1 Australian Journal of Basic and Applied Sciences, 5(1): , 011 ISSN Technical and Economic Assessment of Upgrading a Double-circuit 63kV to a Single-circuit 30kV Transmission Line in Iran 1 Reza Sirjani and Badiossadat Hassanpour 1, Science and Research Branch, Islamic Azad University, Tehran, Iran. Abstract: This paper presents a feasibility study of upgrading 63kV double-circuit to 30kV singlecircuit transmission line by minimum changes. The case study in this research is a double-circuit 63kV transmission line in Iran. Different phase coordinations are considered and four alternatives are proposed and compared in mechanical, electrical and structural views. Finally the best alternative is selected and economic evaluation has demonstrated that this upgrading is almost two million dollars cheaper than constructing a new 30kV transmission line near the existent line. Key words: Transmission Line, Upgrading, Line Post Insulators, Phase Coordination. INTRODUCTION Constructing new power transmission lines leads to onerous expenses so engineers have decided to construct new lines on existent line corridor with higher voltages. The main object of feasibility study of transmission lines upgrading is consideration of necessary transformations on existent line to increase transferable electric power by increasing the voltage. In this method, available towers remain on the previous locations and number of circuits, type of insulators, and electrical clearances will change. The case study in this research is a double-circuit 63kV transmission line in Iran which located in Balouchestan and its length is 53km. Although we have 63,13,30 and 400 kv transmission lines in Iran, ever-increasing demands of electrical energy in this zone and high strength towers used in this line caused to do this feasibility study for upgrading this transmission line to the second higher voltage level (30kV). Since we want to keep existent conductors, designing a Single circuit two bundle transmission line" by decreasing the number of circuits is the best and the most economic method to upgrade a double-circuit line. According to our researches for upgrading this line by minimum possible changes, using Braced Line Post Insulators is the most practical solution. In this way we can keep the allowable electrical clearances of conductors from tower body and ground. Moreover the previous Right of Way remains applicable. In this paper, different phase coordinations are considered and four alternatives are introduced. Firstly, mechanical conditions such as: maximum single span, distances between conductors and shield wires in midspan, and clearances are considered and finally the best alternatives are chosen. Secondly, electrical conditions such as: maximum conductor ampacity, maximum transferable electric power, maximum voltage gradient, corona losses and shield angle are evaluated. For this aim, software has been produced to calculate electromagnetic fields around the line and to evaluate Right of Way for these alternatives. The next part is tower loading and structural consideration. In this section the best alternatives are chosen in new structural conditions. Finally we have compared all chosen alternatives in mechanical, electrical and structural views and selected the best one. An economic study has been appraised expenditures of this conversion compared to the cost of constructing of new 30kV transmission line near the existent line. MATERIALS AND METHODS Consideration Of Appropriate Design To Increase Line Voltage: For upgrading a 63kV double-circuit to 30kV single-circuit transmission line by minimum required changes, using Braced Line Post Insulators is the most practical solution (Laforest, 000). These Ceramic or composite insulators divided into two types: Braced and Un-Braced. Also they will be useful because of their more creepage distances and capability to use in longer spans and heavier conductors. (Laforest, 000; IEC 1109,003; IEC 6195,00). In this consideration we can suggest four alternatives by replacement of line post insulators to cross arms in existent towers. The double-circuit 63kV existent tower design is shown in Fig.(1) and four alternatives for using line post insulators to upgrade the existent design to a single-circuit bundle 30kV are shown in Fig (3). Now we will study and compare these alternatives mechanically, electrically and structurally. Corresponding Author: Reza Sirjani, Science and Research Branch, Islamic Azad University, Tehran, Iran. reza.sirjani@gmail.com. 090

2 Aust. J. Basic & Appl. Sci., 5(1): , 011 Fig. (1) shows the types and installing methods of these insulators on tower: Fig. 1: Line Post Insulators. Fig. : Existent tower design. 091

3 Aust. J. Basic & Appl. Sci., 5(1): , 011 Fig. 3: Alternatives under consideration. Assessment Of Mechanical Conditions In The Existent And Upgraded Line: Existent line characteristics are as follows: Length of line: 53 km Elevation: 1195 m Average days by thunderstorm: 30 days/ per year Conductor: HAWK/ACSR Shield Wire: LYNX CORE two shield The zone loading conditions are presented in Table (1): Table 1: Loading Conditions. No. of Case Loading Case Wind(m/s) Ice(mm) Temperature ( C) 1 Wind & Ice High Wind Heavy Ice (EDS)Every day stress Minimum Temperature Maximum Temperature According to weather condition Sag-Tension can be calculated in all spans for conductor and shield wire (Laforest, 000). Phase-Shield Clearance In Mid-Span: According to structure list of existent line, maximum length of spans is 380m. We have considered two cases, EDS (Every Day Stress) and Lightening, and calculate the clearance of phase to shield in these cases for each alternative. Experientially, lightening case conditions is equivalent to 30% of high wind. Fig. 4: Distances between conductor and shield. 09

4 Aust. J. Basic & Appl. Sci., 5(1): , 011 From Fig.(4) : C(actual) =ƒ c + a ƒ s (1) Every Day Stress: ws f c 1. 6m 8 H f S 7. 11m Lightening ( 30% high wind): ws f c 1. 1m 8 H f S 7. 47m In which a is distance between phase and shield on the tower, f c and f s are sag of conductor and sag of shield wire in meter, H is tension in Kg, w is unit weight of wire in(kg/mm ) and S is span in meter. According to NESC (National Electrical Safety Code) the minimum allowed clearance of phase to shield in EDS case is 3.5 m. Moreover this mid-span clearance in lightening case should be more than 8.5 m. Clearances in all alternatives are suitable in EDS but only the second alternative clearance is enough in lightening condition. Maximum Single Span And Phase To Ground Clearance: In the under consideration line, maximum span between tension towers and suspension towers are 380 m and 378 m respectively. We use Thomas formula in good weather condition because of lack of freezing and galloping phenomenon in that zone (Fink Ronald and Wayne Beaty, 1999). C % f D Spacing A w () Spacing: Distance of phases (ft) W: unit weight of conductor (lb/ft) C: experiential factor depends on weather conditions D : diameter of conductor (inch) l : length of suspension insulator string if any (ft) %f : percent of sag of conductor A : flash over distance ( 1ft for 110KV) C for this 63kV transmission line is 1.87 (Fink Ronald and Wayne Beaty,1999). As the weather conditions do not change and the existent line is operating without any problem, we use the same C factor in this converted design (Fink Ronald and Wayne Beaty, 1999). Now we getting allowed vertical clearances for this upgraded 30kV line: % ƒ = 4. Also the spotting parameter of existent line is a=100m and maximum span(s) is: % f S 8 a 405m 380m 100 Therefore existent spans will be suitable in new condition and it is not necessary to add new towers or change conductors' tension force. Assessment Of Electrical Conditions In The Existent And Upgraded Line: Conductor Ampacity And Transferable Electric Power: This line is operating in double-circuit form and its conductor is HAWK/ACSR. Thus maximum conductor ampacity is: 093

