

ASME INTERPRETATIONS NO. 19

ASME INTERPRETATIONS NO. 19 ASME 831.3 INTERPRETATIONS NO. 19 Replies to Technical Inquiries April 1, 2001 through October 31, 2003 General Information It has been agreed to publish interpretations issued by the B31 Committee concerning

More information

Pressure Vessel FEA Consulting Services

Pressure Vessel FEA Consulting Services Pressure Vessel FEA Consulting Services ASME Section VIII, Division 2 Fatigue Analysis of Pressure Vessels and Heat Exchangers Within the ASME Section VIII, Division 2 code, the design-by-analysis requirement

More information

IS LIMITED REGISTRATION OF IRON OXIDE PELLETS UNDER REACH AN OPTION?

IS LIMITED REGISTRATION OF IRON OXIDE PELLETS UNDER REACH AN OPTION? Position paper (author: Rob Versfeld, Corus Staal BV, nominated lead registrant) IS LIMITED REGISTRATION OF IRON OXIDE PELLETS UNDER REACH AN OPTION? Do Iron Oxide Pellets [Einecs number 265-996-3] fall

More information

Standard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection

Standard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

Page 1 of 12 Second Revision No. 5-NFPA 12-2014 [ Section No. 2.3.4 ] 2.3.4 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C 700, West Conshohocken, PA 19428-2959. ASTM A53, Standard

More information

Fasteners. Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Dwg. No Revision D March 24, 2015

Fasteners. Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Dwg. No Revision D March 24, 2015 Rev. ECO Description Author Approved Date A Initial Release B. Klatt R. Goeke 04/16/91 B General Revision 01/20/06 C General Editorial Update B. Klatt M. Bautz 07/16/14 D Incorporate GSFC 541- PG- 8072.1.2Rev

More information

Standard VAR b Generator Operation for Maintaining Network Voltage Schedules

Standard VAR b Generator Operation for Maintaining Network Voltage Schedules A. Introduction 1. Title: Generator Operation for Maintaining Network Voltage Schedules 2. Number: VAR-002-1.1b 3. Purpose: To ensure generators provide reactive and voltage control necessary to ensure

More information

Implementation Plan Project Modifications to PRC Reliability Standard PRC-025-2

Implementation Plan Project Modifications to PRC Reliability Standard PRC-025-2 Project 2016-04 Modifications to PRC-025-1 Reliability Standard PRC-025-2 Applicable Standard PRC Generator Relay Loadability Requested Retirement PRC 025 1 Generator Relay Loadability Prerequisite Standard

More information

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

ASME B PVC.II.D.C SECTION II MATERI ALS ASME Boiler and Pressure Vessel Code An International Code. Pa r t D Prop er ties (Cu stomar y)

ASME B PVC.II.D.C SECTION II MATERI ALS ASME Boiler and Pressure Vessel Code An International Code. Pa r t D Prop er ties (Cu stomar y) ASME B PVC.II.D.C -2017 SECTION II MATERI ALS 2017 ASME Boiler and Pressure Vessel Code An International Code Pa r t D Prop er ties (Cu stomar y) Markings such as ASME, ASME Standard, or any other marking

More information

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

Engineering Standards For Mechanical Design Criteria

Engineering Standards For Mechanical Design Criteria ENGINEERING STANDARDS FOR MECHANICAL DESIGN CRITERIA PDF - Are you looking for engineering standards for mechanical design criteria Books? Now, you will be happy that at this time engineering standards

More information

ASME SECTION VIII DIVISION 1 PDF

ASME SECTION VIII DIVISION 1 PDF ASME SECTION VIII DIVISION 1 PDF ==> Download: ASME SECTION VIII DIVISION 1 PDF ASME SECTION VIII DIVISION 1 PDF - Are you searching for Asme Section Viii Division 1 Books? Now, you will be happy that

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 16142-1 First edition 2016-03-01 Medical devices Recognized essential principles of safety and performance of medical devices Part 1: General essential principles and additional

More information

FACILITY RATINGS METHOD TABLE OF CONTENTS

FACILITY RATINGS METHOD TABLE OF CONTENTS FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5

More information

AS/NZS 1200:2000 AS/NZS

AS/NZS 1200:2000 AS/NZS AS/NZS 1200:2015 Australian/New Zealand Standard Pressure equipment Superseding AS/NZS 1200:2000 AS/NZS 1200:2015 AS/NZS 1200:2015 This joint Australian/New Zealand standard was prepared by joint Technical

