The purpose of this procedure is to describe a method for using the Dranetz analyzer to commission transformer rated meters.

Size: px
Start display at page:

Download "The purpose of this procedure is to describe a method for using the Dranetz analyzer to commission transformer rated meters."

Transcription

1 Metering Standards Title: BASIC USE OF DRANETZ ANALYZER FOR METER MS 8. Page: of 9.0 PURPOSE The purpose of this procedure is to describe a method for using the Dranetz analyzer to commission transformer rated meters. 2.0 SCOPE This procedure applies to the use of the Dranetz analyzer as part of reference 3. Commissioning Procedure For Transformer Rated Meters. 3.0 REFERENCE 3. MS 2.2, Commissioning Procedure For Transformer Rated Meters. 3.2 Dranetz Analyzer Operator s Manual. 4.0 EQUIPMENT 4. Safety Equipment - Safety Glasses - Safety Footwear - Hard Hat - Work Gloves - Rubber Gloves - Fire retardant clothing (for use under live conditions) - Alternate Light Source 4.2 Test Equipment 5.0 POWER - Dranetz Circuit Analyzer 5. Verify that the voltage leads are connected to the back of the Dranetz as follows: red to A channel, yellow to B, blue to C, and black to Common. 5.2 Verify that the CT leads are connected to the back of the Dranetz as follows: red to A channel, yellow to B, and blue to C. 5.3 Verify that the ground lead (green) is connected to the Safety Gnd at the back of the Dranetz and to an available grounding point at site. 5.4 If there is a 20VAC outlet, then power the Dranetz from it. 5.5 If there is no 20VAC outlet, use the internal battery. 5.6 If there is no outlet and the internal battery does not work, use a voltmeter to check for 20VAC at the test block. If so, use the modified power cord to power the Dranetz from this source. Developed by: Erika Smeltzer Methodology approved by: Dave Stanford C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

2 MS 8. Page: 2 of If there is no source to power the Dranetz analyzer, complete a manual commissioning and explain the reason in the remarks section of the MICS, Metering Installation Commissioning Sheet. 6.0 SETUP 6. The Dranetz will do a self-check, and then display the MAIN menu when powered up. 6.2 Initialize the printer as follows: - select option 4, Configuration Setup - select option, Inputs/Outputs - select option 6, Other Devices - press the second key on the bottom row (below the screen) to turn the printer on. 6.3 Select the configuration setup as follows: - select option 4, Configuration Setup - select option, Inputs/Outputs - select option, Analogue Inputs - press the select config options button on the lower left corner of the screen. - choose one of the following options for Present Configuration depending upon the service: Service Type Single phase 2 wire, one 2-wire CT) Single Phase (3 wire, one 3-wire CT) Single Phase (3 wire, two 2-wire CT Present Config. Required Single Phase Single Phase Split Phase 3 Phase, 3 Wire, Delta 3 Phase, 3 Wire, 2 Probe 3 Phase, 4 wire, Wye 2 /2 Element (2 /2 Element Wye) 3 Phase, 4 Wire, Wye 3 Phase, 4 Wire, 3 Probe (3 Element, Wye) 3 Phase, 4 Wire, Delta 3 Phase, 4 Wire, 3 Probe (Three single 2-wire CTs) 3 Phase, 4 Wire, Delta 3 Phase, 4 Wire, 3 Probe (One 2-wire CT and one 3-wire CT) OR (One 2 -wire CT and two 2-wire CTs connected parallel) 6.4 Verify the screen is displaying FREQ. SYNC:EXTERNAL. If not, then press to change it to EXTERNAL. 6.5 Press the Exit button a several times to return to the MAIN menu. C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

3 MS 8. Page: 3 of CONNECTION 7. Connect the voltage and CT clip leads to the test block in the following sequence; neutral lead, voltage leads, then current leads. Ensure that the arrow on the CT clip leads point to the meter side. Service Type Connection to Test Block Single phase: Black lead to BK (neutral). Red (2 wire, one 2-wire CT) volt lead to R (red hot). Red CT clip to R/W (current) Single Phase: Black lead to BK (hot). Red (3 wire, one 3-wire CT) volt lead to R (hot). Red CT clip to R/W (current) Single Phase: Black lead to neutral. Red volt (3 wire, two 2-wire CT) lead to R (hot). Yellow volt lead to BK (hot), Red CT clip to R/W (current). Yellow CT clip to Y/W (current) 3 Phase, 3 Wire, Delta: Jumper yellow and black leads. Red, yellow, blue volt leads to R,Y,B (red, yellow, blue voltage). Red CT clip to R/W (current), Blue CT clip to B/W (current) 3 Phase, 4 wire, Wye: Jumper yellow and black leads. (2 /2 Element Wye) Red, yellow, blue volt leads to R, Y, B (red, yellow, blue voltage). Red, yellow, blue CT clips to R/W, Y/W, B/W (red, yellow, blue current). 3 Phase, 4 Wire, Wye Black lead to W (neutral). Red, (3 Element, Wye) yellow, blue volt leads to R,Y,B (Red, yellow, blue voltage). Red, yellow, blue CT clips to R/W, Y/W, B/W (red, yellow, blue current). 3 Phase, 4 Wire, Delta Black lead to W (neutral). Red, (Three single 2-wire CT) yellow, blue volt leads to R,Y,B (red, yellow, blue voltage). Red, yellow, blue CT clips to R/W, Y/W, B/W (red, yellow, blue current). 3 Phase, 4 Wire, Delta Black lead to W (neutral). Red (One 2-wire CT and yellow, blue volt leads to one 3-wire CT) R,Y, B (red, yellow, blue (One 2-wire CT Red CT clip to R/W and voltage). (red current). Yellow (not two 2-wire CTs blue) CT clip to B/W (blue current). connected in parallel) 7.2 The last configuration above, total Watts seen by Dranetz will differ from the total watt seen by the meter. Refer to clause 0 for the required calculations. 8.0 OPERATION 8. Print the Voltage and Current vectors as follows: - select option, Meter Mode - select option 4 Voltage and Current Phasors - push print to get a hard copy of the vetors. C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

