Capacitated set-covering model considering the distance objective and dependency of alternative facilities

Size: px
Start display at page:

Download "Capacitated set-covering model considering the distance objective and dependency of alternative facilities"

Transcription

1 IOP Conference Seres: Materals Scence and Engneerng PAPER OPEN ACCESS Capactated set-coverng model consderng the dstance obectve and dependency of alternatve facltes To cte ths artcle: I Wayan Suletra et al 2018 IOP Conf. Ser.: Mater. Sc. Eng Vew the artcle onlne for updates and enhancements. Ths content was downloaded from IP address on 06/10/2018 at 15:27

2 Capactated set-coverng model consderng the dstance obectve and dependency of alternatve facltes I Wayan Suletra*, Yusuf Pryandar, Wakhd A Jauhar Industral Engneerng, Faculty of Engneerng, Unverstas Sebelas Maret *suletra@staff.uns.ac.d Abstract. We propose a new model of faclty locaton to solve a knd of problem that belong to a class of set-coverng problem usng an nteger programmng formulaton. Our model contans a sngle obectve functon, but t represents two goals. The frst s to mnmze the number of facltes, and the other s to mnmze the total dstance of customers to facltes. The frst goal s a mandatory goal, and the second s an mprovement goal that s very useful when alternate optmum solutons for the frst goal exst. We use a bg number as a weght on the frst goal to force the soluton algorthm to gve frst prorty to the frst goal. Besdes consderng capacty constrants, our model accommodates a knd of ether-or constrants representng facltes dependency. The ether-or constrants wll prevent the soluton algorthm to select two or more facltes from the same set of faclty wth mutually exclusve propertes. A real locaton selecton problem to locate a set of wastewater treatment faclty (IPAL) n Surakarta cty, Indonesa, wll descrbe the mplementaton of our model. A numercal example s gven usng the data of that real problem. Keywords: set-coverng, nteger programmng, ether-or constrant, wastewater treatment faclty, dstance goal 1. Introducton The locaton model bascally s a model of the relatonshp between the pont of demand and the locaton pont of the servce faclty. The decson varable n the locaton model s generally to determne where the optmal locatons for servce facltes are bult. The assumptons and obectve functons of the locaton model vary accordng to the characterstcs of the related problem. Daskn [1] classfed the locaton models based on mathematcal modellng (gravty model) nto 4 large groups, that s, analytc, contnuous, network, and dscrete models. The network models and the dscrete models, both assume that the faclty locatons and demand ponts are both dscrete, that s, they are only present at certan ponts wthn the area. The network model assumes a network or path connectng the demand ponts wth faclty locaton ponts whle the dscrete model does not requre such assumptons. One knd of the most wdely known dscrete locaton models s the set-coverng model. The decson varable for the set-coverng model s where the optmal locatons for servce facltes are bult so that the obectve functon s acheved. The obectve functon of the set coverng model s to mnmze the cost of the faclty locaton such that a specfed level of coverage s obtaned. Popular specal case of set-coverng models s to mnmze the number of servce faclty locaton ponts but all demand ponts are served. In other words, where to buld the facltes such that all customers are Content from ths work may be used under the terms of the Creatve Commons Attrbuton 3.0 lcence. Any further dstrbuton of ths work must mantan attrbuton to the author(s) and the ttle of the work, ournal ctaton and DOI. Publshed under lcence by Ltd 1

3 served wth mnmum cost s the common goal of the set coverng model. Because of ts dscrete nature, most set-coverng models are formulated usng nteger programmng [2, 3]. The followng s the nteger lnear programmng model of a basc set-coverng problem [4]: Mnmze Subect to: N X c (1) X X 1, (2) 0,1. (3) Where, c constructon cost of faclty at pont S N d coverage radus of the faclty a set of faclty locaton that can serve demand pont, N d S, (4) the dstance from demand pont to faclty locaton 1,f pont s selected as a faclty locaton X 0,otherwse The above model, equaton (1)-(4), explans that there s only one type of demand spread across multple locatons of pont and also only one type of faclty that can be placed at some ponts to serve the demand. Equaton (1) s the goal of the model, whch s to mnmze the faclty locaton cost. Equaton (2) assures that all demand ponts are served by at least one faclty. Equaton (3) s a logcal bnary constrant. Equaton (4) explans the defnton of coverage. However, the above standard model s not sutable to be appled n the case of determnng the locaton of IPAL facltes. The model does not nclude the capacty and facltes dependency constrants that our model consders. In addton, ths standard model does not consder the dstance obectve n ts obectve functon. A number of related works have been done to develop or modfy the standard set-coverng problem (SCP) model so that t's sutable for solvng dfferent cases. Raagopalan et al. [5] developed an SCP model appled to emergency medcal servce (EMS) by consderng demand fluctuatons at certan tme ntervals. Suletra et al. [6] proposed a new constrant n the SCP model to represent the Indonesan government rule that each faclty s used by at least two provders n the case of cellular telecommuncaton. The model s used to optmze the locaton of the ont base staton. Karm and Bashr [7] presented a numercal example of a hub of arport locaton based on the hub coverng locaton model developed n the study. Yaghn et al. [8] proposed a heurstc algorthm to solve an SCP model appled to tran drver schedulng problems. Furthermore, Lutter et al. [9] and Zhang et al. [10] developed a new constrant n the SCP model to account an uncertan avalablty of faclty appled to the case of emergency servce facltes. Although the research on SCP has been extensvely dscussed n the lterature, there s no model sutable for solvng the problem dscussed n ths study. The goal of the problem s to mnmze the number of facltes and the total travel dstance n the condton that the capacty of each faclty s lmted and there s the dependency property among facltes. 2. Proposed set coverng model The model proposed n ths study s an nteger programmng model that refers to SCP. The basc model of SCP requres that each demand pont s served by at least one faclty (supply pont). In ths study, the requrement s rather dfferent, each IKM (Industr Kecl dan Menengah) or SME s (Small and Medum Enterprses) represented by a demand pont must be served by only one IPAL faclty. The goal s to mnmze the number of IPAL faclty that can serve all demand ponts. Besdes 2

4 mnmzng the number of IPAL faclty, the obectve functon s formulated to mnmze the total dstance between IKM and IPAL faclty. A bg number s used as a weght on the number of faclty mnmzaton goal to force the soluton algorthm to gve frst prorty to ths goal. Therefore, mnmzaton of the total dstance s a second prorty goal that s very useful when alternate optmum solutons for the man goal exst. Mnmze cx dy (5) Subect to: Y 1, (6) Y X 0,, (7) l Y p, (8) X 1 M, (9) X 0,1, (10) 0,1,. Y (11) where, a bg number to prortze the frst goal c d l p the dstance of IPAL to IKM the volume of wastewater produced by IKM the capacty of IPAL M = a set of IPAL wth mutually exclusve selecton (dependency property) X = bner number, 1 f alternatve IPAL s selected to buld, and 0 s otherwse Y bner number, 1 f alternatve IPAL to serve IKM, and 0 s otherwse The frst term of the equaton (5) s the frst goal of the proposed model whch mnmzes the number of facltes, and the second term n the same equaton s the second goal whch mnmze the total dstance from IPAL to IKM n the condton that the frst goal must be acheved frst. A bg number, c, s used to force the model to assgn the prorty to the frst goal. The second goal s an mprovement goal. It wll work when the alternate optmum solutons for the frst goal exst. Equaton (6) s used to model the requrement that each IKM must be served by only one IPAL faclty. Equaton (7) s a logcal constrant to ensure that f the IPAL s allocated to serve the IKM then the IPAL must be selected to buld. Equaton (8) explans that the capacty of each IPAL cannot be volated,.e. the total waste dstrbuted to the IPAL from all IKM s less than the capacty of IPAL. Equaton (9) descrbes the mutually exclusve selecton representng the dependency property among IPAL. Equaton (10) and (11) are logcal bnary constrants. 3. Numercal mplementaton To descrbe the computaton and the applcablty of the proposed model, we use the data from a real problem, that s, locaton selecton of IPAL facltes n Moosongo, Surakarta, Indonesa (fgure 1). The facltes serve the surroundng SME s tahu tempe. An IKM s a demand pont and the IPAL s the faclty that serves the demand ponts. Havng observed n ste, there are 41 demand ponts (=1,2,,41) and 7 alternatve IPAL locatons (=1,2,,7). The map of IKM ponts and IPAL ponts are depcted n fgure 1. 3