5 Aust. J. Basic & Appl. Sci., 5(1): , 011 I Max (75 C) = Amp We have calculated total transferable electric power in the suggested alternatives and as indicated in Table(4) the second alternative is the most suitable design. Corona Phenomenon: The main factor in corona phenomenon is the maximum surface gradient on conductor. Maximum surface gradient should be lower than 17 kv/cm in good weather condition. The method to calculate maximum surface gradient according to existent references is : E MAX 18 c V n r (3) In which : V : Phase Voltage n : number of bundles c: capacitance r : radius of conductor The influence of conductor bundling on surface gradient reduction showed all of the alternatives are suitable for upgrading to 30 kv. Ohmic Losses: The following formula is used to calculate power losses in transmission lines (Laforest, 000) : 1 Ploss 3 Rac I I I c Sin I c MW 3 In which: R ac : AC resistance l : legnht of line I φ : Maximum transferable current in conductor (4) I c V 3 X c Sin 0.31 The power losses should be lower than %5, and the results represented in Table(4) show that these losses are acceptable in all alternatives. Corona Loss Calculation: Both corona loss and corona critical voltage depends on air conditions and transmission line characteristics. Corona loss in good air conditions is limited to the following quantities (Laforest, 000): Table : Acceptable limit for corona loss in each voltage. Line Voltage( kv) Acceptable Losses(kW/km/3φ) V cr Critical voltage of corona is calculated as: D m re ln r In which : (5) 094

6 Aust. J. Basic & Appl. Sci., 5(1): , 011 δ is air density factor that given from air pressure and temperature m is constant factor that proportionate to conductor surface. In ACSR coductors this factor supposed 0.83 to D is GMD (Geometric Mean Distance of phases) And r e is given from this spinning formula: D ln n. S rc re S D (6) ( n 1) Sin ln r n r e In this way calculate V cr for all alternatives. If Vph/Vcr <1.8 use experimental Peterson formula in good air conditions: V ph 6 Pc 1.1 f F 10 ( kw / km / 3 ) D log (7) r In which : f is frequency of system in Hz V ph is Voltage of phase to ground in KV V cr is Critical voltage of corona KV D is Geometric mean distance in m r is Conductor radius in m F is Constant factor depends on Vph/Vcr The obtained results show that Corona loss in all of alternatives are low enough and no important to determinate the best alternative. Shield Angel: This angel is considered for 4 alternatives from existent formula and curve in (Laforest, 000). Table 3: Shield angle for each alternative. Alternative Alt 1 Alt Alt 3 Alt 4 Shield angel Outages per Year Only the second alternative has 1.8outage/100miles/year during 30 days. Also the average number of days with storm and lightening in this zone is 30.Thus:: Number of 1000 shielding failuare outage /100km / year 1600 The line length is 53km and this number of shielding failure will be If we suppose the probability of lightening involved in tower is 60 percent, number of shielding failure will be 0.36 which is lower than allowed failure number in 30kV transmission lines (1.5 outages per year) (Laforest,000), so four alternatives are suitable in this case. Right of Way: We account allowable limit of electric field around transmission lines is kv/m and then calculate Right of Way for each upgraded alternative by prepared software. According to the last approval of Iranian Ministry of Energy, Right of way for 63kV and 30KV transmission lines are 13m and 17m respectively. Our calculations show that electric field resultant in the distance of 13m around this line is lower than kv/m and we can conclude that the previous Right of Way is suitable for each alternative.a sample curve to calculate electric field around the line is shown in Fig.(5). 095

7 Aust. J. Basic & Appl. Sci., 5(1): , 011 Fig. 5: Electric field in different distances from tower. Tower Loading: To upgrade a single-wire double-circuit transmission line to a bundled single-circuit one, in addition to new suggestions for cross arm designing, it is necessary to control tower analysis. There are not important differences between transverse and vertical loads in converted design and the previous one. But lack of vertical load symmetry especially in the first and third alternative will make bending forces to tower members. These cases should check by manufacturer. RESULTS AND DISCUSSION Choosing The Best Alternative By Technical And Economic Considerations: Table (4) indicates the conclusions of comparison in various cases: Table 4: Different alternatives comparison. Cases Alt.1 Alt. Alt. 3 Alt. 4 Transferable Power (MW) Corona Limit(KV/cm) Ohmic losses percent Bending forces to tower members High Low High Low Shield Angle Suitable Suitable Suitable Suitable Corona Loss Vertical Clearances (ph-ph) Suitable for all Spans Suitable for all Spans Suitable for all Spans Suitable for all Spans Clearance (ph-shield) in mid-span Not suitable Suitable Not suitable Not suitable Right of Way Suitable Suitable Suitable Suitable As seen in all cases, the second alternative is preferable and we choose it for this upgrading project. Economic Evaluation: In this part firstly we have calculated expenditures of this conversion performance. Secondly we have explained the benefits of this design for economic saves and thirdly compared the costs of this upgrading to new 30kV transmission line project. Table (5) showed that this upgrading saves almost two million dollars that is 54 percent of a new 30kV transmission line project costs. Conclusion: This paper presents a technical and economic assessment of upgrading a double-circuit 63kV to a single-circuit 30kV electric transmission line in Iran. Four alternatives by replacement of line post insulators to cross arms in existent towers are proposed and compared in mechanical, electrical and structural views. High strength towers, line shortness, suitable conductors, and smooth routes are the most important reasons to make this design practical and we can introduce this project as the first upgrading in transmission lines in Iran. Moreover difference between the cost of this upgrading and a new 30kV transmission line project, proved the benefits of the proposed method. 096