4 MS 8. Page: 4 of 9 - select Next Param to choose the other vectors. - push print to get a hard copy - these vectors should closely match the vector diagrams in this procedure. 8.2 Press the Exit button a several times to return to the MAIN menu. 8.3 Print the summary as follows: - select option 2, View Reports - select option, All Channels, All Parameters - push print to get a hard copy Note : The summary should be printed at the same time as the disk timing or instantaneous meter readings are taken to avoid the errors introduced by fluctuating load. Note 2: If the load is fluctuating, obtain one print out at the start of disk timing and a second print out at the end of disk timing. This will show the load fluctuation and the average value may be used to compare with the meters present demand reading. 8.4 Attach the print outs to the Metering Installation Commissioning Sheet. 9.0 COMPLETION 9. Once the commissioning is complete, disconnect the Dranetz and remove voltage and current leads first and then the neutral. 9.2 Return the CT/ PT cabinet and meter test switch back to its normal operating state. Install security seals to ensure the metering is adequately secured from unauthorized personnel 0.0 FORMULAS Refer to clause 7.2 and the vector data obtained from the Drantez Analyzer: Secondary Watts = V A I A Cos A + V B I B Cos (B - D)- V c I B Cos (C - B) where A is the angle of phase A current, B is the angle of phase B voltage, C is the angle of phase C voltage and D is the angle of phase B current. Example: V a = volt, V b = 2 9 V c = 9 27 I a =.46 33, I b = = (207.6) (.46) Cos (33 )+ (2) (.943) Cos (9-64 ) - (9) (.943) Cos (27-64 ) = ( ) = 578 Watts This is what the meter is expected to register. C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

5 MS 8. Page: 5 of 9 C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

6 MS 8. Page: 6 of 9 C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

7 MS 8. Page: 7 of 9 C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

8 MS 8. Page: 8 of 9 C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

9 MS 8. Page: 9 of 9 C:\Documents and Settings\AG976\Desktop\Metering Standards\MS 8-.doc

25 Lakeside Park Drive P.O. Box 910

25 Lakeside Park Drive P.O. Box 910 Metering Standards Title: OWNERSHIP Page: Page 1 of 17 Date: December, 003 NSPI Meter Service Centre Mailing Address: 5 Lakeside Park Drive P.O. Box 910 Halifax, NS B3T 1M9 Halifax, NS B3J W5 This manual,

More information

Oberebenestrasse Bremgarten Switzerland Tel Fax

Oberebenestrasse Bremgarten Switzerland Tel Fax Oberebenestrasse 11 5620 Bremgarten Switzerland Tel. +41 56 640 06 70 Fax. +41 56 640 06 74 Single Phase - Battery Operated Automatic Transformer Turns Ratiometer Test System Model: TR-1 Model: TR-1P Instruction

More information

Know and understand you and your co-workers competence level before opening a live panel to diagnose

Know and understand you and your co-workers competence level before opening a live panel to diagnose MARCH 2014 BASIC ELECTRICAL UNDERSTANDING MARCH 2014 SAFETY FIRST Always use extreme caution when working around electricity A electrical shock can kill you! The purpose of this module is to: Develop basic

More information

Microprocessor Control Board Set Up Procedures (OR PLC)

Microprocessor Control Board Set Up Procedures (OR PLC) Microprocessor Control Board Set Up Procedures (OR-00 PLC) SWITCHES/PUSHBUTTONS Push Buttons at display SW Enter button SW Back button SW Down SW UP Back light on/off switch Rotary switches on main board

More information

Load-Trainer Transformer Simulator

Load-Trainer Transformer Simulator Load-Trainer Transformer Simulator XFMR-3BUSHING Three Bushing Transformer Simulator Operation Manual C-00879 XFMR-3BUSHING (11-11-15) Product Description 2 Components 3 Set-Up 4 Simulator Description

More information

Dranetz-BMI : the award-winning hand-held 3-phase power analyzer

Dranetz-BMI : the award-winning hand-held 3-phase power analyzer Dranetz-BMI - 4300 4300: the award-winning hand-held 3-phase power analyzer Monitoring power disturbances, power flow, and harmonics, the 4300 uses unique task cards that allow you to adapt and update

More information

Installation Instructions and Reference Handbook. Installation instructions

Installation Instructions and Reference Handbook. Installation instructions Installation Instructions and Reference Handbook Multi-instrument MIB 7000/7000C/7020 4189320016B (UK) DEIF A/S Product information Installation instructions Basic operation DEIF A/S, Frisenborgvej 33

More information

Load-Trainer Transformer Simulator

Load-Trainer Transformer Simulator Load-Trainer Transformer Simulator XFMR-4BUSHING Four Bushing Transformer Simulator Operation Manual Product Description 2 Components Set-Up 3 4 Simulator Description 4 Front Panel Description 5 Toggle

More information

Printing Humidity/Temperature Meter

Printing Humidity/Temperature Meter Printing Humidity/Temperature Meter INSTRUCTION MANUAL I. SAFETY INFORMATION Read the following safety information carefully before attempting to operate or service the meter. Use the meter only as specified

More information

SureTest Model ST-1THD & ST-1THDC Instructions

SureTest Model ST-1THD & ST-1THDC Instructions #61-156 #61-157 #61-158 SureTest Model ST-1THD & ST-1THDC Instructions Introduction The SureTest family of Circuit/distortion analyzers identify problems common to electrical circuits and harmonic distortion