5 Fgure 1. Dsperson of 41 IKM locatons and 7 IPAL alternatves. The frst goal s to mnmze the number of IPAL facltes and the second s to mnmze the total dstance of IKM to IPAL facltes. The constrants are capacty of IPAL, each IKM must be served only by one IPAL faclty (and all IKM must be served), and facltes dependency constrants. Appendx A shows the dstance measure from IKM to IPAL alternatves and appendx B shows the volume of wastewater produced by each IKM. [1] model: [2] sets: [3] pal/s1..s7/:kapastas,dplhtdak; [4] km/c1..c41/:volumelmbah; [5] palkmcombnaton(pal,km):araktempuh,alokas; [6] endsets [7] mn=@sum(pal(i):10000*dplhtdak(i))+@sum(palkmcombnaton(i,j): [8] araktempuh(i,j)*alokas(i,j)); [11]@for(pal(I): [13]@for(palkmcombnaton(I,J): [14] alokas(i,j)-dplhtdak(i)<=0); [15] dplhtdak(1)+dplhtdak(2)<=1; [16] dplhtdak(6)+dplhtdak(7)<=1; [17]@for(palkmcombnaton(I,J):@bn(alokas(I,J))); [18]@for(pal(I):@bn(dplhtdak(I))); [19]data: [20]kapastas,volumelmbah,araktempuh=@OLE('E:\data_lngo\data_km_tahu [21]tempe.xls','kapastas','volumelmbah','araktempuh'); [22]enddata [23]end Fgure 2. Lngo code mplemented n the problem 4

6 Branch-and-Bound algorthm s used to mplement the proposed model to the real problem of IPAL at Moosongo, Surakarta. Lngo software on a notebook 5 2.6GHz wth 8Gb Ram and SSD 256Gb run the model n 5 second to get the global optmum soluton. The code lsted n fgure 2 s the lngo code mplemented to solve ths problem. The lnk between the proposed model and the lngo code can be explaned as follows. s represented by the code alokas, number), d X by the code araktempuh, by the code dplhtdak, c by the number (bg p by the code kapastas, l Y by the code volumelmbah. The obectve functon of the proposed model, equaton (5), s represented by the row [7] and [8] of the lngo code lst. The frst constrant of the proposed model, equaton (6), s represented by the row [9] and [10], the second constrant or equaton (7) by the row [13] and [14], the thrd constrant or equaton (8) by the row [11] and [12], the fourth constrant or equaton (9) by the row [15] and [16], the ffth constrant or equaton (10) by the row [18], and the sxth constrant or equaton (11) by the row [17]. The row [20] and [21] show that the data of,, and, whch are mported from MS Excel fle usng the Lngo The optmum soluton s depcted by fgure 3 and the sze of the problem s shown by the fgure 3. Branch-and-Bound algorthm needs 169,273 teratons to get the global optmal soluton n 5 seconds. Four IPAL facltes are selected to serve 41 IKM,.e. IPAL 2, IPAL 3, IPAL 5, and IPAL 7. The optmum allocaton s as follows. IPAL 2 serves 11 IKM,.e. IKM 1, IKM 2, IKM 3, IKM 4, IKM 5, IKM 6, IKM 8, IKM 9, IKM 10, IKM 11, and IKM 12. IPAL 3 serves 11 IKM,.e. IKM 7, IKM 14, IKM 17, IKM 20, IKM 22, IKM 23, IKM 24, IKM 25, IKM 28, IKM 34, and IKM 35. IPAL 5 serves 13 IKM,.e. IKM 13, IKM 16, IKM 18, IKM 19, IKM 21, IKM 26, IKM 27, IKM 29, IKM 30, IKM 31, IKM 32, IKM 33, and IKM 36. IPAL 7 serves 6 IKM,.e. IKM 15, IKM 37, IKM 38, IKM 39, IKM 40, and IKM 41. p l d Fgure 3. Summary of problem and Lngo output. 5

7 Fgure 4. Optmum allocaton of 41 IKMs to 4 selected IPAL alternatves. 4. Concludng remark We propose a knd of set-coverng model to mnmze two dfferent goals usng the sngle obectve functon. The problem s formulated as a sngle obectve lnear nteger programmng. The standard set coverng model s a specal case of our model by settng t to a sngle goal of mnmzng the number of facltes and removng the capacty and facltes dependency constrants. We mpose several assumptons about the alternatve facltes and demand ponts. We use Branch-and-Bound Algorthms to solve the nteger model and t needs ust 5 second to solve the numercal example. The future research can look nto accommodatng a multple obectve approach to represent a more realstc problem,.e. a problem consderng obectve and subectve crtera smultaneously. Further, the relaxaton of assumptons about the faclty and demand ponts may also be nterestng to be studed. 6

8 Appendx A. Dstance between IKM and IPAL alternatves (n meters). IPAL1 IPAL2 IPAL3 IPAL4 IPAL5 IPAL6 IPAL7 IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM IKM

9 Appendx B. Wastewater produced by IKM Processed soy bean (Kg/day) Daly Waste (ltres) Waste for 3 days dwell tme (ltres) IKM ,850 IKM ,900 5,700 IKM ,375 7,125 IKM ,140 IKM ,850 8,550 IKM ,850 IKM ,900 5,700 IKM IKM ,850 IKM ,850 IKM ,425 IKM ,710 IKM ,425 4,275 IKM ,425 4,275 IKM ,565 IKM ,995 IKM ,425 IKM ,425 IKM ,425 4,275 IKM ,425 IKM ,188 3,563 IKM ,140 IKM ,563 IKM ,425 IKM ,900 5,700 IKM ,850 IKM ,800 11,400 IKM ,850 IKM ,425 4,275 IKM ,900 5,700 IKM ,750 14,250 IKM ,850 IKM ,425 IKM ,850 IKM ,750 14,250 IKM ,850 IKM ,375 7,125 IKM ,850 IKM ,280 IKM ,425 IKM ,425 8

