Raise Structures an Additional 5 to 20 Feet

Size: px
Start display at page:

Download "Raise Structures an Additional 5 to 20 Feet"

Transcription

1 PATENTED Structure Lifting System NO Line Outage Required Most Economical Solution Low Impact Equipment Field Training Included with Equipment Rental Capitalized Expenditure No Loss of Structure Reliability or Decrease in Service Life Permanent, 30+ Year Solution Raise Structures an Additional 5 to 20 Feet Laminated Wood Systems, Inc.

2 Type PRH - Raise Only For H-Frames or Other Multiple Pole Structures Standard Assembly for PRH 7/8 Bolts, Round Washers, Locknuts 1 1/2 4 W A Bond One Top Bolt with 7/8 Bonding Clip Ladder Clips 7/8 Bolt, Curved Washers, Locknuts Section A - A A Safety Cap 7/8 Bolts, 2 Round Washers, Locknuts (typ.) PhaseRaiser Standard Raises are 5, 10, 15 or 20 X = Lift Height For lifts 0 to 15 feet: L = X A = 5-6 For lifts 16 to 20 feet: L = X A = 6-6 L X A 6 7/8 Bolt, Curved Washers, Locknuts PR-1 Curved Shield 3/4 Banding 6 Ladder Clips 7/8 Bolt, Curved Washers, Locknuts 20 ft. lift - North Dakota Add additional X-brace to span gap for lifts 16ft or greater. X-brace assemblies available from LWS (ordered separately) /8 Bolts, 2 Round Washers, Locknuts (typ.) Bond One Bottom Bolt with 7/8 Bonding Clip NOTE: Most H-frame strengths are limited by the pole capacity above the X-brace. However, the capacity of the structure after lift needs to be checked either with the use of PLS-POLE or by LWS to determine if additional X-bracing is required. Page 2

3 Type PRH - Raise Only ORDERING INFORMATION Ordering Example: Need - Raise Structure 10-0 (X=10-0 ) Existing Pole Class 2 W Width of steel Order - P R H L Minimum Unit Size Existing Pole Existing Pole Class Length H2 H PRH9 PRH9 PRH7 PRH7 PRH PRH10 PRH9 PRH8 PRH7 PRH PRH11 PRH10 PRH9 PRH7 PRH PRH11 PRH10 PRH9 PRH8 PRH PRH12 PRH11 PRH10 PRH8 PRH PRH13 PRH12 PRH10 PRH9 PRH PRH13 PRH12 PRH11 PRH9 PRH PRH14 PRH13 PRH11 PRH10 PRH PRH14 PRH13 PRH12 PRH10 PRH PRH15-80 PRH14 PRH12 PRH PRH15-80 PRH14 PRH13 PRH PRH15-80 PRH14 PRH13 PRH PRH15-80 PRH15-80 PRH13 PRH12 Contact LWS for sizes not shown. Note: Material to be galvanized. For weathering steel add W, for painted steel add P. PhaseRaiser unit size from table above. L Length of steel ( X ) Laminated Wood Systems, Inc. Seward, Nebraska Before Lift After Lift 345kV H-frame structure raised 15 feet (Iowa) U.S. PATENTS 6,115,988 6,151,860 CANADIAN PATENTS 2,252,115 2,297,318 Page 3

4 Type PRHR - Raise & Reinforce Standard Assembly for PRHR 7/8 Bolts, Round Washers, Locknuts PRH PhaseRaiser Top Unit PRHRB PhaseRaiser Bottom Unit W-B W Section A - A Ladder Clips Bond One Top Bolt with 7/8 Bonding Clip Safety Cap 1 1/2 4 7/8 Bolts, 2 Round Washers, Locknuts (typ) L X A 6 7/8 Bolt, Curved Washers, Locknuts Ladder Clips 3/4 Banding PR-1 Curved Shield 115kV Single Pole Structure Raised (& Reinforced) 10 feet - Alberta A Bottom unit notched for cross bolt clearance 18 7/8 Bolts, 2 Round Washers, Locknuts 7/8 Bolt, Curved Washers, Locknuts A PRH PhaseRaiser Top Unit Bond One Bottom Bolt with 7/8 Bonding Clip Embedment Depth (bottom unit length minus 5-0 ) PRHRB PhaseRaiser Bottom Unit 345kV H-frame Structure Raised 10 feet - Nebraska Page 4