More information

Installation Manual DOC R1 Date: 05/27/99. Plug-in Meter Installation Manual

Installation Manual DOC R1 Date: 05/27/99. Plug-in Meter Installation Manual Installation Manual DOC-4004-5015-R1 Date: 05/27/99 Plug-in Meter Installation Manual Document Number: Doc-4004-5015-R1 Document Release Date: 5/99 Copyright 1999 TeCom Inc. All rights reserved. No part

More information

Yaskawa Electric America Unit Troubleshooting Manual Section Two: Power Checks GPD 506/P5 and GPD 515/G5 (0.4 ~ 160kW)

Yaskawa Electric America Unit Troubleshooting Manual Section Two: Power Checks GPD 506/P5 and GPD 515/G5 (0.4 ~ 160kW) Yaskawa Electric America Unit Troubleshooting Manual Section Two: Power Checks GPD 506/P5 and GPD 515/G5 (0.4 ~ 160kW) Page 1 Section Two: Power Checks Page 2 Check box when completed Power Checks TEST

More information

OHM'S LAW AND RESISTANCE NETWORKS OBJECT

OHM'S LAW AND RESISTANCE NETWORKS OBJECT 17 E7 E7.1 OHM'S LAW AND RESISTANCE NETWORKS OBJECT The objects of this experiment are to determine the voltage-current relationship for a resistor and to verify the series and parallel resistance formulae.

More information

INTELLIMETER REGISTER

INTELLIMETER REGISTER INTELLIMETER REGISTER MODEL RG2 INSTALLATION AND CONNECTIONS INSTALLATION MANUAL WARNING: Any work on or near energized metering equipment can present a danger of electrical shock. All work on these products

More information

Commercial Microwave Technical Information. CAUTION All safety information must be followed as provided in Service Manual

Commercial Microwave Technical Information. CAUTION All safety information must be followed as provided in Service Manual Commercial Microwave Technical Information 0 V, 0 Hz Models RCS0MPA P00M RCS0A P00M RCS0PBDA P00M RCS0MPSA P00M RFSMPSA P00M RFSSWA P00M RCS0SWA P0M RCS0MPA P0M Due to possibility of personal injury or

More information

I n s t a l l a t i o n M a n u a l. T E D P r o L i t e A B C. f o r. Shop for The Energy Detective products online at: Rev 3.

I n s t a l l a t i o n M a n u a l. T E D P r o L i t e A B C. f o r. Shop for The Energy Detective products online at: Rev 3. Rev 3.5 I n s t a l l a t i o n M a n u a l f o r T E D P r o H o m e T E D P r o L i t e A B C Shop for The Energy Detective products online at: 1.877.766.5412 IMPORTANT: The installation of your TED

More information

Experiment 3 Ohm s Law

Experiment 3 Ohm s Law Experiment 3 Ohm s Law The goals of Experiment 3 are: To identify resistors based upon their color code. To construct a two-resistor circuit using proper wiring techniques. To measure the DC voltages and

More information

EK307 Introduction to the Lab

EK307 Introduction to the Lab EK307 Introduction to the Lab Learning to Use the Test Equipment Laboratory Goal: Become familiar with the test equipment in the electronics laboratory (PHO105). Learning Objectives: Voltage source and

More information

Metering Project Guide

Metering Project Guide Metering Project Guide Power Meter Installation from Start to Finish 2015 DENT Instruments, Inc. No portion of this document may be reproduced or distributed without written permission from DENT Instruments.

More information

ECE65 Introduction to the Function Generator and the Oscilloscope Created by: Eldridge Alcantara (Spring 2007)

ECE65 Introduction to the Function Generator and the Oscilloscope Created by: Eldridge Alcantara (Spring 2007) ECE65 Introduction to the Function Generator and the Oscilloscope Created by: Eldridge Alcantara (Spring 2007) I. Getting Started with the Function Generator OUTPUT Red Clip Small Black Clip 1) Turn on

More information

Single-Phase Transformation Review

Single-Phase Transformation Review Single-Phase Transformation Review S T U D E N T M A N U A L March 2, 2005 2 STUDENT TRAINING MANUAL Prerequisites: None Objectives: Given the Construction Standards manual and a formula sheet, you will

More information

LONG RANGE REMOTE RECEIVER WITH TRANSMITTER FOR BUNGALOWS AND BANKS MODEL KE - 2 L R

LONG RANGE REMOTE RECEIVER WITH TRANSMITTER FOR BUNGALOWS AND BANKS MODEL KE - 2 L R REMOTE RECEIVER DIMENSION : L = 90 MM X H = 75 X D = 38 MM. R F RANGE FOR TRANSMITTER AND RECEIVER IS 20 TO 30 METERS IN CLOSED AREA R F SIGNAL CROSSED WOODEN, R C C WALL, GLASS, AND METAL DOORS REMOTE

More information

I n s ta l l at i o n M a n u a l f o r T E D P r o H o m e T E D P r o L i t e A B C Rev 4.0

I n s ta l l at i o n M a n u a l f o r T E D P r o H o m e T E D P r o L i t e A B C Rev 4.0 I n s t a l l a t i o n M a n u a l f o r T E D P r o H o m e T E D P r o L i t e A B C Rev 4.0 IMPORTANT: The installation of your TED Pro Home system is a several-step process. The 1st step is the installation

More information

Operating Guide October 2006

Operating Guide October 2006 Operating Guide October 2006 Safety 1 Safety This manual represents your meter as manufactured at the time of publication. It assumes standard software. Special versions of software may be fitted, in which