10 References [1] Daskn M S 2008 What You Should Know About Locaton Modelng, Naval Research Logstcs [2] Schllng D A, Jayaraman V and Barkh R 1993 A revew of coverng problems n faclty locaton Locaton Scence [3] Current J, Daskn M and Schllng D 2002 Dscrete network locaton models Faclty Locaton Theory: Applcatons and Methods ed Drezner and Hamacher H (Berln: Sprnger-Verlag) Chapter 3, pp [4] Owen S H and Daskn M S 1998 Strategc faclty locaton: a revew European Journal of Operatonal Research [5] Raagopalan H K, Saydam C and Xao J 2011 A multperod set coverng locaton model for dynamc redeployment of ambulances Computers & Operatons Research [6] Suletra I W, Wdodo and Subanar 2011 Optmum locatons of mult-provders ont base staton by usng set-coverng nteger programmng: modellng & smulaton The 6th SEAMS-UGM Conference [7] Karm H and Bashr M 2011 Hub coverng locaton problems wth dfferent coverage types Scenta Iranca, Transactons E: Industral Engneerng [8] Yaghn M, Karm M and Rahbar M 2015 A set coverng approach for mult-depot tran drver schedulng Journal of Combnatoral Optmzaton 29(3) [9] Lutter P, Degel D, Busng C, Koster A M C A and Werners B 2017 Improved handlng of uncertanty and robustness n set coverng problems European Journal of Operatonal Research 263(1) [10] Zhang B, Peng J and L S 2017 Coverng locaton problem of emergency servce facltes n an uncertan envronment Appled Mathematcal Modellng

A NSGA-II algorithm to solve a bi-objective optimization of the redundancy allocation problem for series-parallel systems

A NSGA-II algorithm to solve a bi-objective optimization of the redundancy allocation problem for series-parallel systems 0 nd Internatonal Conference on Industral Technology and Management (ICITM 0) IPCSIT vol. 49 (0) (0) IACSIT Press, Sngapore DOI: 0.776/IPCSIT.0.V49.8 A NSGA-II algorthm to solve a b-obectve optmzaton of

More information

Downloaded from ijiepr.iust.ac.ir at 5:13 IRST on Saturday December 15th 2018

Downloaded from ijiepr.iust.ac.ir at 5:13 IRST on Saturday December 15th 2018 Internatonal Journal of Industral Eng. & roducton Research (2008) pp. 21-29 Volume 19, Number 4, 2008 Internatonal Journal of Industral Engneerng & roducton Research Journal Webste: http://een.ust.ac.r/

More information

Dynamic Optimization. Assignment 1. Sasanka Nagavalli January 29, 2013 Robotics Institute Carnegie Mellon University

Dynamic Optimization. Assignment 1. Sasanka Nagavalli January 29, 2013 Robotics Institute Carnegie Mellon University Dynamc Optmzaton Assgnment 1 Sasanka Nagavall snagaval@andrew.cmu.edu 16-745 January 29, 213 Robotcs Insttute Carnege Mellon Unversty Table of Contents 1. Problem and Approach... 1 2. Optmzaton wthout

More information

Decision aid methodologies in transportation

Decision aid methodologies in transportation Decson ad methodologes n transportaton Lecture 7: More Applcatons Prem Kumar prem.vswanathan@epfl.ch Transport and Moblty Laboratory Summary We learnt about the dfferent schedulng models We also learnt

More information

NETWORK 2001 Transportation Planning Under Multiple Objectives

NETWORK 2001 Transportation Planning Under Multiple Objectives NETWORK 200 Transportaton Plannng Under Multple Objectves Woodam Chung Graduate Research Assstant, Department of Forest Engneerng, Oregon State Unversty, Corvalls, OR9733, Tel: (54) 737-4952, Fax: (54)

More information

Priority based Dynamic Multiple Robot Path Planning

Priority based Dynamic Multiple Robot Path Planning 2nd Internatonal Conference on Autonomous obots and Agents Prorty based Dynamc Multple obot Path Plannng Abstract Taxong Zheng Department of Automaton Chongqng Unversty of Post and Telecommuncaton, Chna

More information

Calculation of the received voltage due to the radiation from multiple co-frequency sources

Calculation of the received voltage due to the radiation from multiple co-frequency sources Rec. ITU-R SM.1271-0 1 RECOMMENDATION ITU-R SM.1271-0 * EFFICIENT SPECTRUM UTILIZATION USING PROBABILISTIC METHODS Rec. ITU-R SM.1271 (1997) The ITU Radocommuncaton Assembly, consderng a) that communcatons

More information

Optimal Ambulance Location. with Random Delays and Travel Times

Optimal Ambulance Location. with Random Delays and Travel Times 1 Optmal Ambulance Locaton wth Random Delays and Travel Tmes Armann Ingolfsson 1, Susan Budge, Erhan Erkut Unversty of Alberta School of Busness Edmonton, Alberta, T6G 2R6 Last revson: March 2006 Abstract

More information

Walsh Function Based Synthesis Method of PWM Pattern for Full-Bridge Inverter

Walsh Function Based Synthesis Method of PWM Pattern for Full-Bridge Inverter Walsh Functon Based Synthess Method of PWM Pattern for Full-Brdge Inverter Sej Kondo and Krt Choesa Nagaoka Unversty of Technology 63-, Kamtomoka-cho, Nagaoka 9-, JAPAN Fax: +8-58-7-95, Phone: +8-58-7-957

More information

Network Reconfiguration in Distribution Systems Using a Modified TS Algorithm

Network Reconfiguration in Distribution Systems Using a Modified TS Algorithm Network Reconfguraton n Dstrbuton Systems Usng a Modfed TS Algorthm ZHANG DONG,FU ZHENGCAI,ZHANG LIUCHUN,SONG ZHENGQIANG School of Electroncs, Informaton and Electrcal Engneerng Shangha Jaotong Unversty

More information

Define Y = # of mobiles from M total mobiles that have an adequate link. Measure of average portion of mobiles allocated a link of adequate quality.

Define Y = # of mobiles from M total mobiles that have an adequate link. Measure of average portion of mobiles allocated a link of adequate quality. Wreless Communcatons Technologes 6::559 (Advanced Topcs n Communcatons) Lecture 5 (Aprl th ) and Lecture 6 (May st ) Instructor: Professor Narayan Mandayam Summarzed by: Steve Leung (leungs@ece.rutgers.edu)

More information

A TWO-PLAYER MODEL FOR THE SIMULTANEOUS LOCATION OF FRANCHISING SERVICES WITH PREFERENTIAL RIGHTS

A TWO-PLAYER MODEL FOR THE SIMULTANEOUS LOCATION OF FRANCHISING SERVICES WITH PREFERENTIAL RIGHTS A TWO-PLAYER MODEL FOR THE SIMULTANEOUS LOCATION OF FRANCHISING SERVICES WITH PREFERENTIAL RIGHTS Pedro Godnho and oana Das Faculdade de Economa and GEMF Unversdade de Combra Av. Das da Slva 65 3004-5

More information

Optimal Sizing and Allocation of Residential Photovoltaic Panels in a Distribution Network for Ancillary Services Application

Optimal Sizing and Allocation of Residential Photovoltaic Panels in a Distribution Network for Ancillary Services Application Optmal Szng and Allocaton of Resdental Photovoltac Panels n a Dstrbuton Networ for Ancllary Servces Applcaton Reza Ahmad Kordhel, Student Member, IEEE, S. Al Pourmousav, Student Member, IEEE, Jayarshnan

More information

Research of Dispatching Method in Elevator Group Control System Based on Fuzzy Neural Network. Yufeng Dai a, Yun Du b

Research of Dispatching Method in Elevator Group Control System Based on Fuzzy Neural Network. Yufeng Dai a, Yun Du b 2nd Internatonal Conference on Computer Engneerng, Informaton Scence & Applcaton Technology (ICCIA 207) Research of Dspatchng Method n Elevator Group Control System Based on Fuzzy Neural Network Yufeng

More information

Figure.1. Basic model of an impedance source converter JCHPS Special Issue 12: August Page 13