5 Type PRHR - Raise & Reinforce The PRHR system is required for all single pole applications. The system is also used for multi-pole structures where groundline decay is, or could be, an issue. ORDERING INFORMATION Top Unit Minimum Size X = Lift Height Standard Raises are 5, 10, 15 or 20 Existing Pole Existing Pole Class Length H2 H PRH9 PRH9 PRH7 PRH7 PRH PRH10 PRH9 PRH8 PRH7 PRH PRH11 PRH10 PRH9 PRH7 PRH PRH11 PRH10 PRH9 PRH8 PRH PRH12 PRH11 PRH10 PRH8 PRH PRH13 PRH12 PRH10 PRH9 PRH PRH13 PRH12 PRH11 PRH9 PRH PRH14 PRH13 PRH11 PRH10 PRH PRH14 PRH13 PRH12 PRH10 PRH PRH15-80 PRH14 PRH12 PRH PRH15-80 PRH14 PRH13 PRH PRH15-80 PRH14 PRH13 PRH PRH15-80 PRH15-80 PRH13 PRH12 Bottom Unit Minimum Size (Embedment depth = L minus 5-0 ) Existing Pole Existing Pole Class Length H2 H PRHRB58-11 PRHRB58-11 PRHRB5A6-10 PRHRB5A6-10 PRHRB5A PRHRB59-11 PRHRB58-11 PRHRB5A7-10 PRHRB5A6-10 PRHRB5A PRHRB PRHRB59-11 PRHRB58-11 PRHRB5A6-10 PRHRB5A PRHRB PRHRB59-11 PRHRB58-11 PRHRB5A7-10 PRHRB5A PRHRB PRHRB PRHRB59-11 PRHRB5A7-10 PRHRB5A PRHRB PRHRB PRHRB59-11 PRHRB58-11 PRHRB5A PRHRB PRHRB PRHRB PRHRB58-11 PRHRB5A PRHRB PRHRB PRHRB PRHRB59-11 PRHRB5A PRHRB PRHRB PRHRB PRHRB59-11 PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB PRHRB For lifts 0 to 15 feet: L = X A = 5-6 For lifts 16 to 20 feet (H-Frames Only) L = X A = 6-6 (For lifts add additional X-brace) Note: Material to be galvanized. For weathering steel add W, for painted steel add P. Ordering Example: Need - Raise Structure 10-0 (X=10-0 ) Existing Pole Class 1 Order - P R H R L PhaseRaiser top unit size from table above. W Width of top unit steel L Length of top steel ( X ) (Consists of two PRH10-22L Top Units and two PRHRB59-11 Bottom Units) W-B Width of bottom unit steel U.S. PATENTS 6,115,988 6,151,860 CANADIAN PATENTS 2,252,115 2,297,318 Page 5

6 Structure Information Worksheet Use this form to provide LWS engineers information regarding your structure and unique lift requirements. LWS can provide a complete computer analysis on your structure(s) and will recommend & supply complete material kits that will: raise, raise and reinforce the ground line, or raise, reinforce and reclassify the poles for each structure. LWS designers may recommend additional X-braces or foundation systems with the material kits. Complete the following form and fax it to LWS at: OR fill out ONLINE at - OR submit simple spreadsheet containing quantity and size required from charts on pages 3 & 5 Customer Information Customer Name: Contact Name: Project Name: Project Address: City / State: Phone: Fax: Constr Start Date: Delivery Location: City / State / Zip Structure Type No. of Vee Braces Send detailed drawing if available Pole Information Pole Height(s): Pole Class(es): Species: Douglas-fir Southern Pine Cedar Pole Condition at Groundline: Single Pole H-Frame Inspection Report Available? Yes No Structure Information Line Voltage: 345kV 230kV 161kV 138kV Conductor Size: Shield Wire Size: 115kV 69kV Other Span Length: Date Line Built: Lift and Reinforcement Needed NOTE: Illustrations show PhaseRaisers rotated 90 o on poles for clarity. Desired Lift (5 to 20ft) Raise Raise/Reinforce Additional Comments (I.E. - cable TV, Telephone etc.) Page 6 U.S. PATENTS 6,115,988 6,151,860 CANADIAN PATENTS 2,252,115 2,297,318

7 Based on Customer Design Information, LWS will Specify PhaseRaiser Designs Typical PhaseRaiser Designs Page 7

8 Use the PhaseRaiser Wizard with PLS-CADD TM to Simulate Raising Conductor Clearances The PLS-CADD PhaseRaiser Wizard allows users to easily and accurately model the effects of a PhaseRaiser installation on each specific structure as well as the adjacent structures. Page 8

9 Materials, Equipment & Manpower Required for Typical Installations Materials Equipment Safety Cap Steel PhaseRaiser Units 7/8 Anti-split Bolts 7/8 Cross Bolts 7/8 Threaded Rods Covers Cover Band The PhaseRaiser system requires specialized training, tools and equipment for installation. This equipment is available for purchase or lease and includes on-site training by LWS field personnel as well as the following specialized tools and equipment: Custom Equipment Trailer w/ Tool Boxes - Skid Mount Hydraulic Lifting Unit - Hydraulic Hoses - 4 x 101 Hydraulic Cylinders Cylinder Extensions Galvanized Lifting Vangs Cylinder Pins Treated Timbers Nylon Ratchet Straps Banding Dispenser Banding Shear Drilling Alignment Tools 4 Working Ladders In addition to the equipment trailer, a line or boom truck, chain saw and air compressor are also needed. PhaseRaiser units are made of high strength galvanized steel. All bolts conform to ANSI C135.1 The PhaseRaiser units are also available in painted and weathering steel. Personnel For more detailed information regarding installation, see the PhaseRaiser Installation Manual. The PhaseRaiser system enables a crew as small as three for single pole or a crew of five (or six) for H-frame structures to cut the existing poles, install custom designed galvanized or painted steel PhaseRaiser units, then raise and secure the structure to the desired height up to an additional twenty feet. LWS Field Training - A skilled field trainer from LWS works with qualified lineworkers until they develop a comfortable skill level - normally after raising two to three structures. Page 9 U.S. PATENTS 6,115,988 6,151,860 CANADIAN PATENTS 2,252,115 2,297,318

10 Over 5,000 Installations on Energized Lines Since 1997 Permanent, 30+ year Solution Capitalized Expenditure Built in 1950 s Built in 1970 s Built in 1960 s Built in 1940 s Nebraska Florida Iowa Montana Built in 1960 s Built in 1950 s Built in 1950 s Built in 1950 s Minnesota Massachusetts New Mexico Canada Projects Not Shown: California - Colorado - Connecticut - Georgia - Idaho - Maine - Michigan Missouri - Nebraska - Nevada - New Hampshire - New Jersey - New York North Carolina - North Dakota - Pennsylvania South Carolina - Texas Utah - Washington - Wisconsin Page 10 U.S. PATENTS 6,115,988 6,151,860 CANADIAN PATENTS 2,252,115 2,297,318