8 Aust. J. Basic & Appl. Sci., 5(1): , 011 Table 5: Cost evaluation of performance. Expenditures of suggested design performance Price in Iran ($) Costs($) New fitting for 30KV bundle 886$ per km 15,960 Black out Cost We have accounted 5hours for black out in upgrading projects and supposed the economic lost 0 MW per hour. Also the cost of each KW is 0.3$ per hour. ( The period of performance of project accounted 1 months which is more than real time) 1,083,870 Installing new insulators and conversion on cross arms 36$ for each Tower 538,710 Purchase of Line-Post insulators The mean price of double Line-Post insulators is 500$ and each MS tower needs 3 insulators. (10% of insulators are supposed unutilizable) The mean price of quadruple Line-Post insulators is 1000$ and each HS or T-60 tower needs 3 insulators. (10% of insulators are supposed unutilizable) 180,440 17,450 Purchase of Conductors We have 6 conductors in previous single- wire double-circuit line and can use them for new bundle single-circuit design. Nothing Total Costs,156,070 $ ACKNOWLEDGEMENT The special thank to Miss Ziba Fakheri Darian, the kind manager of Technical Unit of Transmission Line Department in Power Engineering Consultant Office (MOSHANIR). Her supervision and support truly help the progression and smoothness of this research. REFERENCES Fink Ronald, C. and H. Wayne Beaty, Standard hand book for electrical Engineers, 30th edition. IEC., 1109, 003, Composite Insulator for a.c overhead lines with Nominal definitions > voltage 1000 V, IEC Standard. IEC., 6195, 00, Insulator for overhead lines composite line post Insulator for alternative current with nominal voltage >1000 v, IEC Standard. Laforest, J.J., 000. Transmission Line Reference Book/345 kv and Above, Second Edition. National Electrical Safety Code (NESC)., 199. The institute of Electrical and electronics engineers, Inc. 097

Roll No. :... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/ POWER SYSTEM-I. Time Allotted : 3 Hours Full Marks : 70

Roll No. :... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/ POWER SYSTEM-I. Time Allotted : 3 Hours Full Marks : 70 Name : Roll No. :.... Invigilator s Signature :.. CS/B.TECH(EE)/SEM-5/EE-502/2011-12 2011 POWER SYSTEM-I Time Allotted : 3 Hours Full Marks : 70 The figures in the margin indicate full marks. Candidates

More information

Fatima Michael college of Engineering and Technology

Fatima Michael college of Engineering and Technology Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric

More information

Appendix I. Applicant s Audible Noise and EMF Calculations

Appendix I. Applicant s Audible Noise and EMF Calculations Appendix I Applicant s Audible Noise and EMF Calculations Structure Type Predicted Intensity of Electric Fields (kv/m) at Maximum Operating Voltage Where Not Paralleling Existing Transmission Lines Line

More information

Analysis of lightning performance of 132KV transmission line by application of surge arresters

Analysis of lightning performance of 132KV transmission line by application of surge arresters Analysis of lightning performance of 132KV transmission line by application of surge arresters S. Mohajer yami *, A. Shayegani akmal, A.Mohseni, A.Majzoobi High Voltage Institute,Tehran University,Iran

More information

Bipole III Transmission Project

Bipole III Transmission Project Bipole III Transmission Project Clean Environment Commission Public Hearings Fall 2012 System Planning Ronald Mazur BP III Keewantinoow Limestone Kettle Kelsey Jenpeg Grand Rapids OVERVIEW Transmission

More information

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another.

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another. TRANSMISSION LINES PRELIMINARIES Generators and loads are connected together through transmission lines transporting electric power from one place to another. Transmission line must, therefore, take power

More information

Multi Voltage Multi Circuit Transmission Tower Design to Reduce Right of Way

Multi Voltage Multi Circuit Transmission Tower Design to Reduce Right of Way Indian Journal of Science and Technology, Vol 9(33), DOI: 10.17485/ijst/2016/v9i33/95239, September 2016 ISSN (Print) : 0974-6846 ISSN (Online) : 0974-5645 Multi Voltage Multi Circuit Transmission Tower

More information

A Study on Electrical Design Considerations of Power Transmission Lines

A Study on Electrical Design Considerations of Power Transmission Lines A Study on Electrical Design Considerations of Power Transmission Lines Gaddam Siva Ph.D Scholar, Department of Electrical Engineering, SSSUTMS, Sehore, Madhya Pradesh, India ABSTRACT: The power is generated

More information

B2-314 MEASUREMENTS ON AEOLIAN VIBRATIONS ON A 3 KM FJORD CROSSING WITH FIBRE-OPTIC BRAGG GRATING SENSORS

B2-314 MEASUREMENTS ON AEOLIAN VIBRATIONS ON A 3 KM FJORD CROSSING WITH FIBRE-OPTIC BRAGG GRATING SENSORS 21, rue d'artois, F-75008 Paris http://www.cigre.org B2-314 Session 2004 CIGRÉ MEASUREMENTS ON AEOLIAN VIBRATIONS ON A 3 KM FJORD CROSSING WITH FIBRE-OPTIC BRAGG GRATING SENSORS L. BJERKAN * and O. LILLEVIK,

More information

Improving Power Transfer Capability of EHV AC Double circuit Transmission line by Enhancing Surge Impedance Loading level

Improving Power Transfer Capability of EHV AC Double circuit Transmission line by Enhancing Surge Impedance Loading level Improving Power Transfer Capability of EHV AC Double circuit Transmission line by Enhancing Surge Impedance Loading level Varun Patel 1, J G Jamnani 2 1,2 School of Technology, Pandit Deendayal Petroleum

More information

The Many Uses of Transmission Line Arresters

The Many Uses of Transmission Line Arresters Introduction It was not realized at the time, but the 1992 introduction of the polymer-housed transmission line arrester (TLA) was clearly a game changer in the practice of lightning protection of transmission

More information

Appendix 6-F: Electric and Magnetic Field Study Report

Appendix 6-F: Electric and Magnetic Field Study Report Draft Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 6-F: Electric and Magnetic Field Study Report ELECTRIC & MAGNETIC FIELDS (EMFs) STUDY REPORT For the CRICKET VALLEY

More information

EL 403 MODEL TEST PAPER - 1 POWER SYSTEMS. Time: Three Hours Maximum Marks: 100

EL 403 MODEL TEST PAPER - 1 POWER SYSTEMS. Time: Three Hours Maximum Marks: 100 POWER SYSTEMS Time: Three Hours Maximum Marks: 0 Answer five questions, taking ANY TWO from Group A, any two from Group B and all from Group C. All parts of a question (a, b, etc. ) should be answered

More information

First South East European Regional CIGRÉ Conference. Portoroz, Slovenia, 7 8 June 2016

First South East European Regional CIGRÉ Conference. Portoroz, Slovenia, 7 8 June 2016 First South East European Regional CIGRÉ Conference Portoroz, Slovenia, 7 8 June 2016 Assessment of new OHL of Slovak Republic Transmission System with regard to the recommendation of the Directive No.

