1 EVALUATION OF GLASS MELTER OPERATION IN TOKAI VITRIFICATION FACILITY Masahiro Yoshioka and Noboru Endo Japan Nuclear Cycle Development Institute Tokai-Works 4-33 Muramatsu, Tokai-mura Ibaraki Japan ABSTRACT The Tokai Vitrification Facility (TVF) was constructed as a first plant in Japan to immobilize the high-level liquid waste (HLLW) to the borosilicate glass in April The TVF finished successfully the test operation being carried out since then using both the simulated waste and HLLW transferred from the Tokai Reprocessing Plant (TRP). After getting an operational license on December 1, 1995, the TVF shifted from the stage of test operation to the full operation. The total HLLW of 52 m 3 was treated, and 62 vitrified wastes were produced through the operation of 1996 including 22 during the test operation. Since then, the operation of TVF including TRP have been stopped up to now due to the accident of the Bituminization Facility occurred in March In future, however, the TVF will have to continue the operation of producing more than 1000 vitrified wastes from the HLLW in TRP, including the HLLW generated in a next decade. The behavior of electro-conductive sludge like noble metals in the glass melter must be evaluated for stable operation of TVF glass melter over a long period. This paper describes operational results and its evaluation related to the noble metals through the glass melter operation with the feed of actual HLLW. It was found that noble metals concentrated in the middle of the melt and then settled to the bottom due to the change of operation where they accumulated. A modification of melter operation and design is presented in this paper to prevent this accumulation. INTRODUCTION The TVF is designed to solidify the HLLW generated from the TRP which treats the LWR spent fuels burned-up 28,000 MWD/MTU in average. The vitrification technology of TVF is based on the liquid fed joule-heated ceramic melter (LFCM) process which has been developed in Power Reactor and Nuclear Fuel Development Corporation (at present, Japan Nuclear Cycle Development Institute (JNC)) through the cooperation with the United State and Germany since Many developmental works were carried out on the glass melter and relative process for the TVF(1). The ground preparation for the TVF was started in mid of The construction of TVF building was completed in February of Subsequently, the installations of process equipment to the cell were finished in April of The test operations had been gone along step-by-step through the cold test and the radioactive test since The cold tests divided into two major tests, the operation test of process equipment and the remote maintenance test, had been conducted alternately. The improvements

2 of some process equipment were carried out based on the result of the cold test for getting more good operability. Each operation result showed that the TVF has enough performance for the safety and process operation, and also for the quality control of glass products. For the remote maintenance of process equipment in the vitrification cell, the remote maintenance capability by two-armed servo-manipulators and in-cell cranes had been confirmed for all remote equipment more than 1000 objects including a glass melter and the racks mounting the process equipment. Subsequently the TVF commenced the radioactive test operations in January 1995 after the preparation for start-up of operation like a cell closing, an establishment of control area, and a connection of HLLW transfer pipe with the TRP. At the beginning of this test operation, the draining glass accumulated in the coupling device between the glass melter and a canister during the third glass draining. After some improvements of both the instrument and glass temperature control were carried out, the test operation was restarted. And radioactive test operation of TVF was finished successfully to produce more 20 vitrified wastes in October After taking the final inspection before the use by government during this test operation, the TVF got an operational license for full operation in December 1, OUTLINE OF TVF Vitrification Process The HLLW is transferred from the TRP to a receiving tank of the TVF after the cooling more than five years. Elemental and radioactive analysis is carried out for process and product quality control. The HLLW is pretreated to adjust the composition by the addition of sodium nitrate and by concentration using an evaporator when required. After the pretreatment, HLLW is transferred to a glass melter continuously using a two-stage airlift system for accurate quantitative feed. Glass fiber cylinders are used as a glass additive for melting. The HLLW transferred to a glass melter is soaked into the cylinder just before it is fed into the melter pool. The glass melted at the temperature of 1100 C to 1200 C is discharged periodically through a metallic nozzle located at the bottom of the melter into a canister. During the discharge, the weight and volume of the glass in the canister are successively measured by load cells and by the gamma-ray method, respectively. The filled canister is subsequently cooled, and transferred to the welding position, and a lid is welded by a TIG welder to seal the canister. After being decontaminated by high-pressure water jet spray and wire brushing and being inspected such as smear test, leak test from lid of a canister, the glass products are stored in forced-air cooling pits. Melter off-gas is cleaned by wet scrubbing process such as a submerged bed scrubber, a venturi scrubber, a perforated plate type water scrubber, and subsequent filtration process such as a high efficiency mist eliminator (HEME), a ruthenium adsorber (silica gel), an iodine adsorber and HEPA filters. The secondary waste like a washed water after treating the off-gas, water used in the decontamination of canister, and condensed waste from the vessels is treated using three stage of evaporation in the TVF. The concentrated waste is mixed to the HLLW at the time of receipt from the TRP, is treated to the vitrified waste. The very low active waste is transferred to the TRP to release to the sea after neutralization. Figure 1 shows a main process flow of the TVF.

3 Specification and Features of the Plant Fig. 1 Main Process Flow in TVF The capacity of TVF, the HLLW treatment rate of 0.35 m 3 /d, is equivalent to the TRP capacity of 0.7 metric tons of uranium per day. The vitrified waste of 300 kg has a heat generation rate of 1.4 kw and radioactivity of 1.5E16 Bq in the design. The TVF incorporates a new concept of fully remote maintenance system for the process equipment in accordance with the adoption of a large vitrification cell so that the plant availability is increased and personnel exposure decreased. In order to carry out this concept, over head system like the bilateral typed two-armed servo-manipulators (BSM), in-cell cranes, and rack system which mount the process equipment on the modularized frames are disposed in a vitrification cell(2). Also the low flow ventilation system is adopted as a cell exhaust treatment system. This system contributes to reduce the release of radio-nuclides from the vitrification cell to atmosphere in the case of release from the equipment to the cell because that exhaust gas is treated by the melter off-gas and vessel off-gas treatment system installed in the vitrification cell(3). The TVF has two main cells; one is a vitrification cell with 27m length, 12m width, and 13m height where most of vitrification process equipment such as the vessels and an evaporator treating HLLW, a glass melter, and the off-gas treatment equipment are installed. Another cell is a transfer cell with storage pits where the glass products are inspected and stored.