Figure.1. Basic model of an impedance source converter JCHPS Special Issue 12: August Page 13 A Hgh Gan DC - DC Converter wth Soft Swtchng and Power actor Correcton for Renewable Energy Applcaton T. Selvakumaran* and. Svachdambaranathan Department of EEE, Sathyabama Unversty, Chenna, Inda. *Correspondng

More information

Comparative Analysis of Reuse 1 and 3 in Cellular Network Based On SIR Distribution and Rate

Comparative Analysis of Reuse 1 and 3 in Cellular Network Based On SIR Distribution and Rate Comparatve Analyss of Reuse and 3 n ular Network Based On IR Dstrbuton and Rate Chandra Thapa M.Tech. II, DEC V College of Engneerng & Technology R.V.. Nagar, Chttoor-5727, A.P. Inda Emal: chandra2thapa@gmal.com

More information

A Comparison of Two Equivalent Real Formulations for Complex-Valued Linear Systems Part 2: Results

A Comparison of Two Equivalent Real Formulations for Complex-Valued Linear Systems Part 2: Results AMERICAN JOURNAL OF UNDERGRADUATE RESEARCH VOL. 1 NO. () A Comparson of Two Equvalent Real Formulatons for Complex-Valued Lnear Systems Part : Results Abnta Munankarmy and Mchael A. Heroux Department of

More information

Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers. By Neven Grubisic Livia Maglic

Optimization Process for Berth and Quay-Crane Assignment in Container Terminals with Separate Piers. By Neven Grubisic Livia Maglic Athens Journal of Technology and Engneerng March 2018 Optmzaton Process for Berth and Quay-Crane Assgnment n Contaner Termnals wth Separate Pers By Neven Grubsc Lva Maglc The objectve of ths research s

More information

Simultaneous Reconfiguration with DG Placement using Bit-Shift Operator Based TLBO

Simultaneous Reconfiguration with DG Placement using Bit-Shift Operator Based TLBO Smultaneous Reconfguraton wth Placement usng Bt-Shft Operator Based TLBO Ayan Ghosh, *Deepak Kumar EEE Department B.I.T Mesra, Ranch Jharkhand, Inda *deepakmek9@gmal.com S. R. Samantaray School of Electrcal

More information

MTBF PREDICTION REPORT

MTBF PREDICTION REPORT MTBF PREDICTION REPORT PRODUCT NAME: BLE112-A-V2 Issued date: 01-23-2015 Rev:1.0 Copyrght@2015 Bluegga Technologes. All rghts reserved. 1 MTBF PREDICTION REPORT... 1 PRODUCT NAME: BLE112-A-V2... 1 1.0

More information

Optimum Allocation of Distributed Generations Based on Evolutionary Programming for Loss Reduction and Voltage Profile Correction

Optimum Allocation of Distributed Generations Based on Evolutionary Programming for Loss Reduction and Voltage Profile Correction ISSN : 0976-8491(Onlne) ISSN : 2229-4333(rnt) Optmum Allocaton of Dstrbuted Generatons Based on Evolutonary rogrammng for Reducton and Voltage rofle Correcton 1 Mohammad Saleh Male, 2 Soodabeh Soleyman

More information

Allocation of capacitor banks in distribution systems using multi-objective function

Allocation of capacitor banks in distribution systems using multi-objective function Vol. 8(27), pp. 1282-1288, 18 July, 2013 DOI 10.5897/SRE2013.5554 ISSN 1992-2248 2013 Academc Journals http://www.academcjournals.org/sre Scentfc Research and Essays Full Length Research aper Allocaton

More information

Optimal Allocation of Static VAr Compensator for Active Power Loss Reduction by Different Decision Variables

Optimal Allocation of Static VAr Compensator for Active Power Loss Reduction by Different Decision Variables S. Aucharyamet and S. Srsumrannukul / GMSARN Internatonal Journal 4 (2010) 57-66 Optmal Allocaton of Statc VAr Compensator for Actve Power oss Reducton by Dfferent Decson Varables S. Aucharyamet and S.

More information

XXVIII. MODELING AND OPTIMIZATION OF RADIO FREQUENCY IDENTIFICATION NETWORKS FOR INVENTORY MANAGEMENT

XXVIII. MODELING AND OPTIMIZATION OF RADIO FREQUENCY IDENTIFICATION NETWORKS FOR INVENTORY MANAGEMENT XXVIII. MODELING AND OPTIMIZATION OF RADIO FREQUENCY IDENTIFICATION NETWORKS FOR INVENTORY MANAGEMENT Atpong Surya Department of Electrcal and Electroncs Engneerng Ubonratchathan Unversty, Thaland, 34190

More information

Location of Rescue Helicopters in South Tyrol

Location of Rescue Helicopters in South Tyrol Locaton of Rescue Helcopters n South Tyrol Monca Talwar Department of Engneerng Scence Unversty of Auckland New Zealand talwar_monca@yahoo.co.nz Abstract South Tyrol s a popular destnaton n Northern Italy

More information

A Mathematical Model for Restoration Problem in Smart Grids Incorporating Load Shedding Concept

A Mathematical Model for Restoration Problem in Smart Grids Incorporating Load Shedding Concept J. Appl. Envron. Bol. Sc., 5(1)20-27, 2015 2015, TextRoad Publcaton ISSN: 2090-4274 Journal of Appled Envronmental and Bologcal Scences www.textroad.com A Mathematcal Model for Restoraton Problem n Smart

More information

To: Professor Avitabile Date: February 4, 2003 From: Mechanical Student Subject: Experiment #1 Numerical Methods Using Excel

To: Professor Avitabile Date: February 4, 2003 From: Mechanical Student Subject: Experiment #1 Numerical Methods Using Excel To: Professor Avtable Date: February 4, 3 From: Mechancal Student Subject:.3 Experment # Numercal Methods Usng Excel Introducton Mcrosoft Excel s a spreadsheet program that can be used for data analyss,

More information

Research on the Process-level Production Scheduling Optimization Based on the Manufacturing Process Simplifies

Research on the Process-level Production Scheduling Optimization Based on the Manufacturing Process Simplifies Internatonal Journal of Smart Home Vol.8, No. (04), pp.7-6 http://dx.do.org/0.457/sh.04.8.. Research on the Process-level Producton Schedulng Optmzaton Based on the Manufacturng Process Smplfes Y. P. Wang,*,

More information

Models for Intra-Hospital Patient Routing

Models for Intra-Hospital Patient Routing Models for Intra-osptal Patent Routng Belma uran, Verena Schmd and Karl. F. Doerner Unversty of Venna, Venna, Austra Johannes Kepler Unversty Lnz, Lnz, Austra (belma.turan@unve.ac.at, verena.schmd@unve.ac.at,

More information

Full-duplex Relaying for D2D Communication in mmwave based 5G Networks

Full-duplex Relaying for D2D Communication in mmwave based 5G Networks Full-duplex Relayng for D2D Communcaton n mmwave based 5G Networks Boang Ma Hamed Shah-Mansour Member IEEE and Vncent W.S. Wong Fellow IEEE Abstract Devce-to-devce D2D communcaton whch can offload data

More information

A Novel Optimization of the Distance Source Routing (DSR) Protocol for the Mobile Ad Hoc Networks (MANET)

A Novel Optimization of the Distance Source Routing (DSR) Protocol for the Mobile Ad Hoc Networks (MANET) A Novel Optmzaton of the Dstance Source Routng (DSR) Protocol for the Moble Ad Hoc Networs (MANET) Syed S. Rzv 1, Majd A. Jafr, and Khaled Ellethy Computer Scence and Engneerng Department Unversty of Brdgeport

