Research Article Dynamic Relay Satellite Scheduling Based on ABC-TOPSIS Algorithm

Size: px
Start display at page:

Download "Research Article Dynamic Relay Satellite Scheduling Based on ABC-TOPSIS Algorithm"

Transcription

1 Mathematcal Problems n Engneerng Volume 2016, Artcle ID , 11 pages Research Artcle Dynamc Relay Satellte Schedulng Based on ABC-TOPSIS Algorthm Shufeng Zhuang, 1 Zhendong Yn, 1 Zhlu Wu, 1 and Xaoguang Chen 1,2 1 School of Electroncs and Informaton Engneerng, Harbn Insttute of Technology, Harbn , Chna 2 Insttute of Telecommuncaton Satellte, Chna Academy of Space Technology, Bejng , Chna Correspondence should be addressed to Zhlu Wu; wuzhlu@ht.edu.cn Receved 22 June 2016; Revsed 1 October 2016; Accepted 16 October 2016 Academc Edtor: Erk Cuevas Copyrght 2016 Shufeng Zhuang et al. Ths s an open access artcle dstrbuted under the Creatve Commons Attrbuton Lcense, whch permts unrestrcted use, dstrbuton, and reproducton n any medum, provded the orgnal work s properly cted. Trackng and Data Relay Satellte System (TDRSS) s a space-based telemetry, trackng, and command system, whch represents a research feld of the nternatonal communcaton. The ssue of the dynamc relay satellte schedulng, whch focuses on assgnng tme resource to user tasks, has been an mportant concern n the TDRSS system. In ths paper, the focus of study s on the dynamc relay satellte schedulng, whose detaled process conssts of two steps: the ntal relay satellte schedulng and the selecton of dynamc schedulng schemes. To solve the dynamc schedulng problem, a new schedulng algorthm ABC-TOPSIS s proposed, whch combnes artfcal bee colony (ABC) and technque for order preference by smlarty to deal soluton (TOPSIS). The artfcal bee colony algorthm s performed to solve the ntal relay satellte schedulng. In addton, the technque for order preference by smlarty to deal soluton s adopted for the selecton of dynamc schedulng schemes. Plenty of smulaton results are presented. The smulaton results demonstrate that the proposed method provdes better performance n solvng the dynamc relay satellte schedulng problem n the TDRSS system. 1. Introducton Trackng and Data Relay Satellte System (TDRSS) s a system whch can provde servce of data relayng, contnuous trackng, and TT&C (telemetry, trackng, and command) for the spacecrafts of LEO (Low Earth Orbt) and MEO (Mddle Earth Orbt) and also between spacecrafts and ground statons. As a space-based telemetry, trackng, and command system, the TDRSS represents a research feld of the nternatonal communcaton feld. To keep pace wth the development of earth observaton, mltary reconnassance, and deep space exploraton n the feld of aeronautcs and astronautcs, the data transmsson of the relay satellte presents the characterstcs of large capacty, hgh speed, and relay tasks dversfcaton [1]. It s n turn necessary to mprove the tme resource utlzaton of the relay satellte for processng tasks. Thedynamcrelaysatellteschedulngsthatthetaskplan managementcenteroftherelaysatellteallocatesthetme resource of the relay satellte for dfferent user tasks scentfcally, accordng to the prorty and duraton of user tasks. Thusnthelmtedtmeresource,thehghprortysumof the scheduled tasks can be acheved. The ssue of the dynamc relay satellte schedulng, whch focuses on assgnng tme resource to user tasks, has been an mportant concern n the TDRSS system [2]. Dfferent from the statc schedulng, even f the ntal schedulng scheme has been generated, the tasksfromusersatelltesmaybechangednthedynamc schedulng. Therefore, the ntal schedulng scheme cannot satsfythenewtasksrequests.inthscase,theschedulng alternatves need to be regenerated and a new approprate scheme should be selected to replace the ntal schedulng scheme.theselectedschementhedynamcschedulngs output as the fnal dynamc relay satellte schedulng scheme. In summary, the detaled process of the dynamc relay satellte schedulng conssts of two steps: the ntal relay satellte schedulng and the selecton of dynamc schedulng schemes. The ntal relay satellte schedulng problem s a NP-hard optmzaton problem wth the constrants of tasks attrbute, tme resource, and the vsual tme wndows between relay satellte and user satelltes, and ths motvates us to take swarm ntellgence algorthms nto account.

2 2 Mathematcal Problems n Engneerng As a branch of natural nspred algorthms, the theory of swarm ntellgence s proposed and becomes a hot spot to solve the optmzaton problems n varous areas [3]. The essence of swarm ntellgence algorthms focuses on the natural phenomena of bologcal groups. And up to now, a varety of swarm ntellgence algorthms for dfferent bologcal groups have been presented, such as genetc algorthm (GA), smulated annealng (SA), ant colony optmzaton (ACO), partcle swarm optmzaton (PSO), and artfcal bee colony (ABC) algorthm [4, 5]. Among them, the artfcal bee colony (ABC) algorthm s an ntellgence-optmzed algorthm dervng from the llumnaton of bees foot-seekng behavor. Due to ts less parameters and strong robustness, theabcalgorthmswdelyusednvarousareas[6].for example, n [7], the ABC algorthm s successfully appled to solve the classcal optmzaton problem: the travelng salesman problem. Moreover, the ABC algorthm has been appled n other aspects, such as flow shop schedulng problem [8, 9], dynamc job shop schedulng problem [10], clusterng approach [11, 12], sgnal processng [13], and mage processng [14, 15]. For the relay satellte schedulng problem, genetc algorthm s appled to generate the schedulng scheme n [16]. However, tasks prorty has not been consdered. After that the ACO algorthm for satellte control resource schedulng problem s presented n [17], but not for the relay satellte system. In [18], the ACO algorthm s used to solve the relay satellte schedulng problem, and the performances of ACO, GA, and SA algorthm are provded. In the relevant research, the ABC algorthm has not been mentoned and appled for relay satellte schedulng. After the completon of the ntal relay satellte schedulng, the ntal schedulng scheme may not be mplemented mmedately. And the tasks set s lkely to change, whch causesthevaratonoftherelaysatellteschedulngscheme. In ths case, the dynamc schedulng scheme needs to replace the ntal schedulng scheme. The goal of the dynamc schedulng s to select a new modfed scheme, whch not only has the hgh prorty sum of the scheduled tasks, but also has the mnmum schemes varaton n comparson wth the ntal schedulng scheme. Therefore, the selecton of dynamc schedulng schemes can be treated as a multple attrbute decson makng (MADM) problem. The technque for order preference by smlarty to deal soluton (TOPSIS) s an effcent method n dealng wth MADM problems [19 21]. The crtcal prncple of TOPSIS s to rank the alternatves accordng to the dstance between alternatves to deal soluton [22, 23]. The alternatve wth the mnmum dstance from the postve deal soluton and the maxmum dstance from the negatve deal soluton s chosen as the best alternatve. For the last several years, themethodoftopsisswdelyapplednvarousfelds, such as manufacturng [24], mltary [25], product desgn [26], resource allocaton, and resource selecton [27, 28]. As a helpful decson rule, the TOPSIS method s sutable for solvng the selecton problem of the dynamc schedulng schemes. In ths paper, the research content focuses on the dynamc relay satellte schedulng n the TDRSS system. In detal, a new effcent schedulng algorthm ABC-TOPSIS based on artfcal bee colony (ABC) and technque for order preference by smlarty to deal soluton (TOPSIS) s frst proposed, n order to solve the dynamc relay satellte schedulng. Frst, the artfcal bee colony (ABC) algorthm s utlzed to solve the ntal relay satellte schedulng. Then by the quantzaton of the schemes varaton between ntal schedulng scheme and dynamc schedulng scheme, the selecton of dynamc schedulng schemes s converted from multple objectve decson makng (MODM) problem nto multple attrbute decson makng (MADM) problem. Thus, TOPSIS s appled to solve the selecton of dynamc schedulng schemes when the tasks set proposed by user satelltes has changed. The rest of ths paper s organzed as follows. In Secton 2, the dynamc relay satellte schedulng system s ntroduced. The ABC-TOPSIS algorthm s developed to solve the dynamc relay satellte schedulng n Secton 3. In Secton 4, the performance of the proposed ABC-TOPSIS algorthm s shown. The conclusons are drawn n Secton Dynamc Relay Satellte Schedulng System In the dynamc relay satellte schedulng system, the relay satellte receves tasks requests from dfferent user satelltes, ncludng low-orbt magng satellte, electronc satellte, and measurement satellte. Wthout consderng the contents of the tasks, the man dfferences between the tasks are the duraton and the prorty. The purpose of the relay satellte schedulng s to allocate the tme resource of the relay satellte reasonably and to generate the schedulng scheme whch meets the expected target. The specfc mplementaton process conssts of two parts: the ntal relay satellte schedulng and the selecton of dynamc schedulng schemes. The dynamc relay satellte schedulng system dagram s shown n Fgure 1. The ntal relay satellte schedulng generates the daly work plan of the relay satellte. Frstly, the tasks proposed by user satelltes are preprocessed to calculate the avalable tme wndows and to assgn the prorty. Then, the ntal relay satellte schedulng model s establshed based on the constrant condtons and the tme resource nformaton. Fnally, the ntal relay schedulng model s solved by the specfc schedulng algorthm. Thus the schedulng scheme can be derved and delvered to perform. Snce the relay satellte s not always ready to schedule tasks, after the generaton of the ntal relay satellte schedulng scheme, the ntal schedulng scheme cannot be mplemented mmedately. In ths perod, the tasks set would be changed dynamcally: some tasks have been canceled, and some new tasks have been added. In ths case, the varaton of the tasks set leads to the changes n the ntal relay satellte schedulng. In vew of the changes of the tasks requests, a new correspondng dynamc relay satellte schedulng scheme needs to be generated. The dynamc schedulng scheme not only ams at makng full use of the tme resource of the relay satellte and maxmzng the scheduled tasks prorty sum as the ntal schedulng scheme, but also mnmzes the varaton between the ntal scheme and the dynamc scheme.