11 The strength and patented design of PhaseRaiser has been proven in full-scale testing. In 1997, LWS, Inc. conducted full scale structure tests on both single pole and H-frame PhaseRaiser installations. The tests proved that the strength and design of the PhaseRaiser lifting system exceeded NESC load requirements. 345kV Double X-braced Structure Raised 5 feet Maximum Transverse Load 24,000 Lbs Based on the following design parameters: Shield Wire...3/8 steel strand Conductor ACSR 26/7 (2 per phase) NESC Medium Loading with steel overload capacity factors. 5 Lift Maximum Span...2,346 feet Maximum Groundline Moment...194,400 ft-lbs PhaseRaiser Rated Capacity...220,000 ft-lbs X-Braced Load...24,019 Lbs. 50ft Class 3 Pole Raised 8 feet Pole Failure... 3,500 pounds Loaded AGL Groundline Moment Failure ,400 ft-lbs No permanent Deformation Page 11 U.S. PATENTS 6,115,988 6,151,860 CANADIAN PATENTS 2,252,115 2,297,318

12 U.S. PATENTS 6,115,988 6,151,860 CANADIAN PATENTS 2,252,115 2,297,318 If your structures are good enough to be in service, they are good enough to raise and remain in service! PhaseRaiser is a PERMANENT solution, get 30 or more years out of your structure. Built in 1950 s Built in 1970 s Built in 1960 s Built in 1940 s Nebraska Florida Iowa Montana Give PhaseRaiser a try with a pilot project of 20 or more structures today! Visit: or call: Laminated Wood Systems, Inc. Seward, Nebraska Laminated Wood Systems, Inc

Installation Instructions

Installation Instructions Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The

More information

Is the scanned image stored as a color, grayscale, or black and white image? If applicable, what resolution is used?

Is the scanned image stored as a color, grayscale, or black and white image? If applicable, what resolution is used? Topic: Trademarks, Trade names, Service marks Question by: Mandy Harlan/LA s IT staff Jurisdiction: Louisiana Date: 25 August 2010 Jurisdiction Question(s) Manitoba Corporations Canada Alabama Alaska Arizona

More information

PENTRUDER 8-20 HF 22KW/30HP WALL SAW (MAX BLADE DIAMETER - 79, WILL TAKE 39 BLADE OUT OF CUT) PART NUMBER DESCRIPTION DETAILS MSRP

PENTRUDER 8-20 HF 22KW/30HP WALL SAW (MAX BLADE DIAMETER - 79, WILL TAKE 39 BLADE OUT OF CUT) PART NUMBER DESCRIPTION DETAILS MSRP PENTRUDER 8-20 HF 22KW/30HP WALL SAW (MAX BLADE DIAMETER - 79, WILL TAKE 39 BLADE OUT OF CUT) 582090 8-20 HF 30 HP WALL SAW BASE PACKAGE $97,745.00 8-20 HF WALL SAW BASE PACKAGE INCLUDES THE FOLLOWING

More information

THE 3905 CENTURY CLUB, INC POINT AWARD APPLICATION (AND SUBSEQUENT 1000-POINT INCREMENTS) (EACH BAND/MODE SEPARATELY) (NOT ENDORSABLE)

THE 3905 CENTURY CLUB, INC POINT AWARD APPLICATION (AND SUBSEQUENT 1000-POINT INCREMENTS) (EACH BAND/MODE SEPARATELY) (NOT ENDORSABLE) THE 3905 CENTURY CLUB, INC. 2000-POINT AWARD APPLICATION (AND SUBSEQUENT 1000-POINT INCREMENTS) (EACH BAND/MODE SEPARATELY) (NOT ENDORSABLE) The requirements for the 2000-Point Award are simple. You just

More information

UNITED STATES. United We Stand Flag Stamp EDNA FERBER DIE CUT X ON 34 C. Washington. Self-Adhesive Booklet Stamps

UNITED STATES. United We Stand Flag Stamp EDNA FERBER DIE CUT X ON 34 C. Washington. Self-Adhesive Booklet Stamps United We Stand Flag Stamp Distinguished Americans SELF-ADHESIVE BOOKLET STAMP DIE CUT 10.50 X 10.75 ON 2 OR 3 SIDES EDNA FERBER 83 C Regular Stamp Washington Self-Adhesive Booklet Stamps PERFORATED 11.25

More information

Recommended Citations

Recommended Citations Recommended Citations Entire set Kunkel, K., R. Frankson, J. Runkle, S. Champion, L. Stevens, D. Easterling, and B. Stewart (Eds.), 2017: State Climate Summaries for the United States. NOAA Technical Report

More information

California Public-Safety Radio Association

California Public-Safety Radio Association Association Orientation Note: This slide presentation is timed to run automatically. Or, you may press the Left or Right arrow keys to change slides. Thank You! CPRA is the Southern California chapter

More information

Display Advertising Networks - National Rate Sheet

Display Advertising Networks - National Rate Sheet Alabama 2x2 $1,000 127 893,708 Monday, 5pm North 2x2 $400 46 393,125 Central 2x2 $400 40 302,717 South 2x2 $400 41 197,866 2x2-2 regions $750 Retail Network 2x3: 1 region $600, 2 regions, $1,100, statewide

More information

: Geocode File - Census Tract, Block-Group and Block. Codebook

: Geocode File - Census Tract, Block-Group and Block. Codebook 196815: Geocode File Census Tract, BlockGroup and Block Codebook Number of Variables 15 Friday June 17 8:49 AM 196815: Geocode File Census Tract, BlockGroup and Block RLS1 "RELEASE NUMBER" NUM(1.) Release