More information

Application of Intelligent Voltage Control System to Korean Power Systems

Application of Intelligent Voltage Control System to Korean Power Systems Applcaton of Intellgent Voltage Control System to Korean Power Systems WonKun Yu a,1 and HeungJae Lee b, *,2 a Department of Power System, Seol Unversty, South Korea. b Department of Power System, Kwangwoon

More information

A PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT

A PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT A PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT Hrotaka Yoshda Kench Kawata IEEE Trans. on Power Systems, Vol.15, No.4, pp.1232-1239, November

More information

Volume 3, Special Issue 3, March 2014

Volume 3, Special Issue 3, March 2014 ISSN (Onlne) : 319-8753 ISSN (Prnt) : 347-6710 Internatonal Journal of Innovatve Research n Scence, Engneerng and Technology Volume 3, Specal Issue 3, March 014 014 Internatonal Conference on Innovatons

More information

Piecewise Linear Approximation of Generators Cost Functions Using Max-Affine Functions

Piecewise Linear Approximation of Generators Cost Functions Using Max-Affine Functions Pecewse Lnear Approxmaton of Generators Cost Functons Usng Max-Affne Functons Hamed Ahmad José R. Martí School of Electrcal and Computer Engneerng Unversty of Brtsh Columba Vancouver, BC, Canada Emal:

More information

Fixed-Charge Network Flow Problems with a Hybrid Optimization and. Constraint Programming Approach. Solving. John Hooker, Hak-Jin Kim

Fixed-Charge Network Flow Problems with a Hybrid Optimization and. Constraint Programming Approach. Solving. John Hooker, Hak-Jin Kim Solvng Fed-Charge Network Flow Problems wth a Hbrd Optmaton and Constrant Programmng Approach John Hooker, Hak-Jn Km Carnege ellon Unverst ISP, August 2 An Approach that Combnes Optmaton and Constrant

More information

A Stochastic Approach to Hotel Revenue Management Considering Individual and Group Customers

A Stochastic Approach to Hotel Revenue Management Considering Individual and Group Customers Proceedngs of the Internatonal Conference on Industral Engneerng and Operatons Management Bal, Indonesa, January 7 9, A Stochastc Approach to Hotel Revenue Management Consderng Indvdual and Group Customers

More information

@IJMTER-2015, All rights Reserved 383

@IJMTER-2015, All rights Reserved 383 SIL of a Safety Fuzzy Logc Controller 1oo usng Fault Tree Analyss (FAT and realablty Block agram (RB r.-ing Mohammed Bsss 1, Fatma Ezzahra Nadr, Prof. Amam Benassa 3 1,,3 Faculty of Scence and Technology,

More information

Integer Programming. P.H.S. Torr Lecture 5. Integer Programming

Integer Programming. P.H.S. Torr Lecture 5. Integer Programming Integer Programmng P.H.S. Torr Lecture 5 Integer Programmng Outlne Mathematcal programmng paradgm Lnear Programmng Integer Programmng Integer Programmng Eample Unmodularty LP -> IP Theorem Concluson Specal

More information

Adaptive System Control with PID Neural Networks

Adaptive System Control with PID Neural Networks Adaptve System Control wth PID Neural Networs F. Shahra a, M.A. Fanae b, A.R. Aromandzadeh a a Department of Chemcal Engneerng, Unversty of Sstan and Baluchestan, Zahedan, Iran. b Department of Chemcal

More information

Network Reconfiguration for Load Balancing in Distribution System with Distributed Generation and Capacitor Placement

Network Reconfiguration for Load Balancing in Distribution System with Distributed Generation and Capacitor Placement World Academy of Scence, Engneerng and Technology nternatonal Journal of Electrcal and Computer Engneerng Networ Reconfguraton for Load Balancng n Dstrbuton System wth Dstrbuted Generaton and Capactor

More information

A study of turbo codes for multilevel modulations in Gaussian and mobile channels

A study of turbo codes for multilevel modulations in Gaussian and mobile channels A study of turbo codes for multlevel modulatons n Gaussan and moble channels Lamne Sylla and Paul Forter (sylla, forter)@gel.ulaval.ca Department of Electrcal and Computer Engneerng Laval Unversty, Ste-Foy,

More information

Solution of a certain class of network flow problems with cascaded demand aggregation and capacity allocation

Solution of a certain class of network flow problems with cascaded demand aggregation and capacity allocation Unersty of Wollongong Research Onlne Faculty of Informatcs - Papers (Arche) Faculty of Engneerng and Informaton Scences 2006 Soluton of a certan class of network flow problems wth cascaded demand aggregaton

More information

RESOURCE CONTROL FOR HYBRID CODE AND TIME DIVISION SCHEDULING

RESOURCE CONTROL FOR HYBRID CODE AND TIME DIVISION SCHEDULING RESOURCE CONTROL FOR HYBRID CODE AND TIME DIVISION SCHEDULING Vaslos A. Srs Insttute of Computer Scence (ICS), FORTH and Department of Computer Scence, Unversty of Crete P.O. Box 385, GR 7 Heraklon, Crete,

More information

Mooring Cost Sensitivity Study Based on Cost-Optimum Mooring Design

Mooring Cost Sensitivity Study Based on Cost-Optimum Mooring Design Proceedngs of Conference 8 Korean Socety of Ocean Engneers May 9-3, Cheju, Korea Moorng Cost Senstvty Study Based on Cost-Optmum Moorng Desgn SAM SANGSOO RYU, CASPAR HEYL AND ARUN DUGGAL Research & Development,

More information

Harmony Search and OPF Based Hybrid Approach for Optimal Placement of Multiple DG Units

Harmony Search and OPF Based Hybrid Approach for Optimal Placement of Multiple DG Units Harmony Search and OPF Based Hybrd Approach for Optmal Placement of Multple Unts Sandeep Kaur Department of Electrcal Engneerng Indan Insttute of Rooree Rooree, Inda sandpsaroa@gmal.com. B. Kumbhar Department

More information

Distributed Uplink Scheduling in EV-DO Rev. A Networks

Distributed Uplink Scheduling in EV-DO Rev. A Networks Dstrbuted Uplnk Schedulng n EV-DO ev. A Networks Ashwn Srdharan (Sprnt Nextel) amesh Subbaraman, och Guérn (ESE, Unversty of Pennsylvana) Overvew of Problem Most modern wreless systems Delver hgh performance

More information

Power Distribution Strategy Considering Active Power Loss for DFIGs Wind Farm

Power Distribution Strategy Considering Active Power Loss for DFIGs Wind Farm Journal of Power and Energy Engneerng, 014,, 13-19 Publshed Onlne Aprl 014 n cres. http://www.scrp.org/journal/jpee http://dx.do.org/10.436/jpee.014.4030 Power Dstrbuton trategy Consderng Actve Power Loss

More information

Adaptive Modulation for Multiple Antenna Channels

Adaptive Modulation for Multiple Antenna Channels Adaptve Modulaton for Multple Antenna Channels June Chul Roh and Bhaskar D. Rao Department of Electrcal and Computer Engneerng Unversty of Calforna, San Dego La Jolla, CA 993-7 E-mal: jroh@ece.ucsd.edu,

More information

Master Physician Scheduling Problem 1

Master Physician Scheduling Problem 1 Master Physcan Schedulng Problem 1 Aldy Gunawan and Hoong Chun Lau School of Informaton Systems, Sngapore Management Unversty, Sngapore Abstract We study a real-world problem arsng from the operatons of