More information

POWER SERIES Plus. Volt / Amp / Hertz. Digital Switchboard Meter. User s Manual IM2493VAF-3

POWER SERIES Plus. Volt / Amp / Hertz. Digital Switchboard Meter. User s Manual IM2493VAF-3 POWER SERIES Plus Volt / Amp / Hertz Digital Switchboard Meter User s Manual General Description The POWER SERIES Plus digital switchboard meters incorporate the latest DSP microprocessor technology. Careful

More information

RAYTECH USA, Inc. 118 S. 2 nd Street Perkasie, PA USA Tel THE SPY Tel Fax

RAYTECH USA, Inc. 118 S. 2 nd Street Perkasie, PA USA Tel THE SPY Tel Fax RAYTECH USA, Inc. 118 S. 2 nd Street Perkasie, PA 18944 USA Tel. 888 4 THE SPY Tel. 267 404 2676 Fax. 267 404 2685 Single Phase - Battery Operated Automatic Transformer Turns Ratiometer Test System Model:

More information

Substation Testing and Commissioning: Power Transformer Through Fault Test

Substation Testing and Commissioning: Power Transformer Through Fault Test 1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of

More information

PNA296 Portable Network Analyzer

PNA296 Portable Network Analyzer PNA296 Portable Network Analyzer nstallation & Operation Manual BG0296 REV.A2 PNA296 Portable Network Analyzer nstallation and Operation Manual MTED WARRANTY The manufacturer offers the customer a 24month

More information

ALX-SSB 5 Band Filter Assembly Manual 19 November 2018

ALX-SSB 5 Band Filter Assembly Manual 19 November 2018 ALX-SSB 5 Band Filter Assembly Manual 19 November 2018 Contents Theory of Operation:... 1 Figure 1... 2 Parts Included:... 4 Board Overview:... 5 Figure 2... 5 Figure 3... 5 Board Assembly:... 6 Cable

More information

Current, resistance, and Ohm s law

Current, resistance, and Ohm s law Current, resistance, and Ohm s law Apparatus DC voltage source set of alligator clips 2 pairs of red and black banana clips 3 round bulb 2 bulb sockets 2 battery holders or 1 two-battery holder 2 1.5V

More information

LVSIM-EMS Help Table of Contents

LVSIM-EMS Help Table of Contents LVSIM-EMS Help Table of Contents LVSIM-EMS Help... 1 Overview of LVSIM-EMS... 7 LVSIM-EMS Toolbar... 8 LVSIM-EMS Menus... 10 File Menu Commands... 10 Virtual Laboratory File (filename.lvsimweb)... 10 New...

More information

ADI-100 Interrupter. Operator s Manual. 526 S. Seminole Bartlesville, OK /

ADI-100 Interrupter. Operator s Manual. 526 S. Seminole Bartlesville, OK / ADI-100 Interrupter Operator s Manual 526 S. Seminole Bartlesville, OK 74003 918/336-1221 www.sescocp.com ADI - 100 Interrupter FEATURES Clock Accuracy 100% during GPS lock Clock Drift 30 µsec per degree

More information

Fluke 125. Getting Started. Industrial ScopeMeter

Fluke 125. Getting Started. Industrial ScopeMeter Fluke 125 Industrial ScopeMeter Getting Started GB Dec 2006, Rev. 1, 09/2009 2006, 2009 Fluke Corporation, All rights reserved. Printed in The Netherlands All product names are trademarks of their respective

More information

JEMSTAR. Digital Multifunction Electricity Meter. Application Notes

JEMSTAR. Digital Multifunction Electricity Meter. Application Notes JEMSTAR Digital Multifunction Electricity Meter Application Notes Publication 1083-608 Rev. A May 2002 AMETEK Power Instruments Tel: (800) 881-4156 255 N. Union Street Fax: (585) 238-4945 Rochester, New

More information

Grounding Recommendations for On Site Power Systems

Grounding Recommendations for On Site Power Systems Grounding Recommendations for On Site Power Systems Revised: February 23, 2017 2017 Cummins All Rights Reserved Course Objectives Participants will be able to: Explain grounding best practices and code

More information

URD Elbow Connectivity using the G3 Field Probe

URD Elbow Connectivity using the G3 Field Probe Origo Corporation Identify & Tag Energized URD Elbow Connectivity - Instruction Manual 1 URD Elbow Connectivity using the G3 Field Probe What is the Elbow Connectivity? Underground Residential Distribution

More information

PM 305 Operating Guide

PM 305 Operating Guide PM 305 Operating Guide Northern Design PREFACE PM305 Operating Guide Revision 2.05 October 2000 This manual represents your meter as manufactured at the time of publication. It assumes standard software.

More information

Ground Fault Location. Turbo Sleuth. Instruction Manual

Ground Fault Location. Turbo Sleuth. Instruction Manual Ground Fault Location Turbo Sleuth Instruction Manual 7615 Kimbel Street, Mississauga, Ontario Canada L5S 1A8 Tel: (905)673-1553 Fax: (905)673-8472 Toll Free: 1-888-RESISTR 737-4787 www.ipc-resistors.com

More information

Lab 4 Ohm s Law and Resistors

Lab 4 Ohm s Law and Resistors ` Lab 4 Ohm s Law and Resistors What You Need To Know: The Physics One of the things that students have a difficult time with when they first learn about circuits is the electronics lingo. The lingo and

More information

TABLE OF CONTENTS SECTION I INTRODUCTION AND DESCRIPTION

TABLE OF CONTENTS SECTION I INTRODUCTION AND DESCRIPTION Walter G. LEGGE Co., Inc. 444 Central Ave., Peekskill, NY 10566 tel # 800-345-3443 fax 800-332-2636 email address: info@leggesystems.com website: www.leggesystems.com TABLE OF CONTENTS SECTION PAGE 1 INTRODUCTION