4 DEVELOPMENT OF NOBLE METAL COMPATIBLE GLASS MELTER SYSTEM Glass Melter Structure for Noble Metal The noble metals such as Ru, Rh, Pd in the HLLW have high density and small solubility to the glass, so they have a tendency of sedimentation to the bottom once they are fed into the glass melter. If they are not discharged thoroughly from the glass melter and accumulate on the bottom area, the current between electrodes will make a preferable shortcut through the accumulation of noble metals due to its high electro-conductivity. As a result, the glass melter based on the LFCM process has a possibility that the melting capability may fall down, and in the worst case, a part of electrode or refractory will be melted down by the heat generated through the excessive current between the accumulation and electrode. Many developmental works for discharging the noble metals effectively through the glass pouring were carried out due to the characteristics in TVF such as the high concentration of noble metals, a long staying time of it in the melt making big sedimentation of it. Several experiments were performed in order to look into the effect of melter bottom slope on the melter operation and discharge of noble metals. The result showed that a melter bottom slope of 45 would eliminate the operational difficulties by facilitating the discharge of deposits. However, the operational result of glass melter with 45 sloped bottom carried out using highly simulated waste showed that the accumulation of 10% of noble metals in every batch might cause operational problems in the glass melter over a long period(1). Therefore, a technique was needed for the TVF that discharge the total amount of noble metals fed into the melter. Glass Melter Operation Mode for Noble Metal Tests to prevent the accumulation of noble metals and to discharge them more effectively from the glass melter were carried out through the operation of Mock-up glass melter over a long period. One of the methods to make this attempt operationally was to keep the melter bottom at a low temperature. The operational method to control the melter bottom temperature was done by controlling the power of auxiliary electrodes located at the melter bottom, as shown in Figure 2. The melter operation with a low bottom temperature kept the resistance between main electrodes stable. No significant change was observed during the operation using this method. Also it was confirmed by evaluating the balance of noble metals after finishing the run, that the amount of noble metals left in the melter was less than 1% of total amount fed into the glass melter(4). On the other hand, the resistance between auxiliary electrodes decreased with the increase of noble metals fed into the glass melter. However, this low resistance was recovered after pouring the glass through the bottom drain nozzle every batch. This operation result of Mock-up glass melter using highly simulated waste meant that the noble metals fed into the glass melter were discharged effectively through the operation mode of a low bottom temperature over a long period. So the cold bottom mode of operation was expected to be one of the most promising methods to eliminate the operational difficulties caused by noble metals for the operation of TVF.

5 Fig. 2 Glass Melter Structure and Operation Mode RESULT AND EVALUATION OF GLASS MELTER OPERATION Result of Glass Melter Operation The glass melter has been operated for producing 62 vitrified wastes by treating 52 m 3 of HLLW containing the noble metals through the divided runs. The amount of noble metals fed into a glass melter was about 260 kg in oxide total, and concentration of them was slightly higher than standard composition (RuO 2 : 0.74%, Rh 2 O 3 : 0.14%, PdO: 0.35%) used in the feed of simulated waste during cold test operation. The accumulation of noble metals on the slope of melter bottom that develops to the decrease of melting capability or the damage of electrodes can be detected by observing the change of resistance between main electrodes during the melter operation. As a result of all glass melter operations, the drop of resistance taken account of the contribution of glass temperature was not observed even in gradually or abruptly during all the operation, so the accumulation of noble metals on the slope of the bottom is evaluated to be prevented by the cold bottom operation mode. The accumulation of noble metals on the bottom can be detected by observing the change of resistance between auxiliary electrodes located at the melter bottom as well as the accumulation on the bottom slope. In usual glass melter operation, the resistance between auxiliary electrodes drops due to the sedimentation of noble metals at the bottom in accordance with the feed operation. However this resistance is recovered to its original value through the discharge of noble metals by glass pouring operation. As a result of all glass melter operations, this resistance dropped gradually with glass melter operation shown in Figure 3. In the first half of operation for producing about 40 vitrified wastes, the dropped resistance due to the sedimentation of noble metals, even big drop in some batches, recovered to nearly former basis after the glass pouring, although the resistance dropped little by little. In the latter of operation for producing 20 vitrified wastes, however, the resistance did not recovered even after glass pouring, especially in big drop at the first batch after the start-up of the glass melter.

6 It was found that there was a difference in the pouring rate at the just beginning of glass pouring in the latter of operation. Abnormal pouring rate was more than 50kg/h at the start of glass pouring in comparison with the normal pouring rate less than 10kg/h. This meant that the glass just upper the draining nozzle was heated by much current of auxiliary electrodes collected through the accumulation of noble metals. This accumulation did not affect to the operation of glass melter except for the heating of melter bottom using auxiliary electrodes. However the bottom heating was confirmed to be made through the current between main electrode and draining nozzle. Consequently the noble metals fed into the glass melter is evaluated to accumulate around the top of draining nozzle at the melter bottom. Fig. 3 Relationship between Drop of Resistance and Operation Evaluation of Noble Metal Accumulation This kind of accumulation was never observed through the operation of Mock-up glass melter and TVF glass melter by feeding the simulated waste containing the noble metals. The difference between both these operations of glass melters is the glass temperature that makes the sedimentation rate of noble metals change. The glass temperature at upper level in the glass melter treating the actual HLLW was relatively low less than 1150 C as compared with being maintained at about 1200 C during the feeding of simulated waste. The low glass temperature is attributed to the good melting capability in feeding the actual HLLW as compared with the simulated waste, that makes large exposure of glass surface to release the heat from the glass to the plenum space. Also the limitation in regulation of HLLW feeding rate less than 0.35 m 3 /day in spite of HLLW concentration contributed to the release of heat from the glass due to increasing the exposure of glass surface.

7 If the glass temperature drops from 1200 C to 1100 or 1000 C, the sedimentation rate of noble metals will be decreased by 1/5 and 1/50 respectively. So the noble metals stayed at the middle of glass melter, and are concentrated there during the operation of treating the HLLW. During the operation with simulated waste, almost all of noble metals fed into the glass melter in each batch settled to the bottom due to the high glass temperature, and were discharged by glass pouring. In the case of operation with actual HLLW, on the other hand, much of noble metals concentrated at middle level of glass melter, noble metals more than the amount fed into the glass melter each batch, is evaluated to settle on the bottom at a time according to the change of operation condition like upper glass temperature or bottom glass temperature. Some of them were discharged by glass pouring, and some accumulated on the bottom area around the draining nozzle. The change of operational condition that let down the resistance between auxiliary electrodes was the rise of upper glass temperature or bottom to medium glass temperature. The rise of upper glass temperature was made by increasing the feed into the glass melter on purpose for making sedimentation of the staying noble metal at the middle of melter. Because there was a concern that much more amount of noble metal staying in the melter could not be discharged through a glass pouring. The rise of bottom glass temperature was made as the result for the big heating of the bottom area before the glass pouring for getting smooth glass stream. So, in the case of idling operation for a long time and start-up operation of the glass containing melter that made the bottom temperature drop greatly, bottom and middle level of glass melter was heated very much. The relationship between the rise of glass temperature or the input power for bottom heating due to the drop of bottom temperature and the drop of resistance is evaluated to have a good coincidence through the analysis of operation data shown in Figure 3. Further, the TVF glass melter has a plane area consisting of the step-up structure around the draining nozzle for preventing the blockade of nozzle by the broken pieces of refractory as shown in Figure 4. So the accumulation of noble metals is estimated to be proceeding little by little, sometimes greatly on a plane area of melter bottom. Step-up Structure Refractory Protection Draining Nozzle PRESENT MELTER NEW MELTER Fig. 4 Modification of Melter Bottom Structure