3 Mathematcal Problems n Engneerng 3 Intal relay satellte schedulng Intal schedulng scheme Implementaton Tasks from dfferent user satelltes Tasks preprocessng Tme resource of relay satellte Selecton of dynamc schedulng scheme Dynamc schedulng scheme Fgure 1: Dynamc relay satellte schedulng system dagram. Theprocessofthedynamcrelaysatellteschedulngs summarzed n two steps, whch are the ntal relay satellte schedulng and the selecton of dynamc schedulng schemes. Fgure 2 shows the flow chat of the dynamc relay satellte schedulng based on the proposed ABC-TOPSIS algorthm. 3. Schedulng Strategy Based on ABC-TOPSIS Algorthm 3.1. Mathematcal Model of Intal Relay Satellte Schedulng Problem. In the ntal relay satellte schedulng problem, the relay satellte has the msson of handng the tasks proposed by the user satelltes. The key object s to allocate the tme resourceoftherelaysatellteforusertasksandachevethe maxmum prorty sum. Snce the relay satellte s not always vsble to user satelltes, the sgnfcant constrant s that there are tme wndows between the relay satellte and user satelltes.thetasksmustbecompletedonlywthnthegven vsual tme wndows. In order to establsh the mathematcal model of the ntal relay satellte schedulng problem, some model parameters are declared as follows Model Parameters. ThesetofthetasksssettoR = r 1,r 2,...,r n },wheren s the number of tasks that need to be scheduled. The set of the prorty of the tasks s expressed as P = p 1,p 2,...,p n } and the set of the duraton of the tasks s D = d 1,d 2,...,d n }.ThesetC = c 1,c 2,...,c n } represents the task contrbuton, whch s the functon of task prorty p and task duraton d. Also the task decson varables are denoted by the set X = x 1,x 2,...,x n },wherex 0, 1}, = 1,2,...,n.Thedecsonvarablex =1represents that the task r has been scheduled by the relay satellte, and x =0 means that the task r has not been scheduled. In addton, the vsual tme wndows and tme resource of the relay satellte are declared. The tme nterval set [SE] = [s 1,e1 ], [s2,e2 ],...,[sk,ek ]} presents the set of vsual tme wndows of the relay satellte whch serve the task r,where k sthenumberofvsualtmewndows,s τ s the start tme, and e τ s the end tme. The tme resource of the relay satellte s denoted by the tme nterval [T S,T E ],wheret S s the start tme and T E s the end tme Objectve Functon. The objectve of the ntal relay satellteschedulngstoobtananoptmaltasksservce scheme, whch, n other words, means the maxmzaton of the sum of the contrbuton of the scheduled tasks. The objectve functon of the ntal relay satellte schedulng can be descrbed as where max n =1 x = 1, r s scheduled 0, unless, c =F(p,d ), c 1. d x c, (1) Constrants. The constrants of the ntal relay satellte task schedulng are gven as follows. (2) T s T T E, T s T +d T E (3) T s τ (1 τ k) f x =1 (4) T +d e τ (1 τ k) f x =1. (5) For r [r 1,r n ], r j [r 1,r n ], =j T T j +d j or T +d T j, where T s the start executon tme of the task r. Constrants (3), (4), and (5) bound the tme perod for the tasks. Constrant (3) represents that tasks whose duraton, more than the length of the relay satellte tme resource, cannot be scheduled. Constrant (4) and constrant (5) mply that the tasks must be scheduled only wthn the gven vsual tme wndows. Constrant (6) means that, at the same tme, the relaysatelltecanonlyhandleonetask.thetmeresources (6)

4 4 Mathematcal Problems n Engneerng Start Analyze ntal schedulng parameters Establsh mathematcal model of ntal schedulng scheme Intal schedulng based on ABC algorthm Intal relay satellte schedulng Feedback tasks mplementaton nformaton to user satelltes Yes Is tasks set changed? Regenerate schedulng alternatves by ABC algorthm No Select dynamc scheme from alternatves by TOPSIS algorthm to replace ntal scheme Implement schedulng scheme Selecton of dynamc schedulng scheme Stop Fgure 2: Flow chat of the dynamc relay satellte schedulng based on the proposed ABC-TOPSIS algorthm. ncapable of beng shared by multple tasks at the same tme. If the current task s not yet completed, new tasks cannot be executed. As expressed n Secton 3.1.1, the task contrbuton varable s the functon of task prorty p and task duraton d. To smplfy the model solvng process, t s assumed that the constructon of the feasble soluton s based on the tme sequence. After the end of the current task, the new task wll be scheduled mmedately for executon. Therefore, the tmeresourceoftherelaysatelltecanbefullyutlzed.inths case, the task contrbuton varable s only related to the task prorty. Then the objectve functon (1) s smplfed as max n =1 x p. (7) 3.2. Intal Relay Satellte Schedulng Based on ABC Algorthm. Snce the optmzaton problem n (7) s generally a NP-hard combnatoral problem, ths requres an effcent optmzaton algorthm for the ntal relay satellte schedulng. In ths secton, the artfcal bee colony algorthm s appled to solve therelaysatellteschedulngproblem. The artfcal bee colony (ABC) algorthm s an ntellgence-optmzed algorthm dervng from the llumnaton of bees foot-seekng behavor. There are three knds of roles n the bee swarm ntellgence model, whch are scout bees, onlooker bees, and employed bees. In the begnnng, wthout pror knowledge, all bees are dentfed as scout bees wth the behavor of the random search around hves. The rchness of the food sources s compared and the relatvely rch food source s selected as the searchng routes of employed bees

5 Mathematcal Problems n Engneerng 5 [29].Thentheemployedbeestakechargeofsearchngfood around the food sources n ther memory; after that, they share the food amount nformaton wth the onlooker bees by dancng n the nearby hve. Then the onlooker bees would select employed bees to follow accordng to the nformaton provded by employed bees [30]. The artfcal bee colony algorthm for the ntal relay satellte schedulng problem can be descrbed as follows. (1) Defne the transton probablty of scout bees and onlooker bees P(r,k,t),whchmeanstheprobabltythat the task r s scheduled n the kth vsual tme wndow at the moment t. The transton probablty of scout bees can be expressed as P(r,k,t) [p ] α [1/d ] β = r allow(k,t) [p ] α [1/d ], β r allow (k, t) 0, r allow (k, t), where p s the prorty of the task r and d stheduratonof the task r. α and β are the weght factors. The set allow (k, t) represents the allowed tasks set for schedulng. Accordng to (8), the task wth hgher prorty and shorter duraton has hgherprobabltytobescheduled. The transton probablty of onlooker bees s wrtten as P(r,k,t) [p ] α [1/d ] β [φ] γ = r allow(k,t) [p ] α [1/d ] β [φ], γ r allow (k, t) 0, r allow (k, t), where φ represents the leadng factor, whch s the leadng nformaton generated by employed bees. The correspondng weght s denoted as γ. (2) In the ABC algorthm, pseudo-random proporton rule s adopted, whch can be descrbed as follows: (a) generate a unformly dstrbuted random number q n the nterval [0, 1], (b) f q q 0 (q 0 s a fxed parameter value), then r = arg max P(r,k,t), (10) r allow(k,t) (c) f q>q 0, then choose the task accordng to P(r,k,t). (3) In each teraton, the optmal soluton s set as the poston of employed bees. Then, the employed bees release the leadng nformaton to attract the onlooker bees. After each teraton, the leadng factor s updated. The updated rules can be descrbed as (8) (9) φ (j+1) =φ (j) +q g C cur, (11) where j s the current teraton. q g represents the leadng factor update ncrease coeffcent. And C cur s the normalzed ftness, whch s defned as follows. C cur = ft max SN n=1 ft, (12) n where ft n s the ftness of the nth soluton. The calculaton equaton s expressed as 1+f n, f n >0 ft n = 1 1+abs (f n ), f n <0. (13) In (13), f n s the optmal soluton tll current teraton n the ABC algorthm for the objectve functon (7). (4) In order to avod the excessve accumulaton of leadng factor, the leadng factor range s lmted to [φ mn, φ max ]. φ (j), φ mn φ (j) φ max φ (j+1) = φ max, φ (j) >φ max φ mn, φ (j) <φ mn. (14) The ABC algorthm s termnated when t reaches the maxmum number of teratons [12] and the schedulng scheme wth the maxmum prorty sum s the fnal output result for the ntal relay satellte schedulng problem. As s seen from the above, n the ABC algorthm, the scout bees search the soluton space-based on the constrant condtons, whch ensures the randomness and avods fallng nto the local optmal soluton. The employed bees correspond to the optmalsolutontllcurrentteraton.theykeeptheelte feature and mantan attracton to the onlooker bees. The onlooker bees select employed bees to follow accordng to the leadng nformaton. The prospect of the mechansm s to mport postve feedback and guarantee the convergence of the algorthm. Through the coordnaton of three knds of bees, the ABC algorthm acheves the effectve optmzaton ablty of randomness and convergence Selecton of Dynamc Schedulng Schemes Based on TOPSIS Algorthm. After the generaton of the ntal relay satellte schedulng scheme, t wats for the mplementaton of the relay satellte. Generally, the ntal relay satellte schedulng scheme would not be made any adjustments. However, n fact, snce the varaton of the user satelltes requrements,someofthetasksthathavebeenproposedmay be canceled. Or n addton, some new tasks are nserted, especally some hgh prorty tasks. The change of the tasks has a drect mpact on the set of the tasks R. Whatsmore, the parameter sets of the tasks prorty P and tasks duraton D also change, respectvely. In ths case, the ntal schedulng scheme cannot be performed completely. In consderaton of the changes of the tasks requests, t s necessary to make the dynamc adjustment and to generate a new correspondng dynamc relay satellte schedulng scheme based on the ntal schedulng scheme. Under the dynamc condton, the adjustment of the ntal schedulng scheme must follow certan prncples. No matter how the tasks set changes, one of the major objectvesstoachevethehghtasksprortysum.theother objectve s to mnmze the varaton between ntal scheme and dynamc scheme. Once the ntal schedulng scheme s