More information

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4 12ft X 12ft Attached Breeze Pergola Assembly Manual (For Both 9 and 12 High Posts) Outdoor Living Today June 1st/2012 Version #4 Note: Installation of Wall Side Girders (P) and Wall Mount Brackets (M)

More information

Dowel Bar Standardization. NC^2 Fall Meeting St. Louis, MO

Dowel Bar Standardization. NC^2 Fall Meeting St. Louis, MO Dowel Bar Standardization 2001 Universal Basket Continuation of discussion from NC^2 Spring meeting Results of Dowel Bar Questionnaire Results of Dowel Bar Questionnaire Dowel Bar Diameters 6.0" 6.5" 7.0"

More information

12X20 Breeze Pergola Assembly Manual Outdoor Living Today

12X20 Breeze Pergola Assembly Manual Outdoor Living Today 12X20 Breeze Pergola Assembly Manual Outdoor Living Today Revision #10 July 21th, 2015 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building permit office to

More information

8x8 Spa Breeze Pergola Assembly Manual Outdoor Living Today

8x8 Spa Breeze Pergola Assembly Manual Outdoor Living Today 8x8 Spa Breeze Pergola Assembly Manual Outdoor Living Today Revision 3. Feb 18th/2015 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building permit office to

More information

8X10 Breeze Pergola Assembly Manual Outdoor Living Today

8X10 Breeze Pergola Assembly Manual Outdoor Living Today 8X10 Breeze Pergola Assembly Manual Outdoor Living Today Revision #11 Jan 18th, 2018 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building permit office to determine

More information

Osprey Platform Assembly Guide. Menunkatuck Audubon Society. Rev 1.0

Osprey Platform Assembly Guide. Menunkatuck Audubon Society. Rev 1.0 Osprey Platform Assembly Guide Menunkatuck Audubon Society Rev 1.0 1 Menunkatuck Audubon Society is a local chapter of National Audubon Society. We serve the shoreline towns of West Haven, New Haven, East

More information

Dowel Bar Standardization. NC^2 Spring Meeting Savannah, GA

Dowel Bar Standardization. NC^2 Spring Meeting Savannah, GA Dowel Bar Standardization NC^2 Spring Meeting Savannah, GA Dowel Bar Task Force Maria Masten, Minnesota DOT Mark Snyder, ACPA Pennsylvania Matt Zeller, Concrete Paving Association of Minnesota Tom Cackler,

More information

Guidelines: Logos & Taglines L O G O S & G U I D E L I N E S

Guidelines: Logos & Taglines L O G O S & G U I D E L I N E S L O G O S & G U I D E L I N E S Guidelines: Logos & Taglines 2018 This guide will help you learn how to leverage the Smithsonian brand by using the Smithsonian Affiliate logos and taglines. In addition

More information

2008 Statistics and Projections to the Year Preliminary Data

2008 Statistics and Projections to the Year Preliminary Data 2008 Statistics and Projections to the Year 2025 2009 Preliminary Data Presented at the 92nd Annual Convention Honolulu, Hawaii August 4-7, 2010 Updated October 2010 Prepared by: Market Research & Statistics

More information

Pamela Amick Klawitter, Ed.D. Author

Pamela Amick Klawitter, Ed.D. Author Editor Eric Migliaccio Managing Editor Ina Massler Levin, M.A. Editor-in-Chief Sharon Coan, M.S. Ed. Illustrator Ken Tunell Cover Artist Lesley Palmer Art Coordinator Kevin Barnes Imaging Ralph Olmedo,

More information

10ft X 16ft Breeze Pergola Assembly Manual. Outdoor Living Today. Revision 6 March 20th,2012

10ft X 16ft Breeze Pergola Assembly Manual. Outdoor Living Today. Revision 6 March 20th,2012 10ft X 16ft Breeze Pergola Assembly Manual Outdoor Living Today Revision 6 March 20th,2012 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building permit office

More information

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today 10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today ITEM# BZ1012ARCH Revision 2 March 25th/2015 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building

More information

Entropy Based Measurement of Geographic. Concentration in U.S. Hog Production. Bryan J. Hubbell FS January 1997

Entropy Based Measurement of Geographic. Concentration in U.S. Hog Production. Bryan J. Hubbell FS January 1997 Entropy Based Measurement of Geographic Concentration in U.S. Hog Production Bryan J. Hubbell FS-97-02 January 1997 Bryan Hubbell is an Assistant Professor in the Department of Agricultural and Applied

More information

State Capitals Directions:

State Capitals Directions: State Capitals Directions: Using the word bank of state capitals below, match the capitals to their state. Hint: Use a map of the United States to help you locate the capitals. State Capitals Albany -

More information

Employer Location file. Codebook

Employer Location file. Codebook 232 Employer Location file Codebook Number of Variables 2 Wednesday July 8 28 :9 PM 232 Employer Location file EMPV "RELEASE NUMBER" NUM(.) Release number Release : 7/28, SAS proc geocode and proc ginside

More information

Event History Calendar (EHC) Between-Wave Moves File. Codebook

Event History Calendar (EHC) Between-Wave Moves File. Codebook 2325 Event History Calendar (EHC) BetweenWave Moves File Codebook Number of Variables 23 Thursday July 2 28 4:5 PM 2325 Event History Calendar (EHC) BetweenWave Moves File EHCV "RELEASE NUMBER" NUM(.)