8 CONCLUSION As a result of operational evaluation, the mechanism of noble metal accumulation on the bottom area was estimated as follows: The noble metals fed into the glass melter were staying and concentrating at the middle of glass melter without making the sedimentation to the bottom every batch of feeding. The change of operation, the rise of glass temperature at middle level of the melter, caused a great deal of sedimentation to the bottom at a time. All of the noble metals settled on the bottom were not discharged due to a plane with step-up structure on the bottom in addition to the excessive amount of noble metal. The accumulation of noble metals proceeded gradually along with the decrease of slope angle to the draining nozzle. In order to discharge all the noble metals even in the case of a great deal of sedimentation, the melter bottom must be improved to the bottom structure with no plane, the structure with straight slope to the nozzle, in addition to making the proper sedimentation of noble metals fed into the glass melter every batch. A step-up structure in the present melter is for preventing the draining nozzle from being blocked by broken pieces of refractory. New melter will adopt the protection system instead of the step-up structure as shown in Figure 4. References 1.Yoshioka, M., et al., Glass Melter and Process Development for PNC Tokai Vitrification Facility, WASTE MANAGEMENT, Vol. 12, pp. 7-16, Senba, Y., et al., Fully Remote Maintenance System in Tokai Vitrification Facility, Proc. of International Conference on Remote Techniques for Hazardous Environments at London, April 19-20, Tsuboya, T., et al., The Japanese Vitrification Program, Proc. of the symposium on waste Management at Tucson Arizona, Feb.28-Mar.3, 1988, Vol.2 pp Yoshioka, M., et al., Evaluation of glass melter operation using highly simulated waste for TVF, Proc. of International Topical Meeting on the Nuclear and Hazardous Waste Management (SPECTRUM'90), Knoxville, TN, Sep.30-Oct.4, 1990.

Commissioning and Cold Test Operation of the German HLLW Vitrification Plant VEK

Commissioning and Cold Test Operation of the German HLLW Vitrification Plant VEK Commissioning and Cold Test Operation of the German HLLW Vitrification Plant VEK W. Grünewald, G. Roth, W. Tobie, S. Weisenburger Forschungszentrum Karlsruhe GmbH Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen,

More information

Development of Remote Hanford Connector Gasket Replacement Tooling for the Savannah River Site s Defense Waste Processing Facility

Development of Remote Hanford Connector Gasket Replacement Tooling for the Savannah River Site s Defense Waste Processing Facility Development of Remote Hanford Connector Gasket Replacement Tooling for the Savannah River Site s Defense Waste Processing Facility - 9457 B. Metzger, J. Gee Defense Waste Processing Facility Savannah River

More information

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA Operation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 12166 Brandon C. Hodges, Defense Waste Processing Facility, Savannah River Remediation LLC, Savanah River Site,

More information

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ Installation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 11136 Michael E. Smith, Daniel C. Iverson Defense Waste Processing Facility Savannah River Remediation LLC

More information

A paper proposed for publication in Nuclear Technology.

A paper proposed for publication in Nuclear Technology. .... DF -MS-79-103 (Re; :4/80) VITRIFICATION OF SRP ifasteby A SLURRY-FED CERAMIC MELTER by G. G. Wicks E. I. du Pent de Nemours G Co. Savannah River Laboratory Aiken, South Carolina 29808 A paper proposed

More information

SIX REQUIREMENTS FOR NUCLEAR ENERGY SYSTEM AND CANDLE REACTOR ABSTRACT

SIX REQUIREMENTS FOR NUCLEAR ENERGY SYSTEM AND CANDLE REACTOR ABSTRACT SIX REQUIREMENTS FOR NUCLEAR ENERGY SYSTEM AND CANDLE REACTOR HIROSHI SEKIMOTO Centre for Research into Innovative Nuclear Energy System, Tokyo Institute of Technology 2-12-1 N1-12, O-okayama, Meguro-ku,

More information

POWER FLATTENING FOR SODIUM COOLED METALLIC FUEL CANDLE REACTOR BY ADDING THORIUM IN INNER CORE

POWER FLATTENING FOR SODIUM COOLED METALLIC FUEL CANDLE REACTOR BY ADDING THORIUM IN INNER CORE , on CD-ROM, American Nuclear Society, LaGrange Park, IL (21) POWER FLATTENING FOR SODIUM COOLED METALLIC FUEL CANDLE REACTOR BY ADDING THORIUM IN INNER CORE Hiroshi SEKIMOTO, Sinsuke NAKAYAMA, Hiroshi

More information

Development of Explosion-proof Autonomous Plant Operation Robot for Petrochemical Plants

Development of Explosion-proof Autonomous Plant Operation Robot for Petrochemical Plants 1 Development of Explosion-proof Autonomous Plant Operation Robot for Petrochemical Plants KOJI SHUKUTANI *1 KEN ONISHI *2 NORIKO ONISHI *1 HIROYOSHI OKAZAKI *3 HIROYOSHI KOJIMA *3 SYUHEI KOBORI *3 For

More information

MOCK-UP TEST OF R EMOTE CONTROL MACHI" 4 CR THE JPDR BIOLOGICAL SHIELD CONCRETE DISMANTLEMENT. Tokai-mura, Naka-gun, Ibaraki-ken , JAPAN

MOCK-UP TEST OF R EMOTE CONTROL MACHI 4 CR THE JPDR BIOLOGICAL SHIELD CONCRETE DISMANTLEMENT. Tokai-mura, Naka-gun, Ibaraki-ken , JAPAN MOCK-UP TEST OF R EMOTE CONTROL MACHI" 4 CR THE JPDR BIOLOGICAL SHIELD CONCRETE DISMANTLEMENT Mitsuo YOKOTA, General Manager Japan Atomic Energy Research Institute Tokai-mura, Naka-gun, Ibaraki-ken 319-11,

More information

WM 04 Conference, February 29-March 4, 2004, Tucson, AZ

WM 04 Conference, February 29-March 4, 2004, Tucson, AZ MOSAIK 20 YEARS OF EXPERIENCE WITH A CASK SYSTEM FOR TRANSPORTATION, CONDITIONING AND STORAGE OF RADIOACTIVE WASTE G. Gestermann GNS Gesellschaft für Nuklear-Service mbh Hollestraße 7 A, Germany 45127

More information

COOLANT WASTE MINIMIZATION USING A COALESCING PLATE SEPARATOR

COOLANT WASTE MINIMIZATION USING A COALESCING PLATE SEPARATOR COOLANT WASTE MINIMIZATION USING A COALESCING PLATE SEPARATOR Kirby S. Mohr, P.E. Mohr Separations Research, Inc. 1278 FM 407 Suite 109 Lewisville, TX 75077 Phone: 918-299-9290 Cell: 918-269-8710 Dennis

More information

Requirement for Holes - Holes for Hanging

Requirement for Holes - Holes for Hanging Requirement for Holes - Holes for Hanging In order for items to progress through the series of pretreatment and galvanizing baths at our facility, they must be suspended in a suitable manner to ensure

More information

TABLE OF CONTENTS. SI No Contents Page No.