6 6 Mathematcal Problems n Engneerng generated, the user satelltes wll receve the tasks mplementaton plan from the relay satellte. And the tasks, whch are scheduled, enter the state of pendng executon. Then the user satelltes may make the correspondng work arrangements for tasks. Therefore a large-scale dynamc adjustment s bound to affect the user satelltes future decson. Basedontheaboveanalyss,thedynamcschedulng problem s a multple objectve decson makng (MODM) problem.oneobjectveofthedynamcschedulngsto allocatethetmeresourceoftherelaysatellteforusertasks and acheve the maxmum prorty sum. The other s to select a new dynamc schedulng scheme, whch has the mnmal change to the ntal schedulng scheme. In order to facltate solvng the multple objectve decson makng problem of the dynamc relay satellte schedulng, frstly t s essental to quantze the schemes varaton between the ntal schedulng scheme and the dynamc schedulng scheme. Assume that the tasks set scheduled n the ntal schedulng scheme s denoted as R n, whle the tasks set scheduled n the dynamc schedulng scheme s expressed as R dyn.thevarablechange(r) ndcates whether the task r changes between the ntal schedulng scheme and the dynamc schedulng scheme. The varable Change(r) s defned as the followng equaton. Change (r) = 0, r R n and r R dyn (15) 1, r R n and r R dyn. Thus, the schemes varaton between the ntal schedulngschemeandthedynamcschedulngschemecanbe wrtten as VAR = Change (r) (16) r R n The solvng process of the dynamc schedulng problem s to select a new modfed scheme, whch has the mnmum schemes varaton n comparson wth the ntal schedulng scheme. The detaled steps are gven as follows. (1) When the change of the tasks set happens after ntal schedulng, reorganze the model parameters of the sets, and use the ABC algorthm to generate several new dynamc schedulng schemes as Secton 3.2. The dynamc schedulng schemes set s denoted as S = s 1,s 2,...,s a },wherea s the number of the new dynamc schedulng schemes. The scheduled tasks prorty sum set of the dynamc schedulng schemes s wrtten as P(s) =p(s 1 ), p(s 2 ),...,p(s a )}. (2) Compare the new dynamc schedulng schemes wth the ntal schedulng scheme, and calculate the schemes varatons for all newly generated schedulng schemes wth reference to the ntal schedulng scheme, accordng to (15) and (16). And the schemes varatons set s represented as VAR(s) =var(s 1 ), var(s 2 ),...,var(s a )}. (3) After the completon of step (1) andstep(2), the dynamc schedulng problem s transformed from multple objectve decson makng (MODM) problem nto multple attrbute decson makng (MADM) problem. The MADM problem of the dynamc schedulng can be denoted as DR [P (s), VAR (s)]. s S (17) The dynamc schedulng problem can be depcted as the use of the decson rule DR to choose a best schedulng scheme from the set S, n accordance wth the attrbute P(s) and VAR(s). In ths paper, the TOPSIS (Technque for Order Preference by Smlarty to an Ideal Soluton) algorthm s adopted as the decson rule DR for the dynamc schedulng, whch s descrbed as follows. (a) Construct normalzed decson matrx Z j = f j a =1 f2 j, (18) where 1,2...,a} and j 1,2}. f j s the jth attrbute value of the scheme. f 1 =p(s ),andf 2 = var(s ). (b) Construct the weghted normalzed decson matrx Z j =w j Z j, (19) where w j s the weght value of the jth attrbute. The value w j represents the mportance of each attrbute. (c) Determne the postve deal soluton (PIS) and negatve deal soluton (NIS) PIS =(max NIS =(mn Z j j=1),(mn Z j j=2)} Z j j=1),(max Z j j=2)}. (20) (d) Calculate the separaton measures of each alternatves from the PIS and NIS C PIS C NIS = = 2 j=1 2 j=1 (Z j PIS j ) 2 (Z j NIS j ) 2. (21) (e) Calculate the relatve closeness of the th schedulng scheme wth respect to the deal soluton C = (C PIS C NIS +C NIS ). (22) The set of the dynamc schedulng schemes can now be ranked accordng to the descendng order of C.Byusng the value C, we can get the apprasal ranks for each scheme. The maxmum value of C corresponds to the best dynamc schedulng scheme. 4. Smulaton Results In ths secton, the performances of the proposed dynamc schedulng method ABC-TOPSIS are shown n the followng smulaton results. Assume a system wth a relay satellte and 10 user satelltes. Each user satellte has 3 tasks requests. Thus thenumberoftaskss30.thetotaltmeresourceoftherelay satellte s set to 100 mnutes. The relay satellte arranges two

7 Mathematcal Problems n Engneerng 7 Table 1: Schedulng parameters. User satellte Tme wndows of relay satellte/mnute Duraton of each task/mnutes Prorty of each task Satellte 1 [1030][7095] [1196] [466] Satellte 2 [1535][5080] [1387] [1358] Satellte 3 [1232][6096] [1045] [2148] Satellte 4 [5 25][55 70] [7 6 10] [5 9 10] Satellte 5 [1736][4062] [1164] [1164] Satellte 6 [850][5570] [858] [777] Satellte 7 [3055][8093] [1085] [985] Satellte 8 [2243][6688] [996] [6159] Satellte 9 [20 50][80 99] [7 12 9] [5 12 7] Satellte 10 [1838][4578] [1058] [1038] Satellte Tme (mnute) Fgure 3: Schedulng result based on ABC algorthm. vsual tme wndows for each user satellte. The tasks prorty and duraton are set between 1 and 15. Table 1 shows the ntal schedulng parameters. Fgure 3 shows a generated ntal schedulng scheme wth the ABC algorthm. In the ABC algorthm for the ntal relay satellte schedulng, the number of bees s set to 100, and the maxmumnumberofteratonss50.q 0 =0.9,q g =0.1,the weght factors α, β, andγ are set to 1.5. The leadng factor range values φ mn and φ max are equal to 0.5 and 8, respectvely. In Fgure 3, the yellow lnes represent the vsual tme wndows between relay satellte and user satelltes. In addton, the black lnes are the scheduled tasks. The length of the black lnes corresponds the duraton of tasks. The detaled tasks scheduledsequencesshownntable2.itcanbeseenthat thetmeresourceoftherelaysatelltesfullyutlzedwththe constrants of tme wndows. Moreover, the ntal schedulng scheme acheves the optmal soluton wth the prorty sum of scheduled tasks equalng to 122. Table 3 compares the performances between ABC, ACO, SA, and GA algorthms for the ntal schedulng. The total teraton tmes of four algorthms are all set to 50. Accordng to Table 3, the ABC and ACO algorthms obtan the optmal prorty sum, whle the SA and GA algorthms fall nto the local optmal soluton. The ACO and GA algorthms take larger teraton tmes to converge, wth respect to the ABC and SA algorthm. Therefore, wth the comprehensve comparson of the convergence and optmzaton ablty, the ABC algorthm turns to be more effectve than other three algorthms. Ths s manly due to the reasons that, n the ABC algorthm, scout bees, onlooker bees, and employed bees perform own dutes effcently. The scout bees search the soluton space randomly based on the constrant condtons, whch ensures the randomness and avods fallng nto the local optmal soluton. The employed bees keep the elte feature and mantan attracton to the onlooker bees, whch guarantee the convergence of the algorthm. In addton, n order to compare the performances of ABC, ACO, SA, and GA algorthms more fully, the smulaton experments are carred on for four relay satellte schedulng cases, whch are lsted as follows. Schedulng Case 1. Tme resource of the relay satellte s set to 100 mnutes, the number of user satelltes s arranged to 10, thenumberoftmewndowss20,andthenumberoftasks s 30. Schedulng Case 2. Tmeresourceoftherelaysatelltessetto 100 mnutes, the number of user satelltes s arranged to 15, the number of tme wndows s 30, and the number of tasks s 45. Schedulng Case 3. Tme resource of the relay satellte s set to 150 mnutes, the number of user satelltes s arranged to 15, the number of tme wndows s 45, and the number of tasks s 45. Schedulng Case 4. Tmeresourceoftherelaysatelltessetto 150 mnutes, the number of user satelltes ncreases to 15, the number of tme wndows s 45, and the number of tasks s 60. Tables 4 7 compare the performances between ABC, ACO, SA, and GA n dfferent schedulng stuatons. From Tables 4 7, t s clear that the algorthms of SA and GA fall nto local optmal soluton and obtan a relatvely low prorty sum, whle the ABC and ACO algorthms both acheve a hgh prorty sum. Then by comparson of average and standard devaton values of prorty sum, ABC appears to be more stable and effcent than ACO.

8 8 Mathematcal Problems n Engneerng Table 2: Scheduled tasks. Scheduled task User satellte Prorty Duraton/mnute R 3 Satellte 4 10 [5 15] R 2 Satellte 3 14 [15 19] R 3 Satellte 2 8 [19 26] R 2 Satellte 6 7 [26 31] R 3 Satellte 8 9 [31 37] R 2 Satellte 7 8 [37 45] R 2 Satellte 5 6 [45 51] R 1 Satellte [51 61] R 2 Satellte 4 9 [61 67] R 3 Satellte 3 8 [67 72] R 3 Satellte 1 6 [72 78] R 2 Satellte 8 15 [78 87] R 2 Satellte 9 12 [87 99] Table 3: Performance of ABC, ACO, SA, and GA algorthms. Algorthm Optmal prorty sum Iteraton tmes for convergence GA SA ACO ABC Table 7: Algorthms performance n schedulng case 4. Algorthms ABC ACO SA GA Optmal prorty sum Worst prorty sum Average of prorty sum Standard devaton of prorty sum Table 4: Algorthms performance n schedulng case 1. Algorthms ABC ACO SA GA Optmal prorty sum Worst prorty sum Average of prorty sum Standard devaton of prorty sum Table 5: Algorthms performance n schedulng case 2. Algorthms ABC ACO SA GA Optmal prorty sum Worst prorty sum Average of prorty sum Standard devaton of prorty sum Table 6: Algorthms performance n schedulng case 3. Schemes prorty sum Schemes varaton Fgure 4: Schemes prorty sum versus scheme varaton Algorthms ABC ACO SA GA Optmal prorty sum Worst prorty sum Average of prorty sum Standard devaton of prorty sum After the generaton of the ntal schedulng scheme, the tasks set would be changed dynamcally: some tasks have been canceled, and some new tasks have been added. In ths case, the varaton of the tasks set leads to the change n the ntal relay satellte schedulng. Once the change of the tasks set happens after ntal schedulng, reorganze the model parametersofthesets,andusetheabcalgorthmtogenerate several new dynamc schedulng schemes. In the followng smulaton, the number of alternatves of the new dynamc schedulng s 50. Fgure 4 shows the selecton results of the dynamc schedulng schemes by the ABC-TOPSIS method. Assume the varaton of tasks requrements s that 2 new tasks are nserted.theprortesof2newtasksare5and15,whle theduratonsare3mnutesand6mnutes,respectvely. The weght value of each attrbute w j s set to 0.5 equally.