More information

Achieving Transparent Coexistence in a Multi-hop Secondary Network Through Distributed Computation

Achieving Transparent Coexistence in a Multi-hop Secondary Network Through Distributed Computation Achevng Transparent Coexstence n a Mult-hop econdary Network Through Dstrbuted Computaton Xu Yuan Y h Y. Thomas Hou Wenng Lou cott F. Mdkff astry Kompella Vrgna olytechnc Insttute and tate Unversty, UA

More information

A MODIFIED DIFFERENTIAL EVOLUTION ALGORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS

A MODIFIED DIFFERENTIAL EVOLUTION ALGORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS A MODIFIED DIFFERENTIAL EVOLUTION ALORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS Kaml Dmller Department of Electrcal-Electroncs Engneerng rne Amercan Unversty North Cyprus, Mersn TURKEY kdmller@gau.edu.tr

More information

MASTER TIMING AND TOF MODULE-

MASTER TIMING AND TOF MODULE- MASTER TMNG AND TOF MODULE- G. Mazaher Stanford Lnear Accelerator Center, Stanford Unversty, Stanford, CA 9409 USA SLAC-PUB-66 November 99 (/E) Abstract n conjuncton wth the development of a Beam Sze Montor

More information

Optimal Capacitor Placement in a Radial Distribution System using Plant Growth Simulation Algorithm

Optimal Capacitor Placement in a Radial Distribution System using Plant Growth Simulation Algorithm World Academy of Scence, Engneerng and Technology Internatonal Journal of Electrcal, omputer, Energetc, Electronc and ommuncaton Engneerng ol:, No:9, 8 Optmal apactor Placement n a Radal Dstrbuton System

More information

Probable Optimization of Reactive Power in distribution systems, in presence of distributed generation sources conjugated to network and islanding

Probable Optimization of Reactive Power in distribution systems, in presence of distributed generation sources conjugated to network and islanding IOSR Journal of Electrcal and Electroncs Engneerng (IOSR-JEEE) e-issn: 2278-1676,p-ISSN: 2320-3331, Volume 11, Issue 5 Ver. II (Sep - Oct 2016), PP 72-78 www.osrjournals.org Probable Optmzaton of Reactve

More information

Graph Method for Solving Switched Capacitors Circuits

Graph Method for Solving Switched Capacitors Circuits Recent Advances n rcuts, ystems, gnal and Telecommuncatons Graph Method for olvng wtched apactors rcuts BHUMIL BRTNÍ Department of lectroncs and Informatcs ollege of Polytechncs Jhlava Tolstého 6, 586

More information

Approaches Method to Solve Ships Routing Problem with an Application to the Indonesian National Shipping Company

Approaches Method to Solve Ships Routing Problem with an Application to the Indonesian National Shipping Company Approaches Method to Solve Shps Routng Problem wth an Applcaton to the Indonesan Natonal Shppng Company ISMAIL YUSUF 1,2), ACHMAD YANI 2,3), and MOHD. SAFIYAN BABA 1) Department of Artfcal Intellgence,

More information

Research Article Dynamic Relay Satellite Scheduling Based on ABC-TOPSIS Algorithm

Research Article Dynamic Relay Satellite Scheduling Based on ABC-TOPSIS Algorithm Mathematcal Problems n Engneerng Volume 2016, Artcle ID 3161069, 11 pages http://dx.do.org/10.1155/2016/3161069 Research Artcle Dynamc Relay Satellte Schedulng Based on ABC-TOPSIS Algorthm Shufeng Zhuang,

More information

APPLICATION OF BINARY VERSION GSA FOR SHUNT CAPACITOR PLACEMENT IN RADIAL DISTRIBUTION SYSTEM

APPLICATION OF BINARY VERSION GSA FOR SHUNT CAPACITOR PLACEMENT IN RADIAL DISTRIBUTION SYSTEM IJRET: Internatonal Journal of Research n Engneerng and Technology eissn: 39-63 pissn: 3-7308 APPLICATION OF BINARY ERSION GSA FOR SHUNT CAPACITOR PLACEMENT IN RADIAL DISTRIBUTION SYSTEM Nasm Al Khan,

More information

Resource Allocation Optimization for Device-to- Device Communication Underlaying Cellular Networks

Resource Allocation Optimization for Device-to- Device Communication Underlaying Cellular Networks Resource Allocaton Optmzaton for Devce-to- Devce Communcaton Underlayng Cellular Networks Bn Wang, L Chen, Xaohang Chen, Xn Zhang, and Dacheng Yang Wreless Theores and Technologes (WT&T) Bejng Unversty

More information

Evolutionary Programming for Reactive Power Planning Using FACTS Devices

Evolutionary Programming for Reactive Power Planning Using FACTS Devices Bplab Bhattacharyya, kash Kumar Gupta,. Das Evolutonary Programmng for Reactve Power Plannng Usng Devces BIPLAB BHATTACHARYYA *, IKAH KUMAR GUPTA 2 AND.DA 3, 2, 3 Department of Electrcal Engneerng, Indan

More information

Review: Our Approach 2. CSC310 Information Theory

Review: Our Approach 2. CSC310 Information Theory CSC30 Informaton Theory Sam Rowes Lecture 3: Provng the Kraft-McMllan Inequaltes September 8, 6 Revew: Our Approach The study of both compresson and transmsson requres that we abstract data and messages

More information

Traffic balancing over licensed and unlicensed bands in heterogeneous networks

Traffic balancing over licensed and unlicensed bands in heterogeneous networks Correspondence letter Traffc balancng over lcensed and unlcensed bands n heterogeneous networks LI Zhen, CUI Qme, CUI Zhyan, ZHENG We Natonal Engneerng Laboratory for Moble Network Securty, Bejng Unversty

More information

Subcarrier allocation for OFDMA wireless channels using lagrangian relaxation methods

Subcarrier allocation for OFDMA wireless channels using lagrangian relaxation methods Unversty of Wollongong Research Onlne Faculty of Informatcs - Papers (Archve) Faculty of Engneerng and Informaton Scences 2006 Subcarrer allocaton for OFDMA wreless channels usng lagrangan relaxaton methods

More information

Yutaka Matsuo and Akihiko Yokoyama. Department of Electrical Engineering, University oftokyo , Hongo, Bunkyo-ku, Tokyo, Japan

Yutaka Matsuo and Akihiko Yokoyama. Department of Electrical Engineering, University oftokyo , Hongo, Bunkyo-ku, Tokyo, Japan Optmzaton of Installaton of FACTS Devce n Power System Plannng by both Tabu Search and Nonlnear Programmng Methods Yutaka Matsuo and Akhko Yokoyama Department of Electrcal Engneerng, Unversty oftokyo 7-3-,

More information

Ergodic Capacity of Block-Fading Gaussian Broadcast and Multi-access Channels for Single-User-Selection and Constant-Power

Ergodic Capacity of Block-Fading Gaussian Broadcast and Multi-access Channels for Single-User-Selection and Constant-Power 7th European Sgnal Processng Conference EUSIPCO 29 Glasgow, Scotland, August 24-28, 29 Ergodc Capacty of Block-Fadng Gaussan Broadcast and Mult-access Channels for Sngle-User-Selecton and Constant-Power

More information

MASTER'S THESIS. Resource Allocation in Ka-band Satellite Systems. by Youyu Feng Advisor: John S. Baras CSHCN MS (ISR MS )