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Page of BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * Colorado PUC E-Filings System IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF THE

More information

Optimization of the Surface Electric Field of Transmission Line Fitting On 500kv Line in High Altitude Area Qin Li1, a, Wang Jing1, b

Optimization of the Surface Electric Field of Transmission Line Fitting On 500kv Line in High Altitude Area Qin Li1, a, Wang Jing1, b International Conference on Mechanics, Materials and Structural Engineering (ICMMSE 2016) Optimization of the Surface Electric Field of Transmission Line Fitting On 500kv Line in High Altitude Area Qin

More information

EE 740 Transmission Lines

EE 740 Transmission Lines EE 740 Transmission Lines 1 High Voltage Power Lines (overhead) Common voltages in north America: 138, 230, 345, 500, 765 kv Bundled conductors are used in extra-high voltage lines Stranded instead of

More information

EE 340 Transmission Lines. Spring 2012

EE 340 Transmission Lines. Spring 2012 EE 340 Transmission Lines Spring 2012 Physical Characteristics Overhead lines An overhead transmission line usually consists of three conductors or bundles of conductors containing the three phases of

More information

Optimal Design of Overhead Transmission Line Towers in Relation with Environmental and Land Ownership in Kenya

Optimal Design of Overhead Transmission Line Towers in Relation with Environmental and Land Ownership in Kenya Optimal Design of Overhead Transmission Line Towers in Relation with Environmental and Land Ownership in Kenya Geoffrey Owade Otieno Lead Environmental Policy & Energy Specialist Kenya Electricity Transmission

More information

Computer Aided Analysis and Design of EHV-AC Transmission line

Computer Aided Analysis and Design of EHV-AC Transmission line Computer Aided Analysis and Design of EHV-AC Transmission line 1 Mr. Parth R. Mishra, 2 Mrs. Dharmishta Makwana 1 Student, 2 Assistant Professor Department of electrical engineering, Kalol institute of

More information

ISSN: International Journal of Advanced Research in Computer Engineering & Technology (IJARCET) Volume 2, No 5, May 2013

ISSN: International Journal of Advanced Research in Computer Engineering & Technology (IJARCET) Volume 2, No 5, May 2013 750kv Transmission Line parameter and line Efficiency calculation and the performance of High Voltage alternating current Transmission system using MATLAB program Alka Szeerin Mansoori M.E. Student of

More information

Analyzing and Modeling the Lightning Transient Effects of 400 KV Single Circuit Transmission Lines

Analyzing and Modeling the Lightning Transient Effects of 400 KV Single Circuit Transmission Lines International Journal of Science and Engineering Investigations vol. 2, issue 19, August 2013 ISSN: 2251-8843 Analyzing and Modeling the Lightning Transient Effects of 400 KV Single Circuit Transmission

More information

Transmission of Electrical Energy

Transmission of Electrical Energy Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors are usually aluminum cable steel reinforced (ACSR),

More information

Keywords: Multi-circuit transmission lines on the same tower, Live working, Swing method.

Keywords: Multi-circuit transmission lines on the same tower, Live working, Swing method. 17 nd International Conference on Electrical and Electronics: Techniques and Applications (EETA 17) ISBN: 978-1-6595-416-5 Research on New Method of Live Working on /5kV Mixed-voltage Four-circuit Transmission

More information

PREVENTING FLASHOVER NEAR A SUBSTATION BY INSTALLING LINE SURGE ARRESTERS

PREVENTING FLASHOVER NEAR A SUBSTATION BY INSTALLING LINE SURGE ARRESTERS 29 th International Conference on Lightning Protection 23 rd 26 th June 2008 Uppsala, Sweden PREVENTING FLASHOVER NEAR A SUBSTATION BY INSTALLING LINE SURGE ARRESTERS Ivo Uglešić Viktor Milardić Božidar

More information

HIGH VOLTAGE Insulation Coordination

HIGH VOLTAGE Insulation Coordination HIGH VOLTAGE Insulation Coordination Assistant Professor Suna BOLAT KRÖGER Eastern Mediterranean University Department of Electric & Electronic Engineering Insulation coordination The term Insulation Co-ordination

More information

DETAIL SPECIFICATION SHEET CABLES, RADIO FREQUENCY, SEMIRIGID, COAXIAL, SEMI-AIR-DIELECTRIC,.875 TO INCHES OUTSIDE DIAMETER, 50 OHMS

DETAIL SPECIFICATION SHEET CABLES, RADIO FREQUENCY, SEMIRIGID, COAXIAL, SEMI-AIR-DIELECTRIC,.875 TO INCHES OUTSIDE DIAMETER, 50 OHMS INCH-POUND MIL-DTL-22931/11B 21 August 2013 SUPERSEDING MIL-C-22931/11A 20 January 1972 DETAIL SPECIFICATION SHEET CABLES, RADIO FREQUENCY, SEMIRIGID, COAXIAL, SEMI-AIR-DIELECTRIC,.875 TO 1.005 INCHES

More information

Lecture 36 Measurements of High Voltages (cont) (Refer Slide Time: 00:14)

Lecture 36 Measurements of High Voltages (cont) (Refer Slide Time: 00:14) Advances in UHV Transmission and Distribution Prof. B Subba Reddy Department of High Voltage Engg (Electrical Engineering) Indian Institute of Science, Bangalore Lecture 36 Measurements of High Voltages