TABLE OF CONTENTS. SI No Contents Page No. TABLE OF CONTENTS SI No Contents Page No. 1 Basic Textile Wet Processing Terms 1 2 Sequence of operations in Wet processing 2 3 Brief Note on jigger machine 3 4 Details of jigger machine 4 5 Operating

More information

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Dewatering Innovations Bill Boggia, ORNL-UCOR/ATL International

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Dewatering Innovations Bill Boggia, ORNL-UCOR/ATL International Dewatering Innovations 16381 Bill Boggia, ORNL-UCOR/ATL International ABSTRACT The Liquid and Gaseous Waste Operations (LGWO) project, located at the Oak Ridge National Laboratory, handles wastewater from

More information

Application Note. ipix A Gamma imager to support various applications. Introduction. An easy to carry and deploy instrument

Application Note. ipix A Gamma imager to support various applications. Introduction. An easy to carry and deploy instrument Application Note ipix A Gamma imager to support various applications Introduction ipix is a unique gamma imager that quickly locates low level radioactive sources from a distance and estimates the dose

More information

International Confidence to Japanese Nuclear Activities

International Confidence to Japanese Nuclear Activities 18 International Confidence to Japanese Nuclear Activities Takaaki KURASAKI Nuclear Nonproliferation Science & Technology Center (NPSTC), Japan Atomic Energy Agency (JAEA) February 7, 2006 1 What is international

More information

dismantling > Cutting techniques for decommissioning nuclear facilities and conditioning of nuclear waste Innovation Our solutions for

dismantling > Cutting techniques for decommissioning nuclear facilities and conditioning of nuclear waste Innovation Our solutions for Cutting techniques for decommissioning nuclear facilities and conditioning of nuclear waste Innovation Nuclear facilities consist of a variety of different components that are made of different materials

More information

Volute Dewatering Press as a New Technology. Bill LaPorte, Envirep, Inc.

Volute Dewatering Press as a New Technology. Bill LaPorte, Envirep, Inc. Volute Dewatering Press as a New Technology Bill LaPorte, Envirep, Inc. WLaPorte@Envirep.com Rev 11 May 2017 DEWATERING METHODS PLATE AND FRAME PRESSES CENTRIFUGES BELT PRESSES SCREW PRESSES ROTARY / FAN

More information

Cartogam Real-Time Portable Gamma-Ray Imaging System

Cartogam Real-Time Portable Gamma-Ray Imaging System Features Complete tool for in situ cartography, saving time, cost and dose Real-time acquisition and immediate display Two dimensional gamma mapping and dose range Dose rate estimation of hot spots Excellent

More information

Hand Torch or Flame Brazing Principles

Hand Torch or Flame Brazing Principles Hand Torch or Flame Brazing Principles Introduction Hand-torch brazing is inexpensive and flexible, making it ideally suited to small production batches or production runs involving differing components.

More information

Manufacturing: Chapter 3 Casting

Manufacturing: Chapter 3 Casting CHAPTER THREE Metal Casting Casting, shown in Fig. 3.1, is the process of pouring molten metal into a mould containing a cavity, which represents the required product shape. It is one of the most commonly

More information

CHAPTER5 5 ZERO DEFECT MANUFACTURING IN THE PRODUCTION OF IMPELLER THROUGH THE APPLICATION OF CAD / CAE

CHAPTER5 5 ZERO DEFECT MANUFACTURING IN THE PRODUCTION OF IMPELLER THROUGH THE APPLICATION OF CAD / CAE 33 CHAPTER5 5 ZERO DEFECT MANUFACTURING IN THE PRODUCTION OF IMPELLER THROUGH THE APPLICATION OF CAD / CAE 5.1 INTRODUCTION In the first place of research, CAD/CAE was applied to achieve ZERO DEFECT MANUFACTURING

More information

WM 07 Conference, February 25 March 1, 2007, Tucson, AZ

WM 07 Conference, February 25 March 1, 2007, Tucson, AZ Generalization of Experience in Radioactive Waste Melting with Application of Induction Melting Technology, Gained at Moscow Sia "Radon" During The Period from 1992 to 2006 ABSTRACT. S.A. Dmitriev, F.A.

More information

HANDLING THE WAX FROM HONEY COMBS*

HANDLING THE WAX FROM HONEY COMBS* HANDLING THE WAX FROM HONEY COMBS* G.F. TOWNSEND, CANADA Cappings Cappings are obtained when the waxen surface is removed from honeycombs prior to extracting the honey. Where eight or nine frames are used

More information

Module 4 Design for Assembly IIT BOMBAY

Module 4 Design for Assembly IIT BOMBAY Module 4 Design for Assembly Lecture 8 Case Studies - IV Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles

More information

Remote Control System of the Concrete Cutting Machine. Research Engineer. General Manager. Shimizu Corporation ABSTRACT

Remote Control System of the Concrete Cutting Machine. Research Engineer. General Manager. Shimizu Corporation ABSTRACT 871 Remote Control System of the Concrete Cutting Machine Kaneo TAKAHASHI, Tetsuo HASEGAWA, Research Engineer General Manager Shimizu Corporation SEVANS SOUTH No. 2-3,Shibaura, 1-chome, Minato - ku, Tokyo

More information

Knowledge Requirements. Protective Coatings Applicator Abrasive Blast Cleaning Operator Spray Painting Operator. trainthepainter.

Knowledge Requirements. Protective Coatings Applicator Abrasive Blast Cleaning Operator Spray Painting Operator. trainthepainter. Knowledge Requirements Protective Coatings Applicator Abrasive Blast Cleaning Operator Spray Painting Operator trainthepainter.com Knowledge Requirements The Knowledge Requirements the protective coatings

More information

Drivetrain for Vehicles 2018

Drivetrain for Vehicles 2018 Drivetrain for Vehicles 2018 presentation of an innovation RoBoC = Roll Bond Core ADVANTAGES OFFER RoBoC - Keep the stator housing battery housing power unit housing junction box and other similar applications

More information

TABLE OF CONTENTS. SI No Contents Page No.