9 Mathematcal Problems n Engneerng 9 Schemes varaton ABC-TOPSIS ABC-SAW Varaton of the tasks set Fgure 5: Schemes varaton versus varaton of the tasks set. Schemes prorty sum ABC-TOPSIS ABC-SAW Varaton of the tasks set Fgure 6: Schemes prorty sum versus varaton of the tasks set. The total 50 alternatves are presented n a scatter plot n accordance wth the schemes varaton and schemes prorty sum. In addton, the value near the scatter n Fgure 4 represents the number of alternatves. In Fgure 4, the best selecton alternatve by ABC-TOPSIS s marked n red, and theworstselectonalternatvebyabc-topsissmarkedn blue. Therefore, the schemes varaton value VAR n (16) of the best dynamc scheme s only 1, whch s a small change between ntal scheme and dynamc scheme. Meanwhle, the best scheme acheves the hgh tasks prorty sum of 132. Thebestalternatvesthendentfedasthefnaldynamc schedulng scheme. Fgures 5 and 6, respectvely, show the schemes varaton VAR and the schemes prorty sum between the ntal schedulng scheme and the dynamc schedulng scheme versus the varaton of the tasks set. When the varaton value of the tasks set s n,tmeansthatn tasks are canceled from the ntal tasks set. Meanwhle, when the varaton value of the tasks set s n, tmeansthatn tasks are nserted nto the ntal tasks set. In the smulaton, the varaton of the tasks sets from 3 to7.abc-sawsthemethodthatcombnes artfcal bee colony (ABC) and smple addtve weghtng (SAW). From Fgures 5 and 6, t can be seen that the ABC- TOPSIS method obtans the smaller schemes varaton and a lttle bt lower prorty sum n comparson wth ABC-SAW. The ABC-TOPSIS method provdes better performance n obtanng the small schemes varaton, whle the ABC-SAW method has more emphass on the hgh prorty sum. Thedynamcrelaysatellteschedulngstreatedasa multple attrbute decson makng (MADM) problem. The two attrbutes are the schemes varaton and prorty sum. In order to compare the performances of ABC-TOPSIS and ABC-SAW clearly, a comprehensve evaluaton value CE s ntroduced, whch s defned as follows. CE = abs (VAR 0 ) abs (PS 0 ) VAR 0 = VAR TS PS 0 = PS V PS, (23) where TS s the number of scheduled tasks n the ntal schedulng scheme. PS s the prorty sum of scheduled tasks n the ntal schedulng scheme. PS V s the schemes prorty sum varaton between the ntal schedulng scheme and the dynamc schedulng scheme. Snce the value CE takes nto account the relatve values of schemes varaton and prorty sum, t s able to effectvely evaluate the performance of ABC- TOPSIS and ABC-SAW. The method wth lower CE would provde better performance n solvng the dynamc relay satellte schedulng problem. Fgure 7 compares the evaluaton ndex CE of ABC- TOPSISandABC-SAW.TheABC-TOPSISmethodproposed n ths paper acheves the relatvely lower CE than ABC-SAW, whch proves that the ABC-TOPSIS has better performance n solvng the dynamc schedulng problem. The ABC- SAW method uses weghtng addton operaton for dfferent attrbutes, whch leads to the result that t s senstve to the large attrbute value. In the dynamc schedulng problem, the value of the tasks prorty sum s larger than the value of the schemes varaton. Thus, the ABC-SAW would select the dynamcschemewthhghprortysum.andthescheme varaton attrbute receved less attenton. 5. Concluson In ths paper, an effcent method ABC-TOPSIS for the dynamcrelaysatellteschedulngsproposed.thedetaled processofthedynamcrelaysatellteschedulngconssts of two steps: the ntal relay satellte schedulng and the selecton of dynamc schedulng schemes. In the frst step,

10 10 Mathematcal Problems n Engneerng CE ABC-TOPSIS ABC-SAW Varaton of the tasks set Fgure 7: CE versus varaton of the tasks set. the ntal relay satellte schedulng mathematcal model s establshed as a NP-hard combnatoral problem. The artfcal bee colony (ABC) algorthm s appled to solve the ntal schedulng problem and to generate the ntal schedulng scheme wth hgh tasks prorty sum. In the second step, the selecton of dynamc schedulng schemes s consdered as a multple attrbute decson makng (MADM) problem, whch ams at achevng the hgh tasks prorty sum and the small varaton between ntal scheme and dynamc scheme. Therefore, the technque for order preference by smlarty to deal soluton (TOPSIS) s performed for the selecton of dynamc schedulng schemes. The smulaton results show that, n contrast wth the other approach, the ABC-TOPSIS s an effectve and reasonable dynamc schedulng method. Competng Interests The authors declare that there s no conflct of nterests regardng the publcaton of ths paper. Acknowledgments The research n ths artcle s supported by the Natonal Natural Scence Foundaton of Chna (Grant nos and ). References [1] S.Rojanasoonthon,J.F.Bard,andS.D.Reddy, Algorthmsfor parallel machne schedulng: a case study of the trackng and data relay satellte system, JournaloftheOperatonalResearch Socety,vol.54,no.8,pp ,2003. [2] S. Rojanasoonthon, Parallel Machne Schedulng wth Tme Wndows, Graduate School of the Unversty of Texas, Austn, Tex, USA, [3] M. Basu, Artfcal bee colony optmzaton for mult-area economc dspatch, Internatonal Electrcal Power and Energy Systems,vol.49,no.1,pp ,2013. [4] D. Karaboga and B. Basturk, On the performance of artfcal bee colony (ABC) algorthm, Appled Soft Computng, vol.8, no. 1, pp , [5] M. El-Abd, Performance assessment of foragng algorthms vs. evolutonary algorthms, Informaton Scences, vol. 182, no. 1, pp , [6] W.-L. Xang and M.-Q. An, An effcent and robust artfcal bee colony algorthm for numercal optmzaton, Computers and Operatons Research,vol.40,no.5,pp ,2013. [7] L. P. Wong, M. Y. H. Low, and C. S. Chong, Bee Colony Optmzaton wth Local Search for Travelng Salesman Problem, Sngapore Nanyang Technologcal Unversty, [8] J.-Q. L, Q.-K. Pan, and F.-T. Wang, A hybrd varable neghborhood search for solvng the hybrd flow shop schedulng problem, Appled Soft Computng,vol.24, no.1,pp , [9] J.-Q. L, Q.-K. Pan, and P.-Y. Duan, An mproved artfcal bee colony algorthm for solvng hybrd flexble flowshop wth dynamc operaton skppng, IEEE Transactons on Cybernetcs, vol.46,no.6,pp ,2016. [10] S.Nguyen,M.Zhang,M.Johnston,andK.C.Tan, Automatc programmng va terated local search for dynamc job shop schedulng, IEEE Transactons on Cybernetcs,vol.45,no.1,pp. 1 14, [11] C. S. Zhang, D. T. Ouyang, and J. X. Nng, An artfcal bee colony approach for clusterng, Expert Systems wth Applcatons,vol.37,no.7,pp ,2010. [12] D. Karaboga and C. Ozturk, A novel clusterng approach: Artfcal Bee Colony (ABC) algorthm, Appled Soft Computng, vol. 11, no. 1, pp , [13]S.L.Sabat,S.K.Udgata,andA.Abraham, Artfcalbee colony algorthm for small sgnal model parameter extracton of MESFET, Engneerng Applcatons of Artfcal Intellgence, vol.23,no.5,pp ,2010. [14]M.Ma,J.Lang,M.Guo,Y.Fan,andY.Yn, SARmage segmentaton based on artfcal bee colony algorthm, Appled Soft Computng, vol. 11, no. 8, pp , [15] F. G. Mohammad and M. S. Abadeh, Image steganalyss usng a bee colony based feature selecton algorthm, Engneerng Applcatons of Artfcal Intellgence, vol.31,no.1,pp.35 43, [16] Z.L.L,X.Meng,S.Q.Lu,S.L.Zhang,andW.Zheng, Genetc algorthm for TDRS communcaton schedulng wth resource constrants, n Proceedngs of the Internatonal Symposum on Intellgent Informaton Technology Applcaton Workshops (IITAW 08), pp , Shangha, Chna, December [17] Z.Na,F.Z.Ren,andK.L.Jun, Newpheromonetralupdatng method of ACO for satellte control resource schedulng problem, n Proceedngs of the IEEE Congress on Evolutonary Computaton (CEC 10),pp.1 6,July2010. [18] Z. S. Gu, Research on the Relay Satellte Dynamc Schedulng Problem Modelng and Optmzaton Technology, Natonal Unversty of Defense Technology, [19] A. A. Naen, S. Homayoun, and M. Saadatseresht, Improvng the dynamc clusterng of hyperspectral data based on the ntegraton of swarm optmzaton and decson analyss, IEEE JournalofSelectedTopcsnAppledEarthObservatonsand Remote Sensng,vol.7,no.6,pp ,2014. [20] Z. Yue, Extenson of TOPSIS to determne weght of decson maker for group decson makng problems wth uncertan nformaton, Expert Systems wth Applcatons, vol. 39,no. 7, pp , 2012.

11 Mathematcal Problems n Engneerng 11 [21] Z. Yue, Approach to group decson makng based on determnng the weghts of experts by usng projecton method, Appled Mathematcal Modellng, vol.36,no.7,pp , [22] S.-M. Chen and J.-A. Hong, Fuzzy multple attrbutes group decson-makng based on rankng nterval type-2 fuzzy sets and the TOPSIS method, IEEE Transactons on Systems, Man, and Cybernetcs: Systems,vol.44,no.12,pp ,2014. [23] N. G. Pateraks, A. Mazza, S. F. Santos et al., Mult-objectve reconfguraton of radal dstrbuton systems usng relablty ndces, IEEE Transactons on Power Systems,vol.31,no.2,pp , [24] Y. T. İç, An expermental desgn approach usng TOPSIS method for the selecton of computer-ntegrated manufacturng technologes, Robotcs and Computer-Integrated Manufacturng,vol.28,no.2,pp ,2012. [25] M. Dağdevren, S. Yavuz, and N. Kılınç, Weapon selecton usng the AHP and TOPSIS methods under fuzzy envronment, Expert Systems wth Applcatons, vol. 36, no. 4, pp , [26] H. Shdpour, M. Shahrokh, and A. Bernard, A mult-objectve programmng approach, ntegrated nto the TOPSIS method, n order to optmze product desgn; In three-dmensonal concurrent engneerng, Computers and Industral Engneerng, vol.64,no.4,pp ,2013. [27] A. Kelemens, K. Ergazaks, and D. Askouns, Support managers selecton usng an extenson of fuzzy TOPSIS, Expert Systems wth Applcatons,vol.38,no.3,pp ,2011. [28] D. Mohamad and R. M. Jaml, A preference analyss model for selectng tourst destnatons based on motvatonal factors: a case study n kedah, malaysa, Proceda-Socal and Behavoral Scences,vol.65,pp.20 25,2012. [29] X.F.Dng,G.L.Lu,M.Du,H.Guo,C.Duan,andH.Qan, Effcency mprovement of overall PMSM-nverter system basedonartfcalbeecolonyalgorthmunderfullpowerrange, IEEE Transactons on Magnetcs,vol.52,no.7,pp.1 4,2016. [30] M. D. L, H. Zhao, X. W. Weng, and H. Q. Huang, Artfcal bee colony algorthm wth comprehensve search mechansm for numercal optmzaton, Systems Engneerng and Electroncs,vol.26,no.3,pp ,2015.