More information

CONDUCTOR CORONA NOISE PREDICTION ON HIGH VOLTAGE AC LINES

CONDUCTOR CORONA NOISE PREDICTION ON HIGH VOLTAGE AC LINES CONDUCTOR CORONA NOISE PREDICTION ON HIGH VOLTAGE AC LINES R.G. Urban*, H.C. Reader*, J.P. Holtzhausen*, K.R. Hubbard**, A.C. Britten** & D.C. Smith** * Department of EE Engineering, University of Stellenbosch,

More information

Overvoltage Protection of Light Railway Transportation Systems

Overvoltage Protection of Light Railway Transportation Systems Overvoltage Protection of Light Railway Transportation Systems F. Delfino, R. Procopio, Student Member, IEEE, and M. Rossi, Student Member, IEEE Abstract In this paper the behavior of the power supply

More information

Analysis of Insulation Strength of Connection of High Voltage Transformer with FEMLAB

Analysis of Insulation Strength of Connection of High Voltage Transformer with FEMLAB Australian Journal of Basic and Applied Sciences, 5(5): 825-832, 2011 ISSN 1991-8178 Analysis of Insulation Strength of Connection of High Voltage Transformer with FEMLAB 1 M. Mohammadi 2 R.Ebrahimi 1

More information

T E C H N I C A L M E M O R A N D U M. ON PARTICULAR ASPECTS RELATED 400 kv TRANSMISSION

T E C H N I C A L M E M O R A N D U M. ON PARTICULAR ASPECTS RELATED 400 kv TRANSMISSION T E C H N I C A L M E M O R A N D U M ON PARTICULAR ASPECTS RELATED 400 kv TRANSMISSION Prepared by Prepared for : Dr Pieter H Pretorius, Trans-Africa Projects : Mr Henry Nawa, Senior Environmental Advisor,

More information

EE 340 Transmission Lines

EE 340 Transmission Lines EE 340 Transmission Lines Physical Characteristics Overhead lines An overhead transmission line usually consists of three conductors or bundles of conductors containing the three phases of the power system.

More information

Automated Transmission Line Impedance Calculation Project

Automated Transmission Line Impedance Calculation Project Automated Transmission Line Impedance Calculation Project Paul Myrda Technical Executive Project Information Webcast March 2015 Background Can we use LIDAR / GIS data to improve or automate the transmission

More information

THE STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION

THE STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION THE STATE OF NEW HAMPSHRE BEFORE THE PUBLC UTLTES COMMSSON PETTON OF PUBLC SERVCE COMPANY OF NEW HAMPSHRE FOR LCENSE TO CONSTRUCT AND MANTAN ELECTRC LNES OVER AND ACROSS THE NUBANUST BROOK TN THE TOWN

More information

High voltage engineering

High voltage engineering High voltage engineering Overvoltages power frequency switching surges lightning surges Overvoltage protection earth wires spark gaps surge arresters Insulation coordination Overvoltages power frequency

More information

Finite Element Analysis of Leakage Inductance of 3-Phase Shell-Type and Core Type Transformers

Finite Element Analysis of Leakage Inductance of 3-Phase Shell-Type and Core Type Transformers Research Journal of Applied Sciences, Engineering and Technology 4(12): 1721-1728, 2012 ISSN: 2040-7467 Maxwell Scientific Organization, 2012 Submitted: January 16, 2012 Accepted: February 06, 2012 Published:

More information

Multilayered Functional Insulation System (MFIS) for AC Power Transmission in High Voltage Hybrid Electrical Propulsion

Multilayered Functional Insulation System (MFIS) for AC Power Transmission in High Voltage Hybrid Electrical Propulsion 2017 Multilayered Functional Insulation System (MFIS) for AC Power Transmission in High Voltage Hybrid Electrical Propulsion Team Lead Maricela Lizcano, PhD Research Materials Engineer Materials Chemistry

More information

What is Corona Effect in Power System and Why it Occurs?

What is Corona Effect in Power System and Why it Occurs? Corona Effect in Power System Electric power transmission practically deals in the bulk transfer of electrical energy, from generating stations situated many kilometers away from the main consumption centers

More information

KINECTRICS NORTH AMERICA INC. TEST REPORT FOR 3M COMPANY TO COMPARE THE LIGHTNING PERFORMANCE OF ACCR TO ACSR CONDUCTORS

KINECTRICS NORTH AMERICA INC. TEST REPORT FOR 3M COMPANY TO COMPARE THE LIGHTNING PERFORMANCE OF ACCR TO ACSR CONDUCTORS To: Colin McCullough 3M Composite Conductor Program 2465 Lexington Ave. South Mendota Heights, MN 5512 USA KINECTRICS NORTH AMERICA INC. TEST REPORT FOR 3M COMPANY TO COMPARE THE LIGHTNING PERFORMANCE

More information

Type DMX-N Surge Arresters Maximum System Voltage 2 to 36 kv

Type DMX-N Surge Arresters Maximum System Voltage 2 to 36 kv Type DMX-N Surge Arresters Maximum System Voltage 2 to 36 kv DMX-N gapless metal oxide surge arresters DMX-N surge arresters are used for the protection of switchgear, transformers and other equipment

More information

Research Article Survey of Induced Voltage and Current Phenomena in GIS Substation

Research Article Survey of Induced Voltage and Current Phenomena in GIS Substation Research Journal of pplied Sciences, Engineering and Technology 7(9): 179733, 14 DOI:1.196/rjaset.7.456 ISSN: 4-7459; e-issn: 4-7467 14 Maxwell Scientific Publication Corp. Submitted: February 7, 17 ccepted:

More information

Lightning Flashover Rate of an Overhead Transmission Line Protected by Surge Arresters

Lightning Flashover Rate of an Overhead Transmission Line Protected by Surge Arresters IEEE PES General Meeting June 23-27, 27, 2007, Tampa Lightning Flashover Rate of an Overhead Transmission Line Protected by Surge Arresters Juan A. Martinez Univ. Politècnica Catalunya Barcelona, Spain

More information

Harmonic Components Analysis of Leakage Current for Standard and Anti-Fog Suspension Insulators under Humidity Conditions

Harmonic Components Analysis of Leakage Current for Standard and Anti-Fog Suspension Insulators under Humidity Conditions Harmonic Components Analysis of Leakage Current for Standard and Anti-Fog Suspension Insulators under Humidity Conditions R. Hajian M. Mirzaie Babol University of Technology, Iran Reza.hajian.7@gmail.com,