TABLE OF CONTENTS. SI No Contents Page No. TABLE OF CONTENTS SI No Contents Page No. 1 Basic Textile wet Processing Terms 1 2 Sequence of operations in Wet processing of Knitted fabric 2 3 Brief Note on soft flow dyeing 3 4 Details of soft flow

More information

OPTIFLUX 1000 Technical Datasheet

OPTIFLUX 1000 Technical Datasheet OPTIFLUX 1000 Technical Datasheet Electromagnetic flow sensor in sandwich design Lightweight and compact Excellent price performance ratio Quick and easy to install The documentation is only complete when

More information

Figure 1: BrazeSkin spraying technique. Page 1

Figure 1: BrazeSkin spraying technique. Page 1 BrazeSkin Pre-brazing techniques for nickel-based and CuproBraze brazing alloys Dr. H. Schmoor, BrazeTec GmbH - Degussa Löttechnik - Hanau 1. Introduction The BrazeSkin technology for applying nickel-based

More information

ISO INTERNATIONAL STANDARD. Remote-handling devices for radioactive materials Part 2: Mechanical master-slave manipulators

ISO INTERNATIONAL STANDARD. Remote-handling devices for radioactive materials Part 2: Mechanical master-slave manipulators INTERNATIONAL STANDARD ISO 17874-2 First edition 2004-12-01 Remote-handling devices for radioactive materials Part 2: Mechanical master-slave manipulators Dispositifs de manipulation à distance pour matériaux

More information

Jared Bower Robatel Technologies Roanoke, Virginia, USA

Jared Bower Robatel Technologies Roanoke, Virginia, USA www.robateltech.com Jared Bower Robatel Technologies Roanoke, Virginia, USA What are Ion-? How is this waste typically managed? Can it be handled in a different way? How is Robatel s new method beneficial

More information

PET1606J2F. Pilani Electron Tubes & Devices Pvt. Ltd. Water Cooled Triode. For Industrial RF Heating. Drop in equivalent of BW1606J2F

PET1606J2F. Pilani Electron Tubes & Devices Pvt. Ltd. Water Cooled Triode. For Industrial RF Heating. Drop in equivalent of BW1606J2F Water Cooled Triode For Industrial RF Heating Drop in equivalent of BW1606J2F Output Power: 30 kw Anode voltage: 10 kv max Anode dissipation: 15 kw max Frequency up to 30 MHz Manufactured in India, in

More information

Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP

Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP PRESENTATION AGENDA Project Background and Goals for GR WWTP WAS

More information

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA Sonar Testing, Imaging and Visualization for Rapid Scan Applications in High-Level Waste Tanks 16386 David Roelant *, Hadi Fekrmandi *, Gene Yllanes ** * Applied Research Center - FIU ** Florida International

More information

Basic Principles and Operation of Transformer

Basic Principles and Operation of Transformer Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core

More information

NZQA Expiring unit standard version 3 Page 1 of 8. Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing

NZQA Expiring unit standard version 3 Page 1 of 8. Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing Page 1 of 8 Title Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing Level 3 Credits 10 Purpose This unit standard is for people working in the pavement surfacing industry.

More information

Technical data sheet. Encapsulator B-390 / B-395 Pro

Technical data sheet. Encapsulator B-390 / B-395 Pro Encapsulator B-390 / B-395 Pro Technical data sheet Production of functionalized beads and core-shell capsules with narrow size distribution are the key benefits of this system. BUCHI offers the Encapsulator

More information

COMPATIBILITY WITH TIMBERS

COMPATIBILITY WITH TIMBERS GENERAL INSTRUCTION FOR WOOD PAINTING WITH WATERBORNE PRODUCTS Waterborne paints represent the technological future where carpenters, furniture and window makers shall address. These paints are endowed

More information

OIL & GAS PRODUCTION & TREATMENT TECHNOLOGIES K-SEP SEPARATOR INTERNALS SEPARATOR & ELECTROSTATIC TREATER INTERNALS, DESIGNS AND SOFTWARE

OIL & GAS PRODUCTION & TREATMENT TECHNOLOGIES K-SEP SEPARATOR INTERNALS SEPARATOR & ELECTROSTATIC TREATER INTERNALS, DESIGNS AND SOFTWARE OIL & GAS PRODUCTION & TREATMENT TECHNOLOGIES K-SEP SEPARATOR INTERNALS SEPARATOR & ELECTROSTATIC TREATER INTERNALS, DESIGNS AND SOFTWARE www.kirkprocess.com 3 DECADES OF EXPERIENCE DESIGNING OIL & GAS

More information

Attention is drawn to the following places, which may be of interest for search:

Attention is drawn to the following places, which may be of interest for search: CPC - B22D - 2017.08 B22D CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES (shaping of plastics or substances in a plastic state B29C; metallurgical processing, selection

More information

Circuit Breaker. By Shashidhar kasthala Assistant Professor Indian Naval Academy

Circuit Breaker. By Shashidhar kasthala Assistant Professor Indian Naval Academy Circuit Breaker By Shashidhar kasthala Assistant Professor Indian Naval Academy In power system, various circuits (e.g., transmission lines, distributors, generating plants etc.) will be switch on-off

More information

Non-contact conveyance is possible.

Non-contact conveyance is possible. Courtesy of CMA/Flodyne/Hydradyne Motion Control Hydraulic Pneumatic Electrical Mechanical (8) 26-8 www.cmafh.com Cyclone Pad Non-contact conveyance is possible. Workpiece with uneven and/or viscous surface

More information

1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish.

1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish. 7 July 09 CUTTING A STANDARD CABOCHON A Standard Cabochon or CAB is an oval or round stone with one flat side and the other side having an even curved dome shape. Top of Cab It will have a narrow bevel

More information

New Freedom in Raw Materials for High Intensity Melters

New Freedom in Raw Materials for High Intensity Melters New Freedom in Raw Materials for High Intensity Melters David Rue Gas Technology Institute GMIC Symposium on Glass Raw Materials University Plaza Hotel, Columbus, OH October 20, 2011 High Intensity Melting

More information

Profiling press braking CNC MACHINING FABRICATION FINISHING

Profiling press braking CNC MACHINING FABRICATION FINISHING Profiling press braking CNC MACHINING FABRICATION FINISHING +44 (0)114 321 6303 enquiries@dnametalwork.com www.dnametalwork.com Profiling Bevel Capability up to 45 LASER cutting PLASMA cutting WATERJET

More information

ejector solutions Produced Water & Sand Management

ejector solutions Produced Water & Sand Management ejector solutions Produced Water & Sand Management How Ejectors Work Sand Slurry Ejectors (also referred to as Jet Pumps or Eductors) provide a simple, robust and reliable method of pumping and pressure