More information

Three Phase Transformers

Three Phase Transformers EE/CME 392 Laboratory 6-1 Three Phase Transformers Safety The voltages used in this experiment are lethal. Assemble or modify a circuit only with the breakers off. Do not apply power until the wiring has

More information

TYPE - K.J.E.T. PRINTING THERMOMETER. Model INSTRUCTION MANUAL

TYPE - K.J.E.T. PRINTING THERMOMETER. Model INSTRUCTION MANUAL TYPE - K.J.E.T. PRINTING THERMOMETER Model 422324 INSTRUCTION MANUAL CONTENTS Title Page I. SAFETY INFORMATION... 1 II. SPECIFICATIONS... 2 2-1 General Information...2 2-2 Electrical Specifications...4

More information

Multi-Function Installation Tester MEGGER CM500. User Guide MEGGER

Multi-Function Installation Tester MEGGER CM500. User Guide MEGGER Multi-Function Installation Tester MEGGER CM500 User Guide MEGGER Contents Safety Warnings 3 Initial Setup 4 General Description 6 Features, Controls and Connections 8 Operation 10 Backlight 10 Auto shut-off

More information

MEGGER CM300 MK II, CM400 MK II & CM500

MEGGER CM300 MK II, CM400 MK II & CM500 MEGGER CM300 MK II, CM400 MK II & CM500 Multi-Function Installation Testers User Guide MEGGER Contents Safety Warnings 3 Initial Setup 4 General Description 6 Features, Controls and Connections 8 Operation

More information

LNR Precision Mountain Topper MTR-4B and MTR-5B REV 2.0 User Manual for use with versions with 16 x 2 display.

LNR Precision Mountain Topper MTR-4B and MTR-5B REV 2.0 User Manual for use with versions with 16 x 2 display. LNR Precision Mountain Topper MTR-4B and MTR-5B REV 2.0 User Manual for use with versions with 16 x 2 display. Four band MTR 4B shown Overview: The Mountain Topper Rigs are designed to be a very small,

More information

AC Voltage-Current Interface Unit (VCIU) for the Galaxy Millennium Controller With L10 L14, L20 L24, L30 L38, L40 L44, and L57 Interface Units

AC Voltage-Current Interface Unit (VCIU) for the Galaxy Millennium Controller With L10 L14, L20 L24, L30 L38, L40 L44, and L57 Interface Units AC Voltage-Current Interface Unit (VCIU) for the Galaxy Millennium Controller With L10 L14, L20 L24, L30 L38, L40 L44, and L57 Interface Units Operation, Installation and Maintenance Manual Select Code

More information

INSTRUCTION MANUAL ENGLISH

INSTRUCTION MANUAL ENGLISH INSTRUCTION MANUAL ENGLISH Raytech GmbH, Oberebenestrasse 11, CH 5620 Bremgarten, Switzerland Contents 1 Safety Precautions... 5 2 Unpacking... 7 2.1 WR50... 7 2.2 WR14... 8 3 Introduction... 10 3.1 General...

More information

Note: 1. All the students must strictly follow all the safety precautions. 2. In case of any question or concern, please contact LAB INSTRUCTOR or TA.

Note: 1. All the students must strictly follow all the safety precautions. 2. In case of any question or concern, please contact LAB INSTRUCTOR or TA. UNIVERSITY OF WATERLOO ELECTRICAL & COMPUTER ENGINEERING DEPARTMENT FALL 2006 E&CE 261: Energy Systems and Components EXPERIMENT 1: THREE-PHASE SYSTEMS Contents covered in this laboratory exercise: 1.

More information

Single-Phase Instrument Transformers

Single-Phase Instrument Transformers Single-Phase Instrument Transformers S T U D E N T M A N U A L March 10, 2005 2 STUDENT TRAINING MANUAL Prerequisites: Single-Phase Transformer Operating Principles module Objectives: Given a Revenue Metering

More information

Model # PCYFC-10kW-250A PCYFC-20kW-250A PowerCycle Battery Conditioner Operation Manual

Model # PCYFC-10kW-250A PCYFC-20kW-250A PowerCycle Battery Conditioner Operation Manual Model # PCYFC-10kW-250A PCYFC-20kW-250A PowerCycle Battery Conditioner Operation Manual MAN-000014-00 REV. B TABLE OF CONTENTS SPECIFICATIONS... 1 CYCLER CONTROLS AND USER INTERFACE... 3 OPERATING PROCEDURE...

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer

More information

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE

More information

User s Manual for PowerSight PS3000

User s Manual for PowerSight PS3000 User s Manual for PowerSight PS3000 Summit Technology, Inc. Walnut Creek, CA 94597 Tel: 1-925-944-1212 Fax: 1-925-944-7126 support@powersight.com http://www.powersight.com Rev for FW 2.9i / SW 3.4H Copyright

More information

C u t l e r- H a m m e r. IQ Analyzer START Q U I C KS TA RT G U I D E

C u t l e r- H a m m e r. IQ Analyzer START Q U I C KS TA RT G U I D E C u t l e r- H a m m e r IQ Analyzer START Q U I C KS TA RT G U I D E C O N T E N T S Introduction 4 Mounting 9 IMPORTANT NOTICE Use this Guide to begin performing basic metering functions quickly, without

More information

LPB OMNI Broadcast Transmitter Installation Procedure Checklist

LPB OMNI Broadcast Transmitter Installation Procedure Checklist Installation Procedure LPB OMNI Broadcast Transmitter Installation Procedure Checklist LPB Communications, Inc. 960 Brook Road, Unit 5 Conshohocken, PA 19428 610-825-4100 phone 610-825-4047 fax www.lpbinc.com!