More information

Customer Requirements RF Antenna Installations

Customer Requirements RF Antenna Installations Application Terms Attachment requirements and clearances on the Pole for Radio Frequency (RF) antenna equipment installations. This standard is intended to allow electrical workers to perform their normal

More information

Cutters. Section. HUBBELL / CHANCE CENTRALIA, MISSOURI Printed in USA FEBRUARY 2009

Cutters. Section. HUBBELL / CHANCE CENTRALIA, MISSOURI Printed in USA FEBRUARY 2009 Cutters Section 2151 2150 Warranty - Material Hubbell Power Systems, Inc. warrants all products sold by it to be merchantable (as such term is defined in the Uniform Commercial Code) and to be free from

More information

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Installation Instructions Bulletin 237029 Foundation Specifications for 5.6-Meter Modular Earth Station Antennas Revision A Introduction This document specifies typical foundation characteristics, designs,

More information

Table of Contents for Standard Duty Poly Blade Arctic Standard Duty Poly Blade 84" & 90" (Blade, Quadrant & T-frame)....2 Important note: Lift frames for this specific blade are listed below: Lift Frame

More information

Foundation Specifications for 7.6-Meter Modular Earth Station Antennas

Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Installation Instructions Foundation Specifications for 7.6-Meter Modular Earth Station Antennas Bulletin 237186A Revision A Introduction This document specifies typical foundation characteristics, designs,

More information

American Safe Room. Explosion Resistant Blast Hatch with Integrated Riser

American Safe Room. Explosion Resistant Blast Hatch with Integrated Riser American Safe Room Explosion Resistant Blast Hatch with Integrated Riser Drawing: ASR-50-RBH Revision: H May 17, 2012 Table of Contents Description... 3 Options... 4 Order form... 5 Option: left or right

More information

2019 OXFORD EWE LAMB FUTURITY (Sponsored by the American Oxford Sheep Association, Inc.)

2019 OXFORD EWE LAMB FUTURITY (Sponsored by the American Oxford Sheep Association, Inc.) 2019 OXFORD EWE LAMB FUTURITY (Sponsored by the American Oxford Sheep Association, Inc.) The American Oxford Sheep Association, Inc. ( AOSA ) is sponsoring its 10th annual ewe lamb youth futurity program

More information

Table of Contents for Heavy duty Steel blade

Table of Contents for Heavy duty Steel blade Table of Contents for Heavy duty Steel blade Arctic Heavy Duty Steel Blade 96", 102, 108" (Blade, Quadrant, A-frame)...2 Shock Absorber Mounting Kit for Arctic Heavy Duty Steel Blade...6 Arctic Heavy Duty

More information

The Variable Threshold Neutral Isolator (VTNI)

The Variable Threshold Neutral Isolator (VTNI) The Variable Threshold Isolator (VTNI) Installation Instructions INTRODUCTION The is designed specifically for installation between the primary neutral of a power utility distribution system and the secondary

More information

Birding in the United States: A Demographic and Economic Analysis

Birding in the United States: A Demographic and Economic Analysis U.S. Fish & Wildlife Service Birding in the United States: A Demographic and Economic Analysis Addendum to the 2006 National Survey of Fishing, Hunting, and Wildlife-Associated Recreation Report 2006-4

More information

SINCE 1922 P UBLICATION N O

SINCE 1922 P UBLICATION N O SINCE 1922 GARED SPORTS MICRO-Z SET-UP INSTRUCTIONS VERY IMPORTANT! READ INSTRUCTIONS CAREFULLY AND FOLLOW STEP BY STEP SET-UP PROCEDURE P UBLICATION N O. 5 5 1 7 5 2 9 1 6 Recommended tools and accessories.

More information

Click here for PIF Contacts (national, regional, and state level) The Partners in Flight mission is expressed in three related concepts:

Click here for PIF Contacts (national, regional, and state level) The Partners in Flight mission is expressed in three related concepts: [Text Links] Partners in Flight / Compañeros en Vuelo / Partenaires d Envol was launched in 1990 in response to growing concerns about declines in the populations of many land bird species. The initial

More information

CM543 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

CM543 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID CM543 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID NET-SERV Co-Location Cabinet (S752S2C122B) Panduit Corp. 2011 INSTRUCTIONS CM543 FRONT OF CABINET REAR OF CABINET NOTE:

More information

Arctic Standard Duty Steel Blade 84", 90" (Blade, Quadrant, A-frame)...2. Arctic Standard Steel Blade, Quadrant & A-frame Installation...

Arctic Standard Duty Steel Blade 84, 90 (Blade, Quadrant, A-frame)...2. Arctic Standard Steel Blade, Quadrant & A-frame Installation... Table of Contents for Standard Steel Arctic Standard Duty Steel Blade 84", 90" (Blade, Quadrant, A-frame)...2 Arctic Standard Steel Blade, Quadrant & A-frame Installation...6 Important note: Lift frames

More information

OLYMPIADTM. Installation, Operation & Maintenance Manual

OLYMPIADTM. Installation, Operation & Maintenance Manual OLYMPIADTM Installation, Operation & Maintenance Manual OLYMPIAD & LEGEND CHAIRS INSTALLATION OPERATION MAINTENANCE MANUAL HUSSEY SEATING COMPANY NO. BERWICK, MAINE 03906 TEL. 1-800-341-0401 FAX No. 1-207-676-0444

More information

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503)

More information

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334

More information

Assembly & Installation Guide (Metric)

Assembly & Installation Guide (Metric) Assembly & Installation Guide (Metric) INFRASTRUCTURE FOR LIFE RS Technologies www.rstandard.com Email Toll Free Phone Fax info@grouprsi.com +1 877 219 8002 +1 403 219 8000 +1 403 219 8001 2421 37th Avenue