More information

Virtual Reality: a way to prepare and optimize operations in decommissioning projects

Virtual Reality: a way to prepare and optimize operations in decommissioning projects Virtual Reality: a way to prepare and optimize operations in decommissioning projects Caroline Chabal 17th February 2016 Virtual Reality: a way to prepare and optimize operations in decommissioning projects

More information

an ISO9001 company TECHNICAL INFORMATION FOR TGS8100 Technical Information for Air Quality Control Sensors

an ISO9001 company TECHNICAL INFORMATION FOR TGS8100 Technical Information for Air Quality Control Sensors TECHNICAL INFORMATION FOR Technical Information for Air Quality Control Sensors an ISO900 company The Figaro 800 is a new MEMStype semiconductor air quality sensor. Combining advanced Micro Electro Mechanical

More information

Radioisotope Shielded Work Station Components Models to

Radioisotope Shielded Work Station Components Models to Radioisotope Shielded Work Station Components Models 67-752 to 67-761! Provides optimum work conditions when using high energy nuclides! Offers maximum protection and versatility! Sold as separate components

More information

AUTOMATIC CIRCLE BURNING AND WELDING

AUTOMATIC CIRCLE BURNING AND WELDING AUTOMATIC CIRCLE BURNING AND WELDING ON PIPE AND PRESSURE VESSELS No Hose or Cable Wrapup (Regardless of Direction or Rotation) Oxy-Fuel Cutting Units, Plasma Cutting Units Wire Feeders and Controls, Motorized

More information

NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM)

NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM) NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM) A machining process is called non-traditional if its material removal mechanism is basically

More information

Industrial X-ray Tube KL

Industrial X-ray Tube KL Description stationary anode x-ray tube is a highly popular and proven side window x-ray tube, which has focus 1.0 mm, is designed for non-destructive x-ray inspection. stationary anode x-ray tube can

More information

Photo: Leslie Bruning - Bruning Sculpture Studio. Castalite

Photo: Leslie Bruning - Bruning Sculpture Studio. Castalite Photo: Leslie Bruning - Bruning Sculpture Studio Castalite Castalite Castalite is a UV-curable ceramic shell resin suitable for 3D printers that utilize SLA, DLP or CLIP technologies with UV wavelengths

More information

PLK CJ PRODUCT INSTRUCTION PI002 REV Page 1

PLK CJ PRODUCT INSTRUCTION PI002 REV Page 1 PLK One Shot Crucible Weld Kit PLK Kit Components CJ One Shot Crucible PLK CJ PRODUCT INSTRUCTION PI002 REV 3 270807 Page 1 PLK The Complete Welding Process The All New Railtech PLK-CJ welding process

More information

CNC Milling as a Decontamination Method for Magnox Pond Skips Herb Cruickshank*, Ian Pullin**, Phil Kightley***

CNC Milling as a Decontamination Method for Magnox Pond Skips Herb Cruickshank*, Ian Pullin**, Phil Kightley*** CNC Milling as a Decontamination Method for Magnox Pond Skips -14322 Herb Cruickshank*, Ian Pullin**, Phil Kightley*** *Senior Consultant Magnox Ltd **Trial Coordinator Magnox Ponds Programme ***Owner

More information

Metal Casting Processes CHAPTER 11 PART I

Metal Casting Processes CHAPTER 11 PART I Metal Casting Processes CHAPTER 11 PART I Topics Introduction Sand casting Shell-Mold Casting Expendable Pattern Casting Plaster-Mold Casting Introduction Metal-Casting Processes First casting were made

More information

Verification and monitoring in the Islamic Republic of Iran in light of United Nations Security Council resolution 2231 (2015)

Verification and monitoring in the Islamic Republic of Iran in light of United Nations Security Council resolution 2231 (2015) Derestricted 6 March 2019 (This document has been derestricted at the meeting of the Board on 6 March 2019) Atoms for Peace and Development Board of Governors Date: 22 February 2019 Original: English For

More information

LABORATORY TECHNIQUE AND EQUIPMENT EXPERIMENT 1

LABORATORY TECHNIQUE AND EQUIPMENT EXPERIMENT 1 LABORATORY TECHNIQUE AND EQUIPMENT EXPERIMENT 1 OBJECTIVE The objective of this experiment is to familiarize the student with the use of basic laboratory equipment and simple chemical laboratory techniques.

More information

The Fukushima nuclear accident

The Fukushima nuclear accident European Clearinghouse on OE Presentation to the EP STOA on the Fukushima nuclear accident 09/06/2011 - Strasbourg 1 The Fukushima nuclear accident What happened? Consequences? JRC involvement? Marc Noël

More information

Droplet size measurement of liquid atomization by the immersion liquid method (droplet coalescence and solution into the immersion liquid)

Droplet size measurement of liquid atomization by the immersion liquid method (droplet coalescence and solution into the immersion liquid) Advances in Fluid Mechanics X 191 Droplet size measurement of liquid atomization by the immersion liquid method (droplet coalescence and solution into the immersion liquid) T. Fujimatsu, M. Kito & K. Kondo

More information

REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD

REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD HR9800122 REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD Prepared by: Kresimir Gudek, Drago Pete Krsko Nuclear Power Plant, Vrbina 12, 8270 Krsko, Slovenia ABSTRACT In order to decrease the

More information

DWPF GC FILTER ASSEMBLY SAMPLING AND ANALYSIS

DWPF GC FILTER ASSEMBLY SAMPLING AND ANALYSIS DWPF GC FILTER ASSEMBLY SAMPLING AND ANALYSIS C. J. Bannochie K. J. Imrich November 2009 Savannah River National Laboratory Savannah River Nuclear Solutions Aiken, SC 29808 Prepared for the U.S. Department

More information

Record of Meeting. Joint U.S.-Russian JCCEM Induction-Heated Cold Crucible Melters Technology Workshop

Record of Meeting. Joint U.S.-Russian JCCEM Induction-Heated Cold Crucible Melters Technology Workshop Record of Meeting Joint U.S.-Russian JCCEM Induction-Heated Cold Crucible Melters Technology Workshop Ijhlhdhe :f_jbdzghjhkkbbckdh]hjz[hq_]hkh\_szgbyih JZa\blbxbIjbeh`_gbyfL_ogheh]bbBg^mdpbhgguoIeZ\bl_e_c^ey

More information

DEEP PENETRATING EDDY CURRENT for DETECTING VOIDS in COPPER

DEEP PENETRATING EDDY CURRENT for DETECTING VOIDS in COPPER DEEP PENETRATING EDDY CURRENT for DETECTING VOIDS in COPPER Tadeusz Stepinski (Uppsala University, Signals and System, P.O.Box 528, SE-75 2 Uppsala, Sweden, ts@signal.uu.se) Abstract Assessment of copper