12 Advances n Operatons Research Advances n Decson Scences Appled Mathematcs Algebra Probablty and Statstcs The Scentfc World Journal Internatonal Dfferental Equatons Submt your manuscrpts at Internatonal Advances n Combnatorcs Mathematcal Physcs Complex Analyss Internatonal Mathematcs and Mathematcal Scences Mathematcal Problems n Engneerng Mathematcs Dscrete Mathematcs Dscrete Dynamcs n Nature and Socety Functon Spaces Abstract and Appled Analyss Internatonal Stochastc Analyss Optmzaton

Research of Dispatching Method in Elevator Group Control System Based on Fuzzy Neural Network. Yufeng Dai a, Yun Du b

Research of Dispatching Method in Elevator Group Control System Based on Fuzzy Neural Network. Yufeng Dai a, Yun Du b 2nd Internatonal Conference on Computer Engneerng, Informaton Scence & Applcaton Technology (ICCIA 207) Research of Dspatchng Method n Elevator Group Control System Based on Fuzzy Neural Network Yufeng

More information

Uncertainty in measurements of power and energy on power networks

Uncertainty in measurements of power and energy on power networks Uncertanty n measurements of power and energy on power networks E. Manov, N. Kolev Department of Measurement and Instrumentaton, Techncal Unversty Sofa, bul. Klment Ohrdsk No8, bl., 000 Sofa, Bulgara Tel./fax:

More information

PRACTICAL, COMPUTATION EFFICIENT HIGH-ORDER NEURAL NETWORK FOR ROTATION AND SHIFT INVARIANT PATTERN RECOGNITION. Evgeny Artyomov and Orly Yadid-Pecht

PRACTICAL, COMPUTATION EFFICIENT HIGH-ORDER NEURAL NETWORK FOR ROTATION AND SHIFT INVARIANT PATTERN RECOGNITION. Evgeny Artyomov and Orly Yadid-Pecht 68 Internatonal Journal "Informaton Theores & Applcatons" Vol.11 PRACTICAL, COMPUTATION EFFICIENT HIGH-ORDER NEURAL NETWORK FOR ROTATION AND SHIFT INVARIANT PATTERN RECOGNITION Evgeny Artyomov and Orly

More information

Dynamic Optimization. Assignment 1. Sasanka Nagavalli January 29, 2013 Robotics Institute Carnegie Mellon University

Dynamic Optimization. Assignment 1. Sasanka Nagavalli January 29, 2013 Robotics Institute Carnegie Mellon University Dynamc Optmzaton Assgnment 1 Sasanka Nagavall snagaval@andrew.cmu.edu 16-745 January 29, 213 Robotcs Insttute Carnege Mellon Unversty Table of Contents 1. Problem and Approach... 1 2. Optmzaton wthout

More information

A Preliminary Study on Targets Association Algorithm of Radar and AIS Using BP Neural Network

A Preliminary Study on Targets Association Algorithm of Radar and AIS Using BP Neural Network Avalable onlne at www.scencedrect.com Proceda Engneerng 5 (2 44 445 A Prelmnary Study on Targets Assocaton Algorthm of Radar and AIS Usng BP Neural Networ Hu Xaoru a, Ln Changchuan a a Navgaton Insttute

More information

Network Reconfiguration in Distribution Systems Using a Modified TS Algorithm

Network Reconfiguration in Distribution Systems Using a Modified TS Algorithm Network Reconfguraton n Dstrbuton Systems Usng a Modfed TS Algorthm ZHANG DONG,FU ZHENGCAI,ZHANG LIUCHUN,SONG ZHENGQIANG School of Electroncs, Informaton and Electrcal Engneerng Shangha Jaotong Unversty

More information

To: Professor Avitabile Date: February 4, 2003 From: Mechanical Student Subject: Experiment #1 Numerical Methods Using Excel

To: Professor Avitabile Date: February 4, 2003 From: Mechanical Student Subject: Experiment #1 Numerical Methods Using Excel To: Professor Avtable Date: February 4, 3 From: Mechancal Student Subject:.3 Experment # Numercal Methods Usng Excel Introducton Mcrosoft Excel s a spreadsheet program that can be used for data analyss,

More information

NETWORK 2001 Transportation Planning Under Multiple Objectives

NETWORK 2001 Transportation Planning Under Multiple Objectives NETWORK 200 Transportaton Plannng Under Multple Objectves Woodam Chung Graduate Research Assstant, Department of Forest Engneerng, Oregon State Unversty, Corvalls, OR9733, Tel: (54) 737-4952, Fax: (54)

More information

Optimal Allocation of Static VAr Compensator for Active Power Loss Reduction by Different Decision Variables

Optimal Allocation of Static VAr Compensator for Active Power Loss Reduction by Different Decision Variables S. Aucharyamet and S. Srsumrannukul / GMSARN Internatonal Journal 4 (2010) 57-66 Optmal Allocaton of Statc VAr Compensator for Actve Power oss Reducton by Dfferent Decson Varables S. Aucharyamet and S.

More information

A NSGA-II algorithm to solve a bi-objective optimization of the redundancy allocation problem for series-parallel systems

A NSGA-II algorithm to solve a bi-objective optimization of the redundancy allocation problem for series-parallel systems 0 nd Internatonal Conference on Industral Technology and Management (ICITM 0) IPCSIT vol. 49 (0) (0) IACSIT Press, Sngapore DOI: 0.776/IPCSIT.0.V49.8 A NSGA-II algorthm to solve a b-obectve optmzaton of

More information

Efficient Large Integers Arithmetic by Adopting Squaring and Complement Recoding Techniques

Efficient Large Integers Arithmetic by Adopting Squaring and Complement Recoding Techniques The th Worshop on Combnatoral Mathematcs and Computaton Theory Effcent Large Integers Arthmetc by Adoptng Squarng and Complement Recodng Technques Cha-Long Wu*, Der-Chyuan Lou, and Te-Jen Chang *Department

More information

MTBF PREDICTION REPORT

MTBF PREDICTION REPORT MTBF PREDICTION REPORT PRODUCT NAME: BLE112-A-V2 Issued date: 01-23-2015 Rev:1.0 Copyrght@2015 Bluegga Technologes. All rghts reserved. 1 MTBF PREDICTION REPORT... 1 PRODUCT NAME: BLE112-A-V2... 1 1.0

More information

Priority based Dynamic Multiple Robot Path Planning

Priority based Dynamic Multiple Robot Path Planning 2nd Internatonal Conference on Autonomous obots and Agents Prorty based Dynamc Multple obot Path Plannng Abstract Taxong Zheng Department of Automaton Chongqng Unversty of Post and Telecommuncaton, Chna

More information

High Speed, Low Power And Area Efficient Carry-Select Adder

High Speed, Low Power And Area Efficient Carry-Select Adder Internatonal Journal of Scence, Engneerng and Technology Research (IJSETR), Volume 5, Issue 3, March 2016 Hgh Speed, Low Power And Area Effcent Carry-Select Adder Nelant Harsh M.tech.VLSI Desgn Electroncs

More information

A PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT

A PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT A PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT Hrotaka Yoshda Kench Kawata IEEE Trans. on Power Systems, Vol.15, No.4, pp.1232-1239, November

More information

Calculation of the received voltage due to the radiation from multiple co-frequency sources

Calculation of the received voltage due to the radiation from multiple co-frequency sources Rec. ITU-R SM.1271-0 1 RECOMMENDATION ITU-R SM.1271-0 * EFFICIENT SPECTRUM UTILIZATION USING PROBABILISTIC METHODS Rec. ITU-R SM.1271 (1997) The ITU Radocommuncaton Assembly, consderng a) that communcatons

More information

Performance Analysis of Multi User MIMO System with Block-Diagonalization Precoding Scheme

Performance Analysis of Multi User MIMO System with Block-Diagonalization Precoding Scheme Performance Analyss of Mult User MIMO System wth Block-Dagonalzaton Precodng Scheme Yoon Hyun m and Jn Young m, wanwoon Unversty, Department of Electroncs Convergence Engneerng, Wolgye-Dong, Nowon-Gu,

More information

Application of Intelligent Voltage Control System to Korean Power Systems

Application of Intelligent Voltage Control System to Korean Power Systems Applcaton of Intellgent Voltage Control System to Korean Power Systems WonKun Yu a,1 and HeungJae Lee b, *,2 a Department of Power System, Seol Unversty, South Korea. b Department of Power System, Kwangwoon

More information

The Impact of Spectrum Sensing Frequency and Packet- Loading Scheme on Multimedia Transmission over Cognitive Radio Networks

The Impact of Spectrum Sensing Frequency and Packet- Loading Scheme on Multimedia Transmission over Cognitive Radio Networks Ths artcle has been accepted for publcaton n a future ssue of ths journal, but has not been fully edted. Content may change pror to fnal publcaton. The Impact of Spectrum Sensng Frequency and Pacet- Loadng

More information

Research on the Process-level Production Scheduling Optimization Based on the Manufacturing Process Simplifies

Research on the Process-level Production Scheduling Optimization Based on the Manufacturing Process Simplifies Internatonal Journal of Smart Home Vol.8, No. (04), pp.7-6 http://dx.do.org/0.457/sh.04.8.. Research on the Process-level Producton Schedulng Optmzaton Based on the Manufacturng Process Smplfes Y. P. Wang,*,

More information

Investigation of Hybrid Particle Swarm Optimization Methods for Solving Transient-Stability Constrained Optimal Power Flow Problems

Investigation of Hybrid Particle Swarm Optimization Methods for Solving Transient-Stability Constrained Optimal Power Flow Problems Investgaton of Hybrd Partcle Swarm Optmzaton Methods for Solvng Transent-Stablty Constraned Optmal Power Flow Problems K. Y. Chan, G. T. Y. Pong and K. W. Chan Abstract In ths paper, hybrd partcle swarm

More information

Study of the Improved Location Algorithm Based on Chan and Taylor

Study of the Improved Location Algorithm Based on Chan and Taylor Send Orders for eprnts to reprnts@benthamscence.ae 58 The Open Cybernetcs & Systemcs Journal, 05, 9, 58-6 Open Access Study of the Improved Locaton Algorthm Based on Chan and Taylor Lu En-Hua *, Xu Ke-Mng

More information

NOVEL ITERATIVE TECHNIQUES FOR RADAR TARGET DISCRIMINATION

NOVEL ITERATIVE TECHNIQUES FOR RADAR TARGET DISCRIMINATION NOVEL ITERATIVE TECHNIQUES FOR RADAR TARGET DISCRIMINATION Phaneendra R.Venkata, Nathan A. Goodman Department of Electrcal and Computer Engneerng, Unversty of Arzona, 30 E. Speedway Blvd, Tucson, Arzona

More information

Rejection of PSK Interference in DS-SS/PSK System Using Adaptive Transversal Filter with Conditional Response Recalculation

Rejection of PSK Interference in DS-SS/PSK System Using Adaptive Transversal Filter with Conditional Response Recalculation SERBIAN JOURNAL OF ELECTRICAL ENGINEERING Vol., No., November 23, 3-9 Rejecton of PSK Interference n DS-SS/PSK System Usng Adaptve Transversal Flter wth Condtonal Response Recalculaton Zorca Nkolć, Bojan

More information

@IJMTER-2015, All rights Reserved 383

@IJMTER-2015, All rights Reserved 383 SIL of a Safety Fuzzy Logc Controller 1oo usng Fault Tree Analyss (FAT and realablty Block agram (RB r.-ing Mohammed Bsss 1, Fatma Ezzahra Nadr, Prof. Amam Benassa 3 1,,3 Faculty of Scence and Technology,