More information

Back to the Basics Current Transformer (CT) Testing

Back to the Basics Current Transformer (CT) Testing Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of

More information

Cable Fault Location System User Manual Version 1.0.4

Cable Fault Location System User Manual Version 1.0.4 Cable Fault Location System User Manual Version 1.0.4 Allied Analogic. Inc. 132 Redtail Ct. Weatherford, TX 76088 (817) 599-0272 2018, AALogic Inc., All rights reserved TABLE OF CONTENTS Table of Contents...

More information

Experiment 6. Electromagnetic Induction and transformers

Experiment 6. Electromagnetic Induction and transformers Experiment 6. Electromagnetic Induction and transformers 1. Purpose Confirm the principle of electromagnetic induction and transformers. 2. Principle The PASCO scientific SF-8616 Basic Coils Set and SF-8617

More information

Page 1 T O O L S A N D M AT E R I A L S R E Q U I R E D. 1. Screwdriver 2. Carpenter's level 3. Electrical Tape PA R T S L I S T. A.

Page 1 T O O L S A N D M AT E R I A L S R E Q U I R E D. 1. Screwdriver 2. Carpenter's level 3. Electrical Tape PA R T S L I S T. A. T O O L S A N D M AT E R I A L S R E Q U I R E D 1. Screwdriver 2. Carpenter's level 3. Electrical Tape PA R T S L I S T A. Cabinet B. Wood Screw X4 C. Plastic wire connector x3 Page 1 I M P O R TA N T

More information

TUNING A MODEL CTA MODULE

TUNING A MODEL CTA MODULE TUNING A MODEL 183150 CTA MODULE TECHNICAL NOTE HWA-002 TSI strives to ship Thermal Anemometry systems that are ready to use by our customers. There are occasions when the system should be shipped back

More information

Megger. Megger 4271 Bronze Way Dallas Tx , USA. User s Guide For MCT Megger Current Transformer Test Set

Megger. Megger 4271 Bronze Way Dallas Tx , USA. User s Guide For MCT Megger Current Transformer Test Set Megger User s Guide For MCT- 1600 Megger Current Transformer Test Set Megger 4271 Bronze Way Dallas Tx-75237-1017, USA. T+1 (800) 723 2861 (USA only) T+1 (214) 330 3203 (International) F +1 (214) 337 3038

More information

MultiCube Multi-Function Electricity Meter. Installation and Operation

MultiCube Multi-Function Electricity Meter. Installation and Operation MultiCube Multi-Function Electricity Meter Installation and Operation PREFACE MultiCube Operating Guide Revision 1.08 Jan 2007 This manual represents your meter as manufactured at the time of publication.

More information

Experiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE

Experiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE Experiment 45 Three-Phase Circuits OBJECTIVE To study the relationship between voltage and current in three-phase circuits. To learn how to make delta and wye connections. To calculate the power in three-phase

More information

Product Overview PowerMetrix 3300 Verification Meter Jay Babin Power Quality Thailand.

Product Overview PowerMetrix 3300 Verification Meter Jay Babin Power Quality Thailand. Product Overview PowerMetrix 3300 Verification Meter Jay Babin Power Quality Thailand jaybabin@powerquality.co.th www.powermetrix.com Brief History of Powermetrix 1994 - Founded in Knoxville, TN USA 1995

More information

Warning: Electrical Hazard... 3 Safety Instruction Sheet for STG Product Overview What s in the box?... 4

Warning: Electrical Hazard... 3 Safety Instruction Sheet for STG Product Overview What s in the box?... 4 STG-2412 User Guide Warning: Electrical Hazard... 3 Safety Instruction Sheet for STG-2412... 3 Product Overview... 4 What s in the box?... 4 Using STG-2412 for Mixing, Processing, and Recording... 5 Software

More information

Dranetz HDPQ Power Quality Analyzers Operational Skills. Warning:

Dranetz HDPQ Power Quality Analyzers Operational Skills. Warning: Dranetz HDPQ Series Power Quality Analyzers Presented by: PowerCET Corporation 3350 Scott Blvd, Bldg 55, Unit 1 Santa Clara, CA 95054 USA 408/988-1346 FAX 408/988-4869 E-mail: training@powercet.com Web

More information

Advanced Pulse WattNode - Option PV (Photovoltaic)

Advanced Pulse WattNode - Option PV (Photovoltaic) Continental Control Systems LLC Manual Supplement: July 2008 Advanced Pulse WattNode - Option PV (Photovoltaic) With Option PV, a single WNB-3Y-208-P Advanced Pulse WattNode can measure the net energy

More information

User s Manual. F2 Calculator. A metering component for thermal energy applications

User s Manual. F2 Calculator. A metering component for thermal energy applications User s Manual F2 Calculator A metering component for thermal energy applications Rev 08.24.2007 1 Installation 1.1 At delivery F2 calculators are delivered in the Transport Mode. Only the clock is active

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

RangeMaster Trouble-shooting Manual

RangeMaster Trouble-shooting Manual RangeMaster Trouble-shooting Manual Page # 2 1. Tools you should have 3 2. What to do first 3 2.1 Most common problems 4 4 5 6 3. Low Range 3.1 Low Range/ Audio 4. Low Range 5. Tracing audio problems 7

More information

Name EET 1131 Lab #2 Oscilloscope and Multisim

Name EET 1131 Lab #2 Oscilloscope and Multisim Name EET 1131 Lab #2 Oscilloscope and Multisim Section 1. Oscilloscope Introduction Equipment and Components Safety glasses Logic probe ETS-7000 Digital-Analog Training System Fluke 45 Digital Multimeter