More information

Mounting Plate User s Guide. Includes Mounting, Installation, and Product Registration

Mounting Plate User s Guide. Includes Mounting, Installation, and Product Registration T M Mounting Plate User s Guide Includes Mounting, Installation, and Product Registration OutBack Power Systems FLEXware is a system of modular aluminum mounting hardware and installation components designed

More information

Installation. Loader Arm Wear Strip Kit TX 1000 Compact Tool Carrier WARNING. Loose Parts. Installation Instructions

Installation. Loader Arm Wear Strip Kit TX 1000 Compact Tool Carrier WARNING. Loose Parts. Installation Instructions Loader Arm Wear Strip Kit TX 1000 Compact Tool Carrier Model No. 133-0241 Form No. 3406-164 Rev B Installation Instructions WARNING CALIFORNIA Proposition 65 Warning This product contains a chemical or

More information

Birding in the United States: A Demographic and Economic Analysis

Birding in the United States: A Demographic and Economic Analysis U.S. Fish & Wildlife Service Birding in the United States: A Demographic and Economic Analysis Addendum to the 2011 National Survey of Fishing, Hunting, and Wildlife-Associated Recreation Report 2011-1

More information

American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO Phone: 303/ Fax: 303/

American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO Phone: 303/ Fax: 303/ American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO 80112 Phone: 303/792-9559 Fax: 303/792-0669 404.1. SCOPE STANDARD FOR RADIALLY REINFORCING CURVED GLUED LAMINATED

More information

SDWH TIMBER-HEX Screw

SDWH TIMBER-HEX Screw Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections, Including Ledgers Double-barrier coating provides corrosion resistance equivalent to hot-dip galvanization, making it suitable

More information

EMB MANUFACTURING INC.

EMB MANUFACTURING INC. TRAILER WOOD PROCESSOR MODELS WP865, WP835, WP635 ASSEMBLY INSTRUCTION MANUAL Please review and understand the operators manual before attempting to operate this machinery. EMB MANUFACTURING INC. 4144

More information

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual This manual is for various mounting types and plain and trussed track profiles. ISO 9001:2008 Registered Manual 103-0075

More information

ClampStar Safe-T-Link Tether Installation Instructions for Deadends

ClampStar Safe-T-Link Tether Installation Instructions for Deadends Tel.800-269-1462 Fax.800-311-9857 P.O. Box 100279, Birmingham, AL 35210 www.classicconnectors.com Classic Connectors, Inc. ClampStar Safe-T-Link Tether Installation Instructions for Deadends General Safety

More information

2012 ACCE Industry Advisory Board Best Practices Positioning Your Firm After the Great Recession

2012 ACCE Industry Advisory Board Best Practices Positioning Your Firm After the Great Recession 2012 ACCE Industry Advisory Board Best Practices Positioning Your Firm After the Great Recession 2012 FMI Corporation 0 The Great Recession 2012 FMI Corporation 1 FMI Corporation 2010 1 Market Truths You

More information

p(s) = P(1st significant digit is s) = log )

p(s) = P(1st significant digit is s) = log ) Math 3070 1. Treibergs Benfords Law: Counting Frequencies and Chi-Squared Test of Proportion. Name: Example June 27, 2011 This example is pure numerology! You may suspend your credulity for this one! If

More information

APPENDIX FENCE GENERAL NOTES

APPENDIX FENCE GENERAL NOTES APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information

Toward A Stronger and More Resilient

Toward A Stronger and More Resilient Toward A Stronger and More Resilient U.S.- Relationship 1 The unshakable U.S.- Alliance is the cornerstone of peace, prosperity, and freedom in the Asia-Pacific region. [The leaders of and the States]

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

INSTALLATION GUIDE. Version 2.0

INSTALLATION GUIDE. Version 2.0 INSTALLATION GUIDE Version 2.0 INTRODUCTION Carefully read these instructions to assure proper installation and performance of the GatorDeck TM. TOOLS NEEDED 1. Calibrated test weights 2. Phillips screwdriver

More information

A LUMINIUM. Modular Handrail Installation Guide. Tools and Materials Required. Hardware Included. See WARNING on inside panel

A LUMINIUM. Modular Handrail Installation Guide. Tools and Materials Required. Hardware Included. See WARNING on inside panel A LUMINIUM Handrail Modular Handrail Installation Guide WALL APPLICATION BALUSTRADE APPLICATION see page 3 see page 11 Tools and Materials Required Mitre saw with non-ferrous metal cutting blade Drill

More information

Population Studies. Steve Davis Department of Family Medicine, Box G Brown University Providence, RI

Population Studies. Steve Davis Department of Family Medicine, Box G Brown University Providence, RI Population Studies The Hooded Merganser A Preliminary Look at Growth in Numbers in the United States as Demonstrated in the Christmas Bird Count Database Steve Davis Department of Family Medicine, Box

More information

SIMPLIFIED DESIGN PROCEDURE FOR GLUED-LAMINATED BRIDGE DECKS

SIMPLIFIED DESIGN PROCEDURE FOR GLUED-LAMINATED BRIDGE DECKS ABSTRACT Procedures have recently been developed for the design of glued-laminated bridge decks and for steel dowel connectors. However, since most bridges are designed in accordance with the Specifications

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

Assembly & Installation Guide. High Performance. Utility Poles

Assembly & Installation Guide. High Performance. Utility Poles Assembly & Installation Guide High Performance Utility Poles RS Technologies Inc. www.rspoles.com Email Info@RSpoles.com Toll Free +1 877 219 8002 Phone +1 519 682 5202 Fax +1 519 682 3786 RS Technologies