More information

Manufacturing Processes - I Dr. D. B. Karunakar Mechanical and Industrial Engineering Department Indian Institute of Technology, Roorkee

Manufacturing Processes - I Dr. D. B. Karunakar Mechanical and Industrial Engineering Department Indian Institute of Technology, Roorkee Manufacturing Processes - I Dr. D. B. Karunakar Mechanical and Industrial Engineering Department Indian Institute of Technology, Roorkee Module - 2 Lecture - 7 Metal Casting Good morning. We have been

More information

Zirblast & Zirshot Ceramic Beads for Surface Treatment. April 2006

Zirblast & Zirshot Ceramic Beads for Surface Treatment. April 2006 Zirblast & Zirshot Ceramic Beads for Surface Treatment April 2006 1 Summary 1 Zirblast & Zirshot ceramic beads characteristics 2 Behavior in industrial use 3 Benefits in use 4 Applications 5 Testing facilities

More information

CP Sub. Code 11 P.G. DIPLOMA IN OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT EXAMINATION, NOVEMBER 2017 ORGANIZATIONAL BEHAVIOUR.

CP Sub. Code 11 P.G. DIPLOMA IN OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT EXAMINATION, NOVEMBER 2017 ORGANIZATIONAL BEHAVIOUR. WSS CP 8501 Sub. Code 11 P.G. DIPLOMA IN OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT EXAMINATION, NOVEMBER 2017 ORGANIZATIONAL BEHAVIOUR (Upto 2015 Batch) Time : 3 Hours Maximum : 75 Marks Part A (5 3 =

More information

Smart Electromagnetic Flowmeter Open channel Flowmeter Detector

Smart Electromagnetic Flowmeter Open channel Flowmeter Detector No. SS2-MGN200-0200 MagneW3000 PLUS Smart Electromagnetic Flowmeter Open channel Flowmeter Detector Model NNK150/951 OVERVIEW The MagneW3000 PLUS Electromagnetic Flowmeter is submersible type of flowmeter

More information

vision without limits SUGAR INDUSTRY CANTY PROCESS TECHNOLOGY BUFFALO DUBLIN THAILAND

vision without limits SUGAR INDUSTRY CANTY PROCESS TECHNOLOGY BUFFALO DUBLIN THAILAND vision without limits SUGAR INDUSTRY CANTY PROCESS TECHNOLOGY BUFFALO DUBLIN THAILAND SUGAR PROCESS LAYOUT 2 SUGAR CRYSTALLIZATION FUSEVIEW SIGHT GLASS The sugar crystallisation process is typically monitored

More information

Pulse Niru Company. General Catalogue.

Pulse Niru Company. General Catalogue. Pulse Niru Company General Catalogue www.pulseniru.com Pulse Niru Company initiated its activities since 2003 in manufacturing Pulsed Power equipment such as High Energy Pulse Discharge Capacitors for

More information

December 24, I. Introduction

December 24, I. Introduction A Summary of the Report of The Criticality Accident Investigation Committee The Nuclear Safety Commission December 24, 1999 DISCLAIMER: It should be noted that this document was directly copied, as is,

More information

Security Council. United Nations S/2016/57. Note by the President of the Security Council. Distr.: General 19 January 2016.

Security Council. United Nations S/2016/57. Note by the President of the Security Council. Distr.: General 19 January 2016. United Nations S/2016/57 Security Council Distr.: General 19 January 2016 Original: English Note by the President of the Security Council At its 7488th meeting, held on 20 July 2015 in connection with

More information

MD PRESS Advanced Wastewater Solutions

MD PRESS Advanced Wastewater Solutions Industry s Most Advanced Technology. Experience, Not Experiments. TRIDENT TM MD PRESS Advanced Wastewater Solutions Sludge Dewatering Technology Experts REVOLUTIONARY SLUDGE DEWATERING 1.604.330.2500 1.800.799.3740

More information

Droplet Size Measurement of Liquid Atomization by Immersion Liquid Method

Droplet Size Measurement of Liquid Atomization by Immersion Liquid Method The 3rd International Conference on Design Engineering and Science, ICDES 2014 Pilsen, Czech Republic, August 31 September 3, 2014 Droplet Size Measurement of Liquid Atomization by Immersion Liquid Method

More information

Non-contact conveyance is possible.

Non-contact conveyance is possible. Cyclone Pad Non-contact conveyance is possible. Supply port Nozzle Workpiece with uneven and/or viscous surface Solar battery cell Whirlwind flow Air layer Electrode line Reflection prevention (viscous)

More information

LABORATORY EVALUATION OF UNDERWATER GROUTING OF CPP-603 BASINS

LABORATORY EVALUATION OF UNDERWATER GROUTING OF CPP-603 BASINS LABORATORY EVALUATION OF UNDERWATER GROUTING OF CPP-603 BASINS ABSTRACT V. J. Johnson, J. H. Pao, R. L. Demmer, and J. L. Tripp Idaho National Engineering and Environmental Laboratory P.O. Box 1625, Idaho

More information

Recent Process and Equipment Improvements to Increase High Level Waste Throughput at The Defense Waste Processing Facility (DWPF) 8366

Recent Process and Equipment Improvements to Increase High Level Waste Throughput at The Defense Waste Processing Facility (DWPF) 8366 ABSTRACT Recent Process and Equipment Improvements to Increase High Level Waste Throughput at The Defense Waste Processing Facility (DWPF) 8366 Richard J. O Driscoll, Allan B. Barnes, James R. Coleman,

More information

Melter Glass Removal And Dismantlement

Melter Glass Removal And Dismantlement ORNL/TM-2000/324 Melter Glass Removal And Dismantlement October 2000 Prepared by: Bradley S. Richardson Group Leader DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available

More information

IGR Institut für Glas- und Rohstofftechnologie. Presentation. by Dirk Diederich, IGR. on in Brussels FERVER

IGR Institut für Glas- und Rohstofftechnologie. Presentation. by Dirk Diederich, IGR. on in Brussels FERVER Presentation by Dirk Diederich, IGR on 26.11.2010 in Brussels FERVER IGR - Institut für Glas- und Rohstofftechnologie GmbH Rudolf-Wissell-Str. 28 a, 37079 Göttingen Tel.: 0551 / 2052804; EMail: d.diederich@igrgmbh.de

More information

INSTALLATION INSTRUCTION Square-Top gully

INSTALLATION INSTRUCTION Square-Top gully INSTALLATION INSTRUCTION Square-Top gully! Read the installation instructions carefully before installation. Only a qualified plumber should install the floor drain. Our on-going product development may

More information

Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report

Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report 1. Introduction By S. S Dua PNC Working Group/Task Group Chair Atomic Energy of Canada Ltd. Canada This

More information

Japan Foundry Society, Inc. Research and Application of EPS Investment Casting Technique. Lu Dingquan Donfeng Investment Casting Co., Ltd.