More information

Lab #1 Lab Introduction

Lab #1 Lab Introduction Cir cuit s 212 Lab Lab #1 Lab Introduction Special Information for this Lab s Report Because this is a one-week lab, please hand in your lab report for this lab at the beginning of next week s lab. The

More information

TM Analogic. Serie TM. Cod. rev

TM Analogic. Serie TM. Cod. rev TM Digital TM Digital-B TM Analogic Serie TM. Cod. rev. 1.0 1 CONTENTS 1 First of all Page 2 2 Installation Page 4 3 Setting and Operation Page 7 4 Maintenance Page 10 1 FIRST OF ALL - WARNINGS Check the

More information

Introduction to basic laboratory instruments

Introduction to basic laboratory instruments Introduction to basic laboratory instruments 1. OBJECTIVES... 2 2. LABORATORY SAFETY... 2 3. BASIC LABORATORY INSTRUMENTS... 2 4. USING A DC POWER SUPPLY... 2 5. USING A FUNCTION GENERATOR... 3 5.1 TURN

More information

Invertek Optidrive E3 Frequency Inverter (IP20, 3ph output) Easy Start Guide

Invertek Optidrive E3 Frequency Inverter (IP20, 3ph output) Easy Start Guide Invertek Optidrive E3 Frequency Inverter (IP20, 3ph output) Easy Start Guide The Invertek Optidrive E3 Frequency Inverter range is available to order from inverterdrive.com This guide is intended to complement

More information

Agilent U1253B True RMS OLED Multimeter. Quick Start Guide

Agilent U1253B True RMS OLED Multimeter. Quick Start Guide Agilent U1253B True RMS OLED Multimeter Quick Start Guide The following items are included with your multimeter: Silicone test leads 4 mm probes Alligator clips Printed Quick Start Guide Rechargeable 8.4

More information

Table of Contents. Mounting Diagram.. Wiring Information.. Setting the STR 1000 as a Repeater or a Transmitter. STR 1000 Frequently Asked Questions..

Table of Contents. Mounting Diagram.. Wiring Information.. Setting the STR 1000 as a Repeater or a Transmitter. STR 1000 Frequently Asked Questions.. STR 1000 Series Repeater Installation Manual (V 3.0) Table of Contents MOUNTING Mounting Diagram.. Page 2 WIRING INFORMATION Wiring Information.. Page 3 Setting the STR 1000 as a Repeater or a Transmitter.

More information

REVAMP4120T Instruction manual

REVAMP4120T Instruction manual REVAMP4120T Instruction manual REVAMP4120T Instruction manual 3 REVAMP4120T manual 4 CLASS-D POWER AMPLIFIER IMPORTANT SAFETY INSTRUCTIONS 1. Read these instructions 2. Keep these instructions 3. Pay

More information

Transformer Waveforms

Transformer Waveforms OBJECTIVE EXPERIMENT Transformer Waveforms Steady-State Testing and Performance of Single-Phase Transformers Waveforms The voltage regulation and efficiency of a distribution system are affected by the

More information

ALACHUA ARES SIMPLEX REPEATER STATION INSTRUCTION MANUAL VERSION 1.0 MARCH

ALACHUA ARES SIMPLEX REPEATER STATION INSTRUCTION MANUAL VERSION 1.0 MARCH ALACHUA ARES SIMPLEX REPEATER STATION INSTRUCTION MANUAL VERSION 1.0 MARCH 23 2017 1 INTRODUCTION A simplex repeater is nothing more than a digital tape recorder that listens to an FM simplex transceiver,

More information

U S E R S M A N U A L

U S E R S M A N U A L U S E R S M A N U A L T H E R M O R E G U L A T O R T R 5 0 0 / T R 5 0 1 S E R I E S HUNDREDTHS VERSION ENGLISH V.1.2 TABLE OF CONTENTS -1- Introduction... page 2-2- Technical specifications -3- Description

More information

Chapter 7. Copyright The McGraw-Hill Companies, Inc. Permission required for reproduction or display.

Chapter 7. Copyright The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7 Copyright The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Learning Objectives 1. Understand the meaning of instantaneous and average power, master AC power notation,

More information

M. Conner Name: AP Physics C: RC Circuits Lab

M. Conner Name: AP Physics C: RC Circuits Lab M. Conner Name: Date: Period: Equipment: breadboard jumper wires one 1 k, one 4.7 k, and one 5.6 k resistors one 1000 F, one 2200 F, and one 470 F capacitor one small alligator clip wire variable power

More information

ECE 404 e-notes...copyright 2008 by Gregory M. Wierzba. All rights reserved...fall 2008.

ECE 404 e-notes...copyright 2008 by Gregory M. Wierzba. All rights reserved...fall 2008. ECE 404L: RF ELECTRONICS LABORATORY DEPARTMENT OF ELECTRICAL AND COMPUTER ENGINEERING MICHIGAN STATE UNIVERSITY I. TITLE: Lab III - AM/FM Radio - AM Radio II. PURPOSE: This lab will focus on soldering

More information

Introduction to the Laboratory

Introduction to the Laboratory Memorial University of Newfoundland Department of Physics and Physical Oceanography Physics 2055 Laboratory Introduction to the Laboratory The purpose of this lab is to introduce you to some of the equipment

More information

picotalk OPERATING MANUAL V1.2 (May 26, 2010) 6 Oakside Court Barrie, Ontario L4N 5V5 Tel: Fax:

picotalk OPERATING MANUAL V1.2 (May 26, 2010) 6 Oakside Court Barrie, Ontario L4N 5V5 Tel: Fax: picotalk OPERATING MANUAL V1.2 (May 26, 2010) 6 Oakside Court Barrie, Ontario L4N 5V5 Tel: 905-803-9274 Fax: 647-439-1470 www.frightideas.com Getting Familiar with your picotalk Mouth Servo Output AUX