More information

The Performance Improvement of BASK System for Giga-Bit MODEM Using the Fuzzy System

The Performance Improvement of BASK System for Giga-Bit MODEM Using the Fuzzy System Int. J. Communcatons, Network and System Scences, 10, 3, 1-5 do:10.36/jcns.10.358 Publshed Onlne May 10 (http://www.scrp.org/journal/jcns/) The Performance Improvement of BASK System for Gga-Bt MODEM Usng

More information

An Optimal Model and Solution of Deployment of Airships for High Altitude Platforms

An Optimal Model and Solution of Deployment of Airships for High Altitude Platforms An Optmal Model and Soluton of Deployment of Arshps for Hgh Alttude Platforms Xuyu Wang, Xnbo Gao, Ru Zong, Peng Cheng. VIPS Lab, School of Electronc Engneerng, Xdan Unversty, X an 77, Chna. Department

More information

ANNUAL OF NAVIGATION 11/2006

ANNUAL OF NAVIGATION 11/2006 ANNUAL OF NAVIGATION 11/2006 TOMASZ PRACZYK Naval Unversty of Gdyna A FEEDFORWARD LINEAR NEURAL NETWORK WITH HEBBA SELFORGANIZATION IN RADAR IMAGE COMPRESSION ABSTRACT The artcle presents the applcaton

More information

A study of turbo codes for multilevel modulations in Gaussian and mobile channels

A study of turbo codes for multilevel modulations in Gaussian and mobile channels A study of turbo codes for multlevel modulatons n Gaussan and moble channels Lamne Sylla and Paul Forter (sylla, forter)@gel.ulaval.ca Department of Electrcal and Computer Engneerng Laval Unversty, Ste-Foy,

More information

Resource Allocation Optimization for Device-to- Device Communication Underlaying Cellular Networks

Resource Allocation Optimization for Device-to- Device Communication Underlaying Cellular Networks Resource Allocaton Optmzaton for Devce-to- Devce Communcaton Underlayng Cellular Networks Bn Wang, L Chen, Xaohang Chen, Xn Zhang, and Dacheng Yang Wreless Theores and Technologes (WT&T) Bejng Unversty

More information

A Fuzzy-based Routing Strategy for Multihop Cognitive Radio Networks

A Fuzzy-based Routing Strategy for Multihop Cognitive Radio Networks 74 Internatonal Journal of Communcaton Networks and Informaton Securty (IJCNIS) Vol. 3, No., Aprl 0 A Fuzzy-based Routng Strategy for Multhop Cogntve Rado Networks Al El Masr, Naceur Malouch and Hcham

More information

Sensors for Motion and Position Measurement

Sensors for Motion and Position Measurement Sensors for Moton and Poston Measurement Introducton An ntegrated manufacturng envronment conssts of 5 elements:- - Machne tools - Inspecton devces - Materal handlng devces - Packagng machnes - Area where

More information

A MODIFIED DIFFERENTIAL EVOLUTION ALGORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS

A MODIFIED DIFFERENTIAL EVOLUTION ALGORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS A MODIFIED DIFFERENTIAL EVOLUTION ALORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS Kaml Dmller Department of Electrcal-Electroncs Engneerng rne Amercan Unversty North Cyprus, Mersn TURKEY kdmller@gau.edu.tr

More information

Diversion of Constant Crossover Rate DE\BBO to Variable Crossover Rate DE\BBO\L

Diversion of Constant Crossover Rate DE\BBO to Variable Crossover Rate DE\BBO\L , pp. 207-220 http://dx.do.org/10.14257/jht.2016.9.1.18 Dverson of Constant Crossover Rate DE\BBO to Varable Crossover Rate DE\BBO\L Ekta 1, Mandeep Kaur 2 1 Department of Computer Scence, GNDU, RC, Jalandhar

More information

Modified Bat Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem

Modified Bat Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem Avalable onlne at www.jpe-onlne.com vol., no. 7, November 07, pp. 999-0 DOI: 0.90/jpe.7.07.p.9990 Modfed Bat Algorthm for the Mult-Objectve Flexble Job Shop Schedulng Problem Haodong Zhu a,b, Baofeng He

More information

A General Technical Route for Parameter Optimization of Ship Motion Controller Based on Artificial Bee Colony Algorithm

A General Technical Route for Parameter Optimization of Ship Motion Controller Based on Artificial Bee Colony Algorithm A General Techncal Route for Parameter Optmzaton of Shp Moton Controller Based on Artfcal Bee Colony Algorthm Yanfe Tan, Lwen Huang, and Yong Xong Abstract The most practcal applcaton n ndustral process

More information

Optimal Placement of PMU and RTU by Hybrid Genetic Algorithm and Simulated Annealing for Multiarea Power System State Estimation

Optimal Placement of PMU and RTU by Hybrid Genetic Algorithm and Simulated Annealing for Multiarea Power System State Estimation T. Kerdchuen and W. Ongsakul / GMSARN Internatonal Journal (09) - Optmal Placement of and by Hybrd Genetc Algorthm and Smulated Annealng for Multarea Power System State Estmaton Thawatch Kerdchuen and

More information

Walsh Function Based Synthesis Method of PWM Pattern for Full-Bridge Inverter

Walsh Function Based Synthesis Method of PWM Pattern for Full-Bridge Inverter Walsh Functon Based Synthess Method of PWM Pattern for Full-Brdge Inverter Sej Kondo and Krt Choesa Nagaoka Unversty of Technology 63-, Kamtomoka-cho, Nagaoka 9-, JAPAN Fax: +8-58-7-95, Phone: +8-58-7-957

More information

Open Access Node Localization Method for Wireless Sensor Networks Based on Hybrid Optimization of Differential Evolution and Particle Swarm Algorithm

Open Access Node Localization Method for Wireless Sensor Networks Based on Hybrid Optimization of Differential Evolution and Particle Swarm Algorithm Send Orders for Reprnts to reprnts@benthamscence.ae The Open Automaton and Control Systems Journal, 014, 6, 61-68 61 Open Access Node Localzaton Method for Wreless Sensor Networks Based on Hybrd Optmzaton

More information

Low Switching Frequency Active Harmonic Elimination in Multilevel Converters with Unequal DC Voltages

Low Switching Frequency Active Harmonic Elimination in Multilevel Converters with Unequal DC Voltages Low Swtchng Frequency Actve Harmonc Elmnaton n Multlevel Converters wth Unequal DC Voltages Zhong Du,, Leon M. Tolbert, John N. Chasson, Hu L The Unversty of Tennessee Electrcal and Computer Engneerng

More information

High Speed ADC Sampling Transients

High Speed ADC Sampling Transients Hgh Speed ADC Samplng Transents Doug Stuetzle Hgh speed analog to dgtal converters (ADCs) are, at the analog sgnal nterface, track and hold devces. As such, they nclude samplng capactors and samplng swtches.

More information

A New Type of Weighted DV-Hop Algorithm Based on Correction Factor in WSNs

A New Type of Weighted DV-Hop Algorithm Based on Correction Factor in WSNs Journal of Communcatons Vol. 9, No. 9, September 2014 A New Type of Weghted DV-Hop Algorthm Based on Correcton Factor n WSNs Yng Wang, Zhy Fang, and Ln Chen Department of Computer scence and technology,

More information

A Comparison of Two Equivalent Real Formulations for Complex-Valued Linear Systems Part 2: Results

A Comparison of Two Equivalent Real Formulations for Complex-Valued Linear Systems Part 2: Results AMERICAN JOURNAL OF UNDERGRADUATE RESEARCH VOL. 1 NO. () A Comparson of Two Equvalent Real Formulatons for Complex-Valued Lnear Systems Part : Results Abnta Munankarmy and Mchael A. Heroux Department of

More information

Comparative Analysis of Reuse 1 and 3 in Cellular Network Based On SIR Distribution and Rate

Comparative Analysis of Reuse 1 and 3 in Cellular Network Based On SIR Distribution and Rate Comparatve Analyss of Reuse and 3 n ular Network Based On IR Dstrbuton and Rate Chandra Thapa M.Tech. II, DEC V College of Engneerng & Technology R.V.. Nagar, Chttoor-5727, A.P. Inda Emal: chandra2thapa@gmal.com

More information

Allocation of capacitor banks in distribution systems using multi-objective function

Allocation of capacitor banks in distribution systems using multi-objective function Vol. 8(27), pp. 1282-1288, 18 July, 2013 DOI 10.5897/SRE2013.5554 ISSN 1992-2248 2013 Academc Journals http://www.academcjournals.org/sre Scentfc Research and Essays Full Length Research aper Allocaton

More information

sensors ISSN by MDPI

sensors ISSN by MDPI Sensors 2007, 7, 628-648 Full Paper sensors ISSN 1424-8220 2007 by MDPI www.mdp.org/sensors Dstrbuted Partcle Swarm Optmzaton and Smulated Annealng for Energy-effcent Coverage n Wreless Sensor Networks

More information

Open Access Research on PID Controller in Active Magnetic Levitation Based on Particle Swarm Optimization Algorithm

Open Access Research on PID Controller in Active Magnetic Levitation Based on Particle Swarm Optimization Algorithm Send Orders for Reprnts to reprnts@benthamscence.ae 1870 The Open Automaton and Control Systems Journal, 2015, 7, 1870-1874 Open Access Research on PID Controller n Actve Magnetc Levtaton Based on Partcle

More information

D-STATCOM Optimal Allocation Based On Investment Decision Theory

D-STATCOM Optimal Allocation Based On Investment Decision Theory Internatonal Conference on Computer Engneerng, Informaton Scence & Applcaton Technology (ICCIA 2016) D-STATCOM Optmal Allocaton Based On Investment Decson Theory Yongjun Zhang1, a, Yfu Mo1, b and Huazhen

More information

A Mathematical Model for Restoration Problem in Smart Grids Incorporating Load Shedding Concept

A Mathematical Model for Restoration Problem in Smart Grids Incorporating Load Shedding Concept J. Appl. Envron. Bol. Sc., 5(1)20-27, 2015 2015, TextRoad Publcaton ISSN: 2090-4274 Journal of Appled Envronmental and Bologcal Scences www.textroad.com A Mathematcal Model for Restoraton Problem n Smart

More information

The Spectrum Sharing in Cognitive Radio Networks Based on Competitive Price Game

The Spectrum Sharing in Cognitive Radio Networks Based on Competitive Price Game 8 Y. B. LI, R. YAG, Y. LI, F. YE, THE SPECTRUM SHARIG I COGITIVE RADIO ETWORKS BASED O COMPETITIVE The Spectrum Sharng n Cogntve Rado etworks Based on Compettve Prce Game Y-bng LI, Ru YAG., Yun LI, Fang

More information

Throughput Maximization by Adaptive Threshold Adjustment for AMC Systems

Throughput Maximization by Adaptive Threshold Adjustment for AMC Systems APSIPA ASC 2011 X an Throughput Maxmzaton by Adaptve Threshold Adjustment for AMC Systems We-Shun Lao and Hsuan-Jung Su Graduate Insttute of Communcaton Engneerng Department of Electrcal Engneerng Natonal