More information

INSTALLATION LOCATIONS: STRUCTURE 37 & 82 DETAIL A DETAIL B TYP OPGW DEADEND ASSEMBLY

INSTALLATION LOCATIONS: STRUCTURE 37 & 82 DETAIL A DETAIL B TYP OPGW DEADEND ASSEMBLY SEE DETAIL "A" SEE DETAIL "B" 25 INSTALLATION LOCATIONS: STRUCTURE 37 & 82 68 80 78 45 77 76 66 69 70 79 POLE BANDING AS REQ'D SLACK 65 67 DETAIL A UC Synergetic, 1601 South MoPac Expy. Building 2, Suite

More information

Lightning Performance Improvement of 115 kv and 24 kv Circuits by External Ground in MEA s Distribution System

Lightning Performance Improvement of 115 kv and 24 kv Circuits by External Ground in MEA s Distribution System Lightning Performance Improvement of 115 kv and 24 kv Circuits by External Ground in MEA s Distribution System A. Phayomhom and S. Sirisumrannukul Abstract This paper presents the guidelines for preparing

More information

Algorithm and Model Development for Innovative High Power AC Transmission. Brian J. Pierre

Algorithm and Model Development for Innovative High Power AC Transmission. Brian J. Pierre Algorithm and Model Development for Innovative High Power AC Transmission by Brian J. Pierre A Dissertation Presented in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy Approved

More information

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission

More information

TEAMS Competition 2014

TEAMS Competition 2014 TEAMS Competition 2014 Engineering Digital Relays for Smart Electrical Grids Introduction W hen people talk about the national power grid, they are actually describing three power grids that are connected

More information

ABSTRACTS of SESSION 6

ABSTRACTS of SESSION 6 ABSTRACTS of SESSION 6 Paper n 1 Lightning protection of overhead 35 kv lines by antenna-module long flashover arresters Abstract: A long-flashover arrester (LFA) of a new antenna-module type is suggested

More information

High Frequency Voltage Stress. Presented by: Flore Chiang Date: March 30, 2012

High Frequency Voltage Stress. Presented by: Flore Chiang Date: March 30, 2012 High Frequency Voltage Stress Presented by: Flore Chiang Date: March 30, 2012 Now the additional data is available! ground rules: 1. intro to PD. 2. experimental results. 3. comparison with current practice.

More information

EE 741. Primary & Secondary Distribution Systems

EE 741. Primary & Secondary Distribution Systems EE 741 Primary & Secondary Distribution Systems Radial-Type Primary Feeder Most common, simplest and lowest cost Example of Overhead Primary Feeder Layout Example of Underground Primary Feeder Layout Radial-Type

More information

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES Shohreh Monshizadeh Islamic Azad University South Tehran Branch (IAU), Tehran,

More information

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Nicholas Klemm Western Area Power Administration Rocky Mountain Region March 2012 Organizational Overview Western

More information

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR 621 212 DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING EE1003 HIGH VOLTAGE ENGINEERING QUESTION BANK UNIT-I OVER VOLTAGES IN ELECTRICAL POWER SYSTEM

More information

Substation Insulation Coordination Study

Substation Insulation Coordination Study [Type the document title] Substation nsulation Coordination Study MEG Energy Christina Lake Regional Project nsulation Coordination Schematic X0057 15km Lines TWR3 TWR2 TWR1 Afrm1 16 230k Source CCT 100

More information

APPLICATION OF LONG FLASHOVER ARRESTERS FOR IMPROVEMENT OF LIGHTNING PROTECTION AND OPERATING VOLTAGE RELIABILITY OF DISTRIBUTION LINES

APPLICATION OF LONG FLASHOVER ARRESTERS FOR IMPROVEMENT OF LIGHTNING PROTECTION AND OPERATING VOLTAGE RELIABILITY OF DISTRIBUTION LINES APPLICATION OF LONG FLASHOVER ARRESTERS FOR IMPROVEMENT OF LIGHTNING PROTECTION AND OPERATING VOLTAGE RELIABILITY OF DISTRIBUTION LINES G. V. Podporkin, V. E. Pilshikov, A. D. Sivaev Streamer Electric

More information

Chapter Seven. Under Ground Cables

Chapter Seven. Under Ground Cables Chapter Seven Under Ground Cables Construction of cables In the fig (7.1)below, shows the general construction of (3-condctor) cable The various part of cable are : 1- Core or conductor A cable may have

More information

Comparison between Different InstallationLocations of Surge Arresters at Transmission Line Using EMTP-RV

Comparison between Different InstallationLocations of Surge Arresters at Transmission Line Using EMTP-RV No. E-13-HVS-2308 Comparison between Different InstallationLocations of Surge Arresters at Transmission Line Using EMT-RV Soheil Derafshi Beigvand, Mohammad Morady Electrical Engineering Department, Engineering

More information

METHODS AND CIRCUITS FOR POWER ARC TEST IN AC CURRENT OF THE SIMPLE AND DOUBLE INSULATOR SETS WITH COMPOSITE MATERIAL FOR AERIAL ELECTRIC LINES

METHODS AND CIRCUITS FOR POWER ARC TEST IN AC CURRENT OF THE SIMPLE AND DOUBLE INSULATOR SETS WITH COMPOSITE MATERIAL FOR AERIAL ELECTRIC LINES METHODS ND CIRCUITS FOR POWER RC TEST IN C CURRENT OF THE SIMPLE ND DOUBLE INSULTOR SETS WITH COMPOSITE MTERIL FOR ERIL ELECTRIC LINES George CURCNU, Constantin INCU, Corneliu CHICIU ICMET-Craiova, Calea

More information

Testing of 400 kv GIS

Testing of 400 kv GIS Testing of 400 kv GIS Robert le Roux, Dermot Dorgan, Brian Perry ESB International - Ireland Paper 028 1 Introduction The 400 kv transmission is designed for critical periods of low loading. Due to critical

More information

1 Formula 1.1 Rules of Thumb 2 Table of AWG wire sizes 3 Pronunciation 4 See also 5 References 6 Further reading 7 External links

1 Formula 1.1 Rules of Thumb 2 Table of AWG wire sizes 3 Pronunciation 4 See also 5 References 6 Further reading 7 External links 1 of 8 6/1/2010 6:57 PM From Wikipedia, the free encyclopedia American wire gauge (AWG), also known as the Brown & Sharpe wire gauge, is a standardized wire gauge system used since 1857 predominantly in