MASTER'S THESIS. Resource Allocation in Ka-band Satellite Systems. by Youyu Feng Advisor: John S. Baras CSHCN MS (ISR MS ) MASTER'S THESIS Resource Allocaton n Ka-band Satellte Systems by Youyu Feng Advsor: John S. Baras CSHCN MS 2001-1 (ISR MS 2001-2) Report Documentaton Page Form Approved OMB No. 0704-0188 Publc reportng

More information

TRAIN PLATFORMING PROBLEM Ľudmila JÁNOŠÍKOVÁ 1, Michal KREMPL 2

TRAIN PLATFORMING PROBLEM Ľudmila JÁNOŠÍKOVÁ 1, Michal KREMPL 2 GIS Ostrava 2014 - Geonformatcs for Intellgent Transportaton Abstract TRAIN PLATFORMING PROBLEM Ľudmla JÁNOŠÍKOVÁ 1, Mchal KREMPL 2 1 Department of Transportaton Networks, Faculty of Management Scence

More information

Optimal Reconfiguration of Distribution System by PSO and GA using graph theory

Optimal Reconfiguration of Distribution System by PSO and GA using graph theory Proceedngs of the 6th WSEAS Internatonal Conference on Applcatons of Electrcal Engneerng, Istanbul, Turkey, May 27-29, 2007 83 Optmal Reconfguraton of Dstrbuton System by PSO and GA usng graph theory Mehd

More information

Optimization of Shortest Path of Multiple Transportation Model Based on Cost Analyses

Optimization of Shortest Path of Multiple Transportation Model Based on Cost Analyses Optmzaton of Shortest Path of Multple Transportaton Model Based on Cost Analyses Yang Yang 1,2 Ruyng Wang 1 Qanqan Zhang 1 1 Chna Unversty of Mnng & Technology (Bejng), School of Management, Bejng, 100083,

More information

Planning of Relay Station Locations in IEEE (WiMAX) Networks

Planning of Relay Station Locations in IEEE (WiMAX) Networks Ths full text paper was peer revewed at the drecton of IEEE Communcatons Socety subject matter experts for publcaton n the WCNC 010 proceedngs. Plannng of Relay Staton Locatons n IEEE 0.16 (WMAX) Networks

More information

Decomposition Principles and Online Learning in Cross-Layer Optimization for Delay-Sensitive Applications

Decomposition Principles and Online Learning in Cross-Layer Optimization for Delay-Sensitive Applications Techncal Report Decomposton Prncples and Onlne Learnng n Cross-Layer Optmzaton for Delay-Senstve Applcatons Abstract In ths report, we propose a general cross-layer optmzaton framework n whch we explctly

More information

NATIONAL RADIO ASTRONOMY OBSERVATORY Green Bank, West Virginia SPECTRAL PROCESSOR MEMO NO. 25. MEMORANDUM February 13, 1985

NATIONAL RADIO ASTRONOMY OBSERVATORY Green Bank, West Virginia SPECTRAL PROCESSOR MEMO NO. 25. MEMORANDUM February 13, 1985 NATONAL RADO ASTRONOMY OBSERVATORY Green Bank, West Vrgna SPECTRAL PROCESSOR MEMO NO. 25 MEMORANDUM February 13, 1985 To: Spectral Processor Group From: R. Fsher Subj: Some Experments wth an nteger FFT

More information

Energy-efficient Subcarrier Allocation in SC-FDMA Wireless Networks based on Multilateral Model of Bargaining

Energy-efficient Subcarrier Allocation in SC-FDMA Wireless Networks based on Multilateral Model of Bargaining etworkng 03 569707 Energy-effcent Subcarrer Allocaton n SC-FDMA Wreless etworks based on Multlateral Model of Barganng Ern Elen Tsropoulou Aggelos Kapoukaks and Symeon apavasslou School of Electrcal and

More information

Modified Bat Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem

Modified Bat Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem Avalable onlne at www.jpe-onlne.com vol., no. 7, November 07, pp. 999-0 DOI: 0.90/jpe.7.07.p.9990 Modfed Bat Algorthm for the Mult-Objectve Flexble Job Shop Schedulng Problem Haodong Zhu a,b, Baofeng He

More information

29. Network Functions for Circuits Containing Op Amps

29. Network Functions for Circuits Containing Op Amps 9. Network Functons for Crcuts Contanng Op Amps Introducton Each of the crcuts n ths problem set contans at least one op amp. Also each crcut s represented by a gven network functon. These problems can

More information

Optimal Grid Topology using Genetic Algorithm to Maintain Network Security

Optimal Grid Topology using Genetic Algorithm to Maintain Network Security Internatonal Journal of Engneerng Scences, 2(8) August 23, Pages: 388-398 TI Journals Internatonal Journal of Engneerng Scences www.tournals.com ISSN 236-6474 Optmal Grd Topology usng Genetc Algorthm to

More information

Resource Control for Elastic Traffic in CDMA Networks

Resource Control for Elastic Traffic in CDMA Networks Resource Control for Elastc Traffc n CDMA Networks Vaslos A. Srs Insttute of Computer Scence, FORTH Crete, Greece vsrs@cs.forth.gr ACM MobCom 2002 Sep. 23-28, 2002, Atlanta, U.S.A. Funded n part by BTexact

More information

Inverse Halftoning Method Using Pattern Substitution Based Data Hiding Scheme

Inverse Halftoning Method Using Pattern Substitution Based Data Hiding Scheme Proceedngs of the World Congress on Engneerng 2011 Vol II, July 6-8, 2011, London, U.K. Inverse Halftonng Method Usng Pattern Substtuton Based Data Hdng Scheme Me-Y Wu, Ja-Hong Lee and Hong-Je Wu Abstract

More information

An Algorithm Forecasting Time Series Using Wavelet

An Algorithm Forecasting Time Series Using Wavelet IJCSI Internatonal Journal of Computer Scence Issues, Vol., Issue, No, January 04 ISSN (Prnt): 94-084 ISSN (Onlne): 94-0784 www.ijcsi.org 0 An Algorthm Forecastng Tme Seres Usng Wavelet Kas Ismal Ibraheem,Eman

More information

Modelling and performance analysis of dual-channel switched reluctance motor

Modelling and performance analysis of dual-channel switched reluctance motor RCHIVES OF ELECRICL ENGINEERING VOL. 64 pp. 89-05 05 DOI 0.55/aee-05-0009 Modellng and performance analyss of dual-channel swtched reluctance motor PIOR OGUSZ MRIUSZ KORKOSZ JN PROKOP Rzeszow Unversty

More information

Performance Analysis of the Weighted Window CFAR Algorithms

Performance Analysis of the Weighted Window CFAR Algorithms Performance Analyss of the Weghted Wndow CFAR Algorthms eng Xangwe Guan Jan He You Department of Electronc Engneerng, Naval Aeronautcal Engneerng Academy, Er a road 88, Yanta Cty 6400, Shandong Provnce,

More information

Desensitized Kalman Filtering with Analytical Gain

Desensitized Kalman Filtering with Analytical Gain Desenstzed Kalman Flterng wth Analytcal Gan ashan Lou School of Electrc and Informaton Engneerng, Zhengzhou Unversty of Lght Industry, Zhengzhou, 45002, Chna, tayzan@sna.com Abstract: he possble methodologes

More information

Joint Power Control and Scheduling for Two-Cell Energy Efficient Broadcasting with Network Coding