More information

Ensemble Evolution of Checkers Players with Knowledge of Opening, Middle and Endgame

Ensemble Evolution of Checkers Players with Knowledge of Opening, Middle and Endgame Ensemble Evoluton of Checkers Players wth Knowledge of Openng, Mddle and Endgame Kyung-Joong Km and Sung-Bae Cho Department of Computer Scence, Yonse Unversty 134 Shnchon-dong, Sudaemoon-ku, Seoul 120-749

More information

Application of a Modified PSO Algorithm to Self-Tuning PID Controller for Ultrasonic Motor

Application of a Modified PSO Algorithm to Self-Tuning PID Controller for Ultrasonic Motor The Proceedngs of the st Internatonal Conference on Industral Applcaton Engneerng Applcaton of a Modfed PSO Algorthm to Self-Tunng PID Controller for Ultrasonc Motor Djoewahr Alrjadjs a,b,*, Kanya Tanaa

More information

Capacitated set-covering model considering the distance objective and dependency of alternative facilities

Capacitated set-covering model considering the distance objective and dependency of alternative facilities IOP Conference Seres: Materals Scence and Engneerng PAPER OPEN ACCESS Capactated set-coverng model consderng the dstance obectve and dependency of alternatve facltes To cte ths artcle: I Wayan Suletra

More information

Improved Detection Performance of Cognitive Radio Networks in AWGN and Rayleigh Fading Environments

Improved Detection Performance of Cognitive Radio Networks in AWGN and Rayleigh Fading Environments Improved Detecton Performance of Cogntve Rado Networks n AWGN and Raylegh Fadng Envronments Yng Loong Lee 1, Wasan Kadhm Saad, Ayman Abd El-Saleh *1,, Mahamod Ismal 1 Faculty of Engneerng Multmeda Unversty

More information

Joint Adaptive Modulation and Power Allocation in Cognitive Radio Networks

Joint Adaptive Modulation and Power Allocation in Cognitive Radio Networks I. J. Communcatons, etwork and System Scences, 8, 3, 7-83 Publshed Onlne August 8 n ScRes (http://www.scrp.org/journal/jcns/). Jont Adaptve Modulaton and Power Allocaton n Cogntve Rado etworks Dong LI,

More information

Optimum Allocation of Distributed Generations Based on Evolutionary Programming for Loss Reduction and Voltage Profile Correction

Optimum Allocation of Distributed Generations Based on Evolutionary Programming for Loss Reduction and Voltage Profile Correction ISSN : 0976-8491(Onlne) ISSN : 2229-4333(rnt) Optmum Allocaton of Dstrbuted Generatons Based on Evolutonary rogrammng for Reducton and Voltage rofle Correcton 1 Mohammad Saleh Male, 2 Soodabeh Soleyman

More information

Research Article A Utility-Based Rate Allocation of M2M Service in Heterogeneous Wireless Environments

Research Article A Utility-Based Rate Allocation of M2M Service in Heterogeneous Wireless Environments Internatonal Dstrbuted Sensor etworks Volume 3, Artcle ID 3847, 7 pages http://dx.do.org/.55/3/3847 Research Artcle A Utlty-Based Rate Allocaton of MM Servce n Heterogeneous Wreless Envronments Yao Huang,

More information

Micro-grid Inverter Parallel Droop Control Method for Improving Dynamic Properties and the Effect of Power Sharing

Micro-grid Inverter Parallel Droop Control Method for Improving Dynamic Properties and the Effect of Power Sharing 2015 AASRI Internatonal Conference on Industral Electroncs and Applcatons (IEA 2015) Mcro-grd Inverter Parallel Droop Control Method for Improvng Dynamc Propertes and the Effect of Power Sharng aohong

More information

MODEL ORDER REDUCTION AND CONTROLLER DESIGN OF DISCRETE SYSTEM EMPLOYING REAL CODED GENETIC ALGORITHM J. S. Yadav, N. P. Patidar, J.

MODEL ORDER REDUCTION AND CONTROLLER DESIGN OF DISCRETE SYSTEM EMPLOYING REAL CODED GENETIC ALGORITHM J. S. Yadav, N. P. Patidar, J. ABSTRACT Research Artcle MODEL ORDER REDUCTION AND CONTROLLER DESIGN OF DISCRETE SYSTEM EMPLOYING REAL CODED GENETIC ALGORITHM J. S. Yadav, N. P. Patdar, J. Sngha Address for Correspondence Maulana Azad

More information

Optimal Sizing and Allocation of Residential Photovoltaic Panels in a Distribution Network for Ancillary Services Application

Optimal Sizing and Allocation of Residential Photovoltaic Panels in a Distribution Network for Ancillary Services Application Optmal Szng and Allocaton of Resdental Photovoltac Panels n a Dstrbuton Networ for Ancllary Servces Applcaton Reza Ahmad Kordhel, Student Member, IEEE, S. Al Pourmousav, Student Member, IEEE, Jayarshnan

More information

antenna antenna (4.139)

antenna antenna (4.139) .6.6 The Lmts of Usable Input Levels for LNAs The sgnal voltage level delvered to the nput of an LNA from the antenna may vary n a very wde nterval, from very weak sgnals comparable to the nose level,

More information

Topology Control for C-RAN Architecture Based on Complex Network

Topology Control for C-RAN Architecture Based on Complex Network Topology Control for C-RAN Archtecture Based on Complex Network Zhanun Lu, Yung He, Yunpeng L, Zhaoy L, Ka Dng Chongqng key laboratory of moble communcatons technology Chongqng unversty of post and telecommuncaton

More information

Side-Match Vector Quantizers Using Neural Network Based Variance Predictor for Image Coding

Side-Match Vector Quantizers Using Neural Network Based Variance Predictor for Image Coding Sde-Match Vector Quantzers Usng Neural Network Based Varance Predctor for Image Codng Shuangteng Zhang Department of Computer Scence Eastern Kentucky Unversty Rchmond, KY 40475, U.S.A. shuangteng.zhang@eku.edu

More information

Redes de Comunicação em Ambientes Industriais Aula 8

Redes de Comunicação em Ambientes Industriais Aula 8 Redes de Comuncação em Ambentes Industras Aula 8 Luís Almeda lda@det.ua.pt Electronc Systems Lab-IEETA / DET Unversdade de Avero Avero, Portugal RCAI 2005/2006 1 In the prevous epsode... Cooperaton models:

More information

FACTS Devices Allocation Using a Novel Dedicated Improved PSO for Optimal Operation of Power System

FACTS Devices Allocation Using a Novel Dedicated Improved PSO for Optimal Operation of Power System Journal of Operaton and Automaton n Power Engneerng Vol. 1, No., Summer & Fall 013, Pages: 14-135 http://journals.uma.ac.r/joape FACTS Devces Allocaton Usng a Novel Dedcated Improved PSO for Optmal Operaton

More information

Fast Code Detection Using High Speed Time Delay Neural Networks

Fast Code Detection Using High Speed Time Delay Neural Networks Fast Code Detecton Usng Hgh Speed Tme Delay Neural Networks Hazem M. El-Bakry 1 and Nkos Mastoraks 1 Faculty of Computer Scence & Informaton Systems, Mansoura Unversty, Egypt helbakry0@yahoo.com Department

More information

Traffic balancing over licensed and unlicensed bands in heterogeneous networks

Traffic balancing over licensed and unlicensed bands in heterogeneous networks Correspondence letter Traffc balancng over lcensed and unlcensed bands n heterogeneous networks LI Zhen, CUI Qme, CUI Zhyan, ZHENG We Natonal Engneerng Laboratory for Moble Network Securty, Bejng Unversty

More information

An efficient cluster-based power saving scheme for wireless sensor networks

An efficient cluster-based power saving scheme for wireless sensor networks RESEARCH Open Access An effcent cluster-based power savng scheme for wreless sensor networks Jau-Yang Chang * and Pe-Hao Ju Abstract In ths artcle, effcent power savng scheme and correspondng algorthm

More information

Optimal Phase Arrangement of Distribution Feeders Using Immune Algorithm

Optimal Phase Arrangement of Distribution Feeders Using Immune Algorithm The 4th Internatonal Conference on Intellgent System Applcatons to Power Systems, ISAP 2007 Optmal Phase Arrangement of Dstrbuton Feeders Usng Immune Algorthm C.H. Ln, C.S. Chen, M.Y. Huang, H.J. Chuang,

More information

Joint Power Control and Scheduling for Two-Cell Energy Efficient Broadcasting with Network Coding

Joint Power Control and Scheduling for Two-Cell Energy Efficient Broadcasting with Network Coding Communcatons and Network, 2013, 5, 312-318 http://dx.do.org/10.4236/cn.2013.53b2058 Publshed Onlne September 2013 (http://www.scrp.org/journal/cn) Jont Power Control and Schedulng for Two-Cell Energy Effcent

More information

Research on Controller of Micro-hydro Power System Nan XIE 1,a, Dezhi QI 2,b,Weimin CHEN 2,c, Wei WANG 2,d

Research on Controller of Micro-hydro Power System Nan XIE 1,a, Dezhi QI 2,b,Weimin CHEN 2,c, Wei WANG 2,d Advanced Materals Research Submtted: 2014-05-13 ISSN: 1662-8985, Vols. 986-987, pp 1121-1124 Accepted: 2014-05-19 do:10.4028/www.scentfc.net/amr.986-987.1121 Onlne: 2014-07-18 2014 Trans Tech Publcatons,

More information

Generator of Time Series of Rain Attenuation: Results of Parameter Extraction

Generator of Time Series of Rain Attenuation: Results of Parameter Extraction 32 M. GRÁBNER U.-. FIEBIG V. KVIERA GENERATOR OF TIME SERIES OF RAIN ATTENUATION: RESULTS... Generator of Tme Seres of Ran Attenuaton: Results of Parameter Extracton Martn GRÁBNER 1 Uwe-arsten FIEBIG 2

More information

The Effect Of Phase-Shifting Transformer On Total Consumers Payments

The Effect Of Phase-Shifting Transformer On Total Consumers Payments Australan Journal of Basc and Appled Scences 5(: 854-85 0 ISSN -88 The Effect Of Phase-Shftng Transformer On Total Consumers Payments R. Jahan Mostafa Nck 3 H. Chahkand Nejad Islamc Azad Unversty Brjand

More information

Subcarrier allocation for OFDMA wireless channels using lagrangian relaxation methods

Subcarrier allocation for OFDMA wireless channels using lagrangian relaxation methods Unversty of Wollongong Research Onlne Faculty of Informatcs - Papers (Archve) Faculty of Engneerng and Informaton Scences 2006 Subcarrer allocaton for OFDMA wreless channels usng lagrangan relaxaton methods

More information

Resource Control for Elastic Traffic in CDMA Networks

Resource Control for Elastic Traffic in CDMA Networks Resource Control for Elastc Traffc n CDMA Networks Vaslos A. Srs Insttute of Computer Scence, FORTH Crete, Greece vsrs@cs.forth.gr ACM MobCom 2002 Sep. 23-28, 2002, Atlanta, U.S.A. Funded n part by BTexact

More information

ROBUST IDENTIFICATION AND PREDICTION USING WILCOXON NORM AND PARTICLE SWARM OPTIMIZATION

ROBUST IDENTIFICATION AND PREDICTION USING WILCOXON NORM AND PARTICLE SWARM OPTIMIZATION 7th European Sgnal Processng Conference (EUSIPCO 9 Glasgow, Scotland, August 4-8, 9 ROBUST IDENTIFICATION AND PREDICTION USING WILCOXON NORM AND PARTICLE SWARM OPTIMIZATION Babta Majh, G. Panda and B.