More information

AT Advanced Wire Tracer. Users Manual

AT Advanced Wire Tracer. Users Manual AT-1000 Advanced Wire Tracer Users Manual AT-1000 Advanced Wire Tracer English Users Manual AT1000_Rev001 2008 Amprobe Test Tools. All rights reserved. Limited Warranty and Limitation of Liability Your

More information

BE1-67N GROUND DIRECTIONAL OVERCURRENT RELAY FEATURES ADDITIONAL INFORMATION. FUNCTIONS AND FEATURES Pages 2-4. APPLICATIONS Page 2

BE1-67N GROUND DIRECTIONAL OVERCURRENT RELAY FEATURES ADDITIONAL INFORMATION. FUNCTIONS AND FEATURES Pages 2-4. APPLICATIONS Page 2 BE1-67N GROUND DIRECTIONAL OVERCURRENT RELAY The BE1-67N Ground Directional Overcurrent Relay provides ground fault protection for transmission and distribution lines by sensing the direction and magnitude

More information

USER MANUAL Clamp Meters ACM-2353

USER MANUAL Clamp Meters ACM-2353 USER MANUAL Clamp Meters ACM-2353 www.tmatlantic.com Overview This Operating Manual covers information on safety and cautions. Please read the relevant information carefully and observe all the Warnings

More information

Specification for a Fully Automatic Meter Test Equipment for testing Three-phase/Single/Transformer operated/ reference Standard energy meters.

Specification for a Fully Automatic Meter Test Equipment for testing Three-phase/Single/Transformer operated/ reference Standard energy meters. Specification for a Fully Automatic Meter Test Equipment for testing Three-phase/Single/Transformer operated/ reference Standard energy meters. Scope: This specification defines the requirement of a Three

More information

WATTNODE Pulse Output Installation and Operation Manual

WATTNODE Pulse Output Installation and Operation Manual WATTNODE Pulse Output Installation and Operation Manual Continental Control Systems http://www.ccontrolsys.com Rev 1.20dUL Information in this document is subject to change without notice. No part of this

More information

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems UNITY/I TM UT3K, UT4K, UT5K and UT8K Single-Phase Uninterruptible Power Systems Installation Manual MLS-0351C-OL Copyright 1994-1997 Best Power. All rights reserved. å IMPORTANT SAFETY INSTRUCTIONS! SAVE

More information

Chapter 24. Alternating Current Circuits

Chapter 24. Alternating Current Circuits Chapter 24 Alternating Current Circuits Objective of Lecture Generators and Motors Inductance RL Circuits (resistance and inductance) Transformers AC REMINDER: WORK ON THE EXAMPLES Read physics in perspective

More information

5.0 THREE PHASE SYSTEM

5.0 THREE PHASE SYSTEM 5.0 THREE PHASE SYSTEM ET 201 BAKISS HIYANA BAU BAKAR JKE, POLISAS 1 COURSE LEARNING OUTCOME 1. Explain AC circuit concept and their analysis using AC circuit law. 2. Apply the knowledge of AC circuit

More information

PT-2000series AC/DCcurrentprobe PT-2710 PT-2720 PT-2740 PT-2770 MANUAL INSTRUCTION

PT-2000series AC/DCcurrentprobe PT-2710 PT-2720 PT-2740 PT-2770 MANUAL INSTRUCTION PT-2000series AC/DCcurrentprobe PT-2710 PT-2720 PT-2740 PT-2770 INSTRUCTION MANUAL General Safety Instructions: Read the following safety instructions to avoid injury and prevent damage to this product

More information

User Manual and Test Procedure

User Manual and Test Procedure RSR/VT A&D ANDY Board User Manual and Test Procedure Version 2.2 June 5, 2006 Copyright 2005-2006 By R. B. Lineberry, W. C. Headley, and R. W. Hendricks The Bradley Department of Electrical and Computer

More information

ALPHA meter. General. Installation instructions IL S

ALPHA meter. General. Installation instructions IL S Installation instructions IL4-400S General This instructional leaflet contains general installation instructions for the following single phase and polyphase watthour meters: socket-connected meters: S,

More information

The D.C. Scout. Operations Manual. (Available Online) D.C. BATTERY DISTRIBUTION SYSTEM GROUND LOCATOR. When minutes matter. Page 1

The D.C. Scout. Operations Manual. (Available Online) D.C. BATTERY DISTRIBUTION SYSTEM GROUND LOCATOR. When minutes matter. Page 1 The D.C. Scout D.C. BATTERY DISTRIBUTION SYSTEM GROUND LOCATOR When minutes matter Operations Manual (Available Online) Page 1 To order parts or for assistance, call or email: H.J Arnett Industries, L.L.C.

More information

Sept 13 Pre-lab due Sept 12; Lab memo due Sept 19 at the START of lab time, 1:10pm

Sept 13 Pre-lab due Sept 12; Lab memo due Sept 19 at the START of lab time, 1:10pm Sept 13 Pre-lab due Sept 12; Lab memo due Sept 19 at the START of lab time, 1:10pm EGR 220: Engineering Circuit Theory Lab 1: Introduction to Laboratory Equipment Pre-lab Read through the entire lab handout

More information

Experiment P55: Light Intensity vs. Position (Light Sensor, Motion Sensor)

Experiment P55: Light Intensity vs. Position (Light Sensor, Motion Sensor) PASCO scientific Vol. 2 Physics Lab Manual: P55-1 Experiment P55: (Light Sensor, Motion Sensor) Concept Time SW Interface Macintosh file Windows file illuminance 30 m 500/700 P55 Light vs. Position P55_LTVM.SWS

More information