More information

Standard BAL Frequency Response and Frequency Bias Setting

Standard BAL Frequency Response and Frequency Bias Setting A. Introduction Title: and Frequency Bias Setting Number: BAL-003-1 Purpose: To require sufficient from the Balancing (BA) to maintain Interconnection Frequency within predefined bounds by arresting frequency

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Pressure Vessels Asme Code Simplified

Pressure Vessels Asme Code Simplified We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with pressure vessels asme

More information

QUALITY ASSURANCE SPECIFICATION

QUALITY ASSURANCE SPECIFICATION Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose

More information

Dimensioning and Tolerancing Principles for Gages and Fixtures

Dimensioning and Tolerancing Principles for Gages and Fixtures ASME Y14.43-2011 [Revision of ASME Y14.43-2003 (R2008)] Dimensioning and Tolerancing Principles for Gages and Fixtures Engineering Drawing and Related Documentation Practices AN AMERICAN NATIONAL STANDARD

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 15547-2 First edition 2005-11-01 Petroleum, petrochemical and natural gas industries Plate-type heat exchangers Part 2: Brazed aluminium plate-fin heat exchangers Industries

More information

Scope/Purpose of SI Training:

Scope/Purpose of SI Training: manufactured equipment and materials at the supplierfacility, and, confirming that the supplier s quality management system is being utilizedeffectively. There is no specific minimum experience requirement

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS

EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS EUR DOC 012 EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS First Edition Approved by the European Air Navigation Planning Group

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

Conformity Assessment. Gerardo Moino PRT Certificate Program April 2018

Conformity Assessment. Gerardo Moino PRT Certificate Program April 2018 Conformity Assessment Gerardo Moino PRT Certificate Program April 2018 PRT Certificate of Authorization TO FABRICATE PARTS WITHOUT DESIGN RESPONSIBILITY UNDER ASME BPVC BACKGROUND During Construction under

More information

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 (Revised) Implementation Plan for Cyber Security Standards The intent

More information

PROPOSAL PAGE 1 OF 5 Revision 3, 4/21/2016. Inquiry: Is it permissible in Section I construction to utilize

PROPOSAL PAGE 1 OF 5 Revision 3, 4/21/2016. Inquiry: Is it permissible in Section I construction to utilize PROPOSAL PAGE 1 OF 5 Case 2697 Unstayed Flat Head Constructed From Forged Material Section I Inquiry: Is it permissible in Section I construction to utilize flat heads with integral flanges constructed

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

IAPMO IGC a Crimp-Style Metal Insert Fittings for SDR 9 PEX and PE-RT Tubing

IAPMO IGC a Crimp-Style Metal Insert Fittings for SDR 9 PEX and PE-RT Tubing Crimp-Style Metal Insert Fittings for SDR 9 PEX and PE-RT Tubing For IAPMO Staff Use Only. Distribution Prohibited. IAPMO Standard IAPMO IGC 319-2015a Crimp-Style, Metal Insert Fittings for SDR 9 PEX and

More information

January 7, 1997 COATED PRINTING PAPER, GS-10 1 GS-10 SECOND EDITION JANUARY 7, This standard has been superseded by Edition 2.

January 7, 1997 COATED PRINTING PAPER, GS-10 1 GS-10 SECOND EDITION JANUARY 7, This standard has been superseded by Edition 2. January 7, 1997 COATED PRINTING PAPER, GS-10 1 GS-10 GREEN SEAL STANDARD FOR COATED PRINTING PAPER SECOND EDITION JANUARY 7, 1997 This standard has been superseded by Edition 2.1, July 12, 2013 Green Seal,

More information

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified

More information

Joint Preparation prior to Tensioning: General:

Joint Preparation prior to Tensioning: General: `Hydraulic Tensioner Procedure for 50% tensioning: Document: PWL-HTS-101 Joint Preparation prior to Tensioning: General: Clean Flanges and check for scars on the flange surface area Check studs and nuts

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE International Telecommunication Union ITU-T K.49 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (12/2005) SERIES K: PROTECTION AGAINST INTERFERENCE Test requirements and performance criteria for voice

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

for industry.com

for industry.com Inspection and Test Plan for Shell and Tube Heat Exchanger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Manuf. TPI Client Remark 1 Pre Inspection Meeting

More information

Alfa Laval Material Standard T

Alfa Laval Material Standard T Marking of material and components for heat exchangers Prepared and edited by Materials & Chemistry Centre, Tumba, Sweden Page No. of pages Revision No. Date 1 7 10 2014-04-28 COPYRIGHT Alfa Laval AB 2014.