More information

Space Time Equalization-space time codes System Model for STCM

Space Time Equalization-space time codes System Model for STCM Space Tme Eualzaton-space tme codes System Model for STCM The system under consderaton conssts of ST encoder, fadng channel model wth AWGN, two transmt antennas, one receve antenna, Vterb eualzer wth deal

More information

HUAWEI TECHNOLOGIES CO., LTD. Huawei Proprietary Page 1

HUAWEI TECHNOLOGIES CO., LTD. Huawei Proprietary Page 1 Project Ttle Date Submtted IEEE 802.16 Broadband Wreless Access Workng Group Double-Stage DL MU-MIMO Scheme 2008-05-05 Source(s) Yang Tang, Young Hoon Kwon, Yajun Kou, Shahab Sanaye,

More information

Distributed Uplink Scheduling in EV-DO Rev. A Networks

Distributed Uplink Scheduling in EV-DO Rev. A Networks Dstrbuted Uplnk Schedulng n EV-DO ev. A Networks Ashwn Srdharan (Sprnt Nextel) amesh Subbaraman, och Guérn (ESE, Unversty of Pennsylvana) Overvew of Problem Most modern wreless systems Delver hgh performance

More information

Impact of Interference Model on Capacity in CDMA Cellular Networks. Robert Akl, D.Sc. Asad Parvez University of North Texas

Impact of Interference Model on Capacity in CDMA Cellular Networks. Robert Akl, D.Sc. Asad Parvez University of North Texas Impact of Interference Model on Capacty n CDMA Cellular Networks Robert Akl, D.Sc. Asad Parvez Unversty of North Texas Outlne Introducton to CDMA networks Average nterference model Actual nterference model

More information

Adaptive Phase Synchronisation Algorithm for Collaborative Beamforming in Wireless Sensor Networks

Adaptive Phase Synchronisation Algorithm for Collaborative Beamforming in Wireless Sensor Networks 213 7th Asa Modellng Symposum Adaptve Phase Synchronsaton Algorthm for Collaboratve Beamformng n Wreless Sensor Networks Chen How Wong, Zhan We Sew, Renee Ka Yn Chn, Aroland Krng, Kenneth Tze Kn Teo Modellng,

More information

Approximating User Distributions in WCDMA Networks Using 2-D Gaussian

Approximating User Distributions in WCDMA Networks Using 2-D Gaussian CCCT 05: INTERNATIONAL CONFERENCE ON COMPUTING, COMMUNICATIONS, AND CONTROL TECHNOLOGIES 1 Approxmatng User Dstrbutons n CDMA Networks Usng 2-D Gaussan Son NGUYEN and Robert AKL Department of Computer

More information

Performance Analysis of the Weighted Window CFAR Algorithms

Performance Analysis of the Weighted Window CFAR Algorithms Performance Analyss of the Weghted Wndow CFAR Algorthms eng Xangwe Guan Jan He You Department of Electronc Engneerng, Naval Aeronautcal Engneerng Academy, Er a road 88, Yanta Cty 6400, Shandong Provnce,

More information

Applications of Modern Optimization Methods for Controlling Parallel Connected DC-DC Buck Converters

Applications of Modern Optimization Methods for Controlling Parallel Connected DC-DC Buck Converters IJCSI Internatonal Journal of Computer Scence Issues, Volume 3, Issue 6, November 26 www.ijcsi.org https://do.org/.2943/266.559 5 Applcatons of Modern Optmzaton Methods for Controllng Parallel Connected

More information

熊本大学学術リポジトリ. Kumamoto University Repositor

熊本大学学術リポジトリ. Kumamoto University Repositor 熊本大学学術リポジトリ Kumamoto Unversty Repostor Ttle Wreless LAN Based Indoor Poston and Its Smulaton Author(s) Ktasuka, Teruak; Nakansh, Tsune CtatonIEEE Pacfc RIM Conference on Comm Computers, and Sgnal Processng

More information

Grain Moisture Sensor Data Fusion Based on Improved Radial Basis Function Neural Network

Grain Moisture Sensor Data Fusion Based on Improved Radial Basis Function Neural Network Gran Mosture Sensor Data Fuson Based on Improved Radal Bass Functon Neural Network Lu Yang, Gang Wu, Yuyao Song, and Lanlan Dong 1 College of Engneerng, Chna Agrcultural Unversty, Bejng,100083, Chna zhjunr@gmal.com,{yanglu,maozhhua}@cau.edu.cn

More information

Distributed Channel Allocation Algorithm with Power Control

Distributed Channel Allocation Algorithm with Power Control Dstrbuted Channel Allocaton Algorthm wth Power Control Shaoj N Helsnk Unversty of Technology, Insttute of Rado Communcatons, Communcatons Laboratory, Otakaar 5, 0150 Espoo, Fnland. E-mal: n@tltu.hut.f

More information

Mooring Cost Sensitivity Study Based on Cost-Optimum Mooring Design

Mooring Cost Sensitivity Study Based on Cost-Optimum Mooring Design Proceedngs of Conference 8 Korean Socety of Ocean Engneers May 9-3, Cheju, Korea Moorng Cost Senstvty Study Based on Cost-Optmum Moorng Desgn SAM SANGSOO RYU, CASPAR HEYL AND ARUN DUGGAL Research & Development,

More information

Wireless Sensor Network Coverage Optimization Based on Fruit Fly Algorithm

Wireless Sensor Network Coverage Optimization Based on Fruit Fly Algorithm Wreless Sensor Network Coverage Optmzaton Based on Frut Fly Algorthm https://do.org/10.3991/joe.v1406.8698 Ren Song!! ", Zhchao Xu, Yang Lu Jln Unversty of Fnance and Economcs, Jln, Chna rensong1579@163.com

More information

Network Reconfiguration of Distribution System Using Artificial Bee Colony Algorithm

Network Reconfiguration of Distribution System Using Artificial Bee Colony Algorithm World Academy of Scence, Engneerng and Technology Internatonal Journal of Electrcal and Computer Engneerng ol:8, No:, 014 Network Reconfguraton of Dstrbuton System Usng Artfcal Bee Colony Algorthm S. Ganesh

More information

Multiple Robots Formation A Multiobjctive Evolution Approach

Multiple Robots Formation A Multiobjctive Evolution Approach Avalable onlne at www.scencedrect.com Proceda Engneerng 41 (2012 ) 156 162 Internatonal Symposum on Robotcs and Intellgent Sensors 2012 (IRIS 2012) Multple Robots Formaton A Multobctve Evoluton Approach

More information

Coverage Maximization in Mobile Wireless Sensor Networks Utilizing Immune Node Deployment Algorithm

Coverage Maximization in Mobile Wireless Sensor Networks Utilizing Immune Node Deployment Algorithm CCECE 2014 1569888203 Coverage Maxmzaton n Moble Wreless Sensor Networs Utlzng Immune Node Deployment Algorthm Mohammed Abo-Zahhad, Sabah M. Ahmed and Nabl Sabor Electrcal and Electroncs Engneerng Department

More information

QoS Provisioning in Wireless Data Networks under Non-Continuously Backlogged Users

QoS Provisioning in Wireless Data Networks under Non-Continuously Backlogged Users os Provsonng n Wreless Data Networks under Non-Contnuously Backlogged Users Tmotheos Kastrnoganns, and Symeon Papavasslou, Member, IEEE School of Electrcal and Computer Engneerng Natonal Techncal Unversty

More information

Exploiting Dynamic Workload Variation in Low Energy Preemptive Task Scheduling

Exploiting Dynamic Workload Variation in Low Energy Preemptive Task Scheduling Explotng Dynamc Worload Varaton n Low Energy Preemptve Tas Schedulng Lap-Fa Leung, Ch-Yng Tsu Department of Electrcal and Electronc Engneerng Hong Kong Unversty of Scence and Technology Clear Water Bay,

More information

PSO and ACO Algorithms Applied to Location Optimization of the WLAN Base Station

PSO and ACO Algorithms Applied to Location Optimization of the WLAN Base Station PSO and ACO Algorthms Appled to Locaton Optmzaton of the WLAN Base Staton Ivan Vlovć 1, Nša Burum 1, Zvonmr Špuš 2 and Robert Nađ 2 1 Unversty of Dubrovn, Croata 2 Unversty of Zagreb, Croata E-mal: van.vlovc@undu.hr,

More information

A novel immune genetic algorithm based on quasi-secondary response

A novel immune genetic algorithm based on quasi-secondary response 12th AIAA/ISSMO Multdscplnary Analyss and Optmzaton Conference 10-12 September 2008, Vctora, Brtsh Columba Canada AIAA 2008-5919 A novel mmune genetc algorthm based on quas-secondary response Langyu Zhao

More information

Servo Actuating System Control Using Optimal Fuzzy Approach Based on Particle Swarm Optimization

Servo Actuating System Control Using Optimal Fuzzy Approach Based on Particle Swarm Optimization Servo Actuatng System Control Usng Optmal Fuzzy Approach Based on Partcle Swarm Optmzaton Dev Patel, L Jun Heng, Abesh Rahman, Deepka Bhart Sngh Abstract Ths paper presents a new optmal fuzzy approach

More information

IEE Electronics Letters, vol 34, no 17, August 1998, pp ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES

IEE Electronics Letters, vol 34, no 17, August 1998, pp ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES IEE Electroncs Letters, vol 34, no 17, August 1998, pp. 1622-1624. ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES A. Chatzgeorgou, S. Nkolads 1 and I. Tsoukalas Computer Scence Department, 1 Department

More information

Cooperative localization method for multi-robot based on PF-EKF

Cooperative localization method for multi-robot based on PF-EKF Scence n Chna Seres F: Informaton Scences 008 SCIENCE IN CHINA PRESS Sprnger www.scchna.com nfo.scchna.com www.sprngerln.com Cooperatve localzaton method for mult-robot based on PF-EKF WANG Lng, WAN JanWe,

More information