Joint Power Control and Scheduling for Two-Cell Energy Efficient Broadcasting with Network Coding Communcatons and Network, 2013, 5, 312-318 http://dx.do.org/10.4236/cn.2013.53b2058 Publshed Onlne September 2013 (http://www.scrp.org/journal/cn) Jont Power Control and Schedulng for Two-Cell Energy Effcent

More information

Shunt Active Filters (SAF)

Shunt Active Filters (SAF) EN-TH05-/004 Martt Tuomanen (9) Shunt Actve Flters (SAF) Operaton prncple of a Shunt Actve Flter. Non-lnear loads lke Varable Speed Drves, Unnterrupted Power Supples and all knd of rectfers draw a non-snusodal

More information

An Application-Aware Spectrum Sharing Approach for Commercial Use of 3.5 GHz Spectrum

An Application-Aware Spectrum Sharing Approach for Commercial Use of 3.5 GHz Spectrum An Applcaton-Aware Spectrum Sharng Approach for Commercal Use of 3.5 GHz Spectrum Haya Shajaah, Ahmed Abdelhad and Charles Clancy Bradley Department of Electrcal and Computer Engneerng Hume Center, Vrgna

More information

CZECH TECHNICAL UNIVERSITY IN PRAGUE FACULTY OF ELECTRICAL ENGINEERING DIPLOMA THESIS. Scheduling and Visualization of Manufacturing Processes

CZECH TECHNICAL UNIVERSITY IN PRAGUE FACULTY OF ELECTRICAL ENGINEERING DIPLOMA THESIS. Scheduling and Visualization of Manufacturing Processes CZECH TECHNICAL UNIVERSITY IN PRAGUE FACULTY OF ELECTRICAL ENGINEERING DIPLOMA THESIS Schedulng and Vsualzaton of Manufacturng Processes Prague, 2008 Author: Roman Čapek Schedulng and Vsualzaton of Manufacturng

More information

Coverage Control for Multiple Event Types with Heterogeneous Robots

Coverage Control for Multiple Event Types with Heterogeneous Robots Coverage Control for Multple Event Types wth Heterogeneous Robots Armn Sadegh Stephen L. Smth Abstract Ths paper focuses on the problem of deployng a set of autonomous robots to effcently montor multple

More information

Control Chart. Control Chart - history. Process in control. Developed in 1920 s. By Dr. Walter A. Shewhart

Control Chart. Control Chart - history. Process in control. Developed in 1920 s. By Dr. Walter A. Shewhart Control Chart - hstory Control Chart Developed n 920 s By Dr. Walter A. Shewhart 2 Process n control A phenomenon s sad to be controlled when, through the use of past experence, we can predct, at least

More information

熊本大学学術リポジトリ. Kumamoto University Repositor

熊本大学学術リポジトリ. Kumamoto University Repositor 熊本大学学術リポジトリ Kumamoto Unversty Repostor Ttle Wreless LAN Based Indoor Poston and Its Smulaton Author(s) Ktasuka, Teruak; Nakansh, Tsune CtatonIEEE Pacfc RIM Conference on Comm Computers, and Sgnal Processng

More information

Generalized Incomplete Trojan-Type Designs with Unequal Cell Sizes

Generalized Incomplete Trojan-Type Designs with Unequal Cell Sizes Internatonal Journal of Theoretcal & Appled Scences 6(1): 50-54(2014) ISSN No. (Prnt): 0975-1718 ISSN No. (Onlne): 2249-3247 Generalzed Incomplete Trojan-Type Desgns wth Unequal Cell Szes Cn Varghese,

More information

Approximating User Distributions in WCDMA Networks Using 2-D Gaussian

Approximating User Distributions in WCDMA Networks Using 2-D Gaussian CCCT 05: INTERNATIONAL CONFERENCE ON COMPUTING, COMMUNICATIONS, AND CONTROL TECHNOLOGIES 1 Approxmatng User Dstrbutons n CDMA Networks Usng 2-D Gaussan Son NGUYEN and Robert AKL Department of Computer

More information

The Impact of Spectrum Sensing Frequency and Packet- Loading Scheme on Multimedia Transmission over Cognitive Radio Networks

The Impact of Spectrum Sensing Frequency and Packet- Loading Scheme on Multimedia Transmission over Cognitive Radio Networks Ths artcle has been accepted for publcaton n a future ssue of ths journal, but has not been fully edted. Content may change pror to fnal publcaton. The Impact of Spectrum Sensng Frequency and Pacet- Loadng

More information

Optimal Transmission Scheduling of Cooperative Communications with A Full-duplex Relay

Optimal Transmission Scheduling of Cooperative Communications with A Full-duplex Relay 1 Optmal Transmsson Schedulng of Cooperatve Communcatons wth A Full-duplex Relay Peng L Member IEEE Song Guo Senor Member IEEE Wehua Zhuang Fellow IEEE Abstract Most exstng research studes n cooperatve

More information

Profile Optimization of Satellite Antenna for Angular Jerk Minimization

Profile Optimization of Satellite Antenna for Angular Jerk Minimization Profle Optmzaton of Satellte Antenna for Angular Jerk Mnmzaton Jangwon Lee, Hyosung Ahn, Kwanghee Ko 3 and Semyung Wang 4 Gwangu Insttute of Scence and Technology, Gwangu, Korea, 500-7 and Daekwan Km 5,

More information

High Speed, Low Power And Area Efficient Carry-Select Adder

High Speed, Low Power And Area Efficient Carry-Select Adder Internatonal Journal of Scence, Engneerng and Technology Research (IJSETR), Volume 5, Issue 3, March 2016 Hgh Speed, Low Power And Area Effcent Carry-Select Adder Nelant Harsh M.tech.VLSI Desgn Electroncs

More information

Medium Term Load Forecasting for Jordan Electric Power System Using Particle Swarm Optimization Algorithm Based on Least Square Regression Methods

Medium Term Load Forecasting for Jordan Electric Power System Using Particle Swarm Optimization Algorithm Based on Least Square Regression Methods Journal of Power and Energy Engneerng, 2017, 5, 75-96 http://www.scrp.org/journal/jpee ISSN Onlne: 2327-5901 ISSN Prnt: 2327-588X Medum Term Load Forecastng for Jordan Electrc Power System Usng Partcle

More information

An Optimization Approach for Airport Slot Allocation under IATA Guidelines

An Optimization Approach for Airport Slot Allocation under IATA Guidelines An Optmzaton Approach for Arport Slot Allocaton under IATA Gudelnes Abstract Ar traffc demand has grown to exceed avalable capacty durng extended parts of each day at many of the busest arports worldwde.

More information

Toward Transparent Coexistence for Multi-hop Secondary Cognitive Radio Networks

Toward Transparent Coexistence for Multi-hop Secondary Cognitive Radio Networks IEEE JOURNAL ON ELECTED AREA IN COMMUNICATION, VOL.??, NO.??, MONTH YEAR Toward Transparent Coexstence for Mult-hop econdary Cogntve Rado Networks Xu Yuan, tudent Member, IEEE, Canmng Jang, Y h, enor Member,

More information

On channel assignment and multicast routing in multi-channel multi-radio wireless mesh networks. Mohsen Jahanshahi*

On channel assignment and multicast routing in multi-channel multi-radio wireless mesh networks. Mohsen Jahanshahi* Int. J. Ad Hoc and Ubqutous Computng, Vol. 12, No. 4, 2013 225 On channel assgnment and multcast routng n mult-channel mult-rado wreless mesh networks Mohsen Jahanshah* Computer Engneerng Department, Scences

More information