More information

MIT Product Demonstration

MIT Product Demonstration MIT Product Demonstration ACPA 55 th Annual Meeting CPU 4 Presented by Garry Aicken, P.E. North American Distributor for MIT Demonstrate the New Rail Less Dowel Bar Scanner - MIT-DOWEL-SCAN Demonstrate

More information

COMPONENTS INSTALLATION

COMPONENTS INSTALLATION PIPE BRACE ASSEMBLY - 8' FIXED-KNOT FENCE Brace posts... 14'x 2 7/8" Structural Tubing Cross Members... 10'x 2 3/8 Structural Tubing Angle Brace... 12'x 2 3/8 Structural Tubing Angle Brace Foot... 6' x

More information

2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS

2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS AMERICAN FOREST & PAPER ASSOCIATION American Wood Council Engineered and Traditional Wood Products March 2002 2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS The 2001 Edition of the National Design Specification

More information

Index Public Library Funding & Technology Access Study,

Index Public Library Funding & Technology Access Study, Index Public Library Funding & Technology Access Study, 2010-2011 Discussions of urban, suburban, or rural libraries in the summary sections are indexed. Additional data for all types of metropolitan status

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd. Sales & Service sasportonline.com SA Sport (Canada) SA Sport (U.S.A.) 135 Forestview Road 7879 Will Rogers Blvd. P.O. Box 40 Fort Worth, Texas Orillia, Ontario USA 76140 Canada L3V 6H9 Telephone: (705)

More information

CHEVY/GMC SuperRail Mounting Kit #3117

CHEVY/GMC SuperRail Mounting Kit #3117 CHEVY/GMC SuperRail Mounting Kit #3117 #3100 SuperGlide (12K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight) 12,000 lbs. 3,000 lbs. Installation Instructions SPECIFICATIONS Fits

More information

STRUCTURAL ATTACHMENTS

STRUCTURAL ATTACHMENTS Brace Structural Attachment Selection Procedure ) Determine structure to be attached to from the following: A) Concrete B) Wood Beam C) Structural Steel 2) Reference structure connection type from Appendix

More information

Aggregates & Finishes for Spun Cast Concrete Poles

Aggregates & Finishes for Spun Cast Concrete Poles ggregates & Finishes for Spun Cast Concrete Poles We offer a variety of pole designs and styles in an assortment of shapes, colors, textures and finishes that are perfect for any application or environment.

More information

Load Tables, Technical Data and Installation Instructions

Load Tables, Technical Data and Installation Instructions W22. W22. W22. W22. W22 W22.. Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections Including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting

More information

CM340B STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING SERVER CABINET FROM SKID

CM340B STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING SERVER CABINET FROM SKID CM340B STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING SERVER CABINET FROM SKID NET-ACCESS Server Cabinets Panduit Corp. 2010 INSTRUCTIONS CM340B CS1 (1) Base Cabinet (2) Solid Side Panels

More information

Power Train Lift Max. Capacity: 1,250 lbs.

Power Train Lift Max. Capacity: 1,250 lbs. 655 EISENHOWER DRIVE OWATONNA, MN 55060 USA PHONE: (507) 455-7000 TECH. SERV.: (800) 533-6127 FAX: (800) 955-8329 ORDER ENTRY: (800) 533-6127 FAX: (800) 283-8665 INTERNATIONAL SALES: (507) 455-7223 FAX:

More information

A domestic address must contain the following data elements:

A domestic address must contain the following data elements: ADDRESS EDITS FOR FILE MAINTENANCE ATTACHMENT TO SERVICE REQUEST #16941 FINAL 1.0 INTRODUCTION There are minimal edits in the Payroll/Personnel System (PPS) for employee address formatting which is causing

More information

Table of Contents Heavy Duty Extra Long Poly Blade

Table of Contents Heavy Duty Extra Long Poly Blade Table of Contents Heavy Duty Extra Long Poly Blade Arctic Heavy Duty Poly Blade 90" & 96" (Blade, Quadrant & A-frame)... 2 Power angling installation.....7 Shock absorber installation....12 Pro-Wings installation..

More information

Complete line of Holemaking Products and Accessories

Complete line of Holemaking Products and Accessories Complete line of Holemaking Products and Accessories I N T R O D U C I N G Holemaking Products Klein Tools has expanded our line of Holemaking products. We have added new flexible drill bits and related

More information

Ram Promaster Rack. Installation instructions for

Ram Promaster Rack. Installation instructions for Installation instructions for Ram Promaster Rack MyGlassTruck.com 200 Acorn Road LOCAL 856-595-9069 WEB www.myglasstruck.com Glassboro, NJ 08028 FAX 856-863-1480 1-844-364-4022 Version 1.0 November 2015

More information

ASSEMBLY AND INSTALLATION INSTRUCTIONS

ASSEMBLY AND INSTALLATION INSTRUCTIONS ASSEMBLY AND INSTALLATION INSTRUCTIONS Model 1425 Aluminum Swivel Rack IMPORTANT BEFORE YOU BEGIN Read these instructions and warnings completely before installation. CAPACITY 200 lbs. MAXIMUM NOTE: This

More information

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

Installation Instructions Kit, Base Rail Bracket Part # 31413

Installation Instructions Kit, Base Rail Bracket Part # 31413 Installation Instructions Kit, Base Rail Bracket Part # 31413 Dealer / Installer: Provide a copy of these Instructions to the end user of this product. These Instructions provide important operating and