Japan Foundry Society, Inc. Research and Application of EPS Investment Casting Technique. Lu Dingquan Donfeng Investment Casting Co., Ltd. Japan Foundry Society, Inc. Research and Application of EPS Investment Casting Technique Lu Dingquan Donfeng Investment Casting Co., Ltd. 13 th WORLD CONFERENCE ON INVESTMENT CASTING Paper: T11 Copyright

More information

FG-02: Apply Hard Surface

FG-02: Apply Hard Surface FG-02: Apply Hard Surface Page 1 of 9 SAFETY FIRST Follow all Caterpillar facility safety standards when performing this task. An explosive hazard exists if acetylene or oxygen leaks when working in a

More information

CRYOGENICS OPERATIONS 2008

CRYOGENICS OPERATIONS 2008 CRYOGENICS OPERATIONS 2008 Organized by CERN Collection of data related to the operation experience on the Tore Supra cryogenic system Related to the European Fusion Development Agreement Task TW6-TSL-004

More information

The end-to-end joining of coils of strip has grown in

The end-to-end joining of coils of strip has grown in Coil-to-coil joining with laser welding The combination of steel strip edge preparation via laser cutting, accurate strip positioning systems, and laser welding in a single unit provides the optimum coil-to-coil

More information

Droplet separators from Lechler Made-to-measure solutions

Droplet separators from Lechler Made-to-measure solutions Droplet Separators Droplet separators from Lechler Made-to-measure solutions Lechler droplet separators. Vital elements in many processing operations. Droplet separators have long played a vital role in

More information

Rotating Anode X-Ray Tube Housing Assembly. General Data. IEC Classification... Class I Type B

Rotating Anode X-Ray Tube Housing Assembly. General Data. IEC Classification... Class I Type B Technical Data TD ROTANODE E7239X E7239FX E7239GX 0197 Rotating Anode X-Ray Tube Housing Assembly Rotating anode X-ray tube housing assembly for the purpose of general diagnostic X-ray procedures. Specially

More information

Introduction to Filters. Master Pneumatic General Purpose Filters Coalescing Filters

Introduction to Filters. Master Pneumatic General Purpose Filters Coalescing Filters Introduction to Filters Master Pneumatic General Purpose Filters Coalescing Filters Several Types of Filters Remove Contaminants from Compressed Air General Purpose --- Remove water and particulate matter

More information

Autofluor. Autoradiographic Image Intensifier. Documented... Autofluor is Superior! C 3 PPO-DMSO. Autofluor

Autofluor. Autoradiographic Image Intensifier. Documented... Autofluor is Superior! C 3 PPO-DMSO. Autofluor Autofluor TM Autoradiographic Image Intensifier 3 H 14 C 3 H 14 C Documented... Autofluor is Superior! -- Perng (1988), Analytical Biochemistry, 173, 387-392 PPO-DMSO Autofluor Toll Free (800) 526-3867

More information

Rotating Anode X-Ray Tube Housing Assembly. General Data. IEC Classification... Class I

Rotating Anode X-Ray Tube Housing Assembly. General Data. IEC Classification... Class I Technical Data TD ROTANODE E7239X E7239FX E7239GX 197 Rotating Anode X-Ray Tube Housing Assembly Rotating anode X-ray tube housing assembly for the purpose of general diagnostic X-ray procedures. Specially

More information

Submerged Arc Welding Equipment

Submerged Arc Welding Equipment Submerged Arc Welding Equipment Miller Submerged Arc Solutions Built for you to build with you. Miller develops high-quality, reliable welding solutions that deliver exceptional performance for our customers.

More information

THE WILLIAMSWARN BOTTLER USER MANUAL

THE WILLIAMSWARN BOTTLER USER MANUAL THE WILLIAMSWARN BOTTLER USER MANUAL SAFETY INFORMATION 2 BOTTLER COMPONENTS 3 MANUAL CLEANING 4 FREE STANDING BOTTLER ASSEMBLY 5 WALL MOUNTED BOTTLER ASSEMBLY 6 BOTTLING YOUR BEVERAGE FROM A WILLIAMSWARN

More information

ROTANODE TM E7252X E7252FX E7252GX Rotating Anode X-Ray Tube Housing Assembly. General Data. IEC Classification... Class I Electrical :

ROTANODE TM E7252X E7252FX E7252GX Rotating Anode X-Ray Tube Housing Assembly. General Data. IEC Classification... Class I Electrical : Technical Data TD ROTANODE TM E7252X E7252FX E7252GX Rotating Anode X-Ray Tube Housing Assembly High speed rotating anode X-ray tube housing assembly for high energy radiographic and cine-fluoroscopic

More information

Robots go where workers safely cannot in Japan's nuclear power plant

Robots go where workers safely cannot in Japan's nuclear power plant Robots go where workers safely cannot in Japan's nuclear power plant By Los Angeles Times, adapted by Newsela staff on 03.18.16 Word Count 817 A remote-controlled robot that looks like an enlarged fiberscope

More information

The Application of Technology Readiness Levels in Planning the Fusion Energy Sciences Program. M. S. Tillack. ARIES Project Meeting 4 5 September2008

The Application of Technology Readiness Levels in Planning the Fusion Energy Sciences Program. M. S. Tillack. ARIES Project Meeting 4 5 September2008 The Application of Technology Readiness Levels in Planning the Fusion Energy Sciences Program M. S. Tillack ARIES Project Meeting 4 5 September2008 Topics Status and plans Oral and printed publication

More information

15 DECEMBER 2012 FIROZABAD INDIA

15 DECEMBER 2012 FIROZABAD INDIA Executive Committee Meeting of the All India Glass Manufacturers Federation 15 DECEMBER 2012 FIROZABAD INDIA FT BURNERS PRACTICAL APPLICATION RESULTS OF NEW GAS BURNER IN FLOAT, CONTAINER AND TABLEWARE

More information

Application of Safeguards Procedures

Application of Safeguards Procedures Application of Safeguards Procedures The earliest applications of safeguards procedures took place in a political and technical climate far different from that of today. In the early 1960's there was a

More information

SAFETY DATA SHEET VILLAS BITUMEN

SAFETY DATA SHEET VILLAS BITUMEN Villas Austria GmbH Industriestraße 18 A9586 Fürnitz Tel.: +43 / 4257 / 22410 Fax: +43 / 4257 / 22412390 office@villas.at www.villas.at SAFETY DATA SHEET VILLAS BITUMEN Edition: 25.08.2011 Villas Bitumen

More information