More information

Influence Of Lightning Strike Location On The Induced Voltage On a Nearby Overhead Line

Influence Of Lightning Strike Location On The Induced Voltage On a Nearby Overhead Line NATIONAL POWER SYSTEMS CONFERENCE NPSC22 563 Influence Of Lightning Strike Location On The Induced Voltage On a Nearby Overhead Line P. Durai Kannu and M. Joy Thomas Abstract This paper analyses the voltages

More information

PLANNING OF DESIGN OF OVERHEAD TRANSMISSION LINE BY MATLAB PROGRAMMING

PLANNING OF DESIGN OF OVERHEAD TRANSMISSION LINE BY MATLAB PROGRAMMING PLANNING OF DESIGN OF OVERHEAD TRANSMISSION LINE BY MATLAB PROGRAMMING Prof. Mohan S. Tajne 1, Miss. Nishigandha N. Daware 2 1 Asst. Prof., Dept. of Electrical Engg. Yashawantrao Chavan College of Engg.

More information

Equipment Rack Grounding. Technical Note

Equipment Rack Grounding. Technical Note Equipment Rack Grounding Technical Note Equipment Rack Grounding Surge Protection Solutions for PTC 1 Equipment Rack Grounding Equipment racks and cabinets can provide an unwanted path for lightning surge

More information

C.2 Equations and Graphs of Conic Sections

C.2 Equations and Graphs of Conic Sections 0 section C C. Equations and Graphs of Conic Sections In this section, we give an overview of the main properties of the curves called conic sections. Geometrically, these curves can be defined as intersections

More information

LIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION

LIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION LIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION Andreas SUMPER sumper@citcea.upc.es Antoni SUDRIÀ sudria@citcea.upc.es Samuel GALCERAN galceran@citcea.upc.es Joan RULL rull@citcea.upc.es

More information

III/IV B.Tech (Regular/Supplementary) DEGREE EXAMINATION

III/IV B.Tech (Regular/Supplementary) DEGREE EXAMINATION Hall Ticket Number: 14EE503 October, 2018 Fifth Semester Time: Three Hours Answer Question No.1 compulsorily. Answer ONE question from each unit. III/IV B.Tech (Regular/Supplementary) DEGREE EXAMINATION

More information

Including Surge Arresters in the Lightning Performance Analysis of 132kV Transmission Line

Including Surge Arresters in the Lightning Performance Analysis of 132kV Transmission Line ncluding Surge Arresters in the Lightning Performance Analysis of 32kV Transmission Line Saeed Mohajeryami, Milad Doostan University of North Carolina at Charlotte Department of Electrical and Computer

More information

Repair & Metrology Services

Repair & Metrology Services Repair & Metrology Services Presents SETTING UP A 100kV MEASUREMENT SYSTEM Author: Les Wesson Co-author: Stephan Mare Content 1. Introduction 2. Setting up a suitable area 3. Purchasing equipment 4. DC

More information

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems These design criteria have been established to assure acceptable

More information

Determining Crossing Conductor Clearance Using Line-Mounted LiDAR. J. C. MCCALL, P. SPILLANE, K. LINDSEY Lindsey Manufacturing USA

Determining Crossing Conductor Clearance Using Line-Mounted LiDAR. J. C. MCCALL, P. SPILLANE, K. LINDSEY Lindsey Manufacturing USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Determining Crossing Conductor Clearance Using Line-Mounted LiDAR J. C. MCCALL, P. SPILLANE,

More information

The Lightning Event. White Paper

The Lightning Event. White Paper The Lightning Event White Paper The Lightning Event Surge Protection Solutions for PTC 1 The Lightning Event There are volumes of information available on what we believe lightning is and how we think

More information

2000 Mathematics Subject Classification: 68Uxx/Subject Classification for Computer Science. 281, 242.2

2000 Mathematics Subject Classification: 68Uxx/Subject Classification for Computer Science. 281, 242.2 ACTA UNIVERSITATIS APULENSIS Special Issue SIMULATION OF LIGHTNING OVERVOLTAGES WITH ATP-EMTP AND PSCAD/EMTDC Violeta Chiş, Cristina Băla and Mihaela-Daciana Crăciun Abstract. Currently, several offline

More information

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS TRANSFORMER IN GRID When surge arres t ers are installed close to a power transformer, they provide protection against lightning overvoltage ABSTRACT The aim of this research article is to determine the

More information

Grounding System Theory and Practice

Grounding System Theory and Practice Grounding System Theory and Practice Course No. E-3046 Credit: 3 PDH Grounding System Theory and Practice Velimir Lackovic, Electrical Engineer System grounding has been used since electrical power systems

More information

Investigation of Transmission Line Overvoltages and their Deduction Approach

Investigation of Transmission Line Overvoltages and their Deduction Approach Investigation of Transmission Line Overvoltages and their Deduction Approach A. Hayati Soloot, A. Gholami, E. Agheb, A. Ghorbandaeipour, and P. Mokhtari Abstract The two significant overvoltages in power

More information

IEEE Power Engineering Society 2001 Winter Meeting Columbus, OH. Panel Session. Data for Modeling System Transients

IEEE Power Engineering Society 2001 Winter Meeting Columbus, OH. Panel Session. Data for Modeling System Transients IEEE Power Engineering Society 2001 Winter Meeting Columbus, OH Panel Session Data for Modeling System Transients Parameters for Modeling Transmission Lines and Transformers in Transient Studies Bruce

More information

Integrating Transmission and Distribution Engineering Eventualities

Integrating Transmission and Distribution Engineering Eventualities Integrating Transmission and Distribution Engineering Eventualities Task 1.1 G. T. Heydt, Arizona State University heydt@asu.edu PSERC Future Grid Initiative May 29, 2013 Innovative HVDC systems Two innovative

More information

General Product Brochure

General Product Brochure General Product Brochure SteppIR Antennas 2112 116th Ave NE #1-5 Bellevue, WA 98004 Tel: 425.453.1910 sales@steppir.com www.steppir.com SteppIR - Why Compromise? The SteppIR antenna was conceived to solve

More information

Simulation Approach in Evaluating the Electromagnetic Fields from the New Lines of Extra High Voltage (EHV) Circuits Near Residential Area in Malaysia