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012 What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012 What We Heard Report: The Case for Change 1 Report of What We Heard: The Case for Change Consultation

More information

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does

More information

AHRI Standard Standard for Performance Rating of Modulating Positive Displacement Refrigerant Compressors

AHRI Standard Standard for Performance Rating of Modulating Positive Displacement Refrigerant Compressors AHRI Standard 545 2017 Standard for Performance Rating of Modulating Positive Displacement Refrigerant Compressors IMPORTANT SAFETY RECOMMENDATIONS AHRI does not set safety standards and does not certify

More information

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design June 2013 Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design Executive Summary A vendor pre-project design review of a new nuclear power plant provides an

More information

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection

Standard PRC Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

State of Shimane Nuclear Power Station

State of Shimane Nuclear Power Station Investors Meeting for FY2017-2Q Financial Results State of Shimane Nuclear Power Station November 8, 2016 The Chugoku Electric Power Co., Inc. 1. Process of Compliance Examinations 1 In December 2013,

More information

Standard Specification for Candle Fire Safety Labeling 1

Standard Specification for Candle Fire Safety Labeling 1 Designation: F2058 07 Standard Specification for Candle Fire Safety Labeling 1 This standard is issued under the fixed designation F2058; the number immediately following the designation indicates the

More information

Outlook on Candidate Performance Specifications for QRTV

Outlook on Candidate Performance Specifications for QRTV Outlook on Candidate Performance Specifications for QRTV 3rd GTR Working Group on QRTV 5-7 December 2011 INTERNATIONAL ORGANIZATION OF MOTOR VEHICLE MANUFACTURERS Page 1 Dec. 2011 Given Task by QRTV Working

More information

ISO INTERNATIONAL STANDARD. Non-destructive testing Ultrasonic thickness measurement

ISO INTERNATIONAL STANDARD. Non-destructive testing Ultrasonic thickness measurement INTERNATIONAL STANDARD ISO 16809 First edition 2012-11-15 Non-destructive testing Ultrasonic thickness measurement Essais non destructifs Mesurage de l'épaisseur par ultrasons Reference number ISO 2012

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

OPITO APPROVED STANDARD

OPITO APPROVED STANDARD OPITO APPROVED STANDARD Offshore Oil & Gas Industry Transformation Scheme Mechanical Program Training Standard The content of this document was developed by OPITO. Guidance and advice on this training

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section Editing (date): Marie-Clémence DEGALLAIX (30/05/2016) Checking (date): Jean FOURCROY (02/06/2016)

More information

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,

More information

FORM Q-120 PROCEDURE SPECIFICATION FOR CLASS II VESSELS (Revision C 2017) Part I Fabrication

FORM Q-120 PROCEDURE SPECIFICATION FOR CLASS II VESSELS (Revision C 2017) Part I Fabrication FORM Q-120 Part I Fabrication PROCEDURE SPECIFICATION NUMBER: NOTE: Procedure Specification Form Q-120 for Class II vessels consists of three parts. Part I, Fabrication, shall be completed for each separately

More information

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS LAST UPDATED 25-10-2017 DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS COURSE DURATION: 5 DAYS REACH US Today for Greater Safety, Quality, Reliability, Productivity, Profitability HRD Approved Class A

More information

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR August 31, 2009 Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR-1000-1 Executive Summary A vendor pre-project design review of a new nuclear power plant provides an opportunity

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Footwear Foot Grounders Resistive Characterization (not to include static control shoes)

Footwear Foot Grounders Resistive Characterization (not to include static control shoes) for the Protection of Electrostatic Discharge Susceptible Items- Footwear Foot Grounders Resistive Characterization (not to include static control shoes) Electrostatic Discharge Association 7900 Turin

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

ALLOY STEEL SOCKET SET SCREWS 1

ALLOY STEEL SOCKET SET SCREWS 1 1 IFI NOTE: - is reprinted with permission from the Annual Book of ASTM Standards, copyright American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959, U.S.A,

More information

IEEE STD AND NEI 96-07, APPENDIX D STRANGE BEDFELLOWS?

IEEE STD AND NEI 96-07, APPENDIX D STRANGE BEDFELLOWS? IEEE STD. 1012 AND NEI 96-07, APPENDIX D STRANGE BEDFELLOWS? David Hooten Altran US Corp 543 Pylon Drive, Raleigh, NC 27606 david.hooten@altran.com ABSTRACT The final draft of a revision to IEEE Std. 1012-2012,

More information

Engineering Policy & Procedure

Engineering Policy & Procedure FPD > Engineering > Global Standards Engineering Policy & Procedure Revision History Number: G2-4 Section: G Subject: Radiographic Examination Procedure 1.0 SCOPE This procedure specifies the requirements

More information