More information

Table of Contents. Arctic Equipment Manufacturing Corporation Arctic SD-S

Table of Contents. Arctic Equipment Manufacturing Corporation Arctic SD-S Arctic SD-S Table of Contents Arctic Standard Duty Steel Blade 84",90" (Blade, Quadrant, A-frame)...2 Arctic Standard Steel Blade, Quadrant & A-frame Installation...6 QL-MKB...12 QUIK*LINK II-MKB...14

More information

Operating Instruction Manual For S-240CC Hydraulic Cutters With Parts List

Operating Instruction Manual For S-240CC Hydraulic Cutters With Parts List HUSKIE TOOLS, INC. Operating Instruction Manual For S-240CC Hydraulic Cutters With Parts List GENERAL INFORMATION GUIDE FOR S-240CC CUTTER The following steps are guidelines for safe operation of the

More information

b2b 2013 cylinders 1 jars 2-3 containers 4-8 votives 9 lids 10 hydration/diffusers 11 customizing processes 12 special production index 15-16

b2b 2013 cylinders 1 jars 2-3 containers 4-8 votives 9 lids 10 hydration/diffusers 11 customizing processes 12 special production index 15-16 B2B contents b2b 2013 cylinders 1 jars 2-3 containers 4-8 votives 9 lids 10 hydration/diffusers 11 customizing processes 12 special production 13-14 index 15-16 ALL PRODUCT NAMES, CONFIGURATIONS AND ITEM

More information

Rayport G Eco Dealer Kit

Rayport G Eco Dealer Kit Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8

More information

VECTOR SURVEILLANCE IN NEW JERSEY EEE and WNV CDC WEEK 23: June 1 to June 7, 2008

VECTOR SURVEILLANCE IN NEW JERSEY EEE and WNV CDC WEEK 23: June 1 to June 7, 2008 VECTOR SURVEILLANCE IN NEW JERSEY EEE and WNV CDC WEEK 3: June 1 to June 7, Prepared by Lisa M. Reed, Scott Crans and Dina Fonseca at the Center for Vector Biology, Rutgers University. Supported by funding

More information

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS 6/1/2008 PATRIOT DOCKS ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical shoreline application.

More information

Bolt Together Pump/Screw Together Frame Conversion Kit

Bolt Together Pump/Screw Together Frame Conversion Kit Instruction Sheet P/N Bolt Together Pump/Screw Together Frame Conversion Kit 1. Description The bolt together pump/screw together frame conversion kit changes your Rhino unloader from a 3-post screw together

More information

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE

More information

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER: PARTS-1 Model 24562/28562 Crane INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA 50438-0189 641-923-3711 MANUAL PART NUMBER: 99903701 Iowa Mold Tooling Co., Inc. is an Oshkosh Truck

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SELF LEVELING RADAR ANTENNA MOUNT MODEL 400G QUESTUS MARINE, INC. PO BOX 9 MARBLEHEAD, MA 01945 1-800-RADAR66 TEL 781.639.1900 FAX 781.639.1905 www.questusmarine.com INSTALLATION

More information

MEEVER BRACING 400 SERIES

MEEVER BRACING 400 SERIES Description The Meever Series bracing is very easy and straightforward to assemble, very adaptable, modular hydraulic bracing system that has interchangeable extension modules in various lengths. The 400

More information

Retractable Tongue Kit Model MPG457 Instructions

Retractable Tongue Kit Model MPG457 Instructions Malone MicroSport Trailer Retractable Tongue Kit Model MPG457 Instructions TM Take a few moments and read through these instructions to familiarize yourself with the step by step assembly process before

More information

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday BENCH SWING SETS

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday BENCH SWING SETS 866.332.2403 (Toll Free); 7am-7pm Pacific Time, Monday-Saturday BENCH SWING SETS SPECIFICATIONS: DIMENSIONS & DRAWINGS Swing itself is 1' 11"H x 2' 4"D. Seat back is 1' 8"H from the top of the seat to

More information

FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS

FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS SYSTEM COMPONENTS FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS s t r oppu S, s gn i n e t s af r oo l F, s l eehw, t e ef FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS 136 MINITEC PROFILE SYSTEM BASE AND TRANSPORT

More information

Mast and Antennas for Field Day & Emergencies

Mast and Antennas for Field Day & Emergencies Mast and Antennas for Field Day & Emergencies John A. Allocca, WB2LUA, July 2005 This is a 27 feet 1.5 diameter portable guyed mast with a 28 feet diameter footprint. It breaks down into four 6 feet sections

More information

ASSEMBLY INSTRUCTIONS JK270

ASSEMBLY INSTRUCTIONS JK270 TOOLS REQUIRED: One knife to open packaging Two ½ wrench or socket (metric 13) One 9/16 wrench or socket (metric 14) One #2 Philips (+) screwdriver NOTE: All bolts are 9/16 (metric 14) and nuts are ½ (metric

More information

INSTALLATION INSTRUCTIONS LARGE FLAT PANEL IN WALL ENCLOSURE Model: PAC-500

INSTALLATION INSTRUCTIONS LARGE FLAT PANEL IN WALL ENCLOSURE Model: PAC-500 INSTALLATION INSTRUCTIONS LARGE FLAT PANEL IN WALL ENCLOSURE Model: PAC-500 Specifications: Designed for in-wall installation spanning a minimum of 3 wood studs, 16" on center. Accomodates MWR, PWR and

More information

Save time! Read the entire manual before beginning Hoister installation.

Save time! Read the entire manual before beginning Hoister installation. Harken, Inc. 1251 E. Wisconsin Ave. Pewaukee, WI 53072 USA Tel: 262-691-3320 Fax: 262-691-3008 Email: hoister@hoister.com Web: www.hoister.com WARNING!: Strictly follow all instructions to avoid an accident,

More information