Simulation Approach in Evaluating the Electromagnetic Fields from the New Lines of Extra High Voltage (EHV) Circuits Near Residential Area in Malaysia European Journal of Scientific Research ISSN 1450-216X Vol.40 No.2 (2010), pp.189-198 EuroJournals Publishing, Inc. 2010 http://www.eurojournals.com/ejsr.htm Simulation Approach in Evaluating the Electromagnetic

More information

Magnetics Design. Specification, Performance and Economics

Magnetics Design. Specification, Performance and Economics Magnetics Design Specification, Performance and Economics W H I T E P A P E R MAGNETICS DESIGN SPECIFICATION, PERFORMANCE AND ECONOMICS By Paul Castillo Applications Engineer Datatronics Introduction The

More information

Generator Advanced Concepts

Generator Advanced Concepts Generator Advanced Concepts Common Topics, The Practical Side Machine Output Voltage Equation Pitch Harmonics Circulating Currents when Paralleling Reactances and Time Constants Three Generator Curves

More information

Hendrix Tap, Tie & Ground Wire

Hendrix Tap, Tie & Ground Wire Hendrix Tap, Tie & Ground Wire MADE IN U.S.A. 53 Old Wilton Road Milford, NH 03055-3119 603-673-2040 www.marmonutility.com A Marmon Wire & Cable/Berkshire Hathaway Company Tap Wire Description Hendrix

More information

Guidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines

Guidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines Guidance for UK Fire and Rescue Services Dealing with incidents on or near National Grid high voltage overhead lines This document offers guidance to the UK s Fire and Rescue Services for dealing with

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

Design and construction of double-blumlein HV pulse power supply

Design and construction of double-blumlein HV pulse power supply Sādhan ā, Vol. 26, Part 5, October 2001, pp. 475 484. Printed in India Design and construction of double-blumlein HV pulse power supply DEEPAK K GUPTA and P I JOHN Institute for Plasma Research, Bhat,

More information

IEC Standard Caledonian Offshore & Marine Cables

IEC Standard Caledonian Offshore & Marine Cables Power Copper s According to IEC 60228 Tinned conductors Cross section cl.2 cl.5 Cross section cl.2 cl.5 mm² Ohm/km Ohm/km mm² Ohm/km Ohm/km 1.0 18.2 20 70 0.270 0.277 1.5 12.2 13.7 95 0.195 0.210 2.5 7.56

More information

Measuring current transformers of the W, W series

Measuring current transformers of the W, W series Measuring current transformers of the W, W -8000 series W(-8000)_D00078_01_D_XXEN/09.2015 Measuring current transformers of the W, W -8000 series Product description The highly sensitive W and W -8000

More information

Voltage Sags Evaluating Methods, Power Quality and Voltage Sags Assessment regarding Voltage Dip Immunity of Equipment

Voltage Sags Evaluating Methods, Power Quality and Voltage Sags Assessment regarding Voltage Dip Immunity of Equipment s Evaluating Methods, Power Quality and s Assessment regarding Voltage Dip Immunity of Equipment ANTON BELÁŇ, MARTIN LIŠKA, BORIS CINTULA, ŽANETA ELESCHOVÁ Institute of Power and Applied Electrical Engineering

More information

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES EXHIBIT JC-9 BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF JERSEY CENTRAL POWER & LIGHT COMPANY PURSUANT TO N.J.S.A. 40:55D-19 FOR A DETERMINATION THAT THE OCEANVIEW

More information

Appendix B to Working on Exposed Energized Parts

Appendix B to Working on Exposed Energized Parts Working on Exposed Energized Parts. - 1910.269 App B Regulations (Standards - 29 CFR) - Table of Contents Part Number: 1910 Part Title: Occupational Safety and Health Standards Subpart: R Subpart Title:

More information

Insulation Co-ordination For HVDC Station

Insulation Co-ordination For HVDC Station Insulation Co-ordination For HVDC Station Insulation Co-ordination Definitions As per IEC 60071 Insulation Coordination is defined as selection of dielectric strength of equipment in relation to the operating

More information

The Influences of Soil Ionization in the Grounding System and Corona Phenomena on the Injection Lightning Current of 1000 KV UHV Transmission Line

The Influences of Soil Ionization in the Grounding System and Corona Phenomena on the Injection Lightning Current of 1000 KV UHV Transmission Line International Academic Institute for Science and Technology International Academic Journal of Science and Engineering Vol. 3, No. 9, 2016, pp. 1-12. ISSN 2454-3896 International Academic Journal of Science

More information

12/2 Product overview. 12/3 7KT1 14, 7KT1 53 E-counters. 12/9 7KT1 11, 7KT1 12 digital measuring devices. 12/11 7KT1 0 analog measuring devices

12/2 Product overview. 12/3 7KT1 14, 7KT1 53 E-counters. 12/9 7KT1 11, 7KT1 12 digital measuring devices. 12/11 7KT1 0 analog measuring devices BETA Measuring /2 Product overview /3 7KT1 14, 7KT1 53 E-counters /9 7KT1 11, 7KT1 digital measuring devices /11 7KT1 0 analog measuring devices / 7KT5 8 time and pulse counters /14 7KT5 5, 7KT5 6 time

More information

American wire gauge - Wikipedia, the free encyclopedia

American wire gauge - Wikipedia, the free encyclopedia merican wire gauge - Wikipedia, the free encyclopedia http://en.wikipedia.org/wiki/merican_wire_gauge merican wire gauge From Wikipedia, the free encyclopedia merican wire gauge (WG), also known as the

More information

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS Management has tentatively approved your request subject to the following conditions: 1. All distribution materials/equipment must be purchased

More information

Raise Structures an Additional 5 to 20 Feet

Raise Structures an Additional 5 to 20 Feet PATENTED Structure Lifting System NO Line Outage Required Most Economical Solution Low Impact Equipment Field Training Included with Equipment Rental Capitalized Expenditure No Loss of Structure Reliability

More information

Modelling of Voltage Regulation Issues in SWER Systems Using PSCAD/EMTDC

Modelling of Voltage Regulation Issues in SWER Systems Using PSCAD/EMTDC Modelling of Voltage Regulation Issues in SWER Systems Using PSCAD/EMTDC Jason Mayer Connell Wagner Pty Ltd Spring Hill, Queensland, Australia Email: mayerj@conwag.com ABSTRACT An economic (low-cost) distribution

More information